II PEKERJAAN BETON
SNI 7394:2008 SNI
1 Membuat beton mutu f'c = 7,4 MPa (K 100) m3 7394.01 668,844.55 121,555.61 790,400.16
2 Membuat beton mutu f'c = 9,8 MPa (K 125) m3 7394.02 704,416.90 121,555.61 825,972.51
3 Membuat beton mutu f'c = 12,2 MPa (K 150) m3 7394.03 732,576.35 121,555.61 854,131.96
4 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100) m3 7394.04 652,239.50 88,346.50 740,586.00
5 Membuat beton mutu f'c = 14,5 MPa (K 175) m3 7394.05 765,521.90 121,555.61 887,077.51
6 Membuat beton mutu f'c = 16,9 MPa (K 200) m3 7394.06 797,580.30 121,555.61 919,135.91
7 Membuat beton mutu f'c = 19,3 MPa (K 225) m3 7394.07 820,733.65 121,555.61 942,289.26
8 Membuat beton mutu f'c = 21,7 MPa (K 250) m3 7394.08 837,161.60 121,555.61 958,717.21
9 Membuat beton mutu f'c = 24,0 MPa (K 275) m3 7394.09 865,451.40 121,555.61 987,007.01
10 Membuat beton mutu f'c = 26,4 MPa (K 300) m3 7394.10 874,246.45 121,555.61 995,802.06
11 Membuat beton mutu f'c = 28,8 MPa (K 325) m3 7394.11 907,432.35 154,606.38 1,062,038.73
12 Membuat beton mutu f'c = 31,2 MPa (K 350) m3 7394.12 918,964.20 154,606.38 1,073,570.58
13 Pembesian dengan besi polos atau besi ulir kg 7394.17 11,875.79 969.31 12,845.11
14 Memasang bekisting untuk pondasi m2 7394.20 31,407.75 51,650.17 83,057.92
15 Memasang bekisting untuk sloof dan ringbalk m2 7394.21 31,407.75 51,650.17 83,057.92
16 Memasang bekisting untuk kolom m2 7394.22 58,067.90 65,555.99 123,623.89
17 Memasang bekisting untuk balok dan konsol m2 7394.23 63,344.60 65,555.99 128,900.59
18 Memasang bekisting untuk plat lantai m2 7394.24 96,536.00 65,555.99 162,091.99
19 Memasang bekisting untuk dinding m2 7394.25 76,809.15 65,555.99 142,365.14
20 Memasang bekisting untuk tangga m2 7394.26 84,128.00 65,555.99 149,683.99
21 Memasang jembatan untuk pengecoran beton m2 7394.27 97,490.25 13,012.40 110,502.65
22 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 7394.28 3,186,344.14 524,468.56 3,710,812.70
23 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 7394.29 3,636,045.24 538,926.85 4,174,972.09
24 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 7394.30 6,588,277.01 738,894.04 7,327,171.05
25 Membuat balok beton bertulang (200 kg besi + bekisting) m3 7394.31 5,011,086.56 642,374.54 5,653,461.10
26 Membuat plat beton bertulang (150 kg besi + bekisting) m3 7394.32 4,610,518.54 524,696.43 5,135,214.96
27 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 7394.33 4,363,757.74 524,468.56 4,888,226.30
28 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 7394.34 4,641,724.16 592,819.54 5,234,543.70
29 Membuat kolom praktis beton bertulang (11 x 11) cm m 7394.35 49,163.36 15,565.44 64,728.80
30 Membuat ring balok beton bertulang (10 x 15) cm m 7394.36 63,197.71 25,702.93 88,900.64
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
31 Membuat beton bertulang (100 kg besi + bekisting) m3 7394.37 2,837,488.76 592,819.54 3,430,308.30
32 Membuat beton bertulang (125 kg besi + bekisting) m3 7394.38 3,130,796.06 592,819.54 3,723,615.60
33 Membuat beton bertulang (150 kg besi + bekisting) m3 7394.39 3,418,569.26 592,819.54 4,011,388.80
34 Membuat beton bertulang (175 kg besi + bekisting) m3 7394.40 3,709,109.51 592,819.54 4,301,929.05
35 Membuat beton bertulang (200 kg besi + bekisting) m3 7394.41 3,999,649.76 592,819.54 4,592,469.30
36 Membuat beton bertulang (225 kg besi + bekisting) m3 7394.42 4,290,190.01 592,819.54 4,883,009.55
37 Membuat beton bertulang (250 kg besi + bekisting) m3 7394.43 4,580,730.26 592,819.54 5,173,549.80
38 Membuat beton bertulang (275 kg besi + bekisting) m3 7394.44 4,871,270.51 592,819.54 5,464,090.05
39 Membuat beton bertulang (300 kg besi + bekisting) m3 7394.45 5,161,810.76 592,819.54 5,754,630.30
40 Membuat beton bertulang (325 kg besi + bekisting) m3 7394.46 5,452,351.01 592,819.54 6,045,170.55
41 Membuat beton bertulang (350 kg besi + bekisting) m3 7394.47 5,742,891.26 592,819.54 6,335,710.80
42 Membuat beton campuran 1:2:3 m3 7394.48 737,459.08 121,555.61 859,014.69
III PEKERJAAN PASANGAN BATU DAN PONDASI
SNI 2836:2008 SNI
1 Memasang batu belah campuran 1 PC : 3 PP m3 2836.01 581,899.89 148,990.88 730,890.77
2 Memasang batu belah campuran 1 PC : 4 PP m3 2836.02 533,148.33 148,990.88 682,139.21
3 Memasang batu belah campuran 1 PC : 5 PP m3 2836.03 499,349.14 148,990.88 648,340.01
4 Memasang batu belah campuran 1 PC : 6 PP m3 2836.04 475,587.68 148,990.88 624,578.56
5 Memasang batu belah campuran 1 PC : 8 PP m3 2836.05 443,017.15 148,990.88 592,008.02
6 Memasang batu belah campuran 1 PC : 3 KP : 10 PP m3 2836.07 463,320.86 148,990.88 612,311.73
7 Memasang batu kosong (aanstamping) m3 2836.09 291,562.13 77,475.26 369,037.38
8 Pasang pondasi siklop, 60% beton camp 1PC:2PB:3KR m3 2836.10 1,969,551.36 272,164.48 2,241,715.83
9 Memasang pondasi sumuran, diameter 100 cm m3 2836.11 572,747.67 220,658.61 793,406.28
10 Memasang batu bronjong kawat 3mm m3 2836.12 1,069,679.52 249,357.60 1,319,037.12
IV PEKERJAAN DINDING
SNI 6897:2008 SNI
1 Memasang dinding bata merah 1 bata, camp 1 PC : 3 PP m2 6897.02 162,423.05 51,884.80 214,307.85
2 Memasang dinding bata merah 1 bata, camp 1 PC : 4 PP m2 6897.03 153,642.27 51,884.80 205,527.07
3 Memasang dinding bata merah 1 bata, camp 1 PC : 5 PP m2 6897.04 149,267.12 51,884.80 201,151.92
4 Memasang dinding bata merah 1 bata, camp 1 PC : 6 PP m2 6897.05 148,119.54 51,884.80 200,004.34
5 Pasang dinding bata merah 1 bata, camp 1PC:3KP:10PP m2 6897.06 135,766.92 51,884.80 187,651.72
6 Pasang dinding bata merah 1/2 bata, camp 1 PC : 2 PP m2 6897.07 83,204.76 25,942.40 109,147.16
7 Pasang dinding bata merah 1/2 bata, camp 1 PC : 3 PP m2 6897.08 77,039.61 25,942.40 102,982.01
8 Pasang dinding bata merah 1/2 bata, camp 1 PC : 4 PP m2 6897.09 73,540.47 25,942.40 99,482.87
9 Pasang dinding bata merah 1/2 bata, camp 1 PC : 5 PP m2 6897.10 71,341.84 25,942.40 97,284.24
10 Pasang dinding bata merah 1/2 bata, camp 1 PC : 6 PP m2 6897.11 70,221.29 25,942.40 96,163.69
11 Pasang dinding bata merah 1/2 bata, camp 1 PC : 8 PP m2 6897.12 67,814.18 25,942.40 93,756.58
12 Pasang dinding bata merah 1/2 bata, camp 1PC:3KP:10PP m2 6897.13 68,157.38 25,942.40 94,099.78
13 Pasang dinding bata merah 1/2 bata, camp 1KP:1SM:1PP m2 6897.14 56,036.02 25,942.40 81,978.42
14 Pasang dinding bata merah 1/2 bata, camp 1 KP:1SM:2PP m2 6897.15 57,179.82 25,942.40 83,122.22
15 Memasang roster 12 x 11 x 24 cm, camp 1 PC : 3 PP m2 6897.22 343,393.91 25,942.40 369,336.31
16 Memasang roster 12 x 11 x 24 cm, campuran 1 PC : 4 PP m2 6897.23 339,707.94 25,942.40 365,650.34
V PEKERJAAN PLESTERAN
SNI 2837:2008 SNI
1 Memasang plesteran 1 PC : 1 PP, tebal 15 mm m2 2837.01 25,617.48 29,798.18 55,415.65
2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm m2 2837.02 18,863.30 29,798.18 48,661.48
3 Memasang plesteran 1 PC : 3 PP, tebal 15 mm m2 2837.03 15,970.64 29,798.18 45,768.82
4 Memasang plesteran 1 PC : 4 PP, tebal 15 mm m2 2837.04 13,971.67 29,798.18 43,769.85
6 Memasang plesteran 1 PC : 6 PP, tebal 15 mm m2 2837.06 11,975.79 29,798.18 41,773.97
7 Memasang plesteran 1 PC : 8 PP, tebal 15 mm m2 2837.08 11,013.12 29,798.18 40,811.29
8 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm m2 2837.09 11,683.39 31,130.88 42,814.27
9 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm m2 2837.10 9,639.63 31,130.88 40,770.51
10 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm m2 2837.11 3,974.32 31,130.88 35,105.20
11 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm m2 2837.12 4,759.09 31,130.88 35,889.97
12 Memasang plesteran 1 PC : 2 PP, tebal 20 mm m2 2837.13 25,220.57 39,895.68 65,116.25
13 Memasang plesteran 1 PC : 3 PP, tebal 20 mm m2 2837.14 21,363.69 39,895.68 61,259.37
14 Memasang plesteran 1 PC : 4 PP, tebal 20 mm m2 2837.15 18,628.90 39,895.68 58,524.58
15 Memasang plesteran 1 PC : 5 PP, tebal 20 mm m2 2837.16 17,230.87 39,895.68 57,126.55
16 Memasang plesteran 1 PC : 6 PP, tebal 20 mm m2 2837.17 15,967.72 39,895.68 55,863.40
17 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm m2 2837.18 5,696.33 43,703.99 49,400.32
18 Memasang berapen 1 PC : 5 PP, tebal 15 mm m2 2837.19 12,871.03 14,978.26 27,849.29
19 Memasang plesteran skoning 1 PC : 2 PP, lebar 10 mm m 2837.20 12,871.03 14,978.26 27,849.29
20 Memasang plesteran ciprat 1 PC : 2 PP m2 2837.23 7,459.45 25,942.40 33,401.85
21 Finishing siar pasangan dinding bata merah (=20 m') m2 2837.24 4,466.66 14,978.26 19,444.92
22 Finishing siar pasangan dinding conblock ekspose (=8 m') m2 2837.25 2,299.44 7,032.08 9,331.52
23 Finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 2837.26 11,613.46 29,798.18 41,411.63
24 Memasang acian m2 2837.27 4,670.74 19,865.45 24,536.19
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
SNI 7395:2008
1 Memasang lantai ubin granit ukuran (40 x 40) cm m2 7395.09 107,423.87 24,910.99 132,334.85
2 Memasang lantai ubin granit ukuran (30 x 30) cm m2 7395.10 97,781.61 25,825.09 123,606.69
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
3 Memasang plint ubin granit ukuran (10 x 40) cm m 7395.24 25,946.34 12,450.85 38,397.18
4 Memasang plint ubin granit ukuran (10 x 30) cm m 7395.25 29,807.34 12,450.85 42,258.18
5 Memasang lantai keramik artistik ukuran (10 x 20) cm m2 7395.32 193,008.82 69,529.08 262,537.89
6 Pasang lantai keramik artistik 10 x 10) atau (5 x 20) cm m2 7395.33 790,652.65 69,529.08 860,181.72
7 Pasang lantai keramik ukuran (33 x 33) cm kelas I m2 7395.34 130,315.07 69,529.08 199,844.14
8 Pasang lantai keramik ukuran (30 x 30) cm kelas I m2 7395.35 146,312.60 69,529.08 215,841.67
9 Pasang lantai keramik ukuran (20 x 20) cm kelas I m2 7395.36 89,431.06 69,529.08 158,960.13
10 Pasang lantai keramik uk (10 x 33) cm, variasi/border m2 7395.37 164,406.96 104,372.79 268,779.74
11 Pasang lantai mosaik uk (30 x 30) cm, camp 1PC:3PP m2 7395.38 329,499.54 69,529.08 399,028.61
12 Memasang plint keramik ukuran (10 x 20) cm m 7395.39 15,269.08 12,450.85 27,719.92
13 Memasang plint keramik ukuran (10 x 10) cm m 7395.40 19,270.47 12,450.85 31,721.31
14 Memasang plint keramik ukuran (5 x 20) cm m 7395.41 9,591.73 12,450.85 22,042.58
15 Pasang plint internal cove artistik ukuran (5 x 5 x 20) cm m 7395.42 24,488.84 18,290.20 42,779.03
16 Memasang lantai marmer ukuran (100 x 100) cm m2 7395.43 182,667.77 69,529.08 252,196.85
17 Memasang lantai karpet m2 7395.44 103,213.11 23,481.65 126,694.76
18 Memasang underlayer/Pelapis bawah karpet m2 7395.45 123,618.50 16,546.20 140,164.70
19 Memasang lantai parquet kayu m2 7395.46 110,913.66 69,529.08 180,442.74
20 Memasang lantai kayu (gymfloor) m2 7395.47 134,021.75 69,529.08 203,550.82
21 Memasang dinding keramik artistik ukuran (10 x 20) cm m2 7395.51 188,974.71 89,394.53 278,369.24
22 Memasang dinding keramik artistik ukuran (5 x 20) cm m2 7395.52 138,401.03 89,394.53 227,795.56
23 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 7395.53 152,140.77 89,394.53 241,535.30
24 Memasang dinding keramik ukuran (20 x 20) cm kelas I m2 7395.54 85,387.27 89,394.53 174,781.80
25 Memasang dinding marmer ukuran (100 x 100) cm m2 7395.55 207,909.06 129,125.43 337,034.48
26 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm m2 7395.56 87,113.38 99,327.25 186,440.63
27 Memasang dinding batu paras m2 7395.57 178,919.81 69,529.08 248,448.89
28 Memasang dinding batu tempel hitam m2 7395.58 137,439.80 69,529.08 206,968.88
29 Memasang lantai keramik ukuran (40 x 40) cm kelas I m2 7395.64 109,654.12 69,529.08 179,183.19
30 Memasang lantai keramik ukuran (40 x 40) cm kelas II m2 7395.65 98,703.68 69,529.08 168,232.75
31 Memasang lantai keramik ukuran (30 x 30) cm kelas I m2 7395.66 146,312.60 69,529.08 215,841.67
32 Memasang lantai keramik ukuran (30 x 30) cm kelas II m2 7395.67 107,407.96 69,529.08 176,937.03
33 Memasang lantai keramik ukuran (20 x 20) cm kelas I m2 7395.68 89,431.06 69,529.08 158,960.13
34 Memasang lantai keramik ukuran (20 x 20) cm kelas II m2 7395.69 90,842.47 69,529.08 160,371.54
35 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 7395.70 152,140.77 12,450.85 164,591.62
36 Memasang dinding keramik ukuran (10 x 20) cm kelas II m3 7395.71 136,679.61 12,450.85 149,130.46
37 Memasang dinding keramik ukuran (20 x 25) cm kelas I m2 7395.72 111,988.73 89,394.53 201,383.26
38 Memasang dinding keramik ukuran (20 x 25) cm kelas II m2 7395.73 100,457.21 89,394.53 189,851.74
39 Memasang paving I, tebal 5 cm, K175 m2 7395.74 71,977.62 54,780.00 126,757.62
40 Memasang paving I, tebal 5 cm, K200 m2 7395.75 72,844.20 54,780.00 127,624.20
41 Memasang paving I, tebal 5 cm, K225 m2 7395.76 76,223.86 54,780.00 131,003.86
42 Memasang paving I, tebal 7 cm, K175 m2 7395.77 84,543.03 54,780.00 139,323.03
43 Memasang paving I, tebal 7 cm, K200 m2 7395.78 95,461.94 54,780.00 150,241.94
44 Memasang paving I, tebal 7 cm, K225 m2 7395.79 109,240.56 54,780.00 164,020.56
VII PEKERJAAN KAYU
SNI 3434:2008
1 Membuat & Pas kusen pintu dan jendela, kayu kelas I m3 3434.01 26,285,380.00 2,044,812.00 28,330,192.00
2 Membuat & Pas kusen pintu dan jendela, kayu kelas II m3 3434.02.1 15,500,000.00 1,000,000.00 16,500,000.00
3 Membuat & Pas kusen pintu dan jendela, kayu kelas III m3 3434.02.2 11,467,720.00 1,988,162.00 13,455,882.00
4 Membuat & Pas daun pintu panel, kayu kelas I m2 3434.05 879,310.00 265,560.00 1,144,870.00
5 Membuat & Pas daun pintu panel, kayu kelas II m2 3434.05.1 721,853.00 292,116.00 1,013,969.00
6 Membuat & Pas pintu & jendela kaca, ky kl I (tanpa kaca) m2 3434.06 580,344.60 233,692.80 814,037.40
7 Membuat & pas pintu & jendela kaca, ky kelas II (tp kaca) m2 3434.06.1 433,111.80 233,692.80 666,804.60
8 Membuat & pasang pintu & jendela jalusi, kayu kelas I m2 3434.07 1,539,698.60 292,116.00 1,831,814.60
9 Membuat & pasang pintu & jendela jalusi, kayu kelas II m2 3434.07.1 1,147,077.80 292,116.00 1,439,193.80
10 Memasang jalusi kusen kayu kelas I m2 3434.10 1,433,718.00 219,787.15 1,653,505.15
11 Memasang jalusi kusen kayu kelas II m2 3434.10.1 1,065,636.00 219,787.15 1,285,423.15
12 Pasang konstruksi kuda-kuda konvensional, kayu kelas I m3 3434.13 19,837,818.00 1,168,464.00 21,006,282.00
13 Pasang konstruksi kuda-kuda konvensional, kayu kelas II m3 3434.13.1 9,078,498.00 1,168,464.00 10,246,962.00
14 Pasang konstruksi kuda-kuda konvensional, kayu kelas III m3 3434.13.2 7,851,558.00 1,168,464.00 9,020,022.00
15 Memasang konstruksi kuda-kuda expose, kayu kelas I m3 3434.14 28,971,228.00 1,168,464.00 30,139,692.00
16 Memasang konstruksi gording, kayu kelas I m3 3434.15 19,793,202.00 701,078.40 20,494,280.40
17 Memasang konstruksi gording, kayu kelas II m3 3434.15.1 9,033,882.00 701,078.40 9,734,960.40
18 Pas rangka atap genteng, kaso & reng kayu kelas I m2 3434.16 220,008.36 13,788.50 233,796.86
19 Pas rangka atap genteng, kaso & reng kayu kelas II m2 3434.16.1 136,524.96 13,788.50 150,313.46
20 Pas rangka atap genteng, kaso & reng kayu kelas III m2 3434.16.2 121,080.96 13,788.50 134,869.46
21 Pas rangka atap genteng beton, kaso & reng ky klas I m2 3434.17 256,147.32 13,788.50 269,935.82
22 Pas rangka atap genteng beton, kaso & reng ky klas II m2 3434.17.1 172,663.92 13,788.50 186,452.42
23 Pas rangka atap genteng beton, kaso & reng ky klas III m2 3434.17.2 141,775.92 13,788.50 155,564.42
24 Memasang rk langit-langit (50 x 100) cm, kayu kelas II m2 3434.19 109,137.60 37,811.40 146,949.00
