ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAM

No. Pekerjaan Satuan Harga Satuan

A Pekerjaan Persiapan

1 Pengukuran dan pemasangan bouwplank m2 39,163.00

2 Pembersihan lokasi m2 9,075.00

3 Bongkaran Beton Bertulang m3 390,495.00

4 Bongkaran dinding tembok batu bata m3 390,495.00

B Pekerjaan Pobdasi

1 Menbikin Kepala dan meruncing tiang bh 25,658.00

2 Menbikin Pen dan lubanga bh 47,520.00

3 Menumbuk tiang di tanah lembek (dipergunakan masuk kedalam tanah ) m 176,886.00

4 Pancang ulun 10/10-400 Titik 153,835.00

5 Pancang ulun 10/10-200 Titik 93,335.00

6 Psang Pondasi sumuran dia 100cm Titik 1,237,225.00

C Pekerjaan Dinding

1 Pasang dinding bataco Tebal 20Cm m2 191,065.00

2 Pasang dinding bataco Tebal 15Cm m2 163,821.00

3 Pasang dinding bataco Tebal 10Cm m2 132,138.00


No. Pekerjaan Satuan Harga Satuan

D Pekerjaan Beton

1 Beton Tumbuk 1 Pc: 3 Psr: 5 Kr m3 1,012,473.00

2 Beton Tumbuk 1 Pc: 3 Psr: 6 Kr m3 993,014.00

3 Beton Tumbuk 1 Pc: 4 Psr: 6 Kr m3 979,583.00

4 Lantai kerja Beton Tumbuk 1 Pc: 3 Psr: 5 Kr m3 109,162.00

5 Beton Bertulang 1 Pc: 2 Psr: 3 Kr m3 990,924.00

6 Beton Bertulang 1 Pc: 2 Psr: 4 Kr m3 1,070,300.00

7 Beton Bertulang 1 Pc: 2 Psr: 2.5 Kr m3 1,125,476.00

8 Beton Bertulang 1 Pc: 1.5 Psr: 3 Kr m3 996,314.00

9 Beton Bertulang 1 Pc: 1.5 Psr: 2.5 Kr m3 1,160,500.00

10 Beton Bertulang 1 Pc: 1 Psr: 2 Kr m3 1,212,662.00

11 Beton Bertulang K 175 m3 1,218,553.00

12 Beton Bertulang K 225 m3 1,336,975.00

13 Beton Bertulang K 300 m3 1,383,311.00

14 Beton Bertulang K350 m3 1,383,674.00

15 Pembesian Dengan Besi Polos kg 20,967.00

16 Pembesian Dengan Besi Ulir kg 27,320.00

17 Pasang Bekisting Untuk Pondasi m2 98,984.00

18 Pasang Bekisting Untuk Sloof m2 105,584.00

19 Pasang Bekisting Untuk Kolom m2 241,442.00

20 Pasang Bekisting Untuk Balok m2 246,502.00

21 Pasang Bekisting Untuk Lantai m2 375,356.00

22 Pasang Bekisting Untuk Tangga m2 227,076.00

23 Pondasi Beton Bertulang ( 150 kg + Bekisting ) m3 4,570,907.00

24 Pondasi Beton Bertulang ( 200 kg + Bekisting ) m3 5,751,031.00

25 Kolom Beton Bertulang ( 300 kg + Bekisting ) m3 9,545,641.00

26 Balok Beton Bertulang ( 200 kg + Bekisting ) m3 7,101,336.00

27 Balok Beton Bertulang ( 150 kg + Bekisting ) m3 6,623,529.00

28 Dinding Beton Bertulang ( 150 kg + Bekisting ) m3 6,277,161.00

29 Tangga Beton Bertulang ( 200 kg + Bekisting ) m3 6,790,526.00

30 Kolom Penguat Beton Bertulang ( 11 x 11 )cm m3 7,449,818.00

31 Ring Balk Beton Bertulang ( 10 x 15 )cm m3 6,958,013.00

E Pekerjaan Besi dan Alluminium

1 Pasang Kawat Harmonika m2 53,661.00

2 Pasang Kawat Nyamuk m2 46,577.00

3 Pasang Rangka Atap baja Ringan m2 274,588.00

F Pekerjaan Pengecetan

1 Membersihkan bidang permukan tembok lama yang pernah di cat m2 9,254.00

2 Pengecetan bidang kayu lama m2 29,647.00

3 Pengecetan bidang kayu baru (1 Lapis plamir) m2 33,910.00

4 Pelaburan bidang kayu dengan residu / ter m2 10,511.00

G Pekerjaan Sanitasi

1 Memasang Bak Kontrol Pasangan Batu Bata kuran 30x30cm tinggi 35 cm bh 496,768.00

2 Memasang Bak Cuci piring Stailis still bh 410,517.00


TAN
TAN
TANAH
TANAHGROGOT,
T TANAH
TANAH
APRIL
GROGOT, APRIL 2003
GROGOT, Tanah Grogot,
Disetujui
Disetujui
Oleh
Oleh
: : TOTAL REKAPITULASI
GROGOT,
AH
AH OKTOBER 2004 ………………2005
A2003
DISETUJUI KASUBDIN
DISETUJUI KASUBDIN
OLEHOLEH:Disetujui
: DISETUJUI
Oleh : OLEH : GRO
APRIL
GR 2003N DIBUAT T Dibuat
OLEH Oleh: :
PEMUKIMAN
Pemukiman
PEMIMPIN DANPROYEK
PEMIMPIN
PROYEKdan
PENATAAN
Penataan RUANGAN
Ruang PROYEK
PELAKSANAKEGIATANPERENCANAAN
PEMIMPIN GOT,
OG DIBUAT A T Dibuat
OLEH Oleh
PT. : CV. DAYEN
: PASER WANGI Consultant
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja TorajaOT,
Sion
DIBUATPenajam
PT. PASER
TH PT. PASER
WANGI
APR
APRIOLEH : G WANGI
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara
ILL 76141
PT. PASERR Consultant
Ir. SYAIFUL ARHAM, M.Si 2003
200 WANGI O MELDA HERAWATY, ST
No NIP. 110 047 312 Uraian Pekerjaan 3 G Jumlah Harga Direktur
DIBU O
Ir. SYAIFULERNI ERAWATI,
ARHAM, M.Si ST DIB
AT T T MELDA HERAWATY, ST
1 ERNI PEMBANGUNAN
ERAWATI, NIP.
NIP. 110 ST550
047 GEDUNG
312015 494
ERNI GEREJA
ERAWATI, ST UAT
OLE , Rp 1,028,672,518.71
BUDI SANTOSO, Direktur
ST
………………………….
2 ………………………….
NIP. 550 015 494 GEDUNG
PEMBANGUNAN NIP. 550SEKOLAH
015 494 MINGGU H
T: Rp Direktur513,485,183.52
NIP.NIP.
550 550
…………………...
…………………... OLE A BUDI SANTOSO,
PT.BUDI SANTOSO, ST
3 PEMBANGUNAN PAGAR PAS
H: P Rp
Direktur ST 772,566,722.09
Direktur
4 PEMBANGUNAN LANSCAPE DAN PARKIR TERBUKA PT.
ER BUDI R Rp 664,482,461.05
PAS
WAN
SANTOSO,I
JUMLAH ER GI ST L Rp 2,979,206,885.37
WA Direktur 2
PPN = 11 NGI
% 0 Rp 327,712,757.39
PERENCANAAN DAN PENGAWASAN 0 Rp 200,000,000.00
3
JUMLAH TOTAL Rp 3,306,919,642.77
DIBULATKAN D Rp 3,306,920,000.00
I
Tanah Grogot,
B Puluh Ribu Rupiah
Terbilang // Disetujui Oleh : Tiga Milyard Tiga Ratus Enam
Mengetahui Juta: Sembilan Ratus Dua
/ Menyetujui ……………..2006
Pelaksana Kegiatan Perencanaan Kepala Dinas PU & Kimbangwil Kabupaten Pasir
BUDI U Dibuat Oleh :
Selaku Pengguna Anggaran SAN A PT. PASER
TOS
BU TWANGI Consultant
DI
O, T
SAN
ST O
TOS
Direk L
O,
tur E
ST H
HJ. ERNI ERAWATI, ST
Dire :
NIP.
: Diperiksa oleh 550 015 494 Ir. H.N. AMBRIADY,MM
NIP. 550 004 803 ktur PBUDI SANTOSO,
PEJABAT PELAKSANA TEKNIS KEGIATAN/ PPTK T ST
. Direktur
P
A
S
E
F A D L Y, S T
R
NIP. 19770703 200502 1006
W
A
N
G
I

B
U
D
I
S
A
N
T
O
S
O
,
S
T
D
ir
e
k
t
u
TAN
TAN
TANAH
TANAHGROGOT,
T TANAH
TANAHAPRIL
GROGOT,
GROGOT, Tanah Grogot,
APRIL 2003
Disetujui
Disetujui
Oleh
Oleh
: : REKAPITULASI GROGOT,
AH
AH OKTOBER 2004 ………………2005
A2003
DISETUJUI KASUBDIN
DISETUJUI KASUBDIN
OLEHOLEH:Disetujui
: DISETUJUI
Oleh : OLEH : GRO
APRIL
GR 2003N DIBUAT T Dibuat
OLEH Oleh
: :
PEMUKIMAN
Pemukiman
PEMIMPIN DANPROYEK
PEMIMPIN
PROYEKdan
PENATAAN
Penataan RUANGAN
Ruang PROYEK
PELAKSANAKEGIATANPERENCANAAN
PEMIMPIN GOT,
OG DIBUAT A T Dibuat
OLEH Oleh
PT. : CV. DAYEN
: PASER WANGI Consultant
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
OT,
DIBUAT
PT. PASER
TH PT. PASER
WANGI
APR
APRIOLEH : G WANGI
Pekerjaan : Pembangunan Gedung Gereja PT.
ILL PASERR Consultant
Lokasi : Kel.ARHAM,
Ir. SYAIFUL Penajam, 2003
200
Kec. Penajam, Kabupaten Penajam Paser Utara 76141
M.Si WANGI O MELDA HERAWATY, ST
NIP. 110 047 312 3 G Direktur
DIBU O
No Ir. SYAIFULERNI
ARHAM, M.Si ST Uraian Pekerjaan
ERAWATI, DIB
AT T T Jumlah
MELDAHarga
HERAWATY, ST
ERNI ERAWATI, NIP.
NIP. 110 ST550
047 312015 494
ERNI ERAWATI, ST UAT
OLE , BUDI SANTOSO, Direktur
ST
………………………….
I ………………………….
NIP. 550 015
Pekerjaan 494
Pendahuluan NIP. 550 015 494 H
T: Rp Direktur 12,200,000.00
NIP.NIP.
550 550
…………………...
…………………... OLE A BUDI SANTOSO,
PT.BUDI SANTOSO, ST
II Pekerjaan Dinding PAS
H: P Rp
Direktur ST 225,330,519.50
Direktur
III Pekerjaan Lantai PT.
ER BUDI R Rp 78,246,914.35
PAS
WAN
SANTOSO,I
IV Pekerjaan Kusen Pintu, Jendela & Penggantung ER
GI ST L Rp 189,516,202.50
WA Direktur 2
V Pekerjaan Reling Stenlish NGI 0 Rp 73,472,700.00
VI Pekerjaan Rangka & Plafond 0 Rp 226,250,641.37
3
VII Pekerjaan Elektrikal Rp 50,204,000.00
VIII Pekerjaan Pengecatan D Rp 59,376,540.99
I
IX Pengadaan Furnitur Interior B Rp 114,075,000.00
BUDI U
JUMLAHSAN A Rp 1,028,672,518.71
TOS
BU T
DI
O, T
SAN
ST O
TOS
Direk L
O,
tur E
ST H
Dire :
ktur P
: Diperiksa oleh T
PEJABAT PELAKSANA TEKNIS KEGIATAN/ PPTK .
P
A
S
E
R
F A D L Y, S T
W
NIP. 19770703 200502 1006
A
N
G
I

B
U
D
I
S
A
N
T
O
S
O
,
S
T
D
ir
e
k
t
u
RENCANA ANGGARAN BIAYA (R A B)

Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Gedung Gereja
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
I Pekerjaan Pendahuluan
1 Pembersihan dan persiapan lokasi ls 1.00 5,000,000.00 5,000,000.00
2 Pembongkaran Gedung Gereja lama ls 1.00 6,500,000.00 6,500,000.00
3 Pasang papan nama Proyek ls 1.00 700,000.00 700,000.00
Jumlah I 12,200,000.00
II Pekerjaan Dinding
1 Pasangan bata ringan dengan mortar m2 355.20 277,013.13 98,395,064.66
2 Plesteran dinding bata 1 Pc : 4 Ps m2 781.44 87,168.08 68,116,624.44
3 Pekerjaan acian untuk plesteran m2 781.44 55,535.00 43,397,270.40
4 Pasang batu alam pada dinding bagian depan m2 35.00 360,616.00 12,621,560.00
5 Plesteran kolom teras 20/100 cm bh 11.20 250,000.00 2,800,000.00
Jumlah II 225,330,519.50
III Pekerjaan Lantai
1 Cor lantai dibawah lantai camp. 1 Pc : 2 Ps : 3 Krl m3 32.39 1,824,640.00 59,100,089.60
2 Pekerjaan acian untuk lantai rabat m2 32.39 55,535.00 1,798,778.65
3 Pasang lantai Granit 60 x 60 m2 26.25 582,990.00 15,303,487.50
4 Pasang lantai Tangga dan teras keramik 40 x 40 cm kasar m2 6.14 332,990.00 2,044,558.60
Jumlah III 78,246,914.35
IV Disetujui
Pekerjaan Kusen Oleh
: Diperiksa/Disetujui
:
Pintu, Diketahui
Jendela Oleh
oleh :
& Penggantung Diperiksa
Disetujui
Oleh
Oleh
: :
ASISTEN TEKNISPejabat Asisten
PPTK
Pelaksana
TeknisTeknis
PPTK Kegiatan / PPTK Diketahui : Konsultan
Kontraktor
Supervisi
Pelaksana
1 Pasang Disetujui
angkur pada
Disetujui Oleh ::kusen
Oleh PEJABAT PELAKSANA TEKNIS KEGIATAN ls 1.00
(PPTK)
CV.
PT.
DAYEN
ARTANUSA 2,500,000.00
CONSULTANT
INDOETAM 2,500,000.00
2Pelaksana
PELAKSANA Kegiatan Perencanaan
PasangKEGIATAN
kusen kayuPERENCANAAN
klas I m' 392.00 173,000.00 67,816,000.00
3 Pasang daun pintu panil kayu klas I bh 5.00 987,000.00 4,935,000.00
4 Pasang daun jendela panil kayu klas I (besar) bh 14.00 312,000.00 4,368,000.00
5 Pasang daun jendela panil kayu klas I (kecil) bh 30.00 304,000.00 9,120,000.00
6 Pasang engsel
ERNI pintu
EKOERAWATI, 4" 3 bh/daun
IRAWANST H. M. SUKRI H, S. Sos bh 15.00
RACHMI HERLIANA,185,292.50
ST 2,779,387.50
ERNI
NIP.ERAWATI,
550 015 494 ST
7 EKO Nip.
IRAWAN
Pasang 550 020
grendel 6372NIP.
pintu 19590318
MUHAMMAD
bh/daun 198002IDRIS,
1002H.S.Sos
AKHMAD COKENG,bhST 10.00Site Engienere
J. EDDY. K
190,292.50 1,902,925.00
NIP. 550 015 494
NIP. NIP.
NIP.0000000000000
19580410 198601 1 001 Site Manager
8 Pasang kunci pintu 2 slagg bh 5.00 258,650.00 1,293,250.00
9 Pasang engsel jendela 3" 2 bh/daun bh 88.00 94,945.00 8,355,160.00
10 Pasang hak angin jendela 2 bh/daun bh 88.00 78,292.50 6,889,740.00
11 Pasang grendel jendela 2 bh/daun bh 88.00 56,292.50 4,953,740.00
12 Pasang handle jendela 1 bh/daun bh 44.00 58,292.50 2,564,870.00
13 Pasang kaca mati bening 5 mm m2 36.00 334,392.50 12,038,130.00
14 Pasang kaca menara tempered ukir Set 12.00 5,000,000.00 60,000,000.00
Jumlah IV 189,516,202.50
V Pekerjaan Reling Stenlish
1 Pas. Reling Tangga m2 81.60 593,000.00 48,388,800.00
2 Pas. Reling Tribun m2 21.60 593,000.00 12,808,800.00
3 Pas. Reling Balkon m2 20.70 593,000.00 12,275,100.00
Jumlah V 73,472,700.00
VI Pekerjaan Rangka & Plafond
1 Pasang rangka plafond m2 710.40 148,362.86 105,396,973.71
2 Pasang plafond PVC 3 layer m2 710.40 161,647.62 114,834,467.66
3 Pasang list plafond PVC motif m' 68.40 88,000.00 6,019,200.00
Jumlah VI 226,250,641.37
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Gedung Gereja
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
VII Pekerjaan Elektrikal
1 Pasang lampu tanam TL 2 x 20 Watt bh 8.00 250,000.00 2,000,000.00
2 Pasang lampu down light PLC 18 Watt bh 46.00 200,000.00 9,200,000.00
3 Pasang lampu EL 18 Watt bh 38.00 72,000.00 2,736,000.00
4 Pasang lampu EL 8 Watt bh 8.00 56,000.00 448,000.00
5 Pasang stop kontak bh 22.00 31,000.00 682,000.00
6 Pasang instalasi ttik lampu bh 94.00 254,000.00 23,876,000.00
7 Pasang saklar ganda bh 12.00 39,000.00 468,000.00
8 Pasang saklar tunggal bh 10.00 24,000.00 240,000.00
9 Pasang Box MCB 8 group bh 2.00 197,000.00 394,000.00
10 Pasang breaker 8 Amp bh 2.00 80,000.00 160,000.00
11 Pasang penangkal petir ls 1.00 10,000,000.00 10,000,000.00
Jumlah VII 50,204,000.00
VIII Pekerjaan Pengecatan
1 Cat dinding bagian dalam (interior) m2 390.72 44,139.20 17,246,068.22
2 Cat dinding bagian luar (exsterior) m2 401.92 56,879.20 22,860,888.06
3 Cat dinding kanopy m2 71.35 56,879.20 4,058,330.92
4 Cat kilap list plafond, list plank, kusen, daun pintu dan jendela m2 287.24 52,956.60 15,211,253.78
Jumlah VIII 59,376,540.99
IX Pengadaan Furnitur Interior
1 Bangku Jamaat EX Jepara/ setara Set 20.00 4,850,000.00 97,000,000.00
2 Mimbar Set 1.00 4,575,000.00 4,575,000.00
3 Kursi lipat chitose bh 50.00 250,000.00 12,500,000.00
Jumlah IX 114,075,000.00
TAN
TAN
TANAH
TANAHGROGOT,
T TANAH
TANAHAPRIL
GROGOT,
GROGOT, Tanah Grogot,
APRIL 2003
Disetujui
Disetujui
Oleh
Oleh
: : REKAPITULASI GROGOT,
AH
AH OKTOBER 2004 ………………2005
A2003
DISETUJUI KASUBDIN
DISETUJUI KASUBDIN
OLEHOLEH:Disetujui
: DISETUJUI
Oleh : OLEH : GRO
APRIL
GR 2003N DIBUAT T Dibuat
OLEH Oleh
: :
PEMUKIMAN
Pemukiman
PEMIMPIN DANPROYEK
PEMIMPIN
PROYEKdan
PENATAAN
Penataan RUANGAN
Ruang PROYEK
PELAKSANAKEGIATANPERENCANAAN
PEMIMPIN GOT,
OG DIBUAT A T Dibuat
OLEH Oleh
PT. : CV. DAYEN
: PASER WANGI Consultant
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
OT,
DIBUAT
PT. PASER
TH PT. PASER
WANGI
APR
APRIOLEH : G WANGI
Pekerjaan : Pembangunan Gedung Sekolah Minggu PT.
ILL PASERR Consultant
Lokasi : Kel.ARHAM,
Ir. SYAIFUL Penajam, 2003
200
Kec. Penajam, Kabupaten Penajam Paser Utara 76141
M.Si WANGI O MELDA HERAWATY, ST
NIP. 110 047 312 3 G Direktur
DIBU O
No Ir. SYAIFULERNI
ARHAM, M.Si ST Uraian Pekerjaan
ERAWATI, DIB
AT T T Jumlah
MELDAHarga
HERAWATY, ST
ERNI ERAWATI, NIP.
NIP. 110 ST550
047 312015 494
ERNI ERAWATI, ST UAT
OLE , BUDI SANTOSO, Direktur
ST
………………………….
I ………………………….
NIP. 550 015
Pekerjaan 494
Pendahuluan NIP. 550 015 494 H
T: Rp Direktur 25,094,517.14
NIP.NIP.
550 550
…………………...
…………………... OLE A BUDI SANTOSO,
PT.BUDI SANTOSO, ST
II Pekerjaan Pondasi PAS
H: P Rp
Direktur ST 49,398,335.07
Direktur
III Pekerjaan Struktur PT.
ER BUDI R Rp 80,369,767.75
PAS
WAN
SANTOSO,I
IV Pekerjaan Dinding ER
GI ST L Rp 79,382,309.34
WA Direktur 2
V Pekerjaan Lantai NGI 0 Rp 84,682,791.36
VI Pekerjaan Kusen Pintu, Jendela & Penggantung 0 Rp 37,786,197.50
3
VII Pekerjaan Rangka dan Atap Rp 68,904,775.85
VIII Pekerjaan Rangka & Plafond D Rp 50,861,361.74
I
IX Pekerjaan Elektrikal B Rp 18,792,000.00
BUDI U
X Pekerjaan Pengecatan SAN A Rp 18,213,127.78
JUMLAHTOS
BU T Rp 513,485,183.52
DI
O, T
SAN
ST O
TOS
Direk L
O,
tur E
ST H
Dire :
ktur P
T
: Diperiksa oleh .
PEJABAT PELAKSANA TEKNIS KEGIATAN/ PPTK P
A
S
E
R
W
F A D L Y, S T A
NIP. 19770703 200502 1006 N
G
I

B
U
D
I
S
A
N
T
O
S
O
,
S
T
D
ir
e
k
t
u
RENCANA ANGGARAN BIAYA (R A B)

Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Gedung Sekolah Minggu
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
I Pekerjaan Pendahuluan
1 Pasang papan nama Proyek ls 1.00 700,000.00 700,000.00
2 Pengukuran dan pemasangan bouwplank m' 43.00 102,631.00 4,413,133.00
3 Job Mix Formula (JMF) beton mutu K-225 ls 1.00 3,000,000.00 3,000,000.00
4 Pemotongan tanah (mekanik) m3 114.00 148,959.51 16,981,384.14
Jumlah I 25,094,517.14
II Pekerjaan Pondasi
A Pekerjaan pondasi foot plat
1 Galian tanah pondasi m3 27.00 166,950.00 4,507,650.00
2 Pancangan kayu ulin 10/10 cm m' 48.00 255,680.00 12,272,640.00
3 Urugan pasir di bawah pondasi t = 5 cm m3 0.50 217,800.00 108,900.00
4 Pengecoran lantai kerja camp. 1 Pc : 3 Ps : 5 Krl tebal = 7 cm m3 0.70 1,374,010.00 961,807.00
5 Pasang begesting m2 12.00 155,952.00 1,871,424.00
6 Cor K-225 m3 3.00 1,747,719.54 5,243,158.61
7 Pembesian D 16 mm kg 1,126.69 21,412.80 24,125,630.46
8 Urugan tanah kembali m3 6.75 45,500.00 307,125.00
Jumlah A 49,398,335.07
B Pekerjaan pondasi batu gunung
1 Galian tanah pondasi m3 53.10 166,950.00 8,865,045.00
2 Urugan pasir di bawah pondasi t = 5 cm m3 2.95 217,800.00 642,510.00
3 Pasang aanstamping batu gunung m3 11.80 592,968.00 6,997,022.40
4 Pasang pondasi batu gunung camp. 1 Pc : 4 Ps m3 21.89 1,207,102.00 26,422,255.68
5 Urugan tanah kembali m3 13.28 45,500.00 604,012.50
Jumlah B 43,530,845.58
Jumlah II (A + B) 92,929,180.65
III Pekerjaan Struktur
1 Pekerjaan sloof 15/25 cm
- Pasang begesting m2 29.50 165,069.50 4,869,550.25
- Cor K-225 m3 2.21 1,747,719.54 3,866,829.47
- Pembesian Ø 12 mm kg 558.61 21,412.80 11,961,447.03
- Pembesian Ø 8 mm kg 93.22 20,365.00 1,898,425.30
Jumlah 1 22,596,252.06
2 Pekerjaan kolom 20/20 cm
- Pasang begesting m2 32.00 282,398.50 9,036,752.00
- Cor K-225 m3 1.60 1,747,719.54 2,796,351.26
- Pembesian Ø 12 mm kg 271.42 21,412.80 5,811,776.52
- Pembesian Ø 8 mm kg 265.31 20,365.00 5,403,038.15
Jumlah 2 23,047,917.93
3 Pekerjaan kolom 15/15 cm (teras)
- Pasang begesting m2 9.60 282,398.50 2,711,025.60
- Cor K-225 m3 0.36 1,747,719.54 629,179.03
- Pembesian D.16 mm kg 100.99 21,412.80 2,162,521.50
- Pembesian Ø 8 mm kg 32.91 20,365.00 670,144.27
Jumlah 3 6,172,870.40
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Gedung Sekolah Minggu
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
4 Pekerjaan balok gantung kanopi 12/15 cm
- Pasang begesting m2 6.76 287,932.00 1,946,420.32
- Cor K-225 m3 0.78 1,747,719.54 1,363,221.24
- Pembesian Ø 12 mm kg 46.18 20,365.00 940,374.24
- Pembesian Ø 8 mm kg 15.06 20,365.00 306,751.21
Jumlah 4 4,556,767.01
5 Pekerjaan ring balk 15/20 cm
- Pasang begesting m2 17.70 287,932.00 5,096,396.40
- Cor K-225 m3 1.77 1,747,719.54 3,093,463.58
- Pembesian Ø 12 mm kg 209.57 20,365.00 4,267,852.32
- Pembesian Ø 8 mm kg 139.83 20,365.00 2,847,637.95
Jumlah 5 15,305,350.25
6 Pekerjaan cor plat kanopi teras
- Pasang begesting m2 6.50 372,398.50 2,420,590.25
- Cor K-225 m3 0.46 1,747,719.54 795,212.39
- Pembesian Ø 10 mm kg 268.83 20,365.00 5,474,807.46
Jumlah 6 8,690,610.10
Jumlah III 80,369,767.75
IV Pekerjaan Dinding
1 Pasangan dinding bata ringan dengan mortar m2 139.40 277,013.13 38,615,630.67
2 Plasteran dinding bata 1 Pc : 4 Ps m2 278.80 87,168.08 24,302,460.70
3 Pekerjaan acian untuk plesteran m2 278.80 55,535.00 15,483,158.00
4 Pasang batu alam pada kolom teras m2 0.40 360,616.00 144,246.40
5 Plesteran kolom teras 15/15 cm m2 9.60 87,168.08 836,813.57
Jumlah IV 79,382,309.34
V Pekerjaan Lantai
1 Urugan tanah peninggian feil lantai rabat m3 68.40 201,200.00 13,762,080.00
2 Urugan pasir bawah lantai cor rabat tebal 5 cm m3 5.70 217,800.00 1,241,460.00
3 Cor lantai dibawah keramik camp. 1 Pc : 2 Ps : 3 Krl tebal = 7 cm m3 7.98 1,824,640.00 14,560,627.20
4 Pekerjaan acian untuk lantai rabat m2 35.00 55,535.00 1,943,725.00
5 Pasang lantai keramik 40 x 40 cm polos ruangan m2 54.00 332,990.00 17,981,460.00
6 Pasang lantai keramik 40 x 40 cm anti slip teras m2 18.00 341,990.00 6,155,820.00
7 Pasang parit pasangan bata
- Galian tanah m3 10.75 136,500.00 1,467,375.00
- Urugan pasir m3 1.08 217,800.00 234,135.00
- Cor lantai camp. 1 Pc : 2 Ps : 3 Krl m3 0.90 1,824,640.00 1,647,649.92
- Pasang rolag bat camp. 1 Pc : 2 Ps m2 43.00 271,609.00 11,679,187.00
- Plesteran dinding bata 1 Pc : 2 Ps m2 51.60 93,966.40 4,848,666.24
- Pekerjaan acian untuk plesteran m2 51.60 55,535.00 2,865,606.00
- Pekerjaan bak kontrol bh 4.00 230,000.00 920,000.00
8 Pasang grill besi penutup parit bagian depan m' 21.50 250,000.00 5,375,000.00
Jumlah V 84,682,791.36
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Gedung Sekolah Minggu
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
VI Disetujui
Pekerjaan KusenOleh
: Diperiksa/Disetujui
:
Pintu, Diketahui
Jendela Oleh
oleh :
& Penggantung Diperiksa
Disetujui
Oleh
Oleh
: :
ASISTEN TEKNIS
Pejabat Asisten
PPTK
Pelaksana
TeknisTeknis
PPTK Kegiatan / PPTK Diketahui : Konsultan
KontraktorSupervisi
Pelaksana
1 Pasang Disetujui
angkur pada
Disetujui Oleh ::kusen
Oleh PEJABAT PELAKSANA TEKNIS KEGIATAN ls 1.00
(PPTK)
CV.
PT.
DAYEN
ARTANUSA 1,500,000.00
CONSULTANT
INDOETAM 1,500,000.00
2Pelaksana
PELAKSANA Kegiatan Perencanaan
PasangKEGIATAN
kusen kayuPERENCANAAN
klas I m' 43.00 173,000.00 7,439,000.00
3 Pasang daun pintu panil kayu klas I bh 2.00 987,000.00 1,974,000.00
4 Pasang daun jendela panil kayu klas I (besar) bh 11.00 471,000.00 5,181,000.00
5 Pasang daun jendela panil kayu klas I (kecil) bh 11.00 357,000.00 3,927,000.00
6 Pasang engsel
ERNI pintu
EKOERAWATI, 4" 3 bh/daun
IRAWANST H. M. SUKRI H, S. Sos bh 6.00
RACHMI HERLIANA,185,292.50
ST 1,111,755.00
EKO ERNINIP.550
Nip.
IRAWAN ERAWATI,
550020
015 494
637 ST
NIP. 19590318
MUHAMMAD 198002IDRIS,
1002H.
S.Sos
AKHMAD COKENG, ST Site Engienere
J. EDDY. K
7 Pasang grendel pintu 2 bh/daun bh 4.00 190,292.50 761,170.00
NIP. 550 015 494
NIP. NIP.
NIP.0000000000000
19580410 198601 1 001 Site Manager
8 Pasang kunci pintu 2 slagg bh 2.00 416,100.00 832,200.00
9 Pasang engsel jendela 3" 2 bh/daun bh 44.00 94,945.00 4,177,580.00
10 Pasang hak angin jendela 2 bh/daun bh 44.00 78,292.50 3,444,870.00
11 Pasang grendel jendela 2 bh/daun bh 44.00 56,292.50 2,476,870.00
12 Pasang handle jendela 1 bh/daun bh 22.00 58,292.50 1,282,435.00
13 Pasang kaca mati bening 5 mm m 2
11.00 334,392.50 3,678,317.50
Jumlah VI 37,786,197.50
VII Pekerjaan Rangka dan Atap
1 Pasang rangka atap baja ringan m2 117.00 224,368.00 26,251,056.00
(reng tb = 0.45 mm, kuda2 + gording tb= 0.6mm)
2 Pasang atap genteng metal t = 0,3 mm m2 117.00 319,328.20 37,361,399.85
3 Pasang list plak woodplank T 8mm m' 44.00 120,280.00 5,292,320.00
Jumlah VII 68,904,775.85
VIII Pekerjaan Rangka & Plafond
1 Pasang rangka plafond m2 130.00 148,362.86 19,287,171.43
2 Pasang plafond PVC 3 layer m2 130.00 161,647.62 21,014,190.31
3 Pasang list plafond PVC m' 120.00 88,000.00 10,560,000.00
Jumlah VIII 50,861,361.74
IX Pekerjaan Elektrikal
1 Pasang lampu tanam TL 2 x 20 Watt bh 6.00 378,000.00 2,268,000.00
2 Pasang lampu down light PLC 18 Watt bh 6.00 94,000.00 564,000.00
3 Pasang lampu LED 18 Watt bh 3.00 72,000.00 216,000.00
4 Pasang lampu LED 8 Watt bh 6.00 56,000.00 336,000.00
5 Pasang stop kontak bh 2.00 31,000.00 62,000.00
6 Pasang instalasi ttik lampu bh 20.00 254,000.00 5,080,000.00
7 Pasang saklar ganda bh 2.00 39,000.00 78,000.00
8 Pasang saklar tunggal bh 1.00 24,000.00 24,000.00
9 Pasang Box MCB 4 group bh 1.00 99,000.00 99,000.00
10 Pasang breaker MCB 2 Amp bh 1.00 65,000.00 65,000.00
11 Pasang penangkal petir ls 1.00 10,000,000.00 10,000,000.00
Jumlah IX 18,792,000.00
X Pekerjaan Pengecatan
1 Cat dinding bagian dalam (interior) m2 139.40 44,139.20 6,153,004.48
2 Cat dinding bagian luar (exsterior) m2 139.40 56,879.20 7,928,960.48
3 Cat dinding kanopy m 2
10.40 56,879.20 591,543.68
4 Cat kilap list plafond, list plank, kusen, daun pintu dan jendela m2 66.84 52,956.60 3,539,619.14
Jumlah X 18,213,127.78
TAN
TAN
TANAH
TANAHGROGOT,
T TANAH
TANAHAPRIL
GROGOT,
GROGOT, Tanah Grogot,
APRIL 2003
Disetujui
DisetujuiOleh
Oleh: : REKAPITULASI GROGOT,
AH
AH OKTOBER 2004 ………………2005
A2003
DISETUJUI KASUBDIN
DISETUJUIKASUBDIN
OLEHOLEH: :
DisetujuiDISETUJUI
Oleh : OLEH :dan GRO
APRIL
GR 2003N DIBUAT T Dibuat
OLEH Oleh
: :
Kegiatan
PEMUKIMAN : Lanjutan
Pemukiman
DAN dan
PENATAAN Pembangunan
Penataan RUANGAN Sarana
Ruang PROYEK Prasara Gereja Toraja Sion Penajam
PEMIMPINPELAKSANAKEGIATANPERENCANAAN
PEMIMPIN
PROYEK
PROYEK PEMIMPIN GOT,
OG DIBUAT A T Dibuat
OLEH Oleh
PT. : CV. DAYEN
: PASER WANGI Consultant
Pekerjaan : Pembangunan Pagar Lingkungan OT,
DIBUAT
PT. PASER
TH PT. PASER
WANGI
APR
APRIOLEH : G WANGI
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
PT.
ILL PASERR Consultant
Ir. SYAIFUL ARHAM, M.Si 2003
200WANGI O MELDA HERAWATY, ST
No NIP. 110 047 312 Uraian Pekerjaan 3 G Jumlah Harga Direktur
DIBU O
Ir. SYAIFULERNI ERAWATI,
ARHAM, M.Si ST DIB
AT T T MELDA HERAWATY, ST
I ERNI Pekerjaan NIP.Pendahuluan
ERAWATI, NIP.
110 ST550
047 312015 494
ERNI ERAWATI, ST UAT
OLE , Rp BUDI SANTOSO, 24,415,698.00
Direktur
ST
………………………….
II ………………………….
NIP. 550 015
Pekerjaan 494
Pondasi NIP. 550 015 494 H
T: Rp Direktur112,936,756.80
NIP.NIP.
550 550
…………………...
…………………... OLE A BUDI SANTOSO,
PT.BUDI SANTOSO, ST
III Pekerjaan Struktur PAS
H: P Rp
Direktur ST 196,699,200.39
Direktur
IV Pekerjaan Dinding PT.
ER BUDI R Rp 158,662,842.52
PAS
WAN
SANTOSO,I
V Pekerjaan Lantai Gerbang ER
GI ST L Rp 234,109,718.14
WA Direktur 2
VI Pekerjaan Elektrikal NGI 0 Rp 15,187,000.00
VII Pekerjaan Pengecatan 0 Rp 30,555,506.24
3
JUMLAH Rp 772,566,722.09
D
I
B
BUDI U
SAN A
TOS
BU T
DI
O, T
SAN
ST O
: Diperiksa oleh TOS
Direk L
PEJABAT PELAKSANA TEKNIS KEGIATAN/ PPTK O,
tur E
ST H
Dire :
ktur P
T
.
F A D L Y, S T P
NIP. 19770703 200502 1006 A
S
E
R
W
A
N
G
I

B
U
D
I
S
A
N
T
O
S
O
,
S
T
D
ir
e
k
t
u
RENCANA ANGGARAN BIAYA (R A B)

Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Pagar Lingkungan
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
I Pekerjaan Pendahuluan
1 Pembersihan lokasi ls 1.00 5,000,000.00 5,000,000.00
2 Pengukuran dan pemasangan bouwplank m' 158.00 102,631.00 16,215,698.00
3 Job Mix Formula (JMF) beton mutu K-225 ls 1.00 2,500,000.00 2,500,000.00
4 Pasang papan nama Proyek ls 1.00 700,000.00 700,000.00
Jumlah I 24,415,698.00
II Pekerjaan Pondasi
1 Galian tanah pondasi m3 14.22 136,500.00 1,941,030.00
2 Urugan pasir di bawah pondasi t = 5 cm m3 7.90 217,800.00 1,720,620.00
3 Pasang aanstamping batu gunung m3 31.60 592,968.00 18,737,788.80
4 Pasang pondasi batu gunung camp. 1 Pc : 4 Ps m3 78.21 1,155,550.00 90,375,565.50
5 Urugan tanah kembali m3 3.56 45,500.00 161,752.50
Jumlah II 112,936,756.80
III Pekerjaan Struktur
1 Pekerjaan sloof 20/30 cm
- Pasang begesting m2 94.80 165,069.50 15,648,588.60
- Cor K-225 m3 9.48 1,747,719.54 16,568,381.21
- Pembesian Ø 12 mm kg 842.36 20,365.00 17,154,596.23
- Pembesian Ø 8 mm kg 374.46 20,365.00 7,625,877.90
Jumlah 1 56,997,443.94
2 Pekerjaan kolom 30/30 cm
- Pasang begesting m2 163.20 282,398.50 46,087,435.20
- Cor K-225 m3 12.24 1,747,719.54 21,392,087.13
- Pembesian D.16 mm kg 1,817.86 21,412.80 38,925,386.96
- Pembesian Ø 8 mm kg 393.95 20,365.00 8,022,723.87
Jumlah 2 114,427,633.15
3 Pekerjaan ring balk 15/20 cm
- Pasang begesting m2 0.68 165,069.50 112,247.26
- Cor camp. 1 Pc : 2 Ps : 3 Krl m3 4.74 1,824,640.00 8,648,793.60
- Pembesian Ø 12 mm kg 561.22 20,365.00 11,429,163.84
- Pembesian Ø 8 mm kg 249.64 20,365.00 5,083,918.60
Jumlah 3 25,274,123.30
Jumlah III 196,699,200.39
IV Pekerjaan Dinding
1 Pasangan dinding bata 1 Pc : 2 Ps m2 79.00 271,609.00 21,457,111.00
2 Pasangan dinding bata 1 Pc : 4 Ps m2 189.60 261,240.00 49,531,104.00
3 Plesteran dinding bata 1 Pc : 2 Ps m2 158.00 93,966.40 14,846,691.20
4 Plesteran dinding bata 1 Pc : 4 Ps m2 379.20 87,168.08 33,054,135.94
5 Plesteran penebalan dinding bagian bawah camp. 1 Pc : 4 Ps m2 31.60 87,168.08 2,754,511.33
6 Plesteran penebalan dinding bagian atas camp. 1 Pc : 4 Ps m2 31.60 174,336.16 5,509,022.66
7 Pekerjaan acian untuk plesteran m2 537.20 55,535.00 29,833,402.00
8 Pasang batu alam pada dinding bagian depan m2 4.65 360,616.00 1,676,864.40
Jumlah IV 158,662,842.52
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Pagar Lingkungan
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
V Pekerjaan Lantai Gerbang
1 Urugan tanah peninggian feil lantai rabat m3 11.20 201,200.00 2,253,440.00
2 Urugan pasir bawah lantai cor rabat tebal 5 cm m3 0.80 217,800.00 174,240.00
3 Cor lantai rabat camp. 1 Pc : 2 Ps : 3 Krl tebal = 7 cm m3 1.40 1,824,640.00 2,554,496.00
4 Pekerjaan acian untuk lantai rabat m2 21.20 55,535.00 1,177,342.00
8 Pasang parit pasangan bata
- Galian tanah m3 142.20 136,500.00 19,410,300.00
- Urugan pasir m3 7.11 217,800.00 1,548,558.00
- Cor lantai camp. 1 Pc : 2 Ps : 3 Krl m3 7.90 1,824,640.00 14,414,656.00
- Pasang Rolag Batu Gunung. 1 Pc : 4 Ps m2 85.32 1,155,550.00 98,591,526.00
- Plesteran dinding bata 1 Pc : 2 Ps m2 150.10 93,966.40 14,104,356.64
- Pekerjaan acian untuk plesteran m2 150.10 55,535.00 8,335,803.50
9 Pasang grill besi penutup parit bagian depan m' 66.00 500,000.00 33,000,000.00
10 Pasang Tralis Pagar stenlish m2 55.80 593,000.00 33,089,400.00
11 Pasang pintu gerbang stenlish m2 9.20 593,000.00 5,455,600.00
Jumlah V 234,109,718.14
VI Disetujui
Pekerjaan Oleh
: Diperiksa/Disetujui
Elektrikal : Diketahui Oleh
oleh : Diperiksa
Disetujui
Oleh
Oleh
: :
ASISTEN TEKNISPejabat Asisten
PPTK
Pelaksana
TeknisTeknis
PPTK Kegiatan / PPTK Diketahui : Konsultan
Kontraktor
Supervisi
Pelaksana
1 Pasang Disetujui
Lampu Dekorasi
Disetujui Oleh ::
Oleh Outdoor - 2PEJABAT
ARAH 4W bh
PELAKSANA TEKNIS KEGIATAN 31.00
(PPTK)
CV.
PT.
DAYEN
ARTANUSA 217,000.00
CONSULTANT
INDOETAM 6,727,000.00
Pelaksana Kegiatan Perencanaan
2 Pasang instalasi ttik lampu
PELAKSANA KEGIATAN PERENCANAAN bh 33.00 254,000.00 8,382,000.00
3 Pasang saklar ganda bh 2.00 39,000.00 78,000.00
Jumlah VI 15,187,000.00
VII Pekerjaan Pengecatan
1 Cat dinding
ERNI bagian pagar
EKOERAWATI,
IRAWAN ST H.(exsterior)
M. SUKRI H, S. Sos m2 537.20
RACHMI HERLIANA,56,879.20
ST 30,555,506.24
NIP.
ERNI
EKO Nip.
IRAWAN 550 015
ERAWATI, 494 ST
550 020 637NIP. 19590318
MUHAMMAD 198002
IDRIS,
1002
H.S.Sos
AKHMAD COKENG, ST JumlahSite
VIIEngienere
J. EDDY. K 30,555,506.24
NIP. 550 015 494
NIP.
Disetujui Oleh
: Diperiksa/Disetujui
: oleh : NIP.
Diketahui Oleh NIP.0000000000000
19580410 198601 1 001 Site Manager
Diperiksa
Disetujui
Oleh
Oleh
: :
ASISTEN TEKNIS
Pejabat Asisten
PPTK
Pelaksana
TeknisTeknis
PPTK Kegiatan / PPTK Diketahui : Konsultan
Kontraktor
Supervisi
Pelaksana
Disetujui Oleh
Disetujui Oleh :: PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
CV.PT.
DAYEN
ARTANUSA
CONSULTANT
INDOETAM
Pelaksana
PELAKSANA Kegiatan Perencanaan
KEGIATAN PERENCANAAN

ERNI
EKOERAWATI,
IRAWANST H. M. SUKRI H, S. Sos RACHMI HERLIANA, ST
NIP.550
EKOERNI
Nip.
IRAWAN 550 020
015 494
ERAWATI, 637ST
NIP. 19590318
MUHAMMAD
198002
IDRIS,
1002H.S.Sos
AKHMAD COKENG, ST Site Engienere
J. EDDY. K
NIP. 550 015 494
NIP. NIP.
NIP.0000000000000
19580410 198601 1 001 Site Manager
TAN
TAN
TANAH
TANAHGROGOT,
T TANAH
TANAHAPRIL
GROGOT,
GROGOT, Tanah Grogot,
APRIL 2003
Disetujui
Disetujui
Oleh
Oleh
: : REKAPITULASI GROGOT,
AH
AH OKTOBER 2004 ………………2005
A2003
DISETUJUI KASUBDIN
DISETUJUI KASUBDIN
OLEHOLEH:Disetujui
: DISETUJUI
Oleh : OLEH : GRO
APRIL
GR 2003N DIBUAT T Dibuat
OLEH Oleh
: :
PEMUKIMAN
Pemukiman
PEMIMPIN DANPROYEK
PEMIMPIN
PROYEKdan
PENATAAN
Penataan RUANGAN
Ruang PROYEK
PELAKSANAKEGIATANPERENCANAAN
PEMIMPIN GOT,
OG DIBUAT A T Dibuat
OLEH Oleh
PT. : CV. DAYEN
: PASER WANGI Consultant
Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
OT,
DIBUAT
PT. PASER
TH PT. PASER
WANGI
APR
APRIOLEH : G WANGI
Pekerjaan : Pembangunan Landscape dan Parkir Terbuka PT.
ILL PASERR Consultant
Lokasi : Kel.ARHAM,
Ir. SYAIFUL Penajam, 2003
200
Kec. Penajam, Kabupaten Penajam Paser Utara 76141
M.Si WANGI O MELDA HERAWATY, ST
NIP. 110 047 312 3 G Direktur
DIBU O
No Ir. SYAIFULERNI
ARHAM, M.Si ST Uraian Pekerjaan
ERAWATI, DIB
AT T T Jumlah
MELDAHarga
HERAWATY, ST
ERNI ERAWATI, NIP.
NIP. 110 ST550
047 312015 494
ERNI ERAWATI, ST UAT
OLE , BUDI SANTOSO, Direktur
ST
………………………….
I ………………………….
NIP. 550 015
Pekerjaan 494
Pendahuluan NIP. 550 015 494 H
T: Rp Direktur 13,118,351.00
NIP.NIP.
550 550
…………………...
…………………... OLE A BUDI SANTOSO,
PT.BUDI SANTOSO, ST
II Pekerjaan Rumah Tongkonan PAS
H: P Rp
Direktur ST 406,929,241.60
Direktur
III Pekerjaan Halaman Parkir PT.
ER BUDI R Rp 80,369,767.75
PAS
WAN
SANTOSO,I
IV Pekerjaan Elektrikal ER
GI ST L Rp 79,382,309.34
WA Direktur 2
V Pekerjaan Pengecatan NGI 0 Rp 84,682,791.36
VI Pekerjaan Konsultansi 0 Rp -
3
JUMLAH Rp 664,482,461.05
D
I
B
BUDI U
SAN A
TOS
BU T
DI
O, T
SAN
ST O
TOS
Direk L
O,
tur E
ST H
Dire :
ktur P
T
.
P
A
S
E
R
W
A
N
G
I

B
U
D
I
S
A
N
T
O
S
O
,
S
T
D
ir
e
k
t
u
RENCANA ANGGARAN BIAYA (R A B)

