A. PEKERJAAN
No JENIS PEKERJAAN Volume Satuan LOKASI PEKERJAAN VOLUME SATUAN KETERANGAN
Pabrikasi Bekisiting Dinding 24 Mtr B111 24 Mtr
Pabrikasi Pembesian Dinding 24 Btg B111 24 Btg
Instal Bekisiting Pondasi 24 Mtr B112-B113
Instal Pembesian Pondasi 145 Btg B112-B113
Cetak beton Tahu 300 Bh B112-B113
Prosess dewatering 1 Lot B112-B113
Pengecoran Pondasi 20 M3 B112-B113
Galian Pondasi 540 M3
B. BAHAN/MATERIAL C. PERALATAN
No Jenis Bahan/Material Volume Satuan No Jenis Peralatan Jumlah Satuan
Triplek Playwood 65 Lbr Vibrator 1 Unit
Kayu 2 x 3 150 Btg Pompa Air 1 Unit
Besi D 13 72 Btg
Besi D 10 95 Btg
Kawat Beton 1 Roll
Bambu 100 Btg