HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls 250,000.00 250,000.00
2 Pengukuran Dan Pemasangan Bowplank 1.00 Ls -
3 As Build Drawing 1.00 Ls 3,000,000.00 3,000,000.00
JUMLAH 3,250,000.00
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Batu Kali 27.48 m3 -
2 Pek. Urugan Pasir Dibawah Pondasi Batu Kali 2.75 m3 -
3 Pek. Urugan Kembali Tanah Bekas Galian 9.16 m3 -
4 Pek. Urugan Sirtu Bawah Lantai 133.96 m3 -
5 Pek. Urugan Pasir Dibawah Lantai 8.89 m3 206,855.00 1,839,354.66
JUMLAH 1,839,354.66
III. PEKERJAAN PASANGAN
1 Pek. Pasangan Batu Kosong 8.24 m3 -
2 Pek. Pasangan Pondasi Batu Kali 1 : 4 36.58 m3 -
3 Pek. Pas. Dinding Batu Bata 1/2 Bata 1 : 4 260.00 m2 -
4 Pek. Plesteran Dinding Batu Bata 1 : 4 520.00 m2 56,119.58 29,182,181.60
5 Pek. Plesteran Pondasi Batu Kali 1 : 3 61.07 m2 49,372.62 3,015,334.02
6 Pek. Acian Pondasi 61.07 m2 27,786.00 1,696,974.38
7 Pek. Pas. Lantai Tegel Keramik 30X30 198.00 m2 -
JUMLAH 33,894,490.00
IV. PEKERJAAN BETON
1 Pek. Cor Beton 1 : 3 : 5 9.90 m3 935,205.86 9,258,537.99
2 Pek. Sloof Beton Bertulang 15 x 20 cm 2.36 m3 -
3 Pek. Kolom Praktis Beton Bertulang 12 x 12 cm (K2) 40.00 m1 -
4 Pek. Ring Balok Beton Bertulang 15 x 20cm 2.42 m3 -
5 Pek. Kolom Beton Bertulang 20 x 25 cm (K1) 2.20 m3 -
JUMLAH 9,258,537.99
V. PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI
1 Pek. Kusen Pintu, Jendela, Kayu Kelas II 1.10 m3 -
2 Pek. Pintu Panil Kayu Kelas II 6.48 m2 590,095.00 3,823,815.60
3 Pek. Daun Jendela Kaca Bening Buka 5 mm 8.24 m2 464,332.00 3,826,095.68
4 Pek. Jendela Kaca Bening Buka 5 mm 17.60 m2 233,325.13 4,106,522.20
JUMLAH 11,756,433.48
VI. PEKERJAAN KAP, ATAP DAN PLAFOND
1 Pek. Konstruksi Kuda-kuda Baja Ringan 212.72 m2 -
2 Pek. Atap Sakura roof 212.72 m2 -
3 Pek. Bumbungan Genteng Metal 32.66 m1 -
4 Pek. Rangka Plafond Hollow( 60 X 60 ) cm 244.83 m2 159,258.00 38,991,136.14
5 Pek. Plafond Gypsum Board 9 mm 244.83 m2 62,947.50 15,411,436.43
6 Pek. Lisplank Woodplank uk. 4050 x 300 x 8 mm 68.40 m1 -
7 Pek. List Plafon Sudut Gypsum 8-10 cm 224.46 m1 47,965.50 10,766,336.13
JUMLAH 65,168,908.70
VII. PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Tembok 520.00 m2 48,796.00 25,373,920.00
2 Pek. Pengecatan Plafond 244.83 m2 48,796.00 11,946,724.68
3 Pek. Pengecatan Pintu, Jendela Kusen/Pintu/Jendela 30.07 m2 78,851.30 2,370,664.33
4 Pek. Pengecatan Lisplank 18.35 m2 48,796.00 895,162.62
JUMLAH 40,586,471.63
VIII. PEKERJAAN ALAT PENGGANTUNG