Kegiatan : Lanjutan Pembangunan Sarana dan Prasara Gereja Toraja Sion Penajam
Pekerjaan : Pembangunan Landscape dan Parkir Terbuka
Lokasi : Kel. Penajam, Kec. Penajam, Kabupaten Penajam Paser Utara 76141
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Satuan Volume
(Rp.) (Rp.)
I Pekerjaan Pendahuluan
1 Pasang papan nama Proyek ls 1.00 700,000.00 700,000.00
2 Pengukuran dan pemasangan bouwplank m' 121.00 102,631.00 12,418,351.00
Jumlah I 13,118,351.00
II Pekerjaan Rumah Tongkonan
1 Urugan tahan dipadatkan m3 8.00 201,200.00 1,609,600.00
2 Urugan pasir di bawah pondasi t = 5 cm m3 0.80 217,800.00 174,240.00
3 Pengecoran lantai kerja camp. 1 Pc : 3 Ps : 5 Krl tebal = 7 cm m3 3.20 1,374,010.00 4,396,832.00
4 Pasang begesting m2 4.80 155,952.00 748,569.60
5 Pengadaan dan pemasangan rumah Ttongkonan ls 2.00 200,000,000.00 400,000,000.00
Jumlah II 406,929,241.60
III Disetujui
Pekerjaan Oleh
Halaman: Diperiksa/Disetujui
: ParkirDiketahui Oleh
oleh : Diperiksa
Disetujui
Oleh
Oleh
: :
ASISTEN TEKNISPejabat Asisten
PPTK
Pelaksana
TeknisTeknis
PPTK Kegiatan / PPTK Diketahui : Konsultan
Kontraktor
Supervisi
Pelaksana
1 UruganDisetujui
tanah diratakan
Disetujui Oleh :: dan dipadatkan
Oleh PEJABAT PELAKSANA TEKNIS KEGIATAN m 3
220.50
(PPTK)
CV.PT.
DAYEN
ARTANUSA 201,200.00
CONSULTANT
INDOETAM 44,364,600.00
2Pelaksana
PELAKSANA Kegiatan Perencanaan
UruganKEGIATAN
pasir PERENCANAAN m3 11.03 217,800.00 2,401,245.00
3 Pasang paving block m3 330.75 381,836.50 126,292,422.38
4 Pasangan bata pengunci Camp. 1 Pc : 2 Ps m2 8.40 271,609.00 2,281,515.60
5 Pasangan bata pot bunga camp. 1 Pc : 2 Ps m2 57.60 271,609.00 15,644,678.40
6 Pasangan
ERNI
EKO bata parit camp.
ERAWATI,
IRAWAN ST H.1M. PcSUKRI
: 2 Ps H, S. Sos m 2
121.00
RACHMI HERLIANA, 271,609.00
ST 32,864,689.00
NIP.550
ERNI 550 020
015 494
ERAWATI, ST
7 EKO Nip.
IRAWAN
Plasteran Bata Camp 6371 NIP.
Pc :19590318
2MUHAMMAD
Ps 198002IDRIS,
1002H.S.Sos
AKHMAD COKENG,mST 2
244.60Site Engienere
J. EDDY. K
93,966.40 22,984,181.44
NIP. 550 015 494
NIP. NIP.
NIP.0000000000000
19580410 198601 1 001 Site Manager
Jumlah III 246,833,331.82
IV Pekerjaan Elektrikal
1 Pasang Rumah Lampu Taman bh 10.00 217,000.00 2,170,000.00
3 Pasang lampu EL 18 Watt bh 18.00 72,000.00 1,296,000.00
6 Pasang instalasi ttik lampu bh 21.00 254,000.00 5,334,000.00
7 Pasang saklar ganda bh 2.00 39,000.00 78,000.00
9 Pasang Box MCB 4 group bh 1.00 197,000.00 197,000.00
10 Pasang breaker 2 Amp bh 4.00 80,000.00 320,000.00
11 Pasang penangkal petir Set 6.00 2,576,000.00 15,456,000.00
Jumlah IV 24,851,000.00
V Pekerjaan Pengecatan
1 Cat pasangan bata pot bunga (exsterior) m2 115.20 56,879.20 6,552,483.84
Jumlah V 6,552,483.84
Diperiksa
Disetujui
Oleh
Oleh
: :
Konsultan
Kontraktor
Supervisi
Pelaksana
CV.PT.
DAYEN
ARTANUSA
CONSULTANT
INDOETAM

RACHMI HERLIANA, ST
Site Engienere
J. EDDY. K
Site Manager
BACKUP BANGUNAN GEREJA

NO URAIAN PEKERJAAN SATUAN

I Pekerjaan Pendahuluan
1 Pekerjaan pembersihan lokasi
ls
Jumlah ls
2 Pengukuran dan Pemasangan Bouwplank
Panjang belakang m'
Panjang Samping kanan m'
Panjang Samping kiri m'
Panjang depan m'
Jumlah m'
3 Job Mix Formula (JMF) beton mutu K-225 ls
4 Pembuatan papan nama proyek
ls
Jumlah ls
5 Pemotongan tanah
Panjang m'
Lebar m'
Tinggi = (0,5 + 2,5 + 6,2) : 3 m'
Jumlah m3
II Pekerjaan Pondasi
A Pondasi foot plat
1 Galian pondasi
Jumlah pondasi fot plat ttk
Lebar m'
Tinggi m'
Panjang m'
Jumlah m3
2 Pengadaan pancang ulin 10/10 cm
Jumlah pondasi fot plat ttk
Jumlah pancang /ttk ttk
Lebar m'
Tinggi m'
Panjang/ttk m'
Jumlah m3
4 Upah memancang pancang
Jumlah pondasi fot plat ttk
Jumlah pancang /ttk ttk
Panjang/ttk m'
Jumlah m'
5 Urugan pasir
Jumlah pondasi fot plat ttk
Lebar m'
Tinggi m'
Panjang m'
Jumlah m3
6 Cor lantai kerja
Jumlah pondasi fot plat ttk
Lebar m'
Tinggi m'
Panjang m'
Jumlah m3
7 Begesting fot plat
Tinggi m'
Panjang (1 x 4) m'
Jumlah m2
Luas/ttk m2
Jumlah pondasi fot plat bh
Jumlah m2
8 Cor pondasi
Jumlah pondasi fot plat ttk
Lebar m'
Tinggi m'
Panjang m'
Jumlah m3
9 Pembesian
a Pembesian bagian luar
Jumlah pondasi fot plat ttk
Besi dia 16 mm ( bbt/m' ) kg
Jumlah tulangan/ttk bh
Panjang tulangan/btg = (0,95 x 2) + (0,25 x 2) + (0,05 x 2) + (1,3*2) m'
Jumlah kg
b Pembesian bagian dalam
Jumlah pondasi fot plat ttk
Besi dia 16 mm ( bbt/m' ) kg
Jumlah tulangan/ttk bh
Panjang tulangan/btg = (0,95 x 2) + (0,25 x 2) + (0,05 x 2) + (1,3*2) m'
Jumlah kg
Jumlah pembesian
Pembesian bagian luar kg
Pembesian bagian dalam kg
Jumlah kg
10 Urugan tanah kembali
Volume galian m3
Koefisien ( 25 % )
Jumlah m3
B Pondasi batu gunung
1 Galian
Panjang
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
2 Pasir urug dibawah Pondasi batu gunung
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
3 Pas. Aanstamping batu gunung
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
4 Vol pondasi batu gunung
Lebar atas m'
Lebar bawah m'
Jumlah rata - rata m'
Lebar m'
Panjang m'
Tinggi m'
Jumlah m3
5 Urugan tanah kembali
Volume galian m3
Koefisien ( 25 % )
Jumlah m3
III Pekerjaan Struktur
1 Sloof 20/30 cm
Pasang begesting
Panjang
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,3 x 2) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 16 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 10 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,20 x 2 ) + (0,10 x 2) + (0,05 X 2) m'
Besi dia 10 mm (bbt/m') kg
Jumlah kg
2 Sloof 15/20 cm
Pasang begesting
Panjang km/wc m'
Lebar (0,2 x 2) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian D 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia D 16 (bbt/m') kg
Jumlah kg
# Pembesian dia 8 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,10 x 2) + (0,20 x 2) + (0,05 X 2) m'
Besi dia 8 mm (bbt/m') kg
Jumlah kg
3 Kolom 40/40 cm
Panjang lt. 1
Panjang/ttk m'
Jumlah bh
Jumlah m'
Panjang lt. 2
Panjang/ttk m'
Jumlah bh
Jumlah m'
Panjang keseluruhan
Panjang lt. 1 m'
Panjang lt. 2 m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,4 x 4) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 16 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 10 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,15 x 4) + (0,05 X 2) m'
Besi dia 10 mm (bbt/m') kg
Jumlah kg
4 Kolom 30/30 cm
Panjang lt. 1
Panjang/ttk m'
Jumlah bh
Jumlah m'
Panjang lt. 2
Panjang/ttk m'
Jumlah bh
Jumlah m'
Panjang keseluruhan
Panjang lt. 1 m'
Panjang lt. 2 m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,3 x 4) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 16 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 10 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,25 x 4) + (0,05 X 2) m'
Besi dia 10 mm (bbt/m') kg
Jumlah kg
5 Kolom 30/45 cm
Panjang/ttk m'
Jumlah bh
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,3 x 2) + (0,45 x 2) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 16 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 10 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,25 x 2) + (0,40 x 2) + (0,05 X 2) m'
Besi dia 10 mm (bbt/m') kg
Jumlah kg
6 Kolom 15/15 cm
Panjang/ttk m'
Jumlah bh
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,15 x 4) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 16 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 10 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,10 x 4) + (0,05 X 2) m'
Besi dia 10 mm (bbt/m') kg
Jumlah kg
7 Kolom 12/12 cm
Panjang lt. 1
Panjang/ttk m'
Jumlah bh
Jumlah m'
Panjang lt. 2
Panjang/ttk m'
Jumlah bh
Jumlah m'
Panjang lt. 3 (gevel)
Bagian depan
Panjang/ttk m'
Jumlah bh
Jumlah m'
Bagian samping
2x2 m'
1,75 x 2 m'
0,5 x 2 m'
Jumlah m'
Panjang gevel
Bagian depan m'
Bagian samping m'
Jumlah m'
Panjang keseluruhan
Panjang lt. 1 m'
Panjang lt. 2 m'
Panjang lt. 3 (gevel) m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,12 x 2) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 12 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 12 mm (bbt/m') kg
Jumlah kg
# Pembesian dia 8 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,07 x 4) + (0,05 X 2) m'
Besi dia 8 mm (bbt/m') kg
Jumlah kg
8 Balok 30/40 cm
Panjang lt. 2
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Panjang lt. 3
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Panjang keseluruhan
Panjang lt. 2 m'
Panjang lt. 3 m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,3 x 2) + (0,4 x 2) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 16 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 10 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel ( 0,25 x 2 ) + ( 0,35 x 2 ) + ( 0,05 X 2 ) m'
Besi dia 10 mm (bbt/m') kg
Jumlah kg
9 Balok 12/15 cm
Pasang begesting
Panjang = teras + samping kiri kanan = 9 + 2 + 2 m'
Lebar (0,2 x 2) + 0,12 m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 12 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 12 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 8 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,07 x 2) + (0,1 x 2) + (0,05 X 2) m'
Besi dia 8 mm (bbt/m') kg
Jumlah kg
10 Ring balk 15/20 cm
Panjang gevel
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,55) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 12 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 12 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 8 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,1 x 2) + (0,15 x 2) + (0,05 X 10) m'
Besi dia 8 mm (bbt/m') kg
Jumlah kg
11 Cor plat lt. 2
# Luas plat
Luas A
Panjang m'
Lebar m'
Jumlah m2
Luas B
Panjang m'
Lebar m'
Jumlah m2
Luas C (teras)
Panjang m'
Lebar m'
Jumlah m2
Luas kotor keseluruhan
Luas A m2
Luas B m2
Luas C (teras) m2
Jumlah m2
Luas pengurangan
Panjang m'
Lebar m'
Jumlah m2
Luas bersih keseluruhan
Luas kotor keseluruhan m2
Luas pengurangan m2
Jumlah m2
# Pasang begesting
Luas plat lantai lantai m2
Jumlah m2
# Beton
Luas m2
Tebal m'
Jumlah m3
Pembesian
Penghitungan ( 0,5 x 9 ) dengan jarak 15 cm
Luas / 9 m2
Tulangan horizontal = 9 x 4 = 36 m'
Tulangan vertikal = 0,5 x 62 = 31 m'

