SAT JUMLAH HARGA 2017

NO URAIAN PEKERJAAN KODE


UAN BAHAN UPAH TOTAL
I PEKERJAAN PERSIAPAN DAN PEKERJAAN TANAH
SNI 2835:2008 SNI
1 Menggali tanah biasa sedalam 1 m m3 2835.01 - 44,547.25 44,547.25
2 Menggali tanah biasa sedalam 2 m m3 2835.02 - 54,692.55 54,692.55
3 Menggali tanah biasa sedalam 3 m m3 2835.03 - 65,002.63 65,002.63
4 Menggali tanah keras sedalam 1 m m3 2835.04 - 59,286.48 59,286.48
5 Menggali tanah cadas sedalam 1 m m3 2835.05 - 89,918.40 89,918.40
6 Menggali tanah lumpur sedalam 1 m m3 2835.06 - 71,687.55 71,687.55
7 Mengerjakan stripping tebing setinggi 1 m m2 2835.07 - 3,244.45 3,244.45
8 Membuang tanah sejauh 30 m m3 2835.08 - 19,518.40 19,518.40
9 Mengurug kembali galian m3 2835.09 - 14,849.08 14,849.08
10 Memadatkan tanah (per 20 cm) m3 2835.10 - 32,444.50 32,444.50
11 Mengurug pasir urug m3 2835.11 145,945.80 17,818.90 163,764.70
12 Memasang lapisan pudel 1 KP : 3 PP : 7 TL m3 2835.12 160,790.57 82,757.40 243,547.97
13 Memasang lapisan pudel 1 KP : 5 TL m3 2835.13 117,775.94 75,189.40 192,965.34
14 Memasang lapisan ijuk tebal 10 cm m2 2835.14 92,400.00 9,733.35 102,133.35
15 Mengurug sirtu padat m3 2835.15 159,896.88 16,222.25 176,119.13
16 Mengurug tanah urug m3 2835.16 58,378.32 17,818.90 76,197.22
17 Mengurug tanah kembali dipadatkan m3 2835.17 - 39,598.70 39,598.70
18 Membongkar genteng/sirap (bongkaran digunakan) m3 2835.18 - 32,444.50 32,444.50
19 Membongkar genteng/sirap (bongkaran tidak digunakan) m3 2835.19 - 6,488.90 6,488.90
20 Membongkar rangka atap, reng kaso (bongkaran digunakan) m3 2835.20 - 20,689.35 20,689.35
21 Membongkar rangka atap, reng kaso (bongkaran tidak digunakan) m3 2835.21 - 15,294.95 15,294.95
22 Membongkar rangka atap, gording, kuda-kuda (bongkaran digunaka m3 2835.22 - 692,588.60 692,588.60
23 Membongkar rangka atap, gording, kuda-kuda (bongkaran tidak dig m3 2835.23 - 461,242.10 461,242.10
24 Membongkar plafon (bongkaran digunakan) m3 2835.24 - 29,623.55 29,623.55
25 Membongkar plafon (bongkaran tidak digunakan) m3 2835.25 - 9,733.35 9,733.35

II PEKERJAAN BETON
SNI 7394:2008 SNI
1 Membuat beton mutu f'c = 7,4 MPa (K 100) m3 7394.01 668,844.55 121,555.61 790,400.16
2 Membuat beton mutu f'c = 9,8 MPa (K 125) m3 7394.02 704,416.90 121,555.61 825,972.51
3 Membuat beton mutu f'c = 12,2 MPa (K 150) m3 7394.03 732,576.35 121,555.61 854,131.96
4 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100) m3 7394.04 652,239.50 88,346.50 740,586.00
5 Membuat beton mutu f'c = 14,5 MPa (K 175) m3 7394.05 765,521.90 121,555.61 887,077.51
6 Membuat beton mutu f'c = 16,9 MPa (K 200) m3 7394.06 797,580.30 121,555.61 919,135.91
7 Membuat beton mutu f'c = 19,3 MPa (K 225) m3 7394.07 820,733.65 121,555.61 942,289.26
8 Membuat beton mutu f'c = 21,7 MPa (K 250) m3 7394.08 837,161.60 121,555.61 958,717.21
9 Membuat beton mutu f'c = 24,0 MPa (K 275) m3 7394.09 865,451.40 121,555.61 987,007.01
10 Membuat beton mutu f'c = 26,4 MPa (K 300) m3 7394.10 874,246.45 121,555.61 995,802.06
11 Membuat beton mutu f'c = 28,8 MPa (K 325) m3 7394.11 907,432.35 154,606.38 1,062,038.73
12 Membuat beton mutu f'c = 31,2 MPa (K 350) m3 7394.12 918,964.20 154,606.38 1,073,570.58
13 Pembesian dengan besi polos atau besi ulir kg 7394.17 11,875.79 969.31 12,845.11
14 Memasang bekisting untuk pondasi m2 7394.20 31,407.75 51,650.17 83,057.92
15 Memasang bekisting untuk sloof dan ringbalk m2 7394.21 31,407.75 51,650.17 83,057.92
16 Memasang bekisting untuk kolom m2 7394.22 58,067.90 65,555.99 123,623.89
17 Memasang bekisting untuk balok dan konsol m2 7394.23 63,344.60 65,555.99 128,900.59
18 Memasang bekisting untuk plat lantai m2 7394.24 96,536.00 65,555.99 162,091.99
19 Memasang bekisting untuk dinding m2 7394.25 76,809.15 65,555.99 142,365.14
20 Memasang bekisting untuk tangga m2 7394.26 84,128.00 65,555.99 149,683.99
21 Memasang jembatan untuk pengecoran beton m2 7394.27 97,490.25 13,012.40 110,502.65
22 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 7394.28 3,186,344.14 524,468.56 3,710,812.70
23 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 7394.29 3,636,045.24 538,926.85 4,174,972.09
24 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 7394.30 6,588,277.01 738,894.04 7,327,171.05
25 Membuat balok beton bertulang (200 kg besi + bekisting) m3 7394.31 5,011,086.56 642,374.54 5,653,461.10
26 Membuat plat beton bertulang (150 kg besi + bekisting) m3 7394.32 4,610,518.54 524,696.43 5,135,214.96
27 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 7394.33 4,363,757.74 524,468.56 4,888,226.30
28 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 7394.34 4,641,724.16 592,819.54 5,234,543.70
29 Membuat kolom praktis beton bertulang (11 x 11) cm m 7394.35 49,163.36 15,565.44 64,728.80
30 Membuat ring balok beton bertulang (10 x 15) cm m 7394.36 63,197.71 25,702.93 88,900.64
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
31 Membuat beton bertulang (100 kg besi + bekisting) m3 7394.37 2,837,488.76 592,819.54 3,430,308.30
32 Membuat beton bertulang (125 kg besi + bekisting) m3 7394.38 3,130,796.06 592,819.54 3,723,615.60
33 Membuat beton bertulang (150 kg besi + bekisting) m3 7394.39 3,418,569.26 592,819.54 4,011,388.80
34 Membuat beton bertulang (175 kg besi + bekisting) m3 7394.40 3,709,109.51 592,819.54 4,301,929.05
35 Membuat beton bertulang (200 kg besi + bekisting) m3 7394.41 3,999,649.76 592,819.54 4,592,469.30
36 Membuat beton bertulang (225 kg besi + bekisting) m3 7394.42 4,290,190.01 592,819.54 4,883,009.55
37 Membuat beton bertulang (250 kg besi + bekisting) m3 7394.43 4,580,730.26 592,819.54 5,173,549.80
38 Membuat beton bertulang (275 kg besi + bekisting) m3 7394.44 4,871,270.51 592,819.54 5,464,090.05
39 Membuat beton bertulang (300 kg besi + bekisting) m3 7394.45 5,161,810.76 592,819.54 5,754,630.30
40 Membuat beton bertulang (325 kg besi + bekisting) m3 7394.46 5,452,351.01 592,819.54 6,045,170.55
41 Membuat beton bertulang (350 kg besi + bekisting) m3 7394.47 5,742,891.26 592,819.54 6,335,710.80
42 Membuat beton campuran 1:2:3 m3 7394.48 737,459.08 121,555.61 859,014.69
III PEKERJAAN PASANGAN BATU DAN PONDASI
SNI 2836:2008 SNI
1 Memasang batu belah campuran 1 PC : 3 PP m3 2836.01 581,899.89 148,990.88 730,890.77
2 Memasang batu belah campuran 1 PC : 4 PP m3 2836.02 533,148.33 148,990.88 682,139.21
3 Memasang batu belah campuran 1 PC : 5 PP m3 2836.03 499,349.14 148,990.88 648,340.01
4 Memasang batu belah campuran 1 PC : 6 PP m3 2836.04 475,587.68 148,990.88 624,578.56
5 Memasang batu belah campuran 1 PC : 8 PP m3 2836.05 443,017.15 148,990.88 592,008.02
6 Memasang batu belah campuran 1 PC : 3 KP : 10 PP m3 2836.07 463,320.86 148,990.88 612,311.73
7 Memasang batu kosong (aanstamping) m3 2836.09 291,562.13 77,475.26 369,037.38
8 Pasang pondasi siklop, 60% beton camp 1PC:2PB:3KR m3 2836.10 1,969,551.36 272,164.48 2,241,715.83
9 Memasang pondasi sumuran, diameter 100 cm m3 2836.11 572,747.67 220,658.61 793,406.28
10 Memasang batu bronjong kawat 3mm m3 2836.12 1,069,679.52 249,357.60 1,319,037.12
IV PEKERJAAN DINDING
SNI 6897:2008 SNI
1 Memasang dinding bata merah 1 bata, camp 1 PC : 3 PP m2 6897.02 162,423.05 51,884.80 214,307.85
2 Memasang dinding bata merah 1 bata, camp 1 PC : 4 PP m2 6897.03 153,642.27 51,884.80 205,527.07
3 Memasang dinding bata merah 1 bata, camp 1 PC : 5 PP m2 6897.04 149,267.12 51,884.80 201,151.92
4 Memasang dinding bata merah 1 bata, camp 1 PC : 6 PP m2 6897.05 148,119.54 51,884.80 200,004.34
5 Pasang dinding bata merah 1 bata, camp 1PC:3KP:10PP m2 6897.06 135,766.92 51,884.80 187,651.72
6 Pasang dinding bata merah 1/2 bata, camp 1 PC : 2 PP m2 6897.07 83,204.76 25,942.40 109,147.16
7 Pasang dinding bata merah 1/2 bata, camp 1 PC : 3 PP m2 6897.08 77,039.61 25,942.40 102,982.01
8 Pasang dinding bata merah 1/2 bata, camp 1 PC : 4 PP m2 6897.09 73,540.47 25,942.40 99,482.87
9 Pasang dinding bata merah 1/2 bata, camp 1 PC : 5 PP m2 6897.10 71,341.84 25,942.40 97,284.24
10 Pasang dinding bata merah 1/2 bata, camp 1 PC : 6 PP m2 6897.11 70,221.29 25,942.40 96,163.69
11 Pasang dinding bata merah 1/2 bata, camp 1 PC : 8 PP m2 6897.12 67,814.18 25,942.40 93,756.58
12 Pasang dinding bata merah 1/2 bata, camp 1PC:3KP:10PP m2 6897.13 68,157.38 25,942.40 94,099.78
13 Pasang dinding bata merah 1/2 bata, camp 1KP:1SM:1PP m2 6897.14 56,036.02 25,942.40 81,978.42
14 Pasang dinding bata merah 1/2 bata, camp 1 KP:1SM:2PP m2 6897.15 57,179.82 25,942.40 83,122.22
15 Memasang roster 12 x 11 x 24 cm, camp 1 PC : 3 PP m2 6897.22 343,393.91 25,942.40 369,336.31
16 Memasang roster 12 x 11 x 24 cm, campuran 1 PC : 4 PP m2 6897.23 339,707.94 25,942.40 365,650.34

V PEKERJAAN PLESTERAN
SNI 2837:2008 SNI
1 Memasang plesteran 1 PC : 1 PP, tebal 15 mm m2 2837.01 25,617.48 29,798.18 55,415.65
2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm m2 2837.02 18,863.30 29,798.18 48,661.48
3 Memasang plesteran 1 PC : 3 PP, tebal 15 mm m2 2837.03 15,970.64 29,798.18 45,768.82
4 Memasang plesteran 1 PC : 4 PP, tebal 15 mm m2 2837.04 13,971.67 29,798.18 43,769.85
6 Memasang plesteran 1 PC : 6 PP, tebal 15 mm m2 2837.06 11,975.79 29,798.18 41,773.97
7 Memasang plesteran 1 PC : 8 PP, tebal 15 mm m2 2837.08 11,013.12 29,798.18 40,811.29
8 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm m2 2837.09 11,683.39 31,130.88 42,814.27
9 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm m2 2837.10 9,639.63 31,130.88 40,770.51
10 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm m2 2837.11 3,974.32 31,130.88 35,105.20
11 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm m2 2837.12 4,759.09 31,130.88 35,889.97
12 Memasang plesteran 1 PC : 2 PP, tebal 20 mm m2 2837.13 25,220.57 39,895.68 65,116.25
13 Memasang plesteran 1 PC : 3 PP, tebal 20 mm m2 2837.14 21,363.69 39,895.68 61,259.37
14 Memasang plesteran 1 PC : 4 PP, tebal 20 mm m2 2837.15 18,628.90 39,895.68 58,524.58
15 Memasang plesteran 1 PC : 5 PP, tebal 20 mm m2 2837.16 17,230.87 39,895.68 57,126.55
16 Memasang plesteran 1 PC : 6 PP, tebal 20 mm m2 2837.17 15,967.72 39,895.68 55,863.40
17 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm m2 2837.18 5,696.33 43,703.99 49,400.32
18 Memasang berapen 1 PC : 5 PP, tebal 15 mm m2 2837.19 12,871.03 14,978.26 27,849.29
19 Memasang plesteran skoning 1 PC : 2 PP, lebar 10 mm m 2837.20 12,871.03 14,978.26 27,849.29
20 Memasang plesteran ciprat 1 PC : 2 PP m2 2837.23 7,459.45 25,942.40 33,401.85
21 Finishing siar pasangan dinding bata merah (=20 m') m2 2837.24 4,466.66 14,978.26 19,444.92
22 Finishing siar pasangan dinding conblock ekspose (=8 m') m2 2837.25 2,299.44 7,032.08 9,331.52
23 Finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 2837.26 11,613.46 29,798.18 41,411.63
24 Memasang acian m2 2837.27 4,670.74 19,865.45 24,536.19
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
SNI 7395:2008
1 Memasang lantai ubin granit ukuran (40 x 40) cm m2 7395.09 107,423.87 24,910.99 132,334.85
2 Memasang lantai ubin granit ukuran (30 x 30) cm m2 7395.10 97,781.61 25,825.09 123,606.69
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
3 Memasang plint ubin granit ukuran (10 x 40) cm m 7395.24 25,946.34 12,450.85 38,397.18
4 Memasang plint ubin granit ukuran (10 x 30) cm m 7395.25 29,807.34 12,450.85 42,258.18
5 Memasang lantai keramik artistik ukuran (10 x 20) cm m2 7395.32 193,008.82 69,529.08 262,537.89
6 Pasang lantai keramik artistik 10 x 10) atau (5 x 20) cm m2 7395.33 790,652.65 69,529.08 860,181.72
7 Pasang lantai keramik ukuran (33 x 33) cm kelas I m2 7395.34 130,315.07 69,529.08 199,844.14
8 Pasang lantai keramik ukuran (30 x 30) cm kelas I m2 7395.35 146,312.60 69,529.08 215,841.67
9 Pasang lantai keramik ukuran (20 x 20) cm kelas I m2 7395.36 89,431.06 69,529.08 158,960.13
10 Pasang lantai keramik uk (10 x 33) cm, variasi/border m2 7395.37 164,406.96 104,372.79 268,779.74
11 Pasang lantai mosaik uk (30 x 30) cm, camp 1PC:3PP m2 7395.38 329,499.54 69,529.08 399,028.61
12 Memasang plint keramik ukuran (10 x 20) cm m 7395.39 15,269.08 12,450.85 27,719.92
13 Memasang plint keramik ukuran (10 x 10) cm m 7395.40 19,270.47 12,450.85 31,721.31
14 Memasang plint keramik ukuran (5 x 20) cm m 7395.41 9,591.73 12,450.85 22,042.58
15 Pasang plint internal cove artistik ukuran (5 x 5 x 20) cm m 7395.42 24,488.84 18,290.20 42,779.03
16 Memasang lantai marmer ukuran (100 x 100) cm m2 7395.43 182,667.77 69,529.08 252,196.85
17 Memasang lantai karpet m2 7395.44 103,213.11 23,481.65 126,694.76
18 Memasang underlayer/Pelapis bawah karpet m2 7395.45 123,618.50 16,546.20 140,164.70
19 Memasang lantai parquet kayu m2 7395.46 110,913.66 69,529.08 180,442.74
20 Memasang lantai kayu (gymfloor) m2 7395.47 134,021.75 69,529.08 203,550.82
21 Memasang dinding keramik artistik ukuran (10 x 20) cm m2 7395.51 188,974.71 89,394.53 278,369.24
22 Memasang dinding keramik artistik ukuran (5 x 20) cm m2 7395.52 138,401.03 89,394.53 227,795.56
23 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 7395.53 152,140.77 89,394.53 241,535.30
24 Memasang dinding keramik ukuran (20 x 20) cm kelas I m2 7395.54 85,387.27 89,394.53 174,781.80
25 Memasang dinding marmer ukuran (100 x 100) cm m2 7395.55 207,909.06 129,125.43 337,034.48
26 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm m2 7395.56 87,113.38 99,327.25 186,440.63
27 Memasang dinding batu paras m2 7395.57 178,919.81 69,529.08 248,448.89
28 Memasang dinding batu tempel hitam m2 7395.58 137,439.80 69,529.08 206,968.88
29 Memasang lantai keramik ukuran (40 x 40) cm kelas I m2 7395.64 109,654.12 69,529.08 179,183.19
30 Memasang lantai keramik ukuran (40 x 40) cm kelas II m2 7395.65 98,703.68 69,529.08 168,232.75
31 Memasang lantai keramik ukuran (30 x 30) cm kelas I m2 7395.66 146,312.60 69,529.08 215,841.67
32 Memasang lantai keramik ukuran (30 x 30) cm kelas II m2 7395.67 107,407.96 69,529.08 176,937.03
33 Memasang lantai keramik ukuran (20 x 20) cm kelas I m2 7395.68 89,431.06 69,529.08 158,960.13
34 Memasang lantai keramik ukuran (20 x 20) cm kelas II m2 7395.69 90,842.47 69,529.08 160,371.54
35 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 7395.70 152,140.77 12,450.85 164,591.62
36 Memasang dinding keramik ukuran (10 x 20) cm kelas II m3 7395.71 136,679.61 12,450.85 149,130.46
37 Memasang dinding keramik ukuran (20 x 25) cm kelas I m2 7395.72 111,988.73 89,394.53 201,383.26
38 Memasang dinding keramik ukuran (20 x 25) cm kelas II m2 7395.73 100,457.21 89,394.53 189,851.74
39 Memasang paving I, tebal 5 cm, K175 m2 7395.74 71,977.62 54,780.00 126,757.62
40 Memasang paving I, tebal 5 cm, K200 m2 7395.75 72,844.20 54,780.00 127,624.20
41 Memasang paving I, tebal 5 cm, K225 m2 7395.76 76,223.86 54,780.00 131,003.86
42 Memasang paving I, tebal 7 cm, K175 m2 7395.77 84,543.03 54,780.00 139,323.03
43 Memasang paving I, tebal 7 cm, K200 m2 7395.78 95,461.94 54,780.00 150,241.94
44 Memasang paving I, tebal 7 cm, K225 m2 7395.79 109,240.56 54,780.00 164,020.56
VII PEKERJAAN KAYU
SNI 3434:2008
1 Membuat & Pas kusen pintu dan jendela, kayu kelas I m3 3434.01 26,285,380.00 2,044,812.00 28,330,192.00
2 Membuat & Pas kusen pintu dan jendela, kayu kelas II m3 3434.02.1 15,500,000.00 1,000,000.00 16,500,000.00
3 Membuat & Pas kusen pintu dan jendela, kayu kelas III m3 3434.02.2 11,467,720.00 1,988,162.00 13,455,882.00
4 Membuat & Pas daun pintu panel, kayu kelas I m2 3434.05 879,310.00 265,560.00 1,144,870.00
5 Membuat & Pas daun pintu panel, kayu kelas II m2 3434.05.1 721,853.00 292,116.00 1,013,969.00
6 Membuat & Pas pintu & jendela kaca, ky kl I (tanpa kaca) m2 3434.06 580,344.60 233,692.80 814,037.40
7 Membuat & pas pintu & jendela kaca, ky kelas II (tp kaca) m2 3434.06.1 433,111.80 233,692.80 666,804.60
8 Membuat & pasang pintu & jendela jalusi, kayu kelas I m2 3434.07 1,539,698.60 292,116.00 1,831,814.60
9 Membuat & pasang pintu & jendela jalusi, kayu kelas II m2 3434.07.1 1,147,077.80 292,116.00 1,439,193.80
10 Memasang jalusi kusen kayu kelas I m2 3434.10 1,433,718.00 219,787.15 1,653,505.15
11 Memasang jalusi kusen kayu kelas II m2 3434.10.1 1,065,636.00 219,787.15 1,285,423.15
12 Pasang konstruksi kuda-kuda konvensional, kayu kelas I m3 3434.13 19,837,818.00 1,168,464.00 21,006,282.00
13 Pasang konstruksi kuda-kuda konvensional, kayu kelas II m3 3434.13.1 9,078,498.00 1,168,464.00 10,246,962.00
14 Pasang konstruksi kuda-kuda konvensional, kayu kelas III m3 3434.13.2 7,851,558.00 1,168,464.00 9,020,022.00
15 Memasang konstruksi kuda-kuda expose, kayu kelas I m3 3434.14 28,971,228.00 1,168,464.00 30,139,692.00
16 Memasang konstruksi gording, kayu kelas I m3 3434.15 19,793,202.00 701,078.40 20,494,280.40
17 Memasang konstruksi gording, kayu kelas II m3 3434.15.1 9,033,882.00 701,078.40 9,734,960.40
18 Pas rangka atap genteng, kaso & reng kayu kelas I m2 3434.16 220,008.36 13,788.50 233,796.86
19 Pas rangka atap genteng, kaso & reng kayu kelas II m2 3434.16.1 136,524.96 13,788.50 150,313.46
20 Pas rangka atap genteng, kaso & reng kayu kelas III m2 3434.16.2 121,080.96 13,788.50 134,869.46
21 Pas rangka atap genteng beton, kaso & reng ky klas I m2 3434.17 256,147.32 13,788.50 269,935.82
22 Pas rangka atap genteng beton, kaso & reng ky klas II m2 3434.17.1 172,663.92 13,788.50 186,452.42
23 Pas rangka atap genteng beton, kaso & reng ky klas III m2 3434.17.2 141,775.92 13,788.50 155,564.42
24 Memasang rk langit-langit (50 x 100) cm, kayu kelas II m2 3434.19 109,137.60 37,811.40 146,949.00
25 Memasang rklangit-langit (50 x 100) cm, kayu kelas III m2 3434.19.1 92,621.10 37,811.40 130,432.50
26 Memasang rklangit-langit (60 x 60) cm, kayu kelas II m2 3434.20 116,173.20 35,288.55 151,461.75
27 Memasang rk langit-langit (60 x 60) cm, kayu kelas III m2 3434.20.1 98,691.45 35,288.55 133,980.00
28 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I m 3434.21 259,321.92 21,500.05 280,821.97
29 Memasang lisplank ukuran (3 x 20) cm, kayu kelas II m 3434.21.1 87,430.20 21,500.05 108,930.25
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
30 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I m 3434.22 263,234.40 21,500.05 284,734.45
31 Memasang lisplank ukuran (3 x 30) cm, kayu kelas II m 3434.22.1 88,159.50 21,500.05 109,659.55
32 Pas rangka dinding pemisah (60 x 120) cm ky kelas II m2 3434.23 224,796.00 43,858.60 268,654.60
33 Pas rangka dinding pemisah (60 x 120) cm ky kelas III m2 3434.23.1 164,736.00 43,858.60 208,594.60
34 Pas dinding pemisah teakwood rangkap, rk ky kelas II m2 3434.24 359,202.54 43,858.60 403,061.13
35 Pas dinding pemisah plywood rangkap, rk ky kelas II m2 3434.25 295,966.22 58,423.20 354,389.42
36 Pas dinding lambriziring dari papan kayu kelas I m2 3434.26 172,260.66 175,269.60 347,530.26
37 Pas dinding lambriziring dari plywood (120 x 240) cm m2 3434.27 56,525.04 7,320.28 63,845.32
VIIIPEKERJAAN BESI DAN ALUMINIUM
SNI 7393:2008
1 Memasang besi profil kg 7393.01 15,195.18 8,273.10 23,468.28
2 Memasang rangka kuda-kuda baja IWF kg 7393.02 16,971.24 8,273.10 25,244.34
3 Mengerjakan 100 kg pekerjaan perakitan kg 7393.03 34,276.00 13,104.91 47,380.91
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
4 Pintu besi plat baja tebal 2 mm rangkap, rk besi siku m2 7393.04 680,076.54 144,738.06 824,814.60
5 Mengerjakan 10 cm pengelasan dengan las listrik cm 7393.05 14,125.65 3,973.09 18,098.74
6 Membuat rangka jendela besi scuare tube (25 x 5) cm m2 7393.06 45,720.75 89,584.06 135,304.81
7 Memasang pintu rolling door besi m2 7393.07 199,914.00 161,012.94 360,926.94
8 Memasang pintu lipat (folding door) m2 7393.08 471,900.00 60,669.40 532,569.40
9 Memasang sunscreen aluminium m2 7393.09 17,589.00 66,553.96 84,142.96
10 Memasang rolling door aluminium m2 7393.10 265,980.00 137,885.00 403,865.00
11 Memasang kusen pintu dan jendela aluminium m 7393.11 82,310.58 5,924.94 88,235.52
12 Memasang pintu aluminium strip lebar 8 cm m2 7393.12 612,380.34 11,716.11 624,096.45
13 Memasang daun pintu & jendela kaca bening rangka aluminium m2 7393.13 374,091.30 11,716.11 385,807.41
14 Memasang venetions blinds dan vertical blinds m2 7393.14 91,960.00 48,300.95 140,260.95
15 Memasang terali besi strip m2 7393.15 103,877.37 230,226.76 334,104.13
16 Memasang kawat nyamuk m2 7393.16 58,681.71 13,788.50 72,470.21
17 Memasang talang datar/jurai seng bjls 28 lebar 90 cm m 7393.18 204,933.30 41,860.78 246,794.08
18 Pas talang 1/2 lingk D-15cm, seng plat bjls 30 lb 45 cm m 7393.19 51,892.50 32,291.27 84,183.77
19 Pasang pintu PVC polos bh 7393.20 211,310.00 140,882.20 352,192.20
20 Pasang pintu PVC motif bh 7393.21 408,100.00 140,882.20 548,982.20
IX PEKERJAAN LANGIT-LANGIT
SNI 2839:2008
1 Memasang langit-langit asbes semen, tebal 4 mm m2 2839.01 15,901.60 7,427.15 23,328.75
2 Memasang langit-langit asbes semen, tebal 5 mm m2 2839.01.1 19,168.60 7,427.15 26,595.75
3 Memasang langit-langit asbes semen, tebal 6 mm m2 2839.01.2 23,766.60 7,427.15 31,193.75
4 Memasang langit-langit akustik ukuran (30 x 30) cm m2 2839.02 292,578.00 16,546.20 309,124.20
5 Memasang langit-langit akustik ukuran (30 x 60) cm m2 2839.03 281,578.00 13,788.50 295,366.50
6 Memasang langit-langit akustik ukuran (60 x 120) cm m2 2839.04 320,298.00 13,788.50 334,086.50
7 Pas langit-langit tripleks ukuran (120 x 240), tbl 3 mm m2 2839.05 22,393.80 13,788.50 36,182.30
8 Pas langit-langit tripleks ukuran (120 x 240), tbl 4 mm m2 2839.05.1 25,128.68 13,788.50 38,917.18
9 Pas langit-langit tripleks ukuran (120 x 240), tbl 6 mm m2 2839.05.2 32,207.18 13,788.50 45,995.68
10 Pas langit-langit lambriziring kayu, tebal 9 mm m2 2839.06 45,216.60 110,308.00 155,524.60
11 Pas. langit-langit gypsum board uk (120x240), tbl 9 mm m2 2839.07 37,338.44 9,932.73 47,271.17
12 Memasang langit-langit calsiboard m2 2839.07.1 64,560.64 9,932.73 74,493.36
13 Memasang langit-langit harplek m2 2839.07.2 22,406.67 13,788.50 36,195.17
14 Memasang list plafond gypsum profil m 2839.08 8,648.64 8,273.10 16,921.74
15 Pas langit-langit akustik uk (60 x 120)+ rk aluminium m2 2839.09 213,474.69 68,942.50 282,417.19
16 Memasang list langit-langit kayu profil m 2839.10 8,279.70 6,935.45 15,215.15

X PEKERJAAN PENUTUP ATAP


SNI 03-3436-1994
1 Memasang penutup atap genteng kodok kebumen m2 R 3436.01 74,646.00 14,978.26 89,624.26
2 Memasang penutup atap genteng kodok kemiri m2 R 3436.01.1 43,436.25 14,978.26 58,414.51
3 Memasang penutup atap genteng magas kebumen glasur m2 R 3436.01.2 100,815.00 14,978.26 115,793.26
4 Memasang penutup atap genteng magas kebumen biasa m2 R 3436.01.3 50,407.50 14,978.26 65,385.76
5 Memasang penutup atap genteng morando kebumen glasur m2 R 3436.01.6 94,980.60 14,978.26 109,958.86
6 Memasang penutup atap genteng morando kebumen biasa m2 R 3436.01.7 57,297.24 14,978.26 72,275.50
7 Memasang penutup atap genteng plentong mojolaban m2 R 3436.01.8 35,692.80 14,978.26 50,671.06
8 Memasang penutup atap genteng pelentong kebumen m2 R 3436.01.9 49,635.30 14,978.26 64,613.56
9 Memasang penutup atap genteng pelentong kecil kemiri m2 R 3436.01.10 34,577.40 14,978.26 49,555.66
10 Memasang bubungan pada atap genteng kebumen m R 3436.03 67,044.98 38,247.88 105,292.86
11 Memasang bubungan pada atap genteng mojolaban m R 3436.03.1 50,078.03 38,247.88 88,325.91
12 Memasang bubungan pada atap genteng kemiri m R 3436.03.2 44,930.03 38,247.88 83,177.91
13 Memasang bubungan pada atap genteng beton m R 3436.04 57,049.28 38,247.88 95,297.16
14 Memasang penutup atap genteng metal kelas I m2 R 3436.05 246,709.32 19,123.94 265,833.26
15 Memasang bubungan pada atap genteng metal kelas I m R 3436.06 122,694.00 14,054.65 136,748.65
16 Memasang penutup atap genteng metal kelas II m2 R 3436.07 134,251.26 19,123.94 153,375.20
17 Memasang bubungan pada atap genteng metal kelas II m R 3436.08 85,156.50 14,054.65 99,211.15

XI PEKERJAAN PENGECATAN DAN FINISHING DINDING


Pt T-38-2000-C
1 Mengikis atau mengerok cat tembok cara manual m2 R.Pt.38.01 - 9,156.62 9,156.62
2 Mencuci bidang permukaan tembok lama dengan sabun m3 R.Pt.38.02 643.50 4,861.56 5,505.06
3 Lapis plamir tembok m2 R.Pt.38.03 2,574.00 3,528.86 6,102.86
4 Pengecatan bidang tembok interior 2 lapis dengan kuas m2 R.Pt.38.04 4,752.00 7,501.95 12,253.95
5 Pengecatan bidang tembok eksterior 2 lapis dengan kuas m2 R.Pt.38.04.1 22,704.00 7,501.95 30,205.95
6 Pengecatan bidang tembok interior 2 lapis dengan roll m2 R.Pt.38.05 9,306.00 4,744.25 14,050.25
7 Pengecatan bidang tembok eksterior 2 lapis dengan roll m2 R.Pt.38.05.1 44,462.00 4,744.25 49,206.25
8 Catan plafon 2 lapis cat tembok dgn kuas termasuk plamir m2 R.Pt.38.06 7,326.00 9,488.49 16,814.49
9 Catan plafon 2 lapis cat tembok dg roll termasuk plamir m2 R.Pt.38.07 11,880.00 6,730.79 18,610.79
10 Pasang wallpaper dengan perekat m2 R.Pt.38.08 231,913.00 8,690.00 240,603.00
11 Melapis meni pada permukaan kayu m2 R.Pt.38.09 6,259.00 4,578.31 10,837.31
12 Mendempul/memplamir dan menggosok kayu m2 R.Pt.38.10 10,957.10 8,482.71 19,439.81
13 Mengecat dasar 1 lapis pada kayu m2 R.Pt.38.11 14,421.00 5,821.64 20,242.64
14 Mengecat penutup 2 lapis pada kayu m2 R.Pt.38.12 19,470.00 20,723.95 40,193.95
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
15 Mengerok karat atau cat permukaan baja dengan soda api m2 R.Pt.38.13 3,575.00 18,230.85 21,805.85
16 Melapis meni pada permukaan baja m2 R.Pt.38.14 4,768.50 4,578.31 9,346.81
17 Mengecat 2 lapis pada permukaan baja menggunakan kuas m2 R.Pt.38.15 12,265.00 20,723.95 32,988.95
18 Mengecat 2 lapis pada permukaan baja dengan semprot m2 R.Pt.38.16 26,675.00 11,719.35 38,394.35
19 Pelapisan bidang kayu dengan teak oil m2 R.Pt.38.17 14,033.80 7,711.55 21,745.35
20 Pelapisan bidang kayu dengan pelitur 2 lapis m2 R.Pt.38.18 18,675.25 34,512.45 53,187.70
21 Pelapisan bidang kayu dengan vernis 2 lapis m2 R.Pt.38.19 14,047.00 7,711.55 21,758.55
22 Pelapisan bidang kayu dengan residu/ter m2 R.Pt.38.20 19,320.40 7,711.55 27,031.95
23 Mengecat genting m2 R.Pt.38.21 16,939.18 35,288.55 52,227.73

XII PEKERJAAN KUNCI, ALAT GANTUNGAN, DAN KACA


Pt T-30-2000-C
1 Pasang kunci tanam antik bh R.Pt.30.01 147,400.00 46,269.30 193,669.30
2 Pasang kunci tanam biasa bh R.Pt.30.02 112,860.00 38,557.75 151,417.75
3 Pasang kunci silinder bh R.Pt.30.03 183,700.00 46,269.30 229,969.30
4 Pasang kunci slot untuk kamar mandi bh R.Pt.30.04 111,870.00 19,278.88 131,148.88
5 Pasang engsel pintu bh R.Pt.30.05 14,850.00 9,677.42 24,527.42
6 Pasang engsel angin untuk pintu bh R.Pt.30.06 19,250.00 9,677.42 28,927.42
7 Pasang engsel pintu klam bh R.Pt.30.07 12,870.00 34,512.45 47,382.45
8 Pasang engsel jendela bh R.Pt.30.08 11,000.00 7,711.55 18,711.55
9 Pasang kait angin bh R.Pt.30.09 7,370.00 7,711.55 15,081.55
10 Pasang door closer bh R.Pt.30.10 212,740.00 15,423.10 228,163.10
11 Pasang door holder bh R.Pt.30.11 30,800.00 7,711.55 38,511.55
12 Pasang door stops bh R.Pt.30.12 46,640.00 9,677.42 56,317.42
13 Pasang rel pintu dorong unit R.Pt.30.13 181,390.00 69,520.00 250,910.00
14 Pasang gerendel bh R.Pt.30.14 5,500.00 7,711.55 13,211.55
15 Pasang kaca polos tebal 2mm m2 R.Pt.30.15 62,920.00 22,061.60 84,981.60
16 Pasang kaca polos tebal 3mm m2 R.Pt.30.16 78,650.00 22,061.60 100,711.60
17 Pasang kaca polos tebal 5mm m2 R.Pt.30.17 92,869.92 22,061.60 114,931.52
18 Pasang kaca polos tebal 8mm m2 R.Pt.30.18 174,131.10 24,910.99 199,042.09
19 Pasang kaca polos tebal 3mm dengan kisi-kisi m2 R.Pt.30.19 85,800.00 34,512.45 120,312.45
20 Pasang kaca rayband tebal 5mm m2 R.Pt.30.20 107,357.25 22,061.60 129,418.85
21 Pasang kaca rayband tebal 8mm m2 R.Pt.30.21 217,074.00 24,910.99 241,984.99
22 Pasang kaca raiben tebal 12mm m2 R.Pt.30.22 211,750.00 24,910.99 236,660.99
23 Pasang kaca buram tebal 3mm m2 R.Pt.30.23 87,065.55 22,061.60 109,127.15
24 Pasang kaca buram tebal 5mm m2 R.Pt.30.24 127,696.14 22,061.60 149,757.74
25 Pasang kaca buram tebal 3mm (motif) m2 R.Pt.30.25 104,478.66 22,061.60 126,540.26
26 Pasang kaca buram tebal 5mm (motif) m2 R.Pt.30.26 208,957.32 22,061.60 231,018.92
27 Pasang kaca cermin tebal 5mm m2 R.Pt.30.27 174,131.10 22,061.60 196,192.70
28 Pasang kaca wire glass tebal 5mm m2 R.Pt.30.28 181,500.00 22,061.60 203,561.60
29 Pasang kaca wire glass tebal 8mm m2 R.Pt.30.29 211,750.00 22,061.60 233,811.60
30 Pasang spring knife bh R.Pt.30.32 6,160.00 7,711.55 13,871.55