1 Pek. Pas. Kunci Pintu 3.00 Bh 207,597.50 622,792.50
2 Pek. Pas. Engsel Pintu 12.00 Bh 50,065.13 600,781.50
3 Pek. Pas. Engsel Jendela 64.00 Bh 29,463.50 1,885,664.00
4 Pek. Pas. Haq Angin 64.00 Bh 36,865.13 2,359,368.00
5 Pek. Pas. Grendel Jendela 32.00 Bh 27,326.75 874,456.00
JUMLAH 6,343,062.00
IX. PEKERJAAN INSTALASI LISTRIK
1 Pek. Pas. Instalasi Titik Lampu + Kabel 26.00 Ttk 371,470.00 9,658,220.00
2 Pek. Pas. Instalasi Titik Stop Kontak + Kabel 5.00 Ttk 485,402.50 2,427,012.50
3 Pek. Pas. SL 23 Watt 20.00 Bh 74,100.13 1,482,002.50
4 Pek. Pas. Lampu 10 Watt 6.00 Bh 41,100.13 246,600.75
5 Pek. Pas. Saklar Tunggal 5.00 Bh 46,600.13 233,000.63
6 Pek. Pas. Saklar Ganda 5.00 Bh 57,600.13 288,000.63
7 Box MCB 1.00 Bh 85,000.00 85,000.00
JUMLAH 14,419,837.00
X. PEKERJAAN AKHIR
1 Administrasi & Dokumentasi 1.00 Ls 3,000,000.00 3,000,000.00
2 Pek. Pembersihan Akhir 1.00 Ls 1,500,000.00 1,500,000.00
JUMLAH 4,500,000.00
DAFTAR ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA
10. (SNI) 1 M² PASANGAN DINDING BATU BATA TEBAL 1/2 BATA CAMPURAN 1 PC : 3 PSR
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A Tenaga
Pekerja L.01 Oh 0.3000 Rp. 80,000.00 Rp.
Tukang Batu L.02 Oh 0.1000 Rp. 100,000.00 Rp.
Kepala Tukang L.03 Oh 0.0100 Rp. 150,000.00 Rp.
Mandor L.04 Oh 0.0150 Rp. 85,000.00 Rp.
Jumlah Harga Tenaga Rp.
B Bahan
Batu Bata Buah 70.0000 Rp. 1,040.00 Rp.
Semen Kg 14.3700 Rp. 1,700.00 Rp.
Pasir Pasang M3 0.0400 Rp. 150,000.00 Rp.
11. (SNI) 1 M² PASANGAN DINDING BATU BATA TEBAL 1/2 BATA CAMPURAN 1 PC : 4 PSR
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A Tenaga
Pekerja L.01 Oh 0.1750 Rp. 80,000.00 Rp.
Tukang Batu L.02 Oh 0.1250 Rp. 100,000.00 Rp.
Kepala Tukang L.03 Oh 0.0100 Rp. 150,000.00 Rp.
Mandor L.04 Oh 0.0150 Rp. 85,000.00 Rp.
Jumlah Harga Tenaga Rp.
B Bahan
Batu Bata Buah 70.000 Rp. 1,040.00 Rp.
Semen Kg 11.500 Rp. 1,700.00 Rp.
Pasir Pasang M3 0.045 Rp. 150,000.00 Rp.
36 MEMASANG 1M² LUAS ATAP GENTENG METAL KONSTRUKSI KUDA-KUDA BAJA RINGAN C75
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A Tenaga
Pekerja L.01 Oh 0.3000 Rp. 80,000.00 Rp.
Tukang Kayu L.02 Oh 0.3000 Rp. 100,000.00 Rp.
Kepala Tukang L.03 Oh 0.0300 Rp. 150,000.00 Rp.
Mandor L.04 Oh 0.0150 Rp. 85,000.00 Rp.
Jumlah Harga Tenaga Rp.
B Bahan
MainTruss C.75-75 M¹ 2.8000 Rp. 15,000.00 Rp.
Roof Botton/Reng R 33-045 M¹ 5.1000 Rp. 9,000.00 Rp.
Screw dia 6 x 20 mm Bh 25.0000 Rp. 500.00 Rp.
Screw dia 4 x 6 mm(Roof Batten Screw) Bh 35.0000 Rp. 500.00 Rp.