Jumlah m'
Luas / 1 m2
Panjang tulangan 13 m' m'
Peanjang / m2 m2
Jumlah m'
Pembesian los
Luas plat m2
kebutuan besi / m2 m'
Besi dia 10 mm ( bbt/m' ) kg
Jumlah kg
12 Cor plat top dag
# Luas plat
Luas A
Panjang m'
Lebar m'
Jumlah m2
Luas B
Panjang m'
Lebar m'
Jumlah m2
Luas keseluruhan
Luas A m2
Luas B m2
Jumlah m2
# Pasang begesting
Luas plat lantai lantai m2
Jumlah m2
# Beton
Luas m2
Tebal m'
Jumlah m3
Pembesian
Penghitungan ( 3 x 3 ) dengan jarak 15 cm
Luas / 9 m2
Tulangan bagi ( 3 : 3 ) = 1 : 0,15 = 6,6 x 4 = 26,4 x 3 m' m'
Tulangan pokok atas / kuda ( 3 : 0,5 ) = 1,5 : 0,15 = 11 x 2 = 22 x 3 m'
Tulangan pokok bawah ( 3 : 0,15 ) = 21 x 2 = 42 x 3 m'
Tulangan ekstra ( 3 : 0,5 ) = 1,5 : 0,15 = 10 x 4 = 40 x 0,8 m'
Jumlah m'
Luas / 1 m2
Panjang tulangan 9 m2 m'
Peanjang / m2 m2
Jumlah m'
Pembesian los
Luas plat m2
kebutuan besi / m2 m'
Besi dia 10 mm ( bbt/m' ) kg
Jumlah kg
13 Pekerjaan tangga
a Sloof tangga 20/30 cm
Vol urugan pasir
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
Cor lantai kerja
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
Pekerjaan begesting
Panjang m'
Tinggi (0,3 x 2) m'
Jumlah m2
Cor
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
Pembesian dia 16 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 16 mm ( bbt/m' ) kg
Jumlah kg
Bobot besi dia 10 mm
Panjang m'
Jarak beugel Mengetahui : m'
PELAKSANA KEGIATAN
Jumlah beugel
PROYEK PEMBANGUNAN PRASARANA
Diajukan
PENDIDIKAN
Oleh : TA. 2004 bh
KONTRAKTOR PELAKSANA
CV. ALVIN ANDHIKA
Mengetahui :
PELAKSANA KEGIATAN
PROYEK PEMBANGUNAN PRASARANA Diajukan
PENDIDIKAN
Oleh : TA. 2004
KONTRAKTOR PELAKSANA
Panjang 1 bh beugel ( 0,15 x 2 ) + ( CV.
0,25ALVIN
x 2 ) +ANDHIKA
( 0,05 X 2 ) m'
Besi dia 10 mm (bbt/m') kg
Jumlah kg
b Balok tangga 12/40 cm
Pekerjaan begesting RIZA HERIANNOOR,S.Kom
MUHAMMAD IDRIS Direktur
Panjang Nip. 550 015 266 m'
Tinggi (0,4 x 2) m'
Jumlah m2
Cor
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 12 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 12 mm ( bbt/m' ) kg
Jumlah kg
# Bobot besi dia 8 mm
Panjang m'
Jarak beugel Mengetahui : m'
PELAKSANA KEGIATAN
Jumlah beugel
PROYEK PEMBANGUNAN PRASARANA Diajukan
PENDIDIKAN
Oleh : TA. 2004 bh
KONTRAKTOR PELAKSANA
Panjang 1 bh beugel ( 0,07 x 2 ) + ( CV.
0,35ALVIN
x 2 ) +ANDHIKA
( 0,05 X 2 ) m'
Besi dia 8 mm ( bbt/m' ) kg
Jumlah kg
# Pekerjaan plat dan anak tangga
Pekerjaan begesting RIZA HERIANNOOR,S.Kom
MUHAMMAD IDRIS Direktur
Plat Nip. 550 015 266
Panjang = (3,5 x 2) + 3 m'
Lebar m'
Jumlah m2
Anak tangga
Panjang = (24 x 1,5) m'
Tinggi m'
Jumlah m2
Volume
Plat m2
Anak tangga m2
Jumlah m2
Pekerjaan cor
Plat
Luas m2
Tebal m'
Jumlah m3
Anak tangga
Volume
0,5 x a x t = ( 0,5 x 0,3 x 0,2 ) m2
Panjang m'
Jumlah m3
Volume cor
Plat m3
Anak tangga m3
Jumlah m3
Pembesian
Pembesian plat tangga
Panjang horizontal
Panjang plat m'
Jarak tulangan m'
Jumlah bh
Jumlah besi bh
Panjang besi/bh m'
Jumlah m'
Panjang vertikal
Lebar plat m'
Jarak tulangan m'
Jumlah bh
Jumlah besi bh
Panjang besi/bh m'
Jumlah m'
# Pembesian plat tangga
Horizontal m'
Vertikal m'
Jumlah m'
# Pembesian anak tangga
Panjang horizontal
Lebar plat m'
Jumlah tulangan bh
Jumlah anak tangga bh
Jumlah m'
Panjang vertikal
Panjang besi 1 bh ( 0,2 + 0,3 ) + ( 0,05 x 2 ) m'
Jumlah tulangan ( 1,5 : 0,2 ) bh
Jumlah anak tangga bh
Jumlah m'
# Pembesian anak tangga
Horizontal m'
Vertikal m'
Jumlah m'
# Pembesian anak dan plat tangga
Panjang plat tangga m'
Panjang anak tangga m'
Besi dia 10 mm ( bbt/m' ) kg
Jumlah kg
14 Pembuatan beton kanopy
# Balok 12/12 cm
# Panjang lt. 1
# Panjang depan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kiri
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kanan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang belakang
Arah horizontal m'
Jumlah m'
# Panjang lt. 1 keseluruhan
Panjang depan m'
Panjang samping kiri m'
Panjang samping kanan m'
Panjang belakang m'
Jumlah m'
# Panjang lt. 2
# Panjang depan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kiri
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kanan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang belakang
Arah horizontal m'
Jumlah m'
# Panjang lt. 2 keseluruhan
Panjang depan m'
Panjang samping kiri m'
Panjang samping kanan m'
Panjang belakang m'
Jumlah m'
# Panjang keseluruhan
Panjang lt. 1 m'
Panjang lt. 2 m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar (0,12 x 2) m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian dia 12 mm
Panjang m'
Jumlah Tulangan bh
Besi dia 12 mm ( bbt/m' ) kg
Jumlah kg
# Pembesian dia 8 mm
Panjang m'
Jarak beugel m'
Jumlah beugel bh
Panjang 1 bh beugel (0,07 x 4) + (0,05 X 2) m'
Besi dia 8 mm (bbt/m') kg
Jumlah kg
# Plat kanopy
# Panjang lt. 1
# Panjang depan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kiri
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kanan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang belakang
Arah horizontal m'
Jumlah m'
# Panjang lt. 1 keseluruhan
Panjang depan m'
Panjang samping kiri m'
Panjang samping kanan m'
Panjang belakang m'
Jumlah m'
# Panjang lt. 2
# Panjang depan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kiri
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang samping kanan
Arah vertikal m'
Arah horizontal m'
Jumlah m'
# Panjang belakang
Arah horizontal m'
Jumlah m'
# Panjang lt. 2 keseluruhan
Panjang depan m'
Panjang samping kiri m'
Panjang samping kanan m'
Panjang belakang m'
Jumlah m'
# Panjang keseluruhan
Panjang lt. 1 m'
Panjang lt. 2 m'
Jumlah m'
Pasang begesting
Panjang m'
Lebar m'
Jumlah m2
Pengecoran
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
# Pembesian plat
Panjang/m2 m'
Luas = luas begesting m2
Jumlah m'
# Pembesian dia 8 mm
Panjang m'
Besi dia 8 mm (bbt/m') kg
Jumlah kg
# Plesteran
Panjang m'
Lebar atas bawah = (0,4 x 2) m'
Jumlah m2
# Acian plesteran dinding kanopy
Panjang m'
Tinggi m'
Jumlah m2
IV Pekerjaan Dinding
# Luas kotor dinding badan bangunan
Luas kotor dinding lantai 1
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Panjang dinding m'
Tinggi pasangan m'
Jumlah m2
Luas kotor dinding lantai 2
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Panjang dinding m'
Tinggi pasangan m'
Jumlah m2
Luas dinding layar depan
Panjang m'
Tingggi m'
Jumlah m2
Luas dinding layar samping
Panjang m'
Tingggi = (3,25 + 0,5) : 2 m'
Jumlah m2
Luas samping m2
Jumlah tampak bh
Jumlah m2
Luas kotor dinding keseluruhan
Luas kotor dinding lantai 1 m2
Luas kotor dinding lantai 2 m2
Luas dinding layar depan m2
Luas dinding layar samping m2
Jumlah m2
# Luas pengurangan
Luas pintu dan jendela
PJ1 = 1 bh x (2,5 x 1,6) + (2,15 x 0,6) x 2) m2
PJ2 = 5 bh x (2,5 x 0,9) + (1,7 x 1,85) m2
P1 = 2 bh x (2,5 x 1,6) m2
P2 = 3 bh x (2,5 x 0,9) m2
P3 = 5 bh x (2,1 x 0,8) m2
J1 = 1 bh x (1,6 x 0,5) m2
J2 = 19 bh x (1,6 x 1) m2
J4 = 3 bh x (1,6 x 1,85) m2
J panjang daoble = 2 bh x (0,6 x 4,2) m2
J panjang tunggal = 1 bh x (0,6 x 2,15) m2
BV = 4 bh x (0,5 x 1,35) m2
Jumlah m2
Luas bersih dinding
Luas kotor dinding keseluruhan m2
Luas pengurangan m2
Jumlah m2
1 Pasangan dinding 1:2
Luas keseluruhan m2
Tinggi pasangan %
Jumlah m2
2 Pasangan dinding 1:4
Luas keseluruhan m2
Luas camp. 1 : 2 m2
m2
3 Vol plesteran 1:2
Luas Pasangan m2
Luar dalam kl
Jumlah m2
4 Vol plesteran 1:4
Luas Pasangan m2
Luar dalam kl
Jumlah m2
5 Vol plesteran 1:4 penebalan bagian bawah
(3 x 9) m2
Jumlah m2
6 Vol plesteran 1:4 penebalan bagian atas
(1,65 x 13,65) m2
(1,75 x 9) m2
Jumlah m2
7 Vol acian untuk plesteran
Vol plesteran 1:2 m2
Vol plesteran 1:4 m2
Jumlah m2
8 Vol pasangan dinding keramik
# KM/WC
Pas. Ful ( 0,9 + 1,2 + 1,2 ) x 1,5 m2
Diatas bak mandi ( 1,1 + 0,8 ) x 1 m2
Diatas closed ( 0,6 + 0,7 ) x 1,45 m2
Jumlah m2
# Vol pasangan dinding keramik
Luas pas. Keramik m2
Jumlah KM/WC bh
Jumlah m2
9 Pasang batu alam
Tampak depan
(7 x 3) - J panjang daoble = 2 bh x (0,6 x 4,2) m2
(3 x 3) m2
Jumlah m2
10 Pembuatan profil kolom teras
Kolom utama bh
Kolom bantu bh
Jumlah bh
V Pekerjaan lantai
1 Urugan tanah dibawah lantai
Luas A
Panjang m'
Lebar m'
Jumlah m2
Luas B
Panjang m'
Lebar m'
Jumlah m2
Luas keseluruhan
Luas A m2
Luas B m2
Jumlah m2
Volume urugan tanah
Luas urugan m2
Tinggi m'
Jumlah m3
2 Urugan pasir dibawah lantai
Luas urugan m2
Tinggi m'
Jumlah m3
3 Cor dibawah lantai keramik
Luas m2
Tinggi m'
Jumlah m3
4 Acian untuk cor rabat
Panjang m'
Lebar m'
Jumlah m2
5 Pasangan keramik ruangan 40/40 cm
Luas kotor lt. 1
Luas A
Panjang m'
Lebar m'
Jumlah m2
Luas B
Panjang m'
Lebar m'
Jumlah m2
Luas C
Panjang m'
Lebar m'
Jumlah m2
Luas lt. 1 kotor
Luas A m2
Luas B m2
Luas C m2
Jumlah m2
Luas kotor lt. 2
Luas A
Panjang m'
Lebar m'
Jumlah m2
Luas B
Panjang m'
Lebar m'
Jumlah m2
Luas C
Panjang m'
Lebar m'
Jumlah m2
Luas kotor keseluruhan
Luas kotor lt. 1 m2
Luas kotor lt. 2 m2
Jumlah m2
Luas pengurangan
KM/WC = (4 x 3) x 2 atas bawah m2
Jumlah m2
# Luas bersih
Luas kotor keseluruhan m2
Luas pengurangan m2
Jumlah m2
6 Pasangan keramik teras 40/40 cm
Luas A
Panjang m'
Lebar m'
Jumlah m2
7 Pasangan keramik 20/20 cm
KMWC
Luas/kmwc = (1,2 x 1,5) m2
Jumlah bh
Jumlah m2
Luar KMWC
Bawah = (1 x 3) m2
Atas = (2,5 x 1,5) + (1 x 1,5) m2
Jumlah m2
Luas keseluruhan
KMWC m2
Luar KMWC m2
Jumlah m2
8 Pekerjaan parit tritisan
Galian
Panjang m'
Lebar m'
tinggi m'
Jumlah m3
# Urugan pasir
Panjang m'
Lebar m'
tinggi m'
Jumlah m3
# Cor lantai
Panjang m'
Lebar m'
tinggi m'
Jumlah m3
# Pasang dinding bata
Panjang rabat m'
Tinggi m'
Jumlah m2
# Plesteran dinding parit
Luas pasangan m2
Luar dalam kl
Jumlah m2
# Acian Plesteran dinding parit
Luas = luas plesteran m2
Jumlah m2
# Pasangan bak kontrol parit tritisan
bh
bh
# Pasangan grill penutup parit bagian teras
m'
m'
VI Pekerjaan kusen, pintu dan penggatung
# Panjang kusen keseluruhan
PJ1 = 1 bh (2,5 x 2) + (2,15 x 2) + (2,7 x 2) + (0,05 x 4) m'
PJ2 = 5 bh (2,5 x 2) + (1,85 x 2) + (2,65 x 2) + (1,75 x 1) + (0,05 x 3) m'
P1 = 2 bh (2,5 x 2) + (1,4 x 2) + (0,05 x 2) m'
P2 = 3 bh (2,5 x 2) + (0,9 x 2) + (0,05 x 2) m'
P3 = 5 bh (2,1 x 2) + (0,8 x 1) + (0,05 x 2) m'
J1 = 1 bh x (1,6 x 2) + (0,5 x 2) + (0,05 x 4) m'
J2 = 19 bh x (1,6 x 3) + (1 x 2) + (0,05 x 4) m'
J4 = 3 bh x (1,6 x 5) + (2,25 x 2) + (0,05 x 4) m'
J panjang doble = 1 bh x (4,2 x 4) + (0,6 x 10) + (0,05 x 8) m'
J panjang tunggal = 1 bh x (2,15 x 2) + (0,6 x 3) + (0,05 x 4) m'
BV = 4 bh x (0,5 x 3) + (1,35 x 2) + (0,05 x 4) m'
Jumlah m'
1 Pasang kusen kayu ulin
P3 = 5 bh (2,1 x 2) + (0,8 x 1) + (0,05 x 2) m'
Jumlah m'
2 Pasang kusen kayu bengkirai
PJ1 = 1 bh (2,5 x 2) + (2,15 x 2) + (2,7 x 2) + (0,05 x 4) m'
PJ2 = 5 bh (2,5 x 2) + (1,85 x 2) + (2,65 x 2) + (1,75 x 1) + (0,05 x 3) m'
P1 = 2 bh (2,5 x 2) + (1,4 x 2) + (0,05 x 2) m'
P2 = 3 bh (2,5 x 2) + (0,9 x 2) + (0,05 x 2) m'
J1 = 1 bh x (1,6 x 2) + (0,5 x 2) + (0,05 x 4) m'
J2 = 19 bh x (1,6 x 3) + (1 x 2) + (0,05 x 4) m'
J4 = 3 bh x (1,6 x 5) + (2,25 x 2) + (0,05 x 4) m'
J panjang doble = 1 bh x (4,2 x 4) + (0,6 x 10) + (0,05 x 8) m'
J panjang tunggal = 1 bh x (2,15 x 2) + (0,6 x 3) + (0,05 x 4) m'
BV = 4 bh x (0,5 x 3) + (1,35 x 2) + (0,05 x 4) m'
Jumlah m'
3 Pasang pintu kayu ulin
P3 = 5 bh x 1 bh
Jumlah bh
4 Pasang pintu kayu bengkirai
PJ2 = 5 bh x 1 bh
P1 = 2 bh x 2 bh
P2 = 3 bh x 1 bh
Jumlah bh
5 Pasang pintu kaca
PJ1 = 1 bh x 2 bh
Jumlah bh
6 Pasang daun jendela besar
J1 = 1 bh x 1 bh
J2 = 19 bh x 2 bh
J4 bh
Jumlah bh
7 Pasang daun jendela kecil
PJ1 = 1 bh x 1 bh
Jumlah bh
8 Pasang engsel pintu
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
9 Pasang grendel pintu
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
10 Pasang kunci 1 slagg biasa
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
11 Pasang kunci 2 slagg biasa
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
12 Pasang engsel jendela
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
13 Pasang hak angin jendela
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
14 Pasang grendel jendela
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
15 Pasang handle jendela
Jumlah daun bh
Pasangan/daun bh
Jumlah bh
16 Pasang kaca mati 5 mm
PJ1
(1,65 x 0,60) + (0,6 x 0,5) m2
Jumlah bh
Jumlah m2
PJ2
(1,35 x 0,85) x 2 m2
Jumlah bh
Jumlah m2
P1
(1,35 x 0,6) m2
Jumlah bh
Jumlah m2
BV km/wc
(0,65 x 0,55) x 2 m2
Jumlah bh
Jumlah m2
J panjang doble
(0,55 x 4,20) m2
Jumlah bh
Jumlah m2
J panjang tunggal
(0,55 x 1,65) m2
Jumlah bh
Jumlah m2
Luas kaca mati keseluruhan
PJ1 m2
PJ2 m2
P1 m2
BV km/wc m2
J panjang doble m2
J panjang tunggal m2
Jumlah m2
VII Pekerjaan Rangka dan Atap
1 Pasang rangka kuda - kuda baja ringan
Panjang m'
Lebar m'
Jumlah m2
2 Pasang atap
Luas tampak m2
Jumlah m2
3 Vol panjang list plank
Panjang = (15 x 1) + (0,5 x 2) m'
Lebar m'
Jumlah m2
VIII Pekerjaan Plafond
1 Pasang rangka + plafond
Lantai 1
Luas A
Panjang m'
Lebar m'
Jumlah m2
Luas B
Panjang m'
Lebar m'
Jumlah m2
Luas lt. 1 keseluruhan
Luas A m2
Luas B m2
Jumlah m2
Lantai 2
Luas A
Panjang m'
Lebar m'
Jumlah m2
Luas B
Panjang m'
Lebar m'
Jumlah m2
Luas lt. 2 keseluruhan
Luas A m2
Luas B m2
Jumlah m2
Tritisan
Panjang m'
Lebar m'
Jumlah m2
Luas kotor plafond keseluruhan
Lantai 1 m2
Lantai 2 m2
Tritisan m2
Jumlah m2
Luas pengurangan
Panjang m'
Lebar m'
Jumlah m2
Luas bersih plafond keseluruhan
Luas kotor plafond keseluruhan m2
Luas pengurangan m2
Jumlah m2
2 Pasang list plafond
Panjang ring balk = (129 + 89) x 2 m'
Panjang list plank x 1 m'
Jumlah m'
IX Pekerjaan Elektrikal
Pasang lampu tanam TL 2 x 20 Watt bh
Pasang down light PLC 100 bh
Pasang lampu EL 18 Watt bh
Pasang lampu EL 8 Watt bh
Pasang stop kontak bh
Pasang instalasi ttik lampu bh
Pasang saklar ganda bh
Pasang saklar tunggal bh
Pasang Box MCB 8 group bh
Pasang breaker 8 Amp bh
Pasang penangkal petir bh
X Pekerjaan Sanitasi
1 Closed duduk bh
2 Pasang bak mandi lapis keramik
a Pasang pondasi rollag 1 : 2
Panjang = (1 x 2) + (0,7 x 2) m'
Lebar m'
Jumlah m2
Volume / unit m2
Jumlah bak mandi bh
Jumlah m2
b Pasang dinding bata 1 : 2
Panjang = (1 x 2) + (0,7 x 2) m'
Tinggi m'
Jumlah m2
Volume / unit m2
Jumlah bak mandi bh
Jumlah m2
c Plesteran dinding bata 1 : 2
Luas
( 1 + 0,7 ) x 0,9 x 2 m2
( 1 + 0,7 ) x 0,9 m2
Jumlah m2
Volume / unit m2
Jumlah bak mandi bh
Jumlah m2
d Cor lantai
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
Volume / unit m3
Jumlah bak mandi bh
Jumlah m2
e Pasang keramik dinding 20/25 cm
Luas
( 1 + 0,7 ) x 0,9 x 2 m2
( 1 + 0,7 ) x 0,9 m2
Jumlah m2
Volume / unit m2
Jumlah bak mandi bh
Jumlah m2
f Pasang keramik lantai 20/20 cm
Luas
Panjang m'
lebar m'
Jumlah m2
Volume / unit m2
Jumlah bak mandi bh
Jumlah m2
g Pasang kran air bak mandi
bh
Jumlah bh
h Pasang flordrain
bh
Jumlah bh
4 Pasang instalasi air bersih
a Pipa PVC 1/2"
untuk KM/WC m'
b Pipa 3/4"
untuk KM/WC m'
5 Instalasi air kotor
a Pipa 2"
untuk KM/WC m'
b Pipa 4"
untuk septictank & resapan m'
c Pasang flordrain KM/WC bh
6 Septictank + resapan
a Galian tanah
Panjang m'
lebar m'
Tinggi m'
Jumlah m3
b Pondasi rolag bata
Panjang = ( 2 + 2 + 1 + 1 ) m'
lebar m'
Tinggi m'
Jumlah m3
c Pasang penggantung kayu ulin 10/10 cm
Panjang = ( 1 + 1 ) m'
lebar m'
Tinggi m'
Jumlah m3
d Pasang dinding bata camp. 1 : 2
Luas ful
Panjang = ( 2 + 2 + 1 + 1 ) m'
Tinggi m'
Jumlah m2
Luas tengah
Panjang = ( 1 + 1 ) m'
Tinggi m'
Jumlah m2
Luas keseluruhan
Luas ful m2
Luas tengah m2
Jumlah m2
Volume Pasang dinding bata camp. 1 : 2
Luas keseluruhan m2
Tebal m'
Jumlah m3
e Plesteran dinding camp. 1 : 2
Luas keseluruhan bh
Luar dalam kl
Jumlah m2
f Urugan pasir lantai
Panjang m'
lebar m'
Tebal m'
Jumlah m3
g Pasang begesting plat
Panjang m'
lebar m'
Jumlah m2
h Pasang Pembesian plat
Arah horizontal
Panjang 1 ttk m'
Jumlah ttk ttk
Jumlah m'
Arah vertikal
Panjang 1 ttk m'
Jumlah ttk ttk
Jumlah m'
Panjang besi keseluruhan
Arah horizontal m'
Arah vertikal m'
Jumlah m'
Bobot besi keseluruhan dia 12 mm
Panjang besi keseluruhan m'
Besi dia 12 mm ( bbt/m' ) kg
Jumlah kg
i Cor plat
Panjang m'
Lebar m'
Tebal m'
Jumlah m3
j Pasang pipa hawa galvanis
m'
Jumlah m'
k Pembuatan resapan
ls
Jumlah ls
7 Pekerjaan tandon air + menara kayu ulin
a Galian pondasi
Volume 1 ttk pondasi
Panjang m'
tinggi m'
lebar m'
Jumlah m3
Volume /ttk m3
Jumlah ttk ttk
Jumlah m3
b Urugan pasir/ 1 bh pondasi
Panjang m'
lebar m'
tinggi m'
Jumlah m3
Volume /ttk m3
Jumlah ttk ttk
Jumlah m3
c Volume cor 1 ttk pondasi
Panjang m'
tinggi m'
lebar m'
Jumlah m3
Volume /ttk m3
Jumlah ttk ttk
Jumlah m3
d Melobang tongkat pada setiap pen
Jumlah = ttk tongkat bh
Jumlah bh
e Psg sunduk ulin 5/10
Jumlah ttk
Panjang 1 bh pancang m'
Jumlah m'
Volume sunduk
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
f Pengadaan tongkat ulin 10/10 cm
Jumlah ttk
Panjang 1 bh tiang m'
Jumlah m'
Volume pengadaan pancang
Panjang m'
Lebar m'
Tinggi m'
Jumlah m3
g Upah meruncing pancang ulin 10/10 cm
Jumlah pancang bh
Jumlah bh
h Upah memancang ulin 10/10 cm
Jumlah ttk
Panjang 1 bh pancang m'
Jumlah m'
i Pasang suai ulin 5/10 cm
Panjang / bh suai ( 2,25 x 2 bh ) m'
Jumlah ttk ttk
Jumlah m'
Volume suai 5/10 cm
Panjang m'
Tinggi m'
Lebar m'
Jumlah m3
j Pasang balok ulin 10/10 cm
Panjang ( 1,5 x 2 ) + (1,5 x 4) m'
Tinggi m'
Lebar m'
Jumlah m3
k Pasang gelagar ulin 5/10 cm
Jumlah gelagar
Jumlah ttk gelagar ttk
Panjang / bh gelagar m'
Jumlah m'
Volume gelagar 5/10 cm
Panjang m'
Tinggi m'
Lebar m'
Jumlah m3
l Pasang lantai papan ulin 2/20 cm
Panjang m'
Lebar m'
Jumlah m'
m Pasang pagar ulin
Panjang ( 1,5 x 3 ) + 1 m'
Jumlah m'
n Pasang tangga ulin
ls
Jumlah ls
o Pasang stop kran
bh
Jumlah bh
p Pasang tandon air @ 1200 ltr
bh
Jumlah bh
q Pasang baut dan mur pada suai angin
bh
Jumlah bh
r Pasang rofdrain corong talang bh
Jumlah bh
s Pasang penggantung besi diameter 10 mm bh
Panjang 1 bh = 0,15 + ( 0,15 x 2 ) m'
Jumlah pasangan penggantung = 15 : 2 bh
Jumlah m'
Panjang keseluruhan m'
Bobot besi 10 mm/m' kg
Jumlah kg
t Pasang talang gantung PVC "U" m'
Jumlah m'
XI Pekerjaan Cat - catan
1 Cat dinding bagian dalam
Cat dinding bagian dalam m2
Jumlah m2
2 Cat dinding bagian luar
Cat dinding bagian luar m2
Jumlah m2
3 Cat dinding kanopy
Acian plesteran dinding kanopy m2
Jumlah m2
4 Cat plafond
Cat = luas volume plafond m2
Jumlah m2
5 Cat kilap
Kusen
Panjang kusen m'
Lebar permukaan (0.05 x 2 ) + (0.12 x 2) m'
Jumlah m2
Daun pintu
Laus 1 daun pintu (0,7 x 2,1 ) x 2 m2
Jumlah daun m2
Jumlah m2
Daun jendela besar
Jumlah daun bh
Luas 1 bingkai = {( 1,3 x 2 ) + ( 0,6 x 2 )} x {( 0,1 x 2 ) + 0,05 )} m2
Jumlah m2
Daun jendela kecil
Jumlah daun bh
luas 1 bingkai = {( 0,6 x 2 ) + ( 0,4 x 2 )} x {( 0,1 x 2 ) + 0,05 )} m2
Jumlah m2
List plank
Panjang list plank m'
Lebar m'
Jumlah m2
Luas cat kilap keseluruhan
Kusen m2
Daun pintu m2
Daun jendela besar m2
Daun jendela kecil m2
List plank m2
Jumlah m2
N GEREJA

VOLUME KETERANGAN

1.000
1.000

23.000
11.500
11.500
23.000
69.000
1.000

1.000
1.000

38.000
50.000
3.066
5,825.400

34.000
1.000
0.600
1.000
20.400

34.000
9.000
0.100
0.100
4.000
12.240

34.000
9.000
4.000
1,224.000

34.000
1.000
0.050
1.000
1.700

34.000
1.000
0.070
1.000
2.380

0.300
4.000
1.200
1.200
34.000
40.800

34.000
1.000
0.300
1.000
10.200

10.000
1.578
7.000
5.100
563.346

10.000
1.578
7.000
5.100
563.346

563.346
563.346
1,126.692

20.400
0.250
5.100

6.000
3.000
9.000
9.000
1.000
0.700
6.300

9.000
1.000
0.050
0.450

9.000
1.000
0.200
1.800

0.300
0.700
0.500
0.500
9.000
0.800
3.600

6.300
0.250
1.575

88.500
54.000
142.500

142.500
0.600
85.500

142.500
0.200
0.300
8.550

30.000
6.000
1.578
284.040
30.000
0.150
200.000
0.900
0.617
111.060

9.000
0.400
3.600

9.000
0.150
0.200
0.270

59.000
6.000
1.578
558.612

59.000
0.150
393.333
0.600
0.395
93.220

5.000
16.000
80.000

3.750
16.000
60.000

80.000
60.000
140.000

140.000
1.600
224.000

140.000
0.400
0.400
22.400

43.000
4.000
1.578
271.416

43.000
0.150
286.667
1.500
0.617
265.310

5.000
16.000
80.000

3.750
8.000
30.000
80.000
30.000
110.000

110.000
1.200
132.000

110.000
0.300
0.300
9.900

110.000
8.000
1.578
1,388.640

110.000
0.150
733.333
1.100
0.617
497.713

4.000
2.000
8.000

8.000
1.500
12.000

8.000
0.450
0.300
1.080

8.000
10.000
1.578
126.240

8.000
0.150
53.333
1.400
0.617
46.069

4.000
4.000
16.000

16.000
0.600
9.600

16.000
0.150
0.150
0.360

16.000
4.000
1.578
100.992

16.000
0.150
106.667
0.500
0.617
32.907

4.000
8.000
32.000

3.750
8.000
30.000

3.250
6.000
19.500

4.000
3.500
1.000
8.500

19.500
8.500
28.000

32.000
30.000
28.000
90.000

90.000
0.240
21.600

90.000
0.120
0.120
1.296

90.000
4.000
0.888
319.680

90.000
0.150
600.000
0.380
0.395
90.060

89.500
80.000
169.500

24.000
36.000
60.000

169.500
60.000
229.500

229.500
1.400
321.300

229.500
0.300
0.400
27.540

229.500
9.000
1.578
3,259.359

229.500
0.150
1,530.000
1.300 0.5
0.617 0.7
1,227.213

13.000
0.520
6.760

13.000
0.120
0.500
0.780

13.000
4.000
0.888
46.176

13.000
0.150
86.667
0.440
0.395
15.063
15.000
20.000
35.000

59.000
0.300
17.700

59.000
0.150
0.200
1.770

59.000
4.000
0.888
209.568

59.000
0.150
393.333
0.900
0.395
139.830

9.000
0.500
4.500

2.000
0.500
1.000
2.000
0.500
1.000

4.500
1.000
1.000
6.500

-
-
-

6.500
-
6.500

6.500
6.500

6.500
0.070
0.455

36.000
31.000 60

67.000

67.000
9.000
7.444
6.500
67.000
0.617
268.834

10.500
4.000
42.000

10.500
4.000
42.000

42.000
42.000
84.000

84.000
84.000

84.000
0.100
8.400

79.200
66.000
126.000
32.000
303.200

303.200
9.000
33.689

84.000
33.689
0.617
1,746.877

3.000
0.300
0.050
0.045

3.000
0.300
0.050
0.045

3.000
0.600
1.800

3.000
0.200
0.300
0.180

3.000
8.000
1.578
37.872

3.000
0.150
20.000
0.900
0.617
11.106

8.500
0.800
6.800

8.500
0.120
0.400
0.408

8.500
8.000
0.888
60.384

8.500
0.150
56.667
0.940
0.395
21.040

10.000
1.250
12.500

36.000
0.200
7.200
12.500
7.200
19.700

19.700
0.080
1.576

0.030
36.000
1.080

1.576
1.080
2.656

10.000
0.150
66.667
66.667
1.250
83.333

1.500
0.150
10.000
10.000
10.000
100.000

83.333
100.000
183.333

1.500
3.000
24.000
108.000

0.600
8.000
24.000
115.200

108.000
115.200
223.200

183.333
223.200
0.617
321.048

32.000
12.600
44.600

16.000
5.400
21.400

8.000
4.700
12.700
7.200
7.200

44.600
21.400
12.700
7.200
85.900

40.000
17.100
57.100

16.000
5.400
21.400

-
1.800
1.800

7.200
7.200

57.100
21.400
1.800
7.200
87.500

85.900
87.500
173.400
173.400
0.240
41.616

173.400
0.120
0.120
2.497

173.400
4.000
0.888
615.917

173.400
0.150
1,156.000
0.380
0.395
173.516

16.000
12.600
28.600

8.000
5.400
13.400

4.000
4.700
8.700

7.200
7.200

28.600
13.400
8.700
7.200
57.900

20.000
17.100
37.100

8.000
5.400
13.400

-
1.800
1.800

7.200
7.200

37.100
13.400
1.800
7.200
59.500

57.900
59.500
117.400

117.400
0.400
46.960

117.400
0.400
0.070
3.287

12.000
46.960
563.520

563.520
0.395
222.590

117.400
0.800
93.920

117.400
0.800
93.920

80.000
49.500
129.500
129.500
3.750
485.625

51.500
37.500
89.000
89.000
3.500
311.500

15.000
3.250
48.750

9.500
1.875
17.813
17.813
2.000
35.625

485.625
311.500
48.750
35.625
881.500

6.580
26.975
8.000
6.750
8.400
0.800
30.400
8.880
5.040
1.290
2.700
105.815

881.500
105.815
775.685

775.685
15.000
116.353

775.685
116.353
659.332

116.353
2.000
232.706

659.332
2.000
1,318.665

27.000
27.000

22.522
15.750
38.272

232.706
1,318.665
1,551.370

4.950
1.900
1.885
8.735

8.735
5.000
43.675

15.960
9.000
24.960

2.000
2.000
4.000

23.000
10.500
241.500

5.000
3.000
15.000

241.500
15.000
256.500

256.500
0.300
76.950

256.500
0.050
12.825

256.500
0.050
12.825

48.000
1.000
48.000

8.500
3.000
25.500

8.500
3.000
25.500

15.000
9.500
142.500

25.500
25.500
142.500
193.500

8.500
3.000
25.500

8.500
3.000
25.500

15.000
9.500
142.500

193.500
142.500
336.000

24.000
24.000

336.000
24.000
360.000

5.000
3.000
15.000

1.800
5.000
9.000

3.000 3.75
5.250
8.250

9.000
8.250
17.250

48.000
0.540
0.410
10.627
48.000
0.540
0.050
1.296

48.000
0.300
0.150
2.160

48.000
1.100
52.800

52.800
2.000
105.600

105.600
105.600

4.000
4.000

6.000
6.000

14.500
79.500
15.800
20.700
25.500
4.400
133.000
38.100 38.1
23.200
6.300
17.600
378.600

25.500
25.500

14.500
8.100
15.000
63.600 10.35
13.000
191.400
29.440
4.800
4.800
4.800
349.440

5.000
5.000

5.000
4.000
3.000
12.000

2.000
2.000

1.000
38.000
10.000
49.000
1.000
1.000

19.000
3.000
57.000

19.000
2.000
38.000

5.000
1.000
5.000

11.000
1.000
11.000

50.000
2.000
100.000

50.000
2.000
100.000

50.000
2.000
100.000

50.000
1.000
50.000
1.200 0.99
2.000
2.400

2.295 0.4
5.000
11.475

0.810
2.000
1.620

0.358
4.000
1.431

2.310
4.000
9.240

0.908 2.295
1.000
0.908

2.400
11.475
1.620
1.431
9.240
0.908
27.074

15.000
11.000
165.000

165.000
165.000

15.500
0.360
5.580

21.000
8.500
178.500

15.000
1.000
15.000

178.500
15.000
193.500

21.000
8.500
178.500

15.000
1.000
15.000

178.500
15.000
193.500
15.000
1.000
15.000

193.500
193.500
15.000
402.000

3.000
3.000
9.000

402.000
9.000
393.000

332.000
15.500
347.500

6.000
12.000
20.000
5.000
12.000
55.000
6.000
8.000
2.000
2.000
1.000

5.000
3.400
0.400
1.360
1.360
5.000
6.800

3.400
0.900
3.060
3.060
5.000
15.300

3.060
1.530
4.590
4.590
5.000
22.950

0.750
0.450
0.150
0.051
0.051
5.000
0.253

3.060
1.530
4.590
4.590
5.000
22.950

1.000
0.700
1.700
1.700
5.000
8.500

5.000
5.000

5.000
5.000

20.000

25.000

15.000

40.000
5.000

2.000
1.000
1.600
3.200

6.000
0.200
0.200
0.240

2.000
0.100
0.100
0.020

6.000
1.650
9.900

2.000
1.000
2.000

9.900
2.000
11.900

11.900
0.090
1.071

11.900
2.000
23.800

2.000
1.000
0.050
0.100

2.000
1.000
2.000

2.000
7.000
14.000

1.000
14.000
14.000

14.000
14.000
28.000

28.000
0.888
24.864

2.000
1.000
0.100
0.200

0.800
0.800

1.000
1.000

0.500
0.600
0.500
0.150
0.150
6.000
0.900

0.500
0.500
0.050
0.013
0.013
6.000
0.075

0.500
0.600
0.500
0.150
0.150
6.000
0.900

6.000
6.000

6.000
0.500
3.000

3.000
0.050
0.100
0.015

6.000
8.000
48.000
48.000
0.100
0.100
0.480

6.000
6.000

6.000
2.000
12.000

4.500
8.000
36.000

36.000
0.100
0.050
0.180

9.000
0.100
0.100
0.090

4.000
1.500
6.000

6.000
0.100
0.050
0.030
1.500
1.500
2.250

5.500
5.500

1.000
1.000

1.000
1.000

2.000
2.000

20.000
20.000
1.000
1.000
30.000
0.450
30.000
13.500
13.500
0.617
8.330
15.000
15.000