25 Memasang rklangit-langit (50 x 100) cm, kayu kelas III m2 3434.19.1 92,621.10 37,811.40 130,432.50
26 Memasang rklangit-langit (60 x 60) cm, kayu kelas II m2 3434.20 116,173.20 35,288.55 151,461.75
27 Memasang rk langit-langit (60 x 60) cm, kayu kelas III m2 3434.20.1 98,691.45 35,288.55 133,980.00
28 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I m 3434.21 259,321.92 21,500.05 280,821.97
29 Memasang lisplank ukuran (3 x 20) cm, kayu kelas II m 3434.21.1 87,430.20 21,500.05 108,930.25
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
30 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I m 3434.22 263,234.40 21,500.05 284,734.45
31 Memasang lisplank ukuran (3 x 30) cm, kayu kelas II m 3434.22.1 88,159.50 21,500.05 109,659.55
32 Pas rangka dinding pemisah (60 x 120) cm ky kelas II m2 3434.23 224,796.00 43,858.60 268,654.60
33 Pas rangka dinding pemisah (60 x 120) cm ky kelas III m2 3434.23.1 164,736.00 43,858.60 208,594.60
34 Pas dinding pemisah teakwood rangkap, rk ky kelas II m2 3434.24 359,202.54 43,858.60 403,061.13
35 Pas dinding pemisah plywood rangkap, rk ky kelas II m2 3434.25 295,966.22 58,423.20 354,389.42
36 Pas dinding lambriziring dari papan kayu kelas I m2 3434.26 172,260.66 175,269.60 347,530.26
37 Pas dinding lambriziring dari plywood (120 x 240) cm m2 3434.27 56,525.04 7,320.28 63,845.32
VIIIPEKERJAAN BESI DAN ALUMINIUM
SNI 7393:2008
1 Memasang besi profil kg 7393.01 15,195.18 8,273.10 23,468.28
2 Memasang rangka kuda-kuda baja IWF kg 7393.02 16,971.24 8,273.10 25,244.34
3 Mengerjakan 100 kg pekerjaan perakitan kg 7393.03 34,276.00 13,104.91 47,380.91
SAT JUMLAH HARGA 2017
NO URAIAN PEKERJAAN KODE
UAN BAHAN UPAH TOTAL
4 Pintu besi plat baja tebal 2 mm rangkap, rk besi siku m2 7393.04 680,076.54 144,738.06 824,814.60
5 Mengerjakan 10 cm pengelasan dengan las listrik cm 7393.05 14,125.65 3,973.09 18,098.74
6 Membuat rangka jendela besi scuare tube (25 x 5) cm m2 7393.06 45,720.75 89,584.06 135,304.81
7 Memasang pintu rolling door besi m2 7393.07 199,914.00 161,012.94 360,926.94
8 Memasang pintu lipat (folding door) m2 7393.08 471,900.00 60,669.40 532,569.40
9 Memasang sunscreen aluminium m2 7393.09 17,589.00 66,553.96 84,142.96
10 Memasang rolling door aluminium m2 7393.10 265,980.00 137,885.00 403,865.00
11 Memasang kusen pintu dan jendela aluminium m 7393.11 82,310.58 5,924.94 88,235.52
12 Memasang pintu aluminium strip lebar 8 cm m2 7393.12 612,380.34 11,716.11 624,096.45
13 Memasang daun pintu & jendela kaca bening rangka aluminium m2 7393.13 374,091.30 11,716.11 385,807.41
14 Memasang venetions blinds dan vertical blinds m2 7393.14 91,960.00 48,300.95 140,260.95
15 Memasang terali besi strip m2 7393.15 103,877.37 230,226.76 334,104.13
16 Memasang kawat nyamuk m2 7393.16 58,681.71 13,788.50 72,470.21
17 Memasang talang datar/jurai seng bjls 28 lebar 90 cm m 7393.18 204,933.30 41,860.78 246,794.08
18 Pas talang 1/2 lingk D-15cm, seng plat bjls 30 lb 45 cm m 7393.19 51,892.50 32,291.27 84,183.77
19 Pasang pintu PVC polos bh 7393.20 211,310.00 140,882.20 352,192.20
20 Pasang pintu PVC motif bh 7393.21 408,100.00 140,882.20 548,982.20
IX PEKERJAAN LANGIT-LANGIT
SNI 2839:2008
1 Memasang langit-langit asbes semen, tebal 4 mm m2 2839.01 15,901.60 7,427.15 23,328.75
2 Memasang langit-langit asbes semen, tebal 5 mm m2 2839.01.1 19,168.60 7,427.15 26,595.75
3 Memasang langit-langit asbes semen, tebal 6 mm m2 2839.01.2 23,766.60 7,427.15 31,193.75
4 Memasang langit-langit akustik ukuran (30 x 30) cm m2 2839.02 292,578.00 16,546.20 309,124.20
5 Memasang langit-langit akustik ukuran (30 x 60) cm m2 2839.03 281,578.00 13,788.50 295,366.50
6 Memasang langit-langit akustik ukuran (60 x 120) cm m2 2839.04 320,298.00 13,788.50 334,086.50
7 Pas langit-langit tripleks ukuran (120 x 240), tbl 3 mm m2 2839.05 22,393.80 13,788.50 36,182.30
8 Pas langit-langit tripleks ukuran (120 x 240), tbl 4 mm m2 2839.05.1 25,128.68 13,788.50 38,917.18
9 Pas langit-langit tripleks ukuran (120 x 240), tbl 6 mm m2 2839.05.2 32,207.18 13,788.50 45,995.68
10 Pas langit-langit lambriziring kayu, tebal 9 mm m2 2839.06 45,216.60 110,308.00 155,524.60
11 Pas. langit-langit gypsum board uk (120x240), tbl 9 mm m2 2839.07 37,338.44 9,932.73 47,271.17
12 Memasang langit-langit calsiboard m2 2839.07.1 64,560.64 9,932.73 74,493.36
13 Memasang langit-langit harplek m2 2839.07.2 22,406.67 13,788.50 36,195.17
14 Memasang list plafond gypsum profil m 2839.08 8,648.64 8,273.10 16,921.74
15 Pas langit-langit akustik uk (60 x 120)+ rk aluminium m2 2839.09 213,474.69 68,942.50 282,417.19
16 Memasang list langit-langit kayu profil m 2839.10 8,279.70 6,935.45 15,215.15
BAHAN ALAM
1 Batu kali belah m3 144,300.00
2 Batu putih m3 120,120.00
3 Kerikil sungai ayak tanpa pasir m3 141,960.00
4 Batu belah 15-20 cm ( pecah tangan ) m3 181,077.00
5 Batu pecah 7-10 cm ( pecah tangan ) m3 183,495.00
6 Batu pecah 5-7 cm ( pecah tangan ) m3 160,680.00
7 Batu pecah 3-5 cm ( pecah tangan ) m3 164,697.00
8 Batu pecah 2-3 cm ( pecah tangan ) m3 169,221.00
9 Batu pecah 2-3 cm ( pecah mesin) m3 208,104.00
10 Batu pecah 1-2 cm ( pecah mesin ) m3 195,819.00
11 Batu pecah 0,5-1 cm ( pecah mesin ) m3 210,249.00
12 Filler / Abu Batu m3 187,512.00
13 Sirtu m3 121,134.00
14 Pasir beton m3 183,300.00
15 Pasir pasang m3 189,540.00
16 Pasir urug m3 110,565.00
123 Batu tempel/palimanan/paras m2 127,881.00
18 Batu tempel hitam/candi m2 93,600.00
19 Batu marmo kuning m2 121,680.00
20 Batu alur (hijau, kuning, putih) m2 140,400.00
21 Batu carport m2 123,240.00
22 Bitumen ( Aspalt ) kg 12,441.00
23 Aspal curah kg 11,871.60
24 Kayu bakar m3 175,500.00
25 Tanah urug (pilihan) m3 44,226.00
26 Semen PC. Kg 1,306.50
27 Semen warna Kg 3,295.50
28 Tepung gipsum Kg 3,471.00
29 Kawur m3 195,000.00
30 Batu Bata buah 624.00
31 Agregat Halus m3 282,282.00
32 Agregat Kasar m3 244,296.00
33 Batu Kapur Bongkahan m3 210,600.00
34 Air kerja ltr 39.00
35 Batu pecah 2-3 cm ( pecah mesin) Kg 125.00
36 Pasir beton Kg 175.00
BAHAN KAYU/BAMBU
1 Kayu jati (ekspose) m3 21,684,000.00
2 Kayu jati lokal (non ekspose) m3 16,107,000.00
3 Kayu bangkirai m3 12,363,000.00
4 Kayu kanfer m3 9,438,000.00
5 Kayu kruing m3 7,215,000.00
6 Kayu meranti m3 6,201,000.00
7 Kayu sengon untuk begesting (papan/kaso) m3 2,730,000.00
8 Kayu usuk jati ekspose m3 17,550,000.00
9 Kayu usuk jati ukuran 5 x 7 m3 11,661,000.00
10 Kayu jati untuk rangka plafond m3 9,867,000.00
11 Kayu usuk bangkirai m3 8,853,000.00
12 Kayu usuk kanfer m3 8,151,000.00
13 Kayu usuk kruing m3 6,240,000.00
14 Kayu kruing untuk rangka plafond m3 6,162,000.00
15 Kayu usuk meranti m3 5,265,000.00
16 Kayu reng jati 2/3 m3 9,126,000.00
17 Kayu reng kanfer 2/3 m3 5,265,000.00
18 Kayu reng kruing 2/3 m3 5,226,000.00
19 Plipit kayu jati 1/3 m' 5,226.00
20 Lis kayu profil 5 cm m' 7,020.00
21 Lis kayu profil 4 cm m' 5,070.00
22 Lis kayu profil 3,5 cm m' 4,680.00
23 Lis kayu profil 3 cm m' 4,290.00
24 Kayu lapis/ tripleks tb. 3 mm lembar 53,040.00
25 Kayu lapis/ tripleks tb. 4 mm lembar 59,670.00
26 Kayu lapis/ tripleks tb. 6 mm lembar 76,830.00
27 Kayu lapis/ tripleks tb. 9 mm lembar 143,754.00
28 Kayu lapis/ tripleks tb. 1,2 mm lembar 167,310.00
NO URAIAN SATUAN HARGA SATUAN
29 Kayu lapis/ tripleks tb. 1,8 mm lembar 235,053.00
30 Teak wood 120 x 240 cm lembar 126,516.00
31 Teak wood 90 x 220 cm lembar 72,150.00
32 Plywood tbl.4 mm (120 x 240) cm lembar 68,094.00
33 Papan akustik softboard 30 x 30 lembar 17,784.00
34 Papan akustik softboard 30 x 60 lembar 54,600.00
35 Papan akustik softboard 60 x 120 lembar 151,008.00
36 Bambu ori batang 20,124.00
37 Bambu apus batang 14,391.00
38 Dolken kayu kelas III diameter 8-10/400 cm batang 60,138.00
39 Formika lembar 68,094.00
-
BAHAN BETON CETAK, GENTENG, LANGIT2 -
10 Tegel paving I, tb 5 cm K 175 m2 46,020.00
11 Tegel paving I, tb 5 cm K 200 m2 46,800.00
12 Tegel paving I, tb 5 cm K 225 m2 49,842.00
13 Tegel paving I, tb 7 cm K 175 m2 57,330.00
14 Tegel paving I, tb 7 cm K 200 m2 67,158.00
15 Tegel paving I, tb 7 cm K 225 m2 79,560.00
16 Tegel paving segienam, tb 5 cm K 175 m2 56,121.00
17 Tegel paving segi enam, warna tb 5 cm K 175 m2 61,854.00
18 Genteng kodok kebumen bh 2,714.40
19 Genteng kodok kemiri bh 1,579.50
20 Genteng magas kebumen glasur bh 3,666.00
21 Genteng magas kebumen biasa bh 1,833.00
22 Genteng mantili mojolaban bh 1,092.00
23 Genteng pelentong kemiri bh 1,092.00
24 Genteng morando kebumen glasur bh 4,797.00
25 Genteng morando kebumen biasa bh 2,893.80
26 Genteng Plentong mojolaban bh 1,248.00
27 Genteng pelentong kebumen bh 1,735.50
28 Genteng pelentong kemiri bh 1,209.00
29 Genteng garuda kemiri bh 1,127.10
30 Genteng beton bh 4,410.90
31 Bubung genteng kebumen bh 8,154.90
32 Bubung genteng mojolaban bh 5,070.00
33 Bubung genteng kemiri bh 4,134.00
34 Bubung genteng beton bh 8,112.00
35 Roster beton 12x11x24 buah 9,594.00
36 Hollow block 20 buah 17,745.00
37 Hollow block 15 buah 16,926.00
38 Hollow block 10 cm buah 15,444.00
39 Bata berongga ekspose buah 2,730.00
40 Penutup atap fibre glass gelombang (180 x 90) cm lembar 36,426.00
41 Penutup atap aluminium gelombang m2 200,226.00
42 Aluminium foil m2 36,000.00
43 Gipsum lembar 86,700.00
44 Harflek m2 18,954.00
45 Calsiboard 240x120 lembar 53,625.00
46 List gipsum profil m 8,190.00
47 Genteng metal kelas I m2 216,060.00
48 Kerpus genting metal kelas I Bh 44,460.00
49 Genteng metal kelas II m2 115,830.00
50 Kerpus genting metal kelas II Bh 30,810.00
51 Tepung Gipsum kg 3,276.00
52 Tegel paving kawung, tb 5 cm K 175 m2 60,060.00
-
BAHAN KERAMIK -
1 Keramik dinding 10 x 20 cm kelas I buah 2,145.00
2 Keramik dinding 20 x 25 cm kelas I buah 3,802.50
3 Keramik dinding 20 x 20 cm kelas I buah 2,008.50
4 Keramik dinding 11 x 11 cm kelas I buah 2,067.00
5 Keramik dinding marmer 100 x 100 cm kelas I buah 156,000.00
6 Keramik lantai 20 x 20 cm kelas I buah 2,031.90
7 Keramik lantai 30 x 30 cm kelas I buah 8,970.00
6 Keramik lantai 60 x 60 cm kelas I buah 41,379.00
8 Keramik lantai 40 x 40 cm kelas I buah 11,427.00
9 Keramik dinding 10 x 20 cm kelas II buah 1,879.80
10 Keramik dinding 20 x 25 cm kelas II buah 3,303.30
NO URAIAN SATUAN HARGA SATUAN
11 Keramik dinding 20 x 20 cm kelas II buah 1,918.80
12 Keramik dinding 11 x 11 cm kelas II buah -
13 Keramik dinding artistik 5 x 20 cm kelas II buah 2,979.60
14 Keramik dinding artistik 10 x 20 cm kelas II buah 2,776.80
15 Keramik dinding marmer 100 x 100 cm kelas II buah 118,560.00
16 Keramik lantai 20 x 20 cm kelas II buah 2,109.90
17 Keramik lantai 30 x 30 cm kelas II buah 5,990.40
18 Keramik lantai 40 x 40 cm kelas II buah 9,925.50
28 Tegel marmer 100 x 100 cm buah 136,500.00
29 Keramik plin 10 x 20 cm buah 2,215.20
30 Keramik plin 10 x 10 cm buah 1,443.00
31 Keramik plin 5 x 20 cm buah 1,443.00
32 Karpet m2 80,028.00
33 Underlayer/pelapis bawah karpet m2 97,695.00
1E+05 Parquet kayu m2 80,028.00
35 Lantai kayu (gymfloor) m2 100,035.00
36 Lantai vinyl karet buah 9,594.00
37 Floor hardener kg 1,989.00
38 Vinyl 30 x 30 buah 2,808.00
39 Kloset porselin jongkok kelas I buah 188,097.00
40 Kloset porselin jongkok kelas II buah 121,602.00
41 Kloset duduk/Monoblok kelas I buah 2,302,560.00
42 Kloset duduk/Monoblok kelas II buah 1,175,265.00
43 Bak fiberglass sudut 0,3 m3 buah 280,137.00
44 Urinoir buah 1,260,246.00
45 Wastafel buah 400,179.00
46 Bak teraso buah 267,423.00
47 Bak Kip fiberglass buah 729,339.00
48 Bak Kip poselin buah 1,633,788.00
49 Bak cuci Stainles steel 1 bak buah 230,256.00
50 Bak cuci Stainles steel 2 bak buah 416,208.00
51 Lem Vinyl kg 20,007.00
52 Wall papre 50 cm m' 62,361.00
53 Lem kg 28,002.00
54 Bata lapis dinding 3 x 7 x 24 cm buah 780.00
BAHAN PIPA
1 Pipa black Steel 6" Sched # 20 m' 265,400.00
2 Screw stainless steel dia 6 mm m' 343,800.00
3 Reducer 10" ke 6" buah 108,600.00
4 Gravel m' 289,400.00
5 Stemvet Kg 14,500.00
6 Bentonite Kg 11,500.00
7 Pipa Piezometer GIP 1" m' 54,400.00
8 Lem pipa kg 104,500.00
9 Baut 5/8 " buah 11,700.00
10 Kunci gembok buah 23,900.00
11 Plastik buah 490.00
12 Pipa PVC 10 mm ( 1/2 ) " AW m 4,500.00
13 Pipa PVC 20 mm ( 3/4 ) " AW m 4,700.00
14 Pipa PVC 25 mm ( 1 ) " AW m 8,500.00
15 Pipa PVC 30 mm ( 1 1/4 ) " AW m 14,400.00
16 Pipa PVC 40 mm ( 1 1/2 ) " AW m 10,900.00
17 Pipa PVC 50 mm ( 2 ) " AW m 14,300.00
18 Pipa PVC 64 mm ( 2 1/2) " AW m 26,600.00
19 Pipa PVC 80 mm ( 3 ) " AW m 14,300.00
20 Pipa PVC 100 mm ( 4 ) " AW m 45,800.00
21 Pipa PVC 150 mm ( 6 ) " AW m 134,600.00
22 Pipa besi Galvanis ( GIP ) DN 100 mm 4" m 149,000.00
23 Pipa besi Galvanis ( GIP ) DN 75 mm 3" m 130,000.00
24 Pipa besi Galvanis ( GIP ) DN 50 mm 2" m 117,900.00
25 Pipa besi Galvanis ( GIP ) DN 40 mm 1 1/2" m 83,000.00
26 Pipa besi Galvanis ( GIP ) DN 30 mm 1 1/4" m 61,000.00
27 Pipa besi Galvanis ( GIP ) DN 25 mm 1" m 47,900.00
28 Pipa besi Galvanis ( GIP ) DN 20 mm 3/4" m 35,700.00
29 Pipa besi Galvanis ( GIP ) DN 10 mm 1/2" m 23,900.00
30 Tangki fiber kapasitas 0,50 m3 buah 1,446,000.00
31 Tangki fiber kapasitas 1 m3 buah 1,469,000.00
32 Tangki fiber kapasitas 2 m3 buah 2,373,000.00
33 Tangki fiber kapasitas 5 m3 buah 10,622,000.00
BAHAN LAIN-LAIN
1 Kunci tanam antik buah 134,000.00
2 Kunci tanam biasa buah 102,600.00
3 Kunci silinder buah 167,000.00
4 Kunci slot buah 101,700.00
5 Engsel pintu buah 13,500.00
6 Engsel jendela buah 10,000.00
7 Grendel ukuran besar buah 6,000.00
8 Grendel ukuran kecil buah 5,000.00
9 Kait angin buah 6,700.00
10 Espanyolete buah 70,000.00
11 Spring Knife buah 5,600.00
12 Door closer buah 193,400.00
NO URAIAN SATUAN HARGA SATUAN
13 Door Holder buah 28,000.00
14 Door stops buah 42,400.00
15 Rel pintu dorong buah 164,900.00
16 Fiberglass ( uk. 0,80 m x 3,00 m ) lembar 111,600.00
17 Cat tembok eksterior Kg 86,000.00
18 Cat tembok interior Kg 18,000.00
19 Cat kayu / besi Kg 46,000.00
20 Cat genteng Kg 28,250.00
21 Plamir kayu Kg 16,950.00
22 Plamir tembok Kg 6,700.00
23 Teer liter 49,000.00
24 Meny Kg 22,000.00
25 Minyak cat liter 19,500.00
26 Minyak tanah liter 13,800.00
27 Dempul Kg 22,100.00
28 Wood filler Kg 29,380.00
29 Amplas kayu lembar 3,340.00
30 Amplas besi lembar 3,700.00
31 Minyak begesting liter 3,300.00
32 Minyak solar liter 7,000.00
33 Minyak premium liter 7,000.00
34 Minyak pelumas liter 36,600.00
35 Kerosine liter 13,800.00
36 Pelitur liter 50,800.00
37 Vernis liter 37,000.00
38 Soda api Kg 28,000.00
39 Lem kayu Kg 23,900.00
40 Kuas 1" buah 7,200.00
41 Kuas 1 1/2" buah 9,400.00
42 Kuas 2" buah 6,700.00
43 Kuas 3" buah 9,000.00
44 Kuas 4" buah 13,500.00
45 Kran air 1/2" buah 10,100.00
46 Kran air 3/4" buah 11,300.00
47 Seal tape buah 6,100.00
48 Floor drain plastik buah 3,900.00
49 Floor drain stainles buah 11,300.00
50 Pipa tanah dia 15 cm buah 7,500.00
51 Pipa tanah dia 20 cm buah 12,900.00
52 Wallpaper m2 189,300.00
53 Vertical blinds/venetions blinds m2 83,600.00
54 Perekat ( lem ) buah 13,000.00
55 Sealant tube 23,700.00
56 Pintu alumunium buah 169,500.00
57 Pintu PVC Polos buah 192,100.00
58 Pintu PVC Motif buah 371,000.00
59 Pintu lipat PVC m2 167,000.00
60 Tali ijuk Kg 14,000.00
61 Alat kerja (sekop, ikrak dll) unit 74,300.00
62 Sewa alat Jam 32,500.00
63 Kawat las Kg 43,200.00
64 Strorox Kg 23,300.00
65 Waterstop lbr 150mm m 139,300.00
66 Waterstop lbr 200mm m 162,000.00
67 Waterstop lbr 230-320mm m 185,000.00
68 Sabun kg 11,700.00
69 Engsel angin buah 17,500.00
70
71 EngselExcavator
Sewa pintu klamKosongan buah
/ jam 11,700.00
#REF!