XIII PEKERJAAN PIPA DAN SANITAIR


RSNI T-15-2002
1 Memasang kloset duduk/monoblok kelas I bh R.T.15.01 2,684,784.96 276,675.36 2,961,460.32
2 Memasang kloset duduk/monoblok kelas II bh R.T.15.02 1,370,358.99 276,675.36 1,647,034.35
3 Memasang kloset jongkok porselen kelas I bh R.T.15.03 217,614.54 185,505.65 403,120.19
4 Memasang kloset jongkok porselen kelas II bh R.T.15.04 144,470.04 185,505.65 329,975.69
5 Memasang urinoir bh R.T.15.05 1,396,978.44 142,004.50 1,538,982.94
6 Memasang wastafel bh R.T.15.06 503,728.37 188,416.25 692,144.62
7 Memasang bak mandi fibreglass volume 0,3 m3 bh R.T.15.07 363,617.83 339,752.60 703,370.43
8 Memasang bak mandi batu bata volume 0,3 m3 bh R.T.15.08 276,190.20 595,963.50 872,153.70
9 Memasang bak fibreglass volume 1 m3 bh R.T.15.09 1,809,808.00 625,300.50 2,435,108.50
10 Memasang pipa beton diameter 20 cm m R.T.15.10 60,124.32 13,905.82 74,030.13
11 Memasang pipa beton diameter 30 cm m R.T.15.11 96,301.41 37,744.36 134,045.77
12 Memasang pipa beton diameter 60 cm m R.T.15.12 196,637.17 37,744.36 234,381.52
13 Memasang pipa beton diameter 80 cm m R.T.15.13 223,683.46 37,744.36 261,427.81
14 Memasang pipa beton diameter 100 cm m R.T.15.14 230,551.68 37,744.36 268,296.03
15 Bak kontrol pasangan batu bata uk 30 x 30 tinggi 50 cm bh R.T.15.15 170,438.27 31,013.57 201,451.83
16 Bak kontrol pasangan batu bata uk 45 x 45 tinggi 50 cm bh R.T.15.16 269,919.08 122,745.54 392,664.61
17 Bak kontrol pasangan batu bata uk 60 x 60 tinggi 50 cm bh R.T.15.17 407,316.11 186,785.28 594,101.39
18 Memasang pipa galvanis diameter 1/2" m R.T.15.18 42,589.80 10,221.95 52,811.75
19 Memasang pipa galvanis diameter 3/4" m R.T.15.19 63,617.40 10,221.95 73,839.35
20 Memasang pipa PVC tipe AW diameter 3/4" m R.T.15.25 8,375.40 6,814.63 15,190.03
21 Memasang pipa PVC tipe AW diameter 1" m R.T.15.26 15,147.00 6,814.63 21,961.63
22 Memasang pipa PVC tipe AW diameter 1 1/2" m R.T.15.27 19,423.80 6,814.63 26,238.43
23 Memasang pipa PVC tipe AW diameter 2" m R.T.15.28 25,482.60 10,221.95 35,704.55
24 Memasang pipa PVC tipe AW diameter 2 1/2" m R.T.15.29 47,401.20 10,221.95 57,623.15
25 Memasang pipa PVC tipe AW diameter 3" m R.T.15.30 25,482.60 15,332.92 40,815.52
26 Memasang pipa PVC tipe AW diameter 4" m R.T.15.31 81,615.60 15,332.92 96,948.52
27 Memasang bak cuci piring stainless steel bh R.T.15.32 618,068.88 23,134.65 641,203.53
29 Memasang kran air diameter 1/2" bh R.T.15.33 11,277.75 7,711.55 18,989.30
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
30 Memasang kran air diameter 3/4" bh R.T.15.34 12,597.75 7,711.55 20,309.30
31 Memasang floor drain stainless steel bh R.T.15.35 12,430.00 7,711.55 20,141.55
32 Memasang floor drain plastik bh R.T.15.36 4,290.00 7,711.55 12,001.55
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL

XIV PEKERJAAN LAIN-LAIN


1 Memasang rangka atap baja ringan untuk atap metal roof bentang < m2 - - 135,000.00
2 Memasang rangka atap baja ringan untuk atap metal roof bentang 1 m2 - - 207,000.00
3 Memasang rangka atap baja ringan untuk atap genteng bentang < 1 m2 - - 189,000.00
4 Memasang rangka atap baja ringan untuk atap genteng bentang 10 m2 - - 270,000.00
5 Memasang rangka plafon besi stall m2 - - 76,500.00
6 Memasang rangka plafon besi holoow m2 - - 72,000.00
7 Memasang penutup atap galvalum 0,5 mm m2 - - 85,500.00
8 Memasang penutup atap polycarbonate kelas I m2 - - 180,000.00
9 Memasang penutup atap polycarbonate kelas II m2 - - 135,000.00
10 Memasang penutup atap polycarbonate rangka besi stainless steel k m2 - - 427,500.00
11 Memasang penutup atap polycarbonate rangka besi stainless steel ke m2 - - 360,000.00
12 Memasang penutup atap polycarbonate rangka besi tempa kelas I m2 - - 337,500.00
13 Memasang penutup atap polycarbonate rangka besi tempa kelas II m2 - - 270,000.00
14 Memasang Lispank GRC/Teakwood m' - - 11,250.00
15 Memasang Partisi GRC Rangka Metal Puring m2 - - 135,000.00
16 Instalasi Titik Lampu bh - - 135,000.00
17 Pasang Lampu SL 14 Watt bh - - 31,500.00
18 Pasang Lampu SL 23 Watt bh - - 45,000.00
19 Pasang Lampu Down Ligth dia. 6 bh - - 67,500.00
20 Pasang Lampu Down Ligth dia. 3 bh - - 45,000.00
21 Pasang Stop Kontak bh - - 22,500.00
22 Pasang Lampu TL 20 Watt bh - - 54,000.00
23 Pasang Lampu TL 40 Watt bh - - 67,500.00
24 Pasang Lampu TL (2 x 20 Watt) + Armatur bh - - 315,000.00
25 Pasang Lampu TL (2 x 40 Watt) + Armatur bh - - 405,000.00
26 Sewa Excavator (bahan dan operator) /jam S.01 266,000.00
27 Sewa Bulldozer (bahan dan operator) /jam S.02 260,000.00
28 Sewa Dum Truck (bahan dan operator) /jam S.03 153,000.00
NO KODE URAIAN SATUAN HARGA SATUAN
1 SU.001 Mandor OH 74,900.00
2 SU.002 Kepala tukang OH 69,050.00
3 SU.003 Tukang batu OH 63,200.00
4 SU.004 Tukang kayu OH 63,200.00
5 SU.005 Tukang cat OH 63,200.00
6 SU.006 Tukang besi OH 63,200.00
7 SU.007 Tukang las OH 63,200.00
8 SU.008 Tukang aluminium OH 63,200.00
9 SU.009 Tukang pipa OH 63,200.00
10 SU.010 Pekerja OH 51,500.00
NO URAIAN SATUAN HARGA SATUAN

BAHAN ALAM
1 Batu kali belah m3 144,300.00
2 Batu putih m3 120,120.00
3 Kerikil sungai ayak tanpa pasir m3 141,960.00
4 Batu belah 15-20 cm ( pecah tangan ) m3 181,077.00
5 Batu pecah 7-10 cm ( pecah tangan ) m3 183,495.00
6 Batu pecah 5-7 cm ( pecah tangan ) m3 160,680.00
7 Batu pecah 3-5 cm ( pecah tangan ) m3 164,697.00
8 Batu pecah 2-3 cm ( pecah tangan ) m3 169,221.00
9 Batu pecah 2-3 cm ( pecah mesin) m3 208,104.00
10 Batu pecah 1-2 cm ( pecah mesin ) m3 195,819.00
11 Batu pecah 0,5-1 cm ( pecah mesin ) m3 210,249.00
12 Filler / Abu Batu m3 187,512.00
13 Sirtu m3 121,134.00
14 Pasir beton m3 183,300.00
15 Pasir pasang m3 189,540.00
16 Pasir urug m3 110,565.00
123 Batu tempel/palimanan/paras m2 127,881.00
18 Batu tempel hitam/candi m2 93,600.00
19 Batu marmo kuning m2 121,680.00
20 Batu alur (hijau, kuning, putih) m2 140,400.00
21 Batu carport m2 123,240.00
22 Bitumen ( Aspalt ) kg 12,441.00
23 Aspal curah kg 11,871.60
24 Kayu bakar m3 175,500.00
25 Tanah urug (pilihan) m3 44,226.00
26 Semen PC. Kg 1,306.50
27 Semen warna Kg 3,295.50
28 Tepung gipsum Kg 3,471.00
29 Kawur m3 195,000.00
30 Batu Bata buah 624.00
31 Agregat Halus m3 282,282.00
32 Agregat Kasar m3 244,296.00
33 Batu Kapur Bongkahan m3 210,600.00
34 Air kerja ltr 39.00
35 Batu pecah 2-3 cm ( pecah mesin) Kg 125.00
36 Pasir beton Kg 175.00

BAHAN KAYU/BAMBU
1 Kayu jati (ekspose) m3 21,684,000.00
2 Kayu jati lokal (non ekspose) m3 16,107,000.00
3 Kayu bangkirai m3 12,363,000.00
4 Kayu kanfer m3 9,438,000.00
5 Kayu kruing m3 7,215,000.00
6 Kayu meranti m3 6,201,000.00
7 Kayu sengon untuk begesting (papan/kaso) m3 2,730,000.00
8 Kayu usuk jati ekspose m3 17,550,000.00
9 Kayu usuk jati ukuran 5 x 7 m3 11,661,000.00
10 Kayu jati untuk rangka plafond m3 9,867,000.00
11 Kayu usuk bangkirai m3 8,853,000.00
12 Kayu usuk kanfer m3 8,151,000.00
13 Kayu usuk kruing m3 6,240,000.00
14 Kayu kruing untuk rangka plafond m3 6,162,000.00
15 Kayu usuk meranti m3 5,265,000.00
16 Kayu reng jati 2/3 m3 9,126,000.00
17 Kayu reng kanfer 2/3 m3 5,265,000.00
18 Kayu reng kruing 2/3 m3 5,226,000.00
19 Plipit kayu jati 1/3 m' 5,226.00
20 Lis kayu profil 5 cm m' 7,020.00
21 Lis kayu profil 4 cm m' 5,070.00
22 Lis kayu profil 3,5 cm m' 4,680.00
23 Lis kayu profil 3 cm m' 4,290.00
24 Kayu lapis/ tripleks tb. 3 mm lembar 53,040.00
25 Kayu lapis/ tripleks tb. 4 mm lembar 59,670.00
26 Kayu lapis/ tripleks tb. 6 mm lembar 76,830.00
27 Kayu lapis/ tripleks tb. 9 mm lembar 143,754.00
28 Kayu lapis/ tripleks tb. 1,2 mm lembar 167,310.00
NO URAIAN SATUAN HARGA SATUAN
29 Kayu lapis/ tripleks tb. 1,8 mm lembar 235,053.00
30 Teak wood 120 x 240 cm lembar 126,516.00
31 Teak wood 90 x 220 cm lembar 72,150.00
32 Plywood tbl.4 mm (120 x 240) cm lembar 68,094.00
33 Papan akustik softboard 30 x 30 lembar 17,784.00
34 Papan akustik softboard 30 x 60 lembar 54,600.00
35 Papan akustik softboard 60 x 120 lembar 151,008.00
36 Bambu ori batang 20,124.00
37 Bambu apus batang 14,391.00
38 Dolken kayu kelas III diameter 8-10/400 cm batang 60,138.00
39 Formika lembar 68,094.00
-
BAHAN BETON CETAK, GENTENG, LANGIT2 -
10 Tegel paving I, tb 5 cm K 175 m2 46,020.00
11 Tegel paving I, tb 5 cm K 200 m2 46,800.00
12 Tegel paving I, tb 5 cm K 225 m2 49,842.00
13 Tegel paving I, tb 7 cm K 175 m2 57,330.00
14 Tegel paving I, tb 7 cm K 200 m2 67,158.00
15 Tegel paving I, tb 7 cm K 225 m2 79,560.00
16 Tegel paving segienam, tb 5 cm K 175 m2 56,121.00
17 Tegel paving segi enam, warna tb 5 cm K 175 m2 61,854.00
18 Genteng kodok kebumen bh 2,714.40
19 Genteng kodok kemiri bh 1,579.50
20 Genteng magas kebumen glasur bh 3,666.00
21 Genteng magas kebumen biasa bh 1,833.00
22 Genteng mantili mojolaban bh 1,092.00
23 Genteng pelentong kemiri bh 1,092.00
24 Genteng morando kebumen glasur bh 4,797.00
25 Genteng morando kebumen biasa bh 2,893.80
26 Genteng Plentong mojolaban bh 1,248.00
27 Genteng pelentong kebumen bh 1,735.50
28 Genteng pelentong kemiri bh 1,209.00
29 Genteng garuda kemiri bh 1,127.10
30 Genteng beton bh 4,410.90
31 Bubung genteng kebumen bh 8,154.90
32 Bubung genteng mojolaban bh 5,070.00
33 Bubung genteng kemiri bh 4,134.00
34 Bubung genteng beton bh 8,112.00
35 Roster beton 12x11x24 buah 9,594.00
36 Hollow block 20 buah 17,745.00
37 Hollow block 15 buah 16,926.00
38 Hollow block 10 cm buah 15,444.00
39 Bata berongga ekspose buah 2,730.00
40 Penutup atap fibre glass gelombang (180 x 90) cm lembar 36,426.00
41 Penutup atap aluminium gelombang m2 200,226.00
42 Aluminium foil m2 36,000.00
43 Gipsum lembar 86,700.00
44 Harflek m2 18,954.00
45 Calsiboard 240x120 lembar 53,625.00
46 List gipsum profil m 8,190.00
47 Genteng metal kelas I m2 216,060.00
48 Kerpus genting metal kelas I Bh 44,460.00
49 Genteng metal kelas II m2 115,830.00
50 Kerpus genting metal kelas II Bh 30,810.00
51 Tepung Gipsum kg 3,276.00
52 Tegel paving kawung, tb 5 cm K 175 m2 60,060.00
-
BAHAN KERAMIK -
1 Keramik dinding 10 x 20 cm kelas I buah 2,145.00
2 Keramik dinding 20 x 25 cm kelas I buah 3,802.50
3 Keramik dinding 20 x 20 cm kelas I buah 2,008.50
4 Keramik dinding 11 x 11 cm kelas I buah 2,067.00
5 Keramik dinding marmer 100 x 100 cm kelas I buah 156,000.00
6 Keramik lantai 20 x 20 cm kelas I buah 2,031.90
7 Keramik lantai 30 x 30 cm kelas I buah 8,970.00
6 Keramik lantai 60 x 60 cm kelas I buah 41,379.00
8 Keramik lantai 40 x 40 cm kelas I buah 11,427.00
9 Keramik dinding 10 x 20 cm kelas II buah 1,879.80
10 Keramik dinding 20 x 25 cm kelas II buah 3,303.30
NO URAIAN SATUAN HARGA SATUAN
11 Keramik dinding 20 x 20 cm kelas II buah 1,918.80
12 Keramik dinding 11 x 11 cm kelas II buah -
13 Keramik dinding artistik 5 x 20 cm kelas II buah 2,979.60
14 Keramik dinding artistik 10 x 20 cm kelas II buah 2,776.80
15 Keramik dinding marmer 100 x 100 cm kelas II buah 118,560.00
16 Keramik lantai 20 x 20 cm kelas II buah 2,109.90
17 Keramik lantai 30 x 30 cm kelas II buah 5,990.40
18 Keramik lantai 40 x 40 cm kelas II buah 9,925.50
28 Tegel marmer 100 x 100 cm buah 136,500.00
29 Keramik plin 10 x 20 cm buah 2,215.20
30 Keramik plin 10 x 10 cm buah 1,443.00
31 Keramik plin 5 x 20 cm buah 1,443.00
32 Karpet m2 80,028.00
33 Underlayer/pelapis bawah karpet m2 97,695.00
1E+05 Parquet kayu m2 80,028.00
35 Lantai kayu (gymfloor) m2 100,035.00
36 Lantai vinyl karet buah 9,594.00
37 Floor hardener kg 1,989.00
38 Vinyl 30 x 30 buah 2,808.00
39 Kloset porselin jongkok kelas I buah 188,097.00
40 Kloset porselin jongkok kelas II buah 121,602.00
41 Kloset duduk/Monoblok kelas I buah 2,302,560.00
42 Kloset duduk/Monoblok kelas II buah 1,175,265.00
43 Bak fiberglass sudut 0,3 m3 buah 280,137.00
44 Urinoir buah 1,260,246.00
45 Wastafel buah 400,179.00
46 Bak teraso buah 267,423.00
47 Bak Kip fiberglass buah 729,339.00
48 Bak Kip poselin buah 1,633,788.00
49 Bak cuci Stainles steel 1 bak buah 230,256.00
50 Bak cuci Stainles steel 2 bak buah 416,208.00
51 Lem Vinyl kg 20,007.00
52 Wall papre 50 cm m' 62,361.00
53 Lem kg 28,002.00
54 Bata lapis dinding 3 x 7 x 24 cm buah 780.00

BAHAN BESI / LOGAM


1 Bindrad kg 15,405.00
2 Baja gulungan ukuran ringan kg 14,391.00
3 Baja anyaman bronjong kg 20,943.00
4 Baja ( baut - baut ) kg 17,940.00
5 Baja ( paku jembatan ) kg 19,500.00
6 Besi beton kg 10,062.00
7 Wire mesh kg 16,770.00
8 Besi plat kg 13,338.00
9 Besi profil kg 12,012.00
10 Besi IWF kg 13,416.00
11 Kawat galvanis kg 17,238.00
12 Kawat nyamuk m2 17,238.00
13 Kawat kasa m2 24,648.00
14 Kawat harmonika m2 24,960.00
15 Kawat duri m 5,460.00
16 Pintu lipat besi m2 429,000.00
17 Pintu rolling door besi m2 181,740.00
18 Pintu rolling door aluminium m2 241,800.00
19 Jendela besi strip plat m2 138,840.00
20 Jendela besi tempa m2 380,640.00
21 Profil aluminium m 60,138.00
22 Aluminium strip 8 cm m 20,007.00
23 Skrup fixer bh 3,627.00
24 Paku kg 15,600.00
25 Paku anti karat kg 19,500.00
26 Paku skrup kg 21,684.00
27 Hollow 4x4 cm btg 20,202.00
28 Hollow 2x2 cm btg 17,628.00
29 Ramset/dina bolt bh 14,040.00
30 Tralis besi strip m2 108,654.00
31 Besi strip kg 15,288.00
32 Strip Plat 3/4" m' 17,004.00
NO URAIAN SATUAN HARGA SATUAN
33 Strip Plat 1" m' 19,968.00
34 Strip Plat 1 1/4" m' 23,400.00
37 Talang seng t = 0.3 mm L = 60 m' 22,035.00
35 Galvalum tebal 4 mm m2 56,784.00
36 Sunscreen alluminium m2 15,990.00
-
BAHAN KACA -
1 Kaca bening 5 mm m2 76,752.00
2 Kaca bening 8 mm m2 143,910.00
3 Kaca rayband 5 mm m2 88,725.00
4 Kaca rayband 8 mm m2 179,400.00
5 Kaca jeruk 3 mm m2 86,346.00
6 Kaca jeruk 5 mm m2 172,692.00
7 Kaca es 3 mm m2 71,955.00
8 Kaca es 5 mm m2 105,534.00
9 Kaca cermin 5 mm m2 143,910.00
10 Kaca patri m2 162,400.00
11 Kaca Bening 2 mm m2 48,200.00
12 Kaca Bening 3 mm m2 52,767.00
13 Kaca rayband 12 mm m2 160,000.00

BAHAN PIPA
1 Pipa black Steel 6" Sched # 20 m' 265,400.00
2 Screw stainless steel dia 6 mm m' 343,800.00
3 Reducer 10" ke 6" buah 108,600.00
4 Gravel m' 289,400.00
5 Stemvet Kg 14,500.00
6 Bentonite Kg 11,500.00
7 Pipa Piezometer GIP 1" m' 54,400.00
8 Lem pipa kg 104,500.00
9 Baut 5/8 " buah 11,700.00
10 Kunci gembok buah 23,900.00
11 Plastik buah 490.00
12 Pipa PVC 10 mm ( 1/2 ) " AW m 4,500.00
13 Pipa PVC 20 mm ( 3/4 ) " AW m 4,700.00
14 Pipa PVC 25 mm ( 1 ) " AW m 8,500.00
15 Pipa PVC 30 mm ( 1 1/4 ) " AW m 14,400.00
16 Pipa PVC 40 mm ( 1 1/2 ) " AW m 10,900.00
17 Pipa PVC 50 mm ( 2 ) " AW m 14,300.00
18 Pipa PVC 64 mm ( 2 1/2) " AW m 26,600.00
19 Pipa PVC 80 mm ( 3 ) " AW m 14,300.00
20 Pipa PVC 100 mm ( 4 ) " AW m 45,800.00
21 Pipa PVC 150 mm ( 6 ) " AW m 134,600.00
22 Pipa besi Galvanis ( GIP ) DN 100 mm 4" m 149,000.00
23 Pipa besi Galvanis ( GIP ) DN 75 mm 3" m 130,000.00
24 Pipa besi Galvanis ( GIP ) DN 50 mm 2" m 117,900.00
25 Pipa besi Galvanis ( GIP ) DN 40 mm 1 1/2" m 83,000.00
26 Pipa besi Galvanis ( GIP ) DN 30 mm 1 1/4" m 61,000.00
27 Pipa besi Galvanis ( GIP ) DN 25 mm 1" m 47,900.00
28 Pipa besi Galvanis ( GIP ) DN 20 mm 3/4" m 35,700.00
29 Pipa besi Galvanis ( GIP ) DN 10 mm 1/2" m 23,900.00
30 Tangki fiber kapasitas 0,50 m3 buah 1,446,000.00
31 Tangki fiber kapasitas 1 m3 buah 1,469,000.00
32 Tangki fiber kapasitas 2 m3 buah 2,373,000.00
33 Tangki fiber kapasitas 5 m3 buah 10,622,000.00

BAHAN LAIN-LAIN
1 Kunci tanam antik buah 134,000.00
2 Kunci tanam biasa buah 102,600.00
3 Kunci silinder buah 167,000.00
4 Kunci slot buah 101,700.00
5 Engsel pintu buah 13,500.00
6 Engsel jendela buah 10,000.00
7 Grendel ukuran besar buah 6,000.00
8 Grendel ukuran kecil buah 5,000.00
9 Kait angin buah 6,700.00
10 Espanyolete buah 70,000.00
11 Spring Knife buah 5,600.00
12 Door closer buah 193,400.00
NO URAIAN SATUAN HARGA SATUAN
13 Door Holder buah 28,000.00
14 Door stops buah 42,400.00
15 Rel pintu dorong buah 164,900.00
16 Fiberglass ( uk. 0,80 m x 3,00 m ) lembar 111,600.00
17 Cat tembok eksterior Kg 86,000.00
18 Cat tembok interior Kg 18,000.00
19 Cat kayu / besi Kg 46,000.00
20 Cat genteng Kg 28,250.00
21 Plamir kayu Kg 16,950.00
22 Plamir tembok Kg 6,700.00
23 Teer liter 49,000.00
24 Meny Kg 22,000.00
25 Minyak cat liter 19,500.00
26 Minyak tanah liter 13,800.00
27 Dempul Kg 22,100.00
28 Wood filler Kg 29,380.00
29 Amplas kayu lembar 3,340.00
30 Amplas besi lembar 3,700.00
31 Minyak begesting liter 3,300.00
32 Minyak solar liter 7,000.00
33 Minyak premium liter 7,000.00
34 Minyak pelumas liter 36,600.00
35 Kerosine liter 13,800.00
36 Pelitur liter 50,800.00
37 Vernis liter 37,000.00
38 Soda api Kg 28,000.00
39 Lem kayu Kg 23,900.00
40 Kuas 1" buah 7,200.00
41 Kuas 1 1/2" buah 9,400.00
42 Kuas 2" buah 6,700.00
43 Kuas 3" buah 9,000.00
44 Kuas 4" buah 13,500.00
45 Kran air 1/2" buah 10,100.00
46 Kran air 3/4" buah 11,300.00
47 Seal tape buah 6,100.00
48 Floor drain plastik buah 3,900.00
49 Floor drain stainles buah 11,300.00
50 Pipa tanah dia 15 cm buah 7,500.00
51 Pipa tanah dia 20 cm buah 12,900.00
52 Wallpaper m2 189,300.00
53 Vertical blinds/venetions blinds m2 83,600.00
54 Perekat ( lem ) buah 13,000.00
55 Sealant tube 23,700.00
56 Pintu alumunium buah 169,500.00
57 Pintu PVC Polos buah 192,100.00
58 Pintu PVC Motif buah 371,000.00
59 Pintu lipat PVC m2 167,000.00
60 Tali ijuk Kg 14,000.00
61 Alat kerja (sekop, ikrak dll) unit 74,300.00
62 Sewa alat Jam 32,500.00
63 Kawat las Kg 43,200.00
64 Strorox Kg 23,300.00
65 Waterstop lbr 150mm m 139,300.00
66 Waterstop lbr 200mm m 162,000.00
67 Waterstop lbr 230-320mm m 185,000.00
68 Sabun kg 11,700.00
69 Engsel angin buah 17,500.00
70
71 EngselExcavator
Sewa pintu klamKosongan buah
/ jam 11,700.00
#REF!
A PEKERJAAN PERSIAPAN DAN PEKERJAAN TANAH
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

2835.01 Menggali tanah biasa sedalam 1 m m3 - 44,547.25 44,547.25


Pekerja 0.750 OH 51,500.00 - 38,625.00 38,625.00
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
- 40,497.50 40,497.50
overhead & Profit 10% - 4,049.75 4,049.75
Jumlah - 44,547.25 44,547.25

2835.02 Menggali tanah biasa sedalam 2 m m3 - 54,692.55 54,692.55


Pekerja 0.900 OH 51,500.00 - 46,350.00 46,350.00
Mandor 0.045 OH 74,900.00 - 3,370.50 3,370.50
- 49,720.50 49,720.50
overhead & Profit 10% - 4,972.05 4,972.05
Jumlah - 54,692.55 54,692.55

2835.03 Menggali tanah biasa sedalam 3 m m3 - 65,002.63 65,002.63


Pekerja 1.050 OH 51,500.00 - 54,075.00 54,075.00
Mandor 0.067 OH 74,900.00 - 5,018.30 5,018.30
- 59,093.30 59,093.30
overhead & Profit 10% - 5,909.33 5,909.33
Jumlah - 65,002.63 65,002.63

2835.04 Menggali tanah keras sedalam 1 m m3 - 59,286.48 59,286.48


Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Mandor 0.032 OH 74,900.00 - 2,396.80 2,396.80
- 53,896.80 53,896.80
overhead & Profit 10% - 5,389.68 5,389.68
Jumlah - 59,286.48 59,286.48

2835.05 Menggali tanah cadas sedalam 1 m m3 - 89,918.40 89,918.40


Pekerja 1.500 OH 51,500.00 - 77,250.00 77,250.00
Mandor 0.060 OH 74,900.00 - 4,494.00 4,494.00
- 81,744.00 81,744.00
overhead & Profit 10% - 8,174.40 8,174.40
Jumlah - 89,918.40 89,918.40

2835.06 Menggali tanah lumpur sedalam 1 m m3 - 71,687.55 71,687.55


Pekerja 1.200 OH 51,500.00 - 61,800.00 61,800.00
Mandor 0.045 OH 74,900.00 - 3,370.50 3,370.50
- 65,170.50 65,170.50
overhead & Profit 10% - 6,517.05 6,517.05
Jumlah - 71,687.55 71,687.55

2835.07 Mengerjakan stripping tebing setinggi 1 m m2 - 3,244.45 3,244.45


Pekerja 0.050 OH 51,500.00 - 2,575.00 2,575.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
- 2,949.50 2,949.50
overhead & Profit 10% - 294.95 294.95
Jumlah - 3,244.45 3,244.45

2835.08 Membuang tanah sejauh 30 m m3 - 19,518.40 19,518.40


Pekerja 0.330 OH 51,500.00 - 16,995.00 16,995.00
Mandor 0.010 OH 74,900.00 - 749.00 749.00
- 17,744.00 17,744.00
overhead & Profit 10% - 1,774.40 1,774.40
Jumlah - 19,518.40 19,518.40

2835.09 Mengurug kembali galian m3 - 14,849.08 14,849.08


Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Mandor 0.008 OH 74,900.00 - 624.17 624.17
- 13,499.17 13,499.17
overhead & Profit 10% - 1,349.92 1,349.92
Jumlah - 14,849.08 14,849.08

2835.10 Memadatkan tanah (per 20 cm) m3 - 32,444.50 32,444.50


Pekerja 0.500 OH 51,500.00 - 25,750.00 25,750.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
- 29,495.00 29,495.00
overhead & Profit 10% - 2,949.50 2,949.50
Jumlah - 32,444.50 32,444.50

2835.11 Mengurug pasir urug m3 145,945.80 17,818.90 163,764.70


Pasir urug 1.200 m3 110,565.00 132,678.00 - 132,678.00
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Mandor 0.010 OH 74,900.00 - 749.00 749.00
132,678.00 16,199.00 148,877.00
overhead & Profit 10% 13,267.80 1,619.90 14,887.70
Jumlah 145,945.80 17,818.90 163,764.70

2835.12 Memasang lapisan pudel 1 KP : 3 PP : 7 TL m3 160,790.57 82,757.40 243,547.97


Batu kapur bongkahan 0.135 m3 210,600.00 28,431.00 28,431.00
Pasir pasang 0.400 m3 189,540.00 75,816.00 75,816.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Tanah urug (pilihan) 0.948 m3 44,226.00 41,926.25 41,926.25
Pekerja 0.800 OH 51,500.00 41,200.00 41,200.00
Tukang batu 0.400 OH 63,200.00 25,280.00 25,280.00
Kepala tukang 0.040 OH 69,050.00 2,762.00 2,762.00
Mandor 0.080 OH 74,900.00 5,992.00 5,992.00
146,173.25 75,234.00 221,407.25
overhead & Profit 10% 14,617.32 7,523.40 22,140.72
Jumlah 160,790.57 82,757.40 243,547.97

2835.13 Memasang lapisan pudel 1 KP : 5 TL m3 117,775.94 75,189.40 192,965.34


Batu kapur bongkahan 0.248 m3 210,600.00 52,228.80 52,228.80
Tanah urug (pilihan) 1.240 m3 44,226.00 54,840.24 54,840.24
Pekerja 0.800 OH 42,900.00 34,320.00 34,320.00
Tukang batu 0.400 OH 63,200.00 25,280.00 25,280.00
Kepala tukang 0.040 OH 69,050.00 2,762.00 2,762.00
Mandor 0.080 OH 74,900.00 5,992.00 5,992.00
107,069.04 68,354.00 175,423.04
overhead & Profit 10% 10,706.90 6,835.40 17,542.30
Jumlah 117,775.94 75,189.40 192,965.34

2835.14 Memasang lapisan ijuk tebal 10 cm m2 92,400.00 9,733.35 102,133.35


Tali ijuk 6.000 Kg 14,000.00 84,000.00 - 84,000.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
84,000.00 8,848.50 92,848.50
overhead & Profit 10% 8,400.00 884.85 9,284.85
Jumlah 92,400.00 9,733.35 102,133.35

2835.15 Mengurug sirtu padat m3 159,896.88 16,222.25 176,119.13


Sirtu 1.200 m3 121,134.00 145,360.80 - 145,360.80
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
145,360.80 14,747.50 160,108.30
overhead & Profit 10% 14,536.08 1,474.75 16,010.83
Jumlah 159,896.88 16,222.25 176,119.13

2835.16 Mengurug tanah urug m3 58,378.32 17,818.90 76,197.22


Tanah urug (pilihan) 1.200 m3 44,226.00 53,071.20 - 53,071.20
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Mandor 0.010 OH 74,900.00 - 749.00 749.00
53,071.20 16,199.00 69,270.20
overhead & Profit 10% 5,307.12 1,619.90 6,927.02
Jumlah 58,378.32 17,818.90 76,197.22

2835.17 Mengurug tanah kembali dipadatkan m3 39,598.70 39,598.70


Pekerja 0.750 OH 51,500.00 - 38,625.00 38,625.00
Mandor 0.013 OH 74,900.00 - 973.70 973.70
- 39,598.70 39,598.70
overhead & Profit 10% - 3,959.87 3,959.87
Jumlah - 43,558.57 43,558.57

2835.18 Membongkar genteng/sirap (bongkaran digunakan) m2 - 32,444.50 32,444.50


Pekerja 0.500 OH 51,500.00 - 25,750.00 25,750.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
- 29,495.00 29,495.00
overhead & Profit 10% - 2,949.50 2,949.50
Jumlah - 32,444.50 32,444.50

2835.19 Membongkar genteng/sirap (bongkaran tidak digunakan) m2 - 6,488.90 6,488.90


Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Mandor 0.010 OH 74,900.00 - 749.00 749.00
- 5,899.00 5,899.00
overhead & Profit 10% - 589.90 589.90
Jumlah - 6,488.90 6,488.90

2835.20 Membongkar rangka atap, reng kaso (bongkaran digunakan) m2 - 20,689.35 20,689.35
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.020 OH 74,900.00 - 1,498.00 1,498.00
- 18,808.50 18,808.50
overhead & Profit 10% - 1,880.85 1,880.85
Jumlah - 20,689.35 20,689.35

2835.21 Membongkar rangka atap, reng kaso (bongkaran tidak digunakan) m2 - 15,294.95 15,294.95
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
- 13,904.50 13,904.50
overhead & Profit 10% - 1,390.45 1,390.45
Jumlah - 15,294.95 15,294.95
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
2835.22 Membongkar rangka atap, gording, kuda-kuda (bongkaran digunakan) m3 - 692,588.60 692,588.60
Tukang kayu 6.000 OH 63,200.00 - 379,200.00 379,200.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Kepala tukang 0.600 OH 69,050.00 - 41,430.00 41,430.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
- 629,626.00 629,626.00
overhead & Profit 10% - 62,962.60 62,962.60
Jumlah - 692,588.60 692,588.60

2835.23 Membongkar rangka atap, gording, kuda-kuda (bongkaran tidak digunakm3 - 461,242.10 461,242.10
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
- 419,311.00 419,311.00
overhead & Profit 10% - 41,931.10 41,931.10
Jumlah - 461,242.10 461,242.10

2835.24 Membongkar plafon (bongkaran digunakan) m2 - 29,623.55 29,623.55


Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
- 26,930.50 26,930.50
overhead & Profit 10% - 2,693.05 2,693.05
Jumlah - 29,623.55 29,623.55

2835.25 Membongkar plafon (bongkaran tidak digunakan) m2 - 9,733.35 9,733.35


Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
- 8,848.50 8,848.50
overhead & Profit 10% - 884.85 884.85
Jumlah - 9,733.35 9,733.35
B PEKERJAAN BETON
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

7394.01 Membuat beton mutu f'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 m3 668,844.55 121,555.61 790,400.16
Semen PC. 247.000 Kg 1,306.50 322,705.50 - 322,705.50
Pasir beton 869.000 Kg 175.00 152,075.00 - 152,075.00
Batu pecah 2-3 cm ( pecah mesin) 999.000 kg 125.00 124,875.00 - 124,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
608,040.50 110,505.10 718,545.60
overhead & Profit 10% 60,804.05 11,050.51 71,854.56
Jumlah 668,844.55 121,555.61 790,400.16

7394.02 Membuat beton mutu f'c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 m3 704,416.90 121,555.61 825,972.51
Semen PC. 276.000 Kg 1,306.50 360,594.00 - 360,594.00
Pasir beton 828.000 kg 175.00 144,900.00 - 144,900.00
Batu pecah 2-3 cm ( pecah mesin) 1,012.000 kg 125.00 126,500.00 - 126,500.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
640,379.00 110,505.10 750,884.10
overhead & Profit 10% 64,037.90 11,050.51 75,088.41
Jumlah 704,416.90 121,555.61 825,972.51

7394.03 Membuat beton mutu f'c = 12,2 MPa (K 150), slump (12 ± 2) cm m3 732,576.35 121,555.61 854,131.96
Semen PC. 299.000 Kg 1,306.50 390,643.50 - 390,643.50
Pasir beton 799.000 Kg 175.00 139,825.00 - 139,825.00
Batu pecah 2-3 cm ( pecah mesin) 1,017.000 Kg 125.00 127,125.00 - 127,125.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
665,978.50 110,505.10 776,483.60
overhead & Profit 10% 66,597.85 11,050.51 77,648.36
Jumlah 732,576.35 121,555.61 854,131.96

7394.04 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100), slump (3 - 6) cm, w/c = 0,87 m3 652,239.50 88,346.50 740,586.00
Semen PC. 230.000 Kg 1,306.50 300,495.00 - 300,495.00
Pasir beton 893.000 Kg 175.00 156,275.00 - 156,275.00
Batu pecah 2-3 cm ( pecah mesin) 1,027.000 Kg 125.00 128,375.00 - 128,375.00
Air kerja 200.000 ltr 39.00 7,800.00 - 7,800.00
Pekerja 1.200 OH 51,500.00 - 61,800.00 61,800.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.060 OH 74,900.00 - 4,494.00 4,494.00
592,945.00 80,315.00 673,260.00
overhead & Profit 10% 59,294.50 8,031.50 67,326.00
Jumlah 652,239.50 88,346.50 740,586.00

7394.05 Membuat beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm m3 765,521.90 121,555.61 887,077.51
Semen PC. 326.000 Kg 1,306.50 425,919.00 - 425,919.00
Pasir beton 760.000 Kg 175.00 133,000.00 - 133,000.00
Batu pecah 2-3 cm ( pecah mesin) 1,029.000 Kg 125.00 128,625.00 - 128,625.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
695,929.00 110,505.10 806,434.10
overhead & Profit 10% 69,592.90 11,050.51 80,643.41
Jumlah 765,521.90 121,555.61 887,077.51

