Anda di halaman 1dari 4

PEKERJAAN

REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

SHOP DRAWING
REVISI
NO. KETERANGAN TANGGAL

25

50
NAMA GAMBAR

250
DENAH PEMASANGAN PIPA
DIAMETER 20" PENGENDALI
REMBESAN DI KOLAM OLAK
BENDUNGAN PENYARING
II.I.12.C

50
NO. GAMBAR
LEMBAR
V=
SKALA
H=

250
TIM TEKNIS
DIUKUR -
DIGAMBAR M.SOFIAN
DIBUAT

52
KONTRAKTOR PELAKSANA
PT. BRANTAS ABIPRAYA (PERSERO)

250
CATUR WIBOWO, S.T.
PROJECT MANAGER

50
DIPERIKSA DAN DISETUJUI

KONSULTAN SUPERVISI
-

23
DENAH PEMASANGAN PIPA ø20"

.........................................
TEAM LEADER
MENGETAHUI
PPK O&P SDA V
REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

0 2 4 6 8 10 M

SKALA = 1 : 20

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001
PEKERJAAN

REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

SHOP DRAWING
REVISI
NO. KETERANGAN TANGGAL

Asal Rembesan
Chute Block
Buffle Block End Sill
NAMA GAMBAR

ELV 15.50
LONG SECTION PEMASANGAN PIPA
DIAMETER 20" PENGEDALI
REMBESAN DI KOLAM OLAK
BENDUNGAN PENYARING
Dinding Existing Dinding Baru NO. GAMBAR II.I.12.C
LEMBAR
V=
SKALA
H=
TIM TEKNIS
ELV 15.50 ELV 15.50 ELV 15.50 DIUKUR -

ELV 15.00 DIGAMBAR M.SOFIAN


DIBUAT

Keadaan Lapangan Elv. 14.40 KONTRAKTOR PELAKSANA


PT. BRANTAS ABIPRAYA (PERSERO)
ELV 13.90
A
ELV 13.40

2050 CATUR WIBOWO, S.T.


PROJECT MANAGER

DIPERIKSA DAN DISETUJUI


2100
KONSULTAN SUPERVISI
-

LONG SECTION PEMASANGAN PIPA

.........................................
TEAM LEADER
MENGETAHUI
PPK O&P SDA V
REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

0 2 4 6 8 10 M

SKALA = 1 : 20

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001
PEKERJAAN

REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

SHOP DRAWING
REVISI
NO. KETERANGAN TANGGAL

ELV.19.00
Dinding Existing
NAMA GAMBAR

CROSS SECTION PEMASANGAN PIPA


DIAMETER 20" PENGENDALI
REMBESAN DI KOLAM OLAK
BENDUNGAN PENYARING
NO. GAMBAR II.I.12.C
LEMBAR
V=
SKALA
H=
TIM TEKNIS
DIUKUR -

ELV.15.00
DIGAMBAR M.SOFIAN
ELV.15.50
DIBUAT

KONTRAKTOR PELAKSANA
PT. BRANTAS ABIPRAYA (PERSERO)

ELV.14.00
ELV.13.90
CATUR WIBOWO, S.T.
ELV.13.40 PROJECT MANAGER

DIPERIKSA DAN DISETUJUI

KONSULTAN SUPERVISI
-

25 50 250 50 250 50 250 50 25

CROSS PEMASANGAN PIPA


Skala1:20
.........................................
TEAM LEADER
MENGETAHUI
PPK O&P SDA V
REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

0 2 4 6 8 10 M

SKALA = 1 : 20

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001
50
A PEKERJAAN

ELV. 13.90 REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

26
SHOP DRAWING

11
50
REVISI
NO. KETERANGAN TANGGAL

33
0
ELV. 13.40

2
Pipa ø 20" Setengah dilubangkan NAMA GAMBAR

Geotextile Non Woven 200 gr DETAIL PEMASANGAN PIPA


DIAMETER 20" PENGENDALI
Gravel 1x2 REMBESAN DIKOLAM OLAK
BENDUNGAN PENYARING

NO. GAMBAR II.I.12.C


Detail Pipa Peralihan Rembesan Kolam Olak (A) 50
LEMBAR
V=
SKALA
H=
TIM TEKNIS
DIUKUR -
DIGAMBAR M.SOFIAN
DIBUAT

KONTRAKTOR PELAKSANA
PT. BRANTAS ABIPRAYA (PERSERO)

50
Pipa ø20" Dilubangkan 21 ø
13 20 2

CATUR WIBOWO, S.T.


PROJECT MANAGER

DIPERIKSA DAN DISETUJUI

KONSULTAN SUPERVISI
-
50

50

Pipa ø 20" Setengah dilubangkan .........................................


TEAM LEADER
Geotextile Non Woven 200 gr MENGETAHUI
PPK O&P SDA V
Gravel 1x2 Pipa ø 20" Setengah dilubangkan REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

Geotextile Non Woven 200 gr


Potongan A Gravel 1x2 0 2 4 6 8 10 M

SKALA = 1 : 5

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001

Anda mungkin juga menyukai