620.548
620.548

930.822
930.822
93.920
93.920

393.000
393.000

378.600
0.340
128.724

2.940
19.000
55.860

49.000
0.950
46.550

1.000
0.500
0.500

15.500
0.360
5.580

128.724
55.860
46.550
0.500
5.580
237.214
Daftar Harga Satuan Upah

Harga Upah rata-


No. Uraian Pekerjaan Satuan Total Keterangan
rata/jam

1 Pekerja hari Rp 175,000.00 Rp 201,200.00


2 Tukang kayu hari Rp 202,400.00 Rp 232,700.00
3 Tukang Batu hari Rp 202,400.00 Rp 232,700.00
4 Tukang Besi hari Rp 202,400.00 Rp 232,700.00
5 Tukang cat hari Rp 202,400.00 Rp 232,700.00 1 Hari =
6 Kepala tukang hari Rp 210,000.00 Rp 241,500.00 7 Jam Kerja

7 Mandor hari Rp 210,000.00 Rp 241,500.00


8 Operator Trampil hari Rp 150,000.00 Rp 172,500.00
9 Pembantu Operator hari Rp 140,000.00 Rp 161,000.00
10 Sopir hari Rp 150,000.00 Rp 172,500.00
Daftar Harga Satuan Bahan

Uraian Harga Bahan


No. Nama Bahan Satuan HARGA ONGKOS Jumlah Profitt, dll Harga Bahan
DASAR ANGKUT
1 Tanah Urug m3 90,000.00 2,700.00 92,700.00 93,000.00 Rp 93,000.00
2 Pasir urug m3 131,250.00 3,937.50 135,187.50 136,000.00 Rp 136,000.00
3 Pasir pasang m3 329,150.00 9,874.50 339,024.50 340,000.00 Rp 340,000.00
4 Sirtu m3 300,000.00 9,000.00 309,000.00 310,000.00 Rp 310,000.00
5 Pasir beton m3 437,500.00 13,125.00 450,625.00 451,000.00 Rp 451,000.00
6 Koral beton/ kerikil m3 425,500.00 12,765.00 438,265.00 439,000.00 Rp 439,000.00
7 Batu gunung m3 244,375.00 7,331.25 251,706.25 252,000.00 Rp 252,000.00
8 Batu pecah 2/3 m3 632,500.00 18,975.00 651,475.00 652,000.00 Rp 652,000.00
9 Batu alam m2 273,600.00 8,208.00 281,808.00 282,000.00 Rp 282,000.00
10 Batu bata bh 2,500.00 75.00 2,575.00 3,000.00 Rp 3,000.00
11 Bata Ringan (Hebel) bh 13,400.00 402.00 13,802.00 14,000.00 Rp 14,000.00
12 Paving block natural bh 2,000.00 60.00 2,060.00 3,000.00 Rp 3,000.00
13 Paving Blok Warna bh 3,800.00 114.00 3,914.00 4,000.00 Rp 4,000.00
14 Kansteen K.225 15/20x30x50 bh 28,000.00 840.00 28,840.00 29,000.00 Rp 29,000.00
15 Semen pc 50 Kg zak 78,100.00 2,343.00 80,443.00 81,000.00 Rp 81,000.00
16 Semen putih zak 23,000.00 690.00 23,690.00 24,000.00 Rp 24,000.00
17 Semen warna kg 4,600.00 138.00 4,738.00 5,000.00 Rp 5,000.00
18 Semen Mortar 40 Kg kg - Rp 8,025.00
19 Kayu galam Ø 10-15 cm m 3
43,000.00 1,290.00 44,290.00 45,000.00 Rp 45,000.00
20 Kayu balok ulin 10/10 cm m 3
8,500,000.00 255,000.00 8,755,000.00 8,756,000.00 Rp 8,756,000.00
21 Kayu balok meranti m3 3,125,000.00 93,750.00 3,218,750.00 3,219,000.00 Rp 3,219,000.00
22 Kayu balok bengkirai m 3
7,500,000.00 225,000.00 7,725,000.00 7,726,000.00 Rp 7,726,000.00
23 Kayu balok resak m 3
4,500,000.00 135,000.00 4,635,000.00 4,636,000.00 Rp 4,636,000.00
24 kayu balok kelas 2 m 3
3,581,000.00 107,430.00 3,688,430.00 3,689,000.00 Rp 3,689,000.00
25 Papan Kayu meranti m 3
3,125,000.00 93,750.00 3,218,750.00 3,219,000.00 Rp 3,219,000.00
26 Papan Kayu bengkirai m 3
7,500,000.00 225,000.00 7,725,000.00 7,726,000.00 Rp 7,726,000.00
27 Papan Kayu Ulin m 3
9,000,000.00 270,000.00 9,270,000.00 9,271,000.00 Rp 9,271,000.00
28 Papan Kayu kelas 2 m 3
3,581,000.00 107,430.00 3,688,430.00 3,689,000.00 Rp 3,689,000.00
29 Papan Ruiter m 3
3,581,000.00 107,430.00 3,688,430.00 3,689,000.00 Rp 3,689,000.00
30 Papan listplank (Woodplank) m' 40,000.00 1,200.00 41,200.00 42,000.00 Rp 42,000.00
31 Baja Truss C Zingkalum m2 141,250.00 4,237.50 145,487.50 146,000.00 Rp 146,000.00
32 Skrup kg 95,000.00 2,850.00 97,850.00 98,000.00 Rp 98,000.00
33 hollow 4 x 4 galvalume rangka plafond btg 36,800.00 1,104.00 37,904.00 38,000.00 Rp 38,000.00
34 Palfon PVC panjang 6 m lebar 20 cm lbr 138,000.00 4,140.00 142,140.00 143,000.00 Rp 143,000.00
35 Kalsiboard 3.5 mm lbr 106,000.00 3,180.00 109,180.00 110,000.00 Rp 110,000.00
36 Kalsiboard 4.5 mm lbr 108,750.00 3,262.50 112,012.50 113,000.00 Rp 113,000.00
37 Triplek 3 mm lbr 60,000.00 1,800.00 61,800.00 62,000.00 Rp 62,000.00
38 Triplek 3,6 mm lbr 75,000.00 2,250.00 77,250.00 78,000.00 Rp 78,000.00
39 Triplek 6 mm lbr 107,682.00 3,230.46 110,912.46 111,000.00 Rp 111,000.00
40 Triplek 9 mm lbr 171,024.00 5,130.72 176,154.72 177,000.00 Rp 177,000.00
41 Triplek 12 mm lbr 285,039.00 8,551.17 293,590.17 294,000.00 Rp 294,000.00
42 Gypsum Standar m2 128,000.00 3,840.00 131,840.00 132,000.00 Rp 132,000.00
43 Jalusi Kayu m' 15,000.00 450.00 15,450.00 16,000.00 Rp 16,000.00
44 Jalusi Dinding layar bh 355,729.00 10,671.87 366,400.87 367,000.00 Rp 367,000.00
45 Paku Tripleks kg 27,500.00 825.00 28,325.00 29,000.00 Rp 29,000.00
46 Paku Kayu kg 27,500.00 825.00 28,325.00 29,000.00 Rp 29,000.00
47 Paku Seng kg 55,935.00 1,678.05 57,613.05 58,000.00 Rp 58,000.00
48 Paku Asbes + Karet kg 55,935.00 1,678.05 57,613.05 58,000.00 Rp 58,000.00
49 Paku Genteng Metal kg 55,935.00 1,678.05 57,613.05 58,000.00 Rp 58,000.00
50 Paku sekrup ktk 14,500.00 435.00 14,935.00 15,000.00 Rp 15,000.00
51 Paku Ulin kg 31,250.00 937.50 32,187.50 33,000.00 Rp 33,000.00
52 Paku beton ktk 31,250.00 937.50 32,187.50 33,000.00 Rp 33,000.00
53 Paku gypsum kg 27,500.00 825.00 28,325.00 29,000.00 Rp 29,000.00
54 Baut 12 mm bh 6,000.00 180.00 6,180.00 7,000.00 Rp 7,000.00
55 Kawat harmonika m 2
32,500.00 975.00 33,475.00 34,000.00 Rp 34,000.00
56 Kawat Whire mask roll 3,245,000.00 97,350.00 3,342,350.00 3,343,000.00 Rp 3,343,000.00
57 Kawat Duri roll 85,250.00 2,557.50 87,807.50 88,000.00 Rp 88,000.00
58 Kawat Nyamuk Lebar 90cm m' 28,600.00 858.00 29,458.00 30,000.00 Rp 30,000.00
59 Kawat Las 3.2mm dos 207,900.00 6,237.00 214,137.00 215,000.00 Rp 215,000.00
60 Kawat beton kg 43,782.00 1,313.46 45,095.46 46,000.00 Rp 46,000.00
61 Besi beton polos kg 16,300.00 489.00 16,789.00 17,000.00 Rp 17,000.00
62 Besi beton ulir D 16 kg 16,200.00 486.00 16,686.00 17,000.00 Rp 17,000.00
63 Besi strip kg 16,000.00 480.00 16,480.00 17,000.00 Rp 17,000.00
64 Baja Profil WF 150 kg 25,000.00 750.00 25,750.00 26,000.00 Rp 26,000.00
65 Pintu Besi m2 990,000.00 29,700.00 1,019,700.00 1,020,000.00 Rp 1,020,000.00
66 Pagar Reling besi stenlish m2 575,000.00 17,250.00 592,250.00 593,000.00 Rp 593,000.00
67 Rolling door m2 781,000.00 23,430.00 804,430.00 805,000.00 Rp 805,000.00
68 Sumur beton Ø 80 cm (gorong-gorong) bh 176,500.00 5,295.00 181,795.00 182,000.00 Rp 182,000.00
69 Sumur beton bertulang Ø 60 (gorong-gorong) m' 313,000.00 9,390.00 322,390.00 323,000.00 Rp 323,000.00
70 Sumur beton bertulang Ø 80 (gorong-gorong) m' 330,000.00 9,900.00 339,900.00 340,000.00 Rp 340,000.00
71 Sumur beton bertulang Ø 100 (gorong-gorong) m' 420,000.00 12,600.00 432,600.00 433,000.00 Rp 433,000.00
72 Plat begel bh 12,000.00 360.00 12,360.00 13,000.00 Rp 13,000.00
73 Begel besi - U bh 12,000.00 360.00 12,360.00 13,000.00 Rp 13,000.00
74 Keramik 10 x 20 m2 69,300.00 2,079.00 71,379.00 72,000.00 Rp 72,000.00
75 Keramik 20 x 20 anti slip m2 61,600.00 1,848.00 63,448.00 64,000.00 Rp 64,000.00
76 Keramik 20 x 25 m 2
61,600.00 1,848.00 63,448.00 64,000.00 Rp 64,000.00
77 Keramik 30x30 warna m 2
93,700.00 2,811.00 96,511.00 97,000.00 Rp 97,000.00
78 Keramik 40 x 40 polos m 2
97,800.00 2,934.00 100,734.00 101,000.00 Rp 101,000.00
79 Keramik 40 x 40 anti slip m 2
106,300.00 3,189.00 109,489.00 110,000.00 Rp 110,000.00
80 Granit 60 x 60 cm m2 340,300.00 10,209.00 350,509.00 351,000.00 Rp 351,000.00
81 Roster beton 30 x 30 cm bh 8,000.00 240.00 8,240.00 9,000.00 Rp 9,000.00
82 Roster kayu 20 x 20 cm bh 82,500.00 2,475.00 84,975.00 85,000.00 Rp 85,000.00
83 List Plafon PVC motif m' 85,000.00 2,550.00 87,550.00 88,000.00 Rp 88,000.00
Uraian Harga Bahan
No. Nama Bahan Satuan HARGA ONGKOS Jumlah Profitt, dll Harga Bahan
DASAR ANGKUT
84 List Profile Sudut 3/5 kayu meranti m' 12,500.00 375.00 12,875.00 13,000.00 Rp 13,000.00
85 List Profile Sudut 3/5 kayu bengkirai m' 13,000.00 390.00 13,390.00 14,000.00 Rp 14,000.00
86 Kusen kayu ulin m' 167,400.00 5,022.00 172,422.00 173,000.00 Rp 173,000.00
87 Kusen kayu bengkirai m' 123,700.00 3,711.00 127,411.00 128,000.00 Rp 128,000.00
88 Pintu Panil Kayu Ulin ukuran besar (fabrikasi) lebar 80 cm bh 825,000.00 24,750.00 849,750.00 850,000.00 Rp 850,000.00
89 Pintu Panil Kayu Ulin ukuran kecil (fabrikasi) lebar 70 cm bh 957,700.00 28,731.00 986,431.00 987,000.00 Rp 987,000.00
90 Pintu Panil Kayu Bengkirai ukuran besar (fabrikasi) L = 80 cm bh 693,000.00 20,790.00 713,790.00 714,000.00 Rp 714,000.00
91 Pintu Panil Kayu Bengkirai ukuran kecil (fabrikasi) L = 70 cm bh 680,000.00 20,400.00 700,400.00 701,000.00 Rp 701,000.00
92 Pintu Panil Kayu Bengkirai Double (fabrikasi) psg 1,375,000.00 41,250.00 1,416,250.00 1,417,000.00 Rp 1,417,000.00
93 Daun jendela ulin ukuran besar (fabrikasi) + kaca 5 mm bh 457,000.00 13,710.00 470,710.00 471,000.00 Rp 471,000.00
94 Daun jendela ulin ukuran kecil (fabrikasi) + kaca 5 mm bh 346,500.00 10,395.00 356,895.00 357,000.00 Rp 357,000.00
95 Daun jendela bengkirai ukuran besar (fabrikasi) + kaca 5 mm bh 302,500.00 9,075.00 311,575.00 312,000.00 Rp 312,000.00
96 Daun jendela bengkirai ukuran kecil (fabrikasi) + kaca 5 mm bh 295,000.00 8,850.00 303,850.00 304,000.00 Rp 304,000.00
97 Hak angin bh 40,625.00 1,218.75 41,843.75 42,000.00 Rp 42,000.00
98 Kaca bening uk. 5 mm m2 262,500.00 7,875.00 270,375.00 271,000.00 Rp 271,000.00
99 Kaca Ryben 5 mm m2 97,900.00 2,937.00 100,837.00 101,000.00 Rp 101,000.00
100 Engsel Jendela Kuningan 3'' bh 53,125.00 1,593.75 54,718.75 55,000.00 Rp 55,000.00
101 Engsel Pintu Kuningan 4 '' bh 289,150.00 8,674.50 297,824.50 298,000.00 Rp 149,000.00
102 Grendel Pintu Kuningan 3'' psg 148,750.00 4,462.50 153,212.50 154,000.00 Rp 154,000.00
103 Grendel Jendela Kuningan 2'' psg 19,000.00 570.00 19,570.00 20,000.00 Rp 20,000.00
104 Handle Pintu bh 17,600.00 528.00 18,128.00 19,000.00 Rp 19,000.00
105 Handle Jendela bh 20,500.00 615.00 21,115.00 22,000.00 Rp 22,000.00
106 Kunci Pintu standar 2 slaag (besar) bh 300,000.00 9,000.00 309,000.00 310,000.00 Rp 310,000.00
107 Kunci Pintu 1 slag (besar) bh 150,000.00 4,500.00 154,500.00 155,000.00 Rp 155,000.00
108 Seng gelombang BJLS 20 lbr 42,900.00 1,287.00 44,187.00 45,000.00 Rp 45,000.00
109 Seng plat BJLS 20 Lebar 50cm m' 22,000.00 660.00 22,660.00 23,000.00 Rp 23,000.00
110 Atap Spandeck lbr 309,000.00 9,270.00 318,270.00 319,000.00 Rp 319,000.00
111 Atap Genteng Metal tebal 0.30 mm lbr 46,200.00 1,386.00 47,586.00 48,000.00 Rp 48,000.00
112 Nok Model C m 38,000.00 1,140.00 39,140.00 40,000.00 Rp 40,000.00
113 Nok Model U m 33,000.00 990.00 33,990.00 34,000.00 Rp 34,000.00
114 Nok samping metal L m' 33,000.00 990.00 33,990.00 34,000.00 Rp 34,000.00
115 Dempul kg 23,100.00 693.00 23,793.00 24,000.00 Rp 24,000.00
116 Lem Vinyl kg 193,500.00 5,805.00 199,305.00 200,000.00 Rp 200,000.00
117 Lem Kaca tube 45,000.00 1,350.00 46,350.00 47,000.00 Rp 47,000.00
118 Ampelas lbr 3,850.00 115.50 3,965.50 4,000.00 Rp 4,000.00
119 Plitur kayu ltr 51,700.00 1,551.00 53,251.00 54,000.00 Rp 54,000.00
120 Minyak cat ltr 16,500.00 495.00 16,995.00 17,000.00 Rp 17,000.00
121 Minyak bekisting ltr 9,900.00 297.00 10,197.00 11,000.00 Rp 11,000.00
122 Residu kg 127,050.00 3,811.50 130,861.50 131,000.00 Rp 131,000.00
123 Cat meni kayu kg 63,500.00 1,905.00 65,405.00 66,000.00 Rp 66,000.00
124 Cat tembok biasa @ 5 kg klg 71,200.00 2,136.00 73,336.00 74,000.00 Rp 74,000.00
125 Cat tembok mutu A @ 2,5 kg klg 119,400.00 3,582.00 122,982.00 123,000.00 Rp 123,000.00
126 Cat kayu kg 49,500.00 1,485.00 50,985.00 51,000.00 Rp 51,000.00
127 Cat besi kg 38,500.00 1,155.00 39,655.00 40,000.00 Rp 40,000.00
128 Cat dasar kg 21,200.00 636.00 21,836.00 22,000.00 Rp 22,000.00
129 Plamir kg 43,750.00 1,312.50 45,062.50 46,000.00 Rp 46,000.00
130 Instalasi titik lampu ttk 246,000.00 7,380.00 253,380.00 254,000.00 Rp 254,000.00
131 Lampu pijar 5 watt bh 4,500.00 135.00 4,635.00 5,000.00 Rp 5,000.00
132 Lampu pijar 10 watt bh 6,500.00 195.00 6,695.00 7,000.00 Rp 7,000.00
133 Lampu pijar 15 watt bh 7,500.00 225.00 7,725.00 8,000.00 Rp 8,000.00
134 Lampu pijar 25 watt bh 9,500.00 285.00 9,785.00 10,000.00 Rp 10,000.00
135 Lampu pijar 40 watt bh 9,500.00 285.00 9,785.00 10,000.00 Rp 10,000.00
136 Lampu pijar 60 watt bh 12,500.00 375.00 12,875.00 13,000.00 Rp 13,000.00
137 Lampu pijar 100 watt bh 15,000.00 450.00 15,450.00 16,000.00 Rp 16,000.00
138 Lampu EL 8 watt standard mutu klas - A bh 53,900.00 1,617.00 55,517.00 56,000.00 Rp 56,000.00
139 Lampu EL 18 watt standard mutu klas - A set 69,300.00 2,079.00 71,379.00 72,000.00 Rp 72,000.00
140 Lampu EL 20 watt standard mutu klas - A bh 40,000.00 1,200.00 41,200.00 42,000.00 Rp 42,000.00
141 Lampu TL (trafo) 20 watt bh 85,000.00 2,550.00 87,550.00 88,000.00 Rp 88,000.00
142 Lampu TL (trafo) 40 watt bh 120,000.00 3,600.00 123,600.00 124,000.00 Rp 124,000.00
143 Lampu TL (trafo) 2 x 20 watt bh 366,500.00 10,995.00 377,495.00 378,000.00 Rp 378,000.00
144 Lampu TL (trafo) 2 x 40 watt bh 235,000.00 7,050.00 242,050.00 243,000.00 Rp 243,000.00
145 Kap lampu biasa bh 15,420.00 462.60 15,882.60 16,000.00 Rp 16,000.00
146 Kap lampu Down lights RD 100 E27 bh 91,000.00 2,730.00 93,730.00 94,000.00 Rp 94,000.00
147 Lampu Dekorasi Outdoor - 2 ARAH 4W bh 210,000.00 6,300.00 216,300.00 217,000.00 Rp 217,000.00
148 Sistem Penangkal Petir + instalasi lengkap ttk 2,500,000.00 75,000.00 2,575,000.00 2,576,000.00 Rp 2,576,000.00
149 Box MCB 4 Group bh 95,625.00 2,868.75 98,493.75 99,000.00 Rp 99,000.00
150 Box MCB 8 Group bh 191,250.00 5,737.50 196,987.50 197,000.00 Rp 197,000.00
151 Saklar Tunggal standard mutu klas - A bh 23,000.00 690.00 23,690.00 24,000.00 Rp 24,000.00
152 Saklar Ganda standard mutu klas - A bh 37,750.00 1,132.50 38,882.50 39,000.00 Rp 39,000.00
153 Stop Kontak standard mutu klas - A bh 30,000.00 900.00 30,900.00 31,000.00 Rp 31,000.00
154 Piting lampu tanam (besar) bh 85,000.00 2,550.00 87,550.00 88,000.00 Rp 88,000.00
155 Piting lampu tanam (kecil) bh 57,750.00 1,732.50 59,482.50 60,000.00 Rp 60,000.00
156 Breaker/MCB 2 amp bh 62,500.00 1,875.00 64,375.00 65,000.00 Rp 65,000.00
157 Breaker/MCB 4 amp bh 77,500.00 2,325.00 79,825.00 80,000.00 Rp 80,000.00
158 Kabel NGA 2,5/ETERNA rol 5,100.00 153.00 5,253.00 6,000.00 Rp 6,000.00
159 Klosed jongkok keramik bh 132,000.00 3,960.00 135,960.00 136,000.00 Rp 136,000.00
160 Klosed Duduk keramik bh 2,200,000.00 66,000.00 2,266,000.00 2,267,000.00 Rp 2,267,000.00
161 Urinoir set 880,000.00 26,400.00 906,400.00 907,000.00 Rp 907,000.00
162 Bak cuci piring aluminium lobang 1 bh 286,000.00 8,580.00 294,580.00 295,000.00 Rp 295,000.00
163 Bak cuci piring aluminium lobang 2 bh 484,000.00 14,520.00 498,520.00 499,000.00 Rp 499,000.00
164 Bak air Uk. 80x 60 x 60 (fiber) bh 258,500.00 7,755.00 266,255.00 267,000.00 Rp 267,000.00
165 Pipa PVC AW Ø 1/2" m' 6,275.00 188.25 6,463.25 7,000.00 Rp 7,000.00
166 Pipa PVC AW Ø 3/4" m' 7,500.00 225.00 7,725.00 8,000.00 Rp 8,000.00
167 Pipa PVC Ø 2" m' 15,200.00 456.00 15,656.00 16,000.00 Rp 16,000.00
168 Pipa PVC Ø 3" m' 27,500.00 825.00 28,325.00 29,000.00 Rp 29,000.00
169 Pipa PVC Ø 4" m' 46,250.00 1,387.50 47,637.50 48,000.00 Rp 48,000.00
Uraian Harga Bahan
No. Nama Bahan Satuan HARGA ONGKOS Jumlah Profitt, dll Harga Bahan
DASAR ANGKUT
170 Pipa Galvanis Ø 2" m' 35,750.00 1,072.50 36,822.50 37,000.00 Rp 37,000.00
171 Pipa Galvanis Ø 3" m' 102,666.67 3,080.00 105,746.67 106,000.00 Rp 106,000.00
172 Pipa Galvanis Ø 4" m' 139,333.33 4,180.00 143,513.33 144,000.00 Rp 144,000.00
173 Tee pvc aw Ø 1/2" bh 4,500.00 135.00 4,635.00 5,000.00 Rp 5,000.00
174 Tee pvc aw Ø 3/4" bh 5,250.00 157.50 5,407.50 6,000.00 Rp 6,000.00
175 Tee pvc aw Ø 1" bh 11,250.00 337.50 11,587.50 12,000.00 Rp 12,000.00
176 Tee pvc aw Ø 2" bh 34,600.00 1,038.00 35,638.00 36,000.00 Rp 36,000.00
177 Tee pvc aw Ø 4" bh 113,400.00 3,402.00 116,802.00 117,000.00 Rp 117,000.00
178 Elbow pvc aw Ø 1/2" bh 4,000.00 120.00 4,120.00 5,000.00 Rp 5,000.00
179 Elbow pvc aw Ø 3/4" bh 5,900.00 177.00 6,077.00 7,000.00 Rp 7,000.00
180 Elbow pvc aw Ø 1" bh 6,000.00 180.00 6,180.00 7,000.00 Rp 7,000.00
181 Elbow pvc aw Ø 2" bh 16,750.00 502.50 17,252.50 18,000.00 Rp 18,000.00
182 Elbow pvc aw Ø 4" bh 91,400.00 2,742.00 94,142.00 95,000.00 Rp 95,000.00
183 Sokced drat pvc aw Ø 1/2" bh 3,000.00 90.00 3,090.00 4,000.00 Rp 4,000.00
184 Socked drat pvc aw Ø 3/4" bh 3,900.00 117.00 4,017.00 5,000.00 Rp 5,000.00
185 Socked drat pvc aw Ø 1" bh 4,800.00 144.00 4,944.00 5,000.00 Rp 5,000.00
186 Socked drat pvc aw Ø 2" bh 15,300.00 459.00 15,759.00 16,000.00 Rp 16,000.00
187 Socked drat pvc aw Ø 4" bh 61,200.00 1,836.00 63,036.00 64,000.00 Rp 64,000.00
188 Lem PVC bh 11,000.00 330.00 11,330.00 12,000.00 Rp 12,000.00
189 Lem Kayu (Fox) ltr 15,000.00 450.00 15,450.00 16,000.00 Rp 16,000.00
190 Seal Tape bh 3,500.00 105.00 3,605.00 4,000.00 Rp 4,000.00
191 Kran Air Ø 3/4" stainless bh 39,600.00 1,188.00 40,788.00 41,000.00 Rp 41,000.00
192 Kran Air Ø 3/4" galvanis bh 26,400.00 792.00 27,192.00 28,000.00 Rp 28,000.00
193 Kran Air Ø 1/2" galvanis bh 22,000.00 660.00 22,660.00 23,000.00 Rp 23,000.00
194 Floor Drain bh 23,100.00 693.00 23,793.00 24,000.00 Rp 24,000.00
195 Talang PVC bh 92,000.00 2,760.00 94,760.00 95,000.00 Rp 95,000.00
196 Corong Talang bh 18,700.00 561.00 19,261.00 20,000.00 Rp 20,000.00
197 Sambungan Talang bh 7,700.00 231.00 7,931.00 8,000.00 Rp 8,000.00
198 Concrete Mixer jam 7,700.00 231.00 7,931.00 8,000.00 Rp 8,000.00
199 Tandon air/ Viberglass 3.000 lt bh 4,180,000.00 125,400.00 4,305,400.00 4,306,000.00 Rp 4,306,000.00
200 Tandon air/ Viberglass 2.000 lt bh 3,080,000.00 92,400.00 3,172,400.00 3,173,000.00 Rp 3,173,000.00
201 Tandon air/ Viberglass 1.200 lt bh 1,430,000.00 42,900.00 1,472,900.00 1,473,000.00 Rp 1,473,000.00
202 Tandon air/ Viberglass 1.000 lt bh 924,000.00 27,720.00 951,720.00 952,000.00 Rp 952,000.00
203 Tandon air/ Viberglass 450 lt bh 89,500.00 2,685.00 92,185.00 93,000.00 Rp 93,000.00
204 Minyak bekisting ltr 9,900.00 297.00 10,197.00 11,000.00 Rp 11,000.00
205 Air bersih (PDAM) ltr 100.00 3.00 103.00 200.00 Rp 200.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN

NO NAMA BARANG SATUAN HARGA SATUAN

UPAH
1 Pekerja ( Buruh semi terlatih ) Hari 177,000
2 Tukang Hari 202,000

MATERIAL, BAHAN DAN KELENGKAPAN


18.
18.2 Kran Air
11 Kran 1/2 inchi Buah 34,000

18.12 Plywood Polos


4 120 cm x 240 cm) tebal 9 mm Lembar 138,000

18.14 Mur / Baut


27 12 mm x 20 cm Buah 8,000
63 Paku Skrup Fab 6X20 Pcs/Biji 600
64 Paku Skrup Fab 6X16 Pcs/Biji 600
###
18.20 Cat Tembok
34 Cat Tembok Racik watershield 5 Kg Kaleng 333,000

18.25 Plamir
2 Paragon 1 Kg Kaleng 77,000

18.29 Semen
2 50 Kg Zak 82,000

18.30 Balok & Papan Ulin


1 Balok ulin 4 m (10 x 10 cm) M3 11,971,000
4 Balok ulin 4 m (5 x 10 cm) M3 11,971,000
10 Papan ulin 2 m (2 x 20 cm) M3 10,774,000

18.32 Balok & Papan Meranti


8 Balok meranti 4 m (5 x 7 cm) M3 3,352,000
15 Papan meranti 4 m (2 x 20 cm) M3 3,352,000

18.37 Paku
3 Paku ulin 2 inchi Kg 36,000
11 Paku biasa 2 inchi Kg 29,000

18.39 Genteng Metal / Rangka Baja Ringan


105 Nok soka type nok A tinted blue 110cm Buah 98,000
108 Taso kaso metal type 75/75 Batang 170,000
109 Taso reng 0,45 panjang 4 m Batang 89,000
125 Spandek 6m Lembar 197,000

18.41 Bahan Galian


3 Pasir Pasang (putih) M3 255,000
4 Pasir Beton (pasir sungai) ex kendilo M3 225,000
NO NAMA BARANG SATUAN HARGA SATUAN

18.42.4 Batu Pecah


3 Batu pecah 2-3 cm Setara Palu M3 599,000

18.42.6 Batu Lainnya


1 Batu bata Buah 1,500

18.44.1 Besi Polos


1 Besi Beton Ø12 x 12m Batang 150,000
2 Besi Beton Ø10 x 12m Batang 114,000
3 Besi Beton Ø8 x 12m Batang 78,000
4 Besi Beton Ø6 x 12m Batang 53,000

18.54 Kawat
7 Kawat Bendrat Kg 38,000

18.56 Galon / Tandon Air


7 Grand 1200 liter Buah 1,916,000
19 Lem Pipa Buah 10,000
24 Air Bersih Liter 120

18.65.1 Pipa PVC & Accessories


17 Pipa PVC AW 1/2 inchi Batang 30,000
24 Pipa PVC AW 2 inchi Batang 235,000
59 Kenne Drat 1/2" Buah 6,000
60 Kenne Elbo 2" Buah 12,000

18.66 BAHAN-BAHAN LAINNYA


1 Pengeras Beton Besmitel 1 Kg Kaleng 48,000
2 Wiremash (M6) 210cm x 54 m Roll 1,010,000
3 Minyak Bekisting Liter 15,000
4 Kayu Galam diameter lebih 8 - 10 cm Batang 42,000