7394.06 Membuat beton mutu f'c = 16,9 MPa (K 200), slump (12 ± 2) cm m3 797,580.30 121,555.61 919,135.91
Semen PC. 352.000 Kg 1,306.50 459,888.00 - 459,888.00
Pasir beton 731.000 Kg 175.00 127,925.00 - 127,925.00
Batu pecah 2-3 cm ( pecah mesin) 1,031.000 Kg 125.00 128,875.00 - 128,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
725,073.00 110,505.10 835,578.10
overhead & Profit 10% 72,507.30 11,050.51 83,557.81
Jumlah 797,580.30 121,555.61 919,135.91

7394.07 Membuat beton mutu f'c = 19,3 MPa (K 225), slump (12 ± 2) cm m3 820,733.65 121,555.61 942,289.26
Semen PC. 371.000 Kg 1,306.50 484,711.50 - 484,711.50
Pasir beton 698.000 Kg 175.00 122,150.00 - 122,150.00
Batu pecah 2-3 cm ( pecah mesin) 1,047.000 Kg 125.00 130,875.00 - 130,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
746,121.50 110,505.10 856,626.60
overhead & Profit 10% 74,612.15 11,050.51 85,662.66
Jumlah 820,733.65 121,555.61 942,289.26

7394.08 Membuat beton mutu f'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 m3 837,161.60 121,555.61 958,717.21
Semen PC. 384.000 Kg 1,306.50 501,696.00 - 501,696.00
Pasir beton 692.000 kg 175.00 121,100.00 - 121,100.00
Batu pecah 2-3 cm ( pecah mesin) 1,039.000 Kg 125.00 129,875.00 - 129,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
761,056.00 110,505.10 871,561.10
overhead & Profit 10% 76,105.60 11,050.51 87,156.11
Jumlah 837,161.60 121,555.61 958,717.21

7394.09 Membuat beton mutu f'c = 24,0 MPa (K 275), slump (12 ± 2) cm m3 865,451.40 121,555.61 987,007.01
Semen PC. 406.000 Kg 1,306.50 530,439.00 - 530,439.00
Pasir beton 684.000 Kg 175.00 119,700.00 - 119,700.00
Batu pecah 2-3 cm ( pecah mesin) 1,026.000 Kg 125.00 128,250.00 - 128,250.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
786,774.00 110,505.10 897,279.10
overhead & Profit 10% 78,677.40 11,050.51 89,727.91
Jumlah 865,451.40 121,555.61 987,007.01

7394.10 Membuat beton mutu f'c = 26,4 MPa (K 300), slump (12 ± 2) cm m3 874,246.45 121,555.61 995,802.06
Semen PC. 413.000 Kg 1,306.50 539,584.50 - 539,584.50
Pasir beton 681.000 Kg 175.00 119,175.00 - 119,175.00
Batu pecah 2-3 cm ( pecah mesin) 1,021.000 Kg 125.00 127,625.00 - 127,625.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
794,769.50 110,505.10 905,274.60
overhead & Profit 10% 79,476.95 11,050.51 90,527.46
Jumlah 874,246.45 121,555.61 995,802.06

7394.11 Membuat beton mutu f'c = 28,8 MPa (K 325), slump (12 ± 2) cm m3 907,432.35 154,606.38 1,062,038.73
Semen PC. 439.000 Kg 1,306.50 573,553.50 - 573,553.50
Pasir beton 670.000 Kg 175.00 117,250.00 - 117,250.00
Batu pecah 2-3 cm ( pecah mesin) 1,006.000 Kg 125.00 125,750.00 - 125,750.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 2.100 OH 51,500.00 - 108,150.00 108,150.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.105 OH 74,900.00 - 7,864.50 7,864.50
824,938.50 140,551.25 965,489.75
overhead & Profit 10% 82,493.85 14,055.13 96,548.98
Jumlah 907,432.35 154,606.38 1,062,038.73

7394.12 Membuat beton mutu f'c = 31,2 MPa (K 350), slump (12 ± 2) cm m3 918,964.20 154,606.38 1,073,570.58
Semen PC. 448.000 Kg 1,306.50 585,312.00 - 585,312.00
Pasir beton 667.000 Kg 175.00 116,725.00 - 116,725.00
Batu pecah 2-3 cm ( pecah mesin) 1,000.000 Kg 125.00 125,000.00 - 125,000.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 2.100 OH 51,500.00 - 108,150.00 108,150.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.105 OH 74,900.00 - 7,864.50 7,864.50
835,422.00 140,551.25 975,973.25
overhead & Profit 10% 83,542.20 14,055.13 97,597.33
Jumlah 918,964.20 154,606.38 1,073,570.58

7394.17 Pembesian dengan besi polos atau besi ulir kg 11,875.79 969.31 12,845.11
Pembesian dengan besi polos atau besi ulir 10 kg 118,757.93 9,693.15 128,451.07
Besi beton 10.500 kg 10,062.00 105,651.00 - 105,651.00
Bindrad 0.150 kg 15,405.00 2,310.75 - 2,310.75
Pekerja 0.070 OH 51,500.00 - 3,605.00 3,605.00
Tukang besi 0.070 OH 63,200.00 - 4,424.00 4,424.00
Kepala tukang 0.007 OH 69,050.00 - 483.35 483.35
Mandor 0.004 OH 74,900.00 - 299.60 299.60
107,961.75 8,811.95 116,773.70
overhead & Profit 10% 10,796.18 881.20 11,677.37
Jumlah 118,757.93 9,693.15 128,451.07

7394.20 Memasang bekisting untuk pondasi m2 31,407.75 51,650.17 83,057.92


Kayu sengon untuk begesting (papan/kaso) 0.010 m3 2,730,000.00 27,300.00 - 27,300.00
Paku 0.075 kg 15,600.00 1,170.00 - 1,170.00
Minyak begesting 0.025 liter 3,300.00 82.50 - 82.50
Pekerja 0.520 OH 51,500.00 - 26,780.00 26,780.00
Tukang kayu 0.260 OH 63,200.00 - 16,432.00 16,432.00
Kepala tukang 0.026 OH 69,050.00 - 1,795.30 1,795.30
Mandor 0.026 OH 74,900.00 - 1,947.40 1,947.40
28,552.50 46,954.70 75,507.20
overhead & Profit 10% 2,855.25 4,695.47 7,550.72
Jumlah 31,407.75 51,650.17 83,057.92

7394.21 Memasang bekisting untuk sloof m2 31,407.75 51,650.17 83,057.92


Kayu sengon untuk begesting (papan/kaso) 0.010 m3 2,730,000.00 27,300.00 - 27,300.00
Paku 0.075 kg 15,600.00 1,170.00 - 1,170.00
Minyak begesting 0.025 liter 3,300.00 82.50 - 82.50
Pekerja 0.520 OH 51,500.00 - 26,780.00 26,780.00
Tukang kayu 0.260 OH 63,200.00 - 16,432.00 16,432.00
Kepala tukang 0.026 OH 69,050.00 - 1,795.30 1,795.30
Mandor 0.026 OH 74,900.00 - 1,947.40 1,947.40
28,552.50 46,954.70 75,507.20
overhead & Profit 10% 2,855.25 4,695.47 7,550.72
Jumlah 31,407.75 51,650.17 83,057.92

7394.22 Memasang bekisting untuk kolom m2 58,067.90 65,555.99 123,623.89


Kayu sengon untuk begesting (papan/kaso) 0.015 m3 2,730,000.00 40,950.00 - 40,950.00
Paku 0.133 kg 15,600.00 2,080.00 - 2,080.00
Kayu lapis/ tripleks tb. 3 mm - lembar - - -
Minyak begesting 0.050 liter 3,300.00 165.00 - 165.00
Bambu apus 0.667 batang 14,391.00 9,594.00 - 9,594.00
Pekerja 0.660 OH 51,500.00 - 33,990.00 33,990.00
Tukang kayu 0.330 OH 63,200.00 - 20,856.00 20,856.00
Kepala tukang 0.033 OH 69,050.00 - 2,278.65 2,278.65
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Mandor 0.033 OH 74,900.00 - 2,471.70 2,471.70
52,789.00 59,596.35 112,385.35
overhead & Profit 10% 5,278.90 5,959.64 11,238.54
Jumlah 58,067.90 65,555.99 123,623.89

7394.23 Memasang bekisting untuk balok m2 63,344.60 65,555.99 128,900.59


Kayu sengon untuk begesting (papan/kaso) 0.015 m3 2,730,000.00 40,950.00 - 40,950.00
Paku 0.133 kg 15,600.00 2,080.00 - 2,080.00
Kayu lapis/ tripleks tb. 3 mm - lembar - - - -
Minyak begesting 0.050 liter 3,300.00 165.00 - 165.00
Bambu apus 1.000 batang 14,391.00 14,391.00 - 14,391.00
Pekerja 0.660 OH 51,500.00 - 33,990.00 33,990.00
Tukang kayu 0.330 OH 63,200.00 - 20,856.00 20,856.00
Kepala tukang 0.033 OH 69,050.00 - 2,278.65 2,278.65
Mandor 0.033 OH 74,900.00 - 2,471.70 2,471.70
57,586.00 59,596.35 117,182.35
overhead & Profit 10% 5,758.60 5,959.64 11,718.24
Jumlah 63,344.60 65,555.99 128,900.59

7394.24 Memasang bekisting untuk plat lantai m2 96,536.00 65,555.99 162,091.99


Kayu sengon untuk begesting (papan/kaso) 0.018 m3 2,730,000.00 50,050.00 - 50,050.00
Paku 0.133 kg 15,600.00 2,080.00 - 2,080.00
Kayu lapis/ tripleks tb. 3 mm 0.117 lembar 53,040.00 6,188.00 - 6,188.00
Minyak begesting 0.200 liter 3,300.00 660.00 - 660.00
Bambu apus 2.000 batang 14,391.00 28,782.00 - 28,782.00
Pekerja 0.660 OH 51,500.00 - 33,990.00 33,990.00
Tukang kayu 0.330 OH 63,200.00 - 20,856.00 20,856.00
Kepala tukang 0.033 OH 69,050.00 - 2,278.65 2,278.65
Mandor 0.033 OH 74,900.00 - 2,471.70 2,471.70
87,760.00 59,596.35 147,356.35
overhead & Profit 10% 8,776.00 5,959.64 14,735.64
Jumlah 96,536.00 65,555.99 162,091.99

7394.25 Memasang bekisting untuk dinding m2 76,809.15 65,555.99 142,365.14


Kayu sengon untuk begesting (papan/kaso) 0.017 m3 2,730,000.00 45,500.00 - 45,500.00
Paku 0.133 kg 15,600.00 2,080.00 - 2,080.00
Kayu lapis/ tripleks tb. 3 mm - lembar - - -
Minyak begesting 0.200 liter 3,300.00 660.00 - 660.00
Bambu apus 1.500 batang 14,391.00 21,586.50 - 21,586.50
Pekerja 0.660 OH 51,500.00 - 33,990.00 33,990.00
Tukang kayu 0.330 OH 63,200.00 - 20,856.00 20,856.00
Kepala tukang 0.033 OH 69,050.00 - 2,278.65 2,278.65
Mandor 0.033 OH 74,900.00 - 2,471.70 2,471.70
69,826.50 59,596.35 129,422.85
overhead & Profit 10% 6,982.65 5,959.64 12,942.29
Jumlah 76,809.15 65,555.99 142,365.14

7394.26 Memasang bekisting untuk tangga m2 84,128.00 65,555.99 149,683.99


Kayu sengon untuk begesting (papan/kaso) 0.015 m3 2,730,000.00 40,950.00 - 40,950.00
Paku 0.133 kg 15,600.00 2,080.00 - 2,080.00
Kayu lapis/ tripleks tb. 3 mm 0.350 lembar 53,040.00 18,564.00 - 18,564.00
Minyak begesting 0.150 liter 3,300.00 495.00 - 495.00
Bambu apus 1.000 batang 14,391.00 14,391.00 - 14,391.00
Pekerja 0.660 OH 51,500.00 - 33,990.00 33,990.00
Tukang kayu 0.330 OH 63,200.00 - 20,856.00 20,856.00
Kepala tukang 0.033 OH 69,050.00 - 2,278.65 2,278.65
Mandor 0.033 OH 74,900.00 - 2,471.70 2,471.70
76,480.00 59,596.35 136,076.35
overhead & Profit 10% 7,648.00 5,959.64 13,607.64
Jumlah 84,128.00 65,555.99 149,683.99

7394.27 Memasang jembatan untuk pengecoran beton m2 97,490.25 13,012.40 110,502.65


Kayu sengon untuk begesting (papan/kaso) 0.026 m3 2,730,000.00 72,072.00 - 72,072.00
Paku 0.600 kg 15,600.00 9,360.00 - 9,360.00
Bambu apus 0.500 batang 14,391.00 7,195.50 - 7,195.50
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.008 OH 74,900.00 - 599.20 599.20
88,627.50 11,829.45 100,456.95
overhead & Profit 10% 8,862.75 1,182.95 10,045.70
Jumlah 97,490.25 13,012.40 110,502.65

7394.28 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 3,186,344.14 524,468.56 3,710,812.70
Kayu sengon untuk begesting (papan/kaso) 0.200 m3 2,730,000.00 546,000.00 - 546,000.00
Paku 1.500 kg 15,600.00 23,400.00 - 23,400.00
Minyak begesting 0.400 liter 3,300.00 1,320.00 - 1,320.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 2.250 kg 15,405.00 34,661.25 - 34,661.25
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.300 OH 51,500.00 - 272,950.00 272,950.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.300 OH 63,200.00 - 82,160.00 82,160.00
Tukang besi 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.262 OH 69,050.00 - 18,091.10 18,091.10
Mandor 0.265 OH 74,900.00 - 19,848.50 19,848.50
2,896,676.49 476,789.60 3,373,466.09
overhead & Profit 10% 289,667.65 47,678.96 337,346.61
Jumlah 3,186,344.14 524,468.56 3,710,812.70

7394.29 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 3,636,045.24 538,926.85 4,174,972.09
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,636,045.24 538,926.85 4,174,972.09
overhead & Profit 10% 363,604.52 53,892.69 417,497.21
Jumlah 3,999,649.76 592,819.54 4,592,469.30

7394.30 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 6,588,277.01 738,894.04 7,327,171.05
Kayu sengon untuk begesting (papan/kaso) 0.550 m3 2,730,000.00 1,501,500.00 - 1,501,500.00
Paku 4.000 kg 15,600.00 62,400.00 - 62,400.00
Minyak begesting 2.000 liter 3,300.00 6,600.00 - 6,600.00
Besi beton 315.000 kg 10,062.00 3,169,530.00 - 3,169,530.00
Bindrad 4.500 kg 15,405.00 69,322.50 - 69,322.50
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 3.500 lembar 53,040.00 185,640.00 - 185,640.00
Bambu apus 20.000 batang 14,391.00 287,820.00 - 287,820.00
Pekerja 7.050 OH 51,500.00 - 363,075.00 363,075.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.650 OH 63,200.00 - 104,280.00 104,280.00
Tukang besi 2.100 OH 63,200.00 - 132,720.00 132,720.00
Kepala tukang 0.403 OH 69,050.00 - 27,827.15 27,827.15
Mandor 0.353 OH 74,900.00 - 26,439.70 26,439.70
5,989,342.74 671,721.85 6,661,064.59
overhead & Profit 10% 598,934.27 67,172.19 666,106.46
Jumlah 6,588,277.01 738,894.04 7,327,171.05

7394.31 Membuat balok beton bertulang (200 kg besi + bekisting) m3 5,011,086.56 642,374.54 5,653,461.10
Kayu sengon untuk begesting (papan/kaso) 0.460 m3 2,730,000.00 1,255,800.00 - 1,255,800.00
Paku 3.200 kg 15,600.00 49,920.00 - 49,920.00
Minyak begesting 1.600 liter 3,300.00 5,280.00 - 5,280.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.800 lembar 53,040.00 148,512.00 - 148,512.00
Bambu apus 16.000 batang 14,391.00 230,256.00 - 230,256.00
Pekerja 6.350 OH 51,500.00 - 327,025.00 327,025.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.650 OH 63,200.00 - 104,280.00 104,280.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.333 OH 69,050.00 - 22,993.65 22,993.65
Mandor 0.318 OH 74,900.00 - 23,818.20 23,818.20
4,555,533.24 583,976.85 5,139,510.09
overhead & Profit 10% 455,553.32 58,397.69 513,951.01
Jumlah 5,011,086.56 642,374.54 5,653,461.10

7394.32 Membuat plat beton bertulang (150 kg besi + bekisting) m3 4,610,518.54 524,696.43 5,135,214.96
Kayu sengon untuk begesting (papan/kaso) 0.440 m3 2,730,000.00 1,201,200.00 - 1,201,200.00
Paku 3.200 kg 15,600.00 49,920.00 - 49,920.00
Minyak begesting 1.600 liter 3,300.00 5,280.00 - 5,280.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 2.250 kg 15,405.00 34,661.25 - 34,661.25
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.800 lembar 53,040.00 148,512.00 - 148,512.00
Bambu apus 32.000 batang 14,391.00 460,512.00 - 460,512.00
Pekerja 5.300 OH 51,500.00 - 272,950.00 272,950.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.300 OH 63,200.00 - 82,160.00 82,160.00
Tukang besi 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.265 OH 69,050.00 - 18,298.25 18,298.25
Mandor 0.265 OH 74,900.00 - 19,848.50 19,848.50
4,191,380.49 476,996.75 4,668,377.24
overhead & Profit 10% 419,138.05 47,699.68 466,837.72
Jumlah 4,610,518.54 524,696.43 5,135,214.96

7394.33 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 4,363,757.74 524,468.56 4,888,226.30
Kayu sengon untuk begesting (papan/kaso) 0.400 m3 2,730,000.00 1,092,000.00 - 1,092,000.00
Paku 3.200 kg 15,600.00 49,920.00 - 49,920.00
Minyak begesting 1.600 liter 3,300.00 5,280.00 - 5,280.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 2.250 kg 15,405.00 34,661.25 - 34,661.25
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.800 lembar 53,040.00 148,512.00 - 148,512.00
Bambu apus 24.000 batang 14,391.00 345,384.00 - 345,384.00
Pekerja 5.300 OH 51,500.00 - 272,950.00 272,950.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.300 OH 63,200.00 - 82,160.00 82,160.00
Tukang besi 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.262 OH 69,050.00 - 18,091.10 18,091.10
Mandor 0.265 OH 74,900.00 - 19,848.50 19,848.50
3,967,052.49 476,789.60 4,443,842.09
overhead & Profit 10% 396,705.25 47,678.96 444,384.21
Jumlah 4,363,757.74 524,468.56 4,888,226.30

7394.34 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 4,641,724.16 592,819.54 5,234,543.70
Kayu sengon untuk begesting (papan/kaso) 0.355 m3 2,730,000.00 969,150.00 - 969,150.00
Paku 3.000 kg 15,600.00 46,800.00 - 46,800.00
Minyak begesting 1.200 liter 3,300.00 3,960.00 - 3,960.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.500 lembar 53,040.00 132,600.00 - 132,600.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Bambu apus 14.000 batang 14,391.00 201,474.00 - 201,474.00
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,219,749.24 538,926.85 4,758,676.09
overhead & Profit 10% 421,974.92 53,892.69 475,867.61
Jumlah 4,641,724.16 592,819.54 5,234,543.70

7394.35 Membuat kolom praktis beton bertulang (11 x 11) cm m 49,163.36 15,565.44 64,728.80
Kayu sengon untuk begesting (papan/kaso) 0.002 m3 2,730,000.00 5,460.00 - 5,460.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Besi beton 3.000 kg 10,062.00 30,186.00 - 30,186.00
Bindrad 0.045 kg 15,405.00 693.23 - 693.23
Semen PC. 4.000 Kg 1,306.50 5,226.00 - 5,226.00
Pasir beton 0.006 m3 183,300.00 1,099.80 - 1,099.80
Batu pecah 2-3 cm ( pecah mesin) 0.009 m3 208,104.00 1,872.94 - 1,872.94
Pekerja 0.180 OH 51,500.00 - 9,270.00 9,270.00
Tukang batu 0.020 OH 63,200.00 - 1,264.00 1,264.00
Tukang kayu 0.020 OH 63,200.00 - 1,264.00 1,264.00
Tukang besi 0.020 OH 63,200.00 - 1,264.00 1,264.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.009 OH 74,900.00 - 674.10 674.10
44,693.96 14,150.40 58,844.36
overhead & Profit 10% 4,469.40 1,415.04 5,884.44
Jumlah 49,163.36 15,565.44 64,728.80

7394.36 Membuat ring balok beton bertulang (10 x 15) cm m 63,197.71 25,702.93 88,900.64
Kayu sengon untuk begesting (papan/kaso) 0.003 m3 2,730,000.00 8,190.00 - 8,190.00
Paku 0.020 kg 15,600.00 312.00 - 312.00
Besi beton 3.600 kg 10,062.00 36,223.20 - 36,223.20
Bindrad 0.050 kg 15,405.00 770.25 - 770.25
Semen PC. 5.500 Kg 1,306.50 7,185.75 - 7,185.75
Pasir beton 0.009 m3 183,300.00 1,649.70 - 1,649.70
Batu pecah 2-3 cm ( pecah mesin) 0.015 m3 208,104.00 3,121.56 - 3,121.56
Pekerja 0.297 OH 51,500.00 - 15,295.50 15,295.50
Tukang batu 0.033 OH 63,200.00 - 2,085.60 2,085.60
Tukang kayu 0.033 OH 63,200.00 - 2,085.60 2,085.60
Tukang besi 0.033 OH 63,200.00 - 2,085.60 2,085.60
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
57,452.46 23,366.30 80,818.76
overhead & Profit 10% 5,745.25 2,336.63 8,081.88
Jumlah 63,197.71 25,702.93 88,900.64

7394.37 Membuat beton bertulang (100 kg besi + bekisting) m3 2,837,488.76 592,819.54 3,430,308.30
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 105.000 kg 10,062.00 1,056,510.00 - 1,056,510.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
2,579,535.24 538,926.85 3,118,462.09
overhead & Profit 10% 257,953.52 53,892.69 311,846.21
Jumlah 2,837,488.76 592,819.54 3,430,308.30

7394.38 Membuat beton bertulang (125 kg besi + bekisting) m3 3,130,796.06 592,819.54 3,723,615.60
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 131.500 kg 10,062.00 1,323,153.00 - 1,323,153.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
2,846,178.24 538,926.85 3,385,105.09
overhead & Profit 10% 284,617.82 53,892.69 338,510.51
Jumlah 3,130,796.06 592,819.54 3,723,615.60

7394.39 Membuat beton bertulang (150 kg besi + bekisting) m3 3,418,569.26 592,819.54 4,011,388.80
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,107,790.24 538,926.85 3,646,717.09
overhead & Profit 10% 310,779.02 53,892.69 364,671.71
Jumlah 3,418,569.26 592,819.54 4,011,388.80
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

7394.40 Membuat beton bertulang (175 kg besi + bekisting) m3 3,709,109.51 592,819.54 4,301,929.05
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 183.750 kg 10,062.00 1,848,892.50 - 1,848,892.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,371,917.74 538,926.85 3,910,844.59
overhead & Profit 10% 337,191.77 53,892.69 391,084.46
Jumlah 3,709,109.51 592,819.54 4,301,929.05

7394.41 Membuat beton bertulang (200 kg besi + bekisting) m3 3,999,649.76 592,819.54 4,592,469.30
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,636,045.24 538,926.85 4,174,972.09
overhead & Profit 10% 363,604.52 53,892.69 417,497.21
Jumlah 3,999,649.76 592,819.54 4,592,469.30

7394.42 Membuat beton bertulang (225 kg besi + bekisting) m3 4,290,190.01 592,819.54 4,883,009.55
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 236.250 kg 10,062.00 2,377,147.50 - 2,377,147.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,900,172.74 538,926.85 4,439,099.59
overhead & Profit 10% 390,017.27 53,892.69 443,909.96
Jumlah 4,290,190.01 592,819.54 4,883,009.55

7394.43 Membuat beton bertulang (250 kg besi + bekisting) m3 4,580,730.26 592,819.54 5,173,549.80
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 262.500 kg 10,062.00 2,641,275.00 - 2,641,275.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,164,300.24 538,926.85 4,703,227.09
overhead & Profit 10% 416,430.02 53,892.69 470,322.71
Jumlah 4,580,730.26 592,819.54 5,173,549.80

7394.44 Membuat beton bertulang (275 kg besi + bekisting) m3 4,871,270.51 592,819.54 5,464,090.05
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 288.750 kg 10,062.00 2,905,402.50 - 2,905,402.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,428,427.74 538,926.85 4,967,354.59
overhead & Profit 10% 442,842.77 53,892.69 496,735.46
Jumlah 4,871,270.51 592,819.54 5,464,090.05

7394.45 Membuat beton bertulang (300 kg besi + bekisting) m3 5,161,810.76 592,819.54 5,754,630.30
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 315.000 kg 10,062.00 3,169,530.00 - 3,169,530.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,692,555.24 538,926.85 5,231,482.09
overhead & Profit 10% 469,255.52 53,892.69 523,148.21
Jumlah 5,161,810.76 592,819.54 5,754,630.30

7394.46 Membuat beton bertulang (325 kg besi + bekisting) m3 5,452,351.01 592,819.54 6,045,170.55
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 341.250 kg 10,062.00 3,433,657.50 - 3,433,657.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,956,682.74 538,926.85 5,495,609.59
overhead & Profit 10% 495,668.27 53,892.69 549,560.96
Jumlah 5,452,351.01 592,819.54 6,045,170.55

7394.47 Membuat beton bertulang (350 kg besi + bekisting) m3 5,742,891.26 592,819.54 6,335,710.80
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 367.500 kg 10,062.00 3,697,785.00 - 3,697,785.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
5,220,810.24 538,926.85 5,759,737.09
overhead & Profit 10% 522,081.02 53,892.69 575,973.71
Jumlah 5,742,891.26 592,819.54 6,335,710.80

7394.48 1 M3 BETON BERTULANG 1 PC : 2 PS : 3 KRL


Semen PC 326.000 kg 1,306.50 425,919.00 425,919.00
Pasir beton 0.466 m3 183,300.00 85,362.81 85,362.81
Split pecah mesin 2/3 0.724 m3 208,104.00 150,750.54 150,750.54
Air kerja 215.000 ltr 39.00 8,385.00 8,385.00
Pekerja 1.650 org 51,500.00 84,975.00 84,975.00
Tukang batu 0.275 org 63,200.00 17,380.00 17,380.00
Kepala tukang batu 0.028 org 69,050.00 1,933.40 1,933.40
Mandor 0.083 org 74,900.00 6,216.70 6,216.70
Jumlah
C PEKERJAAN PASANGAN BATU DAN PONDASI
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

2836.01 Memasang batu belah campuran 1 PC : 3 PP m3 581,899.89 148,990.88 730,890.77


Batu kali belah 1.200 m3 144,300.00 173,160.00 - 173,160.00
Semen PC. 202.000 Kg 1,306.50 263,913.00 - 263,913.00
Pasir pasang 0.485 m3 189,540.00 91,926.90 - 91,926.90
Pekerja 1.500 OH 51,500.00 - 77,250.00 77,250.00
Tukang batu 0.750 OH 63,200.00 - 47,400.00 47,400.00
Kepala tukang 0.075 OH 69,050.00 - 5,178.75 5,178.75
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
528,999.90 135,446.25 664,446.15
overhead & Profit 10% 52,899.99 13,544.63 66,444.62
Jumlah 581,899.89 148,990.88 730,890.77

2836.02 Memasang batu belah campuran 1 PC : 4 PP m3 533,148.33 148,990.88 682,139.21


Batu kali belah 1.200 m3 144,300.00 173,160.00 - 173,160.00
Semen PC. 163.000 Kg 1,306.50 212,959.50 - 212,959.50
Pasir pasang 0.520 m3 189,540.00 98,560.80 - 98,560.80
Pekerja 1.500 OH 51,500.00 - 77,250.00 77,250.00
Tukang batu 0.750 OH 63,200.00 - 47,400.00 47,400.00
Kepala tukang 0.075 OH 69,050.00 - 5,178.75 5,178.75
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
484,680.30 135,446.25 620,126.55
overhead & Profit 10% 48,468.03 13,544.63 62,012.66
Jumlah 533,148.33 148,990.88 682,139.21

2836.03 Memasang batu belah campuran 1 PC : 5 PP m3 499,349.14 148,990.88 648,340.01


Batu kali belah 1.200 m3 144,300.00 173,160.00 - 173,160.00
Semen PC. 136.000 Kg 1,306.50 177,684.00 - 177,684.00
Pasir pasang 0.544 m3 189,540.00 103,109.76 - 103,109.76
Pekerja 1.500 OH 51,500.00 - 77,250.00 77,250.00
Tukang batu 0.750 OH 63,200.00 - 47,400.00 47,400.00
Kepala tukang 0.075 OH 69,050.00 - 5,178.75 5,178.75
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
453,953.76 135,446.25 589,400.01
overhead & Profit 10% 45,395.38 13,544.63 58,940.00
Jumlah 499,349.14 148,990.88 648,340.01

2836.04 Memasang batu belah campuran 1 PC : 6 PP m3 475,587.68 148,990.88 624,578.56


Batu kali belah 1.200 m3 144,300.00 173,160.00 - 173,160.00
Semen PC. 117.000 Kg 1,306.50 152,860.50 - 152,860.50
Pasir pasang 0.561 m3 189,540.00 106,331.94 - 106,331.94
Pekerja 1.500 OH 51,500.00 - 77,250.00 77,250.00
Tukang batu 0.750 OH 63,200.00 - 47,400.00 47,400.00
Kepala tukang 0.075 OH 69,050.00 - 5,178.75 5,178.75
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
432,352.44 135,446.25 567,798.69
overhead & Profit 10% 43,235.24 13,544.63 56,779.87
Jumlah 475,587.68 148,990.88 624,578.56

2836.05 Memasang batu belah campuran 1 PC : 8 PP m3 443,017.15 148,990.88 592,008.02


Batu kali belah 1.200 m3 144,300.00 173,160.00 - 173,160.00
Semen PC. 91.000 Kg 1,306.50 118,891.50 - 118,891.50
Pasir pasang 0.584 m3 189,540.00 110,691.36 - 110,691.36
Pekerja 1.500 OH 51,500.00 - 77,250.00 77,250.00
Tukang batu 0.750 OH 63,200.00 - 47,400.00 47,400.00
Kepala tukang 0.075 OH 69,050.00 - 5,178.75 5,178.75
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
402,742.86 135,446.25 538,189.11
overhead & Profit 10% 40,274.29 13,544.63 53,818.91
Jumlah 443,017.15 148,990.88 592,008.02

2836.07 Memasang batu belah campuran 1 PC : 3 KP : 10 PP m3 463,320.86 148,990.88 612,311.73


Batu belah 15-20 cm ( pecah tangan ) 1.200 m3 181,077.00 217,292.40 - 217,292.40
Semen PC. 61.000 Kg 1,306.50 79,696.50 - 79,696.50
Batu Kapur Bongkahan 0.147 m3 210,600.00 30,958.20 - 30,958.20
Pasir pasang 0.492 m3 189,540.00 93,253.68 - 93,253.68
Pekerja 1.500 OH 51,500.00 - 77,250.00 77,250.00
Tukang batu 0.750 OH 63,200.00 - 47,400.00 47,400.00
Kepala tukang 0.075 OH 69,050.00 - 5,178.75 5,178.75
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
421,200.78 135,446.25 556,647.03
overhead & Profit 10% 42,120.08 13,544.63 55,664.70
Jumlah 463,320.86 148,990.88 612,311.73

2836.09 Memasang batu kosong (aanstamping) m3 291,562.13 77,475.26 369,037.38


Batu belah 15-20 cm ( pecah tangan ) 1.200 m3 181,077.00 217,292.40 - 217,292.40
Pasir urug 0.432 m3 110,565.00 47,764.08 - 47,764.08
Pekerja 0.780 OH 51,500.00 - 40,170.00 40,170.00
Tukang batu 0.390 OH 63,200.00 - 24,648.00 24,648.00
Kepala tukang 0.039 OH 69,050.00 - 2,692.95 2,692.95
Mandor 0.039 OH 74,900.00 - 2,921.10 2,921.10
265,056.48 70,432.05 335,488.53
overhead & Profit 10% 26,505.65 7,043.21 33,548.85
Jumlah 291,562.13 77,475.26 369,037.38

2836.10 Memasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR m3 1,969,551.36 272,164.48 2,241,715.83
Batu belah 15-20 cm ( pecah tangan ) 0.480 m3 181,077.00 86,916.96 - 86,916.96
Semen PC. 194.000 Kg 1,306.50 253,461.00 - 253,461.00
Pasir beton 0.312 m3 183,300.00 57,189.60 - 57,189.60
Batu pecah 2-3 cm ( pecah mesin) 0.468 m3 208,104.00 97,392.67 - 97,392.67
Besi beton 126.000 kg 10,062.00 1,267,812.00 - 1,267,812.00
Bindrad 1.800 kg 15,405.00 27,729.00 - 27,729.00
Pekerja 3.400 OH 51,500.00 - 175,100.00 175,100.00
Tukang batu 0.850 OH 63,200.00 - 53,720.00 53,720.00
Kepala tukang 0.085 OH 69,050.00 - 5,869.25 5,869.25
Mandor 0.170 OH 74,900.00 - 12,733.00 12,733.00
1,790,501.23 247,422.25 2,037,923.48
overhead & Profit 10% 179,050.12 24,742.23 203,792.35
Jumlah 1,969,551.36 272,164.48 2,241,715.83
2836.11 Memasang pondasi sumuran, diameter 100 cm m3 572,747.67 220,658.61 793,406.28
Batu belah 15-20 cm ( pecah tangan ) 0.450 m3 181,077.00 81,484.65 - 81,484.65
Semen PC. 194.000 Kg 1,306.50 253,461.00 - 253,461.00
Pasir beton 0.312 m3 183,300.00 57,189.60 - 57,189.60
Batu pecah 2-3 cm ( pecah mesin) 0.468 m3 208,104.00 97,392.67 - 97,392.67
Pekerja 2.400 OH 51,500.00 - 123,600.00 123,600.00
Tukang batu 0.800 OH 63,200.00 - 50,560.00 50,560.00
Kepala tukang 0.080 OH 69,050.00 - 5,524.00 5,524.00
Mandor 0.119 OH 74,900.00 - 8,913.10 8,913.10
489,527.92 188,597.10 678,125.02
overhead & Profit 17% 83,219.75 32,061.51 115,281.25
Jumlah 572,747.67 220,658.61 793,406.28

2836.12 Memasang batu bronjong kawat 3mm m3 1,069,679.52 249,357.60 1,319,037.12


Batu belah 15-20 cm ( pecah tangan ) 1.200 m3 181,077.00 217,292.40 - 217,292.40
Baja anyaman bronjong 18.000 kg 20,943.00 376,974.00 - 376,974.00
Pekerja 2.000 OH 51,500.00 - 103,000.00 103,000.00
Tukang batu 0.400 OH 63,200.00 - 25,280.00 25,280.00
Kepala tukang 0.040 OH 69,050.00 - 2,762.00 2,762.00
Mandor 0.100 OH 74,900.00 - 7,490.00 7,490.00
PEKERJAAN DINDING DAN PEKERJAAN PLESTERAN
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

6897.02 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 3 PP m2 162,423.05 51,884.80 214,307.85
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 32.950 Kg 1,306.50 43,049.18 - 43,049.18
Pasir pasang 0.091 m3 189,540.00 17,248.14 - 17,248.14
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
147,657.32 47,168.00 194,825.32
overhead & Profit 10% 14,765.73 4,716.80 19,482.53
Jumlah 162,423.05 51,884.80 214,307.85

6897.03 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 4 PP m2 153,642.27 51,884.80 205,527.07
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 26.550 Kg 1,306.50 34,687.58 - 34,687.58
Pasir pasang 0.093 m3 189,540.00 17,627.22 - 17,627.22
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
139,674.80 47,168.00 186,842.80
overhead & Profit 10% 13,967.48 4,716.80 18,684.28
Jumlah 153,642.27 51,884.80 205,527.07

6897.04 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 5 PP m2 149,267.12 51,884.80 201,151.92
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 22.200 Kg 1,306.50 29,004.30 - 29,004.30
Pasir pasang 0.102 m3 189,540.00 19,333.08 - 19,333.08
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
135,697.38 47,168.00 182,865.38
overhead & Profit 10% 13,569.74 4,716.80 18,286.54
Jumlah 149,267.12 51,884.80 201,151.92

6897.05 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 6 PP m2 148,119.54 51,884.80 200,004.34
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 18.500 Kg 1,306.50 24,170.25 - 24,170.25
Pasir pasang 0.122 m3 189,540.00 23,123.88 - 23,123.88
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
134,654.13 47,168.00 181,822.13
overhead & Profit 10% 13,465.41 4,716.80 18,182.21
Jumlah 148,119.54 51,884.80 200,004.34

6897.06 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP m2 135,766.92 51,884.80 187,651.72
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 10.080 Kg 1,306.50 13,169.52 - 13,169.52
Pasir pasang 0.0925 m3 189,540.00 17,532.45 - 17,532.45
Kawur 0.0275 m3 195,000.00 5,362.50 - 5,362.50
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
123,424.47 47,168.00 170,592.47
overhead & Profit 10% 12,342.45 4,716.80 17,059.25
Jumlah 135,766.92 51,884.80 187,651.72

6897.07 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 2 PP m2 83,204.76 25,942.40 109,147.16
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 18.950 Kg 1,306.50 24,758.18 - 24,758.18
Pasir pasang 0.038 m3 189,540.00 7,202.52 - 7,202.52
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
75,640.70 23,584.00 99,224.70
overhead & Profit 10% 7,564.07 2,358.40 9,922.47
Jumlah 83,204.76 25,942.40 109,147.16

6897.08 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 3 PP m2 77,039.61 25,942.40 102,982.01
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 14.370 Kg 1,306.50 18,774.41 - 18,774.41
Pasir pasang 0.040 m3 189,540.00 7,581.60 - 7,581.60
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
70,036.01 23,584.00 93,620.01
overhead & Profit 10% 7,003.60 2,358.40 9,362.00
Jumlah 77,039.61 25,942.40 102,982.01