A PEKERJAAN PERSIAPAN DAN PEKERJAAN TANAH
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
2835.20 Membongkar rangka atap, reng kaso (bongkaran digunakan) m2 - 20,689.35 20,689.35
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.020 OH 74,900.00 - 1,498.00 1,498.00
- 18,808.50 18,808.50
overhead & Profit 10% - 1,880.85 1,880.85
Jumlah - 20,689.35 20,689.35
2835.21 Membongkar rangka atap, reng kaso (bongkaran tidak digunakan) m2 - 15,294.95 15,294.95
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
- 13,904.50 13,904.50
overhead & Profit 10% - 1,390.45 1,390.45
Jumlah - 15,294.95 15,294.95
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
2835.22 Membongkar rangka atap, gording, kuda-kuda (bongkaran digunakan) m3 - 692,588.60 692,588.60
Tukang kayu 6.000 OH 63,200.00 - 379,200.00 379,200.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Kepala tukang 0.600 OH 69,050.00 - 41,430.00 41,430.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
- 629,626.00 629,626.00
overhead & Profit 10% - 62,962.60 62,962.60
Jumlah - 692,588.60 692,588.60
2835.23 Membongkar rangka atap, gording, kuda-kuda (bongkaran tidak digunakm3 - 461,242.10 461,242.10
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
- 419,311.00 419,311.00
overhead & Profit 10% - 41,931.10 41,931.10
Jumlah - 461,242.10 461,242.10
7394.01 Membuat beton mutu f'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 m3 668,844.55 121,555.61 790,400.16
Semen PC. 247.000 Kg 1,306.50 322,705.50 - 322,705.50
Pasir beton 869.000 Kg 175.00 152,075.00 - 152,075.00
Batu pecah 2-3 cm ( pecah mesin) 999.000 kg 125.00 124,875.00 - 124,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
608,040.50 110,505.10 718,545.60
overhead & Profit 10% 60,804.05 11,050.51 71,854.56
Jumlah 668,844.55 121,555.61 790,400.16
7394.02 Membuat beton mutu f'c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 m3 704,416.90 121,555.61 825,972.51
Semen PC. 276.000 Kg 1,306.50 360,594.00 - 360,594.00
Pasir beton 828.000 kg 175.00 144,900.00 - 144,900.00
Batu pecah 2-3 cm ( pecah mesin) 1,012.000 kg 125.00 126,500.00 - 126,500.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
640,379.00 110,505.10 750,884.10
overhead & Profit 10% 64,037.90 11,050.51 75,088.41
Jumlah 704,416.90 121,555.61 825,972.51
7394.03 Membuat beton mutu f'c = 12,2 MPa (K 150), slump (12 ± 2) cm m3 732,576.35 121,555.61 854,131.96
Semen PC. 299.000 Kg 1,306.50 390,643.50 - 390,643.50
Pasir beton 799.000 Kg 175.00 139,825.00 - 139,825.00
Batu pecah 2-3 cm ( pecah mesin) 1,017.000 Kg 125.00 127,125.00 - 127,125.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
665,978.50 110,505.10 776,483.60
overhead & Profit 10% 66,597.85 11,050.51 77,648.36
Jumlah 732,576.35 121,555.61 854,131.96
7394.04 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100), slump (3 - 6) cm, w/c = 0,87 m3 652,239.50 88,346.50 740,586.00
Semen PC. 230.000 Kg 1,306.50 300,495.00 - 300,495.00
Pasir beton 893.000 Kg 175.00 156,275.00 - 156,275.00
Batu pecah 2-3 cm ( pecah mesin) 1,027.000 Kg 125.00 128,375.00 - 128,375.00
Air kerja 200.000 ltr 39.00 7,800.00 - 7,800.00
Pekerja 1.200 OH 51,500.00 - 61,800.00 61,800.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.060 OH 74,900.00 - 4,494.00 4,494.00
592,945.00 80,315.00 673,260.00
overhead & Profit 10% 59,294.50 8,031.50 67,326.00
Jumlah 652,239.50 88,346.50 740,586.00
7394.05 Membuat beton mutu f'c = 14,5 MPa (K 175), slump (12 ± 2) cm m3 765,521.90 121,555.61 887,077.51
Semen PC. 326.000 Kg 1,306.50 425,919.00 - 425,919.00
Pasir beton 760.000 Kg 175.00 133,000.00 - 133,000.00
Batu pecah 2-3 cm ( pecah mesin) 1,029.000 Kg 125.00 128,625.00 - 128,625.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
695,929.00 110,505.10 806,434.10
overhead & Profit 10% 69,592.90 11,050.51 80,643.41
Jumlah 765,521.90 121,555.61 887,077.51
7394.06 Membuat beton mutu f'c = 16,9 MPa (K 200), slump (12 ± 2) cm m3 797,580.30 121,555.61 919,135.91
Semen PC. 352.000 Kg 1,306.50 459,888.00 - 459,888.00
Pasir beton 731.000 Kg 175.00 127,925.00 - 127,925.00
Batu pecah 2-3 cm ( pecah mesin) 1,031.000 Kg 125.00 128,875.00 - 128,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
725,073.00 110,505.10 835,578.10
overhead & Profit 10% 72,507.30 11,050.51 83,557.81
Jumlah 797,580.30 121,555.61 919,135.91
7394.07 Membuat beton mutu f'c = 19,3 MPa (K 225), slump (12 ± 2) cm m3 820,733.65 121,555.61 942,289.26
Semen PC. 371.000 Kg 1,306.50 484,711.50 - 484,711.50
Pasir beton 698.000 Kg 175.00 122,150.00 - 122,150.00
Batu pecah 2-3 cm ( pecah mesin) 1,047.000 Kg 125.00 130,875.00 - 130,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
746,121.50 110,505.10 856,626.60
overhead & Profit 10% 74,612.15 11,050.51 85,662.66
Jumlah 820,733.65 121,555.61 942,289.26
7394.08 Membuat beton mutu f'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 m3 837,161.60 121,555.61 958,717.21
Semen PC. 384.000 Kg 1,306.50 501,696.00 - 501,696.00
Pasir beton 692.000 kg 175.00 121,100.00 - 121,100.00
Batu pecah 2-3 cm ( pecah mesin) 1,039.000 Kg 125.00 129,875.00 - 129,875.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
761,056.00 110,505.10 871,561.10
overhead & Profit 10% 76,105.60 11,050.51 87,156.11
Jumlah 837,161.60 121,555.61 958,717.21
7394.09 Membuat beton mutu f'c = 24,0 MPa (K 275), slump (12 ± 2) cm m3 865,451.40 121,555.61 987,007.01
Semen PC. 406.000 Kg 1,306.50 530,439.00 - 530,439.00
Pasir beton 684.000 Kg 175.00 119,700.00 - 119,700.00
Batu pecah 2-3 cm ( pecah mesin) 1,026.000 Kg 125.00 128,250.00 - 128,250.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
786,774.00 110,505.10 897,279.10
overhead & Profit 10% 78,677.40 11,050.51 89,727.91
Jumlah 865,451.40 121,555.61 987,007.01
7394.10 Membuat beton mutu f'c = 26,4 MPa (K 300), slump (12 ± 2) cm m3 874,246.45 121,555.61 995,802.06
Semen PC. 413.000 Kg 1,306.50 539,584.50 - 539,584.50
Pasir beton 681.000 Kg 175.00 119,175.00 - 119,175.00
Batu pecah 2-3 cm ( pecah mesin) 1,021.000 Kg 125.00 127,625.00 - 127,625.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 1.650 OH 51,500.00 - 84,975.00 84,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Kepala tukang 0.028 OH 69,050.00 - 1,933.40 1,933.40
Mandor 0.083 OH 74,900.00 - 6,216.70 6,216.70
794,769.50 110,505.10 905,274.60
overhead & Profit 10% 79,476.95 11,050.51 90,527.46
Jumlah 874,246.45 121,555.61 995,802.06
7394.11 Membuat beton mutu f'c = 28,8 MPa (K 325), slump (12 ± 2) cm m3 907,432.35 154,606.38 1,062,038.73
Semen PC. 439.000 Kg 1,306.50 573,553.50 - 573,553.50
Pasir beton 670.000 Kg 175.00 117,250.00 - 117,250.00
Batu pecah 2-3 cm ( pecah mesin) 1,006.000 Kg 125.00 125,750.00 - 125,750.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 2.100 OH 51,500.00 - 108,150.00 108,150.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.105 OH 74,900.00 - 7,864.50 7,864.50
824,938.50 140,551.25 965,489.75
overhead & Profit 10% 82,493.85 14,055.13 96,548.98
Jumlah 907,432.35 154,606.38 1,062,038.73
7394.12 Membuat beton mutu f'c = 31,2 MPa (K 350), slump (12 ± 2) cm m3 918,964.20 154,606.38 1,073,570.58
Semen PC. 448.000 Kg 1,306.50 585,312.00 - 585,312.00
Pasir beton 667.000 Kg 175.00 116,725.00 - 116,725.00
Batu pecah 2-3 cm ( pecah mesin) 1,000.000 Kg 125.00 125,000.00 - 125,000.00
Air kerja 215.000 ltr 39.00 8,385.00 - 8,385.00
Pekerja 2.100 OH 51,500.00 - 108,150.00 108,150.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.105 OH 74,900.00 - 7,864.50 7,864.50
835,422.00 140,551.25 975,973.25
overhead & Profit 10% 83,542.20 14,055.13 97,597.33
Jumlah 918,964.20 154,606.38 1,073,570.58
7394.17 Pembesian dengan besi polos atau besi ulir kg 11,875.79 969.31 12,845.11
Pembesian dengan besi polos atau besi ulir 10 kg 118,757.93 9,693.15 128,451.07
Besi beton 10.500 kg 10,062.00 105,651.00 - 105,651.00
Bindrad 0.150 kg 15,405.00 2,310.75 - 2,310.75
Pekerja 0.070 OH 51,500.00 - 3,605.00 3,605.00
Tukang besi 0.070 OH 63,200.00 - 4,424.00 4,424.00
Kepala tukang 0.007 OH 69,050.00 - 483.35 483.35
Mandor 0.004 OH 74,900.00 - 299.60 299.60
107,961.75 8,811.95 116,773.70
overhead & Profit 10% 10,796.18 881.20 11,677.37
Jumlah 118,757.93 9,693.15 128,451.07
7394.28 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 3,186,344.14 524,468.56 3,710,812.70
Kayu sengon untuk begesting (papan/kaso) 0.200 m3 2,730,000.00 546,000.00 - 546,000.00
Paku 1.500 kg 15,600.00 23,400.00 - 23,400.00
Minyak begesting 0.400 liter 3,300.00 1,320.00 - 1,320.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 2.250 kg 15,405.00 34,661.25 - 34,661.25
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.300 OH 51,500.00 - 272,950.00 272,950.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.300 OH 63,200.00 - 82,160.00 82,160.00
Tukang besi 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.262 OH 69,050.00 - 18,091.10 18,091.10
Mandor 0.265 OH 74,900.00 - 19,848.50 19,848.50
2,896,676.49 476,789.60 3,373,466.09
overhead & Profit 10% 289,667.65 47,678.96 337,346.61
Jumlah 3,186,344.14 524,468.56 3,710,812.70
7394.29 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 3,636,045.24 538,926.85 4,174,972.09
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,636,045.24 538,926.85 4,174,972.09
overhead & Profit 10% 363,604.52 53,892.69 417,497.21
Jumlah 3,999,649.76 592,819.54 4,592,469.30
7394.30 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 6,588,277.01 738,894.04 7,327,171.05
Kayu sengon untuk begesting (papan/kaso) 0.550 m3 2,730,000.00 1,501,500.00 - 1,501,500.00
Paku 4.000 kg 15,600.00 62,400.00 - 62,400.00
Minyak begesting 2.000 liter 3,300.00 6,600.00 - 6,600.00
Besi beton 315.000 kg 10,062.00 3,169,530.00 - 3,169,530.00
Bindrad 4.500 kg 15,405.00 69,322.50 - 69,322.50
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 3.500 lembar 53,040.00 185,640.00 - 185,640.00
Bambu apus 20.000 batang 14,391.00 287,820.00 - 287,820.00
Pekerja 7.050 OH 51,500.00 - 363,075.00 363,075.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.650 OH 63,200.00 - 104,280.00 104,280.00
Tukang besi 2.100 OH 63,200.00 - 132,720.00 132,720.00
Kepala tukang 0.403 OH 69,050.00 - 27,827.15 27,827.15
Mandor 0.353 OH 74,900.00 - 26,439.70 26,439.70
5,989,342.74 671,721.85 6,661,064.59
overhead & Profit 10% 598,934.27 67,172.19 666,106.46
Jumlah 6,588,277.01 738,894.04 7,327,171.05
7394.31 Membuat balok beton bertulang (200 kg besi + bekisting) m3 5,011,086.56 642,374.54 5,653,461.10
Kayu sengon untuk begesting (papan/kaso) 0.460 m3 2,730,000.00 1,255,800.00 - 1,255,800.00
Paku 3.200 kg 15,600.00 49,920.00 - 49,920.00
Minyak begesting 1.600 liter 3,300.00 5,280.00 - 5,280.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.800 lembar 53,040.00 148,512.00 - 148,512.00
Bambu apus 16.000 batang 14,391.00 230,256.00 - 230,256.00
Pekerja 6.350 OH 51,500.00 - 327,025.00 327,025.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.650 OH 63,200.00 - 104,280.00 104,280.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.333 OH 69,050.00 - 22,993.65 22,993.65
Mandor 0.318 OH 74,900.00 - 23,818.20 23,818.20
4,555,533.24 583,976.85 5,139,510.09
overhead & Profit 10% 455,553.32 58,397.69 513,951.01
Jumlah 5,011,086.56 642,374.54 5,653,461.10
7394.32 Membuat plat beton bertulang (150 kg besi + bekisting) m3 4,610,518.54 524,696.43 5,135,214.96
Kayu sengon untuk begesting (papan/kaso) 0.440 m3 2,730,000.00 1,201,200.00 - 1,201,200.00
Paku 3.200 kg 15,600.00 49,920.00 - 49,920.00
Minyak begesting 1.600 liter 3,300.00 5,280.00 - 5,280.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 2.250 kg 15,405.00 34,661.25 - 34,661.25
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.800 lembar 53,040.00 148,512.00 - 148,512.00
Bambu apus 32.000 batang 14,391.00 460,512.00 - 460,512.00
Pekerja 5.300 OH 51,500.00 - 272,950.00 272,950.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.300 OH 63,200.00 - 82,160.00 82,160.00
Tukang besi 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.265 OH 69,050.00 - 18,298.25 18,298.25
Mandor 0.265 OH 74,900.00 - 19,848.50 19,848.50
4,191,380.49 476,996.75 4,668,377.24
overhead & Profit 10% 419,138.05 47,699.68 466,837.72
Jumlah 4,610,518.54 524,696.43 5,135,214.96
7394.33 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 4,363,757.74 524,468.56 4,888,226.30
Kayu sengon untuk begesting (papan/kaso) 0.400 m3 2,730,000.00 1,092,000.00 - 1,092,000.00
Paku 3.200 kg 15,600.00 49,920.00 - 49,920.00
Minyak begesting 1.600 liter 3,300.00 5,280.00 - 5,280.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 2.250 kg 15,405.00 34,661.25 - 34,661.25
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.800 lembar 53,040.00 148,512.00 - 148,512.00
Bambu apus 24.000 batang 14,391.00 345,384.00 - 345,384.00
Pekerja 5.300 OH 51,500.00 - 272,950.00 272,950.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.300 OH 63,200.00 - 82,160.00 82,160.00
Tukang besi 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.262 OH 69,050.00 - 18,091.10 18,091.10
Mandor 0.265 OH 74,900.00 - 19,848.50 19,848.50
3,967,052.49 476,789.60 4,443,842.09
overhead & Profit 10% 396,705.25 47,678.96 444,384.21
Jumlah 4,363,757.74 524,468.56 4,888,226.30
7394.34 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 4,641,724.16 592,819.54 5,234,543.70
Kayu sengon untuk begesting (papan/kaso) 0.355 m3 2,730,000.00 969,150.00 - 969,150.00
Paku 3.000 kg 15,600.00 46,800.00 - 46,800.00
Minyak begesting 1.200 liter 3,300.00 3,960.00 - 3,960.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Kayu lapis/ tripleks tb. 3 mm 2.500 lembar 53,040.00 132,600.00 - 132,600.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Bambu apus 14.000 batang 14,391.00 201,474.00 - 201,474.00
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,219,749.24 538,926.85 4,758,676.09
overhead & Profit 10% 421,974.92 53,892.69 475,867.61
Jumlah 4,641,724.16 592,819.54 5,234,543.70
7394.35 Membuat kolom praktis beton bertulang (11 x 11) cm m 49,163.36 15,565.44 64,728.80
Kayu sengon untuk begesting (papan/kaso) 0.002 m3 2,730,000.00 5,460.00 - 5,460.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Besi beton 3.000 kg 10,062.00 30,186.00 - 30,186.00
Bindrad 0.045 kg 15,405.00 693.23 - 693.23
Semen PC. 4.000 Kg 1,306.50 5,226.00 - 5,226.00
Pasir beton 0.006 m3 183,300.00 1,099.80 - 1,099.80
Batu pecah 2-3 cm ( pecah mesin) 0.009 m3 208,104.00 1,872.94 - 1,872.94
Pekerja 0.180 OH 51,500.00 - 9,270.00 9,270.00
Tukang batu 0.020 OH 63,200.00 - 1,264.00 1,264.00
Tukang kayu 0.020 OH 63,200.00 - 1,264.00 1,264.00
Tukang besi 0.020 OH 63,200.00 - 1,264.00 1,264.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.009 OH 74,900.00 - 674.10 674.10
44,693.96 14,150.40 58,844.36
overhead & Profit 10% 4,469.40 1,415.04 5,884.44
Jumlah 49,163.36 15,565.44 64,728.80
7394.36 Membuat ring balok beton bertulang (10 x 15) cm m 63,197.71 25,702.93 88,900.64
Kayu sengon untuk begesting (papan/kaso) 0.003 m3 2,730,000.00 8,190.00 - 8,190.00
Paku 0.020 kg 15,600.00 312.00 - 312.00
Besi beton 3.600 kg 10,062.00 36,223.20 - 36,223.20
Bindrad 0.050 kg 15,405.00 770.25 - 770.25
Semen PC. 5.500 Kg 1,306.50 7,185.75 - 7,185.75
Pasir beton 0.009 m3 183,300.00 1,649.70 - 1,649.70
Batu pecah 2-3 cm ( pecah mesin) 0.015 m3 208,104.00 3,121.56 - 3,121.56
Pekerja 0.297 OH 51,500.00 - 15,295.50 15,295.50
Tukang batu 0.033 OH 63,200.00 - 2,085.60 2,085.60
Tukang kayu 0.033 OH 63,200.00 - 2,085.60 2,085.60
Tukang besi 0.033 OH 63,200.00 - 2,085.60 2,085.60
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
57,452.46 23,366.30 80,818.76
overhead & Profit 10% 5,745.25 2,336.63 8,081.88
Jumlah 63,197.71 25,702.93 88,900.64
7394.37 Membuat beton bertulang (100 kg besi + bekisting) m3 2,837,488.76 592,819.54 3,430,308.30
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 105.000 kg 10,062.00 1,056,510.00 - 1,056,510.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
2,579,535.24 538,926.85 3,118,462.09
overhead & Profit 10% 257,953.52 53,892.69 311,846.21
Jumlah 2,837,488.76 592,819.54 3,430,308.30
7394.38 Membuat beton bertulang (125 kg besi + bekisting) m3 3,130,796.06 592,819.54 3,723,615.60
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 131.500 kg 10,062.00 1,323,153.00 - 1,323,153.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
2,846,178.24 538,926.85 3,385,105.09
overhead & Profit 10% 284,617.82 53,892.69 338,510.51
Jumlah 3,130,796.06 592,819.54 3,723,615.60
7394.39 Membuat beton bertulang (150 kg besi + bekisting) m3 3,418,569.26 592,819.54 4,011,388.80
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 157.500 kg 10,062.00 1,584,765.00 - 1,584,765.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,107,790.24 538,926.85 3,646,717.09
overhead & Profit 10% 310,779.02 53,892.69 364,671.71
Jumlah 3,418,569.26 592,819.54 4,011,388.80
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
7394.40 Membuat beton bertulang (175 kg besi + bekisting) m3 3,709,109.51 592,819.54 4,301,929.05
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 183.750 kg 10,062.00 1,848,892.50 - 1,848,892.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,371,917.74 538,926.85 3,910,844.59
overhead & Profit 10% 337,191.77 53,892.69 391,084.46
Jumlah 3,709,109.51 592,819.54 4,301,929.05
7394.41 Membuat beton bertulang (200 kg besi + bekisting) m3 3,999,649.76 592,819.54 4,592,469.30
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 210.000 kg 10,062.00 2,113,020.00 - 2,113,020.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,636,045.24 538,926.85 4,174,972.09
overhead & Profit 10% 363,604.52 53,892.69 417,497.21
Jumlah 3,999,649.76 592,819.54 4,592,469.30
7394.42 Membuat beton bertulang (225 kg besi + bekisting) m3 4,290,190.01 592,819.54 4,883,009.55
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 236.250 kg 10,062.00 2,377,147.50 - 2,377,147.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
3,900,172.74 538,926.85 4,439,099.59
overhead & Profit 10% 390,017.27 53,892.69 443,909.96
Jumlah 4,290,190.01 592,819.54 4,883,009.55
7394.43 Membuat beton bertulang (250 kg besi + bekisting) m3 4,580,730.26 592,819.54 5,173,549.80
