PEKERJAAN

REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

SHOP DRAWING
REVISI
NO. KETERANGAN TANGGAL

25

50
NAMA GAMBAR

250
DENAH PEMASANGAN PIPA
DIAMETER 20" PENGENDALI
REMBESAN DI KOLAM OLAK
BENDUNGAN PENYARING
II.I.12.C

50
NO. GAMBAR
LEMBAR
V=
SKALA
H=

250
TIM TEKNIS
DIUKUR -
DIGAMBAR M.SOFIAN
DIBUAT

52
KONTRAKTOR PELAKSANA
PT. BRANTAS ABIPRAYA (PERSERO)

250
CATUR WIBOWO, S.T.
PROJECT MANAGER

50
DIPERIKSA DAN DISETUJUI

KONSULTAN SUPERVISI
-

23
DENAH PEMASANGAN PIPA
.........................................
TEAM LEADER
MENGETAHUI
PPK O&P SDA V
REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

0 2 4 6 8 10 M

SKALA = 1 : 20

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001
PEKERJAAN

REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

SHOP DRAWING
REVISI
Asal Rembesan NO. KETERANGAN TANGGAL

Chute Block
Buffle Block End Sill NAMA GAMBAR

LONG SECTION PEMASANGAN PIPA


DIAMETER 20" PENGEDALI
REMBESAN DI KOLAM OLAK
BENDUNGAN PENYARING
NO. GAMBAR II.I.12.C
Dinding Existing Dinding Baru LEMBAR
V=
SKALA
H=
TIM TEKNIS
DIUKUR -

ELV 15.00 DIGAMBAR M.SOFIAN


DIBUAT

KONTRAKTOR PELAKSANA
PT. BRANTAS ABIPRAYA (PERSERO)

A
2050

CATUR WIBOWO, S.T.


PROJECT MANAGER

DIPERIKSA DAN DISETUJUI


Keadaan Lapangan Elv. 14.40 KONSULTAN SUPERVISI
-

2100

LONG SECTION PEMASANGAN PIPA .........................................


TEAM LEADER
MENGETAHUI
PPK O&P SDA V
REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

0 2 4 6 8 10 M

SKALA = 1 : 20

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001
PEKERJAAN

REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

SHOP DRAWING
REVISI
NO. KETERANGAN TANGGAL

Dinding Existing
NAMA GAMBAR

CROSS SECTION PEMASANGAN PIPA


DIAMETER 20" PENGENDALI
REMBESAN DI KOLAM OLAK
BENDUNGAN PENYARING
NO. GAMBAR II.I.12.C
LEMBAR
V=
SKALA
H=

ELV.15.00
TIM TEKNIS
DIUKUR -
DIGAMBAR M.SOFIAN
DIBUAT

KONTRAKTOR PELAKSANA
PT. BRANTAS ABIPRAYA (PERSERO)

CATUR WIBOWO, S.T.


PROJECT MANAGER

DIPERIKSA DAN DISETUJUI

KONSULTAN SUPERVISI
-

25 50 250 50 250 50 250 50 25

CROSS PEMASANGAN PIPA


Skala1:20
.........................................
TEAM LEADER
MENGETAHUI
PPK O&P SDA V
REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
DI PULAU SUMBAWA 1

0 2 4 6 8 10 M

SKALA = 1 : 20

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001
PEKERJAAN

50 REMEDIAL DAN PENANGANAN


SEDIMENTASI BENDUNGAN
A DI PULAU SUMBAWA 1
ELV. 14.4
SHOP DRAWING

13
REVISI

2
NO. KETERANGAN TANGGAL
50

20
2
NAMA GAMBAR

13
ELV. 13.9 DETAIL PEMASANGAN PIPA
DIAMETER 20" PENGENDALI
Pipa ø 20" REMBESAN DIKOLAM OLAK
BENDUNGAN PENYARING
Geomembran
NO. GAMBAR II.I.12.C
Gravel/ Filter Rembesan LEMBAR
V=
SKALA
H=
TIM TEKNIS
DIUKUR -
Detail Pipa Peralihan Rembesan Kolam Olak (A) DIGAMBAR M.SOFIAN
DIBUAT

KONTRAKTOR PELAKSANA
50 PT. BRANTAS ABIPRAYA (PERSERO)

13 20 2

CATUR WIBOWO, S.T.


PROJECT MANAGER

DIPERIKSA DAN DISETUJUI


50

KONSULTAN SUPERVISI
-

Pipa ø 20"
Geomembran .........................................
TEAM LEADER
Gravel/ Filter Rembesan MENGETAHUI
PPK O&P SDA V
REMEDIAL DAN PENANGANAN SEDIMENTASI BENDUNGAN
Potongan A DI PULAU SUMBAWA 1

0 2 4 6 8 10 M

SKALA = 1 : 5

IFAN AZWAR NASUTION, S.T,M.T.


NIP. 198608122010121001