6897.09 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 4 PP m2 73,540.47 25,942.40 99,482.87
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 11.500 Kg 1,306.50 15,024.75 - 15,024.75
Pasir pasang 0.043 m3 189,540.00 8,150.22 - 8,150.22
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
66,854.97 23,584.00 90,438.97
overhead & Profit 10% 6,685.50 2,358.40 9,043.90
Jumlah 73,540.47 25,942.40 99,482.87

6897.10 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 5 PP m2 71,341.84 25,942.40 97,284.24
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Semen PC. 9.680 Kg 1,306.50 12,646.92 - 12,646.92
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
64,856.22 23,584.00 88,440.22
overhead & Profit 10% 6,485.62 2,358.40 8,844.02
Jumlah 71,341.84 25,942.40 97,284.24

6897.11 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 6 PP m2 70,221.29 25,942.40 96,163.69
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 8.320 Kg 1,306.50 10,870.08 - 10,870.08
Pasir pasang 0.049 m3 189,540.00 9,287.46 - 9,287.46
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
63,837.54 23,584.00 87,421.54
overhead & Profit 10% 6,383.75 2,358.40 8,742.15
Jumlah 70,221.29 25,942.40 96,163.69

6897.12 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 8 PP m2 67,814.18 25,942.40 93,756.58
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 6.500 Kg 1,306.50 8,492.25 - 8,492.25
Pasir pasang 0.050 m3 189,540.00 9,477.00 - 9,477.00
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
61,649.25 23,584.00 85,233.25
overhead & Profit 10% 6,164.93 2,358.40 8,523.33
Jumlah 67,814.18 25,942.40 93,756.58

6897.13 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 PP m2 68,157.38 25,942.40 94,099.78
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 4.500 Kg 1,306.50 5,879.25 - 5,879.25
Pasir pasang 0.050 m3 189,540.00 9,477.00 - 9,477.00
Kawur 0.015 m3 195,000.00 2,925.00 - 2,925.00
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
61,961.25 23,584.00 85,545.25
overhead & Profit 10% 6,196.13 2,358.40 8,554.53
Jumlah 68,157.38 25,942.40 94,099.78

6897.14 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP m2 56,036.02 25,942.40 81,978.42
Batu bata 70.000 buah 624.00 43,680.00 43,680.00
Semen warna 0.018 kg 3,295.50 59.32 59.32
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Batu kapur bongkahan 0.018 m3 210,600.00 3,790.80 3,790.80
Pekerja 0.300 OH 51,500.00 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 690.50 690.50
Mandor 0.015 OH 74,900.00 1,123.50 1,123.50
50,941.84 23,584.00 74,525.84
overhead & Profit 10% 5,094.18 2,358.40 7,452.58
Jumlah 56,036.02 25,942.40 81,978.42

6897.15 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP m2 57,179.82 25,942.40 83,122.22
Batu bata 70.000 buah 624.00 43,680.00 43,680.00
Semen warna 0.014 kg 3,295.50 46.14 46.14
Pasir pasang 0.028 m3 189,540.00 5,307.12 5,307.12
Batu kapur bongkahan 0.014 m3 210,600.00 2,948.40 2,948.40
Pekerja 0.300 OH 51,500.00 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 690.50 690.50
Mandor 0.015 OH 74,900.00 1,123.50 1,123.50
51,981.66 23,584.00 75,565.66
overhead & Profit 10% 5,198.17 2,358.40 7,556.57
Jumlah 57,179.82 25,942.40 83,122.22

6897.22 Memasang roster ukuran 12 x 11 x 24 cm, campuran spesi 1 PC : 3 PP m2 343,393.91 25,942.40 369,336.31
Roster beton 12x11x24 30.000 bh 9,594.00 287,820.00 - 287,820.00
Semen PC. 14.000 Kg 1,306.50 18,291.00 - 18,291.00
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
312,176.28 23,584.00 335,760.28
overhead & Profit 10% 31,217.63 2,358.40 33,576.03
Jumlah 343,393.91 25,942.40 369,336.31

6897.23 Memasang roster ukuran 12 x 11 x 24 cm, campuran spesi 1 PC : 4 PP m2 339,707.94 25,942.40 365,650.34
Roster beton 12x11x24 30.000 bh 9,594.00 287,820.00 - 287,820.00
Semen PC. 11.000 Kg 1,306.50 14,371.50 - 14,371.50
Pasir pasang 0.035 m3 189,540.00 6,633.90 - 6,633.90
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
308,825.40 23,584.00 332,409.40
overhead & Profit 10% 30,882.54 2,358.40 33,240.94
Jumlah 339,707.94 25,942.40 365,650.34

2837.01 Memasang plesteran 1 PC : 1 PP, tebal 15 mm m2 25,617.48 29,798.18 55,415.65


Semen PC. 15.504 Kg 1,306.50 20,255.98 - 20,255.98
Pasir pasang 0.016 m3 189,540.00 3,032.64 - 3,032.64
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
23,288.62 27,089.25 50,377.87
overhead & Profit 10% 2,328.86 2,708.93 5,037.79
Jumlah 25,617.48 29,798.18 55,415.65

2837.02 Memasang plesteran 1 PC : 2 PP, tebal 15 mm m2 18,863.30 29,798.18 48,661.48


Semen PC. 10.224 Kg 1,306.50 13,357.66 - 13,357.66
Pasir pasang 0.020 m3 189,540.00 3,790.80 - 3,790.80
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
17,148.46 27,089.25 44,237.71
overhead & Profit 10% 1,714.85 2,708.93 4,423.77
Jumlah 18,863.30 29,798.18 48,661.48

2837.03 Memasang plesteran 1 PC : 3 PP, tebal 15 mm m2 15,970.64 29,798.18 45,768.82


Semen PC. 7.776 Kg 1,306.50 10,159.34 - 10,159.34
Pasir pasang 0.023 m3 189,540.00 4,359.42 - 4,359.42
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
14,518.76 27,089.25 41,608.01
overhead & Profit 10% 1,451.88 2,708.93 4,160.80
Jumlah 15,970.64 29,798.18 45,768.82

2837.04 Memasang plesteran 1 PC : 4 PP, tebal 15 mm m2 13,971.67 29,798.18 43,769.85


Semen PC. 6.240 Kg 1,306.50 8,152.56 - 8,152.56
Pasir pasang 0.024 m3 189,540.00 4,548.96 - 4,548.96
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
12,701.52 27,089.25 39,790.77
overhead & Profit 10% 1,270.15 2,708.93 3,979.08
Jumlah 13,971.67 29,798.18 43,769.85

2837.06 Memasang plesteran 1 PC : 6 PP, tebal 15 mm m2 11,975.79 29,798.18 41,773.97


Semen PC. 4.416 Kg 1,306.50 5,769.50 - 5,769.50
Pasir pasang 0.027 m3 189,540.00 5,117.58 - 5,117.58
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
10,887.08 27,089.25 37,976.33
overhead & Profit 10% 1,088.71 2,708.93 3,797.63
Jumlah 11,975.79 29,798.18 41,773.97

2837.08 Memasang plesteran 1 PC : 8 PP, tebal 15 mm m2 11,013.12 29,798.18 40,811.29


Semen PC. 3.456 Kg 1,306.50 4,515.26 - 4,515.26
Pasir pasang 0.029 m3 189,540.00 5,496.66 - 5,496.66
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
10,011.92 27,089.25 37,101.17
overhead & Profit 10% 1,001.19 2,708.93 3,710.12
Jumlah 11,013.12 29,798.18 40,811.29

2837.09 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm m2 11,683.39 31,130.88 42,814.27


Semen PC. 5.760 Kg 1,306.50 7,525.44 - 7,525.44
Batu Kapur Bongkahan 0.003 m3 210,600.00 631.80 - 631.80
Pasir pasang 0.013 m3 189,540.00 2,464.02 - 2,464.02
Pekerja 0.360 OH 51,500.00 - 18,540.00 18,540.00
Tukang batu 0.120 OH 63,200.00 - 7,584.00 7,584.00
Kepala tukang 0.012 OH 69,050.00 - 828.60 828.60
Mandor 0.018 OH 74,900.00 - 1,348.20 1,348.20
10,621.26 28,300.80 38,922.06
overhead & Profit 10% 1,062.13 2,830.08 3,892.21
Jumlah 11,683.39 31,130.88 42,814.27

2837.10 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm m2 9,639.63 31,130.88 40,770.51


Semen PC. 3.000 Kg 1,306.50 3,919.50 - 3,919.50
Batu Kapur Bongkahan 0.005 m3 210,600.00 1,053.00 - 1,053.00
Pasir pasang 0.020 m3 189,540.00 3,790.80 - 3,790.80
Pekerja 0.360 OH 51,500.00 - 18,540.00 18,540.00
Tukang batu 0.120 OH 63,200.00 - 7,584.00 7,584.00
Kepala tukang 0.012 OH 69,050.00 - 828.60 828.60
Mandor 0.018 OH 74,900.00 - 1,348.20 1,348.20
8,763.30 28,300.80 37,064.10
overhead & Profit 10% 876.33 2,830.08 3,706.41
Jumlah 9,639.63 31,130.88 40,770.51

2837.11 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm m2 3,974.32 31,130.88 35,105.20


Semen PC 0.009 kg 1,306.50 11.76 11.76
Batu kapur bongkahan 0.009 m3 210,600.00 1,895.40 1,895.40
Pasir pasang 0.009 m3 189,540.00 1,705.86 1,705.86
Pekerja 0.360 OH 51,500.00 18,540.00 18,540.00
Tukang batu 0.120 OH 63,200.00 7,584.00 7,584.00
Kepala tukang 0.012 OH 69,050.00 828.60 828.60
Mandor 0.018 OH 74,900.00 1,348.20 1,348.20
3,613.02 28,300.80 31,913.82
overhead & Profit 10% 361.30 2,830.08 3,191.38
Jumlah 3,974.32 31,130.88 35,105.20

2837.12 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm m2 4,759.09 31,130.88 35,889.97


Semen PC 0.007 kg 1,306.50 9.15 9.15
Batu kapur bongkahan 0.007 m3 210,600.00 1,474.20 1,474.20
Pasir pasang 0.015 m3 189,540.00 2,843.10 2,843.10
Pekerja 0.360 OH 51,500.00 18,540.00 18,540.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Tukang batu 0.120 OH 63,200.00 7,584.00 7,584.00
Kepala tukang 0.012 OH 69,050.00 828.60 828.60
Mandor 0.018 OH 74,900.00 1,348.20 1,348.20
4,326.45 28,300.80 32,627.25
overhead & Profit 10% 432.64 2,830.08 3,262.72
Jumlah 4,759.09 31,130.88 35,889.97

2837.13 Memasang plesteran 1 PC : 2 PP, tebal 20 mm m2 25,220.57 39,895.68 65,116.25


Semen PC. 13.632 Kg 1,306.50 17,810.21 - 17,810.21
Pasir pasang 0.027 m3 189,540.00 5,117.58 - 5,117.58
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
22,927.79 36,268.80 59,196.59
overhead & Profit 10% 2,292.78 3,626.88 5,919.66
Jumlah 25,220.57 39,895.68 65,116.25

2837.14 Memasang plesteran 1 PC : 3 PP, tebal 20 mm m2 21,363.69 39,895.68 61,259.37


Semen PC. 10.368 Kg 1,306.50 13,545.79 - 13,545.79
Pasir pasang 0.031 m3 189,540.00 5,875.74 - 5,875.74
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
19,421.53 36,268.80 55,690.33
overhead & Profit 10% 1,942.15 3,626.88 5,569.03
Jumlah 21,363.69 39,895.68 61,259.37

2837.15 Memasang plesteran 1 PC : 4 PP, tebal 20 mm m2 18,628.90 39,895.68 58,524.58


Semen PC. 8.320 Kg 1,306.50 10,870.08 - 10,870.08
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
16,935.36 36,268.80 53,204.16
overhead & Profit 10% 1,693.54 3,626.88 5,320.42
Jumlah 18,628.90 39,895.68 58,524.58

2837.16 Memasang plesteran 1 PC : 5 PP, tebal 20 mm m2 17,230.87 39,895.68 57,126.55


Semen PC. 6.912 Kg 1,306.50 9,030.53 - 9,030.53
Pasir pasang 0.035 m3 189,540.00 6,633.90 - 6,633.90
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
15,664.43 36,268.80 51,933.23
overhead & Profit 10% 1,566.44 3,626.88 5,193.32
Jumlah 17,230.87 39,895.68 57,126.55

2837.17 Memasang plesteran 1 PC : 6 PP, tebal 20 mm m2 15,967.72 39,895.68 55,863.40


Semen PC. 5.888 Kg 1,306.50 7,692.67 - 7,692.67
Pasir pasang 0.036 m3 189,540.00 6,823.44 - 6,823.44
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
14,516.11 36,268.80 50,784.91
overhead & Profit 10% 1,451.61 3,626.88 5,078.49
Jumlah 15,967.72 39,895.68 55,863.40

2837.18 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm m2 5,696.33 43,703.99 49,400.32


Semen PC. 0.009 Kg 1,306.50 11.76 - 11.76
Kawur 0.009 m3 195,000.00 1,755.00 - 1,755.00
Pasir pasang 0.018 m3 189,540.00 3,411.72 - 3,411.72
Pekerja 0.440 OH 51,500.00 - 22,660.00 22,660.00
Tukang batu 0.220 OH 63,200.00 - 13,904.00 13,904.00
Kepala tukang 0.022 OH 69,050.00 - 1,519.10 1,519.10
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
5,178.48 39,730.90 44,909.38
overhead & Profit 10% 517.85 3,973.09 4,490.94
Jumlah 5,696.33 43,703.99 49,400.32

2837.19 Memasang berapen 1 PC : 5 PP, tebal 15 mm m2 12,871.03 14,978.26 27,849.29


Semen PC. 5.184 Kg 1,306.50 6,772.90 - 6,772.90
Pasir pasang 0.026 m3 189,540.00 4,928.04 - 4,928.04
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang batu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
11,700.94 13,616.60 25,317.54
overhead & Profit 10% 1,170.09 1,361.66 2,531.75
Jumlah 12,871.03 14,978.26 27,849.29

2837.20 Memasang plesteran skoning 1 PC : 2 PP, lebar 10 mm m 3,429.00 5,340.28 8,769.28


Semen PC. 0.500 Kg 1,306.50 653.25 - 653.25
Pasir pasang 0.013 m3 189,540.00 2,464.02 - 2,464.02
Pekerja 0.040 OH 51,500.00 - 2,060.00 2,060.00
Tukang batu 0.020 OH 63,200.00 - 1,264.00 1,264.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
3,117.27 4,854.80 7,972.07
overhead & Profit 10% 311.73 485.48 797.21
Jumlah 3,429.00 5,340.28 8,769.28

2837.23 Memasang plesteran ciprat 1 PC : 2 PP m2 7,459.45 25,942.40 33,401.85


Semen PC. 4.320 Kg 1,306.50 5,644.08 - 5,644.08
Pasir pasang 0.006 m3 189,540.00 1,137.24 - 1,137.24
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
6,781.32 23,584.00 30,365.32
overhead & Profit 10% 678.13 2,358.40 3,036.53
Jumlah 7,459.45 25,942.40 33,401.85

2837.24 Memasang finishing siar pasangan dinding bata merah (=20 m') m2 4,466.66 14,978.26 19,444.92
Semen PC. 3.108 Kg 1,306.50 4,060.60 - 4,060.60
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang batu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
4,060.60 13,616.60 17,677.20
overhead & Profit 10% 406.06 1,361.66 1,767.72
Jumlah 4,466.66 14,978.26 19,444.92

2837.25 Memasang finishing siar pasangan dinding conblock ekspose (=8 m') m2 2,299.44 7,032.08 9,331.52
Semen PC. 1.600 Kg 1,306.50 2,090.40 2,090.40
Pekerja 0.070 OH 51,500.00 3,605.00 3,605.00
Tukang batu 0.035 OH 63,200.00 2,212.00 2,212.00
Kepala tukang 0.004 OH 69,050.00 276.20 276.20
Mandor 0.004 OH 74,900.00 299.60 299.60
2,090.40 6,392.80 8,483.20
overhead & Profit 10% 209.04 639.28 848.32
Jumlah 2,299.44 7,032.08 9,331.52

2837.26 Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 11,613.46 29,798.18 41,411.63
Semen PC. 6.340 Kg 1,306.50 8,283.21 - 8,283.21
Pasir pasang 0.012 m3 189,540.00 2,274.48 - 2,274.48
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
10,557.69 27,089.25 37,646.94
overhead & Profit 10% 1,055.77 2,708.93 3,764.69
Jumlah 11,613.46 29,798.18 41,411.63

2837.27 Memasang acian m2 4,670.74 19,865.45 24,536.19


Semen PC. 3.250 Kg 1,306.50 4,246.13 - 4,246.13
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
E PEKERJAAN PENUTUP LANTAI DAN DINDING
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

7395.09 Memasang lantai ubin granit ukuran (40x40) cm m2 107,423.87 24,910.99 132,334.85
Tegel granit 40x40 cm 6.630 buah 10,865.90 72,040.91 72,040.91
Semen PC 9.800 kg 1,306.50 12,803.70 12,803.70
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.300 kg 3,295.50 4,284.15 4,284.15
Pekerja 0.250 OH 51,500.00 12,875.00 12,875.00
Tukang batu 0.125 OH 63,200.00 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 897.65 897.65
Mandor 0.013 OH 74,900.00 973.70 973.70
97,658.06 22,646.35 120,304.41
overhead & Profit 10% 9,765.81 2,264.64 12,030.44
Jumlah 107,423.87 24,910.99 132,334.85

7395.10 Memasang lantai ubin granit ukuran (30x30) cm m2 97,781.61 25,825.09 123,606.69
Tegel granit 30x30 cm 11.870 buah 5,253.14 62,354.82 62,354.82
Semen PC 10.000 kg 1,306.50 13,065.00 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.260 OH 51,500.00 13,390.00 13,390.00
Tukang batu 0.130 OH 63,200.00 8,216.00 8,216.00
Kepala tukang 0.013 OH 69,050.00 897.65 897.65
Mandor 0.013 OH 74,900.00 973.70 973.70
88,892.37 23,477.35 112,369.72
overhead & Profit 10% 8,889.24 2,347.74 11,236.97
Jumlah 97,781.61 25,825.09 123,606.69

7395.24 Memasang plint ubin granit ukuran (10x40) cm m' 25,946.34 12,450.85 38,397.18
Plint ubin granit 10x40 cm 2.650 buah 8,000.00 21,200.00 21,200.00
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.100 kg 3,295.50 329.55 329.55
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
23,587.58 11,318.95 34,906.53
overhead & Profit 10% 2,358.76 1,131.90 3,490.65
Jumlah 25,946.34 12,450.85 38,397.18

7395.25 Memasang plint ubin granit ukuran (10x30) cm m' 29,807.34 12,450.85 42,258.18
Plint ubin granit 10x30 cm 3.530 buah 7,000.00 24,710.00 24,710.00
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.100 kg 3,295.50 329.55 329.55
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
27,097.58 11,318.95 38,416.53
overhead & Profit 10% 2,709.76 1,131.90 3,841.65
Jumlah 29,807.34 12,450.85 42,258.18

7395.32 Memasang lantai keramik artistik ukuran (10x20) cm m2 193,008.82 69,529.08 262,537.89
Tegel keramik artistik 10x20 cm 53.000 buah 2,776.80 147,170.40 147,170.40
Semen PC 8.190 kg 1,306.50 10,700.24 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 2.750 kg 3,295.50 9,062.63 9,062.63
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
175,462.56 63,208.25 238,670.81
overhead & Profit 10% 17,546.26 6,320.83 23,867.08
Jumlah 193,008.82 69,529.08 262,537.89

7395.33 Pasang lantai keramik artistik 10x10 atau 5x20 cm m2 790,652.65 69,529.08 860,181.72
Tegel keramik artistik 10 x 10 cm 106.000 buah 6,500.00 689,000.00 689,000.00
Semen PC. 8.190 kg 1,306.50 10,700.24 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 3.200 kg 3,295.50 10,545.60 10,545.60
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
718,775.14 63,208.25 781,983.39
overhead & Profit 10% 71,877.51 6,320.83 78,198.34
Jumlah 790,652.65 69,529.08 860,181.72

7395.34 Memasang lantai keramik ukuran (33 x 33) cm kelas I m2 130,315.07 69,529.08 199,844.14
Keramik lantai 33x33 cm kelas I 10.000 bh 9,390.00 93,900.00 - 93,900.00
Semen PC. 8.190 Kg 1,306.50 10,700.24 - 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Semen warna 1.620 Kg 3,295.50 5,338.71 - 5,338.71
Pekerja 0.700 OH 51,500.00 - 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 - 2,621.50 2,621.50
118,468.25 63,208.25 181,676.50
overhead & Profit 10% 11,846.82 6,320.83 18,167.65
Jumlah 130,315.07 69,529.08 199,844.14

7395.35 Memasang lantai keramik ukuran (30 x 30) cm kelas I m2 146,312.60 69,529.08 215,841.67
Tegel keramik lantai 30 x 30 cm kelas I 11.870 buah 8,970.00 106,473.90 - 106,473.90
Semen PC. 10.000 Kg 1,306.50 13,065.00 - 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Semen warna 1.500 Kg 3,295.50 4,943.25 - 4,943.25
Pekerja 0.700 OH 51,500.00 - 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 - 2,621.50 2,621.50
133,011.45 63,208.25 196,219.70
overhead & Profit 10% 13,301.15 6,320.83 19,621.97
Jumlah 146,312.60 69,529.08 215,841.67

7395.36 Memasang lantai keramik ukuran (20 x 20) cm kelas I m2 89,431.06 69,529.08 158,960.13
Tegel keramik lantai 20 x 20 cm kelas I 26.500 buah 2,031.90 53,845.35 - 53,845.35
Semen PC. 10.400 Kg 1,306.50 13,587.60 - 13,587.60
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Semen warna 1.620 Kg 3,295.50 5,338.71 - 5,338.71
Pekerja 0.700 OH 51,500.00 - 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 - 2,621.50 2,621.50
81,300.96 63,208.25 144,509.21
overhead & Profit 10% 8,130.10 6,320.83 14,450.92
Jumlah 89,431.06 69,529.08 158,960.13

7395.37 Pasang lantai keramik uk (10x33) cm, variasi border m2 164,406.96 104,372.79 268,779.74
Tegel keramik 10x33 cm 33.000 buah 3,510.00 115,830.00 115,830.00
Semen PC. 8.190 Kg 1,306.50 10,700.24 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 4.370 Kg 3,295.50 14,401.34 14,401.34
Pekerja 1.050 OH 51,500.00 54,075.00 54,075.00
Tukang batu 0.525 OH 63,200.00 33,180.00 33,180.00
Kepala tukang 0.053 OH 69,050.00 3,659.65 3,659.65
Mandor 0.053 OH 74,900.00 3,969.70 3,969.70
149,460.87 94,884.35 244,345.22
overhead & Profit 10% 14,946.09 9,488.44 24,434.52
Jumlah 164,406.96 104,372.79 268,779.74

7395.38 Pasang lantai mosaik uk (30x30)cm, camp 1pc:3pp m2 329,499.54 69,529.08 399,028.61
Tegel mozaik 11.870 buah 22,500.00 267,075.00 267,075.00
Semen PC. 14.150 Kg 1,306.50 18,486.98 18,486.98
Pasir pasang 0.039 m3 189,540.00 7,392.06 7,392.06
Semen warna 2.000 Kg 3,295.50 6,591.00 6,591.00
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
299,545.04 63,208.25 362,753.29
overhead & Profit 10% 29,954.50 6,320.83 36,275.33
Jumlah 329,499.54 69,529.08 399,028.61

7395.39 Memasang plint keramik ukuran (10x20) cm m' 15,269.08 12,450.85 27,719.92
Keramik plin 10x20cm 5.300 buah 2,215.20 11,740.56 11,740.56
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.025 kg 3,295.50 82.39 82.39
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
13,880.98 11,318.95 25,199.93
overhead & Profit 10% 1,388.10 1,131.90 2,519.99
Jumlah 15,269.08 12,450.85 27,719.92

7395.40 Memasang plint keramik ukuran (10x10) cm m' 19,270.47 12,450.85 31,721.31
Keramik plin 10x10cm 10.600 buah 1,443.00 15,295.80 15,295.80
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.050 kg 3,295.50 164.78 164.78
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
17,518.61 11,318.95 28,837.56
overhead & Profit 10% 1,751.86 1,131.90 2,883.76
Jumlah 19,270.47 12,450.85 31,721.31

7395.41 Memasang plint keramik ukuran (5x20) cm m' 9,591.73 12,450.85 22,042.58
Keramik plin 5x20cm 5.300 buah 1,443.00 7,647.90 7,647.90
Semen PC 0.570 kg 1,306.50 744.71 744.71
Pasir pasang 0.0015 m3 189,540.00 284.31 284.31
Semen warna 0.013 kg 3,295.50 42.84 42.84
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
8,719.76 11,318.95 20,038.71
overhead & Profit 10% 871.98 1,131.90 2,003.87
Jumlah 9,591.73 12,450.85 22,042.58

7395.42 Memasang plint internal cove artistik ukuran (5x5x20)cm m' 24,488.84 18,290.20 42,779.03
Plint internal cove artistik 5x5x20cm 5.300 buah 3,750.00 19,875.00 19,875.00
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.100 kg 3,295.50 329.55 329.55
Pekerja 0.075 OH 51,500.00 3,862.50 3,862.50
Tukang batu 0.075 OH 63,200.00 4,740.00 4,740.00
Kepala tukang 0.075 OH 69,050.00 5,178.75 5,178.75
Mandor 0.038 OH 74,900.00 2,846.20 2,846.20
22,262.58 16,627.45 38,890.03
overhead & Profit 10% 2,226.26 1,662.75 3,889.00
Jumlah 24,488.84 18,290.20 42,779.03

7395.43 Memasang lantai marmer ukuran (100x100)cm m2 182,667.77 69,529.08 252,196.85


Tegel marmer 100x100cm 1.060 buah 136,500.00 144,690.00 144,690.00
Semen PC 8.190 kg 1,306.50 10,700.24 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Semen warna 0.650 kg 3,295.50 2,142.08 2,142.08
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
166,061.61 63,208.25 229,269.86
overhead & Profit 10% 16,606.16 6,320.83 22,926.99
Jumlah 182,667.77 69,529.08 252,196.85

7395.44 Memasang lantai karpet m2 103,213.11 23,481.65 126,694.76


Karpet 1.050 m2 80,028.00 84,029.40 84,029.40
Lem 0.350 kg 28,002.00 9,800.70 9,800.70
Pekerja 0.170 OH 51,500.00 8,755.00 8,755.00
Tukang batu 0.170 OH 63,200.00 10,744.00 10,744.00
Kepala tukang 0.017 OH 69,050.00 1,173.85 1,173.85
Mandor 0.009 OH 74,900.00 674.10 674.10
93,830.10 21,346.95 115,177.05
overhead & Profit 10% 9,383.01 2,134.70 11,517.71
Jumlah 103,213.11 23,481.65 126,694.76

7395.45 Memasang underlayer/pelapis bawah karpet m2 123,618.50 16,546.20 140,164.70


Underlayer/pelapis bawah karpet 1.050 m2 97,695.00 102,579.75 102,579.75
Lem 0.350 kg 28,002.00 9,800.70 9,800.70
Pekerja 0.120 OH 51,500.00 6,180.00 6,180.00
Tukang batu 0.120 OH 63,200.00 7,584.00 7,584.00
Kepala tukang 0.012 OH 69,050.00 828.60 828.60
Mandor 0.006 OH 74,900.00 449.40 449.40
112,380.45 15,042.00 127,422.45
overhead & Profit 10% 11,238.05 1,504.20 12,742.25
Jumlah 123,618.50 16,546.20 140,164.70

7395.46 Memasang lantai parquet kayu m2 110,913.66 69,529.08 180,442.74


Parquet kayu 1.050 m2 80,028.00 84,029.40 84,029.40
Lem 0.600 kg 28,002.00 16,801.20 16,801.20
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
100,830.60 63,208.25 164,038.85
overhead & Profit 10% 10,083.06 6,320.83 16,403.89
Jumlah 110,913.66 69,529.08 180,442.74

7395.47 Memasang lantai kayu (gymfloor) m2 134,021.75 69,529.08 203,550.82


Lantai kayu (gymfloor) 1.050 m2 100,035.00 105,036.75 105,036.75
Lem 0.600 kg 28,002.00 16,801.20 16,801.20
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
121,837.95 63,208.25 185,046.20
overhead & Profit 10% 12,183.80 6,320.83 18,504.62
Jumlah 134,021.75 69,529.08 203,550.82

7395.51 Memasang dinding keramik artistik ukuran (10x20)cm m2 188,974.71 89,394.53 278,369.24
Keramik artistik 10x20 53.000 buah 2,776.80 147,170.40 147,170.40
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
171,795.20 81,267.75 253,062.95
overhead & Profit 10% 17,179.52 8,126.78 25,306.29
Jumlah 188,974.71 89,394.53 278,369.24

7395.52 Memasang dinding keramik artistik ukuran (5x20)cm m2 138,401.03 89,394.53 227,795.56
Keramik artistik 5 x 20 106.000 buah 950.00 100,700.00 100,700.00
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.900 Kg 3,295.50 9,556.95 9,556.95
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
125,819.12 81,267.75 207,086.87
overhead & Profit 10% 12,581.91 8,126.78 20,708.69
Jumlah 138,401.03 89,394.53 227,795.56

7395.53 Memasang dinding keramik ukuran (10x20)cm kelas I m2 152,140.77 89,394.53 241,535.30
Keramik 10 x 20 53.000 buah 2,145.00 113,685.00 113,685.00
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
138,309.80 81,267.75 219,577.55
overhead & Profit 10% 13,830.98 8,126.78 21,957.75
Jumlah 152,140.77 89,394.53 241,535.30

7395.54 Memasang dinding keramik ukuran (20x20)cm kelas I m2 85,387.27 89,394.53 174,781.80
Keramik 20 x 20 26.500 buah 2,000.00 53,000.00 53,000.00
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
77,624.80 81,267.75 158,892.55
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
overhead & Profit 10% 7,762.48 8,126.78 15,889.25
Jumlah 85,387.27 89,394.53 174,781.80

7395.55 Memasang dinding marmer (100x100)cm kelas I m2 207,909.06 129,125.43 337,034.48


Marmer 100x100 1.060 buah 156,000.00 165,360.00 165,360.00
Paku 0.033 kg 15,600.00 514.80
Semen PC. 12.440 Kg 1,306.50 16,252.86 16,252.86
Pasir pasang 0.025 m3 189,540.00 4,738.50 4,738.50
Semen warna 0.650 Kg 3,295.50 2,142.08 2,142.08
Pekerja 1.300 OH 51,500.00 66,950.00 66,950.00
Tukang batu 0.650 OH 63,200.00 41,080.00 41,080.00
Kepala tukang 0.065 OH 69,050.00 4,488.25 4,488.25
Mandor 0.065 OH 74,900.00 4,868.50 4,868.50
189,008.24 117,386.75 305,880.19
overhead & Profit 10% 18,900.82 11,738.68 30,588.02
Jumlah 207,909.06 129,125.43 336,468.20

7395.56 Memasang dinding bata pelapis ukuran (3x7x24)cm m2 87,113.38 99,327.25 186,440.63
Bata lapis dinding 63.000 buah 780.00 49,140.00 49,140.00
Semen PC. 12.440 Kg 1,306.50 16,252.86 16,252.86
Pasir pasang 0.025 m3 189,540.00 4,738.50 4,738.50
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 1.000 OH 51,500.00 51,500.00 51,500.00
Tukang batu 0.500 OH 63,200.00 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 3,452.50 3,452.50
Mandor 0.050 OH 74,900.00 3,745.00 3,745.00
79,193.99 90,297.50 169,491.49
overhead & Profit 10% 7,919.40 9,029.75 16,949.15
Jumlah 87,113.38 99,327.25 186,440.63

7395.57 Memasang dinding batu paras m2 178,919.81 69,529.08 248,448.89


Batu tempel/palimanan/paras 1.100 m2 127,881.00 140,669.10 140,669.10
Semen PC. 11.750 Kg 1,306.50 15,351.38 15,351.38
Pasir pasang 0.035 m3 189,540.00 6,633.90 6,633.90
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
162,654.38 63,208.25 225,862.63
overhead & Profit 10% 16,265.44 6,320.83 22,586.26
Jumlah 178,919.81 69,529.08 248,448.89

7395.58 Memasang dinding batu tempel hitam m2 137,439.80 69,529.08 206,968.88


Batu tempel hitam/candi 1.100 m2 93,600.00 102,960.00 102,960.00
Semen PC. 11.750 Kg 1,306.50 15,351.38 15,351.38
Pasir pasang 0.035 m3 189,540.00 6,633.90 6,633.90
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
124,945.28 63,208.25 188,153.53
overhead & Profit 10% 12,494.53 6,320.83 18,815.35
Jumlah 137,439.80 69,529.08 206,968.88

7395.64 Memasang lantai keramik ukuran (40x40) cm kelas I m2 109,654.12 69,529.08 179,183.19
Keramik lantai 40 x 40 cm kelas I 6.630 buah 11,427.00 75,761.01 75,761.01
Semen PC. 8.000 kg 1,306.50 10,452.00 10,452.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
99,685.56 63,208.25 162,893.81
overhead & Profit 10% 9,968.56 6,320.83 16,289.38
Jumlah 109,654.12 69,529.08 179,183.19

7395.65 Memasang lantai keramik ukuran (40x40) cm kelas II m2 98,703.68 69,529.08 168,232.75
Keramik lantai 40 x 40 cm kelas II 6.630 buah 9,925.50 65,806.07 65,806.07
Semen PC. 8.000 kg 1,306.50 10,452.00 10,452.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
89,730.62 63,208.25 152,938.87
overhead & Profit 10% 8,973.06 6,320.83 15,293.89
Jumlah 98,703.68 69,529.08 168,232.75

7395.66 Memasang lantai keramik ukuran (30x30) cm kelas I m2 146,312.60 69,529.08 215,841.67
Keramik lantai 30x30 cm kelas I 11.870 buah 8,970.00 106,473.90 106,473.90
Semen PC 10.000 kg 1,306.50 13,065.00 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
133,011.45 63,208.25 196,219.70
overhead & Profit 10% 13,301.15 6,320.83 19,621.97
Jumlah 146,312.60 69,529.08 215,841.67

7395.67 Memasang lantai keramik ukuran (30x30) cm kelas II m2 107,407.96 69,529.08 176,937.03
Keramik lantai 30x30 cm kelas II 11.870 buah 5,990.40 71,106.05 71,106.05
Semen PC 10.000 kg 1,306.50 13,065.00 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
97,643.60 63,208.25 160,851.85
overhead & Profit 10% 9,764.36 6,320.83 16,085.18
Jumlah 107,407.96 69,529.08 176,937.03

7395.68 Memasang lantai keramik ukuran (20x20) cm kelas I m2 89,431.06 69,529.08 158,960.13
Keramik lantai 20x20 cm kelas I 26.500 buah 2,031.90 53,845.35 53,845.35
Semen PC 10.400 kg 1,306.50 13,587.60 13,587.60
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.620 kg 3,295.50 5,338.71 5,338.71
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
81,300.96 63,208.25 144,509.21
overhead & Profit 10% 8,130.10 6,320.83 14,450.92
Jumlah 89,431.06 69,529.08 158,960.13

7395.69 Memasang lantai keramik ukuran (20x20) cm kelas II m2 90,842.47 69,529.08 160,371.54
Keramik lantai 20 x 20 cm kelas II 26.500 buah 2,109.90 55,912.35 55,912.35
Semen PC. 9.800 kg 1,306.50 12,803.70 12,803.70
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.620 kg 3,295.50 5,338.71 5,338.71
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
82,584.06 63,208.25 145,792.31
overhead & Profit 10% 8,258.41 6,320.83 14,579.23
Jumlah 90,842.47 69,529.08 160,371.54

7395.70 Memasang Dinding keramik ukuran 10x20 cm kelas I m2 152,140.77 12,450.85 164,591.62
Keramik dinding 10 x 20 cm kelas I 53.000 buah 2,145.00 113,685.00 113,685.00
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 kg 3,295.50 9,062.63 9,062.63
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
138,309.80 11,318.95 149,628.75
overhead & Profit 10% 13,830.98 1,131.90 14,962.87
Jumlah 152,140.77 12,450.85 164,591.62

7395.71 Memasang Dinding keramik ukuran 10x20 cm kelas II m2 136,679.61 12,450.85 149,130.46
Keramik dinding 10 x 20 cm kelas II 53.000 buah 1,879.80 99,629.40 99,629.40
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 kg 3,295.50 9,062.63 9,062.63
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
124,254.20 11,318.95 135,573.15
overhead & Profit 10% 12,425.42 1,131.90 13,557.31
Jumlah 136,679.61 12,450.85 149,130.46

7395.72 Memasang Dinding keramik ukuran 20x25 cm kelas I m2 111,988.73 89,394.53 201,383.26
Keramik dinding 20 x 25 cm kelas I 21.000 buah 3,802.50 79,852.50 79,852.50
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 1.940 kg 3,295.50 6,393.27 6,393.27
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
101,807.94 81,267.75 183,075.69
overhead & Profit 10% 10,180.79 8,126.78 18,307.57
Jumlah 111,988.73 89,394.53 201,383.26

7395.73 Memasang Dinding keramik ukuran 20x25 cm kelas II m2 100,457.21 89,394.53 189,851.74
Keramik dinding 20 x 25 cm kelas II 21.000 buah 3,303.30 69,369.30 69,369.30
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 1.940 kg 3,295.50 6,393.27 6,393.27
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
91,324.74 81,267.75 172,592.49
overhead & Profit 10% 9,132.47 8,126.78 17,259.25
Jumlah 100,457.21 89,394.53 189,851.74