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 262.500 kg 10,062.00 2,641,275.00 - 2,641,275.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,164,300.24 538,926.85 4,703,227.09
overhead & Profit 10% 416,430.02 53,892.69 470,322.71
Jumlah 4,580,730.26 592,819.54 5,173,549.80
7394.44 Membuat beton bertulang (275 kg besi + bekisting) m3 4,871,270.51 592,819.54 5,464,090.05
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 288.750 kg 10,062.00 2,905,402.50 - 2,905,402.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,428,427.74 538,926.85 4,967,354.59
overhead & Profit 10% 442,842.77 53,892.69 496,735.46
Jumlah 4,871,270.51 592,819.54 5,464,090.05
7394.45 Membuat beton bertulang (300 kg besi + bekisting) m3 5,161,810.76 592,819.54 5,754,630.30
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 315.000 kg 10,062.00 3,169,530.00 - 3,169,530.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,692,555.24 538,926.85 5,231,482.09
overhead & Profit 10% 469,255.52 53,892.69 523,148.21
Jumlah 5,161,810.76 592,819.54 5,754,630.30
7394.46 Membuat beton bertulang (325 kg besi + bekisting) m3 5,452,351.01 592,819.54 6,045,170.55
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 341.250 kg 10,062.00 3,433,657.50 - 3,433,657.50
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
4,956,682.74 538,926.85 5,495,609.59
overhead & Profit 10% 495,668.27 53,892.69 549,560.96
Jumlah 5,452,351.01 592,819.54 6,045,170.55
7394.47 Membuat beton bertulang (350 kg besi + bekisting) m3 5,742,891.26 592,819.54 6,335,710.80
Kayu sengon untuk begesting (papan/kaso) 0.270 m3 2,730,000.00 737,100.00 - 737,100.00
Paku 2.000 kg 15,600.00 31,200.00 - 31,200.00
Minyak begesting 0.600 liter 3,300.00 1,980.00 - 1,980.00
Besi beton 367.500 kg 10,062.00 3,697,785.00 - 3,697,785.00
Bindrad 3.000 kg 15,405.00 46,215.00 - 46,215.00
Semen PC. 336.000 Kg 1,306.50 438,984.00 - 438,984.00
Pasir beton 0.540 m3 183,300.00 98,982.00 - 98,982.00
Batu pecah 2-3 cm ( pecah mesin) 0.810 m3 208,104.00 168,564.24 - 168,564.24
Pekerja 5.650 OH 51,500.00 - 290,975.00 290,975.00
Tukang batu 0.275 OH 63,200.00 - 17,380.00 17,380.00
Tukang kayu 1.560 OH 63,200.00 - 98,592.00 98,592.00
Tukang besi 1.400 OH 63,200.00 - 88,480.00 88,480.00
Kepala tukang 0.323 OH 69,050.00 - 22,303.15 22,303.15
Mandor 0.283 OH 74,900.00 - 21,196.70 21,196.70
5,220,810.24 538,926.85 5,759,737.09
overhead & Profit 10% 522,081.02 53,892.69 575,973.71
Jumlah 5,742,891.26 592,819.54 6,335,710.80
2836.10 Memasang pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR m3 1,969,551.36 272,164.48 2,241,715.83
Batu belah 15-20 cm ( pecah tangan ) 0.480 m3 181,077.00 86,916.96 - 86,916.96
Semen PC. 194.000 Kg 1,306.50 253,461.00 - 253,461.00
Pasir beton 0.312 m3 183,300.00 57,189.60 - 57,189.60
Batu pecah 2-3 cm ( pecah mesin) 0.468 m3 208,104.00 97,392.67 - 97,392.67
Besi beton 126.000 kg 10,062.00 1,267,812.00 - 1,267,812.00
Bindrad 1.800 kg 15,405.00 27,729.00 - 27,729.00
Pekerja 3.400 OH 51,500.00 - 175,100.00 175,100.00
Tukang batu 0.850 OH 63,200.00 - 53,720.00 53,720.00
Kepala tukang 0.085 OH 69,050.00 - 5,869.25 5,869.25
Mandor 0.170 OH 74,900.00 - 12,733.00 12,733.00
1,790,501.23 247,422.25 2,037,923.48
overhead & Profit 10% 179,050.12 24,742.23 203,792.35
Jumlah 1,969,551.36 272,164.48 2,241,715.83
2836.11 Memasang pondasi sumuran, diameter 100 cm m3 572,747.67 220,658.61 793,406.28
Batu belah 15-20 cm ( pecah tangan ) 0.450 m3 181,077.00 81,484.65 - 81,484.65
Semen PC. 194.000 Kg 1,306.50 253,461.00 - 253,461.00
Pasir beton 0.312 m3 183,300.00 57,189.60 - 57,189.60
Batu pecah 2-3 cm ( pecah mesin) 0.468 m3 208,104.00 97,392.67 - 97,392.67
Pekerja 2.400 OH 51,500.00 - 123,600.00 123,600.00
Tukang batu 0.800 OH 63,200.00 - 50,560.00 50,560.00
Kepala tukang 0.080 OH 69,050.00 - 5,524.00 5,524.00
Mandor 0.119 OH 74,900.00 - 8,913.10 8,913.10
489,527.92 188,597.10 678,125.02
overhead & Profit 17% 83,219.75 32,061.51 115,281.25
Jumlah 572,747.67 220,658.61 793,406.28
6897.02 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 3 PP m2 162,423.05 51,884.80 214,307.85
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 32.950 Kg 1,306.50 43,049.18 - 43,049.18
Pasir pasang 0.091 m3 189,540.00 17,248.14 - 17,248.14
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
147,657.32 47,168.00 194,825.32
overhead & Profit 10% 14,765.73 4,716.80 19,482.53
Jumlah 162,423.05 51,884.80 214,307.85
6897.03 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 4 PP m2 153,642.27 51,884.80 205,527.07
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 26.550 Kg 1,306.50 34,687.58 - 34,687.58
Pasir pasang 0.093 m3 189,540.00 17,627.22 - 17,627.22
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
139,674.80 47,168.00 186,842.80
overhead & Profit 10% 13,967.48 4,716.80 18,684.28
Jumlah 153,642.27 51,884.80 205,527.07
6897.04 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 5 PP m2 149,267.12 51,884.80 201,151.92
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 22.200 Kg 1,306.50 29,004.30 - 29,004.30
Pasir pasang 0.102 m3 189,540.00 19,333.08 - 19,333.08
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
135,697.38 47,168.00 182,865.38
overhead & Profit 10% 13,569.74 4,716.80 18,286.54
Jumlah 149,267.12 51,884.80 201,151.92
6897.05 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 6 PP m2 148,119.54 51,884.80 200,004.34
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 18.500 Kg 1,306.50 24,170.25 - 24,170.25
Pasir pasang 0.122 m3 189,540.00 23,123.88 - 23,123.88
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
134,654.13 47,168.00 181,822.13
overhead & Profit 10% 13,465.41 4,716.80 18,182.21
Jumlah 148,119.54 51,884.80 200,004.34
6897.06 Memasang dinding bata merah tebal 1 bata, campuran spesi 1 PC : 3 KP : 10 PP m2 135,766.92 51,884.80 187,651.72
Batu Bata 140.000 buah 624.00 87,360.00 - 87,360.00
Semen PC. 10.080 Kg 1,306.50 13,169.52 - 13,169.52
Pasir pasang 0.0925 m3 189,540.00 17,532.45 - 17,532.45
Kawur 0.0275 m3 195,000.00 5,362.50 - 5,362.50
Pekerja 0.600 OH 51,500.00 - 30,900.00 30,900.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.030 OH 74,900.00 - 2,247.00 2,247.00
123,424.47 47,168.00 170,592.47
overhead & Profit 10% 12,342.45 4,716.80 17,059.25
Jumlah 135,766.92 51,884.80 187,651.72
6897.07 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 2 PP m2 83,204.76 25,942.40 109,147.16
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 18.950 Kg 1,306.50 24,758.18 - 24,758.18
Pasir pasang 0.038 m3 189,540.00 7,202.52 - 7,202.52
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
75,640.70 23,584.00 99,224.70
overhead & Profit 10% 7,564.07 2,358.40 9,922.47
Jumlah 83,204.76 25,942.40 109,147.16
6897.08 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 3 PP m2 77,039.61 25,942.40 102,982.01
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 14.370 Kg 1,306.50 18,774.41 - 18,774.41
Pasir pasang 0.040 m3 189,540.00 7,581.60 - 7,581.60
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
70,036.01 23,584.00 93,620.01
overhead & Profit 10% 7,003.60 2,358.40 9,362.00
Jumlah 77,039.61 25,942.40 102,982.01
6897.09 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 4 PP m2 73,540.47 25,942.40 99,482.87
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 11.500 Kg 1,306.50 15,024.75 - 15,024.75
Pasir pasang 0.043 m3 189,540.00 8,150.22 - 8,150.22
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
66,854.97 23,584.00 90,438.97
overhead & Profit 10% 6,685.50 2,358.40 9,043.90
Jumlah 73,540.47 25,942.40 99,482.87
6897.10 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 5 PP m2 71,341.84 25,942.40 97,284.24
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Semen PC. 9.680 Kg 1,306.50 12,646.92 - 12,646.92
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
64,856.22 23,584.00 88,440.22
overhead & Profit 10% 6,485.62 2,358.40 8,844.02
Jumlah 71,341.84 25,942.40 97,284.24
6897.11 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 6 PP m2 70,221.29 25,942.40 96,163.69
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 8.320 Kg 1,306.50 10,870.08 - 10,870.08
Pasir pasang 0.049 m3 189,540.00 9,287.46 - 9,287.46
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
63,837.54 23,584.00 87,421.54
overhead & Profit 10% 6,383.75 2,358.40 8,742.15
Jumlah 70,221.29 25,942.40 96,163.69
6897.12 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 8 PP m2 67,814.18 25,942.40 93,756.58
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 6.500 Kg 1,306.50 8,492.25 - 8,492.25
Pasir pasang 0.050 m3 189,540.00 9,477.00 - 9,477.00
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
61,649.25 23,584.00 85,233.25
overhead & Profit 10% 6,164.93 2,358.40 8,523.33
Jumlah 67,814.18 25,942.40 93,756.58
6897.13 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 3 KP : 10 PP m2 68,157.38 25,942.40 94,099.78
Batu Bata 70.000 buah 624.00 43,680.00 - 43,680.00
Semen PC. 4.500 Kg 1,306.50 5,879.25 - 5,879.25
Pasir pasang 0.050 m3 189,540.00 9,477.00 - 9,477.00
Kawur 0.015 m3 195,000.00 2,925.00 - 2,925.00
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
61,961.25 23,584.00 85,545.25
overhead & Profit 10% 6,196.13 2,358.40 8,554.53
Jumlah 68,157.38 25,942.40 94,099.78
6897.14 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 1 PP m2 56,036.02 25,942.40 81,978.42
Batu bata 70.000 buah 624.00 43,680.00 43,680.00
Semen warna 0.018 kg 3,295.50 59.32 59.32
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Batu kapur bongkahan 0.018 m3 210,600.00 3,790.80 3,790.80
Pekerja 0.300 OH 51,500.00 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 690.50 690.50
Mandor 0.015 OH 74,900.00 1,123.50 1,123.50
50,941.84 23,584.00 74,525.84
overhead & Profit 10% 5,094.18 2,358.40 7,452.58
Jumlah 56,036.02 25,942.40 81,978.42
6897.15 Memasang dinding bata merah tebal 1/2 bata, campuran spesi 1 KP : 1 SM : 2 PP m2 57,179.82 25,942.40 83,122.22
Batu bata 70.000 buah 624.00 43,680.00 43,680.00
Semen warna 0.014 kg 3,295.50 46.14 46.14
Pasir pasang 0.028 m3 189,540.00 5,307.12 5,307.12
Batu kapur bongkahan 0.014 m3 210,600.00 2,948.40 2,948.40
Pekerja 0.300 OH 51,500.00 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 690.50 690.50
Mandor 0.015 OH 74,900.00 1,123.50 1,123.50
51,981.66 23,584.00 75,565.66
overhead & Profit 10% 5,198.17 2,358.40 7,556.57
Jumlah 57,179.82 25,942.40 83,122.22
6897.22 Memasang roster ukuran 12 x 11 x 24 cm, campuran spesi 1 PC : 3 PP m2 343,393.91 25,942.40 369,336.31
Roster beton 12x11x24 30.000 bh 9,594.00 287,820.00 - 287,820.00
Semen PC. 14.000 Kg 1,306.50 18,291.00 - 18,291.00
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
312,176.28 23,584.00 335,760.28
overhead & Profit 10% 31,217.63 2,358.40 33,576.03
Jumlah 343,393.91 25,942.40 369,336.31
6897.23 Memasang roster ukuran 12 x 11 x 24 cm, campuran spesi 1 PC : 4 PP m2 339,707.94 25,942.40 365,650.34
Roster beton 12x11x24 30.000 bh 9,594.00 287,820.00 - 287,820.00
Semen PC. 11.000 Kg 1,306.50 14,371.50 - 14,371.50
Pasir pasang 0.035 m3 189,540.00 6,633.90 - 6,633.90
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
308,825.40 23,584.00 332,409.40
overhead & Profit 10% 30,882.54 2,358.40 33,240.94
Jumlah 339,707.94 25,942.40 365,650.34
2837.24 Memasang finishing siar pasangan dinding bata merah (=20 m') m2 4,466.66 14,978.26 19,444.92
Semen PC. 3.108 Kg 1,306.50 4,060.60 - 4,060.60
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang batu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
4,060.60 13,616.60 17,677.20
overhead & Profit 10% 406.06 1,361.66 1,767.72
Jumlah 4,466.66 14,978.26 19,444.92
2837.25 Memasang finishing siar pasangan dinding conblock ekspose (=8 m') m2 2,299.44 7,032.08 9,331.52
Semen PC. 1.600 Kg 1,306.50 2,090.40 2,090.40
Pekerja 0.070 OH 51,500.00 3,605.00 3,605.00
Tukang batu 0.035 OH 63,200.00 2,212.00 2,212.00
Kepala tukang 0.004 OH 69,050.00 276.20 276.20
Mandor 0.004 OH 74,900.00 299.60 299.60
2,090.40 6,392.80 8,483.20
overhead & Profit 10% 209.04 639.28 848.32
Jumlah 2,299.44 7,032.08 9,331.52
2837.26 Memasang finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 11,613.46 29,798.18 41,411.63
Semen PC. 6.340 Kg 1,306.50 8,283.21 - 8,283.21
Pasir pasang 0.012 m3 189,540.00 2,274.48 - 2,274.48
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
10,557.69 27,089.25 37,646.94
overhead & Profit 10% 1,055.77 2,708.93 3,764.69
Jumlah 11,613.46 29,798.18 41,411.63
7395.09 Memasang lantai ubin granit ukuran (40x40) cm m2 107,423.87 24,910.99 132,334.85
Tegel granit 40x40 cm 6.630 buah 10,865.90 72,040.91 72,040.91
Semen PC 9.800 kg 1,306.50 12,803.70 12,803.70
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.300 kg 3,295.50 4,284.15 4,284.15
Pekerja 0.250 OH 51,500.00 12,875.00 12,875.00
Tukang batu 0.125 OH 63,200.00 7,900.00 7,900.00
Kepala tukang 0.013 OH 69,050.00 897.65 897.65
Mandor 0.013 OH 74,900.00 973.70 973.70
97,658.06 22,646.35 120,304.41
overhead & Profit 10% 9,765.81 2,264.64 12,030.44
Jumlah 107,423.87 24,910.99 132,334.85
7395.10 Memasang lantai ubin granit ukuran (30x30) cm m2 97,781.61 25,825.09 123,606.69
Tegel granit 30x30 cm 11.870 buah 5,253.14 62,354.82 62,354.82
Semen PC 10.000 kg 1,306.50 13,065.00 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.260 OH 51,500.00 13,390.00 13,390.00
Tukang batu 0.130 OH 63,200.00 8,216.00 8,216.00
Kepala tukang 0.013 OH 69,050.00 897.65 897.65
Mandor 0.013 OH 74,900.00 973.70 973.70
88,892.37 23,477.35 112,369.72
overhead & Profit 10% 8,889.24 2,347.74 11,236.97
Jumlah 97,781.61 25,825.09 123,606.69
7395.24 Memasang plint ubin granit ukuran (10x40) cm m' 25,946.34 12,450.85 38,397.18
Plint ubin granit 10x40 cm 2.650 buah 8,000.00 21,200.00 21,200.00
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.100 kg 3,295.50 329.55 329.55
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
23,587.58 11,318.95 34,906.53
overhead & Profit 10% 2,358.76 1,131.90 3,490.65
Jumlah 25,946.34 12,450.85 38,397.18
7395.25 Memasang plint ubin granit ukuran (10x30) cm m' 29,807.34 12,450.85 42,258.18
Plint ubin granit 10x30 cm 3.530 buah 7,000.00 24,710.00 24,710.00
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.100 kg 3,295.50 329.55 329.55
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
27,097.58 11,318.95 38,416.53
overhead & Profit 10% 2,709.76 1,131.90 3,841.65
Jumlah 29,807.34 12,450.85 42,258.18
7395.32 Memasang lantai keramik artistik ukuran (10x20) cm m2 193,008.82 69,529.08 262,537.89
Tegel keramik artistik 10x20 cm 53.000 buah 2,776.80 147,170.40 147,170.40
Semen PC 8.190 kg 1,306.50 10,700.24 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 2.750 kg 3,295.50 9,062.63 9,062.63
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
175,462.56 63,208.25 238,670.81
overhead & Profit 10% 17,546.26 6,320.83 23,867.08
Jumlah 193,008.82 69,529.08 262,537.89
7395.33 Pasang lantai keramik artistik 10x10 atau 5x20 cm m2 790,652.65 69,529.08 860,181.72
Tegel keramik artistik 10 x 10 cm 106.000 buah 6,500.00 689,000.00 689,000.00
Semen PC. 8.190 kg 1,306.50 10,700.24 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 3.200 kg 3,295.50 10,545.60 10,545.60
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
718,775.14 63,208.25 781,983.39
overhead & Profit 10% 71,877.51 6,320.83 78,198.34
Jumlah 790,652.65 69,529.08 860,181.72
7395.34 Memasang lantai keramik ukuran (33 x 33) cm kelas I m2 130,315.07 69,529.08 199,844.14
Keramik lantai 33x33 cm kelas I 10.000 bh 9,390.00 93,900.00 - 93,900.00
Semen PC. 8.190 Kg 1,306.50 10,700.24 - 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Semen warna 1.620 Kg 3,295.50 5,338.71 - 5,338.71
Pekerja 0.700 OH 51,500.00 - 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 - 2,621.50 2,621.50
118,468.25 63,208.25 181,676.50
overhead & Profit 10% 11,846.82 6,320.83 18,167.65
Jumlah 130,315.07 69,529.08 199,844.14
7395.35 Memasang lantai keramik ukuran (30 x 30) cm kelas I m2 146,312.60 69,529.08 215,841.67
Tegel keramik lantai 30 x 30 cm kelas I 11.870 buah 8,970.00 106,473.90 - 106,473.90
Semen PC. 10.000 Kg 1,306.50 13,065.00 - 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Semen warna 1.500 Kg 3,295.50 4,943.25 - 4,943.25
Pekerja 0.700 OH 51,500.00 - 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 - 2,621.50 2,621.50
133,011.45 63,208.25 196,219.70
overhead & Profit 10% 13,301.15 6,320.83 19,621.97
Jumlah 146,312.60 69,529.08 215,841.67
7395.36 Memasang lantai keramik ukuran (20 x 20) cm kelas I m2 89,431.06 69,529.08 158,960.13
Tegel keramik lantai 20 x 20 cm kelas I 26.500 buah 2,031.90 53,845.35 - 53,845.35
Semen PC. 10.400 Kg 1,306.50 13,587.60 - 13,587.60
Pasir pasang 0.045 m3 189,540.00 8,529.30 - 8,529.30
Semen warna 1.620 Kg 3,295.50 5,338.71 - 5,338.71
Pekerja 0.700 OH 51,500.00 - 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 - 2,621.50 2,621.50
81,300.96 63,208.25 144,509.21
overhead & Profit 10% 8,130.10 6,320.83 14,450.92
Jumlah 89,431.06 69,529.08 158,960.13
7395.37 Pasang lantai keramik uk (10x33) cm, variasi border m2 164,406.96 104,372.79 268,779.74
Tegel keramik 10x33 cm 33.000 buah 3,510.00 115,830.00 115,830.00
Semen PC. 8.190 Kg 1,306.50 10,700.24 10,700.24
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 4.370 Kg 3,295.50 14,401.34 14,401.34
Pekerja 1.050 OH 51,500.00 54,075.00 54,075.00
Tukang batu 0.525 OH 63,200.00 33,180.00 33,180.00
Kepala tukang 0.053 OH 69,050.00 3,659.65 3,659.65
Mandor 0.053 OH 74,900.00 3,969.70 3,969.70
149,460.87 94,884.35 244,345.22
overhead & Profit 10% 14,946.09 9,488.44 24,434.52
Jumlah 164,406.96 104,372.79 268,779.74
7395.38 Pasang lantai mosaik uk (30x30)cm, camp 1pc:3pp m2 329,499.54 69,529.08 399,028.61
Tegel mozaik 11.870 buah 22,500.00 267,075.00 267,075.00
Semen PC. 14.150 Kg 1,306.50 18,486.98 18,486.98
Pasir pasang 0.039 m3 189,540.00 7,392.06 7,392.06
Semen warna 2.000 Kg 3,295.50 6,591.00 6,591.00
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
299,545.04 63,208.25 362,753.29
overhead & Profit 10% 29,954.50 6,320.83 36,275.33
Jumlah 329,499.54 69,529.08 399,028.61
7395.39 Memasang plint keramik ukuran (10x20) cm m' 15,269.08 12,450.85 27,719.92
Keramik plin 10x20cm 5.300 buah 2,215.20 11,740.56 11,740.56