18.66.5 Elektrikal
1 Lampu LED Tenaga Surya 120watt bh 631,000
ANALISA HARGA SATUAN PEKERJAAN

Harga Satuan Upah Bahan Jumlah Harga


No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
A Pekerjaan Persiapan
A.1 1 m' Pengukuran dan Pasangan bouwplank
0.0070 m3 Papan kayu meranti 3,219,000.00 22,533.00
0.0120 m3 Balok 5/7 3,219,000.00 38,628.00
0.0200 kg Paku kayu 29,000.00 580.00
0.1000 oh Tukang kayu 202,400.00 20,240.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0050 oh Mandor 210,000.00 1,050.00
40,890.00 61,741.00 102,631.00 SNI
A.2 1 m2 bongkar &menurunkan atap sirap/genteng/seng
yang tidak dipakai
0.0542 oh Pekerja 175,000.00 9,485.00
0.0027 oh Mandor 210,000.00 567.00
10,052.00 - 10,052.00 Analisa kab.
A.3 1 m2 menurunkan rangka atap dari kayu
(kayu bongkaran tidak dipakai lagi )
0.0700 oh Pekerja 175,000.00 12,250.00
0.0035 oh Mandor 210,000.00 735.00
12,985.00 - 12,985.00 Analisa kab.
A.4 1 m2 bongkar dinding, lantai dari kayu
(kayu bongkaran tidak dipakai lagi )
0.2000 oh Pekerja 175,000.00 35,000.00
0.0150 oh Mandor 210,000.00 3,150.00
38,150.00 - 38,150.00 Analisa kab.
A.5 1 m2 Pembersihan Lokasi dan perataan
0.0150 oh Pekerja 175,000.00 2,625.00
0.0008 oh Mandor 210,000.00 168.00
2,793.00 - 2,793.00 Analisa kab.
B Pekerjaan Tanah
B.1 1 m3 Galian Tanah Biasa sedalam 1 meter
0.7500 oh Pekerja 175,000.00 131,250.00
0.0250 oh Mandor 210,000.00 5,250.00
136,500.00 - 136,500.00 SNI
B.2 1 m3 Galian Tanah Biasa sedalam 2 meter
0.9000 oh Pekerja 175,000.00 157,500.00
0.0450 oh Mandor 210,000.00 9,450.00
166,950.00 - 166,950.00 SNI
B.3 1 m3 Galian Tanah Biasa sedalam 3 meter
1.0500 oh Pekerja 175,000.00 183,750.00
0.0670 oh Mandor 210,000.00 14,070.00
197,820.00 - 197,820.00 SNI
B.4 1 m3 Galian Tanah Keras sedalam 1 meter
1.0000 oh Pekerja 175,000.00 175,000.00
0.0320 oh Mandor 210,000.00 6,720.00
181,720.00 - 181,720.00 SNI
B.5 1 m3 Galian Tanah Cadas sedalam 1 meter
1.5000 oh Pekerja 175,000.00 262,500.00
0.0600 oh Mandor 210,000.00 12,600.00
275,100.00 - 275,100.00 SNI
B.6 1 m3 Galian Tanah Lumpur sedalam 1 meter
1.2000 oh Pekerja 175,000.00 210,000.00
0.0450 oh Mandor 210,000.00 9,450.00
219,450.00 - 219,450.00 SNI
B.7 1 m3 Urugan tanah kembali
0.3333 m3 Dari indeks pekerjaan galian 45,500.00
45,500.00 - 45,500.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
B.8 1 m3 Urugan Tanah dipadatkan
1.2000 m3 Tanah urug 93,000.00 111,600.00
0.5000 oh Pekerja 175,000.00 87,500.00
0.0100 oh Mandor 210,000.00 2,100.00
89,600.00 111,600.00 201,200.00
B.9 1 m3 Urugan Pasir
1.2000 m3 Pasir urug 136,000.00 163,200.00
0.3000 oh Pekerja 175,000.00 52,500.00
0.0100 oh Mandor 210,000.00 2,100.00
54,600.00 163,200.00 217,800.00 SNI
B.10 1 m3 Urugan sirtu
1.2000 m3 Sirtu 310,000.00 372,000.00
0.2500 oh Pekerja 175,000.00 43,750.00
0.0250 oh Mandor 210,000.00 5,250.00
49,000.00 372,000.00 421,000.00 SNI
B.11 1 m2 pasang lapisan ijuk tebal 10 cm , untuk bidang resapan.
6.0000 kg Ijuk 10,000.00 60,000.00
0.1500 oh Pekerja 175,000.00 26,250.00
0.0150 oh Mandor 210,000.00 3,150.00
29,400.00 60,000.00 89,400.00 SNI
C Pekerjaan Pondasi
C.1 1 m3 Pas. batu kosong / Aanstamping
1.2000 m3 Batu Gunung/ batu belah 15/20 cm 252,000.00 302,400.00
0.4320 m3 Pasir urug 136,000.00 58,752.00
0.7800 oh Pekerja 175,000.00 136,500.00
0.0390 oh Mandor 210,000.00 8,190.00
0.3900 oh Tukang Batu 202,400.00 78,936.00
0.0390 oh Kepala Tukang 210,000.00 8,190.00
231,816.00 361,152.00 592,968.00 SNI
C.2 1 m3 Pasangan batu gunung 1 : 3
1.2000 m3 Batu Gunung/ batu belah 15/20 cm 252,000.00 302,400.00
0.4858 m3 Pasir pasang 340,000.00 165,172.00
202.00 kg Semen portland 50 kg 1,620.00 327,240.00
1.5000 oh Pekerja 175,000.00 262,500.00
0.0750 oh Mandor 210,000.00 15,750.00
0.6000 oh Tukang batu 202,400.00 121,440.00
0.0600 oh Kepala tukang 210,000.00 12,600.00
412,290.00 794,812.00 1,207,102.00 SNI
C.3 1 m3 Pasangan batu gunung 1 : 4
1.2000 m3 Batu Gunung/ batu belah 15/20 cm 252,000.00 302,400.00
0.5200 m3 Pasir pasang 340,000.00 176,800.00
163.00 kg Semen portland 50 kg 1,620.00 264,060.00
1.5000 oh Pekerja 175,000.00 262,500.00
0.0750 oh Mandor 210,000.00 15,750.00
0.6000 oh Tukang batu 202,400.00 121,440.00
0.0600 oh Kepala tukang 210,000.00 12,600.00
412,290.00 743,260.00 1,155,550.00 SNI
D Pekerjaan Tiang Pancang
D.1 Pekerjaan tiang per m' - 20/20, tanah biasa
(dihitung bagian yang masuk tanah)
0.4000 Tukang kayu 202,400.00 80,960.00
0.3000 Pekerja 175,000.00 52,500.00
0.0460 Mandor 210,000.00 9,660.00
1.0000 Ls sewa alat pancang 25,000.00 25,000.00
168,120.00 - 168,120.00
D.2 1 m1 Tanah biasa - 10/10
1.00 m' Kayu ulin 10/10 cm 87,560.00 87,560.00
0.2500 Upah (D.1) 168,120.00 42,030.00
42,030.00 87,560.00 129,590.00
D.3 1 m1 Tanah keras - 20/20
1.5000 Upah (D.1) 168,120.00 252,180.00
252,180.00 - 252,180.00
D.4 1 m1 Tanah keras - 10/10
1.00 m' Kayu ulin 10/10 cm 87,560.00 87,560.00
1.0000 Upah (D.1) 168,120.00 168,120.00
168,120.00 87,560.00 255,680.00
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
D.5 1 m1 Tanah pasir - 20/20
2.0000 Upah (D.1) 168,120.00 336,240.00
336,240.00 - 336,240.00
D.6 1 m1 Tanah pasir - 10/10
2.6667 Upah (D.1) 168,120.00 448,325.60
448,325.60 - 448,325.60
D.7 1 bh Membuat cincin kepala tiang pancang &
dilancipkan balok kayu ulin 20/20 cm
0.2250 Tukang kayu 202,400.00 45,540.00
0.0750 Pekerja 175,000.00 13,125.00
0.0038 Mandor 210,000.00 798.00
59,463.00 - 59,463.00
D.8 1 bh Membuat cincin kepala tiang pancang &
dilancipkan balok kayu ulin 10/10 cm
0.5000 Upah (D.7) 59,463.00 29,731.50
29,731.50 - 29,731.50
D.9 1 bh Membuat cincin kepala tiang pancang &
dilancipkan balok kayu galam n 12 - 20 cm
0.5000 Upah (D.7) 59,463.00 29,731.50
29,731.50 - 29,731.50
D.10 Membuat kalang pada pancangan kayu 5/7 - 50 cm
0.0019 Kayu Ulin 8,756,000.00 16,636.40
0.0600 Tukang kayu 202,400.00 12,144.00
0.0600 Pekerja 175,000.00 10,500.00
0.0030 Mandor 210,000.00 630.00
23,274.00 16,636.40 39,910.40
D.11 Membuat pen dan lubang pada
tiap kepala kayu ( Tiap -tiap pasang)
0.2000 Tukang kayu 202,400.00 40,480.00
0.0200 Mandor 210,000.00 4,200.00
44,680.00 - 44,680.00
E Pekerjaan Struktur Beton
E Dimana Bobot isi pasir=1.400 kg/m3, Bobot isi Kerikil =
1.350 kg/m3, Bukling faktor pasir = 20%
E.1 1m3 Beton Mutu K 100
247.00 kg Semen portland 50 kg 1,620.00 400,140.00
869.00 kg Pasir beton 322.14 279,942.14
999.00 kg Batu pecah 2/3 482.96 482,480.00
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,211,023.74 1,578,743.74 SNI
E.2 1m3 Beton Mutu K 125
276.00 kg Semen portland 50 kg 1,620.00 447,120.00
828.00 kg Pasir beton 322.14 266,734.29
1,012.00 kg Batu pecah 2/3 482.96 488,758.52
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,251,074.40 1,618,794.40 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
E.3 1m3 Beton Mutu K 150
299.00 kg Semen portland 50 kg 1,620.00 484,380.00
799.00 kg Pasir beton 322.14 257,392.14
1,017.00 kg Batu pecah 2/3 482.96 491,173.33
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,281,407.08 1,649,127.08 SNI
E.4 1m3 Beton Lantai kerja Mutu K 100
230.00 kg Semen portland 50 kg 1,620.00 372,600.00
893.00 kg Pasir beton 322.14 287,673.57
1,027.00 kg Batu pecah 2/3 482.96 496,002.96
200.00 ltr Air 200.00 40,000.00
1.2000 oh Pekerja 175,000.00 210,000.00
0.2000 oh Tukang batu 202,400.00 40,480.00
0.0200 oh Kepala tukang 210,000.00 4,200.00
0.0600 oh Mandor 210,000.00 12,600.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
267,280.00 1,201,738.13 1,469,018.13 SNI
E.5 1m3 Beton Mutu K 175
326.00 kg Semen portland 50 kg 1,620.00 528,120.00
760.00 kg Pasir beton 322.14 244,828.57
1,029.00 kg Batu pecah 2/3 482.96 496,968.89
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,318,379.06 1,686,099.06 SNI
E.6 1m3 Beton Mutu K 200
326.00 kg Semen portland 50 kg 1,620.00 528,120.00
760.00 kg Pasir beton 322.14 244,828.57
1,029.00 kg Batu pecah 2/3 482.96 496,968.89
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,318,379.06 1,686,099.06 SNI
E.7 1m3 Beton Mutu K 225
371.00 kg Semen portland 50 kg 1,620.00 601,020.00
698.00 kg Pasir beton 322.14 224,855.71
1,047.00 kg Batu pecah 2/3 482.96 505,662.22
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,379,999.54 1,747,719.54 SNI
E.8 1m3 Beton Mutu K 250
384.00 kg Semen portland 50 kg 1,620.00 622,080.00
692.00 kg Pasir beton 322.14 222,922.86
1,039.00 kg Batu pecah 2/3 482.96 501,798.52
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,395,262.98 1,762,982.98 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
E.9 1m3 Beton Mutu K 275
406.00 kg Semen portland 50 kg 1,620.00 657,720.00
684.00 kg Pasir beton 322.14 220,345.71
1,026.00 kg Batu pecah 2/3 482.96 495,520.00
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,422,047.31 1,789,767.31 SNI
E.10 1m3 Beton Mutu K 300
413.00 kg Semen portland 50 kg 1,620.00 669,060.00
681.00 kg Pasir beton 322.14 219,379.29
1,021.00 kg Batu pecah 2/3 482.96 493,105.19
215.00 ltr Air 200.00 43,000.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.2750 oh Tukang batu 202,400.00 55,660.00
0.0280 oh Kepala tukang 210,000.00 5,880.00
0.0830 oh Mandor 210,000.00 17,430.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
367,720.00 1,430,006.07 1,797,726.07 SNI
E.11 1m3 Beton Mutu K 325
439.00 kg Semen portland 50 kg 1,620.00 711,180.00
670.00 kg Pasir beton 322.14 215,835.71
1,021.00 kg Batu pecah 2/3 482.96 493,105.19
215.00 ltr Air 200.00 43,000.00
2.1000 oh Pekerja 175,000.00 367,500.00
0.3500 oh Tukang batu 202,400.00 70,840.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
0.1050 oh Mandor 210,000.00 22,050.00
0.6827 jam Cocrete Mixer 8,000.00 5,461.60
467,740.00 1,468,582.50 1,936,322.50 SNI
E.12 1m3 Beton kedap air dengan strorox-100
400.00 kg Semen portland 50 kg 1,620.00 648,000.00
0.48 m3 Pasir beton 322.14 154.63
0.80 m3 Batu pecah 2/3 482.96 386.37
1.20 kg Strorox - 100 -
2.1000 oh Pekerja 175,000.00 367,500.00
0.3500 oh Tukang batu 202,400.00 70,840.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
0.1050 oh Mandor 210,000.00 22,050.00
467,740.00 648,541.00 1,116,281.00 SNI
E.13 1 m3 Membuat beton tumbuk 1:3:5
0.8700 m3 Koral beton 439,000.00 381,930.00
0.5200 m3 Pasir beton 451,000.00 234,520.00
218.0000 kg Semen portland 1,620.00 353,160.00
215.00 ltr Air 200.00 43,000.00
0.2500 oh Tukang batu 202,400.00 50,600.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.0250 oh Kepala tukang 210,000.00 5,250.00
0.0800 oh Mandor 210,000.00 16,800.00
361,400.00 1,012,610.00 1,374,010.00
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
E.14 1 m3 Membuat beton tumbuk 1:3:6
0.9400 m3 Koral beton 439,000.00 412,660.00
0.4700 m3 Pasir beton 451,000.00 211,970.00
197.0000 kg Semen portland 1,620.00 319,140.00
215.00 ltr Air 200.00 43,000.00
0.2500 oh Tukang batu 202,400.00 50,600.00
1.6500 oh Pekerja 175,000.00 288,750.00
0.0250 oh Kepala tukang 210,000.00 5,250.00
0.0800 oh Mandor 210,000.00 16,800.00
361,400.00 986,770.00 1,348,170.00
E.15 1 m3 Membuat beton bertulang 1:2:3
0.8100 m3 Koral beton 439,000.00 355,590.00
0.5400 m3 Pasir beton 451,000.00 243,540.00
336.0000 kg Semen portland 1,620.00 544,320.00
215.00 ltr Air 200.00 43,000.00
0.3500 oh Tukang batu 202,400.00 70,840.00
2.0000 oh Pekerja 175,000.00 350,000.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
1.0000 oh Mandor 210,000.00 210,000.00
638,190.00 1,186,450.00 1,824,640.00
F Pekerjaan Struktur Pembesian
F.1 1 kg Pekerjaan Pembesian (besi polos)
1.0500 kg Besi beton polos 17,000.00 17,850.00
0.0100 kg Kawat beton 46,000.00 460.00
0.0050 oh Tukang besi 202,400.00 1,012.00
0.0050 oh Pekerja 175,000.00 875.00
0.0005 oh Kepala tukang 210,000.00 105.00
0.0003 oh Mandor 210,000.00 63.00
2,055.00 18,310.00 20,365.00 SNI
F.2 1 kg Pekerjaan Pembesian (besi ulir)
1.0500 kg Besi beton ulir 17,000.00 17,850.00
0.0150 kg Kawat beton 46,000.00 690.00
0.0070 oh Tukang besi 202,400.00 1,416.80
0.0070 oh Pekerja 175,000.00 1,225.00
0.0007 oh Kepala tukang 210,000.00 147.00
0.0004 oh Mandor 210,000.00 84.00
2,872.80 18,540.00 21,412.80 SNI
F.3 1 kg Pekerjaan Jaring Kawat baja /Wire mesh
1.0200 kg Besi beton ulir 17,000.00 17,340.00
0.0050 kg Kawat beton 46,000.00 230.00
0.0025 oh Tukang besi 202,400.00 506.00
0.0025 oh Pekerja 175,000.00 437.50
0.0025 oh Kepala tukang 210,000.00 525.00
0.0001 oh Mandor 210,000.00 21.00
1,489.50 17,570.00 19,059.50 SNI
G Pekerjaan Struktur Begesting
G.1 1 m2 Membuat bekisting untuk Pondasi
0.0400 m3 kayu bekisting papan kelas III 3,689,000.00 147,560.00
0.3000 kg Paku kayu 29,000.00 8,700.00
0.1000 ltr Minyak Bekisting 11,000.00 1,100.00
0.2600 oh Tukang kayu 202,400.00 52,624.00
0.5200 oh Pekerja 175,000.00 91,000.00
0.0260 oh Kepala tukang kayu 210,000.00 5,460.00
0.0260 oh Mandor 210,000.00 5,460.00
154,544.00 157,360.00 311,904.00 SNI
2 x pakai 155,952.00
G.2 1 m2 Membuat bekisting untuk sloof
0.0450 m3 kayu kelas III 3,689,000.00 166,005.00
0.3000 kg Paku kayu 29,000.00 8,700.00
0.1000 ltr Minyak Bekisting 11,000.00 1,100.00
0.2600 oh Tukang kayu 202,400.00 52,624.00
0.5200 oh Pekerja 175,000.00 91,000.00
0.0260 oh Kepala tukang kayu 210,000.00 5,460.00
0.0250 oh Mandor 210,000.00 5,250.00
154,334.00 175,805.00 330,139.00 SNI
2 x pakai 165,069.50
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
G.3 1 m2 Membuat bekisting untuk kolom
0.0400 m3 kayuKelas III 3,689,000.00 147,560.00
0.0150 m3 Balok kayu Kelas II 3,689,000.00 55,335.00
0.4000 kg Paku kayu 29,000.00 11,600.00
0.2000 ltr Minyak Bekisting 11,000.00 2,200.00
0.3500 lbr Plywood Tebal 9mm 177,000.00 61,950.00
2.0000 btg Dolken kayu galam Dia.8-10cm P=4m 45,000.00 90,000.00
0.3300 oh Tukang kayu 202,400.00 66,792.00
0.6600 oh Pekerja 175,000.00 115,500.00
0.0330 oh Kepala tukang kayu 210,000.00 6,930.00
0.0330 oh Mandor 210,000.00 6,930.00
196,152.00 368,645.00 564,797.00 SNI
2 x pakai 282,398.50
G.4 1 m2 Membuat bekisting untuk balok
0.0400 m3 kayuKelas III 3,689,000.00 147,560.00
0.0180 m3 Balok kayu Kelas II 3,689,000.00 66,402.00
0.4000 kg Paku kayu 29,000.00 11,600.00
0.2000 ltr Minyak Bekisting 11,000.00 2,200.00
0.3500 lbr Plywood Tebal 9mm 177,000.00 61,950.00
2.0000 btg Dolken kayu galam Dia.8-10cm P=4m 45,000.00 90,000.00
0.3300 oh Tukang kayu 202,400.00 66,792.00
0.6600 oh Pekerja 175,000.00 115,500.00
0.0330 oh Kepala tukang kayu 210,000.00 6,930.00
0.0330 oh Mandor 210,000.00 6,930.00
196,152.00 379,712.00 575,864.00 SNI
2 x pakai 287,932.00
G.5 1 m2 Membuat bekisting untuk Lantai
0.0400 m3 kayuKelas III 3,689,000.00 147,560.00
0.0150 m3 Balok kayu Kelas II 3,689,000.00 55,335.00
0.4000 kg Paku kayu 29,000.00 11,600.00
0.2000 ltr Minyak Bekisting 11,000.00 2,200.00
0.3500 lbr Plywood Tebal 9mm 177,000.00 61,950.00
6.0000 btg Dolken kayu galam Dia.8-10cm P=4m 45,000.00 270,000.00
0.3300 oh Tukang kayu 202,400.00 66,792.00
0.6600 oh Pekerja 175,000.00 115,500.00
0.0330 oh Kepala tukang kayu 210,000.00 6,930.00
0.0330 oh Mandor 210,000.00 6,930.00
196,152.00 548,645.00 744,797.00 SNI
2 x pakai 372,398.50
G.6 1 m2 Membuat bekisting untuk Dinding
0.0300 m3 kayuKelas III 3,689,000.00 110,670.00
0.0200 m3 Balok kayu Kelas II 3,689,000.00 73,780.00
0.4000 kg Paku kayu 29,000.00 11,600.00
0.2000 ltr Minyak Bekisting 11,000.00 2,200.00
0.3500 lbr Plywood Tebal 9mm 177,000.00 61,950.00
3.0000 btg Dolken kayu galam Dia.8-10cm P=4m 45,000.00 135,000.00
0.3300 oh Tukang kayu 202,400.00 66,792.00
0.6600 oh Pekerja 175,000.00 115,500.00
0.0330 oh Kepala tukang kayu 210,000.00 6,930.00
0.0330 oh Mandor 210,000.00 6,930.00
196,152.00 395,200.00 591,352.00 SNI
2 x pakai 295,676.00
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
G.7 1 m2 Membuat bekisting untuk Tangga
0.0300 m3 kayuKelas III 3,689,000.00 110,670.00
0.0150 m3 Balok kayu Kelas II 3,689,000.00 55,335.00
0.4000 kg Paku kayu 29,000.00 11,600.00
0.1500 ltr Minyak Bekisting 11,000.00 1,650.00
0.3500 lbr Plywood Tebal 9mm 177,000.00 61,950.00
2.0000 btg Dolken kayu galam Dia.8-10cm P=4m 45,000.00 90,000.00
0.3300 oh Tukang kayu 202,400.00 66,792.00
0.6600 oh Pekerja 175,000.00 115,500.00
0.0330 oh Kepala tukang kayu 210,000.00 6,930.00
0.0330 oh Mandor 210,000.00 6,930.00
196,152.00 241,205.00 437,357.00 SNI
3 x pakai 145,785.67
H Pekerjaan Dinding
H.1 1 m2 Pasangan batu bata tebal 1/2 bata. 1 Pc : 2 Ps
50.0000 bh Batu Bata 3,000.00 150,000.00
0.038 m3 Pasir Pasang 340,000.00 12,920.00
18.9500 kg Semen portland 50 kg 1,620.00 30,699.00
0.3000 oh Pekerja 175,000.00 52,500.00
0.0150 oh Mandor 210,000.00 3,150.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
77,990.00 193,619.00 271,609.00 SNI
H.2 1 m2 Pasangan batu bata 1/2 bata, 1 Pc : 4 Ps
50.0000 bh Batu Bata 3,000.00 150,000.00
0.043 m3 Pasir Pasang 340,000.00 14,620.00
11.5000 kg Semen portland 50 kg 1,620.00 18,630.00
0.3000 oh Pekerja 175,000.00 52,500.00
0.0150 oh Mandor 210,000.00 3,150.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
77,990.00 183,250.00 261,240.00 SNI
H.2 1 m2 Pasangan bata ringan tebal 10 cm dengan mortar siap pakai
8.4000 bh Batu Bata 14,000.00 117,600.00
0.063 kg Mortart Siap Pakai 8,025.00 505.58
1.0000 sak Alat Bantu 10 % 11,810.56 11,810.56
0.6710 oh Pekerja 175,000.00 117,425.00
0.0030 oh Mandor 210,000.00 630.00
0.1300 oh Tukang batu 202,400.00 26,312.00
0.0130 oh Kepala tukang 210,000.00 2,730.00
147,097.00 129,916.13 277,013.13 SNI
H.3 1 m2 Pasangan batu bata 1/2 bata, 1 Pc : 6 Ps
50.0000 bh Batu Bata 3,000.00 150,000.00
0.049 m3 Pasir Pasang 340,000.00 16,660.00
8.3200 kg Semen portland 50 kg 1,620.00 13,478.40
0.3000 oh Pekerja 175,000.00 52,500.00
0.0150 oh Mandor 210,000.00 3,150.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
77,990.00 180,138.40 258,128.40 SNI
H.4 1 m2 Pasang Dinding terawang (Roster ), 1 Pc : 4 Ps
11.0000 bh Roster 30x30 cm 9,000.00 99,000.00
0.035 m3 Pasir Pasang 340,000.00 11,900.00
11.0000 kg Semen portland 50 kg 1,620.00 17,820.00
0.3000 oh Pekerja 175,000.00 52,500.00
0.0150 oh Mandor 210,000.00 3,150.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
77,990.00 128,720.00 206,710.00 SNI
H.4a 1 m2 Pasang Pavingblock T 8cm
50.0000 bh Paving block 3,000.00 150,000.00
0.035 m3 Pasir Beton 451,000.00 15,785.00
1.0000 % Peralatan 10% 16,578.50 16,578.50
0.5000 oh Pekerja 175,000.00 87,500.00
0.0013 oh Mandor 210,000.00 273.00
0.5000 oh Tukang batu 202,400.00 101,200.00
0.0500 oh Kepala tukang 210,000.00 10,500.00
199,473.00 182,363.50 381,836.50 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
H.5 1 m2 Plesteran 1 : 2 , tebal 15 mm
0.0200 m3 Pasir Pasang 340,000.00 6,800.00
10.2200 kg Semen portland 50 kg 1,620.00 16,556.40
0.2000 oh Pekerja 175,000.00 35,000.00
0.0100 oh Mandor 210,000.00 2,100.00
0.1500 oh Tukang batu 202,400.00 30,360.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
70,610.00 23,356.40 93,966.40 SNI
H.6 1 m2 Plesteran 1 : 4 , tebal 15 mm
0.0240 m3 Pasir Pasang 340,000.00 8,160.00
5.1840 kg Semen portland 50 kg 1,620.00 8,398.08
0.2000 oh Pekerja 175,000.00 35,000.00
0.0100 oh Mandor 210,000.00 2,100.00
0.1500 oh Tukang batu 202,400.00 30,360.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
70,610.00 16,558.08 87,168.08 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
H.7 1 m2 Plesteran 1 : 6 , tebal 15 mm
0.0270 m3 Pasir Pasang 340,000.00 9,180.00
4.4160 kg Semen portland 50 kg 1,620.00 7,153.92
0.2000 oh Pekerja 175,000.00 35,000.00
0.0100 oh Mandor 210,000.00 2,100.00
0.1500 oh Tukang batu 202,400.00 30,360.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
70,610.00 16,333.92 86,943.92 SNI
H.8 1 m2 Plesteran Ciprat 1:2
0.0060 m3 Pasir Pasang 340,000.00 2,040.00
4.3200 kg Semen portland 50 kg 1,620.00 6,998.40
0.2500 oh Pekerja 175,000.00 43,750.00
0.0130 oh Mandor 210,000.00 2,730.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
68,820.00 9,038.40 77,858.40 SNI
H.9 1 m2 Acian
3.2500 kg Semen Pc 50 kg 1,620.00 5,265.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.1500 oh Pekerja 175,000.00 26,250.00
0.0080 oh Mandor 210,000.00 1,680.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
50,270.00 5,265.00 55,535.00 SNI
H.10 1 m2 Pasang dinding keramik 20x25
21.0000 bh Keramik 20x25 3,200.00 67,200.00
9.3000 kg Semen portland 50 kg 1,620.00 15,066.00
0.0180 m3 Pasir Pasang 340,000.00 6,120.00
1.9400 kg Semen warna 5,000.00 9,700.00
0.4500 or Tukang batu 202,400.00 91,080.00
0.6000 or Pekerja 175,000.00 105,000.00
0.0450 or Kepala tukang 210,000.00 9,450.00
0.0300 or Mandor 210,000.00 6,300.00
211,830.00 98,086.00 309,916.00 SNI
H.11 1 m2 Dinding pemisah plywood rangkap
0.8600 lbr Plywood tebal 4mm 120x240cm 78,000.00 67,080.00
0.2800 m3 Kayu meranti 3,219,000.00 901,320.00
0.1500 kg Paku kayu 29,000.00 4,350.00
0.5600 kg Lem Kayu 15,000.00 8,400.00
0.2000 oh Pekerja 175,000.00 35,000.00
0.0100 oh Mandor 210,000.00 2,100.00
0.6000 oh Tukang kayu 202,400.00 121,440.00
0.0600 oh Kepala tukang 210,000.00 12,600.00
171,140.00 981,150.00 1,152,290.00 SNI
H.12 1 m2 Dinding batu alam
1.0500 m2 Batu tempel motif garis 282,000.00 296,100.00
11.7500 kg Semen portland 50 kg 1,620.00 19,035.00
0.0350 m3 Pasir Pasang 340,000.00 11,900.00
0.0900 or Tukang batu 202,400.00 18,216.00
0.0350 or Pekerja 175,000.00 6,125.00
0.0090 or Kepala tukang 210,000.00 1,890.00
0.0350 or Mandor 210,000.00 7,350.00
33,581.00 327,035.00 360,616.00 SNI
H.13 1 m2 Rangka dinding pemisah (60x120)
0.0280 m3 Balok Kayu 3,219,000.00 90,132.00
0.1500 kg Paku kayu 29,000.00 4,350.00
0.1500 oh Pekerja 175,000.00 26,250.00
0.0050 oh Mandor 210,000.00 1,050.00
0.2000 oh Tukang kayu 202,400.00 40,480.00
0.0200 oh Kepala tukang 210,000.00 4,200.00
71,980.00 94,482.00 166,462.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
I Pekerjaan Kayu. Rangka Atap
I.1 1 m3 Mengerjakan rangka bawah dari kayu ulin
(tongkat,Sunduk)
1.1000 m3 Kayu ulin 8,756,000.00 9,631,600.00
9.0000 oh Tukang kayu 202,400.00 1,821,600.00
9.0000 oh Pekerja 175,000.00 1,575,000.00
0.9000 oh Kepala tukang 210,000.00 189,000.00
0.4500 oh Mandor 210,000.00 94,500.00
1.0000 ls Alat bantu(Bor listrik,dll) 25,000.00
3,680,100.00 9,631,600.00 13,311,700.00
I.2 1 m3 Mengerjakan sloof dan lenger
1.1000 m3 Kayu ulin 8,756,000.00 9,631,600.00
5.2238 kg Paku ulin 33,000.00 172,385.40
10.0000 oh Tukang kayu 202,400.00 2,024,000.00
6.0000 oh Pekerja 175,000.00 1,050,000.00
1.0000 oh Kepala tukang 210,000.00 210,000.00
0.3000 oh Mandor 210,000.00 63,000.00
1.0000 ls Alat bantu (Bor Listrik dll) 25,000.00 25,000.00
3,372,000.00 9,803,985.40 13,175,985.40
I.3 1 m2 Lantai papan ulin diketam tanpa celah
0.0234 m3 Papan kayu ulin 9,271,000.00 216,941.40
0.1609 kg Paku ulin 33,000.00 5,309.70
0.6000 oh Tukang kayu 202,400.00 121,440.00
0.3000 oh Pekerja 175,000.00 52,500.00
0.0600 oh Kepala tukang 210,000.00 12,600.00
0.0150 oh Mandor 210,000.00 3,150.00
1.0000 ls Ls alat bantu (ketam listrik) 25,000.00 25,000.00
214,690.00 222,251.10 436,941.10
I.4 1 m3 Mengerjakan Kolom Praktis Kayu Meranti
1.1000 m3 Kayu Meranti 3,219,000.00 3,540,900.00
2.6493 kg Paku ulin 33,000.00 87,426.90
12.0000 oh Tukang kayu 202,400.00 2,428,800.00
5.7143 oh Pekerja 175,000.00 1,000,002.50
2.5000 oh Kepala tukang 210,000.00 525,000.00
0.4688 oh Mandor 210,000.00 98,448.00
1.0000 ls Ls alat bantu (ketam listrik) 25,000.00 25,000.00
4,077,250.50 3,628,326.90 7,705,577.40
I.5 1 m3 Mengerjakan Rangka Rumah Kayu Ulin
1.1000 m3 Kayu ulin 8,756,000.00 9,631,600.00
2.6493 kg Paku ulin 33,000.00 87,426.90
25.0000 oh Tukang kayu 202,400.00 5,060,000.00
9.3750 oh Pekerja 175,000.00 1,640,625.00
2.5000 oh Kepala tukang 210,000.00 525,000.00
0.4688 oh Mandor 210,000.00 98,448.00
1.0000 ls Ls alat bantu (ketam listrik) 25,000.00 25,000.00
7,349,073.00 9,719,026.90 17,068,099.90
I.6 1 m3 Membuat dan memasang kusen pintu dan jendela
1.1000 m3 Kayu ulin 8,756,000.00 9,631,600.00
1.2500 kg Paku Ulin 33,000.00 41,250.00
1.0000 kg Lem kayu 15,000.00 15,000.00
6.0000 oh Pekerja 175,000.00 1,050,000.00
0.3000 oh Mandor 210,000.00 63,000.00