7395.74 Memasang paving I, tebal 5 cm, K175 m2 71,977.62 54,780.00 126,757.62


Tegel paving I, tb 5 cm K 175 1.010 m2 46,020.00 46,480.20 - 46,480.20
Pasir pasang 0.100 m3 189,540.00 18,954.00 - 18,954.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang batu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
65,434.20 49,800.00 115,234.20
overhead & Profit 10% 6,543.42 4,980.00 11,523.42
Jumlah 71,977.62 54,780.00 126,757.62

7395.75 Memasang paving I, tebal 5 cm, K200 m2 72,844.20 54,780.00 127,624.20


Tegel paving I, Tb 5 cm K200 1.010 m2 46,800.00 47,268.00 - 47,268.00
Pasir pasang 0.100 m3 189,540.00 18,954.00 - 18,954.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang batu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
66,222.00 49,800.00 116,022.00
overhead & Profit 10% 6,622.20 4,980.00 11,602.20
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Jumlah 72,844.20 54,780.00 127,624.20

7395.76 Memasang paving I, tebal 5 cm, K225 m2 76,223.86 54,780.00 131,003.86


Tegel paving I, Tb 5 cm K225 1.010 m2 49,842.00 50,340.42 - 50,340.42
Pasir pasang 0.100 m3 189,540.00 18,954.00 - 18,954.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang batu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
69,294.42 49,800.00 119,094.42
overhead & Profit 10% 6,929.44 4,980.00 11,909.44
Jumlah 76,223.86 54,780.00 131,003.86

7395.77 Memasang paving I, tebal 7 cm, K175 m2 84,543.03 54,780.00 139,323.03


Tegel paving I, Tb 7 cm K175 1.010 m2 57,330.00 57,903.30 - 57,903.30
Pasir pasang 0.100 m3 189,540.00 18,954.00 - 18,954.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang batu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
76,857.30 49,800.00 126,657.30
overhead & Profit 10% 7,685.73 4,980.00 12,665.73
Jumlah 84,543.03 54,780.00 139,323.03

7395.78 Memasang paving I, tebal 7 cm, K200 m2 95,461.94 54,780.00 150,241.94


Tegel paving I, Tb 7 cm K200 1.010 m2 67,158.00 67,829.58 - 67,829.58
Pasir pasang 0.100 m3 189,540.00 18,954.00 - 18,954.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang batu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
86,783.58 49,800.00 136,583.58
overhead & Profit 10% 8,678.36 4,980.00 13,658.36
Jumlah 95,461.94 54,780.00 150,241.94

7395.79 Memasang paving I, tebal 7 cm, K225 m2 109,240.56 54,780.00 164,020.56


Tegel paving I, Tb 7 cm K225 1.010 m2 79,560.00 80,355.60 - 80,355.60
Pasir pasang 0.100 m3 189,540.00 18,954.00 - 18,954.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang batu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
F PEKERJAAN KAYU
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

3434.01 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I m3 26,285,380.00 2,044,812.00 28,330,192.00
Kayu jati (ekspose) 1.100 m3 21,684,000.00 23,852,400.00 - 23,852,400.00
Paku 1.250 kg 15,600.00 19,500.00 - 19,500.00
Lem kayu 1.000 Kg 23,900.00 23,900.00 - 23,900.00
Pekerja 7.000 OH 51,500.00 - 360,500.00 360,500.00
Tukang kayu 21.000 OH 63,200.00 - 1,327,200.00 1,327,200.00
Kepala tukang 2.100 OH 69,050.00 - 145,005.00 145,005.00
Mandor 0.350 OH 74,900.00 - 26,215.00 26,215.00
23,895,800.00 1,858,920.00 25,754,720.00
overhead & Profit 10% 2,389,580.00 185,892.00 2,575,472.00
Jumlah 26,285,380.00 2,044,812.00 28,330,192.00

3434.02.1 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II m3 19,537,210.00 1,988,162.00 21,525,372.00
Kayu jati lokal (non ekspose) 1.100 m3 16,107,000.00 17,717,700.00 - 17,717,700.00
Paku 1.250 kg 15,600.00 19,500.00 - 19,500.00
Lem kayu 1.000 Kg 23,900.00 23,900.00 - 23,900.00
Pekerja 6.000 OH 51,500.00 - 309,000.00 309,000.00
Tukang kayu 21.000 OH 63,200.00 - 1,327,200.00 1,327,200.00
Kepala tukang 2.100 OH 69,050.00 - 145,005.00 145,005.00
Mandor 0.350 OH 74,900.00 - 26,215.00 26,215.00
17,761,100.00 1,807,420.00 19,568,520.00
overhead & Profit 10% 1,776,110.00 180,742.00 1,956,852.00
Jumlah 19,537,210.00 1,988,162.00 21,525,372.00

3434.02.2 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas III m3 11,467,720.00 1,988,162.00 13,455,882.00
Kayu kanfer 1.100 m3 9,438,000.00 10,381,800.00 - 10,381,800.00
Paku 1.250 kg 15,600.00 19,500.00 - 19,500.00
Lem kayu 1.000 Kg 23,900.00 23,900.00 - 23,900.00
Pekerja 6.000 OH 51,500.00 - 309,000.00 309,000.00
Tukang kayu 21.000 OH 63,200.00 - 1,327,200.00 1,327,200.00
Kepala tukang 2.100 OH 69,050.00 - 145,005.00 145,005.00
Mandor 0.350 OH 74,900.00 - 26,215.00 26,215.00
10,425,200.00 1,807,420.00 12,232,620.00
overhead & Profit 10% 1,042,520.00 180,742.00 1,223,262.00
Jumlah 11,467,720.00 1,988,162.00 13,455,882.00

3434.05 Membuat dan memasang daun pintu panel, kayu kelas I m2 879,310.00 265,560.00 1,144,870.00
Kayu jati (ekspose) 0.040 m3 21,684,000.00 867,360.00 - 867,360.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
879,310.00 265,560.00 1,144,870.00
overhead & Profit 10% 87,931.00 26,556.00 114,487.00
Jumlah 967,241.00 292,116.00 1,259,357.00

3434.05.1 Membuat dan memasang daun pintu panel, kayu kelas II m2 721,853.00 292,116.00 1,013,969.00
Kayu jati lokal (non ekspose) 0.040 m3 16,107,000.00 644,280.00 - 644,280.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
656,230.00 265,560.00 921,790.00
overhead & Profit 10% 65,623.00 26,556.00 92,179.00
Jumlah 721,853.00 292,116.00 1,013,969.00

3434.06 Membuat dan memasang pintu dan jendela kaca, kayu kelas I (tanpa kaca) m2 580,344.60 233,692.80 814,037.40
Kayu jati (ekspose) 0.024 m3 21,684,000.00 520,416.00 - 520,416.00
Lem kayu 0.300 Kg 23,900.00 7,170.00 - 7,170.00
Pekerja 0.800 OH 51,500.00 - 41,200.00 41,200.00
Tukang kayu 2.400 OH 63,200.00 - 151,680.00 151,680.00
Kepala tukang 0.240 OH 69,050.00 - 16,572.00 16,572.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
527,586.00 212,448.00 740,034.00
overhead & Profit 10% 52,758.60 21,244.80 74,003.40
Jumlah 580,344.60 233,692.80 814,037.40

3434.06.1 Membuat dan memasang pintu dan jendela kaca, kayu kelas II (tanpa kaca) m2 433,111.80 233,692.80 666,804.60
Kayu jati lokal (non ekspose) 0.024 m3 16,107,000.00 386,568.00 - 386,568.00
Lem kayu 0.300 Kg 23,900.00 7,170.00 - 7,170.00
Pekerja 0.800 OH 51,500.00 - 41,200.00 41,200.00
Tukang kayu 2.400 OH 63,200.00 - 151,680.00 151,680.00
Kepala tukang 0.240 OH 69,050.00 - 16,572.00 16,572.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
393,738.00 212,448.00 606,186.00
overhead & Profit 10% 39,373.80 21,244.80 60,618.60
Jumlah 433,111.80 233,692.80 666,804.60

3434.07 Membuat dan memasang pintu dan jendela jalusi, kayu kelas I m2 1,539,698.60 292,116.00 1,831,814.60
Kayu jati (ekspose) 0.064 m3 21,684,000.00 1,387,776.00 - 1,387,776.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
1,399,726.00 265,560.00 1,665,286.00
overhead & Profit 10% 139,972.60 26,556.00 166,528.60
Jumlah 1,539,698.60 292,116.00 1,831,814.60

3434.07.1 Membuat dan memasang pintu dan jendela jalusi, kayu kelas II m2 1,147,077.80 292,116.00 1,439,193.80
Kayu jati lokal (non ekspose) 0.064 m3 16,107,000.00 1,030,848.00 - 1,030,848.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
1,042,798.00 265,560.00 1,308,358.00
overhead & Profit 10% 104,279.80 26,556.00 130,835.80
Jumlah 1,147,077.80 292,116.00 1,439,193.80

3434.10 Memasang jalusi kusen kayu kelas I m2 1,433,718.00 219,787.15 1,653,505.15


Kayu jati (ekspose) 0.060 m3 21,684,000.00 1,301,040.00 - 1,301,040.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Pekerja 0.670 OH 51,500.00 - 34,505.00 34,505.00
Tukang kayu 2.000 OH 63,200.00 - 126,400.00 126,400.00
Kepala tukang 0.200 OH 69,050.00 - 13,810.00 13,810.00
Mandor 0.335 OH 74,900.00 - 25,091.50 25,091.50
1,303,380.00 199,806.50 1,503,186.50
overhead & Profit 10% 130,338.00 19,980.65 150,318.65
Jumlah 1,433,718.00 219,787.15 1,653,505.15

3434.10.1 Memasang jalusi kusen kayu kelas II m2 1,065,636.00 219,787.15 1,285,423.15


Kayu jati lokal (non ekspose) 0.060 m3 16,107,000.00 966,420.00 - 966,420.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Pekerja 0.670 OH 51,500.00 - 34,505.00 34,505.00
Tukang kayu 2.000 OH 63,200.00 - 126,400.00 126,400.00
Kepala tukang 0.200 OH 69,050.00 - 13,810.00 13,810.00
Mandor 0.335 OH 74,900.00 - 25,091.50 25,091.50
968,760.00 199,806.50 1,168,566.50
overhead & Profit 10% 96,876.00 19,980.65 116,856.65
Jumlah 1,065,636.00 219,787.15 1,285,423.15

3434.13 Memasang konstruksi kuda-kuda konvensional, kayu kelas I m3 19,837,818.00 1,168,464.00 21,006,282.00
Kayu jati lokal (non ekspose) 1.100 m3 16,107,000.00 17,717,700.00 - 17,717,700.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
18,034,380.00 1,062,240.00 19,096,620.00
overhead & Profit 10% 1,803,438.00 106,224.00 1,909,662.00
Jumlah 19,837,818.00 1,168,464.00 21,006,282.00

3434.13.1 Memasang konstruksi kuda-kuda konvensional, kayu kelas II m3 9,078,498.00 1,168,464.00 10,246,962.00
Kayu kruing 1.100 m3 7,215,000.00 7,936,500.00 - 7,936,500.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
8,253,180.00 1,062,240.00 9,315,420.00
overhead & Profit 10% 825,318.00 106,224.00 931,542.00
Jumlah 9,078,498.00 1,168,464.00 10,246,962.00

3434.13.2 Memasang konstruksi kuda-kuda konvensional, kayu kelas III m3 7,851,558.00 1,168,464.00 9,020,022.00
Kayu meranti 1.100 m3 6,201,000.00 6,821,100.00 - 6,821,100.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
7,137,780.00 1,062,240.00 8,200,020.00
overhead & Profit 10% 713,778.00 106,224.00 820,002.00
Jumlah 7,851,558.00 1,168,464.00 9,020,022.00

3434.14 Memasang konstruksi kuda-kuda expose, kayu kelas I m3 28,971,228.00 1,168,464.00 30,139,692.00
Kayu jati (ekspose) 1.200 m3 21,684,000.00 26,020,800.00 - 26,020,800.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
26,337,480.00 1,062,240.00 27,399,720.00
overhead & Profit 10% 2,633,748.00 106,224.00 2,739,972.00
Jumlah 28,971,228.00 1,168,464.00 30,139,692.00

3434.15 Memasang konstruksi gording, kayu kelas I m3 19,793,202.00 701,078.40 20,494,280.40


Kayu jati lokal (non ekspose) 1.100 m3 16,107,000.00 17,717,700.00 - 17,717,700.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 3.000 kg 15,600.00 46,800.00 - 46,800.00
Pekerja 2.400 OH 51,500.00 - 123,600.00 123,600.00
Tukang kayu 7.200 OH 63,200.00 - 455,040.00 455,040.00
Kepala tukang 0.720 OH 69,050.00 - 49,716.00 49,716.00
Mandor 0.120 OH 74,900.00 - 8,988.00 8,988.00
17,993,820.00 637,344.00 18,631,164.00
overhead & Profit 10% 1,799,382.00 63,734.40 1,863,116.40
Jumlah 19,793,202.00 701,078.40 20,494,280.40

3434.15.1 Memasang konstruksi gording, kayu kelas II m3 9,033,882.00 701,078.40 9,734,960.40


Kayu kruing 1.100 m3 7,215,000.00 7,936,500.00 - 7,936,500.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 3.000 kg 15,600.00 46,800.00 - 46,800.00
Pekerja 2.400 OH 51,500.00 - 123,600.00 123,600.00
Tukang kayu 7.200 OH 63,200.00 - 455,040.00 455,040.00
Kepala tukang 0.720 OH 69,050.00 - 49,716.00 49,716.00
Mandor 0.120 OH 74,900.00 - 8,988.00 8,988.00
8,212,620.00 637,344.00 8,849,964.00
overhead & Profit 10% 821,262.00 63,734.40 884,996.40
Jumlah 9,033,882.00 701,078.40 9,734,960.40

3434.16 Pas. Rangka atap genteng, kaso & reng kayu kls I m2 220,008.36 13,788.50 233,796.86
Kayu usuk jati ukuran 5 x 7 0.014 m3 11,661,000.00 163,254.00 - 163,254.00
Kayu reng jati 2/3 0.0036 m3 9,126,000.00 32,853.60 - 32,853.60
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
200,007.60 12,535.00 212,542.60
overhead & Profit 10% 20,000.76 1,253.50 21,254.26
Jumlah 220,008.36 13,788.50 233,796.86

3434.16.1 Pas. Rangka atap genteng, kaso & reng kayu kls II m2 136,524.96 13,788.50 150,313.46
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng jati 0.0036 m3 9,126,000.00 32,853.60 - 32,853.60
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
124,113.60 12,535.00 136,648.60
overhead & Profit 10% 12,411.36 1,253.50 13,664.86
Jumlah 136,524.96 13,788.50 150,313.46

3434.16.2 Pas. Rangka atap genteng, kaso & reng kayu kls III m2 121,080.96 13,788.50 134,869.46
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng kruing 0.0036 m3 5,226,000.00 18,813.60 - 18,813.60
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
110,073.60 12,535.00 122,608.60
overhead & Profit 10% 11,007.36 1,253.50 12,260.86
Jumlah 121,080.96 13,788.50 134,869.46

3434.17 Memasang rangka atap genteng beton, kaso kayu kelas I, reng kayu kelas I m2 256,147.32 13,788.50 269,935.82
Kayu usuk jati ukuran 5 x 7 0.014 m3 11,661,000.00 163,254.00 - 163,254.00
Kayu reng jati 2/3 0.0072 m3 9,126,000.00 65,707.20 - 65,707.20
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
232,861.20 12,535.00 245,396.20
overhead & Profit 10% 23,286.12 1,253.50 24,539.62
Jumlah 256,147.32 13,788.50 269,935.82

3434.17.1 Memasang rangka atap genteng beton, kaso kayu kelas II, reng kayu kelas I m2 172,663.92 13,788.50 186,452.42
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng jati 2/3 0.0072 m3 9,126,000.00 65,707.20 - 65,707.20
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
156,967.20 12,535.00 169,502.20
overhead & Profit 10% 15,696.72 1,253.50 16,950.22
Jumlah 172,663.92 13,788.50 186,452.42

3434.17.2 Memasang rangka atap genteng beton, kaso kayu kelas II, reng kayu kelas II m2 141,775.92 13,788.50 155,564.42
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng kruing 2/3 0.0072 m3 5,226,000.00 37,627.20 - 37,627.20
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
128,887.20 12,535.00 141,422.20
overhead & Profit 10% 12,888.72 1,253.50 14,142.22
Jumlah 141,775.92 13,788.50 155,564.42

3434.19 Memasang rangka langit-langit (50 x 100) cm, kayu kelas II m2 109,137.60 37,811.40 146,949.00
Kayu usuk kruing 0.0154 m3 6,240,000.00 96,096.00 - 96,096.00
Paku 0.200 kg 15,600.00 3,120.00 - 3,120.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
99,216.00 34,374.00 133,590.00
overhead & Profit 10% 9,921.60 3,437.40 13,359.00
Jumlah 109,137.60 37,811.40 146,949.00

3434.19.1 Memasang rangka langit-langit (50 x 100) cm, kayu kelas III m2 92,621.10 37,811.40 130,432.50
Kayu usuk meranti 0.0154 m3 5,265,000.00 81,081.00 - 81,081.00
Paku 0.200 kg 15,600.00 3,120.00 - 3,120.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
84,201.00 34,374.00 118,575.00
overhead & Profit 10% 8,420.10 3,437.40 11,857.50
Jumlah 92,621.10 37,811.40 130,432.50

3434.20 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II m2 116,173.20 35,288.55 151,461.75
Kayu usuk kruing 0.0163 m3 6,240,000.00 101,712.00 - 101,712.00
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
105,612.00 32,080.50 137,692.50
overhead & Profit 10% 10,561.20 3,208.05 13,769.25
Jumlah 116,173.20 35,288.55 151,461.75

3434.20.1 Memasang rangka langit-langit (60 x 60) cm, kayu kelas III m2 98,691.45 35,288.55 133,980.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Kayu usuk meranti 0.0163 m3 5,265,000.00 85,819.50 - 85,819.50
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
89,719.50 32,080.50 121,800.00
overhead & Profit 10% 8,971.95 3,208.05 12,180.00
Jumlah 98,691.45 35,288.55 133,980.00

3434.21 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I m 259,321.92 21,500.05 280,821.97
Kayu jati (ekspose) 0.0108 m3 21,684,000.00 234,187.20 - 234,187.20
Paku 0.100 kg 15,600.00 1,560.00 - 1,560.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
235,747.20 19,545.50 255,292.70
overhead & Profit 10% 23,574.72 1,954.55 25,529.27
Jumlah 259,321.92 21,500.05 280,821.97

3434.21.1 Memasang lisplank ukuran (3 x 20) cm, kayu kelas II m 87,430.20 21,500.05 108,930.25
Kayu kruing 0.0108 m3 7,215,000.00 77,922.00 - 77,922.00
Paku 0.100 kg 15,600.00 1,560.00 - 1,560.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
79,482.00 19,545.50 99,027.50
overhead & Profit 10% 7,948.20 1,954.55 9,902.75
Jumlah 87,430.20 21,500.05 108,930.25

3434.22 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I m 263,234.40 21,500.05 284,734.45
Kayu jati (ekspose) 0.011 m3 21,684,000.00 238,524.00 - 238,524.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
239,304.00 19,545.50 258,849.50
overhead & Profit 10% 23,930.40 1,954.55 25,884.95
Jumlah 263,234.40 21,500.05 284,734.45

3434.22.1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas II m 88,159.50 21,500.05 109,659.55
Kayu kruing 0.011 m3 7,215,000.00 79,365.00 - 79,365.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
80,145.00 19,545.50 99,690.50
overhead & Profit 10% 8,014.50 1,954.55 9,969.05
Jumlah 88,159.50 21,500.05 109,659.55

3434.23 Memasang rangka dinding pemisah (60 x 120) cm kayu kelas II m2 224,796.00 43,858.60 268,654.60
Kayu kruing 0.028 m3 7,215,000.00 202,020.00 - 202,020.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.450 OH 63,200.00 - 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 - 3,107.25 3,107.25
Mandor 0.008 OH 74,900.00 - 599.20 599.20
204,360.00 39,871.45 244,231.45
overhead & Profit 10% 20,436.00 3,987.15 24,423.15
Jumlah 224,796.00 43,858.60 268,654.60

3434.23.1 Memasang rangka dinding pemisah (60 x 120) cm kayu kelas III m2 164,736.00 43,858.60 208,594.60
Kayu usuk meranti 0.028 m3 5,265,000.00 147,420.00 - 147,420.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.450 OH 63,200.00 - 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 - 3,107.25 3,107.25
Mandor 0.008 OH 74,900.00 - 599.20 599.20
149,760.00 39,871.45 189,631.45
overhead & Profit 10% 14,976.00 3,987.15 18,963.15
Jumlah 164,736.00 43,858.60 208,594.60

3434.24 Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II m2 359,202.54 43,858.60 403,061.13
Kayu kruing 0.028 m3 7,215,000.00 202,020.00 202,020.00
Paku 0.150 kg 15,600.00 2,340.00 2,340.00
Teakwood 120x240 cm 0.860 lembar 126,516.00 108,803.76 108,803.76
Lem kayu 0.560 Kg 23,900.00 13,384.00 13,384.00
Pekerja 0.150 OH 51,500.00 7,725.00 7,725.00
Tukang kayu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.008 OH 74,900.00 599.20 599.20
326,547.76 39,871.45 366,419.21
overhead & Profit 10% 32,654.78 3,987.15 36,641.92
Jumlah 359,202.54 43,858.60 403,061.13

3434.25 Memasang dinding pemisah plywood rangkap, rangka kayu kelas II m2 295,966.22 58,423.20 354,389.42
Kayu kruing 0.028 m3 7,215,000.00 202,020.00 - 202,020.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Kayu lapis/ tripleks tb. 4 mm 0.860 lembar 59,670.00 51,316.20 - 51,316.20
Lem kayu 0.560 Kg 23,900.00 13,384.00 - 13,384.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.600 OH 63,200.00 - 37,920.00 37,920.00
Kepala tukang 0.060 OH 69,050.00 - 4,143.00 4,143.00
Mandor 0.010 OH 74,900.00 - 749.00 749.00
269,060.20 53,112.00 322,172.20
overhead & Profit 10% 26,906.02 5,311.20 32,217.22
Jumlah 295,966.22 58,423.20 354,389.42
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
3434.26 Memasang dinding lambriziring dari papan kayu kelas I m2 172,260.66 175,269.60 347,530.26
Kayu jati (ekspose) 0.007 m3 21,684,000.00 151,788.00 151,788.00
Paku 0.100 kg 15,600.00 1,560.00 1,560.00
Paku skrup 0.150 kg 21,684.00 3,252.60 3,252.60
Pekerja 0.600 OH 51,500.00 30,900.00 30,900.00
Tukang kayu 1.800 OH 63,200.00 113,760.00 113,760.00
Kepala tukang 0.180 OH 69,050.00 12,429.00 12,429.00
Mandor 0.030 OH 74,900.00 2,247.00 2,247.00
156,600.60 159,336.00 315,936.60
overhead & Profit 10% 15,660.06 15,933.60 31,593.66
Jumlah 172,260.66 175,269.60 347,530.26

3434.27 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm m2 56,525.04 7,320.28 63,845.32
Teakwood 120x240 0.400 lembar 126,516.00 50,606.40 50,606.40
Paku 0.050 kg 15,600.00 780.00 780.00
Pekerja 0.025 OH 51,500.00 1,287.50 1,287.50
Tukang kayu 0.075 OH 63,200.00 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 552.40 552.40
Mandor 0.001 OH 74,900.00 74.90 74.90
G PEKERJAAN BESI DAN ALUMINIUM
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

7393.01 Memasang besi profil kg 15,195.18 8,273.10 23,468.28


Besi profil 1.150 kg 12,012.00 13,813.80 - 13,813.80
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang las 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.003 OH 74,900.00 - 224.70 224.70
13,813.80 7,521.00 21,334.80
overhead & Profit 10% 1,381.38 752.10 2,133.48
Jumlah 15,195.18 8,273.10 23,468.28

7393.02 Memasang rangka kuda-kuda baja IWF kg 16,971.24 8,273.10 25,244.34


Besi IWF 1.150 kg 13,416.00 15,428.40 - 15,428.40
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang las 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.003 OH 74,900.00 - 224.70 224.70
15,428.40 7,521.00 22,949.40
overhead & Profit 10% 1,542.84 752.10 2,294.94
Jumlah 16,971.24 8,273.10 25,244.34

7393.03 Mengerjakan 100 kg pekerjaan perakitan kg 34,276.00 13,104.91 47,380.91


Sewa alat 0.800 jam 18,750.00 15,000.00 15,000.00
solar 1.000 ltr 12,500.00 12,500.00 12,500.00
Minyak pelumas 0.100 ltr 36,600.00 3,660.00 3,660.00
Pekerja 0.100 OH 51,500.00 5,150.00 5,150.00
Tukang las 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.001 OH 69,050.00 69.05 69.05
Mandor 0.005 OH 74,900.00 374.50 374.50
31,160.00 11,913.55 43,073.55
overhead & Profit 10% 3,116.00 1,191.36 4,307.36
Jumlah 34,276.00 13,104.91 47,380.91

7393.04 Membuat pintu besi plat baja tebal 2 mm rangkap, rangka besi siku m2 680,076.54 144,738.06 824,814.60
Besi profil 15.000 kg 12,012.00 180,180.00 - 180,180.00
Besi plat 32.800 kg 13,338.00 437,486.40 - 437,486.40
Engsel pintu klam 0.050 bh 11,700.00 585.00
Pekerja 1.050 OH 51,500.00 - 54,075.00 54,075.00
Tukang las 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.105 OH 69,050.00 - 7,250.25 7,250.25
Mandor 0.052 OH 74,900.00 - 3,894.80 3,894.80
618,251.40 131,580.05 749,246.45
overhead & Profit 10% 61,825.14 13,158.01 74,924.65
Jumlah 680,076.54 144,738.06 824,171.10

7393.05 Mengerjakan 10 cm pengelasan dengan las listrik cm 14,125.65 3,973.09 18,098.74


Engsel pintu klam 0.400 buah 11,700.00 4,680.00 4,680.00
Sabun 0.300 kg 11,700.00 3,510.00 3,510.00
Sewa alat 0.170 jam 18,750.00 3,187.50 3,187.50
minyak pelumas 0.040 ltr 36,600.00 1,464.00 1,464.00
pekerja 0.040 OH 51,500.00 2,060.00 2,060.00
Tukang las 0.020 OH 63,200.00 1,264.00 1,264.00
Kepala tukang 0.002 OH 69,050.00 138.10 138.10
Mandor 0.002 OH 74,900.00 149.80 149.80
12,841.50 3,611.90 16,453.40
overhead & Profit 10% 1,284.15 361.19 1,645.34
Jumlah 14,125.65 3,973.09 18,098.74

7393.06 Membuat rangka jendela besi scuare tube (25 x 5) cm m2 45,720.75 89,584.06 135,304.81
Besi scuare tube 4.760 m 7,250.00 34,510.00 34,510.00
Besi lis kaca (1 x 1) cm 4.522 m 1,560.00 7,054.32 7,054.32
Pengelasan 20.000 cm - -
Pekerja 0.650 OH 51,500.00 33,475.00 33,475.00
Tukang las 0.650 OH 63,200.00 41,080.00 41,080.00
Kepala tukang 0.065 OH 69,050.00 4,488.25 4,488.25
Mandor 0.032 OH 74,900.00 2,396.80 2,396.80
41,564.32 81,440.05 123,004.37
overhead & Profit 10% 4,156.43 8,144.01 12,300.44
Jumlah 45,720.75 89,584.06 135,304.81

7393.07 Memasang pintu rolling door besi m2 199,914.00 161,012.94 360,926.94


Pintu rolling door besi 1.000 m2 181,740.00 181,740.00 - 181,740.00
Pekerja 1.200 OH 51,500.00 - 61,800.00 61,800.00
Tukang las 1.200 OH 63,200.00 - 75,840.00 75,840.00
Kepala tukang 0.120 OH 69,050.00 - 8,286.00 8,286.00
Mandor 0.006 OH 74,900.00 - 449.40 449.40
181,740.00 146,375.40 328,115.40
overhead & Profit 10% 18,174.00 14,637.54 32,811.54
Jumlah 199,914.00 161,012.94 360,926.94

7393.08 Memasang pintu lipat (folding door) plastik/PVC m2 471,900.00 60,669.40 532,569.40
Pintu lipat besi 1.000 m2 429,000.00 429,000.00 - 429,000.00
Pekerja 0.440 OH 51,500.00 - 22,660.00 22,660.00
Tukang aluminium 0.440 OH 63,200.00 - 27,808.00 27,808.00
Kepala tukang 0.044 OH 69,050.00 - 3,038.20 3,038.20
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
429,000.00 55,154.00 484,154.00
overhead & Profit 10% 42,900.00 5,515.40 48,415.40
Jumlah 471,900.00 60,669.40 532,569.40

7393.09 Memasang sunscreen aluminium m2 17,589.00 66,553.96 84,142.96


Sunscreen alluminium 1.000 m2 15,990.00 15,990.00 15,990.00
pekerja 0.080 OH 51,500.00 4,120.00 4,120.00
Tukang las 0.800 OH 63,200.00 50,560.00 50,560.00
Kepala tukang 0.080 OH 69,050.00 5,524.00 5,524.00
Mandor 0.004 OH 74,900.00 299.60 299.60
15,990.00 60,503.60 76,493.60
overhead & Profit 10% 1,599.00 6,050.36 7,649.36
Jumlah 17,589.00 66,553.96 84,142.96
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

7393.10 Memasang rolling door aluminium m2 265,980.00 137,885.00 403,865.00


Pintu rolling door aluminium 1.000 m2 241,800.00 241,800.00 - 241,800.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang aluminium/pintu jendela lainnya 1.000 OH 63,200.00 - 63,200.00 63,200.00
Kepala tukang 0.100 OH 69,050.00 - 6,905.00 6,905.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
241,800.00 125,350.00 367,150.00
overhead & Profit 10% 24,180.00 12,535.00 36,715.00
Jumlah 265,980.00 137,885.00 403,865.00

7393.11 Memasang kusen pintu dan jendela aluminium m 82,310.58 5,924.94 88,235.52
Profil aluminium 1.100 m 60,138.00 66,151.80 - 66,151.80
Skrup fixer 2.000 bh 3,627.00 7,254.00 - 7,254.00
Sealant 0.060 tube 23,700.00 1,422.00 - 1,422.00
Pekerja 0.043 OH 51,500.00 - 2,214.50 2,214.50
Tukang aluminium/pintu jendela lainnya 0.043 OH 63,200.00 - 2,717.60 2,717.60
Kepala tukang 0.0043 OH 69,050.00 - 296.92 296.92
Mandor 0.0021 OH 74,900.00 - 157.29 157.29
74,827.80 5,386.31 80,214.11
overhead & Profit 10% 7,482.78 538.63 8,021.41
Jumlah 82,310.58 5,924.94 88,235.52

7393.12 Memasang pintu aluminium strip lebar 8 cm m2 612,380.34 11,716.11 624,096.45


Profil aluminium 4.400 m 60,138.00 264,607.20 - 264,607.20
Aluminium strip 8 cm 14.600 m 20,007.00 292,102.20 - 292,102.20
Pekerja 0.085 OH 51,500.00 - 4,377.50 4,377.50
Tukang aluminium/pintu jendela lainnya 0.085 OH 63,200.00 - 5,372.00 5,372.00
Kepala tukang 0.0085 OH 69,050.00 - 586.93 586.93
Mandor 0.0042 OH 74,900.00 - 314.58 314.58
556,709.40 10,651.01 567,360.41
overhead & Profit 10% 55,670.94 1,065.10 56,736.04
Jumlah 612,380.34 11,716.11 624,096.45

7393.13 Memasang pintu kaca rangka aluminium m2 374,091.30 11,716.11 385,807.41


Profil aluminium 4.400 m 60,138.00 264,607.20 - 264,607.20
Kaca bening 5 mm 0.900 m2 76,752.00 69,076.80 - 69,076.80
Sealant 0.270 tube 23,700.00 6,399.00 - 6,399.00
Pekerja 0.085 OH 51,500.00 - 4,377.50 4,377.50
Tukang aluminium/pintu jendela lainnya 0.085 OH 63,200.00 - 5,372.00 5,372.00
Kepala tukang 0.0085 OH 69,050.00 - 586.93 586.93
Mandor 0.0042 OH 74,900.00 - 314.58 314.58
340,083.00 10,651.01 350,734.01
overhead & Profit 10% 34,008.30 1,065.10 35,073.40
Jumlah 374,091.30 11,716.11 385,807.41

7393.14 Memasang venetions blinds dan vertical blinds m2 91,960.00 48,300.95 140,260.95
Vertical blinds/venetions blinds 1.000 m2 83,600.00 83,600.00 - 83,600.00
Pekerja 0.350 OH 51,500.00 - 18,025.00 18,025.00
Tukang aluminium/pintu jendela lainnya 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.018 OH 74,900.00 - 1,348.20 1,348.20
83,600.00 43,909.95 127,509.95
overhead & Profit 10% 8,360.00 4,391.00 12,751.00
Jumlah 91,960.00 48,300.95 140,260.95

7393.15 Memasang terali besi strip m2 103,877.37 230,226.76 334,104.13


Besi strip 6.177 kg 15,288.00 94,433.98 - 94,433.98
Pekerja 1.670 OH 51,500.00 - 86,005.00 86,005.00
Tukang las 1.670 OH 63,200.00 - 105,544.00 105,544.00
Kepala tukang 0.167 OH 69,050.00 - 11,531.35 11,531.35
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
94,433.98 209,297.05 303,731.03
overhead & Profit 10% 9,443.40 20,929.71 30,373.10
Jumlah 103,877.37 230,226.76 334,104.13

7393.16 Memasang kawat nyamuk m2 58,681.71 13,788.50 72,470.21


Kawat kasa 1.100 m2 24,648.00 27,112.80 27,112.80
Pengelasan 11.110 cm - - -
Besi strip 1.716 kg 15,288.00 26,234.21 26,234.21
Pekerja 0.100 OH 51,500.00 5,150.00 5,150.00
Tukang las 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 690.50 690.50
Mandor 0.005 OH 74,900.00 374.50 374.50
53,347.01 12,535.00 65,882.01
overhead & Profit 10% 5,334.70 1,253.50 6,588.20
Jumlah 58,681.71 13,788.50 72,470.21

7393.18 Memasang talang datar/jurai seng bjls 28 lebar 90 cm m 204,933.30 41,860.78 246,794.08
Talang seng t = 0.3 mm L = 90 1.050 m' 65,000.00 68,250.00 - 68,250.00
Paku 0.015 kg 15,600.00 234.00 - 234.00
Kayu meranti 0.019 m3 6,201,000.00 117,819.00 - 117,819.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.400 OH 63,200.00 - 25,280.00 25,280.00
Kepala tukang 0.025 OH 69,050.00 - 1,726.25 1,726.25
Mandor 0.010 OH 74,900.00 - 749.00 749.00
186,303.00 38,055.25 224,358.25
overhead & Profit 10% 18,630.30 3,805.53 22,435.83
Jumlah 204,933.30 41,860.78 246,794.08

7393.19 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m 51,892.50 32,291.27 84,183.77
Talang seng t = 0.3 mm L = 45 1.050 m' 37,500.00 39,375.00 - 39,375.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Besi strip 0.500 kg 15,288.00 7,644.00 - 7,644.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang besi 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.008 OH 74,900.00 - 599.20 599.20
47,175.00 29,355.70 76,530.70
overhead & Profit 10% 4,717.50 2,935.57 7,653.07
Jumlah 51,892.50 32,291.27 84,183.77
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
7393.20 Pasang pintu PVC polos bh 211,310.00 140,882.20 352,192.20
Pintu PVC Polos 1.000 buah 192,100.00 192,100.00 - 192,100.00
Pekerja 1.050 OH 51,500.00 - 54,075.00 54,075.00
Tukang aluminium/pintu jendela lainnya 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.105 OH 69,050.00 - 7,250.25 7,250.25
Mandor 0.0052 OH 74,900.00 - 389.48 389.48
192,100.00 128,074.73 320,174.73
overhead & Profit 10% 19,210.00 12,807.47 32,017.47
Jumlah 211,310.00 140,882.20 352,192.20

7393.21 Pasang pintu PVC motif bh 408,100.00 140,882.20 548,982.20


Pintu PVC Motif 1.000 buah 371,000.00 371,000.00 - 371,000.00
Pekerja 1.050 OH 51,500.00 - 54,075.00 54,075.00
Tukang aluminium/pintu jendela lainnya 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.105 OH 69,050.00 - 7,250.25 7,250.25
Mandor 0.0052 OH 74,900.00 - 389.48 389.48
H PEKERJAAN LANGIT-LANGIT
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

2839.01 Memasang langit-langit asbes semen, tebal 4 mm m2 15,901.60 7,427.15 23,328.75


Asbes semen 4mm 1.100 bh 13,000.00 14,300.00 - 14,300.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Pekerja 0.030 OH 51,500.00 - 1,545.00 1,545.00
Tukang kayu 0.070 OH 63,200.00 - 4,424.00 4,424.00
Kepala tukang 0.007 OH 69,050.00 - 483.35 483.35
Mandor 0.004 OH 74,900.00 - 299.60 299.60
14,456.00 6,751.95 21,207.95
overhead & Profit 10% 1,445.60 675.20 2,120.80
Jumlah 15,901.60 7,427.15 23,328.75

2839.01.1 Memasang langit-langit asbes semen, tebal 5 mm m2 19,168.60 7,427.15 26,595.75


Asbes semen 5mm 1.100 bh 15,700.00 17,270.00 - 17,270.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Pekerja 0.030 OH 51,500.00 - 1,545.00 1,545.00
Tukang kayu 0.070 OH 63,200.00 - 4,424.00 4,424.00
Kepala tukang 0.007 OH 69,050.00 - 483.35 483.35
Mandor 0.004 OH 74,900.00 - 299.60 299.60
17,426.00 6,751.95 24,177.95
overhead & Profit 10% 1,742.60 675.20 2,417.80
Jumlah 19,168.60 7,427.15 26,595.75