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.025 kg 3,295.50 82.39 82.39
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
13,880.98 11,318.95 25,199.93
overhead & Profit 10% 1,388.10 1,131.90 2,519.99
Jumlah 15,269.08 12,450.85 27,719.92
7395.40 Memasang plint keramik ukuran (10x10) cm m' 19,270.47 12,450.85 31,721.31
Keramik plin 10x10cm 10.600 buah 1,443.00 15,295.80 15,295.80
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.050 kg 3,295.50 164.78 164.78
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
17,518.61 11,318.95 28,837.56
overhead & Profit 10% 1,751.86 1,131.90 2,883.76
Jumlah 19,270.47 12,450.85 31,721.31
7395.41 Memasang plint keramik ukuran (5x20) cm m' 9,591.73 12,450.85 22,042.58
Keramik plin 5x20cm 5.300 buah 1,443.00 7,647.90 7,647.90
Semen PC 0.570 kg 1,306.50 744.71 744.71
Pasir pasang 0.0015 m3 189,540.00 284.31 284.31
Semen warna 0.013 kg 3,295.50 42.84 42.84
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
8,719.76 11,318.95 20,038.71
overhead & Profit 10% 871.98 1,131.90 2,003.87
Jumlah 9,591.73 12,450.85 22,042.58
7395.42 Memasang plint internal cove artistik ukuran (5x5x20)cm m' 24,488.84 18,290.20 42,779.03
Plint internal cove artistik 5x5x20cm 5.300 buah 3,750.00 19,875.00 19,875.00
Semen PC 1.140 kg 1,306.50 1,489.41 1,489.41
Pasir pasang 0.003 m3 189,540.00 568.62 568.62
Semen warna 0.100 kg 3,295.50 329.55 329.55
Pekerja 0.075 OH 51,500.00 3,862.50 3,862.50
Tukang batu 0.075 OH 63,200.00 4,740.00 4,740.00
Kepala tukang 0.075 OH 69,050.00 5,178.75 5,178.75
Mandor 0.038 OH 74,900.00 2,846.20 2,846.20
22,262.58 16,627.45 38,890.03
overhead & Profit 10% 2,226.26 1,662.75 3,889.00
Jumlah 24,488.84 18,290.20 42,779.03
7395.51 Memasang dinding keramik artistik ukuran (10x20)cm m2 188,974.71 89,394.53 278,369.24
Keramik artistik 10x20 53.000 buah 2,776.80 147,170.40 147,170.40
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
171,795.20 81,267.75 253,062.95
overhead & Profit 10% 17,179.52 8,126.78 25,306.29
Jumlah 188,974.71 89,394.53 278,369.24
7395.52 Memasang dinding keramik artistik ukuran (5x20)cm m2 138,401.03 89,394.53 227,795.56
Keramik artistik 5 x 20 106.000 buah 950.00 100,700.00 100,700.00
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.900 Kg 3,295.50 9,556.95 9,556.95
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
125,819.12 81,267.75 207,086.87
overhead & Profit 10% 12,581.91 8,126.78 20,708.69
Jumlah 138,401.03 89,394.53 227,795.56
7395.53 Memasang dinding keramik ukuran (10x20)cm kelas I m2 152,140.77 89,394.53 241,535.30
Keramik 10 x 20 53.000 buah 2,145.00 113,685.00 113,685.00
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
138,309.80 81,267.75 219,577.55
overhead & Profit 10% 13,830.98 8,126.78 21,957.75
Jumlah 152,140.77 89,394.53 241,535.30
7395.54 Memasang dinding keramik ukuran (20x20)cm kelas I m2 85,387.27 89,394.53 174,781.80
Keramik 20 x 20 26.500 buah 2,000.00 53,000.00 53,000.00
Semen PC. 9.300 Kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
77,624.80 81,267.75 158,892.55
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
overhead & Profit 10% 7,762.48 8,126.78 15,889.25
Jumlah 85,387.27 89,394.53 174,781.80
7395.56 Memasang dinding bata pelapis ukuran (3x7x24)cm m2 87,113.38 99,327.25 186,440.63
Bata lapis dinding 63.000 buah 780.00 49,140.00 49,140.00
Semen PC. 12.440 Kg 1,306.50 16,252.86 16,252.86
Pasir pasang 0.025 m3 189,540.00 4,738.50 4,738.50
Semen warna 2.750 Kg 3,295.50 9,062.63 9,062.63
Pekerja 1.000 OH 51,500.00 51,500.00 51,500.00
Tukang batu 0.500 OH 63,200.00 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 3,452.50 3,452.50
Mandor 0.050 OH 74,900.00 3,745.00 3,745.00
79,193.99 90,297.50 169,491.49
overhead & Profit 10% 7,919.40 9,029.75 16,949.15
Jumlah 87,113.38 99,327.25 186,440.63
7395.64 Memasang lantai keramik ukuran (40x40) cm kelas I m2 109,654.12 69,529.08 179,183.19
Keramik lantai 40 x 40 cm kelas I 6.630 buah 11,427.00 75,761.01 75,761.01
Semen PC. 8.000 kg 1,306.50 10,452.00 10,452.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
99,685.56 63,208.25 162,893.81
overhead & Profit 10% 9,968.56 6,320.83 16,289.38
Jumlah 109,654.12 69,529.08 179,183.19
7395.65 Memasang lantai keramik ukuran (40x40) cm kelas II m2 98,703.68 69,529.08 168,232.75
Keramik lantai 40 x 40 cm kelas II 6.630 buah 9,925.50 65,806.07 65,806.07
Semen PC. 8.000 kg 1,306.50 10,452.00 10,452.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
89,730.62 63,208.25 152,938.87
overhead & Profit 10% 8,973.06 6,320.83 15,293.89
Jumlah 98,703.68 69,529.08 168,232.75
7395.66 Memasang lantai keramik ukuran (30x30) cm kelas I m2 146,312.60 69,529.08 215,841.67
Keramik lantai 30x30 cm kelas I 11.870 buah 8,970.00 106,473.90 106,473.90
Semen PC 10.000 kg 1,306.50 13,065.00 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
133,011.45 63,208.25 196,219.70
overhead & Profit 10% 13,301.15 6,320.83 19,621.97
Jumlah 146,312.60 69,529.08 215,841.67
7395.67 Memasang lantai keramik ukuran (30x30) cm kelas II m2 107,407.96 69,529.08 176,937.03
Keramik lantai 30x30 cm kelas II 11.870 buah 5,990.40 71,106.05 71,106.05
Semen PC 10.000 kg 1,306.50 13,065.00 13,065.00
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.500 kg 3,295.50 4,943.25 4,943.25
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
97,643.60 63,208.25 160,851.85
overhead & Profit 10% 9,764.36 6,320.83 16,085.18
Jumlah 107,407.96 69,529.08 176,937.03
7395.68 Memasang lantai keramik ukuran (20x20) cm kelas I m2 89,431.06 69,529.08 158,960.13
Keramik lantai 20x20 cm kelas I 26.500 buah 2,031.90 53,845.35 53,845.35
Semen PC 10.400 kg 1,306.50 13,587.60 13,587.60
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.620 kg 3,295.50 5,338.71 5,338.71
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
81,300.96 63,208.25 144,509.21
overhead & Profit 10% 8,130.10 6,320.83 14,450.92
Jumlah 89,431.06 69,529.08 158,960.13
7395.69 Memasang lantai keramik ukuran (20x20) cm kelas II m2 90,842.47 69,529.08 160,371.54
Keramik lantai 20 x 20 cm kelas II 26.500 buah 2,109.90 55,912.35 55,912.35
Semen PC. 9.800 kg 1,306.50 12,803.70 12,803.70
Pasir pasang 0.045 m3 189,540.00 8,529.30 8,529.30
Semen warna 1.620 kg 3,295.50 5,338.71 5,338.71
Pekerja 0.700 OH 51,500.00 36,050.00 36,050.00
Tukang batu 0.350 OH 63,200.00 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 2,416.75 2,416.75
Mandor 0.035 OH 74,900.00 2,621.50 2,621.50
82,584.06 63,208.25 145,792.31
overhead & Profit 10% 8,258.41 6,320.83 14,579.23
Jumlah 90,842.47 69,529.08 160,371.54
7395.70 Memasang Dinding keramik ukuran 10x20 cm kelas I m2 152,140.77 12,450.85 164,591.62
Keramik dinding 10 x 20 cm kelas I 53.000 buah 2,145.00 113,685.00 113,685.00
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 kg 3,295.50 9,062.63 9,062.63
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
138,309.80 11,318.95 149,628.75
overhead & Profit 10% 13,830.98 1,131.90 14,962.87
Jumlah 152,140.77 12,450.85 164,591.62
7395.71 Memasang Dinding keramik ukuran 10x20 cm kelas II m2 136,679.61 12,450.85 149,130.46
Keramik dinding 10 x 20 cm kelas II 53.000 buah 1,879.80 99,629.40 99,629.40
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 2.750 kg 3,295.50 9,062.63 9,062.63
Pekerja 0.090 OH 51,500.00 4,635.00 4,635.00
Tukang batu 0.090 OH 63,200.00 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 621.45 621.45
Mandor 0.005 OH 74,900.00 374.50 374.50
124,254.20 11,318.95 135,573.15
overhead & Profit 10% 12,425.42 1,131.90 13,557.31
Jumlah 136,679.61 12,450.85 149,130.46
7395.72 Memasang Dinding keramik ukuran 20x25 cm kelas I m2 111,988.73 89,394.53 201,383.26
Keramik dinding 20 x 25 cm kelas I 21.000 buah 3,802.50 79,852.50 79,852.50
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 1.940 kg 3,295.50 6,393.27 6,393.27
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
101,807.94 81,267.75 183,075.69
overhead & Profit 10% 10,180.79 8,126.78 18,307.57
Jumlah 111,988.73 89,394.53 201,383.26
7395.73 Memasang Dinding keramik ukuran 20x25 cm kelas II m2 100,457.21 89,394.53 189,851.74
Keramik dinding 20 x 25 cm kelas II 21.000 buah 3,303.30 69,369.30 69,369.30
Semen PC. 9.300 kg 1,306.50 12,150.45 12,150.45
Pasir pasang 0.018 m3 189,540.00 3,411.72 3,411.72
Semen warna 1.940 kg 3,295.50 6,393.27 6,393.27
Pekerja 0.900 OH 51,500.00 46,350.00 46,350.00
Tukang batu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.045 OH 74,900.00 3,370.50 3,370.50
91,324.74 81,267.75 172,592.49
overhead & Profit 10% 9,132.47 8,126.78 17,259.25
Jumlah 100,457.21 89,394.53 189,851.74
3434.01 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I m3 26,285,380.00 2,044,812.00 28,330,192.00
Kayu jati (ekspose) 1.100 m3 21,684,000.00 23,852,400.00 - 23,852,400.00
Paku 1.250 kg 15,600.00 19,500.00 - 19,500.00
Lem kayu 1.000 Kg 23,900.00 23,900.00 - 23,900.00
Pekerja 7.000 OH 51,500.00 - 360,500.00 360,500.00
Tukang kayu 21.000 OH 63,200.00 - 1,327,200.00 1,327,200.00
Kepala tukang 2.100 OH 69,050.00 - 145,005.00 145,005.00
Mandor 0.350 OH 74,900.00 - 26,215.00 26,215.00
23,895,800.00 1,858,920.00 25,754,720.00
overhead & Profit 10% 2,389,580.00 185,892.00 2,575,472.00
Jumlah 26,285,380.00 2,044,812.00 28,330,192.00
3434.02.1 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas II m3 19,537,210.00 1,988,162.00 21,525,372.00
Kayu jati lokal (non ekspose) 1.100 m3 16,107,000.00 17,717,700.00 - 17,717,700.00
Paku 1.250 kg 15,600.00 19,500.00 - 19,500.00
Lem kayu 1.000 Kg 23,900.00 23,900.00 - 23,900.00
Pekerja 6.000 OH 51,500.00 - 309,000.00 309,000.00
Tukang kayu 21.000 OH 63,200.00 - 1,327,200.00 1,327,200.00
Kepala tukang 2.100 OH 69,050.00 - 145,005.00 145,005.00
Mandor 0.350 OH 74,900.00 - 26,215.00 26,215.00
17,761,100.00 1,807,420.00 19,568,520.00
overhead & Profit 10% 1,776,110.00 180,742.00 1,956,852.00
Jumlah 19,537,210.00 1,988,162.00 21,525,372.00
3434.02.2 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas III m3 11,467,720.00 1,988,162.00 13,455,882.00
Kayu kanfer 1.100 m3 9,438,000.00 10,381,800.00 - 10,381,800.00
Paku 1.250 kg 15,600.00 19,500.00 - 19,500.00
Lem kayu 1.000 Kg 23,900.00 23,900.00 - 23,900.00
Pekerja 6.000 OH 51,500.00 - 309,000.00 309,000.00
Tukang kayu 21.000 OH 63,200.00 - 1,327,200.00 1,327,200.00
Kepala tukang 2.100 OH 69,050.00 - 145,005.00 145,005.00
Mandor 0.350 OH 74,900.00 - 26,215.00 26,215.00
10,425,200.00 1,807,420.00 12,232,620.00
overhead & Profit 10% 1,042,520.00 180,742.00 1,223,262.00
Jumlah 11,467,720.00 1,988,162.00 13,455,882.00
3434.05 Membuat dan memasang daun pintu panel, kayu kelas I m2 879,310.00 265,560.00 1,144,870.00
Kayu jati (ekspose) 0.040 m3 21,684,000.00 867,360.00 - 867,360.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
879,310.00 265,560.00 1,144,870.00
overhead & Profit 10% 87,931.00 26,556.00 114,487.00
Jumlah 967,241.00 292,116.00 1,259,357.00
3434.05.1 Membuat dan memasang daun pintu panel, kayu kelas II m2 721,853.00 292,116.00 1,013,969.00
Kayu jati lokal (non ekspose) 0.040 m3 16,107,000.00 644,280.00 - 644,280.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
656,230.00 265,560.00 921,790.00
overhead & Profit 10% 65,623.00 26,556.00 92,179.00
Jumlah 721,853.00 292,116.00 1,013,969.00
3434.06 Membuat dan memasang pintu dan jendela kaca, kayu kelas I (tanpa kaca) m2 580,344.60 233,692.80 814,037.40
Kayu jati (ekspose) 0.024 m3 21,684,000.00 520,416.00 - 520,416.00
Lem kayu 0.300 Kg 23,900.00 7,170.00 - 7,170.00
Pekerja 0.800 OH 51,500.00 - 41,200.00 41,200.00
Tukang kayu 2.400 OH 63,200.00 - 151,680.00 151,680.00
Kepala tukang 0.240 OH 69,050.00 - 16,572.00 16,572.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
527,586.00 212,448.00 740,034.00
overhead & Profit 10% 52,758.60 21,244.80 74,003.40
Jumlah 580,344.60 233,692.80 814,037.40
3434.06.1 Membuat dan memasang pintu dan jendela kaca, kayu kelas II (tanpa kaca) m2 433,111.80 233,692.80 666,804.60
Kayu jati lokal (non ekspose) 0.024 m3 16,107,000.00 386,568.00 - 386,568.00
Lem kayu 0.300 Kg 23,900.00 7,170.00 - 7,170.00
Pekerja 0.800 OH 51,500.00 - 41,200.00 41,200.00
Tukang kayu 2.400 OH 63,200.00 - 151,680.00 151,680.00
Kepala tukang 0.240 OH 69,050.00 - 16,572.00 16,572.00
Mandor 0.040 OH 74,900.00 - 2,996.00 2,996.00
393,738.00 212,448.00 606,186.00
overhead & Profit 10% 39,373.80 21,244.80 60,618.60
Jumlah 433,111.80 233,692.80 666,804.60
3434.07 Membuat dan memasang pintu dan jendela jalusi, kayu kelas I m2 1,539,698.60 292,116.00 1,831,814.60
Kayu jati (ekspose) 0.064 m3 21,684,000.00 1,387,776.00 - 1,387,776.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
1,399,726.00 265,560.00 1,665,286.00
overhead & Profit 10% 139,972.60 26,556.00 166,528.60
Jumlah 1,539,698.60 292,116.00 1,831,814.60
3434.07.1 Membuat dan memasang pintu dan jendela jalusi, kayu kelas II m2 1,147,077.80 292,116.00 1,439,193.80
Kayu jati lokal (non ekspose) 0.064 m3 16,107,000.00 1,030,848.00 - 1,030,848.00
Lem kayu 0.500 Kg 23,900.00 11,950.00 - 11,950.00
Pekerja 1.000 OH 51,500.00 - 51,500.00 51,500.00
Tukang kayu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.050 OH 74,900.00 - 3,745.00 3,745.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
1,042,798.00 265,560.00 1,308,358.00
overhead & Profit 10% 104,279.80 26,556.00 130,835.80
Jumlah 1,147,077.80 292,116.00 1,439,193.80
3434.13 Memasang konstruksi kuda-kuda konvensional, kayu kelas I m3 19,837,818.00 1,168,464.00 21,006,282.00
Kayu jati lokal (non ekspose) 1.100 m3 16,107,000.00 17,717,700.00 - 17,717,700.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
18,034,380.00 1,062,240.00 19,096,620.00
overhead & Profit 10% 1,803,438.00 106,224.00 1,909,662.00
Jumlah 19,837,818.00 1,168,464.00 21,006,282.00
3434.13.1 Memasang konstruksi kuda-kuda konvensional, kayu kelas II m3 9,078,498.00 1,168,464.00 10,246,962.00
Kayu kruing 1.100 m3 7,215,000.00 7,936,500.00 - 7,936,500.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
8,253,180.00 1,062,240.00 9,315,420.00
overhead & Profit 10% 825,318.00 106,224.00 931,542.00
Jumlah 9,078,498.00 1,168,464.00 10,246,962.00
3434.13.2 Memasang konstruksi kuda-kuda konvensional, kayu kelas III m3 7,851,558.00 1,168,464.00 9,020,022.00
Kayu meranti 1.100 m3 6,201,000.00 6,821,100.00 - 6,821,100.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
7,137,780.00 1,062,240.00 8,200,020.00
overhead & Profit 10% 713,778.00 106,224.00 820,002.00
Jumlah 7,851,558.00 1,168,464.00 9,020,022.00
3434.14 Memasang konstruksi kuda-kuda expose, kayu kelas I m3 28,971,228.00 1,168,464.00 30,139,692.00
Kayu jati (ekspose) 1.200 m3 21,684,000.00 26,020,800.00 - 26,020,800.00
Besi strip 15.000 kg 15,288.00 229,320.00 - 229,320.00
Paku 5.600 kg 15,600.00 87,360.00 - 87,360.00
Pekerja 4.000 OH 51,500.00 - 206,000.00 206,000.00
Tukang kayu 12.000 OH 63,200.00 - 758,400.00 758,400.00
Kepala tukang 1.200 OH 69,050.00 - 82,860.00 82,860.00
Mandor 0.200 OH 74,900.00 - 14,980.00 14,980.00
26,337,480.00 1,062,240.00 27,399,720.00
overhead & Profit 10% 2,633,748.00 106,224.00 2,739,972.00
Jumlah 28,971,228.00 1,168,464.00 30,139,692.00
3434.16 Pas. Rangka atap genteng, kaso & reng kayu kls I m2 220,008.36 13,788.50 233,796.86
Kayu usuk jati ukuran 5 x 7 0.014 m3 11,661,000.00 163,254.00 - 163,254.00
Kayu reng jati 2/3 0.0036 m3 9,126,000.00 32,853.60 - 32,853.60
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
200,007.60 12,535.00 212,542.60
overhead & Profit 10% 20,000.76 1,253.50 21,254.26
Jumlah 220,008.36 13,788.50 233,796.86
3434.16.1 Pas. Rangka atap genteng, kaso & reng kayu kls II m2 136,524.96 13,788.50 150,313.46
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng jati 0.0036 m3 9,126,000.00 32,853.60 - 32,853.60
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
124,113.60 12,535.00 136,648.60
overhead & Profit 10% 12,411.36 1,253.50 13,664.86
Jumlah 136,524.96 13,788.50 150,313.46
3434.16.2 Pas. Rangka atap genteng, kaso & reng kayu kls III m2 121,080.96 13,788.50 134,869.46
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng kruing 0.0036 m3 5,226,000.00 18,813.60 - 18,813.60
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
110,073.60 12,535.00 122,608.60
overhead & Profit 10% 11,007.36 1,253.50 12,260.86
Jumlah 121,080.96 13,788.50 134,869.46
3434.17 Memasang rangka atap genteng beton, kaso kayu kelas I, reng kayu kelas I m2 256,147.32 13,788.50 269,935.82
Kayu usuk jati ukuran 5 x 7 0.014 m3 11,661,000.00 163,254.00 - 163,254.00
Kayu reng jati 2/3 0.0072 m3 9,126,000.00 65,707.20 - 65,707.20
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
232,861.20 12,535.00 245,396.20
overhead & Profit 10% 23,286.12 1,253.50 24,539.62
Jumlah 256,147.32 13,788.50 269,935.82
3434.17.1 Memasang rangka atap genteng beton, kaso kayu kelas II, reng kayu kelas I m2 172,663.92 13,788.50 186,452.42
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng jati 2/3 0.0072 m3 9,126,000.00 65,707.20 - 65,707.20
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
156,967.20 12,535.00 169,502.20
overhead & Profit 10% 15,696.72 1,253.50 16,950.22
Jumlah 172,663.92 13,788.50 186,452.42
3434.17.2 Memasang rangka atap genteng beton, kaso kayu kelas II, reng kayu kelas II m2 141,775.92 13,788.50 155,564.42
Kayu usuk kruing 0.014 m3 6,240,000.00 87,360.00 - 87,360.00
Kayu reng kruing 2/3 0.0072 m3 5,226,000.00 37,627.20 - 37,627.20
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
128,887.20 12,535.00 141,422.20
overhead & Profit 10% 12,888.72 1,253.50 14,142.22
Jumlah 141,775.92 13,788.50 155,564.42
3434.19 Memasang rangka langit-langit (50 x 100) cm, kayu kelas II m2 109,137.60 37,811.40 146,949.00
Kayu usuk kruing 0.0154 m3 6,240,000.00 96,096.00 - 96,096.00
Paku 0.200 kg 15,600.00 3,120.00 - 3,120.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
99,216.00 34,374.00 133,590.00
overhead & Profit 10% 9,921.60 3,437.40 13,359.00
Jumlah 109,137.60 37,811.40 146,949.00
3434.19.1 Memasang rangka langit-langit (50 x 100) cm, kayu kelas III m2 92,621.10 37,811.40 130,432.50
Kayu usuk meranti 0.0154 m3 5,265,000.00 81,081.00 - 81,081.00
Paku 0.200 kg 15,600.00 3,120.00 - 3,120.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.075 OH 74,900.00 - 5,617.50 5,617.50
