Surusunda 2
Surusunda 2
85,263,690.91
- 363,452.54
93,790,060.00
400,060.00
93,500,000.00
- 110,000.00
ANALISA HARGA SATUAN PEKERJAAN
D Jumlah A + B + C 40,511.70
E Overhead & Profit 10% 4,051.17
F Harga Satuan Pekerjaan (D+E) 44,562.87
D Jumlah A + B + C 21,687.70
E Overhead & Profit 10% 2,168.77
F Harga Satuan Pekerjaan (D+E) 23,856.47
6 A,4,4,2.4 Plesteran 1 : 4 m2
7 A,4,4,2.27 Acian m2
8 A,4,4,2.26 Siar-an 1 :2 m2
R PEMUKIMAN
AN KARANGPUCUNG
HARGA
SATUAN PEKERJAAN
(Rp)
60,425.75
43,851.50
116,570.30
153,530.30
770,623.59
52,379.91
31,247.70
50,658.63
44,562.87
23,856.47
p, April 2022
la Pelaksana
langan Bencana Daerah
JONARDI, MM,
415 198503 1 022
DAFTAR HARGA BAHAN / MATERIAL
HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp)
I BAHAN / MATERIAL
II TENAGA KERJA
1 Pekerja OH 70,000.00
2 Tukang batu OH 86,100.00
3 Kepala Tukang OH 92,400.00
4 Mandor OH 97,300.00