2839.01.2 Memasang langit-langit asbes semen, tebal 6 mm m2 23,766.60 7,427.15 31,193.75


Asbes semen 6mm 1.100 bh 19,500.00 21,450.00 - 21,450.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Pekerja 0.030 OH 51,500.00 - 1,545.00 1,545.00
Tukang kayu 0.070 OH 63,200.00 - 4,424.00 4,424.00
Kepala tukang 0.007 OH 69,050.00 - 483.35 483.35
Mandor 0.004 OH 74,900.00 - 299.60 299.60
21,606.00 6,751.95 28,357.95
overhead & Profit 10% 2,160.60 675.20 2,835.80
Jumlah 23,766.60 7,427.15 31,193.75

2839.02 Memasang langit-langit akustik ukuran (30 x 30) cm m2 292,578.00 16,546.20 309,124.20
Papan akustik softboard 30 x 30 12.000 lembar 22,100.00 265,200.00 - 265,200.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.120 OH 51,500.00 - 6,180.00 6,180.00
Tukang kayu 0.120 OH 63,200.00 - 7,584.00 7,584.00
Kepala tukang 0.012 OH 69,050.00 - 828.60 828.60
Mandor 0.006 OH 74,900.00 - 449.40 449.40
265,980.00 15,042.00 281,022.00
overhead & Profit 10% 26,598.00 1,504.20 28,102.20
Jumlah 292,578.00 16,546.20 309,124.20

2839.03 Memasang langit-langit akustik ukuran (30 x 60) cm m2 281,578.00 13,788.50 295,366.50
Papan akustik softboard 30 x 60 5.800 lembar 44,000.00 255,200.00 - 255,200.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
255,980.00 12,535.00 268,515.00
overhead & Profit 10% 25,598.00 1,253.50 26,851.50
Jumlah 281,578.00 13,788.50 295,366.50

2839.04 Memasang langit-langit akustik ukuran (60 x 120) cm m2 320,298.00 13,788.50 334,086.50
Papan akustik softboard 60 x 120 1.500 lembar 193,600.00 290,400.00 - 290,400.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
291,180.00 12,535.00 303,715.00
overhead & Profit 10% 29,118.00 1,253.50 30,371.50
Jumlah 320,298.00 13,788.50 334,086.50

2839.05 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm m2 22,393.80 13,788.50 36,182.30
Kayu lapis/ tripleks tb. 3 mm 0.375 lembar 53,040.00 19,890.00 - 19,890.00
Paku 0.030 kg 15,600.00 468.00 - 468.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
20,358.00 12,535.00 32,893.00
overhead & Profit 10% 2,035.80 1,253.50 3,289.30
Jumlah 22,393.80 13,788.50 36,182.30

2839.05.1 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm m2 25,128.68 13,788.50 38,917.18
Kayu lapis/ tripleks tb. 4 mm 0.375 lembar 59,670.00 22,376.25 - 22,376.25
Paku 0.030 kg 15,600.00 468.00 - 468.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
22,844.25 12,535.00 35,379.25
overhead & Profit 10% 2,284.43 1,253.50 3,537.93
Jumlah 25,128.68 13,788.50 38,917.18

2839.05.2 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm m2 32,207.18 13,788.50 45,995.68
Kayu lapis/ tripleks tb. 6 mm 0.375 lembar 76,830.00 28,811.25 - 28,811.25
Paku 0.030 kg 15,600.00 468.00 - 468.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
29,279.25 12,535.00 41,814.25
overhead & Profit 10% 2,927.93 1,253.50 4,181.43
Jumlah 32,207.18 13,788.50 45,995.68
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

2839.06 Memasang langit-langit lambriziring kayu, tebal 9 mm m2 45,216.60 110,308.00 155,524.60


Kayu sengon untuk bekesting 0.015 m3 2,730,000.00 40,950.00 - 36,937.50
Paku 0.010 kg 15,600.00 156.00 - 525.00
Pekerja 0.800 OH 51,500.00 - 41,200.00 4,000.00
Tukang kayu 0.800 OH 63,200.00 - 50,560.00 5,000.00
Kepala tukang 0.080 OH 69,050.00 - 5,524.00 550.00
Mandor 0.040 OH 74,900.00 - 2,996.00 300.00
41,106.00 100,280.00 47,312.50
overhead & Profit 10% 4,110.60 10,028.00 4,731.25
Jumlah 45,216.60 110,308.00 52,043.75

2839.07 Memasang langit-langit gypsum board ukuran (120 x 240 x 9) cm, tebal 9 mm m2 37,338.44 9,932.73 47,271.17
Gipsum 0.364 lembar 86,700.00 31,558.80 - 31,558.80
Paku skrup 0.110 kg 21,684.00 2,385.24 - 2,385.24
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.005 OH 74,900.00 - 374.50 374.50
33,944.04 9,029.75 42,973.79
overhead & Profit 10% 3,394.40 902.98 4,297.38
Jumlah 37,338.44 9,932.73 47,271.17

2839.08 Memasang list plafond gypsum profil m 8,648.64 8,273.10 16,921.74


List gipsum profil 0.900 m 8,190.00 7,371.00 - 7,371.00
Tepung gipsum 0.150 Kg 3,276.00 491.40 - 491.40
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang kayu 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.003 OH 74,900.00 - 224.70 224.70
7,862.40 7,521.00 15,383.40
overhead & Profit 10% 786.24 752.10 1,538.34
Jumlah 8,648.64 8,273.10 16,921.74

2839.09 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka aluminium m2 213,474.69 68,942.50 282,417.19
Hollow 4x4 cm 3.600 m 5,050.50 18,181.80 - 18,181.80
Ramset/dina bolt 1.050 bh 14,040.00 14,742.00 14,742.00
Kawat galvanis 0.150 kg 17,238.00 2,585.70 2,585.70
Papan akustik softboard 60x120 1.050 lembar 151,008.00 158,558.40 158,558.40
Pekerja 0.500 OH 51,500.00 - 25,750.00 25,750.00
Tukang kayu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
194,067.90 62,675.00 256,742.90
overhead & Profit 10% 19,406.79 6,267.50 25,674.29
Jumlah 213,474.69 68,942.50 282,417.19

2839.10 Memasang list langit-langit kayu profil m 8,279.70 6,935.45 15,215.15


Lis kayu profil 5 cm 1.050 m' 7,020.00 7,371.00 - 7,371.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Pekerja 0.050 OH 51,500.00 - 2,575.00 2,575.00
Tukang kayu 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.003 OH 74,900.00 - 224.70 224.70
7,527.00 6,304.95 13,831.95
overhead & Profit 10% 752.70 630.50 1,383.20
Jumlah 8,279.70 6,935.45 15,215.15

2839.07.1 Memasang langit-langit calsiboard m2 64,560.64 9,932.73 74,493.36


Calsiboard 1.050 m2 53,625.00 56,306.25 - 56,306.25
Paku skrup 0.110 kg 21,684.00 2,385.24 - 2,385.24
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.005 OH 74,900.00 - 374.50 374.50
58,691.49 9,029.75 67,721.24
overhead & Profit 0.100 5,869.15 902.98 6,772.12
Jumlah 64,560.64 9,932.73 74,493.36

2839.07.2 Memasang langit-langit harplek m2 22,406.67 13,788.50 36,195.17


Harflek 1.050 m2 18,954.00 19,901.70 - 19,901.70
Paku 0.030 kg 15,600.00 468.00 - 468.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
I PEKERJAAN PENUTUP ATAP
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

R3436.01 Memasang penutup atap genteng kodok kebumen m2 74,646.00 14,978.26 89,624.26
Genteng kodok kebumen 25.000 bh 2,714.40 67,860.00 - 67,860.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
67,860.00 13,616.60 81,476.60
overhead & Profit 10% 6,786.00 1,361.66 8,147.66
Jumlah 74,646.00 14,978.26 89,624.26

R3436.01.1 Memasang penutup atap genteng kodok kemiri m2 43,436.25 14,978.26 58,414.51
Genteng kodok kemiri 25.000 bh 1,579.50 39,487.50 - 39,487.50
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
39,487.50 13,616.60 53,104.10
overhead & Profit 10% 3,948.75 1,361.66 5,310.41
Jumlah 43,436.25 14,978.26 58,414.51

R3436.01.2 Memasang penutup atap genteng pelentong besar/magas glasur m2 100,815.00 14,978.26 115,793.26
Genteng magas kebumen glasur 25.000 bh 3,666.00 91,650.00 - 91,650.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
91,650.00 13,616.60 105,266.60
overhead & Profit 10% 9,165.00 1,361.66 10,526.66
Jumlah 100,815.00 14,978.26 115,793.26

R3436.01.3 Memasang penutup atap genteng pelentong besar/magas kebumen m2 50,407.50 14,978.26 65,385.76
Genteng magas kebumen biasa 25.000 bh 1,833.00 45,825.00 - 45,825.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
45,825.00 13,616.60 59,441.60
overhead & Profit 10% 4,582.50 1,361.66 5,944.16
Jumlah 50,407.50 14,978.26 65,385.76

R3436.01.8 Memasang penutup atap genteng pelentong besar/magas/mantili kecil mojolaban m2 35,692.80 14,978.26 50,671.06
Genteng plentong Mojolaban 26.000 bh 1,248.00 32,448.00 - 32,448.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
32,448.00 13,616.60 46,064.60
overhead & Profit 10% 3,244.80 1,361.66 4,606.46
Jumlah 35,692.80 14,978.26 50,671.06

R3436.01.9 Memasang penutup atap genteng pelentong Kebumen m2 49,635.30 14,978.26 64,613.56
Genteng plentong kebumen 26.000 bh 1,735.50 45,123.00 45,123.00
Pekerja 0.150 OH 51,500.00 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 552.40 552.40
Mandor 0.008 OH 74,900.00 599.20 599.20
45,123.00 13,616.60 58,739.60
overhead & Profit 10% 4,512.30 1,361.66 5,873.96
Jumlah 49,635.30 14,978.26 64,613.56

R3436.01.10 Memasang penutup atap genteng pelentong besar/magas/mantili kecil kemiri m2 34,577.40 14,978.26 49,555.66
Genteng pelentong kemiri 26.000 bh 1,209.00 31,434.00 - 31,434.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
31,434.00 13,616.60 45,050.60
overhead & Profit 10% 3,143.40 1,361.66 4,505.06
Jumlah 34,577.40 14,978.26 49,555.66

R3436.01.6 Memasang penutup atap genteng morando glasur m2 94,980.60 14,978.26 109,958.86
Genteng morando kebumen glasur 18.000 bh 4,797.00 86,346.00 - 86,346.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
86,346.00 13,616.60 99,962.60
overhead & Profit 10% 8,634.60 1,361.66 9,996.26
Jumlah 94,980.60 14,978.26 109,958.86

R3436.01.7 Memasang penutup atap genteng morando m2 57,297.24 14,978.26 72,275.50


Genteng morando kebumen biasa 18.000 bh 2,893.80 52,088.40 - 52,088.40
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
52,088.40 13,616.60 65,705.00
overhead & Profit 10% 5,208.84 1,361.66 6,570.50
Jumlah 57,297.24 14,978.26 72,275.50

R3436.03 Memasang bubung pada atap genteng kebumen m 67,044.98 38,247.88 105,292.86
Bubung genteng kebumen 5.000 bh 8,154.90 40,774.50 - 40,774.50
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
60,949.98 34,770.80 95,720.78
overhead & Profit 10% 6,095.00 3,477.08 9,572.08
Jumlah 67,044.98 38,247.88 105,292.86

R3436.03.1 Memasang bubung pada atap genteng mojolaban m 50,078.03 38,247.88 88,325.91
Bubung genteng mojolaban 5.000 bh 5,070.00 25,350.00 - 25,350.00
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
45,525.48 34,770.80 80,296.28
overhead & Profit 10% 4,552.55 3,477.08 8,029.63
Jumlah 50,078.03 38,247.88 88,325.91

R3436.03.2 Memasang bubung pada atap genteng kemiri m 44,930.03 38,247.88 83,177.91
Bubung genteng kemiri 5.000 bh 4,134.00 20,670.00 - 20,670.00
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
40,845.48 34,770.80 75,616.28
overhead & Profit 10% 4,084.55 3,477.08 7,561.63
Jumlah 44,930.03 38,247.88 83,177.91

R3436.04 Memasang bubung pada atap genteng beton m 57,049.28 38,247.88 95,297.16
Bubung genteng beton 3.500 bh 8,112.00 28,392.00 - 28,392.00
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Semen warna 1.000 Kg 3,295.50 3,295.50 - 3,295.50
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
51,862.98 34,770.80 86,633.78
overhead & Profit 10% 5,186.30 3,477.08 8,663.38
Jumlah 57,049.28 38,247.88 95,297.16

R3436.05 Memasang penutup atap genteng metal kelas I m2 246,709.32 19,123.94 265,833.26
Genteng metal kelas I 1.020 m2 216,060.00 220,381.20 - 220,381.20
Paku anti karat 0.200 kg 19,500.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.001 OH 74,900.00 - 74.90 74.90
224,281.20 17,385.40 241,666.60
overhead & Profit 10% 22,428.12 1,738.54 24,166.66
Jumlah 246,709.32 19,123.94 265,833.26

R3436.06 Memasang bubung pada atap genteng metal kelas I m 122,694.00 14,054.65 136,748.65
Kerpus genting metal kelas I 2.500 Bh 44,460.00 111,150.00 - 111,150.00
Paku anti karat 0.020 kg 19,500.00 390.00 - 390.00
Pekerja 0.025 OH 51,500.00 - 1,287.50 1,287.50
Tukang kayu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.013 OH 74,900.00 - 973.70 973.70
111,540.00 12,776.95 124,316.95
overhead & Profit 10% 11,154.00 1,277.70 12,431.70
Jumlah 122,694.00 14,054.65 136,748.65

R3436.07 Memasang penutup atap genteng metal kelas II m2 134,251.26 19,123.94 153,375.20
Genteng metal kelas II 1.020 m2 115,830.00 118,146.60 - 118,146.60
Paku anti karat 0.200 kg 19,500.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.001 OH 74,900.00 - 74.90 74.90
122,046.60 17,385.40 139,432.00
overhead & Profit 10% 12,204.66 1,738.54 13,943.20
Jumlah 134,251.26 19,123.94 153,375.20

R3436.08 Memasang bubung pada atap genteng metal kelas II m 85,156.50 14,054.65 99,211.15
Kerpus genting metal kelas II 2.500 Bh 30,810.00 77,025.00 - 77,025.00
Paku anti karat 0.020 kg 19,500.00 390.00 - 390.00
Pekerja 0.025 OH 51,500.00 - 1,287.50 1,287.50
Tukang kayu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.013 OH 74,900.00 - 973.70 973.70
PEKERJAAN PENGECATAN DAN FINISHING DINDING

KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

R.Pt.38.01 Mengikis atau mengerok cat tembok cara manual m2 - 9,156.62 9,156.62
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Mandor 0.008 OH 74,900.00 - 599.20 599.20
- 8,324.20 8,324.20
overhead & Profit 10% - 832.42 832.42
Jumlah - 9,156.62 9,156.62

R.Pt.38.02 Mencuci bidang permukaan tembok lama dengan sabun m2 643.50 4,861.56 5,505.06
Sabun 0.050 kg 11,700.00 585.00 585.00
Pekerja 0.080 OH 51,500.00 4,120.00 4,120.00
Mandor 0.004 OH 74,900.00 299.60 299.60
585.00 4,419.60 5,004.60
overhead & Profit 10% 58.50 441.96 500.46
Jumlah 643.50 4,861.56 5,505.06

R.Pt.38.03 Lapis plamir tembok m2 2,574.00 3,528.86 6,102.86


Plamir tembok 0.100 Kg 6,700.00 670.00 - 670.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 - 1,670.00
Pekerja 0.020 OH 51,500.00 - 1,030.00 1,030.00
Tukang cat 0.030 OH 63,200.00 - 1,896.00 1,896.00
Kepala tukang 0.003 OH 69,050.00 - 207.15 207.15
Mandor 0.001 OH 74,900.00 - 74.90 74.90
2,340.00 3,208.05 5,548.05
overhead & Profit 10% 234.00 320.81 554.81
Jumlah 2,574.00 3,528.86 6,102.86

R.Pt.38.04 Pengecatan bidang tembok interior 2 lapis dengan kuas m2 4,752.00 7,501.95 12,253.95
Cat tembok interior 0.240 Kg 18,000.00 4,320.00 - 4,320.00
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang cat 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.003 OH 74,900.00 - 224.70 224.70
4,320.00 6,819.95 11,139.95
overhead & Profit 10% 432.00 682.00 1,114.00
Jumlah 4,752.00 7,501.95 12,253.95

R.Pt.38.05 Pengecatan bidang tembok interior 2 lapis dengan roll m2 9,306.00 4,744.25 14,050.25
Cat tembok interior 0.470 Kg 18,000.00 8,460.00 - 8,460.00
Pekerja 0.040 OH 51,500.00 - 2,060.00 2,060.00
Tukang cat 0.030 OH 63,200.00 - 1,896.00 1,896.00
Kepala tukang 0.003 OH 69,050.00 - 207.15 207.15
Mandor 0.002 OH 74,900.00 - 149.80 149.80
8,460.00 4,312.95 12,772.95
overhead & Profit 10% 846.00 431.30 1,277.30
Jumlah 9,306.00 4,744.25 14,050.25

R.Pt.38.04.1 Pengecatan bidang tembok eksterior 2 lapis dengan kuas m2 22,704.00 7,501.95 30,205.95
Cat tembok eksterior 0.240 Kg 86,000.00 20,640.00 - 20,640.00
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang cat 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.003 OH 74,900.00 - 224.70 224.70
20,640.00 6,819.95 27,459.95
overhead & Profit 10% 2,064.00 682.00 2,746.00
Jumlah 22,704.00 7,501.95 30,205.95

R.Pt.38.05.1 Pengecatan bidang tembok eksterior 2 lapis dengan roll m2 44,462.00 4,744.25 49,206.25
Cat tembok eksterior 0.470 Kg 86,000.00 40,420.00 - 40,420.00
Pekerja 0.040 OH 51,500.00 - 2,060.00 2,060.00
Tukang cat 0.030 OH 63,200.00 - 1,896.00 1,896.00
Kepala tukang 0.003 OH 69,050.00 - 207.15 207.15
Mandor 0.002 OH 74,900.00 - 149.80 149.80
40,420.00 4,312.95 44,732.95
overhead & Profit 10% 4,042.00 431.30 4,473.30
Jumlah 44,462.00 4,744.25 49,206.25

R.Pt.38.06 Pengecatan plafon 2 lapis dengan cat tembok dengan kuas termasuk plamir m2 7,326.00 9,488.49 16,814.49
Plamir tembok 0.100 Kg 6,700.00 670.00 - 670.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 - 1,670.00
Cat tembok interior 0.240 Kg 18,000.00 4,320.00 - 4,320.00
Pekerja 0.080 OH 51,500.00 - 4,120.00 4,120.00
Tukang cat 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.004 OH 74,900.00 - 299.60 299.60
6,660.00 8,625.90 15,285.90
overhead & Profit 10% 666.00 862.59 1,528.59
Jumlah 7,326.00 9,488.49 16,814.49

R.Pt.38.07 Pengecatan plafon 2 lapis dengan cat tembok dengan roll termasuk plamir m2 11,880.00 6,730.79 18,610.79
Plamir tembok 0.100 Kg 6,700.00 670.00 - 670.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 - 1,670.00
Cat tembok interior 0.470 Kg 18,000.00 8,460.00 - 8,460.00
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang cat 0.040 OH 63,200.00 - 2,528.00 2,528.00
Kepala tukang 0.004 OH 69,050.00 - 276.20 276.20
Mandor 0.003 OH 74,900.00 - 224.70 224.70
10,800.00 6,118.90 16,918.90
overhead & Profit 10% 1,080.00 611.89 1,691.89
Jumlah 11,880.00 6,730.79 18,610.79

R.Pt.38.08 Pasang wallpaper dengan perekat m2 231,913.00 8,690.00 240,603.00


Wallpaper 1.100 m2 189,300.00 208,230.00 - 208,230.00
Perekat ( lem ) 0.200 buah 13,000.00 2,600.00 - 2,600.00
Pekerja 0.010 OH 51,500.00 - 515.00 515.00
Tukang aluminium/pintu jendela lainnya 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
210,830.00 7,900.00 218,730.00
overhead & Profit 10% 21,083.00 790.00 21,873.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Jumlah 231,913.00 8,690.00 240,603.00

R.Pt.38.09 Melapis meni pada permukaan kayu m2 6,259.00 4,578.31 10,837.31


Meny 0.170 Kg 22,000.00 3,740.00 - 3,740.00
Minyak cat 0.100 liter 19,500.00 1,950.00 - 1,950.00
Pekerja 0.075 OH 51,500.00 - 3,862.50 3,862.50
Mandor 0.004 OH 74,900.00 - 299.60 299.60
5,690.00 4,162.10 9,852.10
overhead & Profit 10% 569.00 416.21 985.21
Jumlah 6,259.00 4,578.31 10,837.31

R.Pt.38.10 Mendempul/memplamir dan menggosok kayu m2 10,957.10 8,482.71 19,439.81


Dempul 0.150 Kg 22,100.00 3,315.00 - 3,315.00
Plamir kayu 0.080 Kg 16,950.00 1,356.00 - 1,356.00
Minyak cat 0.100 liter 19,500.00 1,950.00 - 1,950.00
Amplas kayu 1.000 lembar 3,340.00 3,340.00 - 3,340.00
Tukang kayu 0.110 OH 63,200.00 - 6,952.00 6,952.00
Kepala tukang 0.011 OH 69,050.00 - 759.55 759.55
9,961.00 7,711.55 17,672.55
overhead & Profit 10% 996.10 771.16 1,767.26
Jumlah 10,957.10 8,482.71 19,439.81

R.Pt.38.11 Mengecat dasar 1 lapis pada kayu m2 14,421.00 5,821.64 20,242.64


Cat kayu / besi 0.170 Kg 46,000.00 7,820.00 - 7,820.00
Minyak cat 0.100 liter 19,500.00 1,950.00 - 1,950.00
Amplas kayu 1.000 lembar 3,340.00 3,340.00 - 3,340.00
Tukang cat 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
13,110.00 5,292.40 18,402.40
overhead & Profit 10% 1,311.00 529.24 1,840.24
Jumlah 14,421.00 5,821.64 20,242.64

R.Pt.38.12 Mengecat penutup 2 lapis pada kayu m2 19,470.00 20,723.95 40,193.95


Cat kayu / besi 0.300 Kg 46,000.00 13,800.00 - 13,800.00
Minyak cat 0.200 liter 19,500.00 3,900.00 - 3,900.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang cat 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.008 OH 74,900.00 - 599.20 599.20
17,700.00 18,839.95 36,539.95
overhead & Profit 10% 1,770.00 1,884.00 3,654.00
Jumlah 19,470.00 20,723.95 40,193.95

R.Pt.38.13 Mengerok karat atau cat permukaan baja dengan soda api m2 3,575.00 18,230.85 21,805.85
Soda api 0.050 Kg 28,000.00 1,400.00 - 1,400.00
Amplas besi 0.500 lembar 3,700.00 1,850.00 - 1,850.00
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
3,250.00 16,573.50 19,823.50
overhead & Profit 10% 325.00 1,657.35 1,982.35
Jumlah 3,575.00 18,230.85 21,805.85

R.Pt.38.14 Melapis meni pada permukaan baja m2 4,768.50 4,578.31 9,346.81


Meny 0.100 Kg 22,000.00 2,200.00 - 2,200.00
Minyak cat 0.100 liter 19,500.00 1,950.00 - 1,950.00
Amplas besi 0.050 lembar 3,700.00 185.00 - 185.00
Pekerja 0.075 OH 51,500.00 - 3,862.50 3,862.50
Mandor 0.004 OH 74,900.00 - 299.60 299.60
4,335.00 4,162.10 8,497.10
overhead & Profit 10% 433.50 416.21 849.71
Jumlah 4,768.50 4,578.31 9,346.81

R.Pt.38.15 Mengecat penutup 2 lapis pada permukaan baja menggunakan kuas m2 12,265.00 20,723.95 32,988.95
Cat kayu / besi 0.200 Kg 46,000.00 9,200.00 - 9,200.00
Minyak cat 0.100 liter 19,500.00 1,950.00 - 1,950.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang cat 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.008 OH 74,900.00 - 599.20 599.20
11,150.00 18,839.95 29,989.95
overhead & Profit 10% 1,115.00 1,884.00 2,999.00
Jumlah 12,265.00 20,723.95 32,988.95

R.Pt.38.16 Mengecat penutup 2 lapis pada permukaan baja dengan semprot m2 26,675.00 11,719.35 38,394.35
Cat kayu / besi 0.400 Kg 46,000.00 18,400.00 - 18,400.00
Minyak cat 0.300 liter 19,500.00 5,850.00 - 5,850.00
Pekerja 0.020 OH 51,500.00 - 1,030.00 1,030.00
Tukang cat 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.001 OH 69,050.00 - 69.05 69.05
Mandor 0.001 OH 74,900.00 - 74.90 74.90
24,250.00 10,653.95 34,903.95
overhead & Profit 10% 2,425.00 1,065.40 3,490.40
Jumlah 26,675.00 11,719.35 38,394.35

R.Pt.38.17 Pelapisan bidang kayu dengan teak oil m2 14,033.80 7,711.55 21,745.35
Minyak pelumas 0.300 liter 36,600.00 10,980.00 10,980.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 1,670.00
kuas 1" 0.015 buah 7,200.00 108.00 108.00
Tukang cat 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 690.50 690.50
12,758.00 7,010.50 19,768.50
overhead & Profit 10% 1,275.80 701.05 1,976.85
Jumlah 14,033.80 7,711.55 21,745.35

R.Pt.38.18 Pelapisan bidang kayu dengan pelitur 2 lapis m2 18,675.25 34,512.45 53,187.70
Wood filler 0.100 Kg 34,775.00 3,477.50 - 3,477.50
Pelitur 0.200 liter 50,800.00 10,160.00 - 10,160.00
Amplas kayu 1.000 lembar 3,340.00 3,340.00 - 3,340.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang cat 0.250 OH 63,200.00 - 15,800.00 15,800.00
Kepala tukang 0.025 OH 69,050.00 - 1,726.25 1,726.25
Mandor 0.013 OH 74,900.00 - 973.70 973.70
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
16,977.50 31,374.95 48,352.45
overhead & Profit 10% 1,697.75 3,137.50 4,835.25
Jumlah 18,675.25 34,512.45 53,187.70

R.Pt.38.19 Pelapisan bidang kayu dengan vernis 2 lapis m2 14,047.00 7,711.55 21,758.55
Vernis 0.300 liter 37,000.00 11,100.00 - 11,100.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 - 1,670.00
Tukang cat 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
12,770.00 7,010.50 19,780.50
overhead & Profit 10% 1,277.00 701.05 1,978.05
Jumlah 14,047.00 7,711.55 21,758.55

R.Pt.38.20 Pelapisan bidang kayu dengan residu/ter m2 19,320.40 7,711.55 27,031.95


Teer 0.350 liter 49,000.00 17,150.00 - 17,150.00
Minyak tanah 0.030 liter 13,800.00 414.00 - 414.00
Tukang cat 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
17,564.00 7,010.50 24,574.50
overhead & Profit 10% 1,756.40 701.05 2,457.45
Jumlah 19,320.40 7,711.55 27,031.95

R.Pt.38.21 Mengecat genting m2 16,939.18 35,288.55 52,227.73


Cat genteng 0.425 Kg 28,250.00 12,006.25 - 12,006.25
Minyak cat 0.174 liter 19,500.00 3,393.00 - 3,393.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang cat 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
K PEKERJAAN KUNCI, ALAT GANTUNGAN, DAN KACA
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

R.Pt.30.01 Pasang kunci tanam antik bh 147,400.00 46,269.30 193,669.30


Kunci tanam antik 1.000 buah 134,000.00 134,000.00 - 134,000.00
Tukang kayu 0.600 OH 63,200.00 - 37,920.00 37,920.00
Kepala tukang 0.060 OH 69,050.00 - 4,143.00 4,143.00
134,000.00 42,063.00 176,063.00
overhead & Profit 10% 13,400.00 4,206.30 17,606.30
Jumlah 147,400.00 46,269.30 193,669.30

R.Pt.30.02 Pasang kunci tanam biasa bh 112,860.00 38,557.75 151,417.75


Kunci tanam biasa 1.000 buah 102,600.00 102,600.00 - 102,600.00
Tukang kayu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
102,600.00 35,052.50 137,652.50
overhead & Profit 10% 10,260.00 3,505.25 13,765.25
Jumlah 112,860.00 38,557.75 151,417.75

R.Pt.30.03 Pasang kunci silinder bh 183,700.00 46,269.30 229,969.30


Kunci silinder 1.000 buah 167,000.00 167,000.00 - 167,000.00
Tukang kayu 0.600 OH 63,200.00 - 37,920.00 37,920.00
Kepala tukang 0.060 OH 69,050.00 - 4,143.00 4,143.00
167,000.00 42,063.00 209,063.00
overhead & Profit 10% 16,700.00 4,206.30 20,906.30
Jumlah 183,700.00 46,269.30 229,969.30

R.Pt.30.04 Pasang kunci slot untuk kamar mandi bh 111,870.00 19,278.88 131,148.88
Kunci slot 1.000 buah 101,700.00 101,700.00 - 101,700.00
Tukang kayu 0.250 OH 63,200.00 - 15,800.00 15,800.00
Kepala tukang 0.025 OH 69,050.00 - 1,726.25 1,726.25
101,700.00 17,526.25 119,226.25
overhead & Profit 10% 10,170.00 1,752.63 11,922.63
Jumlah 111,870.00 19,278.88 131,148.88

R.Pt.30.05 Pasang engsel pintu bh 14,850.00 9,677.42 24,527.42


Engsel pintu 1.000 buah 13,500.00 13,500.00 - 13,500.00
Tukang kayu 0.125 OH 63,200.00 - 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 - 897.65 897.65
13,500.00 8,797.65 22,297.65
overhead & Profit 10% 1,350.00 879.77 2,229.77
Jumlah 14,850.00 9,677.42 24,527.42

R.Pt.30.06 Pasang engsel angin untuk pintu 19,250.00 9,677.42 28,927.42


Engsel angin 1.000 buah 17,500.00 17,500.00 17,500.00
Tukang kayu 0.125 OH 63,200.00 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 897.65 897.65
17,500.00 8,797.65 26,297.65
overhead & Profit 10% 1,750.00 879.77 2,629.77
Jumlah 19,250.00 9,677.42 28,927.42

R.Pt.30.07 Pasang engsel pintu klam 12,870.00 34,512.45 47,382.45


Engsel pintu klam 1.000 buah 11,700.00 11,700.00 11,700.00
Pekerja 0.250 OH 51,500.00 12,875.00 12,875.00
Tukang kayu 0.250 OH 63,200.00 15,800.00 15,800.00
Kepala tukang 0.025 OH 69,050.00 1,726.25 1,726.25
Mandor 0.013 OH 74,900.00 973.70 973.70
11,700.00 31,374.95 43,074.95
overhead & Profit 10% 1,170.00 3,137.50 4,307.50
Jumlah 12,870.00 34,512.45 47,382.45

R.Pt.30.08 Pasang engsel jendela bh 11,000.00 7,711.55 18,711.55


Engsel jendela 1.000 buah 10,000.00 10,000.00 - 10,000.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
10,000.00 7,010.50 17,010.50
overhead & Profit 10% 1,000.00 701.05 1,701.05
Jumlah 11,000.00 7,711.55 18,711.55

R.Pt.30.09 Pasang kait angin bh 7,370.00 7,711.55 15,081.55


Kait angin 1.000 buah 6,700.00 6,700.00 - 6,700.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
6,700.00 7,010.50 13,710.50
overhead & Profit 10% 670.00 701.05 1,371.05
Jumlah 7,370.00 7,711.55 15,081.55

R.Pt.30.10 Pasang door closer bh 212,740.00 15,423.10 228,163.10


Door closer 1.000 buah 193,400.00 193,400.00 - 193,400.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
193,400.00 14,021.00 207,421.00
overhead & Profit 10% 19,340.00 1,402.10 20,742.10
Jumlah 212,740.00 15,423.10 228,163.10

R.Pt.30.11 Pasang door holder bh 30,800.00 7,711.55 38,511.55


Door Holder 1.000 buah 28,000.00 28,000.00 - 28,000.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
28,000.00 7,010.50 35,010.50
overhead & Profit 10% 2,800.00 701.05 3,501.05
Jumlah 30,800.00 7,711.55 38,511.55

R.Pt.30.12 Pasang door stops bh 46,640.00 9,677.42 56,317.42


Door stops 1.000 buah 42,400.00 42,400.00 - 42,400.00
Tukang kayu 0.125 OH 63,200.00 - 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 - 897.65 897.65
42,400.00 8,797.65 51,197.65
overhead & Profit 10% 4,240.00 879.77 5,119.77
Jumlah 46,640.00 9,677.42 56,317.42
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
R.Pt.30.13 Pasang rel pintu dorong unit 181,390.00 69,520.00 250,910.00
Rel pintu dorong 1.000 buah 164,900.00 164,900.00 - 164,900.00
Pekerja 0.080 OH 51,500.00 - 4,120.00 4,120.00
Tukang kayu 0.800 OH 63,200.00 - 50,560.00 50,560.00
Kepala tukang 0.080 OH 69,050.00 - 5,524.00 5,524.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
164,900.00 63,200.00 228,100.00
overhead & Profit 10% 16,490.00 6,320.00 22,810.00
Jumlah 181,390.00 69,520.00 250,910.00

R.Pt.30.14 Pasang gerendel bh 5,500.00 7,711.55 13,211.55


Grendel ukuran kecil 1.000 buah 5,000.00 5,000.00 - 5,000.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
5,000.00 7,010.50 12,010.50
overhead & Profit 10% 500.00 701.05 1,201.05
Jumlah 5,500.00 7,711.55 13,211.55

R.Pt.30.15 Pasang kaca polos tebal 2mm m2 62,920.00 22,061.60 84,981.60


Kaca bening 2 mm 1.100 m2 52,000.00 57,200.00 57,200.00
Pekerja 0.160 OH 51,500.00 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 599.20 599.20
57,200.00 20,056.00 77,256.00
overhead & Profit 10% 5,720.00 2,005.60 7,725.60
Jumlah 62,920.00 22,061.60 84,981.60

R.Pt.30.16 Pasang kaca polos tebal 3mm m2 78,650.00 22,061.60 100,711.60


Kaca bening 3 mm 1.100 m2 65,000.00 71,500.00 71,500.00
Pekerja 0.160 OH 51,500.00 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 599.20 599.20
71,500.00 20,056.00 91,556.00
overhead & Profit 10% 7,150.00 2,005.60 9,155.60
Jumlah 78,650.00 22,061.60 100,711.60

R.Pt.30.17 Pasang kaca polos tebal 5mm m2 92,869.92 22,061.60 114,931.52


Kaca bening 5 mm 1.100 m2 76,752.00 84,427.20 - 84,427.20
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
84,427.20 20,056.00 104,483.20
overhead & Profit 10% 8,442.72 2,005.60 10,448.32
Jumlah 92,869.92 22,061.60 114,931.52

R.Pt.30.18 Pasang kaca polos tebal 8mm m2 174,131.10 24,910.99 199,042.09


Kaca bening 8 mm 1.100 m2 143,910.00 158,301.00 - 158,301.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang kayu 0.125 OH 63,200.00 - 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 - 897.65 897.65
Mandor 0.013 OH 74,900.00 - 973.70 973.70
158,301.00 22,646.35 180,947.35
overhead & Profit 10% 15,830.10 2,264.64 18,094.74
Jumlah 174,131.10 24,910.99 199,042.09

R.Pt.30.19 Pasang kaca polos tebal 3mm dengan kisi-kisi m2 85,800.00 34,512.45 120,312.45
Kaca bening 3 mm 1.200 m2 65,000.00 78,000.00 78,000.00
Pekerja 0.250 OH 51,500.00 12,875.00 12,875.00
Tukang kayu 0.250 OH 63,200.00 15,800.00 15,800.00
Kepala tukang 0.025 OH 69,050.00 1,726.25 1,726.25
Mandor 0.013 OH 74,900.00 973.70 973.70
78,000.00 31,374.95 109,374.95
overhead & Profit 10% 7,800.00 3,137.50 10,937.50
Jumlah 85,800.00 34,512.45 120,312.45

R.Pt.30.20 Pasang kaca rayband tebal 5mm m2 107,357.25 22,061.60 129,418.85


Kaca rayband 5 mm 1.100 m2 88,725.00 97,597.50 - 97,597.50
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
97,597.50 20,056.00 117,653.50
overhead & Profit 10% 9,759.75 2,005.60 11,765.35
Jumlah 107,357.25 22,061.60 129,418.85

R.Pt.30.21 Pasang kaca rayband tebal 8mm m2 217,074.00 24,910.99 241,984.99


Kaca rayband 8 mm 1.100 m2 179,400.00 197,340.00 - 197,340.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang kayu 0.125 OH 63,200.00 - 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 - 897.65 897.65
Mandor 0.013 OH 74,900.00 - 973.70 973.70
197,340.00 22,646.35 219,986.35
overhead & Profit 10% 19,734.00 2,264.64 21,998.64
Jumlah 217,074.00 24,910.99 241,984.99

R.Pt.30.22 Pasang kaca raiben tebal 12mm m2 211,750.00 24,910.99 236,660.99


Kaca bening 12 mm 1.100 m2 175,000.00 192,500.00 192,500.00
Pekerja 0.250 OH 51,500.00 12,875.00 12,875.00
Tukang kayu 0.125 OH 63,200.00 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 897.65 897.65
Mandor 0.013 OH 74,900.00 973.70 973.70
192,500.00 22,646.35 215,146.35
overhead & Profit 10% 19,250.00 2,264.64 21,514.64
Jumlah 211,750.00 24,910.99 236,660.99