84,201.00 34,374.00 118,575.00
overhead & Profit 10% 8,420.10 3,437.40 11,857.50
Jumlah 92,621.10 37,811.40 130,432.50
3434.20 Memasang rangka langit-langit (60 x 60) cm, kayu kelas II m2 116,173.20 35,288.55 151,461.75
Kayu usuk kruing 0.0163 m3 6,240,000.00 101,712.00 - 101,712.00
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
105,612.00 32,080.50 137,692.50
overhead & Profit 10% 10,561.20 3,208.05 13,769.25
Jumlah 116,173.20 35,288.55 151,461.75
3434.20.1 Memasang rangka langit-langit (60 x 60) cm, kayu kelas III m2 98,691.45 35,288.55 133,980.00
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
Kayu usuk meranti 0.0163 m3 5,265,000.00 85,819.50 - 85,819.50
Paku 0.250 kg 15,600.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.010 OH 74,900.00 - 749.00 749.00
89,719.50 32,080.50 121,800.00
overhead & Profit 10% 8,971.95 3,208.05 12,180.00
Jumlah 98,691.45 35,288.55 133,980.00
3434.21 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I m 259,321.92 21,500.05 280,821.97
Kayu jati (ekspose) 0.0108 m3 21,684,000.00 234,187.20 - 234,187.20
Paku 0.100 kg 15,600.00 1,560.00 - 1,560.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
235,747.20 19,545.50 255,292.70
overhead & Profit 10% 23,574.72 1,954.55 25,529.27
Jumlah 259,321.92 21,500.05 280,821.97
3434.21.1 Memasang lisplank ukuran (3 x 20) cm, kayu kelas II m 87,430.20 21,500.05 108,930.25
Kayu kruing 0.0108 m3 7,215,000.00 77,922.00 - 77,922.00
Paku 0.100 kg 15,600.00 1,560.00 - 1,560.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
79,482.00 19,545.50 99,027.50
overhead & Profit 10% 7,948.20 1,954.55 9,902.75
Jumlah 87,430.20 21,500.05 108,930.25
3434.22 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I m 263,234.40 21,500.05 284,734.45
Kayu jati (ekspose) 0.011 m3 21,684,000.00 238,524.00 - 238,524.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
239,304.00 19,545.50 258,849.50
overhead & Profit 10% 23,930.40 1,954.55 25,884.95
Jumlah 263,234.40 21,500.05 284,734.45
3434.22.1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas II m 88,159.50 21,500.05 109,659.55
Kayu kruing 0.011 m3 7,215,000.00 79,365.00 - 79,365.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.005 OH 74,900.00 - 374.50 374.50
80,145.00 19,545.50 99,690.50
overhead & Profit 10% 8,014.50 1,954.55 9,969.05
Jumlah 88,159.50 21,500.05 109,659.55
3434.23 Memasang rangka dinding pemisah (60 x 120) cm kayu kelas II m2 224,796.00 43,858.60 268,654.60
Kayu kruing 0.028 m3 7,215,000.00 202,020.00 - 202,020.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.450 OH 63,200.00 - 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 - 3,107.25 3,107.25
Mandor 0.008 OH 74,900.00 - 599.20 599.20
204,360.00 39,871.45 244,231.45
overhead & Profit 10% 20,436.00 3,987.15 24,423.15
Jumlah 224,796.00 43,858.60 268,654.60
3434.23.1 Memasang rangka dinding pemisah (60 x 120) cm kayu kelas III m2 164,736.00 43,858.60 208,594.60
Kayu usuk meranti 0.028 m3 5,265,000.00 147,420.00 - 147,420.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.450 OH 63,200.00 - 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 - 3,107.25 3,107.25
Mandor 0.008 OH 74,900.00 - 599.20 599.20
149,760.00 39,871.45 189,631.45
overhead & Profit 10% 14,976.00 3,987.15 18,963.15
Jumlah 164,736.00 43,858.60 208,594.60
3434.24 Memasang dinding pemisah teakwood rangkap, rangka kayu kelas II m2 359,202.54 43,858.60 403,061.13
Kayu kruing 0.028 m3 7,215,000.00 202,020.00 202,020.00
Paku 0.150 kg 15,600.00 2,340.00 2,340.00
Teakwood 120x240 cm 0.860 lembar 126,516.00 108,803.76 108,803.76
Lem kayu 0.560 Kg 23,900.00 13,384.00 13,384.00
Pekerja 0.150 OH 51,500.00 7,725.00 7,725.00
Tukang kayu 0.450 OH 63,200.00 28,440.00 28,440.00
Kepala tukang 0.045 OH 69,050.00 3,107.25 3,107.25
Mandor 0.008 OH 74,900.00 599.20 599.20
326,547.76 39,871.45 366,419.21
overhead & Profit 10% 32,654.78 3,987.15 36,641.92
Jumlah 359,202.54 43,858.60 403,061.13
3434.25 Memasang dinding pemisah plywood rangkap, rangka kayu kelas II m2 295,966.22 58,423.20 354,389.42
Kayu kruing 0.028 m3 7,215,000.00 202,020.00 - 202,020.00
Paku 0.150 kg 15,600.00 2,340.00 - 2,340.00
Kayu lapis/ tripleks tb. 4 mm 0.860 lembar 59,670.00 51,316.20 - 51,316.20
Lem kayu 0.560 Kg 23,900.00 13,384.00 - 13,384.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.600 OH 63,200.00 - 37,920.00 37,920.00
Kepala tukang 0.060 OH 69,050.00 - 4,143.00 4,143.00
Mandor 0.010 OH 74,900.00 - 749.00 749.00
269,060.20 53,112.00 322,172.20
overhead & Profit 10% 26,906.02 5,311.20 32,217.22
Jumlah 295,966.22 58,423.20 354,389.42
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
3434.26 Memasang dinding lambriziring dari papan kayu kelas I m2 172,260.66 175,269.60 347,530.26
Kayu jati (ekspose) 0.007 m3 21,684,000.00 151,788.00 151,788.00
Paku 0.100 kg 15,600.00 1,560.00 1,560.00
Paku skrup 0.150 kg 21,684.00 3,252.60 3,252.60
Pekerja 0.600 OH 51,500.00 30,900.00 30,900.00
Tukang kayu 1.800 OH 63,200.00 113,760.00 113,760.00
Kepala tukang 0.180 OH 69,050.00 12,429.00 12,429.00
Mandor 0.030 OH 74,900.00 2,247.00 2,247.00
156,600.60 159,336.00 315,936.60
overhead & Profit 10% 15,660.06 15,933.60 31,593.66
Jumlah 172,260.66 175,269.60 347,530.26
3434.27 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm m2 56,525.04 7,320.28 63,845.32
Teakwood 120x240 0.400 lembar 126,516.00 50,606.40 50,606.40
Paku 0.050 kg 15,600.00 780.00 780.00
Pekerja 0.025 OH 51,500.00 1,287.50 1,287.50
Tukang kayu 0.075 OH 63,200.00 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 552.40 552.40
Mandor 0.001 OH 74,900.00 74.90 74.90
G PEKERJAAN BESI DAN ALUMINIUM
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
7393.04 Membuat pintu besi plat baja tebal 2 mm rangkap, rangka besi siku m2 680,076.54 144,738.06 824,814.60
Besi profil 15.000 kg 12,012.00 180,180.00 - 180,180.00
Besi plat 32.800 kg 13,338.00 437,486.40 - 437,486.40
Engsel pintu klam 0.050 bh 11,700.00 585.00
Pekerja 1.050 OH 51,500.00 - 54,075.00 54,075.00
Tukang las 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.105 OH 69,050.00 - 7,250.25 7,250.25
Mandor 0.052 OH 74,900.00 - 3,894.80 3,894.80
618,251.40 131,580.05 749,246.45
overhead & Profit 10% 61,825.14 13,158.01 74,924.65
Jumlah 680,076.54 144,738.06 824,171.10
7393.06 Membuat rangka jendela besi scuare tube (25 x 5) cm m2 45,720.75 89,584.06 135,304.81
Besi scuare tube 4.760 m 7,250.00 34,510.00 34,510.00
Besi lis kaca (1 x 1) cm 4.522 m 1,560.00 7,054.32 7,054.32
Pengelasan 20.000 cm - -
Pekerja 0.650 OH 51,500.00 33,475.00 33,475.00
Tukang las 0.650 OH 63,200.00 41,080.00 41,080.00
Kepala tukang 0.065 OH 69,050.00 4,488.25 4,488.25
Mandor 0.032 OH 74,900.00 2,396.80 2,396.80
41,564.32 81,440.05 123,004.37
overhead & Profit 10% 4,156.43 8,144.01 12,300.44
Jumlah 45,720.75 89,584.06 135,304.81
7393.08 Memasang pintu lipat (folding door) plastik/PVC m2 471,900.00 60,669.40 532,569.40
Pintu lipat besi 1.000 m2 429,000.00 429,000.00 - 429,000.00
Pekerja 0.440 OH 51,500.00 - 22,660.00 22,660.00
Tukang aluminium 0.440 OH 63,200.00 - 27,808.00 27,808.00
Kepala tukang 0.044 OH 69,050.00 - 3,038.20 3,038.20
Mandor 0.022 OH 74,900.00 - 1,647.80 1,647.80
429,000.00 55,154.00 484,154.00
overhead & Profit 10% 42,900.00 5,515.40 48,415.40
Jumlah 471,900.00 60,669.40 532,569.40
7393.11 Memasang kusen pintu dan jendela aluminium m 82,310.58 5,924.94 88,235.52
Profil aluminium 1.100 m 60,138.00 66,151.80 - 66,151.80
Skrup fixer 2.000 bh 3,627.00 7,254.00 - 7,254.00
Sealant 0.060 tube 23,700.00 1,422.00 - 1,422.00
Pekerja 0.043 OH 51,500.00 - 2,214.50 2,214.50
Tukang aluminium/pintu jendela lainnya 0.043 OH 63,200.00 - 2,717.60 2,717.60
Kepala tukang 0.0043 OH 69,050.00 - 296.92 296.92
Mandor 0.0021 OH 74,900.00 - 157.29 157.29
74,827.80 5,386.31 80,214.11
overhead & Profit 10% 7,482.78 538.63 8,021.41
Jumlah 82,310.58 5,924.94 88,235.52
7393.14 Memasang venetions blinds dan vertical blinds m2 91,960.00 48,300.95 140,260.95
Vertical blinds/venetions blinds 1.000 m2 83,600.00 83,600.00 - 83,600.00
Pekerja 0.350 OH 51,500.00 - 18,025.00 18,025.00
Tukang aluminium/pintu jendela lainnya 0.350 OH 63,200.00 - 22,120.00 22,120.00
Kepala tukang 0.035 OH 69,050.00 - 2,416.75 2,416.75
Mandor 0.018 OH 74,900.00 - 1,348.20 1,348.20
83,600.00 43,909.95 127,509.95
overhead & Profit 10% 8,360.00 4,391.00 12,751.00
Jumlah 91,960.00 48,300.95 140,260.95
7393.18 Memasang talang datar/jurai seng bjls 28 lebar 90 cm m 204,933.30 41,860.78 246,794.08
Talang seng t = 0.3 mm L = 90 1.050 m' 65,000.00 68,250.00 - 68,250.00
Paku 0.015 kg 15,600.00 234.00 - 234.00
Kayu meranti 0.019 m3 6,201,000.00 117,819.00 - 117,819.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.400 OH 63,200.00 - 25,280.00 25,280.00
Kepala tukang 0.025 OH 69,050.00 - 1,726.25 1,726.25
Mandor 0.010 OH 74,900.00 - 749.00 749.00
186,303.00 38,055.25 224,358.25
overhead & Profit 10% 18,630.30 3,805.53 22,435.83
Jumlah 204,933.30 41,860.78 246,794.08
7393.19 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m 51,892.50 32,291.27 84,183.77
Talang seng t = 0.3 mm L = 45 1.050 m' 37,500.00 39,375.00 - 39,375.00
Paku 0.010 kg 15,600.00 156.00 - 156.00
Besi strip 0.500 kg 15,288.00 7,644.00 - 7,644.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang besi 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
Mandor 0.008 OH 74,900.00 - 599.20 599.20
47,175.00 29,355.70 76,530.70
overhead & Profit 10% 4,717.50 2,935.57 7,653.07
Jumlah 51,892.50 32,291.27 84,183.77
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
7393.20 Pasang pintu PVC polos bh 211,310.00 140,882.20 352,192.20
Pintu PVC Polos 1.000 buah 192,100.00 192,100.00 - 192,100.00
Pekerja 1.050 OH 51,500.00 - 54,075.00 54,075.00
Tukang aluminium/pintu jendela lainnya 1.050 OH 63,200.00 - 66,360.00 66,360.00
Kepala tukang 0.105 OH 69,050.00 - 7,250.25 7,250.25
Mandor 0.0052 OH 74,900.00 - 389.48 389.48
192,100.00 128,074.73 320,174.73
overhead & Profit 10% 19,210.00 12,807.47 32,017.47
Jumlah 211,310.00 140,882.20 352,192.20
2839.02 Memasang langit-langit akustik ukuran (30 x 30) cm m2 292,578.00 16,546.20 309,124.20
Papan akustik softboard 30 x 30 12.000 lembar 22,100.00 265,200.00 - 265,200.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.120 OH 51,500.00 - 6,180.00 6,180.00
Tukang kayu 0.120 OH 63,200.00 - 7,584.00 7,584.00
Kepala tukang 0.012 OH 69,050.00 - 828.60 828.60
Mandor 0.006 OH 74,900.00 - 449.40 449.40
265,980.00 15,042.00 281,022.00
overhead & Profit 10% 26,598.00 1,504.20 28,102.20
Jumlah 292,578.00 16,546.20 309,124.20
2839.03 Memasang langit-langit akustik ukuran (30 x 60) cm m2 281,578.00 13,788.50 295,366.50
Papan akustik softboard 30 x 60 5.800 lembar 44,000.00 255,200.00 - 255,200.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
255,980.00 12,535.00 268,515.00
overhead & Profit 10% 25,598.00 1,253.50 26,851.50
Jumlah 281,578.00 13,788.50 295,366.50
2839.04 Memasang langit-langit akustik ukuran (60 x 120) cm m2 320,298.00 13,788.50 334,086.50
Papan akustik softboard 60 x 120 1.500 lembar 193,600.00 290,400.00 - 290,400.00
Paku 0.050 kg 15,600.00 780.00 - 780.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
291,180.00 12,535.00 303,715.00
overhead & Profit 10% 29,118.00 1,253.50 30,371.50
Jumlah 320,298.00 13,788.50 334,086.50
2839.05 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm m2 22,393.80 13,788.50 36,182.30
Kayu lapis/ tripleks tb. 3 mm 0.375 lembar 53,040.00 19,890.00 - 19,890.00
Paku 0.030 kg 15,600.00 468.00 - 468.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
20,358.00 12,535.00 32,893.00
overhead & Profit 10% 2,035.80 1,253.50 3,289.30
Jumlah 22,393.80 13,788.50 36,182.30
2839.05.1 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm m2 25,128.68 13,788.50 38,917.18
Kayu lapis/ tripleks tb. 4 mm 0.375 lembar 59,670.00 22,376.25 - 22,376.25
Paku 0.030 kg 15,600.00 468.00 - 468.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
22,844.25 12,535.00 35,379.25
overhead & Profit 10% 2,284.43 1,253.50 3,537.93
Jumlah 25,128.68 13,788.50 38,917.18
2839.05.2 Memasang langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm m2 32,207.18 13,788.50 45,995.68
Kayu lapis/ tripleks tb. 6 mm 0.375 lembar 76,830.00 28,811.25 - 28,811.25
Paku 0.030 kg 15,600.00 468.00 - 468.00
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.005 OH 74,900.00 - 374.50 374.50
29,279.25 12,535.00 41,814.25
overhead & Profit 10% 2,927.93 1,253.50 4,181.43
Jumlah 32,207.18 13,788.50 45,995.68
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
2839.07 Memasang langit-langit gypsum board ukuran (120 x 240 x 9) cm, tebal 9 mm m2 37,338.44 9,932.73 47,271.17
Gipsum 0.364 lembar 86,700.00 31,558.80 - 31,558.80
Paku skrup 0.110 kg 21,684.00 2,385.24 - 2,385.24
Pekerja 0.100 OH 51,500.00 - 5,150.00 5,150.00
Tukang kayu 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.005 OH 74,900.00 - 374.50 374.50
33,944.04 9,029.75 42,973.79
overhead & Profit 10% 3,394.40 902.98 4,297.38
Jumlah 37,338.44 9,932.73 47,271.17
2839.09 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka aluminium m2 213,474.69 68,942.50 282,417.19
Hollow 4x4 cm 3.600 m 5,050.50 18,181.80 - 18,181.80
Ramset/dina bolt 1.050 bh 14,040.00 14,742.00 14,742.00
Kawat galvanis 0.150 kg 17,238.00 2,585.70 2,585.70
Papan akustik softboard 60x120 1.050 lembar 151,008.00 158,558.40 158,558.40
Pekerja 0.500 OH 51,500.00 - 25,750.00 25,750.00
Tukang kayu 0.500 OH 63,200.00 - 31,600.00 31,600.00
Kepala tukang 0.050 OH 69,050.00 - 3,452.50 3,452.50
Mandor 0.025 OH 74,900.00 - 1,872.50 1,872.50
194,067.90 62,675.00 256,742.90
overhead & Profit 10% 19,406.79 6,267.50 25,674.29
Jumlah 213,474.69 68,942.50 282,417.19
R3436.01 Memasang penutup atap genteng kodok kebumen m2 74,646.00 14,978.26 89,624.26
Genteng kodok kebumen 25.000 bh 2,714.40 67,860.00 - 67,860.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
67,860.00 13,616.60 81,476.60
overhead & Profit 10% 6,786.00 1,361.66 8,147.66
Jumlah 74,646.00 14,978.26 89,624.26
R3436.01.1 Memasang penutup atap genteng kodok kemiri m2 43,436.25 14,978.26 58,414.51
Genteng kodok kemiri 25.000 bh 1,579.50 39,487.50 - 39,487.50
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
39,487.50 13,616.60 53,104.10
overhead & Profit 10% 3,948.75 1,361.66 5,310.41
Jumlah 43,436.25 14,978.26 58,414.51
R3436.01.2 Memasang penutup atap genteng pelentong besar/magas glasur m2 100,815.00 14,978.26 115,793.26
Genteng magas kebumen glasur 25.000 bh 3,666.00 91,650.00 - 91,650.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
91,650.00 13,616.60 105,266.60
overhead & Profit 10% 9,165.00 1,361.66 10,526.66
Jumlah 100,815.00 14,978.26 115,793.26
R3436.01.3 Memasang penutup atap genteng pelentong besar/magas kebumen m2 50,407.50 14,978.26 65,385.76
Genteng magas kebumen biasa 25.000 bh 1,833.00 45,825.00 - 45,825.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
45,825.00 13,616.60 59,441.60
overhead & Profit 10% 4,582.50 1,361.66 5,944.16
Jumlah 50,407.50 14,978.26 65,385.76
R3436.01.8 Memasang penutup atap genteng pelentong besar/magas/mantili kecil mojolaban m2 35,692.80 14,978.26 50,671.06
Genteng plentong Mojolaban 26.000 bh 1,248.00 32,448.00 - 32,448.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
32,448.00 13,616.60 46,064.60
overhead & Profit 10% 3,244.80 1,361.66 4,606.46
Jumlah 35,692.80 14,978.26 50,671.06
R3436.01.9 Memasang penutup atap genteng pelentong Kebumen m2 49,635.30 14,978.26 64,613.56
Genteng plentong kebumen 26.000 bh 1,735.50 45,123.00 45,123.00
Pekerja 0.150 OH 51,500.00 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 552.40 552.40
Mandor 0.008 OH 74,900.00 599.20 599.20
45,123.00 13,616.60 58,739.60
overhead & Profit 10% 4,512.30 1,361.66 5,873.96
Jumlah 49,635.30 14,978.26 64,613.56
R3436.01.10 Memasang penutup atap genteng pelentong besar/magas/mantili kecil kemiri m2 34,577.40 14,978.26 49,555.66
Genteng pelentong kemiri 26.000 bh 1,209.00 31,434.00 - 31,434.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
31,434.00 13,616.60 45,050.60
overhead & Profit 10% 3,143.40 1,361.66 4,505.06
Jumlah 34,577.40 14,978.26 49,555.66
R3436.01.6 Memasang penutup atap genteng morando glasur m2 94,980.60 14,978.26 109,958.86
Genteng morando kebumen glasur 18.000 bh 4,797.00 86,346.00 - 86,346.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang kayu 0.075 OH 63,200.00 - 4,740.00 4,740.00
Kepala tukang 0.008 OH 69,050.00 - 552.40 552.40
Mandor 0.008 OH 74,900.00 - 599.20 599.20
86,346.00 13,616.60 99,962.60
overhead & Profit 10% 8,634.60 1,361.66 9,996.26
Jumlah 94,980.60 14,978.26 109,958.86
R3436.03 Memasang bubung pada atap genteng kebumen m 67,044.98 38,247.88 105,292.86
Bubung genteng kebumen 5.000 bh 8,154.90 40,774.50 - 40,774.50
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
60,949.98 34,770.80 95,720.78
overhead & Profit 10% 6,095.00 3,477.08 9,572.08
Jumlah 67,044.98 38,247.88 105,292.86
R3436.03.1 Memasang bubung pada atap genteng mojolaban m 50,078.03 38,247.88 88,325.91
Bubung genteng mojolaban 5.000 bh 5,070.00 25,350.00 - 25,350.00
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
45,525.48 34,770.80 80,296.28
overhead & Profit 10% 4,552.55 3,477.08 8,029.63
Jumlah 50,078.03 38,247.88 88,325.91
R3436.03.2 Memasang bubung pada atap genteng kemiri m 44,930.03 38,247.88 83,177.91
Bubung genteng kemiri 5.000 bh 4,134.00 20,670.00 - 20,670.00
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
40,845.48 34,770.80 75,616.28
overhead & Profit 10% 4,084.55 3,477.08 7,561.63
Jumlah 44,930.03 38,247.88 83,177.91
R3436.04 Memasang bubung pada atap genteng beton m 57,049.28 38,247.88 95,297.16
Bubung genteng beton 3.500 bh 8,112.00 28,392.00 - 28,392.00
Semen PC. 10.800 Kg 1,306.50 14,110.20 - 14,110.20
Semen warna 1.000 Kg 3,295.50 3,295.50 - 3,295.50
Pasir pasang 0.032 m3 189,540.00 6,065.28 - 6,065.28
Pekerja 0.400 OH 51,500.00 - 20,600.00 20,600.00
Tukang batu 0.200 OH 63,200.00 - 12,640.00 12,640.00
Kepala tukang 0.020 OH 69,050.00 - 1,381.00 1,381.00
Mandor 0.002 OH 74,900.00 - 149.80 149.80
51,862.98 34,770.80 86,633.78
overhead & Profit 10% 5,186.30 3,477.08 8,663.38
Jumlah 57,049.28 38,247.88 95,297.16