20.0000 oh Tukang kayu 202,400.00 4,048,000.00
2.0000 oh Kepala tukang 210,000.00 420,000.00
5,581,000.00 9,687,850.00 15,268,850.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
I.7 1 m3 Membuat dan memasang kusen pintu dan jendela
1.1000 m3 Kayu Bengkirai 7,726,000.00 8,498,600.00
1.2500 kg Paku Kayu 29,000.00 36,250.00
1.0000 kg Lem kayu 15,000.00 15,000.00
6.0000 oh Pekerja 175,000.00 1,050,000.00
0.3000 oh Mandor 210,000.00 63,000.00
20.0000 oh Tukang kayu 202,400.00 4,048,000.00
2.0000 oh Kepala tukang 210,000.00 420,000.00
5,581,000.00 8,549,850.00 14,130,850.00 SNI
I.8 1 m3 Membuat dan memasang kusen pintu dan jendela
1.2000 m3 Kayu Kelas II dan III 7,726,000.00 9,271,200.00
1.2500 kg Paku Kayu 29,000.00 36,250.00
1.0000 kg Lem kayu 15,000.00 15,000.00
6.0000 oh Pekerja 175,000.00 1,050,000.00
0.3000 oh Mandor 210,000.00 63,000.00
18.0000 oh Tukang kayu 202,400.00 3,643,200.00
2.0000 oh Kepala tukang 210,000.00 420,000.00
5,176,200.00 9,322,450.00 14,498,650.00 SNI
I.9 1 m2 Memasang jalusi kusen, kayu ulin
0.0600 m3 Papan kayu ulin 9,271,000.00 556,260.00
0.1500 kg Paku 1 s/d 2.5 cm 29,000.00 4,350.00
0.6700 or Pekerja 175,000.00 117,250.00
0.3350 or Mandor 210,000.00 70,350.00
2.0000 or Tukang kayu 202,400.00 404,800.00
0.2000 or Kepala tukang 210,000.00 42,000.00
634,400.00 560,610.00 1,195,010.00 SNI
I.10 1 m3 Pasang konstruksi kuda-kuda kayu Bentang 6m
1.1000 m3 Kayu Kelas I, II dan III 3,219,000.00 3,540,900.00
15.0000 kg Besi strip 13,000.00 195,000.00
5.6000 kg Paku kayu 29,000.00 162,400.00
4.0000 oh Pekerja 175,000.00 700,000.00
0.2000 oh Mandor 210,000.00 42,000.00
12.0000 oh Tukang kayu 202,400.00 2,428,800.00
1.2000 oh Kepala tukang 210,000.00 252,000.00
3,422,800.00 3,898,300.00 7,321,100.00 SNI
I.11 1 m3 Pasang konstruksi kuda-kuda Expose, kayu kelas I
1.2000 m3 Balok Kayu 7,726,000.00 9,271,200.00
15.0000 kg Besi strip 13,000.00 195,000.00
5.6000 kg Paku kayu 29,000.00 162,400.00
6.0000 oh Pekerja 175,000.00 1,050,000.00
0.3000 oh Mandor 210,000.00 63,000.00
20.0000 oh Tukang kayu 202,400.00 4,048,000.00
2.0000 oh Kepala tukang 210,000.00 420,000.00
5,581,000.00 9,628,600.00 15,209,600.00 SNI
I.12 1 m2 Rangka atap genteng, Kayu kelas II
0.0140 m3 Kasau 3,219,000.00 45,066.00
0.0570 m3 Reng 3,219,000.00 183,483.00
0.2500 kg Paku kayu 29,000.00 7,250.00
0.1000 oh Tukang kayu 202,400.00 20,240.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0050 oh Mandor 210,000.00 1,050.00
40,890.00 235,799.00 276,689.00 SNI
I.13 1 m2 Rangka atap sirap, Kayu kelas II
0.1650 m3 Kayu kelas II 3,219,000.00 531,135.00
0.2000 kg Paku kayu 29,000.00 5,800.00
0.1200 oh Tukang kayu 202,400.00 24,288.00
0.1200 oh Pekerja 175,000.00 21,000.00
0.0120 oh Kepala tukang 210,000.00 2,520.00
0.0060 oh Mandor 210,000.00 1,260.00
49,068.00 536,935.00 586,003.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
I.14 1 m3 Gording
1.1000 m3 Kayu meranti 3,219,000.00 3,540,900.00
15.0000 kg Besi Srip 13,000.00 195,000.00
3.0000 kg Paku kayu 29,000.00 87,000.00
7.2000 oh Tukang kayu 202,400.00 1,457,280.00
2.4000 oh Pekerja 175,000.00 420,000.00
0.7200 oh Kepala tukang 210,000.00 151,200.00
0.1200 oh Mandor 210,000.00 25,200.00
2,053,680.00 3,822,900.00 5,876,580.00 SNI
I.15 1 m' Pasang listplank 2x 2/20 kayu ulin
0.0108 m3 Papan kayu ulin 9,271,000.00 100,126.80
0.1000 kg Paku ulin 33,000.00 3,300.00
0.2000 oh Tukang kayu 202,400.00 40,480.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.0250 oh Kepala tukang 210,000.00 5,250.00
0.0050 oh Mandor 210,000.00 1,050.00
64,280.00 103,426.80 167,706.80 SNI
I.15 1 m' Pasang listplank woodplank
1.1000 m' Papan woodplank 42,000.00 46,200.00
0.1000 kg skruw 98,000.00 9,800.00
0.2000 oh Tukang kayu 202,400.00 40,480.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.0250 oh Kepala tukang 210,000.00 5,250.00
0.0050 oh Mandor 210,000.00 1,050.00
64,280.00 56,000.00 120,280.00 SNI
I.16 1 m' Pasang listplank 2x 2/20 kayu meranti
0.0108 m3 Papan kayu meranti 3,219,000.00 34,765.20
0.1000 kg Paku kayu 29,000.00 2,900.00
0.2000 oh Tukang kayu 202,400.00 40,480.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.0250 oh Kepala tukang 210,000.00 5,250.00
0.0050 oh Mandor 210,000.00 1,050.00
64,280.00 37,665.20 101,945.20 SNI
I.17 1 m2 Rangka atap baja ringan
1.1000 m2 Baja Ringan (truus + reng) +Peralatan 146,000.00 160,600.00
0.1500 kg Screw 98,000.00 14,700.00
0.1200 oh Tukang baja ringan 202,400.00 24,288.00
0.1200 oh Pekerja 175,000.00 21,000.00
0.0120 oh Kepala tukang 210,000.00 2,520.00
0.0060 oh Mandor 210,000.00 1,260.00
49,068.00 175,300.00 224,368.00 Analisa Kab.
J Pekerjaan Penutup Atap
J.1 1 m2 Pasang atap spandek
0.9524 lbr Atap spandek 319,000.00 303,809.52
0.0267 kg paku genteng 58,000.00 1,548.60
0.0417 oh Tukang kayu 202,400.00 8,440.08
0.0250 oh Pekerja 175,000.00 4,375.00
0.0042 oh Kepala tukang 210,000.00 882.00
0.0013 oh Mandor 210,000.00 273.00
13,970.08 305,358.12 319,328.20
J.2 1 m' Pasang nok genteng metal U 110 cm
1.1000 bh Genteng metal U 110 cm 34,000.00 37,400.00
0.2000 kg paku genteng 58,000.00 11,600.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.2500 oh Pekerja 175,000.00 43,750.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.0130 oh Mandor 210,000.00 2,730.00
79,990.00 49,000.00 128,990.00
J.3 1 m' Pasang nok genteng metal model C 40 cm
3.0000 bh Genteng metal model C 40 cm 40,000.00 120,000.00
0.0750 kg paku genteng 58,000.00 4,350.00
0.0375 oh Tukang kayu 202,400.00 7,590.00
0.0375 oh Pekerja 175,000.00 6,562.50
0.0038 oh Kepala tukang 210,000.00 798.00
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
0.0019 oh Mandor 210,000.00 399.00
15,349.50 124,350.00 139,699.50
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
J.4 1 m' Nok samping genteng metal 110 cm
1.1000 bh Nok samping genteng metal 34,000.00 37,400.00
0.0750 kg Paku genteng 58,000.00 4,350.00
0.0375 oh Tukang kayu 202,400.00 7,590.00
0.0375 oh Pekerja 175,000.00 6,562.50
0.0038 oh Kepala tukang 210,000.00 798.00
0.0019 oh Mandor 210,000.00 399.00
15,349.50 41,750.00 57,099.50
J.5 1 m2 Penutup Atap Seng Gelombang BJLS 20
0.8929 lbr Seng BJLS 20 42,900.00 38,305.41
0.0482 kg kg Paku seng 55,935.00 2,696.07
0.0750 oh Tukang kayu 202,400.00 15,180.00
0.0375 oh Pekerja 175,000.00 6,562.50
0.0075 oh Kepala tukang 210,000.00 1,575.00
0.0018 oh Mandor 210,000.00 378.00
23,695.50 41,001.48 64,696.98
J.6 1 m2 penutup atap seng gelombang BJLS 20 Banyak Jurai
1.1688 lbr Seng BJLS 20 42,900.00 50,141.52
0.0540 kg Paku seng 55,935.00 3,020.49
0.0975 oh Tukang kayu 202,400.00 19,734.00
0.0488 oh Pekerja 175,000.00 8,540.00
0.0098 oh Kepala tukang 210,000.00 2,058.00
0.0023 oh Mandor 210,000.00 483.00
30,815.00 53,162.01 83,977.01
J.7 1 m' Bubungan seng datar / Jurai dalam
1.0000 m' Seng plat BJLS 20 22,000.00 22,000.00
0.0500 kg Paku seng 55,935.00 2,796.75
0.0088 m3 Papan meranti 3,125,000.00 27,500.00
0.0750 oh Tukang kayu 202,400.00 15,180.00
0.0750 oh Pekerja 175,000.00 13,125.00
0.0075 oh Kepala tukang 210,000.00 1,575.00
0.0038 oh Mandor 210,000.00 798.00
30,678.00 52,296.75 82,974.75
J.8 1 m2 Atap genteng
25.0000 bh Genteng -
0.1000 oh Tukang Batu 202,400.00 20,240.00
0.2000 oh Pekerja 175,000.00 35,000.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0100 oh Mandor 210,000.00 2,100.00
59,440.00 - 59,440.00
J.9 1 m' Nok Genteng
5.0000 bh Bubungan genteng beton -
0.2160 zak Semen Pc 50 kg 78,100.00 16,869.60
0.0300 m3 Pasir Pasang 329,150.00 9,874.50
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.3000 oh Pekerja 175,000.00 52,500.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.0150 oh Mandor 210,000.00 3,150.00
89,160.00 26,744.10 115,904.10
J.10 1 m2 penutup atap sirap
1.2000 Ikt ikat sirap ulin isi 100 bh -
0.2000 kg kg Paku sirap 27,500.00 5,500.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.3000 oh Pekerja 175,000.00 52,500.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.0150 oh Mandor 210,000.00 3,150.00
89,160.00 5,500.00 94,660.00
K Pekerjaan Langit-langit
K.1 1 m2 rangka langit-langit (60x60 )
1.1643 btg hollow 4 x 4 galvalume rangka plafond 38,000.00 44,242.86
0.2500 kg skruw 98,000.00
0.3000 oh Tukang kayu 202,400.00 60,720.00
0.2000 oh Pekerja 175,000.00 35,000.00
0.0300 oh Kepala tukang 210,000.00 6,300.00
0.0100 oh Mandor 210,000.00 2,100.00
104,120.00 44,242.86 148,362.86 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
K.2 1 M2 Memasang langit - langit besi profil + kawat
1.0000 m2 Besi Profil "I" 150,000.00 150,000.00
0.1500 kg Kawat diameter 4 mm 40,000.00 6,000.00
1.0500 bh Ramset 25,000.00 26,250.00
0.0500 oh Pekerja 175,000.00 8,750.00
0.5000 oh Tukang kayu 202,400.00 101,200.00
0.5000 oh Kepala tukang 210,000.00 105,000.00
0.0250 oh Mandor 210,000.00 5,250.00
220,200.00 182,250.00 402,450.00 SNI
K.3 1 m2 Plafond PVC 3 layer
0.8333 lbr Palafon PVC 3 layer 6m 143,000.00 119,161.90
0.0720 kg skruw 98,000.00 7,055.72
0.1000 oh Tukang kayu 202,400.00 20,240.00
0.0700 oh Pekerja 175,000.00 12,250.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0040 oh Mandor 210,000.00 840.00
35,430.00 126,217.62 161,647.62 SNI
K.4 1 m2 Plafond lambriziring kayu tebal 9mm
0.0150 m3 Papan Kayu 7,726,000.00 115,890.00
0.0100 kg Paku Tripleks 98,000.00 980.00
0.8000 oh Tukang kayu 202,400.00 161,920.00
0.6000 oh Pekerja 175,000.00 105,000.00
0.0800 oh Kepala tukang 210,000.00 16,800.00
0.0030 oh Mandor 210,000.00 630.00
284,350.00 116,870.00 401,220.00 SNI
K.5 1 m2 Plafond Gypsum (120x240x9)
0.3640 lbr Gypsum board 380,160.00 138,378.24
0.1100 kg Paku Skrup 15,000.00 1,650.00
0.0500 oh Tukang kayu 202,400.00 10,120.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.0050 oh Kepala tukang 210,000.00 1,050.00
0.0050 oh Mandor 210,000.00 1,050.00
29,720.00 140,028.24 169,748.24 SNI
K.6 1 m2 Plafond Akustik 60x120 + Rangka Aluminium
3.6000 m' Profil Aluminium -
0.1500 kg Kawat Dia 4mm -
1.0500 bh Ramset -
1.5000 lbr Akustik 60x120 -
0.5000 oh Tukang kayu 202,400.00 101,200.00
0.1500 oh Pekerja 175,000.00 26,250.00
0.0500 oh Kepala tukang 210,000.00 10,500.00
0.0080 oh Mandor 210,000.00 1,680.00
139,630.00 - 139,630.00 SNI
K.7 1 m' list plafond kayu profil
1.0500 m' list kayu profil 13,000.00 13,650.00
0.0100 kg paku kayu 98,000.00 980.00
0.0500 oh Tukang kayu 202,400.00 10,120.00
0.0500 oh Pekerja 175,000.00 8,750.00
0.0050 oh Kepala tukang 210,000.00 1,050.00
0.0030 oh Mandor 210,000.00 630.00
20,550.00 14,630.00 35,180.00 SNI
L Pekerjaan Lantai
L.1 1 m2 Pasang Lantai Keramik 30x30
11.8700 bh Keramik30x30 warna 8,818.18 104,671.82
10.0000 kg Semen portland 1,620.00 16,200.00
0.0450 m3 Pasir Pasang 340,000.00 15,300.00
1.5000 kg Semen warna 5,000.00 7,500.00
0.3500 oh Tukang batu 202,400.00 70,840.00
0.6200 oh Pekerja 175,000.00 108,500.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
0.0300 oh Mandor 210,000.00 6,300.00
192,990.00 143,671.82 336,661.82 SNI
L.1 1 m2 Pasang Lantai Granit 60 x 60
2.7778 bh Granit 60 x 60 126,360.00 351,000.00
10.0000 kg Semen portland 1,620.00 16,200.00
0.0450 m3 Pasir Pasang 340,000.00 15,300.00
1.5000 kg Semen warna 5,000.00 7,500.00
0.3500 oh Tukang batu 202,400.00 70,840.00
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
0.6200 oh Pekerja 175,000.00 108,500.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
0.0300 oh Mandor 210,000.00 6,300.00
192,990.00 390,000.00 582,990.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
L.2 1 m2 Pasang Lantai Keramik 40x40 polos
6.2500 bh Keramik 40x40 polos 16,160.00 101,000.00
10.0000 kg Semen portland 1,620.00 16,200.00
0.0450 m3 Pasir Pasang 340,000.00 15,300.00
1.5000 kg Semen warna 5,000.00 7,500.00
0.3500 oh Tukang batu 202,400.00 70,840.00
0.6200 oh Pekerja 175,000.00 108,500.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
0.0300 oh Mandor 210,000.00 6,300.00
192,990.00 140,000.00 332,990.00 SNI
L.3 1 m2 Pasang Lantai Keramik 40x40 anti slip
6.2500 bh Keramik 40x40 anti slip 17,600.00 110,000.00
10.0000 kg Semen portland 1,620.00 16,200.00
0.0450 m3 Pasir Pasang 340,000.00 15,300.00
1.5000 kg Semen warna 5,000.00 7,500.00
0.3500 oh Tukang batu 202,400.00 70,840.00
0.6200 oh Pekerja 175,000.00 108,500.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
0.0300 oh Mandor 210,000.00 6,300.00
192,990.00 149,000.00 341,990.00 SNI
L.4 1 m2 Pasang Lantai Keramik 20x20 anti slip
26.5000 bh Keramik 20x20 anti slip 2,560.00 67,840.00
10.0000 kg Semen portland 1,620.00 16,200.00
0.0450 m3 Pasir Pasang 340,000.00 15,300.00
1.5000 kg Semen warna 5,000.00 7,500.00
0.3500 oh Tukang batu 202,400.00 70,840.00
0.6200 oh Pekerja 175,000.00 108,500.00
0.0350 oh Kepala tukang 210,000.00 7,350.00
0.0300 oh Mandor 210,000.00 6,300.00
192,990.00 106,840.00 299,830.00 SNI
L.5 1 m2 Pasang lantai double Plywood 12 mm
0.8600 lbr Plywood 12 mm 294,000.00 252,840.00
0.2500 oh Tukang batu 202,400.00 50,600.00
0.1250 oh Pekerja 175,000.00 21,875.00
0.0250 oh Kepala tukang 210,000.00 5,250.00
0.0063 oh Mandor 210,000.00 1,323.00
79,048.00 252,840.00 331,888.00
M Pekerjaan pipa dan sanitasi
M.1 1 bh Memasang klosed duduk/monohok keramik
1.0000 bh Klosed duduk/monohok 2,267,000.00 2,267,000.00
0.0600 ls Perlengkapan 6% harga klosed 136,020.00 8,161.20
1.1000 oh Tukang batu 202,400.00 222,640.00
3.3000 oh Pekerja 175,000.00 577,500.00
0.0010 oh Kepala tukang 210,000.00 210.00
0.1600 oh Mandor 210,000.00 33,600.00
833,950.00 2,275,161.20 3,109,111.20 SNI
M.2 1 bh Memasang klosed jongkok porselin
1.0000 bh Klosed jongkok keramik 136,000.00 136,000.00
6.0000 kg Semen PC 1,620.00 9,720.00
0.0100 m3 Pasir pasang 340,000.00 3,400.00
1.5000 oh Tukang batu 202,400.00 303,600.00
1.0000 oh Pekerja 175,000.00 175,000.00
0.3000 oh Kepala tukang 210,000.00 63,000.00
0.1600 oh Mandor 210,000.00 33,600.00
575,200.00 149,120.00 724,320.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
M.3 1 m' Memasang pipa PVC Aw Ø 1/2'
1.2000 m' Pipa PVC Ø 1/2' 7,000.00 8,400.00
0.3500 ls Perlengkapan 1,400.00 490.00
0.0600 oh Tukang batu 202,400.00 12,144.00
0.0360 oh Pekerja 175,000.00 6,300.00
0.0060 oh Kepala tukang 210,000.00 1,260.00
0.0018 oh Mandor 210,000.00 378.00
20,082.00 8,890.00 28,972.00 SNI
M.4 1 m' Memasang pipa PVC Aw Ø 3/4'
1.2000 m' Pipa PVC Ø 3/4' 8,000.00 9,600.00
0.3500 ls Perlengkapan 1,600.00 560.00
0.0600 oh Tukang batu 202,400.00 12,144.00
0.0360 oh Pekerja 175,000.00 6,300.00
0.0060 oh Kepala tukang 210,000.00 1,260.00
0.0018 oh Mandor 210,000.00 378.00
20,082.00 10,160.00 30,242.00 SNI
M.5 1 m' Memasang pipa PVC Aw Ø 2'
1.2000 m' Pipa PVC Ø 2' 16,000.00 19,200.00
0.3500 ls Perlengkapan 3,200.00 1,120.00
0.0600 oh Tukang batu 202,400.00 12,144.00
0.0360 oh Pekerja 175,000.00 6,300.00
0.0060 oh Kepala tukang 210,000.00 1,260.00
0.0018 oh Mandor 210,000.00 378.00
20,082.00 20,320.00 40,402.00 SNI
M.6 1 m' Memasang pipa PVC Aw Ø 4''
1.2000 m' Pipa PVC Ø 4' 48,000.00 57,600.00
0.3500 ls Perlengkapan 9,600.00 3,360.00
0.1350 oh Tukang batu 202,400.00 27,324.00
0.0810 oh Pekerja 175,000.00 14,175.00
0.0135 oh Kepala tukang 210,000.00 2,835.00
0.0041 oh Mandor 210,000.00 861.00
45,195.00 60,960.00 106,155.00 SNI
M.7 1 bh Memasang kran Ø 3/4'' atau 1/2''
1.0000 bh Kran air 23,000.00 23,000.00
0.0250 bh Seal tape 4,000.00 100.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.0100 oh Pekerja 175,000.00 1,750.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0050 oh Mandor 210,000.00 1,050.00
25,140.00 23,100.00 48,240.00 SNI
M.8 1 bh memasang floor drain
1.0000 bh Floor drain 24,000.00 24,000.00
0.1000 oh Tukang batu 202,400.00 20,240.00
0.0100 oh Pekerja 175,000.00 1,750.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0050 oh Mandor 210,000.00 1,050.00
25,140.00 24,000.00 49,140.00
N Pekerjaan Kunci dan Kaca
N.1 1 bh Pasang Kunci Tanam Biasa
1.0000 bh Kunci tanam biasa 310,000.00 310,000.00
0.5000 oh Tukang kayu 202,400.00 101,200.00
0.0100 oh Pekerja 175,000.00 1,750.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0050 oh Mandor 210,000.00 1,050.00
106,100.00 310,000.00 416,100.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
N.2 1 bh Pasang Kunci Tanam Kamar Mandi
1.0000 bh Kunci tanam kamar mandi 155,000.00 155,000.00
0.5000 oh Tukang kayu 202,400.00 101,200.00
0.0050 oh Pekerja 175,000.00 875.00
0.0050 oh Kepala tukang 210,000.00 1,050.00
0.0025 oh Mandor 210,000.00 525.00
103,650.00 155,000.00 258,650.00 SNI
N.3 1 bh Pasang Engsel pintu
1.0000 bh Engsel pintu kuningan 4 " 149,000.00 149,000.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 149,000.00 185,292.50 SNI
N.4 1 bh Pasang Engsel Jendela kupu-kupu
1.0000 bh Engsel jendela 3' 55,000.00 55,000.00
0.1000 oh Tukang kayu 202,400.00 20,240.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.00050 oh Mandor 210,000.00 105.00
39,945.00 55,000.00 94,945.00 SNI
N.5 1 bh Pasang Kait Angin
1.0000 bh Kait angin 42,000.00 42,000.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 42,000.00 78,292.50 SNI
N.6 1 bh Pasang handle Pintu
1.0000 bh Handle 19,000.00 19,000.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 19,000.00 55,292.50 SNI
N.7 1 bh Pasang handle Jendela
1.0000 bh Handle 22,000.00 22,000.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 22,000.00 58,292.50 SNI
N.8 1 bh Pasang grandel Pintu
1.0000 bh Grandel 154,000.00 154,000.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 154,000.00 190,292.50 SNI
N.9 1 bh Pasang grandel Jendela
1.0000 bh Grandel 20,000.00 20,000.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 20,000.00 56,292.50 SNI
N.10 1 bh Pasang grandel Pintu Tanam [esoagnolet]
1.0000 bh Grandel tanam 108,900.00 108,900.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 108,900.00 145,192.50 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
N.11 1 m2 Pasang Kaca, tebal 5 mm
1.1000 m2 Kaca 5 mm 271,000.00 298,100.00
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 298,100.00 334,392.50 SNI
N.12 1 m2 Pasang Kaca Patri, tebal 5 mm
1.1000 m2 Kaca patri 5 mm -
0.1500 oh Tukang kayu 202,400.00 30,360.00
0.0150 oh Pekerja 175,000.00 2,625.00
0.0150 oh Kepala tukang 210,000.00 3,150.00
0.00075 oh Mandor 210,000.00 157.50
36,292.50 - 36,292.50 SNI
O Pekerjaan Cat-catan
O.1 1 m2 pengecatan bidang kayu baru
0.2000 kg Cat meni 66,000.00 13,200.00
0.1500 kg Plamir 46,000.00 6,900.00
0.1700 kg Cat dasar 22,000.00 3,740.00
0.2600 kg Cat Penutup 2 kali 51,000.00 13,260.00
0.0090 oh Tukang Cat 202,400.00 1,821.60
0.0700 oh Pekerja 175,000.00 12,250.00
0.0060 oh Kepala tukang 210,000.00 1,260.00
0.0025 oh Mandor 210,000.00 525.00
15,856.60 37,100.00 52,956.60 SNI
O.2 1 m2 pengecatan tembok baru (exsterior)
0.1000 kg Plamir 46,000.00 4,600.00
0.1000 kg Cat dasar 22,000.00 2,200.00
0.2600 kg Cat penutup 2 kali klas A 123,000.00 31,980.00
0.0630 oh Tukang Cat 202,400.00 12,751.20
0.0200 oh Pekerja 175,000.00 3,500.00
0.0063 oh Kepala tukang 210,000.00 1,323.00
0.0025 oh Mandor 210,000.00 525.00
18,099.20 38,780.00 56,879.20 SNI
O.3 1 m2 Mengecat dinding/plapond
0.1800 kg Cat tembok 123,000.00 22,140.00
0.0750 oh Tukang cat 202,400.00 15,180.00
0.1500 oh Pekerja 175,000.00 26,250.00
0.0075 oh Kepala tukang 210,000.00 1,575.00
0.0075 oh Mandor 210,000.00 1,575.00
44,580.00 22,140.00 66,720.00 Standar Kab.
O.4 1 m2 pengecatan tembok baru (interior)
0.1000 kg Plamir 46,000.00 4,600.00
0.1000 kg Cat dasar 22,000.00 2,200.00
0.2600 kg Cat penutup 2 kali klas biasa 74,000.00 19,240.00
0.0630 oh Tukang Cat 202,400.00 12,751.20
0.0200 oh Pekerja 175,000.00 3,500.00
0.0063 oh Kepala tukang 210,000.00 1,323.00
0.0025 oh Mandor 210,000.00 525.00
18,099.20 26,040.00 44,139.20 SNI
O.5 1 m2 Plituran
0.0200 kg Sirlak 51,700.00 1,034.00
0.3300 ltr Spritus - -
2.0000 lbr Ampelas 3,850.00 7,700.00 7,700.00
0.1999 oh Tukang cat 74,000.00 14,792.60
22,492.60 8,734.00 31,226.60
O.6 1 m2 Mengecat dasar / meni
0.0840 kg Cat dasar/meni 63,500.00 5,334.00
0.0440 ltr Minyak cat 16,500.00 726.00
0.0600 oh Tukang cat 74,000.00 4,440.00
0.0300 oh Pekerja 202,400.00 6,072.00
0.0060 oh Kepala tukang 175,000.00 1,050.00
0.0015 oh Mandor 210,000.00 315.00
11,877.00 6,060.00 17,937.00
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
P Pekerjaan Besi Dan Aluminium
P.1 1 Kg Pemasangan Besi Frofil
1.1500 kg Besi Profil 26,000.00 29,900.00
0.0600 oh Pekerja 175,000.00 10,500.00
0.0600 oh Tukang Las 202,400.00 12,144.00
0.0060 oh Kepala tukang 210,000.00 1,260.00
0.0030 oh Mandor 210,000.00 630.00
24,534.00 29,900.00 54,434.00 SNI
P.2 1 Kg Pemasangan Rangka Kuda-kuda baja IWF
1.1500 kg Besi baja IWF 26,000.00 29,900.00
0.0600 oh Pekerja 175,000.00 10,500.00
0.0600 oh Tukang Las 202,400.00 12,144.00
0.0060 oh Kepala tukang 210,000.00 1,260.00
0.0030 oh Mandor 210,000.00 630.00
24,534.00 29,900.00 54,434.00 SNI
P.3 100 Kg Pekerjaan perakitan
1.0000 ltr Solar -
0.1000 ltr Minyak pelumas -
0.1000 oh Pekerja 175,000.00 17,500.00
0.1000 oh Tukang Besi 202,400.00 20,240.00
0.0010 oh Kepala tukang 210,000.00 210.00
0.0050 oh Mandor 210,000.00 1,050.00
0.0080 jam Sewa alat
39,000.00 - 39,000.00 SNI
P.4 1m2 Pintu besi Plat baja Tebal 2mm rangkap,rangka baja siku
15.0000 kg Besi Siku 30.30.3 -
32.8000 kg Besi Plat Baja -
0.0500 kg Kawat las -
1.0500 oh Pekerja 175,000.00 183,750.00
1.0500 oh Tukang Besi 202,400.00 212,520.00
0.1050 oh Kepala tukang 210,000.00 22,050.00
0.0520 oh Mandor 210,000.00 10,920.00
429,240.00 - 429,240.00 SNI
P.5 1 Cm Pengelasan dengan las listrik
0.0400 kg Kawat las listrik -
0.0300 ltr Solar -
0.0040 ltr Minyak pelumas -
0.0040 oh Pekerja 175,000.00 700.00
0.0020 oh Tukang Besi 202,400.00 404.80
0.0002 oh Kepala tukang 210,000.00 42.00
0.0002 oh Mandor 210,000.00 42.00
0.0170 jam Sewa alat
1,188.80 - 1,188.80 SNI
P.6 1 m2 Memasang pintu lipat ( Folding door)
1.0000 m2 Pintu lipat -
0.4400 oh Pekerja 175,000.00 77,000.00
0.4400 oh Tukang Besi 202,400.00 89,056.00
0.0440 oh Kepala tukang 210,000.00 9,240.00
0.0220 oh Mandor 210,000.00 4,620.00
179,916.00 - 179,916.00 SNI
P.7 1 m2 Memasangsunscreen Alluminium
1.0000 m2 Sunscreen alluminium -
0.0800 oh Pekerja 175,000.00 14,000.00
0.8000 oh Tukang Besi 202,400.00 161,920.00
0.0800 oh Kepala tukang 210,000.00 16,800.00
0.0040 oh Mandor 210,000.00 840.00
193,560.00 - 193,560.00 SNI
Harga Satuan Upah Bahan Jumlah Harga
No. Nama Pekerjaan Keterangan
(Rp.) (Rp.) (Rp.) (Rp.)
P.8 1 m2 Memasang Rolling door Alluminium
1.0000 m2 Rolling door alluminium - -
1.0000 oh Pekerja 175,000.00 175,000.00
1.0000 oh Tukang Besi 202,400.00 202,400.00
0.1000 oh Kepala tukang 210,000.00 21,000.00
0.0500 oh Mandor 210,000.00 10,500.00
408,900.00 - 408,900.00 SNI
P.9 1 m' Kosen pintu Alluminium
1.1000 m' Profil alluminium - -
2.0000 bh Skrup Fikxer - -
0.0600 tube Sealant 47,000.00
0.0430 oh Pekerja 175,000.00 7,525.00
0.0430 oh Tukang Besi Konstruksi 202,400.00 8,703.20
0.0043 oh Kepala tukang 210,000.00 903.00
0.0021 oh Mandor 210,000.00 441.00
17,572.20 - 17,572.20 SNI
P.10 1 m2 Pintu kaca rangka Alluminium
4.4000 m' Pintu alluminium - -
4.5000 m' Profil kaca - -
0.2700 tube Sealant 47,000.00 12,690.00
0.0850 oh Pekerja 175,000.00 14,875.00
0.0850 oh Tukang Besi 202,400.00 17,204.00
0.0080 oh Kepala tukang 210,000.00 1,680.00
0.0040 oh Mandor 210,000.00 840.00
34,599.00 12,690.00 47,289.00 SNI
P.11 1 m2 Kawat nyamuk
1.1000 m2 Kawat nyamuk 30,000.00 33,000.00
11.1100 cm Pengelasan - -
1.7160 kg Baja Strip 17,000.00 29,172.00
0.1000 oh Pekerja 175,000.00 17,500.00
0.1000 oh Tukang Besi 202,400.00 20,240.00
0.0100 oh Kepala tukang 210,000.00 2,100.00
0.0050 oh Mandor 210,000.00 1,050.00
40,890.00 62,172.00 103,062.00 SNI
P.12 1 m' Talang datar/jurai seng
1.0500 m' Seng Plat 23,000.00 24,150.00
0.0150 kg Paku Kayu 29,000.00 435.00
0.0190 m3 Papan Kayu kelas II atau III 3,219,000.00 61,161.00
0.2000 oh Pekerja 175,000.00 35,000.00
0.4000 oh Tukang Besi 202,400.00 80,960.00
0.0250 oh Kepala tukang 210,000.00 5,250.00
0.0100 oh Mandor 210,000.00 2,100.00
123,310.00 85,746.00 209,056.00 SNI