R.Pt.30.23 Pasang kaca buram tebal 3mm m2 87,065.55 22,061.60 109,127.15


Kaca es 3 mm 1.100 m2 71,955.00 79,150.50 - 79,150.50
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
79,150.50 20,056.00 99,206.50
overhead & Profit 10% 7,915.05 2,005.60 9,920.65
Jumlah 87,065.55 22,061.60 109,127.15

R.Pt.30.24 Pasang kaca buram tebal 5mm m2 127,696.14 22,061.60 149,757.74


Kaca es 5 mm 1.100 m2 105,534.00 116,087.40 - 116,087.40
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
116,087.40 20,056.00 136,143.40
overhead & Profit 10% 11,608.74 2,005.60 13,614.34
Jumlah 127,696.14 22,061.60 149,757.74

R.Pt.30.25 Pasang kaca buram tebal 3mm (motif) m2 104,478.66 22,061.60 126,540.26
Kaca jeruk 3 mm 1.100 m2 86,346.00 94,980.60 - 94,980.60
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
94,980.60 20,056.00 115,036.60
overhead & Profit 10% 9,498.06 2,005.60 11,503.66
Jumlah 104,478.66 22,061.60 126,540.26

R.Pt.30.26 Pasang kaca buram tebal 5mm (motif) m2 208,957.32 22,061.60 231,018.92
Kaca jeruk 5 mm 1.100 m2 172,692.00 189,961.20 - 189,961.20
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
189,961.20 20,056.00 210,017.20
overhead & Profit 10% 18,996.12 2,005.60 21,001.72
Jumlah 208,957.32 22,061.60 231,018.92

R.Pt.30.27 Pasang kaca cermin tebal 5mm m2 174,131.10 22,061.60 196,192.70


Kaca cermin 5 mm 1.100 m2 143,910.00 158,301.00 - 158,301.00
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
158,301.00 20,056.00 178,357.00
overhead & Profit 10% 15,830.10 2,005.60 17,835.70
Jumlah 174,131.10 22,061.60 196,192.70

R.Pt.30.28 Pasang kaca wire glass tebal 5mm m2 181,500.00 22,061.60 203,561.60
wireglass 5 mm 1.100 m2 150,000.00 165,000.00 165,000.00
Pekerja 0.160 OH 51,500.00 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 599.20 599.20
165,000.00 20,056.00 185,056.00
overhead & Profit 10% 16,500.00 2,005.60 18,505.60
Jumlah 181,500.00 22,061.60 203,561.60

R.Pt.30.29 Pasang kaca wire glass tebal 8mm m2 211,750.00 22,061.60 233,811.60
wireglass 8 mm 1.100 m2 175,000.00 192,500.00 192,500.00
Pekerja 0.160 OH 51,500.00 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 599.20 599.20
192,500.00 20,056.00 212,556.00
overhead & Profit 10% 19,250.00 2,005.60 21,255.60
Jumlah 211,750.00 22,061.60 233,811.60

R.Pt.30.32 Pasang spring knife bh 6,160.00 7,711.55 13,871.55


Spring Knife 1.000 buah 5,600.00 5,600.00 - 5,600.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
L PEKERJAAN PIPA DAN SANITAIR
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)

R.T.15.01 Memasang kloset duduk/monoblok kelas I bh 2,684,784.96 276,675.36 2,961,460.32


Kloset duduk/Monoblok kelas I 1.060 buah 2,302,560.00 2,440,713.60 - 2,440,713.60
Pekerja 3.300 OH 51,500.00 - 169,950.00 169,950.00
Tukang batu 1.100 OH 63,200.00 - 69,520.00 69,520.00
Kepala tukang 0.001 OH 69,050.00 - 69.05 69.05
Mandor 0.160 OH 74,900.00 - 11,984.00 11,984.00
2,440,713.60 251,523.05 2,692,236.65
overhead & Profit 10% 244,071.36 25,152.31 269,223.67
Jumlah 2,684,784.96 276,675.36 2,961,460.32

R.T.15.02 Memasang kloset duduk/monoblok kelas II bh 1,370,358.99 276,675.36 1,647,034.35


Kloset duduk/Monoblok kelas II 1.060 buah 1,175,265.00 1,245,780.90 - 1,245,780.90
Pekerja 3.300 OH 51,500.00 - 169,950.00 169,950.00
Tukang batu 1.100 OH 63,200.00 - 69,520.00 69,520.00
Kepala tukang 0.001 OH 69,050.00 - 69.05 69.05
Mandor 0.160 OH 74,900.00 - 11,984.00 11,984.00
1,245,780.90 251,523.05 1,497,303.95
overhead & Profit 10% 124,578.09 25,152.31 149,730.40
Jumlah 1,370,358.99 276,675.36 1,647,034.35

R.T.15.03 Memasang kloset jongkok porselen kelas I bh 217,614.54 185,505.65 403,120.19


Kloset porselin jongkok kelas I 1.000 buah 188,097.00 188,097.00 - 188,097.00
Semen PC. 6.000 Kg 1,306.50 7,839.00 - 7,839.00
Pasir pasang 0.010 m3 189,540.00 1,895.40 - 1,895.40
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang batu 1.500 OH 63,200.00 - 94,800.00 94,800.00
Kepala tukang 0.150 OH 69,050.00 - 10,357.50 10,357.50
Mandor 0.160 OH 74,900.00 - 11,984.00 11,984.00
197,831.40 168,641.50 366,472.90
overhead & Profit 10% 19,783.14 16,864.15 36,647.29
Jumlah 217,614.54 185,505.65 403,120.19

R.T.15.04 Memasang kloset jongkok porselen kelas II bh 144,470.04 185,505.65 329,975.69


Kloset porselin jongkok kelas II 1.000 buah 121,602.00 121,602.00 - 121,602.00
Semen PC. 6.000 Kg 1,306.50 7,839.00 - 7,839.00
Pasir pasang 0.010 m3 189,540.00 1,895.40 - 1,895.40
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang batu 1.500 OH 63,200.00 - 94,800.00 94,800.00
Kepala tukang 0.150 OH 69,050.00 - 10,357.50 10,357.50
Mandor 0.160 OH 74,900.00 - 11,984.00 11,984.00
131,336.40 168,641.50 299,977.90
overhead & Profit 10% 13,133.64 16,864.15 29,997.79
Jumlah 144,470.04 185,505.65 329,975.69

R.T.15.05 Memasang urinoir bh 1,396,978.44 142,004.50 1,538,982.94


Urinoir 1.000 buah 1,260,246.00 1,260,246.00 - 1,260,246.00
Semen PC. 6.000 Kg 1,306.50 7,839.00 - 7,839.00
Pasir pasang 0.010 m3 189,540.00 1,895.40 - 1,895.40
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang batu 1.000 OH 63,200.00 - 63,200.00 63,200.00
Kepala tukang 0.100 OH 69,050.00 - 6,905.00 6,905.00
Mandor 0.100 OH 74,900.00 - 7,490.00 7,490.00
1,269,980.40 129,095.00 1,399,075.40
overhead & Profit 10% 126,998.04 12,909.50 139,907.54
Jumlah 1,396,978.44 142,004.50 1,538,982.94

R.T.15.06 Memasang wastafel bh 503,728.37 188,416.25 692,144.62


Wastafel 1.120 buah 400,179.00 448,200.48 - 448,200.48
Semen PC. 6.000 Kg 1,306.50 7,839.00 - 7,839.00
Pasir pasang 0.010 m3 189,540.00 1,895.40 - 1,895.40
Pekerja 1.200 OH 51,500.00 - 61,800.00 61,800.00
Tukang batu 1.450 OH 63,200.00 - 91,640.00 91,640.00
Kepala tukang 0.150 OH 69,050.00 - 10,357.50 10,357.50
Mandor 0.100 OH 74,900.00 - 7,490.00 7,490.00
457,934.88 171,287.50 629,222.38
overhead & Profit 10% 45,793.49 17,128.75 62,922.24
Jumlah 503,728.37 188,416.25 692,144.62

R.T.15.07 Memasang bak mandi fibreglass volume 0,3 m3 bh 363,617.83 339,752.60 703,370.43
Bak fiberglass sudut 0,3 m3 1.180 buah 280,137.00 330,561.66 - 330,561.66
Pekerja 1.800 OH 51,500.00 - 92,700.00 92,700.00
Tukang batu 2.700 OH 63,200.00 - 170,640.00 170,640.00
Kepala tukang 0.540 OH 69,050.00 - 37,287.00 37,287.00
Mandor 0.110 OH 74,900.00 - 8,239.00 8,239.00
330,561.66 308,866.00 639,427.66
overhead & Profit 10% 33,056.17 30,886.60 63,942.77
Jumlah 363,617.83 339,752.60 703,370.43

R.T.15.08 Memasang bak mandi batu bata volume 0,3 m3 bh 276,190.20 595,963.50 872,153.70
Batu Bata 60.000 buah 624.00 37,440.00 - 37,440.00
Semen PC. 120.000 Kg 1,306.50 156,780.00 - 156,780.00
Pasir pasang 0.300 m3 189,540.00 56,862.00 - 56,862.00
Pekerja 6.000 OH 51,500.00 - 309,000.00 309,000.00
Tukang batu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.300 OH 74,900.00 - 22,470.00 22,470.00
251,082.00 541,785.00 792,867.00
overhead & Profit 10% 25,108.20 54,178.50 79,286.70
Jumlah 276,190.20 595,963.50 872,153.70

R.T.15.09 Memasang bak fibreglass volume 1 m3 bh 1,809,808.00 625,300.50 2,435,108.50


Tangki fiber kapasitas 1 m3 1.120 buah 1,469,000.00 1,645,280.00 - 1,645,280.00
Pekerja 3.000 OH 51,500.00 - 154,500.00 154,500.00
Tukang batu 4.500 OH 63,200.00 - 284,400.00 284,400.00
Kepala tukang 0.900 OH 69,050.00 - 62,145.00 62,145.00
Mandor 0.900 OH 74,900.00 - 67,410.00 67,410.00
1,645,280.00 568,455.00 2,213,735.00
overhead & Profit 10% 164,528.00 56,845.50 221,373.50
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Jumlah 1,809,808.00 625,300.50 2,435,108.50

R.T.15.10 Memasang pipa beton diameter 20 cm m 60,124.32 13,905.82 74,030.13


Gorong - gorong buis beton dia. 20 cm 1.100 m' 25,313.81 27,845.19 - 27,845.19
Batu Bata 13.500 buah 624.00 8,424.00 - 8,424.00
Semen PC. 3.920 Kg 1,306.50 5,121.48 - 5,121.48
Pasir pasang 0.056 m3 189,540.00 10,614.24 - 10,614.24
Pasir urug 0.024 m3 110,565.00 2,653.56 - 2,653.56
Pekerja 0.140 OH 51,500.00 - 7,210.00 7,210.00
Tukang batu 0.070 OH 63,200.00 - 4,424.00 4,424.00
Kepala tukang 0.007 OH 69,050.00 - 483.35 483.35
Mandor 0.007 OH 74,900.00 - 524.30 524.30
54,658.47 12,641.65 67,300.12
overhead & Profit 10% 5,465.85 1,264.17 6,730.01
Jumlah 60,124.32 13,905.82 74,030.13

R.T.15.11 Memasang pipa beton diameter 30 cm m 96,301.41 37,744.36 134,045.77


Gorong - gorong buis beton dia. 30 cm 1.100 m' 34,480.37 37,928.40 - 37,928.40
Batu Bata 27.500 buah 624.00 17,160.00 - 17,160.00
Semen PC. 10.300 Kg 1,306.50 13,456.95 - 13,456.95
Pasir pasang 0.060 m3 189,540.00 11,372.40 - 11,372.40
Pasir urug 0.069 m3 110,565.00 7,628.99 - 7,628.99
Pekerja 0.380 OH 51,500.00 - 19,570.00 19,570.00
Tukang batu 0.190 OH 63,200.00 - 12,008.00 12,008.00
Kepala tukang 0.019 OH 69,050.00 - 1,311.95 1,311.95
Mandor 0.019 OH 74,900.00 - 1,423.10 1,423.10
87,546.74 34,313.05 121,859.79
overhead & Profit 10% 8,754.67 3,431.31 12,185.98
Jumlah 96,301.41 37,744.36 134,045.77

R.T.15.12 Memasang pipa beton diameter 60 cm m 196,637.17 37,744.36 234,381.52


Gorong - gorong buis beton dia. 60 cm 1.100 m' 117,402.48 129,142.73 - 129,142.73
Batu Bata 27.500 buah 624.00 17,160.00 - 17,160.00
Semen PC. 10.300 Kg 1,306.50 13,456.95 - 13,456.95
Pasir pasang 0.060 m3 189,540.00 11,372.40 - 11,372.40
Pasir urug 0.069 m3 110,565.00 7,628.99 - 7,628.99
Pekerja 0.380 OH 51,500.00 - 19,570.00 19,570.00
Tukang batu 0.190 OH 63,200.00 - 12,008.00 12,008.00
Kepala tukang 0.019 OH 69,050.00 - 1,311.95 1,311.95
Mandor 0.019 OH 74,900.00 - 1,423.10 1,423.10
178,761.06 34,313.05 213,074.11
overhead & Profit 10% 17,876.11 3,431.31 21,307.41
Jumlah 196,637.17 37,744.36 234,381.52

R.T.15.13 Memasang pipa beton diameter 80 cm m 223,683.46 37,744.36 261,427.81


Gorong - gorong buis beton dia. 80 cm 1.100 m' 139,754.78 153,730.26 - 153,730.26
Batu Bata 27.500 buah 624.00 17,160.00 - 17,160.00
Semen PC. 10.300 Kg 1,306.50 13,456.95 - 13,456.95
Pasir pasang 0.060 m3 189,540.00 11,372.40 - 11,372.40
Pasir urug 0.069 m3 110,565.00 7,628.99 - 7,628.99
Pekerja 0.380 OH 51,500.00 - 19,570.00 19,570.00
Tukang batu 0.190 OH 63,200.00 - 12,008.00 12,008.00
Kepala tukang 0.019 OH 69,050.00 - 1,311.95 1,311.95
Mandor 0.019 OH 74,900.00 - 1,423.10 1,423.10
203,348.60 34,313.05 237,661.65
overhead & Profit 10% 20,334.86 3,431.31 23,766.16
Jumlah 223,683.46 37,744.36 261,427.81

R.T.15.14 Memasang pipa beton diameter 100 cm m 230,551.68 37,744.36 268,296.03


Gorong - gorong buis beton dia. 100 cm 1.100 m' 145,431.00 159,974.10 - 159,974.10
Batu Bata 27.500 buah 624.00 17,160.00 - 17,160.00
Semen PC. 10.300 Kg 1,306.50 13,456.95 - 13,456.95
Pasir pasang 0.060 m3 189,540.00 11,372.40 - 11,372.40
Pasir urug 0.069 m3 110,565.00 7,628.99 - 7,628.99
Pekerja 0.380 OH 51,500.00 - 19,570.00 19,570.00
Tukang batu 0.190 OH 63,200.00 - 12,008.00 12,008.00
Kepala tukang 0.019 OH 69,050.00 - 1,311.95 1,311.95
Mandor 0.019 OH 74,900.00 - 1,423.10 1,423.10
209,592.44 34,313.05 243,905.49
overhead & Profit 10% 20,959.24 3,431.31 24,390.55
Jumlah 230,551.68 37,744.36 268,296.03

R.T.15.15 Memasang bak kontrol pasangan batu bata ukuran 30 x 30 tinggi 50 cm bh 170,438.27 31,013.57 201,451.83
Batu Bata 68.150 buah 624.00 42,525.60 - 42,525.60
Semen PC. 44.000 Kg 1,306.50 57,486.00 - 57,486.00
Pasir pasang 0.070 m3 189,540.00 13,267.80 - 13,267.80
Batu pecah 2-3 cm ( pecah mesin) 0.070 m3 208,104.00 14,567.28 - 14,567.28
Pasir beton 0.060 m3 183,300.00 10,998.00 - 10,998.00
Besi beton 1.600 kg 10,062.00 16,099.20 - 16,099.20
Pekerja 0.320 OH 51,500.00 - 16,480.00 16,480.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.016 OH 74,900.00 - 1,198.40 1,198.40
154,943.88 28,194.15 183,138.03
overhead & Profit 10% 15,494.39 2,819.42 18,313.80
Jumlah 170,438.27 31,013.57 201,451.83

R.T.15.16 Memasang bak kontrol pasangan batu bata ukuran 45 x 45 tinggi 50 cm bh 269,919.08 122,745.54 392,664.61
Batu Bata 117.500 buah 624.00 73,320.00 - 73,320.00
Semen PC. 77.000 Kg 1,306.50 100,600.50 - 100,600.50
Pasir pasang 0.130 m3 189,540.00 24,640.20 - 24,640.20
Batu pecah 2-3 cm ( pecah mesin) 0.020 m3 208,104.00 4,162.08 - 4,162.08
Pasir beton 0.090 m3 183,300.00 16,497.00 - 16,497.00
Besi beton 2.600 kg 10,062.00 26,161.20 - 26,161.20
Pekerja 1.420 OH 51,500.00 - 73,130.00 73,130.00
Tukang batu 0.473 OH 63,200.00 - 29,893.60 29,893.60
Kepala tukang 0.047 OH 69,050.00 - 3,245.35 3,245.35
Mandor 0.071 OH 74,900.00 - 5,317.90 5,317.90
245,380.98 111,586.85 356,967.83
overhead & Profit 10% 24,538.10 11,158.69 35,696.78
Jumlah 269,919.08 122,745.54 392,664.61
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
R.T.15.17 Memasang bak kontrol pasangan batu bata ukuran 60 x 60 tinggi 50 cm bh 407,316.11 186,785.28 594,101.39
Batu Bata 174.370 buah 624.00 108,806.88 - 108,806.88
Semen PC. 114.000 Kg 1,306.50 148,941.00 - 148,941.00
Pasir pasang 0.184 m3 189,540.00 34,875.36 - 34,875.36
Batu pecah 2-3 cm ( pecah mesin) 0.033 m3 208,104.00 6,867.43 - 6,867.43
Pasir beton 0.120 m3 183,300.00 21,996.00 - 21,996.00
Besi beton 4.850 kg 10,062.00 48,800.70 - 48,800.70
Pekerja 2.160 OH 51,500.00 - 111,240.00 111,240.00
Tukang batu 0.720 OH 63,200.00 - 45,504.00 45,504.00
Kepala tukang 0.072 OH 69,050.00 - 4,971.60 4,971.60
Mandor 0.108 OH 74,900.00 - 8,089.20 8,089.20
370,287.37 169,804.80 540,092.17
overhead & Profit 10% 37,028.74 16,980.48 54,009.22
Jumlah 407,316.11 186,785.28 594,101.39

R.T.15.18 Memasang pipa galvanis diameter 1/2" m 42,589.80 10,221.95 52,811.75


Pipa besi Galvanis ( GIP ) DN 10 mm 1/2" 1.620 m 23,900.00 38,718.00 - 38,718.00
Pekerja 0.054 OH 51,500.00 - 2,781.00 2,781.00
Tukang pipa 0.090 OH 63,200.00 - 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 - 621.45 621.45
Mandor 0.003 OH 74,900.00 - 202.23 202.23
38,718.00 9,292.68 48,010.68
overhead & Profit 10% 3,871.80 929.27 4,801.07
Jumlah 42,589.80 10,221.95 52,811.75

R.T.15.19 Memasang pipa galvanis diameter 3/4" m 63,617.40 10,221.95 73,839.35


Pipa besi Galvanis ( GIP ) DN 20 mm 3/4" 1.620 m 35,700.00 57,834.00 - 57,834.00
Pekerja 0.054 OH 51,500.00 - 2,781.00 2,781.00
Tukang pipa 0.090 OH 63,200.00 - 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 - 621.45 621.45
Mandor 0.003 OH 74,900.00 - 202.23 202.23
57,834.00 9,292.68 67,126.68
overhead & Profit 10% 5,783.40 929.27 6,712.67
Jumlah 63,617.40 10,221.95 73,839.35

R.T.15.20 Memasang pipa galvanis diameter 1" m 85,357.80 10,221.95 95,579.75


Pipa besi Galvanis ( GIP ) DN 25 mm 1" 1.620 m 47,900.00 77,598.00 - 77,598.00
Pekerja 0.054 OH 51,500.00 - 2,781.00 2,781.00
Tukang pipa 0.090 OH 63,200.00 - 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 - 621.45 621.45
Mandor 0.003 OH 74,900.00 - 202.23 202.23
77,598.00 9,292.68 86,890.68
overhead & Profit 10% 7,759.80 929.27 8,689.07
Jumlah 85,357.80 10,221.95 95,579.75

R.T.15.21 Memasang pipa galvanis diameter 1 1/2" m 147,906.00 20,443.90 168,349.90


Pipa besi Galvanis ( GIP ) DN 40 mm 1 1/2" 1.620 m 83,000.00 134,460.00 - 134,460.00
Pekerja 0.108 OH 51,500.00 - 5,562.00 5,562.00
Tukang pipa 0.180 OH 63,200.00 - 11,376.00 11,376.00
Kepala tukang 0.018 OH 69,050.00 - 1,242.90 1,242.90
Mandor 0.005 OH 74,900.00 - 404.46 404.46
134,460.00 18,585.36 153,045.36
overhead & Profit 10% 13,446.00 1,858.54 15,304.54
Jumlah 147,906.00 20,443.90 168,349.90

R.T.15.22 Memasang pipa galvanis diameter 3" m 231,660.00 20,443.90 252,103.90


Pipa besi Galvanis ( GIP ) DN 75 mm 3" 1.620 m 130,000.00 210,600.00 - 210,600.00
Pekerja 0.108 OH 51,500.00 - 5,562.00 5,562.00
Tukang pipa 0.180 OH 63,200.00 - 11,376.00 11,376.00
Kepala tukang 0.018 OH 69,050.00 - 1,242.90 1,242.90
Mandor 0.005 OH 74,900.00 - 404.46 404.46
210,600.00 18,585.36 229,185.36
overhead & Profit 10% 21,060.00 1,858.54 22,918.54
Jumlah 231,660.00 20,443.90 252,103.90

R.T.15.23 Memasang pipa galvanis diameter 4" m 265,518.00 25,554.87 291,072.87


Pipa besi Galvanis ( GIP ) DN 100 mm 4" 1.620 m 149,000.00 241,380.00 - 241,380.00
Pekerja 0.135 OH 51,500.00 - 6,952.50 6,952.50
Tukang pipa 0.225 OH 63,200.00 - 14,220.00 14,220.00
Kepala tukang 0.023 OH 69,050.00 - 1,553.63 1,553.63
Mandor 0.007 OH 74,900.00 - 505.58 505.58
241,380.00 23,231.70 264,611.70
overhead & Profit 10% 24,138.00 2,323.17 26,461.17
Jumlah 265,518.00 25,554.87 291,072.87

R.T.15.25 Memasang pipa PVC tipe AW diameter 3/4" m 8,375.40 6,814.63 15,190.03
Pipa PVC 20 mm ( 3/4 ) " AW 1.620 m 4,700.00 7,614.00 - 7,614.00
Pekerja 0.036 OH 51,500.00 - 1,854.00 1,854.00
Tukang pipa 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.002 OH 74,900.00 - 134.82 134.82
7,614.00 6,195.12 13,809.12
overhead & Profit 10% 761.40 619.51 1,380.91
Jumlah 8,375.40 6,814.63 15,190.03

R.T.15.26 Memasang pipa PVC tipe AW diameter 1" m 15,147.00 6,814.63 21,961.63
Pipa PVC 25 mm ( 1 ) " AW 1.620 m 8,500.00 13,770.00 - 13,770.00
Pekerja 0.036 OH 51,500.00 - 1,854.00 1,854.00
Tukang pipa 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.002 OH 74,900.00 - 134.82 134.82
13,770.00 6,195.12 19,965.12
overhead & Profit 10% 1,377.00 619.51 1,996.51
Jumlah 15,147.00 6,814.63 21,961.63

R.T.15.27 Memasang pipa PVC tipe AW diameter 1 1/2" m 19,423.80 6,814.63 26,238.43
Pipa PVC 40 mm ( 1 1/2 ) " AW 1.620 m 10,900.00 17,658.00 - 17,658.00
Pekerja 0.036 OH 51,500.00 - 1,854.00 1,854.00
Tukang pipa 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.002 OH 74,900.00 - 134.82 134.82
17,658.00 6,195.12 23,853.12
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
overhead & Profit 10% 1,765.80 619.51 2,385.31
Jumlah 19,423.80 6,814.63 26,238.43

R.T.15.28 Memasang pipa PVC tipe AW diameter 2" m 25,482.60 10,221.95 35,704.55
Pipa PVC 50 mm ( 2 ) " AW 1.620 m 14,300.00 23,166.00 - 23,166.00
Pekerja 0.054 OH 51,500.00 - 2,781.00 2,781.00
Tukang pipa 0.090 OH 63,200.00 - 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 - 621.45 621.45
Mandor 0.003 OH 74,900.00 - 202.23 202.23
23,166.00 9,292.68 32,458.68
overhead & Profit 10% 2,316.60 929.27 3,245.87
Jumlah 25,482.60 10,221.95 35,704.55

R.T.15.29 Memasang pipa PVC tipe AW diameter 2 1/2" m 47,401.20 10,221.95 57,623.15
Pipa PVC 64 mm ( 2 1/2) " AW 1.620 m 26,600.00 43,092.00 - 43,092.00
Pekerja 0.054 OH 51,500.00 - 2,781.00 2,781.00
Tukang pipa 0.090 OH 63,200.00 - 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 - 621.45 621.45
Mandor 0.003 OH 74,900.00 - 202.23 202.23
43,092.00 9,292.68 52,384.68
overhead & Profit 10% 4,309.20 929.27 5,238.47
Jumlah 47,401.20 10,221.95 57,623.15

R.T.15.30 Memasang pipa PVC tipe AW diameter 3" m 25,482.60 15,332.92 40,815.52
Pipa PVC 80 mm ( 3 ) " AW 1.620 m 14,300.00 23,166.00 - 23,166.00
Pekerja 0.081 OH 51,500.00 - 4,171.50 4,171.50
Tukang pipa 0.135 OH 63,200.00 - 8,532.00 8,532.00
Kepala tukang 0.014 OH 69,050.00 - 932.18 932.18
Mandor 0.004 OH 74,900.00 - 303.35 303.35
23,166.00 13,939.02 37,105.02
overhead & Profit 10% 2,316.60 1,393.90 3,710.50
Jumlah 25,482.60 15,332.92 40,815.52

R.T.15.31 Memasang pipa PVC tipe AW diameter 4" m 81,615.60 15,332.92 96,948.52
Pipa PVC 100 mm ( 4 ) " AW 1.620 m 45,800.00 74,196.00 - 74,196.00
Pekerja 0.081 OH 51,500.00 - 4,171.50 4,171.50
Tukang pipa 0.135 OH 63,200.00 - 8,532.00 8,532.00
Kepala tukang 0.014 OH 69,050.00 - 932.18 932.18
Mandor 0.004 OH 74,900.00 - 303.35 303.35
74,196.00 13,939.02 88,135.02
overhead & Profit 10% 7,419.60 1,393.90 8,813.50
Jumlah 81,615.60 15,332.92 96,948.52

R.T.15.32 Memasang bak cuci piring stainless steel bh 618,068.88 23,134.65 641,203.53
Bak cuci stainless 2 bk 1.350 buah 416,208.00 561,880.80 - 561,880.80
Tukang pipa 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
561,880.80 21,031.50 582,912.30
overhead & Profit 10% 56,188.08 2,103.15 58,291.23
Jumlah 618,068.88 23,134.65 641,203.53

R.T.15.33 Memasang kran air diameter 1/2" bh 11,277.75 7,711.55 18,989.30


Kran air 1/2" 1.000 buah 10,100.00 10,100.00 - 10,100.00
Seal tape 0.025 buah 6,100.00 152.50 - 152.50
Tukang pipa 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
10,252.50 7,010.50 17,263.00
overhead & Profit 10% 1,025.25 701.05 1,726.30
Jumlah 11,277.75 7,711.55 18,989.30

R.T.15.34 Memasang kran air diameter 3/4" bh 12,597.75 7,711.55 20,309.30


Kran air 3/4" 1.000 buah 11,300.00 11,300.00 - 11,300.00
Seal tape 0.025 buah 6,100.00 152.50 - 152.50
Tukang pipa 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
11,452.50 7,010.50 18,463.00
overhead & Profit 10% 1,145.25 701.05 1,846.30
Jumlah 12,597.75 7,711.55 20,309.30

R.T.15.35 Memasang floor drain stainless steel bh 12,430.00 7,711.55 20,141.55


Floor drain stainles 1.000 buah 11,300.00 11,300.00 - 11,300.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
11,300.00 7,010.50 18,310.50
overhead & Profit 10% 1,130.00 701.05 1,831.05
Jumlah 12,430.00 7,711.55 20,141.55

R.T.15.36 Memasang floor drain plastik bh 4,290.00 7,711.55 12,001.55


Floor drain plastik 1.000 buah 3,900.00 3,900.00 - 3,900.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
TAKSIR PEKERJAAN LAIN-LAIN

KODE URAIAN KOEF


1 2 3

M.001 Memasang floor drain plastik


Kloset duduk/Monoblok kelas I 1.060
Pekerja 3.300
Tukang batu 1.100
Kepala tukang 0.001
Mandor 0.160
SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
4 5 6=(3X5) 7=(3X5) 8=(6+7)

bh 1,590,000.00 155,995.00 1,745,995.00


buah 1,500,000.00 1,590,000.00 - 1,590,000.00
OH 31,500.00 - 103,950.00 103,950.00
OH 40,000.00 - 44,000.00 44,000.00
OH 45,000.00 - 45.00 45.00
OH 50,000.00 - 8,000.00 8,000.00
DAFTAR HARGA SATUAN PEKERJAAN
EDISI EDISI HPS
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
I PEKERJAAN PERSIAPAN DAN PEKERJAAN TANAH
SNI SNI 2835:2008
1 1 2835.01 Menggali tanah biasa sedalam 1 m m3 - 44,547.25 44,547.25
2 2 2835.02 Menggali tanah biasa sedalam 2 m m3 - 54,692.55 54,692.55
3 3 2835.03 Menggali tanah biasa sedalam 3 m m3 - 65,002.63 65,002.63
4 4 2835.04 Menggali tanah keras sedalam 1 m m3 - 59,286.48 59,286.48
5 5 2835.05 Menggali tanah cadas sedalam 1 m m3 - 89,918.40 89,918.40
6 6 2835.06 Menggali tanah lumpur sedalam 1 m m3 - 71,687.55 71,687.55
7 7 2835.07 Mengerjakan stripping tebing setinggi 1 m m2 - 3,244.45 3,244.45
8 8 2835.08 Membuang tanah sejauh 30 m m3 - 19,518.40 19,518.40
9 9 2835.09 Mengurug kembali galian m3 - 14,849.08 14,849.08
10 10 2835.10 Memadatkan tanah (per 20 cm) m3 - 32,444.50 32,444.50
11 11 2835.11 Mengurug pasir urug m3 145,945.80 17,818.90 163,764.70
12 12 2835.12 Memasang lapisan pudel 1 KP : 3 PP : 7 TL m3 160,790.57 82,757.40 243,547.97
13 13 2835.13 Memasang lapisan pudel 1 KP : 5 TL m3 117,775.94 75,189.40 192,965.34
14 14 2835.14 Memasang lapisan ijuk tebal 10 cm m2 92,400.00 9,733.35 102,133.35
15 15 2835.15 Mengurug sirtu padat m3 159,896.88 16,222.25 176,119.13
16 16 2835.16 Mengurug tanah urug m3 58,378.32 17,818.90 76,197.22
17 17 2835.17 Mengurug tanah kembali dipadatkan m3 - 39,598.70 39,598.70
18 18 2835.18 Membongkar genteng/sirap (bongkaran digunakan) m3 - 32,444.50 32,444.50
19 19 2835.19 Membongkar genteng/sirap (bongkaran tidak digunakan) m3 - 6,488.90 6,488.90
20 20 2835.20 Membongkar rangka atap, reng kaso (bongkaran digunakan) m3 - 20,689.35 20,689.35
21 21 2835.21 Membongkar rangka atap, reng kaso (bongkaran tidak digunakan) m3 - 15,294.95 15,294.95
22 22 2835.22 Membongkar rangka atap, gording, kuda-kuda (bongkaran digunak m3 - 692,588.60 692,588.60
23 23 2835.23 Membongkar rangka atap, gording, kuda-kuda (bongkaran tidak di m3 - 461,242.10 461,242.10
24 24 2835.24 Membongkar plafon (bongkaran digunakan) m3 - 29,623.55 29,623.55
25 25 2835.25 Membongkar plafon (bongkaran tidak digunakan) m3 - 9,733.35 9,733.35
26 26 2835.26 Menggali tanah biasa menggunakan alat berat di buang setempat m3 #REF! 512.26 #REF!