R3436.05 Memasang penutup atap genteng metal kelas I m2 246,709.32 19,123.94 265,833.26
Genteng metal kelas I 1.020 m2 216,060.00 220,381.20 - 220,381.20
Paku anti karat 0.200 kg 19,500.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.001 OH 74,900.00 - 74.90 74.90
224,281.20 17,385.40 241,666.60
overhead & Profit 10% 22,428.12 1,738.54 24,166.66
Jumlah 246,709.32 19,123.94 265,833.26
R3436.06 Memasang bubung pada atap genteng metal kelas I m 122,694.00 14,054.65 136,748.65
Kerpus genting metal kelas I 2.500 Bh 44,460.00 111,150.00 - 111,150.00
Paku anti karat 0.020 kg 19,500.00 390.00 - 390.00
Pekerja 0.025 OH 51,500.00 - 1,287.50 1,287.50
Tukang kayu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.013 OH 74,900.00 - 973.70 973.70
111,540.00 12,776.95 124,316.95
overhead & Profit 10% 11,154.00 1,277.70 12,431.70
Jumlah 122,694.00 14,054.65 136,748.65
R3436.07 Memasang penutup atap genteng metal kelas II m2 134,251.26 19,123.94 153,375.20
Genteng metal kelas II 1.020 m2 115,830.00 118,146.60 - 118,146.60
Paku anti karat 0.200 kg 19,500.00 3,900.00 - 3,900.00
Pekerja 0.200 OH 51,500.00 - 10,300.00 10,300.00
Tukang kayu 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
Mandor 0.001 OH 74,900.00 - 74.90 74.90
122,046.60 17,385.40 139,432.00
overhead & Profit 10% 12,204.66 1,738.54 13,943.20
Jumlah 134,251.26 19,123.94 153,375.20
R3436.08 Memasang bubung pada atap genteng metal kelas II m 85,156.50 14,054.65 99,211.15
Kerpus genting metal kelas II 2.500 Bh 30,810.00 77,025.00 - 77,025.00
Paku anti karat 0.020 kg 19,500.00 390.00 - 390.00
Pekerja 0.025 OH 51,500.00 - 1,287.50 1,287.50
Tukang kayu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.013 OH 74,900.00 - 973.70 973.70
PEKERJAAN PENGECATAN DAN FINISHING DINDING
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
R.Pt.38.01 Mengikis atau mengerok cat tembok cara manual m2 - 9,156.62 9,156.62
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Mandor 0.008 OH 74,900.00 - 599.20 599.20
- 8,324.20 8,324.20
overhead & Profit 10% - 832.42 832.42
Jumlah - 9,156.62 9,156.62
R.Pt.38.02 Mencuci bidang permukaan tembok lama dengan sabun m2 643.50 4,861.56 5,505.06
Sabun 0.050 kg 11,700.00 585.00 585.00
Pekerja 0.080 OH 51,500.00 4,120.00 4,120.00
Mandor 0.004 OH 74,900.00 299.60 299.60
585.00 4,419.60 5,004.60
overhead & Profit 10% 58.50 441.96 500.46
Jumlah 643.50 4,861.56 5,505.06
R.Pt.38.04 Pengecatan bidang tembok interior 2 lapis dengan kuas m2 4,752.00 7,501.95 12,253.95
Cat tembok interior 0.240 Kg 18,000.00 4,320.00 - 4,320.00
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang cat 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.003 OH 74,900.00 - 224.70 224.70
4,320.00 6,819.95 11,139.95
overhead & Profit 10% 432.00 682.00 1,114.00
Jumlah 4,752.00 7,501.95 12,253.95
R.Pt.38.05 Pengecatan bidang tembok interior 2 lapis dengan roll m2 9,306.00 4,744.25 14,050.25
Cat tembok interior 0.470 Kg 18,000.00 8,460.00 - 8,460.00
Pekerja 0.040 OH 51,500.00 - 2,060.00 2,060.00
Tukang cat 0.030 OH 63,200.00 - 1,896.00 1,896.00
Kepala tukang 0.003 OH 69,050.00 - 207.15 207.15
Mandor 0.002 OH 74,900.00 - 149.80 149.80
8,460.00 4,312.95 12,772.95
overhead & Profit 10% 846.00 431.30 1,277.30
Jumlah 9,306.00 4,744.25 14,050.25
R.Pt.38.04.1 Pengecatan bidang tembok eksterior 2 lapis dengan kuas m2 22,704.00 7,501.95 30,205.95
Cat tembok eksterior 0.240 Kg 86,000.00 20,640.00 - 20,640.00
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang cat 0.050 OH 63,200.00 - 3,160.00 3,160.00
Kepala tukang 0.005 OH 69,050.00 - 345.25 345.25
Mandor 0.003 OH 74,900.00 - 224.70 224.70
20,640.00 6,819.95 27,459.95
overhead & Profit 10% 2,064.00 682.00 2,746.00
Jumlah 22,704.00 7,501.95 30,205.95
R.Pt.38.05.1 Pengecatan bidang tembok eksterior 2 lapis dengan roll m2 44,462.00 4,744.25 49,206.25
Cat tembok eksterior 0.470 Kg 86,000.00 40,420.00 - 40,420.00
Pekerja 0.040 OH 51,500.00 - 2,060.00 2,060.00
Tukang cat 0.030 OH 63,200.00 - 1,896.00 1,896.00
Kepala tukang 0.003 OH 69,050.00 - 207.15 207.15
Mandor 0.002 OH 74,900.00 - 149.80 149.80
40,420.00 4,312.95 44,732.95
overhead & Profit 10% 4,042.00 431.30 4,473.30
Jumlah 44,462.00 4,744.25 49,206.25
R.Pt.38.06 Pengecatan plafon 2 lapis dengan cat tembok dengan kuas termasuk plamir m2 7,326.00 9,488.49 16,814.49
Plamir tembok 0.100 Kg 6,700.00 670.00 - 670.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 - 1,670.00
Cat tembok interior 0.240 Kg 18,000.00 4,320.00 - 4,320.00
Pekerja 0.080 OH 51,500.00 - 4,120.00 4,120.00
Tukang cat 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.004 OH 74,900.00 - 299.60 299.60
6,660.00 8,625.90 15,285.90
overhead & Profit 10% 666.00 862.59 1,528.59
Jumlah 7,326.00 9,488.49 16,814.49
R.Pt.38.07 Pengecatan plafon 2 lapis dengan cat tembok dengan roll termasuk plamir m2 11,880.00 6,730.79 18,610.79
Plamir tembok 0.100 Kg 6,700.00 670.00 - 670.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 - 1,670.00
Cat tembok interior 0.470 Kg 18,000.00 8,460.00 - 8,460.00
Pekerja 0.060 OH 51,500.00 - 3,090.00 3,090.00
Tukang cat 0.040 OH 63,200.00 - 2,528.00 2,528.00
Kepala tukang 0.004 OH 69,050.00 - 276.20 276.20
Mandor 0.003 OH 74,900.00 - 224.70 224.70
10,800.00 6,118.90 16,918.90
overhead & Profit 10% 1,080.00 611.89 1,691.89
Jumlah 11,880.00 6,730.79 18,610.79
R.Pt.38.13 Mengerok karat atau cat permukaan baja dengan soda api m2 3,575.00 18,230.85 21,805.85
Soda api 0.050 Kg 28,000.00 1,400.00 - 1,400.00
Amplas besi 0.500 lembar 3,700.00 1,850.00 - 1,850.00
Pekerja 0.300 OH 51,500.00 - 15,450.00 15,450.00
Mandor 0.015 OH 74,900.00 - 1,123.50 1,123.50
3,250.00 16,573.50 19,823.50
overhead & Profit 10% 325.00 1,657.35 1,982.35
Jumlah 3,575.00 18,230.85 21,805.85
R.Pt.38.15 Mengecat penutup 2 lapis pada permukaan baja menggunakan kuas m2 12,265.00 20,723.95 32,988.95
Cat kayu / besi 0.200 Kg 46,000.00 9,200.00 - 9,200.00
Minyak cat 0.100 liter 19,500.00 1,950.00 - 1,950.00
Pekerja 0.150 OH 51,500.00 - 7,725.00 7,725.00
Tukang cat 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.008 OH 74,900.00 - 599.20 599.20
11,150.00 18,839.95 29,989.95
overhead & Profit 10% 1,115.00 1,884.00 2,999.00
Jumlah 12,265.00 20,723.95 32,988.95
R.Pt.38.16 Mengecat penutup 2 lapis pada permukaan baja dengan semprot m2 26,675.00 11,719.35 38,394.35
Cat kayu / besi 0.400 Kg 46,000.00 18,400.00 - 18,400.00
Minyak cat 0.300 liter 19,500.00 5,850.00 - 5,850.00
Pekerja 0.020 OH 51,500.00 - 1,030.00 1,030.00
Tukang cat 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.001 OH 69,050.00 - 69.05 69.05
Mandor 0.001 OH 74,900.00 - 74.90 74.90
24,250.00 10,653.95 34,903.95
overhead & Profit 10% 2,425.00 1,065.40 3,490.40
Jumlah 26,675.00 11,719.35 38,394.35
R.Pt.38.17 Pelapisan bidang kayu dengan teak oil m2 14,033.80 7,711.55 21,745.35
Minyak pelumas 0.300 liter 36,600.00 10,980.00 10,980.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 1,670.00
kuas 1" 0.015 buah 7,200.00 108.00 108.00
Tukang cat 0.100 OH 63,200.00 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 690.50 690.50
12,758.00 7,010.50 19,768.50
overhead & Profit 10% 1,275.80 701.05 1,976.85
Jumlah 14,033.80 7,711.55 21,745.35
R.Pt.38.18 Pelapisan bidang kayu dengan pelitur 2 lapis m2 18,675.25 34,512.45 53,187.70
Wood filler 0.100 Kg 34,775.00 3,477.50 - 3,477.50
Pelitur 0.200 liter 50,800.00 10,160.00 - 10,160.00
Amplas kayu 1.000 lembar 3,340.00 3,340.00 - 3,340.00
Pekerja 0.250 OH 51,500.00 - 12,875.00 12,875.00
Tukang cat 0.250 OH 63,200.00 - 15,800.00 15,800.00
Kepala tukang 0.025 OH 69,050.00 - 1,726.25 1,726.25
Mandor 0.013 OH 74,900.00 - 973.70 973.70
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
16,977.50 31,374.95 48,352.45
overhead & Profit 10% 1,697.75 3,137.50 4,835.25
Jumlah 18,675.25 34,512.45 53,187.70
R.Pt.38.19 Pelapisan bidang kayu dengan vernis 2 lapis m2 14,047.00 7,711.55 21,758.55
Vernis 0.300 liter 37,000.00 11,100.00 - 11,100.00
Amplas kayu 0.500 lembar 3,340.00 1,670.00 - 1,670.00
Tukang cat 0.100 OH 63,200.00 - 6,320.00 6,320.00
Kepala tukang 0.010 OH 69,050.00 - 690.50 690.50
12,770.00 7,010.50 19,780.50
overhead & Profit 10% 1,277.00 701.05 1,978.05
Jumlah 14,047.00 7,711.55 21,758.55
R.Pt.30.04 Pasang kunci slot untuk kamar mandi bh 111,870.00 19,278.88 131,148.88
Kunci slot 1.000 buah 101,700.00 101,700.00 - 101,700.00
Tukang kayu 0.250 OH 63,200.00 - 15,800.00 15,800.00
Kepala tukang 0.025 OH 69,050.00 - 1,726.25 1,726.25
101,700.00 17,526.25 119,226.25
overhead & Profit 10% 10,170.00 1,752.63 11,922.63
Jumlah 111,870.00 19,278.88 131,148.88
R.Pt.30.19 Pasang kaca polos tebal 3mm dengan kisi-kisi m2 85,800.00 34,512.45 120,312.45
Kaca bening 3 mm 1.200 m2 65,000.00 78,000.00 78,000.00
Pekerja 0.250 OH 51,500.00 12,875.00 12,875.00
Tukang kayu 0.250 OH 63,200.00 15,800.00 15,800.00
Kepala tukang 0.025 OH 69,050.00 1,726.25 1,726.25
Mandor 0.013 OH 74,900.00 973.70 973.70
78,000.00 31,374.95 109,374.95
overhead & Profit 10% 7,800.00 3,137.50 10,937.50
Jumlah 85,800.00 34,512.45 120,312.45
R.Pt.30.25 Pasang kaca buram tebal 3mm (motif) m2 104,478.66 22,061.60 126,540.26
Kaca jeruk 3 mm 1.100 m2 86,346.00 94,980.60 - 94,980.60
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
94,980.60 20,056.00 115,036.60
overhead & Profit 10% 9,498.06 2,005.60 11,503.66
Jumlah 104,478.66 22,061.60 126,540.26
R.Pt.30.26 Pasang kaca buram tebal 5mm (motif) m2 208,957.32 22,061.60 231,018.92
Kaca jeruk 5 mm 1.100 m2 172,692.00 189,961.20 - 189,961.20
Pekerja 0.160 OH 51,500.00 - 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 - 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 - 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 - 599.20 599.20
189,961.20 20,056.00 210,017.20
overhead & Profit 10% 18,996.12 2,005.60 21,001.72
Jumlah 208,957.32 22,061.60 231,018.92
R.Pt.30.28 Pasang kaca wire glass tebal 5mm m2 181,500.00 22,061.60 203,561.60
wireglass 5 mm 1.100 m2 150,000.00 165,000.00 165,000.00
Pekerja 0.160 OH 51,500.00 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 599.20 599.20
165,000.00 20,056.00 185,056.00
overhead & Profit 10% 16,500.00 2,005.60 18,505.60
Jumlah 181,500.00 22,061.60 203,561.60
R.Pt.30.29 Pasang kaca wire glass tebal 8mm m2 211,750.00 22,061.60 233,811.60
wireglass 8 mm 1.100 m2 175,000.00 192,500.00 192,500.00
Pekerja 0.160 OH 51,500.00 8,240.00 8,240.00
Tukang kayu 0.160 OH 63,200.00 10,112.00 10,112.00
Kepala tukang 0.016 OH 69,050.00 1,104.80 1,104.80
Mandor 0.008 OH 74,900.00 599.20 599.20
192,500.00 20,056.00 212,556.00
overhead & Profit 10% 19,250.00 2,005.60 21,255.60
Jumlah 211,750.00 22,061.60 233,811.60
R.T.15.07 Memasang bak mandi fibreglass volume 0,3 m3 bh 363,617.83 339,752.60 703,370.43
Bak fiberglass sudut 0,3 m3 1.180 buah 280,137.00 330,561.66 - 330,561.66
Pekerja 1.800 OH 51,500.00 - 92,700.00 92,700.00
Tukang batu 2.700 OH 63,200.00 - 170,640.00 170,640.00
Kepala tukang 0.540 OH 69,050.00 - 37,287.00 37,287.00
Mandor 0.110 OH 74,900.00 - 8,239.00 8,239.00
330,561.66 308,866.00 639,427.66
overhead & Profit 10% 33,056.17 30,886.60 63,942.77
Jumlah 363,617.83 339,752.60 703,370.43
R.T.15.08 Memasang bak mandi batu bata volume 0,3 m3 bh 276,190.20 595,963.50 872,153.70
Batu Bata 60.000 buah 624.00 37,440.00 - 37,440.00
Semen PC. 120.000 Kg 1,306.50 156,780.00 - 156,780.00
Pasir pasang 0.300 m3 189,540.00 56,862.00 - 56,862.00
Pekerja 6.000 OH 51,500.00 - 309,000.00 309,000.00
Tukang batu 3.000 OH 63,200.00 - 189,600.00 189,600.00
Kepala tukang 0.300 OH 69,050.00 - 20,715.00 20,715.00
Mandor 0.300 OH 74,900.00 - 22,470.00 22,470.00
251,082.00 541,785.00 792,867.00
overhead & Profit 10% 25,108.20 54,178.50 79,286.70
Jumlah 276,190.20 595,963.50 872,153.70
R.T.15.15 Memasang bak kontrol pasangan batu bata ukuran 30 x 30 tinggi 50 cm bh 170,438.27 31,013.57 201,451.83
Batu Bata 68.150 buah 624.00 42,525.60 - 42,525.60
Semen PC. 44.000 Kg 1,306.50 57,486.00 - 57,486.00
Pasir pasang 0.070 m3 189,540.00 13,267.80 - 13,267.80
Batu pecah 2-3 cm ( pecah mesin) 0.070 m3 208,104.00 14,567.28 - 14,567.28
Pasir beton 0.060 m3 183,300.00 10,998.00 - 10,998.00
Besi beton 1.600 kg 10,062.00 16,099.20 - 16,099.20
Pekerja 0.320 OH 51,500.00 - 16,480.00 16,480.00
Tukang batu 0.150 OH 63,200.00 - 9,480.00 9,480.00
Kepala tukang 0.015 OH 69,050.00 - 1,035.75 1,035.75
Mandor 0.016 OH 74,900.00 - 1,198.40 1,198.40
154,943.88 28,194.15 183,138.03
overhead & Profit 10% 15,494.39 2,819.42 18,313.80
Jumlah 170,438.27 31,013.57 201,451.83
R.T.15.16 Memasang bak kontrol pasangan batu bata ukuran 45 x 45 tinggi 50 cm bh 269,919.08 122,745.54 392,664.61
Batu Bata 117.500 buah 624.00 73,320.00 - 73,320.00
Semen PC. 77.000 Kg 1,306.50 100,600.50 - 100,600.50
Pasir pasang 0.130 m3 189,540.00 24,640.20 - 24,640.20
Batu pecah 2-3 cm ( pecah mesin) 0.020 m3 208,104.00 4,162.08 - 4,162.08
Pasir beton 0.090 m3 183,300.00 16,497.00 - 16,497.00
Besi beton 2.600 kg 10,062.00 26,161.20 - 26,161.20
Pekerja 1.420 OH 51,500.00 - 73,130.00 73,130.00
Tukang batu 0.473 OH 63,200.00 - 29,893.60 29,893.60
Kepala tukang 0.047 OH 69,050.00 - 3,245.35 3,245.35
Mandor 0.071 OH 74,900.00 - 5,317.90 5,317.90
245,380.98 111,586.85 356,967.83
overhead & Profit 10% 24,538.10 11,158.69 35,696.78
Jumlah 269,919.08 122,745.54 392,664.61
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
R.T.15.17 Memasang bak kontrol pasangan batu bata ukuran 60 x 60 tinggi 50 cm bh 407,316.11 186,785.28 594,101.39
Batu Bata 174.370 buah 624.00 108,806.88 - 108,806.88
Semen PC. 114.000 Kg 1,306.50 148,941.00 - 148,941.00
Pasir pasang 0.184 m3 189,540.00 34,875.36 - 34,875.36
Batu pecah 2-3 cm ( pecah mesin) 0.033 m3 208,104.00 6,867.43 - 6,867.43
Pasir beton 0.120 m3 183,300.00 21,996.00 - 21,996.00
Besi beton 4.850 kg 10,062.00 48,800.70 - 48,800.70
Pekerja 2.160 OH 51,500.00 - 111,240.00 111,240.00
Tukang batu 0.720 OH 63,200.00 - 45,504.00 45,504.00
Kepala tukang 0.072 OH 69,050.00 - 4,971.60 4,971.60
Mandor 0.108 OH 74,900.00 - 8,089.20 8,089.20
370,287.37 169,804.80 540,092.17
overhead & Profit 10% 37,028.74 16,980.48 54,009.22
Jumlah 407,316.11 186,785.28 594,101.39
R.T.15.25 Memasang pipa PVC tipe AW diameter 3/4" m 8,375.40 6,814.63 15,190.03
Pipa PVC 20 mm ( 3/4 ) " AW 1.620 m 4,700.00 7,614.00 - 7,614.00
Pekerja 0.036 OH 51,500.00 - 1,854.00 1,854.00
Tukang pipa 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.002 OH 74,900.00 - 134.82 134.82
7,614.00 6,195.12 13,809.12
overhead & Profit 10% 761.40 619.51 1,380.91
Jumlah 8,375.40 6,814.63 15,190.03
R.T.15.26 Memasang pipa PVC tipe AW diameter 1" m 15,147.00 6,814.63 21,961.63
Pipa PVC 25 mm ( 1 ) " AW 1.620 m 8,500.00 13,770.00 - 13,770.00
Pekerja 0.036 OH 51,500.00 - 1,854.00 1,854.00
Tukang pipa 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.002 OH 74,900.00 - 134.82 134.82
13,770.00 6,195.12 19,965.12
overhead & Profit 10% 1,377.00 619.51 1,996.51
Jumlah 15,147.00 6,814.63 21,961.63
R.T.15.27 Memasang pipa PVC tipe AW diameter 1 1/2" m 19,423.80 6,814.63 26,238.43
Pipa PVC 40 mm ( 1 1/2 ) " AW 1.620 m 10,900.00 17,658.00 - 17,658.00
Pekerja 0.036 OH 51,500.00 - 1,854.00 1,854.00
Tukang pipa 0.060 OH 63,200.00 - 3,792.00 3,792.00
Kepala tukang 0.006 OH 69,050.00 - 414.30 414.30
Mandor 0.002 OH 74,900.00 - 134.82 134.82
17,658.00 6,195.12 23,853.12
KODE URAIAN KOEF SAT HARGA SAT HARGA BAHAN HARGA UPAH JUMLAH
1 2 3 4 5 6=(3X5) 7=(3X5) 8=(6+7)
overhead & Profit 10% 1,765.80 619.51 2,385.31
Jumlah 19,423.80 6,814.63 26,238.43
R.T.15.28 Memasang pipa PVC tipe AW diameter 2" m 25,482.60 10,221.95 35,704.55
Pipa PVC 50 mm ( 2 ) " AW 1.620 m 14,300.00 23,166.00 - 23,166.00
Pekerja 0.054 OH 51,500.00 - 2,781.00 2,781.00
Tukang pipa 0.090 OH 63,200.00 - 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 - 621.45 621.45
Mandor 0.003 OH 74,900.00 - 202.23 202.23
23,166.00 9,292.68 32,458.68
overhead & Profit 10% 2,316.60 929.27 3,245.87
Jumlah 25,482.60 10,221.95 35,704.55
R.T.15.29 Memasang pipa PVC tipe AW diameter 2 1/2" m 47,401.20 10,221.95 57,623.15
Pipa PVC 64 mm ( 2 1/2) " AW 1.620 m 26,600.00 43,092.00 - 43,092.00
Pekerja 0.054 OH 51,500.00 - 2,781.00 2,781.00
Tukang pipa 0.090 OH 63,200.00 - 5,688.00 5,688.00
Kepala tukang 0.009 OH 69,050.00 - 621.45 621.45
Mandor 0.003 OH 74,900.00 - 202.23 202.23
43,092.00 9,292.68 52,384.68
overhead & Profit 10% 4,309.20 929.27 5,238.47
Jumlah 47,401.20 10,221.95 57,623.15
R.T.15.30 Memasang pipa PVC tipe AW diameter 3" m 25,482.60 15,332.92 40,815.52
Pipa PVC 80 mm ( 3 ) " AW 1.620 m 14,300.00 23,166.00 - 23,166.00
Pekerja 0.081 OH 51,500.00 - 4,171.50 4,171.50
Tukang pipa 0.135 OH 63,200.00 - 8,532.00 8,532.00
Kepala tukang 0.014 OH 69,050.00 - 932.18 932.18
Mandor 0.004 OH 74,900.00 - 303.35 303.35
23,166.00 13,939.02 37,105.02
overhead & Profit 10% 2,316.60 1,393.90 3,710.50
Jumlah 25,482.60 15,332.92 40,815.52
R.T.15.31 Memasang pipa PVC tipe AW diameter 4" m 81,615.60 15,332.92 96,948.52
Pipa PVC 100 mm ( 4 ) " AW 1.620 m 45,800.00 74,196.00 - 74,196.00
Pekerja 0.081 OH 51,500.00 - 4,171.50 4,171.50
Tukang pipa 0.135 OH 63,200.00 - 8,532.00 8,532.00
Kepala tukang 0.014 OH 69,050.00 - 932.18 932.18
Mandor 0.004 OH 74,900.00 - 303.35 303.35
74,196.00 13,939.02 88,135.02
overhead & Profit 10% 7,419.60 1,393.90 8,813.50
Jumlah 81,615.60 15,332.92 96,948.52
R.T.15.32 Memasang bak cuci piring stainless steel bh 618,068.88 23,134.65 641,203.53
Bak cuci stainless 2 bk 1.350 buah 416,208.00 561,880.80 - 561,880.80
Tukang pipa 0.300 OH 63,200.00 - 18,960.00 18,960.00
Kepala tukang 0.030 OH 69,050.00 - 2,071.50 2,071.50
561,880.80 21,031.50 582,912.30
overhead & Profit 10% 56,188.08 2,103.15 58,291.23
Jumlah 618,068.88 23,134.65 641,203.53
II II PEKERJAAN BETON
SNI SNI 7394:2008
1 1 7394.01 Membuat beton mutu f'c = 7,4 MPa (K 100) m3 668,844.55 121,555.61 790,400.16
2 2 7394.02 Membuat beton mutu f'c = 9,8 MPa (K 125) m3 704,416.90 121,555.61 825,972.51
3 3 7394.03 Membuat beton mutu f'c = 12,2 MPa (K 150) m3 732,576.35 121,555.61 854,131.96
4 4 7394.04 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100) m3 652,239.50 88,346.50 740,586.00
5 5 7394.05 Membuat beton mutu f'c = 14,5 MPa (K 175) m3 765,521.90 121,555.61 887,077.51
