2 Item Pekerjaan : Pekerjaan Instalasi Tata Udara Ducting Supply & Return
7 Referensi
a. Gbr. DED : No. .... RKS Hal…….Bab ...... Psl ...... BoQ No. .......
b. Risalah Rapat : No. ................................. e. Syarat K3 : ........................................
c. Gbr. Shopdrawing No. : ........................................ f. Lainnya : ........................................
d. Metode Kerja : √ ADA TIDAK ADA
Keterangan : Beri tanda " √ " pada kotak pilihan
No URAIAN PEKERJAAN SAT EST. VOLUME KETERANGAN
KETERANGAN:
No MATERIAL UTAMA VOL. SAT. RENCANA ALAT VOL. SAT. RENCANA TENAGA VOL. SAT.
1 Ducting PIR Sheet 66 Lembar Water pass 1 lot a. Pelaksana 1 org.
2 Material Bantu 1 Lot Tubbing catter 1 Unit b. Quality Control 1 org.
3 Support 1 Lot Vacumm Pump 1 Unit c. Inspektor K3 1 org.
4 Flexible Round Duct 6 Roll Konci pas torsi 1 Unit d. Pekerja 2 org.
5 Accecories 1 Lot Manifol gauge secukupnya
JUMLAH 5 org.
EVALUASI DAN REKOMENDASI *) diisi oleh Konsultan MK
1. Dasar Pemeriksaan : Keterangan : Beri tanda " √ " pada kotak pilihan
- Dok. RKS : Sesuai Tidak Sesuai
- Dok. Gambar : Sesuai Tidak Sesuai
- BoQ : Sesuai Tidak Sesuai
- Risalah Rapat : Sesuai Tidak Sesuai
- Metode Kerja : Sesuai Tidak Sesuai
- Syarat K3 : Sesuai Tidak Sesuai
- Lainnya : ……………………………..
2. Kesimpulan : DITERIMA/DISETUJUI DISETUJUI DGN CATATAN DITOLAK DENGAN REKOMENDASI
TGL : ....................... ..........................................................
Catatan Konsultan MK Diperiksa/Disetujui Oleh Dibuat Oleh :
Konsultan MK Kontraktor
PT Virama Karya KSO PT Laras Waskita - Nindya KSO
Sembada