II II PEKERJAAN BETON
SNI SNI 7394:2008
1 1 7394.01 Membuat beton mutu f'c = 7,4 MPa (K 100) m3 668,844.55 121,555.61 790,400.16
2 2 7394.02 Membuat beton mutu f'c = 9,8 MPa (K 125) m3 704,416.90 121,555.61 825,972.51
3 3 7394.03 Membuat beton mutu f'c = 12,2 MPa (K 150) m3 732,576.35 121,555.61 854,131.96
4 4 7394.04 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100) m3 652,239.50 88,346.50 740,586.00
5 5 7394.05 Membuat beton mutu f'c = 14,5 MPa (K 175) m3 765,521.90 121,555.61 887,077.51
6 6 7394.06 Membuat beton mutu f'c = 16,9 MPa (K 200) m3 797,580.30 121,555.61 919,135.91
7 7 7394.07 Membuat beton mutu f'c = 19,3 MPa (K 225) m3 820,733.65 121,555.61 942,289.26
8 8 7394.08 Membuat beton mutu f'c = 21,7 MPa (K 250) m3 837,161.60 121,555.61 958,717.21
9 9 7394.09 Membuat beton mutu f'c = 24,0 MPa (K 275) m3 865,451.40 121,555.61 987,007.01
10 10 7394.10 Membuat beton mutu f'c = 26,4 MPa (K 300) m3 874,246.45 121,555.61 995,802.06
11 11 7394.11 Membuat beton mutu f'c = 28,8 MPa (K 325) m3 907,432.35 154,606.38 1,062,038.73
12 12 7394.12 Membuat beton mutu f'c = 31,2 MPa (K 350) m3 918,964.20 154,606.38 1,073,570.58
13 17 7394.17 Pembesian dengan besi polos atau besi ulir kg 11,875.79 969.31 12,845.11
14 20 7394.20 Memasang bekisting untuk pondasi m2 31,407.75 51,650.17 83,057.92
15 21 7394.21 Memasang bekisting untuk sloof dan ringbalk m2 31,407.75 51,650.17 83,057.92
16 22 7394.22 Memasang bekisting untuk kolom m2 58,067.90 65,555.99 123,623.89
17 23 7394.23 Memasang bekisting untuk balok dan konsol m2 63,344.60 65,555.99 128,900.59
18 24 7394.24 Memasang bekisting untuk plat lantai m2 96,536.00 65,555.99 162,091.99
19 25 7394.25 Memasang bekisting untuk dinding m2 76,809.15 65,555.99 142,365.14
20 26 7394.26 Memasang bekisting untuk tangga m2 84,128.00 65,555.99 149,683.99
21 27 7394.27 Memasang jembatan untuk pengecoran beton m2 97,490.25 13,012.40 110,502.65
22 28 7394.28 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 3,186,344.14 524,468.56 3,710,812.70
23 29 7394.29 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 3,636,045.24 538,926.85 4,174,972.09
24 30 7394.30 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 6,588,277.01 738,894.04 7,327,171.05
25 31 7394.31 Membuat balok beton bertulang (200 kg besi + bekisting) m3 5,011,086.56 642,374.54 5,653,461.10
26 32 7394.32 Membuat plat beton bertulang (150 kg besi + bekisting) m3 4,610,518.54 524,696.43 5,135,214.96
27 33 7394.33 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 4,363,757.74 524,468.56 4,888,226.30
28 34 7394.34 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 4,641,724.16 592,819.54 5,234,543.70
29 35 7394.35 Membuat kolom praktis beton bertulang (11 x 11) cm m 49,163.36 15,565.44 64,728.80
30 36 7394.36 Membuat ring balok beton bertulang (10 x 15) cm m 63,197.71 25,702.93 88,900.64
31 37 7394.37 Membuat beton bertulang (100 kg besi + bekisting) m3 2,837,488.76 592,819.54 3,430,308.30
32 38 7394.38 Membuat beton bertulang (125 kg besi + bekisting) m3 3,130,796.06 592,819.54 3,723,615.60
33 39 7394.39 Membuat beton bertulang (150 kg besi + bekisting) m3 3,418,569.26 592,819.54 4,011,388.80
34 40 7394.40 Membuat beton bertulang (175 kg besi + bekisting) m3 3,709,109.51 592,819.54 4,301,929.05
35 41 7394.41 Membuat beton bertulang (200 kg besi + bekisting) m3 3,999,649.76 592,819.54 4,592,469.30
36 42 7394.42 Membuat beton bertulang (225 kg besi + bekisting) m3 4,290,190.01 592,819.54 4,883,009.55
37 43 7394.43 Membuat beton bertulang (250 kg besi + bekisting) m3 4,580,730.26 592,819.54 5,173,549.80
38 44 7394.44 Membuat beton bertulang (275 kg besi + bekisting) m3 4,871,270.51 592,819.54 5,464,090.05
39 45 7394.45 Membuat beton bertulang (300 kg besi + bekisting) m3 5,161,810.76 592,819.54 5,754,630.30
40 46 7394.46 Membuat beton bertulang (325 kg besi + bekisting) m3 5,452,351.01 592,819.54 6,045,170.55
41 47 7394.47 Membuat beton bertulang (350 kg besi + bekisting) m3 5,742,891.26 592,819.54 6,335,710.80
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
42 47 7394.48 Membuat beton campuran 1:2:3 m3 - - -
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
III III PEKERJAAN PASANGAN BATU DAN PONDASI
SNI SNI 2836:2008
1 1 2836.01 Memasang batu belah campuran 1 PC : 3 PP m3 581,899.89 148,990.88 730,890.77
2 2 2836.02 Memasang batu belah campuran 1 PC : 4 PP m3 533,148.33 148,990.88 682,139.21
3 3 2836.03 Memasang batu belah campuran 1 PC : 5 PP m3 499,349.14 148,990.88 648,340.01
4 4 2836.04 Memasang batu belah campuran 1 PC : 6 PP m3 475,587.68 148,990.88 624,578.56
5 5 2836.05 Memasang batu belah campuran 1 PC : 8 PP m3 443,017.15 148,990.88 592,008.02
6 7 2836.07 Memasang batu belah campuran 1 PC : 3 KP : 10 PP m3 463,320.86 148,990.88 612,311.73
7 9 2836.09 Memasang batu kosong (aanstamping) m3 291,562.13 77,475.26 369,037.38
8 10 2836.10 Pasang pondasi siklop, 60% beton camp 1PC:2PB:3KR m3 1,969,551.36 272,164.48 2,241,715.83
9 11 2836.11 Memasang pondasi sumuran, diameter 100 cm m3 572,747.67 220,658.61 793,406.28
10 12 2836.12 Memasang batu bronjong kawat 3mm m3 1,069,679.52 249,357.60 1,319,037.12
IV IV PEKERJAAN DINDING
SNI SNI 6897:2008
1 2 6897.02 Memasang dinding bata merah 1 bata, camp 1 PC : 3 PP m2 162,423.05 51,884.80 214,307.85
2 3 6897.03 Memasang dinding bata merah 1 bata, camp 1 PC : 4 PP m2 153,642.27 51,884.80 205,527.07
3 4 6897.04 Memasang dinding bata merah 1 bata, camp 1 PC : 5 PP m2 149,267.12 51,884.80 201,151.92
4 5 6897.05 Memasang dinding bata merah 1 bata, camp 1 PC : 6 PP m2 148,119.54 51,884.80 200,004.34
5 6 6897.06 Pasang dinding bata merah 1 bata, camp 1PC:3KP:10PP m2 135,766.92 51,884.80 187,651.72
6 7 6897.07 Pasang dinding bata merah 1/2 bata, camp 1 PC : 2 PP m2 83,204.76 25,942.40 109,147.16
7 8 6897.08 Pasang dinding bata merah 1/2 bata, camp 1 PC : 3 PP m2 77,039.61 25,942.40 102,982.01
8 9 6897.09 Pasang dinding bata merah 1/2 bata, camp 1 PC : 4 PP m2 73,540.47 25,942.40 99,482.87
9 10 6897.10 Pasang dinding bata merah 1/2 bata, camp 1 PC : 5 PP m2 71,341.84 25,942.40 97,284.24
10 11 6897.11 Pasang dinding bata merah 1/2 bata, camp 1 PC : 6 PP m2 70,221.29 25,942.40 96,163.69
11 12 6897.12 Pasang dinding bata merah 1/2 bata, camp 1 PC : 8 PP m2 67,814.18 25,942.40 93,756.58
12 13 6897.13 Pasang dinding bata merah 1/2 bata, camp 1PC:3KP:10PP m2 68,157.38 25,942.40 94,099.78
13 14 6897.14 Pasang dinding bata merah 1/2 bata, camp 1KP:1SM:1PP m2 56,036.02 25,942.40 81,978.42
14 15 6897.15 Pasang dinding bata merah 1/2 bata, camp 1 KP:1SM:2PP m2 57,179.82 25,942.40 83,122.22
15 22 6897.22 Memasang roster 12 x 11 x 24 cm, camp 1 PC : 3 PP m2 343,393.91 25,942.40 369,336.31
16 23 6897.23 Memasang roster 12 x 11 x 24 cm, campuran 1 PC : 4 PP m2 339,707.94 25,942.40 365,650.34

V V PEKERJAAN PLESTERAN
SNI SNI 2837:2008
1 1 2837.01 Memasang plesteran 1 PC : 1 PP, tebal 15 mm m2 25,617.48 29,798.18 55,415.65
2 2 2837.02 Memasang plesteran 1 PC : 2 PP, tebal 15 mm m2 18,863.30 29,798.18 48,661.48
3 3 2837.03 Memasang plesteran 1 PC : 3 PP, tebal 15 mm m2 15,970.64 29,798.18 45,768.82
4 4 2837.04 Memasang plesteran 1 PC : 4 PP, tebal 15 mm m2 13,971.67 29,798.18 43,769.85
6 6 2837.06 Memasang plesteran 1 PC : 6 PP, tebal 15 mm m2 11,975.79 29,798.18 41,773.97
7 8 2837.08 Memasang plesteran 1 PC : 8 PP, tebal 15 mm m2 11,013.12 29,798.18 40,811.29
8 9 2837.09 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm m2 11,683.39 31,130.88 42,814.27
9 10 2837.10 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm m2 9,639.63 31,130.88 40,770.51
10 11 2837.11 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm m2 3,974.32 31,130.88 35,105.20
11 12 2837.12 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm m2 4,759.09 31,130.88 35,889.97
12 13 2837.13 Memasang plesteran 1 PC : 2 PP, tebal 20 mm m2 25,220.57 39,895.68 65,116.25
13 14 2837.14 Memasang plesteran 1 PC : 3 PP, tebal 20 mm m2 21,363.69 39,895.68 61,259.37
14 15 2837.15 Memasang plesteran 1 PC : 4 PP, tebal 20 mm m2 18,628.90 39,895.68 58,524.58
15 16 2837.16 Memasang plesteran 1 PC : 5 PP, tebal 20 mm m2 17,230.87 39,895.68 57,126.55
16 17 2837.17 Memasang plesteran 1 PC : 6 PP, tebal 20 mm m2 15,967.72 39,895.68 55,863.40
17 18 2837.18 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm m2 5,696.33 43,703.99 49,400.32
18 19 2837.19 Memasang berapen 1 PC : 5 PP, tebal 15 mm m2 12,871.03 14,978.26 27,849.29
19 20 2837.20 Memasang plesteran skoning 1 PC : 2 PP, lebar 10 mm m 12,871.03 14,978.26 27,849.29
20 23 2837.23 Memasang plesteran ciprat 1 PC : 2 PP m2 7,459.45 25,942.40 33,401.85
21 24 2837.24 Finishing siar pasangan dinding bata merah (=20 m') m2 4,466.66 14,978.26 19,444.92
22 25 2837.25 Finishing siar pasangan dinding conblock ekspose (=8 m') m2 2,299.44 7,032.08 9,331.52
23 26 2837.26 Finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 11,613.46 29,798.18 41,411.63
24 27 2837.27 Memasang acian m2 4,670.74 19,865.45 24,536.19
VI VI PEKERJAAN PENUTUP LANTAI DAN DINDING
SNI 7395:2008
1 9 7395.09 Memasang lantai ubin granit ukuran (40 x 40) cm m2 107,423.87 24,910.99 132,334.85
2 10 7395.10 Memasang lantai ubin granit ukuran (30 x 30) cm m2 97,781.61 25,825.09 123,606.69
3 24 7395.24 Memasang plint ubin granit ukuran (10 x 40) cm m 25,946.34 12,450.85 38,397.18
4 25 7395.25 Memasang plint ubin granit ukuran (10 x 30) cm m 29,807.34 12,450.85 42,258.18
5 32 7395.32 Memasang lantai keramik artistik ukuran (10 x 20) cm m2 193,008.82 69,529.08 262,537.89
6 33 7395.33 Pasang lantai keramik artistik 10 x 10) atau (5 x 20) cm m2 790,652.65 69,529.08 860,181.72
7 34 7395.34 Pasang lantai keramik ukuran (33 x 33) cm kelas I m2 130,315.07 69,529.08 199,844.14
8 35 7395.35 Pasang lantai keramik ukuran (30 x 30) cm kelas I m2 146,312.60 69,529.08 215,841.67
9 36 7395.36 Pasang lantai keramik ukuran (20 x 20) cm kelas I m2 89,431.06 69,529.08 158,960.13
10 37 7395.37 Pasang lantai keramik uk (10 x 33) cm, variasi/border m2 164,406.96 104,372.79 268,779.74
11 38 7395.38 Pasang lantai mosaik uk (30 x 30) cm, camp 1PC:3PP m2 329,499.54 69,529.08 399,028.61
12 39 7395.39 Memasang plint keramik ukuran (10 x 20) cm m 15,269.08 12,450.85 27,719.92
13 40 7395.40 Memasang plint keramik ukuran (10 x 10) cm m 19,270.47 12,450.85 31,721.31
14 41 7395.41 Memasang plint keramik ukuran (5 x 20) cm m 9,591.73 12,450.85 22,042.58
15 42 7395.42 Pasang plint internal cove artistik ukuran (5 x 5 x 20) cm m 24,488.84 18,290.20 42,779.03
16 43 7395.43 Memasang lantai marmer ukuran (100 x 100) cm m2 182,667.77 69,529.08 252,196.85
17 44 7395.44 Memasang lantai karpet m2 103,213.11 23,481.65 126,694.76
18 45 7395.45 Memasang underlayer/Pelapis bawah karpet m2 123,618.50 16,546.20 140,164.70
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
19 46 7395.46 Memasang lantai parquet kayu m2 110,913.66 69,529.08 180,442.74
20 47 7395.47 Memasang lantai kayu (gymfloor) m2 134,021.75 69,529.08 203,550.82
21 51 7395.51 Memasang dinding keramik artistik ukuran (10 x 20) cm m2 188,974.71 89,394.53 278,369.24
22 52 7395.52 Memasang dinding keramik artistik ukuran (5 x 20) cm m2 138,401.03 89,394.53 227,795.56
23 53 7395.53 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 152,140.77 89,394.53 241,535.30
24 54 7395.54 Memasang dinding keramik ukuran (20 x 20) cm kelas I m2 85,387.27 89,394.53 174,781.80
25 55 7395.55 Memasang dinding marmer ukuran (100 x 100) cm m2 207,909.06 129,125.43 337,034.48
26 56 7395.56 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm m2 87,113.38 99,327.25 186,440.63
27 57 7395.57 Memasang dinding batu paras m2 178,919.81 69,529.08 248,448.89
28 58 7395.58 Memasang dinding batu tempel hitam m2 137,439.80 69,529.08 206,968.88
29 64 7395.64 Memasang lantai keramik ukuran (40 x 40) cm kelas I m2 109,654.12 69,529.08 179,183.19
30 65 7395.65 Memasang lantai keramik ukuran (40 x 40) cm kelas II m2 98,703.68 69,529.08 168,232.75
31 66 7395.66 Memasang lantai keramik ukuran (30 x 30) cm kelas I m2 146,312.60 69,529.08 215,841.67
32 67 7395.67 Memasang lantai keramik ukuran (30 x 30) cm kelas II m2 107,407.96 69,529.08 176,937.03
33 68 7395.68 Memasang lantai keramik ukuran (20 x 20) cm kelas I m2 89,431.06 69,529.08 158,960.13
34 69 7395.69 Memasang lantai keramik ukuran (20 x 20) cm kelas II m2 90,842.47 69,529.08 160,371.54
35 70 7395.70 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 152,140.77 12,450.85 164,591.62
36 71 7395.71 Memasang dinding keramik ukuran (10 x 20) cm kelas II m3 136,679.61 12,450.85 149,130.46
37 72 7395.72 Memasang dinding keramik ukuran (20 x 25) cm kelas I m2 111,988.73 89,394.53 201,383.26
38 73 7395.73 Memasang dinding keramik ukuran (20 x 25) cm kelas II m2 100,457.21 89,394.53 189,851.74
39 74 7395.74 Memasang paving I, tebal 5 cm, K175 m2 71,977.62 54,780.00 126,757.62
40 75 7395.75 Memasang paving I, tebal 5 cm, K200 m2 72,844.20 54,780.00 127,624.20
41 76 7395.76 Memasang paving I, tebal 5 cm, K225 m2 76,223.86 54,780.00 131,003.86
42 77 7395.77 Memasang paving I, tebal 7 cm, K175 m2 84,543.03 54,780.00 139,323.03
43 78 7395.78 Memasang paving I, tebal 7 cm, K200 m2 95,461.94 54,780.00 150,241.94
44 79 7395.79 Memasang paving I, tebal 7 cm, K225 m2 109,240.56 54,780.00 164,020.56
VII VII PEKERJAAN KAYU
SNI 3434:2008
1 1 3434.01 Membuat & Pas kusen pintu dan jendela, kayu kelas I m3 26,285,380.00 2,044,812.00 28,330,192.00
2 2 3434.02.1 Membuat & Pas kusen pintu dan jendela, kayu kelas II m3 19,537,210.00 1,988,162.00 21,525,372.00
3 3 3434.02.2 Membuat & Pas kusen pintu dan jendela, kayu kelas III m3 11,467,720.00 1,988,162.00 13,455,882.00
4 6 3434.05 Membuat & Pas daun pintu panel, kayu kelas I m2 879,310.00 265,560.00 1,144,870.00
5 7 3434.05.1 Membuat & Pas daun pintu panel, kayu kelas II m2 721,853.00 292,116.00 1,013,969.00
6 8 3434.06 Membuat & Pas pintu & jendela kaca, ky kl I (tanpa kaca) m2 580,344.60 233,692.80 814,037.40
7 9 3434.06.1 Membuat & pas pintu & jendela kaca, ky kelas II (tp kaca) m2 433,111.80 233,692.80 666,804.60
8 10 3434.07 Membuat & pasang pintu & jendela jalusi, kayu kelas I m2 1,539,698.60 292,116.00 1,831,814.60
9 11 3434.07.1 Membuat & pasang pintu & jendela jalusi, kayu kelas II m2 1,147,077.80 292,116.00 1,439,193.80
10 15 3434.10 Memasang jalusi kusen kayu kelas I m2 1,433,718.00 219,787.15 1,653,505.15
11 16 3434.10.1 Memasang jalusi kusen kayu kelas II m2 1,065,636.00 219,787.15 1,285,423.15
12 19 3434.13 Pasang konstruksi kuda-kuda konvensional, kayu kelas I m3 19,837,818.00 1,168,464.00 21,006,282.00
13 20 3434.13.1 Pasang konstruksi kuda-kuda konvensional, kayu kelas II m3 9,078,498.00 1,168,464.00 10,246,962.00
14 21 3434.13.2 Pasang konstruksi kuda-kuda konvensional, kayu kelas III m3 7,851,558.00 1,168,464.00 9,020,022.00
15 22 3434.14 Memasang konstruksi kuda-kuda expose, kayu kelas I m3 28,971,228.00 1,168,464.00 30,139,692.00
16 23 3434.15 Memasang konstruksi gording, kayu kelas I m3 19,793,202.00 701,078.40 20,494,280.40
17 24 3434.15.1 Memasang konstruksi gording, kayu kelas II m3 9,033,882.00 701,078.40 9,734,960.40
18 25 3434.16 Pas rangka atap genteng, kaso & reng kayu kelas I m2 220,008.36 13,788.50 233,796.86
19 26 3434.16.1 Pas rangka atap genteng, kaso & reng kayu kelas II m2 136,524.96 13,788.50 150,313.46
20 27 3434.16.2 Pas rangka atap genteng, kaso & reng kayu kelas III m2 121,080.96 13,788.50 134,869.46
21 28 3434.17 Pas rangka atap genteng beton, kaso & reng ky klas I m2 256,147.32 13,788.50 269,935.82
22 29 3434.17.1 Pas rangka atap genteng beton, kaso & reng ky klas II m2 172,663.92 13,788.50 186,452.42
23 30 3434.17.2 Pas rangka atap genteng beton, kaso & reng ky klas III m2 141,775.92 13,788.50 155,564.42
24 33 3434.19 Memasang rk langit-langit (50 x 100) cm, kayu kelas II m2 109,137.60 37,811.40 146,949.00
25 34 3434.19.1 Memasang rklangit-langit (50 x 100) cm, kayu kelas III m2 92,621.10 37,811.40 130,432.50
26 35 3434.20 Memasang rklangit-langit (60 x 60) cm, kayu kelas II m2 116,173.20 35,288.55 151,461.75
27 36 3434.20.1 Memasang rk langit-langit (60 x 60) cm, kayu kelas III m2 98,691.45 35,288.55 133,980.00
28 37 3434.21 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I m 259,321.92 21,500.05 280,821.97
29 38 3434.21.1 Memasang lisplank ukuran (3 x 20) cm, kayu kelas II m 87,430.20 21,500.05 108,930.25
30 39 3434.22 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I m 263,234.40 21,500.05 284,734.45
31 40 3434.22.1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas II m 88,159.50 21,500.05 109,659.55
32 41 3434.23 Pas rangka dinding pemisah (60 x 120) cm ky kelas II m2 224,796.00 43,858.60 268,654.60
33 42 3434.23.1 Pas rangka dinding pemisah (60 x 120) cm ky kelas III m2 164,736.00 43,858.60 208,594.60
34 43 3434.24 Pas dinding pemisah teakwood rangkap, rk ky kelas II m2 359,202.54 43,858.60 403,061.13
35 44 3434.25 Pas dinding pemisah plywood rangkap, rk ky kelas II m2 295,966.22 58,423.20 354,389.42
36 45 3434.26 Pas dinding lambriziring dari papan kayu kelas I m2 172,260.66 175,269.60 347,530.26
37 46 3434.27 Pas dinding lambriziring dari plywood (120 x 240) cm m2 56,525.04 7,320.28 63,845.32

VIII VIII PEKERJAAN BESI DAN ALUMINIUM


SNI 7393:2008
1 1 7393.01 Memasang besi profil kg 15,195.18 8,273.10 23,468.28
2 2 7393.02 Memasang rangka kuda-kuda baja IWF kg 16,971.24 8,273.10 25,244.34
3 3 7393.03 Mengerjakan 100 kg pekerjaan perakitan kg 34,276.00 13,104.91 47,380.91
4 4 7393.04 Pintu besi plat baja tebal 2 mm rangkap, rk besi siku m2 680,076.54 144,738.06 824,814.60
5 5 7393.05 Mengerjakan 10 cm pengelasan dengan las listrik cm 14,125.65 3,973.09 18,098.74
6 6 7393.06 Membuat rangka jendela besi scuare tube (25 x 5) cm m2 45,720.75 89,584.06 135,304.81
7 7 7393.07 Memasang pintu rolling door besi m2 199,914.00 161,012.94 360,926.94
8 8 7393.08 Memasang pintu lipat (folding door) m2 471,900.00 60,669.40 532,569.40
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
9 9 7393.09 Memasang sunscreen aluminium m2 17,589.00 66,553.96 84,142.96
10 10 7393.10 Memasang rolling door aluminium m2 265,980.00 137,885.00 403,865.00
11 11 7393.11 Memasang kusen pintu dan jendela aluminium m 82,310.58 5,924.94 88,235.52
12 12 7393.12 Memasang pintu aluminium strip lebar 8 cm m2 612,380.34 11,716.11 624,096.45
13 13 7393.13 Memasang daun pintu & jendela kaca bening rangka aluminium m2 374,091.30 11,716.11 385,807.41
14 14 7393.14 Memasang venetions blinds dan vertical blinds m2 91,960.00 48,300.95 140,260.95
15 15 7393.15 Memasang terali besi strip m2 103,877.37 230,226.76 334,104.13
16 16 7393.16 Memasang kawat nyamuk m2 58,681.71 13,788.50 72,470.21
17 18 7393.18 Memasang talang datar/jurai seng bjls 28 lebar 90 cm m 204,933.30 41,860.78 246,794.08
18 19 7393.19 Pas talang 1/2 lingk D-15cm, seng plat bjls 30 lb 45 cm m 51,892.50 32,291.27 84,183.77
19 20 7393.20 Pasang pintu PVC polos bh 211,310.00 140,882.20 352,192.20
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
20 21 7393.21 Pasang pintu PVC motif bh 408,100.00 140,882.20 548,982.20

IX IX PEKERJAAN LANGIT-LANGIT
SNI 2839:2008
1 1 2839.01 Memasang langit-langit asbes semen, tebal 4 mm m2 15,901.60 7,427.15 23,328.75
2 2 2839.01.1 Memasang langit-langit asbes semen, tebal 5 mm m2 19,168.60 7,427.15 26,595.75
3 3 2839.01.2 Memasang langit-langit asbes semen, tebal 6 mm m2 23,766.60 7,427.15 31,193.75
4 4 2839.02 Memasang langit-langit akustik ukuran (30 x 30) cm m2 292,578.00 16,546.20 309,124.20
5 5 2839.03 Memasang langit-langit akustik ukuran (30 x 60) cm m2 281,578.00 13,788.50 295,366.50
6 6 2839.04 Memasang langit-langit akustik ukuran (60 x 120) cm m2 320,298.00 13,788.50 334,086.50
7 7 2839.05 Pas langit-langit tripleks ukuran (120 x 240), tbl 3 mm m2 22,393.80 13,788.50 36,182.30
8 8 2839.05.1 Pas langit-langit tripleks ukuran (120 x 240), tbl 4 mm m2 25,128.68 13,788.50 38,917.18
9 9 2839.05.2 Pas langit-langit tripleks ukuran (120 x 240), tbl 6 mm m2 32,207.18 13,788.50 45,995.68
10 10 2839.06 Pas langit-langit lambriziring kayu, tebal 9 mm m2 45,216.60 110,308.00 155,524.60
11 11 2839.07 Pas. langit-langit gypsum board uk (120x240), tbl 9 mm m2 37,338.44 9,932.73 47,271.17
12 12 2839.07.1 Memasang langit-langit calsiboard m2 64,560.64 9,932.73 74,493.36
13 13 2839.07.2 Memasang langit-langit harplek m2 22,406.67 13,788.50 36,195.17
14 14 2839.08 Memasang list plafond gypsum profil m 8,648.64 8,273.10 16,921.74
15 15 2839.09 Pas langit-langit akustik uk (60 x 120)+ rk aluminium m2 213,474.69 68,942.50 282,417.19
16 16 2839.10 Memasang list langit-langit kayu profil m 8,279.70 6,935.45 15,215.15

X X PEKERJAAN PENUTUP ATAP


SNI 03-3436-1994
1 1 R 3436.01 Memasang penutup atap genteng kodok kebumen m2 74,646.00 14,978.26 89,624.26
2 2 R 3436.01.1 Memasang penutup atap genteng kodok kemiri m2 43,436.25 14,978.26 58,414.51
3 3 R 3436.01.2 Memasang penutup atap genteng magas kebumen glasur m2 100,815.00 14,978.26 115,793.26
4 4 R 3436.01.3 Memasang penutup atap genteng magas kebumen biasa m2 50,407.50 14,978.26 65,385.76
5 7 R 3436.01.6 Memasang penutup atap genteng morando kebumen glasur m2 94,980.60 14,978.26 109,958.86
6 8 R 3436.01.7 Memasang penutup atap genteng morando kebumen biasa m2 57,297.24 14,978.26 72,275.50
7 9 R 3436.01.8 Memasang penutup atap genteng plentong mojolaban m2 35,692.80 14,978.26 50,671.06
8 10 R 3436.01.9 Memasang penutup atap genteng pelentong kebumen m2 49,635.30 14,978.26 64,613.56
9 11 R 3436.01.10 Memasang penutup atap genteng pelentong kecil kemiri m2 34,577.40 14,978.26 49,555.66
10 14 R 3436.03 Memasang bubungan pada atap genteng kebumen m 67,044.98 38,247.88 105,292.86
11 15 R 3436.03.1 Memasang bubungan pada atap genteng mojolaban m 50,078.03 38,247.88 88,325.91
12 16 R 3436.03.2 Memasang bubungan pada atap genteng kemiri m 44,930.03 38,247.88 83,177.91
13 17 R 3436.04 Memasang bubungan pada atap genteng beton m 57,049.28 38,247.88 95,297.16
14 18 R 3436.05 Memasang penutup atap genteng metal kelas I m2 246,709.32 19,123.94 265,833.26
15 19 R 3436.06 Memasang bubungan pada atap genteng metal kelas I m 122,694.00 14,054.65 136,748.65
16 20 R 3436.07 Memasang penutup atap genteng metal kelas II m2 134,251.26 19,123.94 153,375.20
17 21 R 3436.08 Memasang bubungan pada atap genteng metal kelas II m 85,156.50 14,054.65 99,211.15

XI XI PEKERJAAN PENGECATAN DAN FINISHING DINDING


Pt T-38-2000-C
1 1 R.Pt.38.01 Mengikis atau mengerok cat tembok cara manual m2 - 9,156.62 9,156.62
2 2 R.Pt.38.02 Mencuci bidang permukaan tembok lama dengan sabun m3 643.50 4,861.56 5,505.06
3 3 R.Pt.38.03 Lapis plamir tembok m2 2,574.00 3,528.86 6,102.86
4 4 R.Pt.38.04 Pengecatan bidang tembok interior 2 lapis dengan kuas m2 4,752.00 7,501.95 12,253.95
5 5 R.Pt.38.04.1 Pengecatan bidang tembok eksterior 2 lapis dengan kuas m2 22,704.00 7,501.95 30,205.95
6 6 R.Pt.38.05 Pengecatan bidang tembok interior 2 lapis dengan roll m2 9,306.00 4,744.25 14,050.25
7 7 R.Pt.38.05.1 Pengecatan bidang tembok eksterior 2 lapis dengan roll m2 44,462.00 4,744.25 49,206.25
8 8 R.Pt.38.06 Catan plafon 2 lapis cat tembok dgn kuas termasuk plamir m2 7,326.00 9,488.49 16,814.49
9 9 R.Pt.38.07 Catan plafon 2 lapis cat tembok dg roll termasuk plamir m2 11,880.00 6,730.79 18,610.79
10 10 R.Pt.38.08 Pasang wallpaper dengan perekat m2 231,913.00 8,690.00 240,603.00
11 11 R.Pt.38.09 Melapis meni pada permukaan kayu m2 6,259.00 4,578.31 10,837.31
12 12 R.Pt.38.10 Mendempul/memplamir dan menggosok kayu m2 10,957.10 8,482.71 19,439.81
13 13 R.Pt.38.11 Mengecat dasar 1 lapis pada kayu m2 14,421.00 5,821.64 20,242.64
14 14 R.Pt.38.12 Mengecat penutup 2 lapis pada kayu m2 19,470.00 20,723.95 40,193.95
15 15 R.Pt.38.13 Mengerok karat atau cat permukaan baja dengan soda api m2 3,575.00 18,230.85 21,805.85
16 16 R.Pt.38.14 Melapis meni pada permukaan baja m2 4,768.50 4,578.31 9,346.81
17 17 R.Pt.38.15 Mengecat 2 lapis pada permukaan baja menggunakan kuas m2 12,265.00 20,723.95 32,988.95
18 18 R.Pt.38.16 Mengecat 2 lapis pada permukaan baja dengan semprot m2 26,675.00 11,719.35 38,394.35
19 19 R.Pt.38.17 Pelapisan bidang kayu dengan teak oil m2 14,033.80 7,711.55 21,745.35
20 20 R.Pt.38.18 Pelapisan bidang kayu dengan pelitur 2 lapis m2 18,675.25 34,512.45 53,187.70
21 21 R.Pt.38.19 Pelapisan bidang kayu dengan vernis 2 lapis m2 14,047.00 7,711.55 21,758.55
22 22 R.Pt.38.20 Pelapisan bidang kayu dengan residu/ter m2 19,320.40 7,711.55 27,031.95
23 23 R.Pt.38.21 Mengecat genting m2 16,939.18 35,288.55 52,227.73

XII XII PEKERJAAN KUNCI, ALAT GANTUNGAN, DAN KACA


Pt T-30-2000-C
1 1 R.Pt.30.01 Pasang kunci tanam antik bh 147,400.00 46,269.30 193,669.30
2 2 R.Pt.30.02 Pasang kunci tanam biasa bh 112,860.00 38,557.75 151,417.75
3 3 R.Pt.30.03 Pasang kunci silinder bh 183,700.00 46,269.30 229,969.30
4 4 R.Pt.30.04 Pasang kunci slot untuk kamar mandi bh 111,870.00 19,278.88 131,148.88
5 5 R.Pt.30.05 Pasang engsel pintu bh 14,850.00 9,677.42 24,527.42
6 6 R.Pt.30.06 Pasang engsel angin untuk pintu bh 19,250.00 9,677.42 28,927.42
7 7 R.Pt.30.07 Pasang engsel pintu klam bh 12,870.00 34,512.45 47,382.45
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
8 8 R.Pt.30.08 Pasang engsel jendela bh 11,000.00 7,711.55 18,711.55
9 9 R.Pt.30.09 Pasang kait angin bh 7,370.00 7,711.55 15,081.55
10 10 R.Pt.30.10 Pasang door closer bh 212,740.00 15,423.10 228,163.10
11 11 R.Pt.30.11 Pasang door holder bh 30,800.00 7,711.55 38,511.55
12 12 R.Pt.30.12 Pasang door stops bh 46,640.00 9,677.42 56,317.42
13 13 R.Pt.30.13 Pasang rel pintu dorong unit 181,390.00 69,520.00 250,910.00
14 14 R.Pt.30.14 Pasang gerendel bh 5,500.00 7,711.55 13,211.55
15 15 R.Pt.30.15 Pasang kaca polos tebal 2mm m2 62,920.00 22,061.60 84,981.60
16 16 R.Pt.30.16 Pasang kaca polos tebal 3mm m2 78,650.00 22,061.60 100,711.60
17 17 R.Pt.30.17 Pasang kaca polos tebal 5mm m2 92,869.92 22,061.60 114,931.52
18 18 R.Pt.30.18 Pasang kaca polos tebal 8mm m2 174,131.10 24,910.99 199,042.09
19 19 R.Pt.30.19 Pasang kaca polos tebal 3mm dengan kisi-kisi m2 85,800.00 34,512.45 120,312.45
20 20 R.Pt.30.20 Pasang kaca rayband tebal 5mm m2 107,357.25 22,061.60 129,418.85
21 21 R.Pt.30.21 Pasang kaca rayband tebal 8mm m2 217,074.00 24,910.99 241,984.99
22 22 R.Pt.30.22 Pasang kaca raiben tebal 12mm m2 211,750.00 24,910.99 236,660.99
23 23 R.Pt.30.23 Pasang kaca buram tebal 3mm m2 87,065.55 22,061.60 109,127.15
24 24 R.Pt.30.24 Pasang kaca buram tebal 5mm m2 127,696.14 22,061.60 149,757.74
25 25 R.Pt.30.25 Pasang kaca buram tebal 3mm (motif) m2 104,478.66 22,061.60 126,540.26
26 26 R.Pt.30.26 Pasang kaca buram tebal 5mm (motif) m2 208,957.32 22,061.60 231,018.92
27 27 R.Pt.30.27 Pasang kaca cermin tebal 5mm m2 174,131.10 22,061.60 196,192.70
28 28 R.Pt.30.28 Pasang kaca wire glass tebal 5mm m2 181,500.00 22,061.60 203,561.60
29 29 R.Pt.30.29 Pasang kaca wire glass tebal 8mm m2 211,750.00 22,061.60 233,811.60
30 32 R.Pt.30.32 Pasang spring knife bh 6,160.00 7,711.55 13,871.55

XIII XIII PEKERJAAN PIPA DAN SANITAIR


RSNI T-15-2002
1 1 R.T.15.01 Memasang kloset duduk/monoblok kelas I bh 2,684,784.96 276,675.36 2,961,460.32
2 2 R.T.15.02 Memasang kloset duduk/monoblok kelas II bh 1,370,358.99 276,675.36 1,647,034.35
3 3 R.T.15.03 Memasang kloset jongkok porselen kelas I bh 217,614.54 185,505.65 403,120.19
4 4 R.T.15.04 Memasang kloset jongkok porselen kelas II bh 144,470.04 185,505.65 329,975.69
5 5 R.T.15.05 Memasang urinoir bh 1,396,978.44 142,004.50 1,538,982.94
6 6 R.T.15.06 Memasang wastafel bh 503,728.37 188,416.25 692,144.62
7 7 R.T.15.07 Memasang bak mandi fibreglass volume 0,3 m3 bh 363,617.83 339,752.60 703,370.43
8 8 R.T.15.08 Memasang bak mandi batu bata volume 0,3 m3 bh 276,190.20 595,963.50 872,153.70
9 9 R.T.15.09 Memasang bak fibreglass volume 1 m3 bh 1,809,808.00 625,300.50 2,435,108.50
10 10 R.T.15.10 Memasang pipa beton diameter 20 cm m 60,124.32 13,905.82 74,030.13
11 11 R.T.15.11 Memasang pipa beton diameter 30 cm m 96,301.41 37,744.36 134,045.77
12 12 R.T.15.12 Memasang pipa beton diameter 60 cm m 196,637.17 37,744.36 234,381.52
13 13 R.T.15.13 Memasang pipa beton diameter 80 cm m 223,683.46 37,744.36 261,427.81
14 14 R.T.15.14 Memasang pipa beton diameter 100 cm m 230,551.68 37,744.36 268,296.03
15 15 R.T.15.15 Bak kontrol pasangan batu bata uk 30 x 30 tinggi 50 cm bh 170,438.27 31,013.57 201,451.83
16 16 R.T.15.16 Bak kontrol pasangan batu bata uk 45 x 45 tinggi 50 cm bh 269,919.08 122,745.54 392,664.61
17 17 R.T.15.17 Bak kontrol pasangan batu bata uk 60 x 60 tinggi 50 cm bh 407,316.11 186,785.28 594,101.39
18 18 R.T.15.18 Memasang pipa galvanis diameter 1/2" m 42,589.80 10,221.95 52,811.75
19 19 R.T.15.19 Memasang pipa galvanis diameter 3/4" m 63,617.40 10,221.95 73,839.35
20 20 R.T.15.20 Memasang pipa galvanis diameter 1" m 85,357.80 10,221.95 95,579.75
21 21 R.T.15.21 Memasang pipa galvanis diameter 1 1/2" m 147,906.00 20,443.90 168,349.90
22 22 R.T.15.22 Memasang pipa galvanis diameter 3" m 231,660.00 20,443.90 252,103.90
23 23 R.T.15.23 Memasang pipa galvanis diameter 4" m 265,518.00 25,554.87 291,072.87
24 25 R.T.15.25 Memasang pipa PVC tipe AW diameter 3/4" m 8,375.40 6,814.63 15,190.03
25 26 R.T.15.26 Memasang pipa PVC tipe AW diameter 1" m 15,147.00 6,814.63 21,961.63
26 27 R.T.15.27 Memasang pipa PVC tipe AW diameter 1 1/2" m 19,423.80 6,814.63 26,238.43
27 28 R.T.15.28 Memasang pipa PVC tipe AW diameter 2" m 25,482.60 10,221.95 35,704.55
28 29 R.T.15.29 Memasang pipa PVC tipe AW diameter 2 1/2" m 47,401.20 10,221.95 57,623.15
29 30 R.T.15.30 Memasang pipa PVC tipe AW diameter 3" m 25,482.60 15,332.92 40,815.52
30 31 R.T.15.31 Memasang pipa PVC tipe AW diameter 4" m 81,615.60 15,332.92 96,948.52
31 32 R.T.15.32 Memasang bak cuci piring stainless steel bh 618,068.88 23,134.65 641,203.53
32 33 R.T.15.33 Memasang kran air diameter 1/2" bh 11,277.75 7,711.55 18,989.30
33 34 R.T.15.34 Memasang kran air diameter 3/4" bh 12,597.75 7,711.55 20,309.30
34 35 R.T.15.35 Memasang floor drain stainless steel bh 12,430.00 7,711.55 20,141.55
35 36 R.T.15.36 Memasang floor drain plastik bh 4,290.00 7,711.55 12,001.55
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL

XIV XIV PEKERJAAN LAIN-LAIN


1 1 Memasang rangka atap baja ringan untuk atap metal roof bentang m2 - - 135,000.00
2 2 Memasang rangka atap baja ringan untuk atap metal roof bentang m2 - - 207,000.00
3 3 Memasang rangka atap baja ringan untuk atap genteng bentang < m2 - - 189,000.00
4 4 Memasang rangka atap baja ringan untuk atap genteng bentang 10 m2 - - 270,000.00
5 5 Memasang rangka plafon besi stall m2 - - 76,500.00
6 6 Memasang rangka plafon besi holoow m2 - - 72,000.00
7 7 Memasang penutup atap galvalum 0,5 mm m2 - - 85,500.00
8 8 Memasang penutup atap polycarbonate kelas I m2 - - 180,000.00
9 9 Memasang penutup atap polycarbonate kelas II m2 - - 135,000.00
10 10 Memasang penutup atap polycarbonate rangka besi stainless steel m2 - - 427,500.00
11 11 Memasang penutup atap polycarbonate rangka besi stainless steel m2 - - 360,000.00
12 12 Memasang penutup atap polycarbonate rangka besi tempa kelas I m2 - - 337,500.00
13 13 Memasang penutup atap polycarbonate rangka besi tempa kelas II m2 - - 270,000.00
14 14 Memasang Lispank GRC/Teakwood m' - - 11,250.00
15 15 Memasang Partisi GRC Rangka Metal Puring m2 - - 135,000.00
16 16 Instalasi Titik Lampu bh - - 135,000.00
17 17 Pasang Lampu SL 14 Watt bh - - 31,500.00
18 17 Pasang Lampu SL 23 Watt bh - - 45,000.00
19 18 Pasang Lampu Down Ligth dia. 6 bh - - 67,500.00
20 19 Pasang Lampu Down Ligth dia. 3 bh - - 45,000.00
21 20 Pasang Stop Kontak bh - - 22,500.00
22 21 Pasang Lampu TL 20 Watt bh - - 54,000.00
23 22 Pasang Lampu TL 40 Watt bh - - 67,500.00
24 23 Pasang Lampu TL (2 x 20 Watt) + Armatur bh - - 315,000.00
25 24 Pasang Lampu TL (2 x 40 Watt) + Armatur bh - - 405,000.00
26 25 S.01 Sewa Excavator (bahan dan operator) /jam 266,000.00
27 26 S.02 Sewa Bulldozer (bahan dan operator) /jam 260,000.00
28 27 S.03 Sewa Dum Truck (bahan dan operator) /jam 153,000.00