6 6 7394.06 Membuat beton mutu f'c = 16,9 MPa (K 200) m3 797,580.30 121,555.61 919,135.91
7 7 7394.07 Membuat beton mutu f'c = 19,3 MPa (K 225) m3 820,733.65 121,555.61 942,289.26
8 8 7394.08 Membuat beton mutu f'c = 21,7 MPa (K 250) m3 837,161.60 121,555.61 958,717.21
9 9 7394.09 Membuat beton mutu f'c = 24,0 MPa (K 275) m3 865,451.40 121,555.61 987,007.01
10 10 7394.10 Membuat beton mutu f'c = 26,4 MPa (K 300) m3 874,246.45 121,555.61 995,802.06
11 11 7394.11 Membuat beton mutu f'c = 28,8 MPa (K 325) m3 907,432.35 154,606.38 1,062,038.73
12 12 7394.12 Membuat beton mutu f'c = 31,2 MPa (K 350) m3 918,964.20 154,606.38 1,073,570.58
13 17 7394.17 Pembesian dengan besi polos atau besi ulir kg 11,875.79 969.31 12,845.11
14 20 7394.20 Memasang bekisting untuk pondasi m2 31,407.75 51,650.17 83,057.92
15 21 7394.21 Memasang bekisting untuk sloof dan ringbalk m2 31,407.75 51,650.17 83,057.92
16 22 7394.22 Memasang bekisting untuk kolom m2 58,067.90 65,555.99 123,623.89
17 23 7394.23 Memasang bekisting untuk balok dan konsol m2 63,344.60 65,555.99 128,900.59
18 24 7394.24 Memasang bekisting untuk plat lantai m2 96,536.00 65,555.99 162,091.99
19 25 7394.25 Memasang bekisting untuk dinding m2 76,809.15 65,555.99 142,365.14
20 26 7394.26 Memasang bekisting untuk tangga m2 84,128.00 65,555.99 149,683.99
21 27 7394.27 Memasang jembatan untuk pengecoran beton m2 97,490.25 13,012.40 110,502.65
22 28 7394.28 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 3,186,344.14 524,468.56 3,710,812.70
23 29 7394.29 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 3,636,045.24 538,926.85 4,174,972.09
24 30 7394.30 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 6,588,277.01 738,894.04 7,327,171.05
25 31 7394.31 Membuat balok beton bertulang (200 kg besi + bekisting) m3 5,011,086.56 642,374.54 5,653,461.10
26 32 7394.32 Membuat plat beton bertulang (150 kg besi + bekisting) m3 4,610,518.54 524,696.43 5,135,214.96
27 33 7394.33 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 4,363,757.74 524,468.56 4,888,226.30
28 34 7394.34 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 4,641,724.16 592,819.54 5,234,543.70
29 35 7394.35 Membuat kolom praktis beton bertulang (11 x 11) cm m 49,163.36 15,565.44 64,728.80
30 36 7394.36 Membuat ring balok beton bertulang (10 x 15) cm m 63,197.71 25,702.93 88,900.64
31 37 7394.37 Membuat beton bertulang (100 kg besi + bekisting) m3 2,837,488.76 592,819.54 3,430,308.30
32 38 7394.38 Membuat beton bertulang (125 kg besi + bekisting) m3 3,130,796.06 592,819.54 3,723,615.60
33 39 7394.39 Membuat beton bertulang (150 kg besi + bekisting) m3 3,418,569.26 592,819.54 4,011,388.80
34 40 7394.40 Membuat beton bertulang (175 kg besi + bekisting) m3 3,709,109.51 592,819.54 4,301,929.05
35 41 7394.41 Membuat beton bertulang (200 kg besi + bekisting) m3 3,999,649.76 592,819.54 4,592,469.30
36 42 7394.42 Membuat beton bertulang (225 kg besi + bekisting) m3 4,290,190.01 592,819.54 4,883,009.55
37 43 7394.43 Membuat beton bertulang (250 kg besi + bekisting) m3 4,580,730.26 592,819.54 5,173,549.80
38 44 7394.44 Membuat beton bertulang (275 kg besi + bekisting) m3 4,871,270.51 592,819.54 5,464,090.05
39 45 7394.45 Membuat beton bertulang (300 kg besi + bekisting) m3 5,161,810.76 592,819.54 5,754,630.30
40 46 7394.46 Membuat beton bertulang (325 kg besi + bekisting) m3 5,452,351.01 592,819.54 6,045,170.55
41 47 7394.47 Membuat beton bertulang (350 kg besi + bekisting) m3 5,742,891.26 592,819.54 6,335,710.80
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
42 47 7394.48 Membuat beton campuran 1:2:3 m3 - - -
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
III III PEKERJAAN PASANGAN BATU DAN PONDASI
SNI SNI 2836:2008
1 1 2836.01 Memasang batu belah campuran 1 PC : 3 PP m3 581,899.89 148,990.88 730,890.77
2 2 2836.02 Memasang batu belah campuran 1 PC : 4 PP m3 533,148.33 148,990.88 682,139.21
3 3 2836.03 Memasang batu belah campuran 1 PC : 5 PP m3 499,349.14 148,990.88 648,340.01
4 4 2836.04 Memasang batu belah campuran 1 PC : 6 PP m3 475,587.68 148,990.88 624,578.56
5 5 2836.05 Memasang batu belah campuran 1 PC : 8 PP m3 443,017.15 148,990.88 592,008.02
6 7 2836.07 Memasang batu belah campuran 1 PC : 3 KP : 10 PP m3 463,320.86 148,990.88 612,311.73
7 9 2836.09 Memasang batu kosong (aanstamping) m3 291,562.13 77,475.26 369,037.38
8 10 2836.10 Pasang pondasi siklop, 60% beton camp 1PC:2PB:3KR m3 1,969,551.36 272,164.48 2,241,715.83
9 11 2836.11 Memasang pondasi sumuran, diameter 100 cm m3 572,747.67 220,658.61 793,406.28
10 12 2836.12 Memasang batu bronjong kawat 3mm m3 1,069,679.52 249,357.60 1,319,037.12
IV IV PEKERJAAN DINDING
SNI SNI 6897:2008
1 2 6897.02 Memasang dinding bata merah 1 bata, camp 1 PC : 3 PP m2 162,423.05 51,884.80 214,307.85
2 3 6897.03 Memasang dinding bata merah 1 bata, camp 1 PC : 4 PP m2 153,642.27 51,884.80 205,527.07
3 4 6897.04 Memasang dinding bata merah 1 bata, camp 1 PC : 5 PP m2 149,267.12 51,884.80 201,151.92
4 5 6897.05 Memasang dinding bata merah 1 bata, camp 1 PC : 6 PP m2 148,119.54 51,884.80 200,004.34
5 6 6897.06 Pasang dinding bata merah 1 bata, camp 1PC:3KP:10PP m2 135,766.92 51,884.80 187,651.72
6 7 6897.07 Pasang dinding bata merah 1/2 bata, camp 1 PC : 2 PP m2 83,204.76 25,942.40 109,147.16
7 8 6897.08 Pasang dinding bata merah 1/2 bata, camp 1 PC : 3 PP m2 77,039.61 25,942.40 102,982.01
8 9 6897.09 Pasang dinding bata merah 1/2 bata, camp 1 PC : 4 PP m2 73,540.47 25,942.40 99,482.87
9 10 6897.10 Pasang dinding bata merah 1/2 bata, camp 1 PC : 5 PP m2 71,341.84 25,942.40 97,284.24
10 11 6897.11 Pasang dinding bata merah 1/2 bata, camp 1 PC : 6 PP m2 70,221.29 25,942.40 96,163.69
11 12 6897.12 Pasang dinding bata merah 1/2 bata, camp 1 PC : 8 PP m2 67,814.18 25,942.40 93,756.58
12 13 6897.13 Pasang dinding bata merah 1/2 bata, camp 1PC:3KP:10PP m2 68,157.38 25,942.40 94,099.78
13 14 6897.14 Pasang dinding bata merah 1/2 bata, camp 1KP:1SM:1PP m2 56,036.02 25,942.40 81,978.42
14 15 6897.15 Pasang dinding bata merah 1/2 bata, camp 1 KP:1SM:2PP m2 57,179.82 25,942.40 83,122.22
15 22 6897.22 Memasang roster 12 x 11 x 24 cm, camp 1 PC : 3 PP m2 343,393.91 25,942.40 369,336.31
16 23 6897.23 Memasang roster 12 x 11 x 24 cm, campuran 1 PC : 4 PP m2 339,707.94 25,942.40 365,650.34
V V PEKERJAAN PLESTERAN
SNI SNI 2837:2008
1 1 2837.01 Memasang plesteran 1 PC : 1 PP, tebal 15 mm m2 25,617.48 29,798.18 55,415.65
2 2 2837.02 Memasang plesteran 1 PC : 2 PP, tebal 15 mm m2 18,863.30 29,798.18 48,661.48
3 3 2837.03 Memasang plesteran 1 PC : 3 PP, tebal 15 mm m2 15,970.64 29,798.18 45,768.82
4 4 2837.04 Memasang plesteran 1 PC : 4 PP, tebal 15 mm m2 13,971.67 29,798.18 43,769.85
6 6 2837.06 Memasang plesteran 1 PC : 6 PP, tebal 15 mm m2 11,975.79 29,798.18 41,773.97
7 8 2837.08 Memasang plesteran 1 PC : 8 PP, tebal 15 mm m2 11,013.12 29,798.18 40,811.29
8 9 2837.09 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm m2 11,683.39 31,130.88 42,814.27
9 10 2837.10 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm m2 9,639.63 31,130.88 40,770.51
10 11 2837.11 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm m2 3,974.32 31,130.88 35,105.20
11 12 2837.12 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm m2 4,759.09 31,130.88 35,889.97
12 13 2837.13 Memasang plesteran 1 PC : 2 PP, tebal 20 mm m2 25,220.57 39,895.68 65,116.25
13 14 2837.14 Memasang plesteran 1 PC : 3 PP, tebal 20 mm m2 21,363.69 39,895.68 61,259.37
14 15 2837.15 Memasang plesteran 1 PC : 4 PP, tebal 20 mm m2 18,628.90 39,895.68 58,524.58
15 16 2837.16 Memasang plesteran 1 PC : 5 PP, tebal 20 mm m2 17,230.87 39,895.68 57,126.55
16 17 2837.17 Memasang plesteran 1 PC : 6 PP, tebal 20 mm m2 15,967.72 39,895.68 55,863.40
17 18 2837.18 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm m2 5,696.33 43,703.99 49,400.32
18 19 2837.19 Memasang berapen 1 PC : 5 PP, tebal 15 mm m2 12,871.03 14,978.26 27,849.29
19 20 2837.20 Memasang plesteran skoning 1 PC : 2 PP, lebar 10 mm m 12,871.03 14,978.26 27,849.29
20 23 2837.23 Memasang plesteran ciprat 1 PC : 2 PP m2 7,459.45 25,942.40 33,401.85
21 24 2837.24 Finishing siar pasangan dinding bata merah (=20 m') m2 4,466.66 14,978.26 19,444.92
22 25 2837.25 Finishing siar pasangan dinding conblock ekspose (=8 m') m2 2,299.44 7,032.08 9,331.52
23 26 2837.26 Finishing siar pasangan batu kali adukan 1 PC : 2 PP m2 11,613.46 29,798.18 41,411.63
24 27 2837.27 Memasang acian m2 4,670.74 19,865.45 24,536.19
VI VI PEKERJAAN PENUTUP LANTAI DAN DINDING
SNI 7395:2008
1 9 7395.09 Memasang lantai ubin granit ukuran (40 x 40) cm m2 107,423.87 24,910.99 132,334.85
2 10 7395.10 Memasang lantai ubin granit ukuran (30 x 30) cm m2 97,781.61 25,825.09 123,606.69
3 24 7395.24 Memasang plint ubin granit ukuran (10 x 40) cm m 25,946.34 12,450.85 38,397.18
4 25 7395.25 Memasang plint ubin granit ukuran (10 x 30) cm m 29,807.34 12,450.85 42,258.18
5 32 7395.32 Memasang lantai keramik artistik ukuran (10 x 20) cm m2 193,008.82 69,529.08 262,537.89
6 33 7395.33 Pasang lantai keramik artistik 10 x 10) atau (5 x 20) cm m2 790,652.65 69,529.08 860,181.72
7 34 7395.34 Pasang lantai keramik ukuran (33 x 33) cm kelas I m2 130,315.07 69,529.08 199,844.14
8 35 7395.35 Pasang lantai keramik ukuran (30 x 30) cm kelas I m2 146,312.60 69,529.08 215,841.67
9 36 7395.36 Pasang lantai keramik ukuran (20 x 20) cm kelas I m2 89,431.06 69,529.08 158,960.13
10 37 7395.37 Pasang lantai keramik uk (10 x 33) cm, variasi/border m2 164,406.96 104,372.79 268,779.74
11 38 7395.38 Pasang lantai mosaik uk (30 x 30) cm, camp 1PC:3PP m2 329,499.54 69,529.08 399,028.61
12 39 7395.39 Memasang plint keramik ukuran (10 x 20) cm m 15,269.08 12,450.85 27,719.92
13 40 7395.40 Memasang plint keramik ukuran (10 x 10) cm m 19,270.47 12,450.85 31,721.31
14 41 7395.41 Memasang plint keramik ukuran (5 x 20) cm m 9,591.73 12,450.85 22,042.58
15 42 7395.42 Pasang plint internal cove artistik ukuran (5 x 5 x 20) cm m 24,488.84 18,290.20 42,779.03
16 43 7395.43 Memasang lantai marmer ukuran (100 x 100) cm m2 182,667.77 69,529.08 252,196.85
17 44 7395.44 Memasang lantai karpet m2 103,213.11 23,481.65 126,694.76
18 45 7395.45 Memasang underlayer/Pelapis bawah karpet m2 123,618.50 16,546.20 140,164.70
SAT JUMLAH HARGA 2015
NO KODE URAIAN PEKERJAAN
UAN BAHAN UPAH TOTAL
19 46 7395.46 Memasang lantai parquet kayu m2 110,913.66 69,529.08 180,442.74
20 47 7395.47 Memasang lantai kayu (gymfloor) m2 134,021.75 69,529.08 203,550.82
21 51 7395.51 Memasang dinding keramik artistik ukuran (10 x 20) cm m2 188,974.71 89,394.53 278,369.24
22 52 7395.52 Memasang dinding keramik artistik ukuran (5 x 20) cm m2 138,401.03 89,394.53 227,795.56
23 53 7395.53 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 152,140.77 89,394.53 241,535.30
24 54 7395.54 Memasang dinding keramik ukuran (20 x 20) cm kelas I m2 85,387.27 89,394.53 174,781.80
25 55 7395.55 Memasang dinding marmer ukuran (100 x 100) cm m2 207,909.06 129,125.43 337,034.48
26 56 7395.56 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm m2 87,113.38 99,327.25 186,440.63
27 57 7395.57 Memasang dinding batu paras m2 178,919.81 69,529.08 248,448.89
28 58 7395.58 Memasang dinding batu tempel hitam m2 137,439.80 69,529.08 206,968.88
29 64 7395.64 Memasang lantai keramik ukuran (40 x 40) cm kelas I m2 109,654.12 69,529.08 179,183.19
30 65 7395.65 Memasang lantai keramik ukuran (40 x 40) cm kelas II m2 98,703.68 69,529.08 168,232.75
31 66 7395.66 Memasang lantai keramik ukuran (30 x 30) cm kelas I m2 146,312.60 69,529.08 215,841.67
32 67 7395.67 Memasang lantai keramik ukuran (30 x 30) cm kelas II m2 107,407.96 69,529.08 176,937.03
33 68 7395.68 Memasang lantai keramik ukuran (20 x 20) cm kelas I m2 89,431.06 69,529.08 158,960.13
34 69 7395.69 Memasang lantai keramik ukuran (20 x 20) cm kelas II m2 90,842.47 69,529.08 160,371.54
35 70 7395.70 Memasang dinding keramik ukuran (10 x 20) cm kelas I m2 152,140.77 12,450.85 164,591.62
36 71 7395.71 Memasang dinding keramik ukuran (10 x 20) cm kelas II m3 136,679.61 12,450.85 149,130.46
37 72 7395.72 Memasang dinding keramik ukuran (20 x 25) cm kelas I m2 111,988.73 89,394.53 201,383.26
38 73 7395.73 Memasang dinding keramik ukuran (20 x 25) cm kelas II m2 100,457.21 89,394.53 189,851.74
39 74 7395.74 Memasang paving I, tebal 5 cm, K175 m2 71,977.62 54,780.00 126,757.62
40 75 7395.75 Memasang paving I, tebal 5 cm, K200 m2 72,844.20 54,780.00 127,624.20
41 76 7395.76 Memasang paving I, tebal 5 cm, K225 m2 76,223.86 54,780.00 131,003.86
42 77 7395.77 Memasang paving I, tebal 7 cm, K175 m2 84,543.03 54,780.00 139,323.03
43 78 7395.78 Memasang paving I, tebal 7 cm, K200 m2 95,461.94 54,780.00 150,241.94
44 79 7395.79 Memasang paving I, tebal 7 cm, K225 m2 109,240.56 54,780.00 164,020.56
VII VII PEKERJAAN KAYU
SNI 3434:2008
1 1 3434.01 Membuat & Pas kusen pintu dan jendela, kayu kelas I m3 26,285,380.00 2,044,812.00 28,330,192.00
2 2 3434.02.1 Membuat & Pas kusen pintu dan jendela, kayu kelas II m3 19,537,210.00 1,988,162.00 21,525,372.00
3 3 3434.02.2 Membuat & Pas kusen pintu dan jendela, kayu kelas III m3 11,467,720.00 1,988,162.00 13,455,882.00
4 6 3434.05 Membuat & Pas daun pintu panel, kayu kelas I m2 879,310.00 265,560.00 1,144,870.00
5 7 3434.05.1 Membuat & Pas daun pintu panel, kayu kelas II m2 721,853.00 292,116.00 1,013,969.00
6 8 3434.06 Membuat & Pas pintu & jendela kaca, ky kl I (tanpa kaca) m2 580,344.60 233,692.80 814,037.40
7 9 3434.06.1 Membuat & pas pintu & jendela kaca, ky kelas II (tp kaca) m2 433,111.80 233,692.80 666,804.60
8 10 3434.07 Membuat & pasang pintu & jendela jalusi, kayu kelas I m2 1,539,698.60 292,116.00 1,831,814.60
9 11 3434.07.1 Membuat & pasang pintu & jendela jalusi, kayu kelas II m2 1,147,077.80 292,116.00 1,439,193.80
10 15 3434.10 Memasang jalusi kusen kayu kelas I m2 1,433,718.00 219,787.15 1,653,505.15
11 16 3434.10.1 Memasang jalusi kusen kayu kelas II m2 1,065,636.00 219,787.15 1,285,423.15
12 19 3434.13 Pasang konstruksi kuda-kuda konvensional, kayu kelas I m3 19,837,818.00 1,168,464.00 21,006,282.00
13 20 3434.13.1 Pasang konstruksi kuda-kuda konvensional, kayu kelas II m3 9,078,498.00 1,168,464.00 10,246,962.00
14 21 3434.13.2 Pasang konstruksi kuda-kuda konvensional, kayu kelas III m3 7,851,558.00 1,168,464.00 9,020,022.00
15 22 3434.14 Memasang konstruksi kuda-kuda expose, kayu kelas I m3 28,971,228.00 1,168,464.00 30,139,692.00
16 23 3434.15 Memasang konstruksi gording, kayu kelas I m3 19,793,202.00 701,078.40 20,494,280.40
17 24 3434.15.1 Memasang konstruksi gording, kayu kelas II m3 9,033,882.00 701,078.40 9,734,960.40
18 25 3434.16 Pas rangka atap genteng, kaso & reng kayu kelas I m2 220,008.36 13,788.50 233,796.86
19 26 3434.16.1 Pas rangka atap genteng, kaso & reng kayu kelas II m2 136,524.96 13,788.50 150,313.46
20 27 3434.16.2 Pas rangka atap genteng, kaso & reng kayu kelas III m2 121,080.96 13,788.50 134,869.46
21 28 3434.17 Pas rangka atap genteng beton, kaso & reng ky klas I m2 256,147.32 13,788.50 269,935.82
22 29 3434.17.1 Pas rangka atap genteng beton, kaso & reng ky klas II m2 172,663.92 13,788.50 186,452.42
23 30 3434.17.2 Pas rangka atap genteng beton, kaso & reng ky klas III m2 141,775.92 13,788.50 155,564.42
24 33 3434.19 Memasang rk langit-langit (50 x 100) cm, kayu kelas II m2 109,137.60 37,811.40 146,949.00
25 34 3434.19.1 Memasang rklangit-langit (50 x 100) cm, kayu kelas III m2 92,621.10 37,811.40 130,432.50
26 35 3434.20 Memasang rklangit-langit (60 x 60) cm, kayu kelas II m2 116,173.20 35,288.55 151,461.75
27 36 3434.20.1 Memasang rk langit-langit (60 x 60) cm, kayu kelas III m2 98,691.45 35,288.55 133,980.00
28 37 3434.21 Memasang lisplank ukuran (3 x 20) cm, kayu kelas I m 259,321.92 21,500.05 280,821.97
29 38 3434.21.1 Memasang lisplank ukuran (3 x 20) cm, kayu kelas II m 87,430.20 21,500.05 108,930.25
30 39 3434.22 Memasang lisplank ukuran (3 x 30) cm, kayu kelas I m 263,234.40 21,500.05 284,734.45
31 40 3434.22.1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas II m 88,159.50 21,500.05 109,659.55
32 41 3434.23 Pas rangka dinding pemisah (60 x 120) cm ky kelas II m2 224,796.00 43,858.60 268,654.60
33 42 3434.23.1 Pas rangka dinding pemisah (60 x 120) cm ky kelas III m2 164,736.00 43,858.60 208,594.60
34 43 3434.24 Pas dinding pemisah teakwood rangkap, rk ky kelas II m2 359,202.54 43,858.60 403,061.13
35 44 3434.25 Pas dinding pemisah plywood rangkap, rk ky kelas II m2 295,966.22 58,423.20 354,389.42
36 45 3434.26 Pas dinding lambriziring dari papan kayu kelas I m2 172,260.66 175,269.60 347,530.26
37 46 3434.27 Pas dinding lambriziring dari plywood (120 x 240) cm m2 56,525.04 7,320.28 63,845.32
IX IX PEKERJAAN LANGIT-LANGIT
SNI 2839:2008
1 1 2839.01 Memasang langit-langit asbes semen, tebal 4 mm m2 15,901.60 7,427.15 23,328.75
2 2 2839.01.1 Memasang langit-langit asbes semen, tebal 5 mm m2 19,168.60 7,427.15 26,595.75
3 3 2839.01.2 Memasang langit-langit asbes semen, tebal 6 mm m2 23,766.60 7,427.15 31,193.75
4 4 2839.02 Memasang langit-langit akustik ukuran (30 x 30) cm m2 292,578.00 16,546.20 309,124.20
5 5 2839.03 Memasang langit-langit akustik ukuran (30 x 60) cm m2 281,578.00 13,788.50 295,366.50
6 6 2839.04 Memasang langit-langit akustik ukuran (60 x 120) cm m2 320,298.00 13,788.50 334,086.50
7 7 2839.05 Pas langit-langit tripleks ukuran (120 x 240), tbl 3 mm m2 22,393.80 13,788.50 36,182.30
8 8 2839.05.1 Pas langit-langit tripleks ukuran (120 x 240), tbl 4 mm m2 25,128.68 13,788.50 38,917.18
9 9 2839.05.2 Pas langit-langit tripleks ukuran (120 x 240), tbl 6 mm m2 32,207.18 13,788.50 45,995.68
10 10 2839.06 Pas langit-langit lambriziring kayu, tebal 9 mm m2 45,216.60 110,308.00 155,524.60
11 11 2839.07 Pas. langit-langit gypsum board uk (120x240), tbl 9 mm m2 37,338.44 9,932.73 47,271.17
12 12 2839.07.1 Memasang langit-langit calsiboard m2 64,560.64 9,932.73 74,493.36
13 13 2839.07.2 Memasang langit-langit harplek m2 22,406.67 13,788.50 36,195.17
14 14 2839.08 Memasang list plafond gypsum profil m 8,648.64 8,273.10 16,921.74
15 15 2839.09 Pas langit-langit akustik uk (60 x 120)+ rk aluminium m2 213,474.69 68,942.50 282,417.19
16 16 2839.10 Memasang list langit-langit kayu profil m 8,279.70 6,935.45 15,215.15