Dynabolt dia 12 x 120 mm Bh 1.0000 Rp. 2,500.00 Rp.
50 1 M² Pengecatan Bidang Tembok & Plafond (1lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A Tenaga
Pekerja L.01 Oh 0.0200 Rp. 80,000.00 Rp.
Tukang Cat L.02 Oh 0.0630 Rp. 100,000.00 Rp.
Kepala Tukang L.03 Oh 0.0060 Rp. 150,000.00 Rp.
Mandor L.04 Oh 0.0030 Rp. 85,000.00 Rp.
Jumlah Harga Tenaga Rp.
B Bahan
Plamir Tembok Kg 0.1000 Rp. 28,000.00 Rp.
Kertas Gosok Lbr 0.5000 Rp. 8,000.00 Rp.
Cat Dasar Kg 0.1000 Rp. 23,200.00 Rp.
Cat Penutup ( Penutup 3 x ) Kualitas Tinggi Kg 0.2600 Rp. 100,000.00 Rp.
Kuas Roll Bh 0.0100 Rp. 18,500.00 Rp.
Jumlah Harga Bahan Rp.
C Peralatan
44 (SNI) 1 M³ MEMBUAT DAN MEMPASANG KUSEN PINTU DAN JENDELA, KAYU KELAS II
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A Tenaga
Pekerja L.01 Oh 6.0000 Rp. 80,000.00 Rp.
Tukang Kayu L.02 Oh 18.0000 Rp. 100,000.00 Rp.
Kepala Tukang L.03 Oh 1.8000 Rp. 150,000.00 Rp.
Mandor L.04 Oh 0.3000 Rp. 85,000.00 Rp.
Jumlah Harga Tenaga Rp.
B Bahan
Balok Kayu M² 1.1000 Rp. 2,400,000.00 Rp.
Paku Kg 1.2500 Rp. 20,000.00 Rp.
Lem Kayu Kg 1.0000 Rp. 22,400.00 Rp.
46 (SNI) 1 M² MEMBUAT DAN MEMASANG DAUN PINTU / JENDELA KACA, KAYU KELAS II
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A Tenaga
Pekerja L.01 Oh 0.8000 Rp. 80,000.00 Rp.
Tukang Kayu L.02 Oh 2.4000 Rp. 100,000.00 Rp.
Kepala Tukang L.03 Oh 0.2400 Rp. 150,000.00 Rp.
Mandor L.04 Oh 0.0400 Rp. 85,000.00 Rp.
Jumlah Harga Tenaga Rp.
B Bahan
Papan Kayu Kelas II M² 0.0300 Rp. 2,400,000.00 Rp.
Lem Kayu Kg 0.3000 Rp. 22,400.00 Rp.
~
Jumlah Harga Bahan Rp.
C Peralatan
PARATUR
NOLOGI PERTANIAN/PERKEBUNAN
NO URAIAN PE
Jumlah Harga
1. (SNI) 1M1 Penguran dan Pemasangan Bowplank
8,000.00 Bahan
10,000.00 0.011 M3
1,500.00 0.006 M3
850.00 0.020 Kg
20,350.00
0.100 Oh
9,600.00 0.100 Oh
17,600.00 0.010 Oh
400.00 0.010 Oh
27,600.00
47,950.00
4,795.00
52,745.00
Jumlah Harga
60,000.00
2,125.00
62,125.00
0.00
62,125.00
6,212.50
68,337.50
Jumlah Harga
72,000.00
3,825.00
75,825.00
0.00
75,825.00
7,582.50
83,407.50
Jumlah Harga
24,000.00 0.5
1,275.00 0.05
25,275.00
0.00
25,275.00
2,527.50
27,802.50
Jumlah Harga
24,000.00
850.00
24,850.00
163,200.00
163,200.00
188,050.00
18,805.00
206,855.00
Jumlah Harga
12,000.00
1,275.00
13,275.00
132,000.00 0.00
132,000.00
145,275.00
14,527.50
159,802.50
Jumlah Harga
120,000.00
75,000.00
11,250.00
6,375.00
212,625.00
216,000.00
277,100.00
81,600.00
574,700.00
787,325.00
78,732.50
866,057.50
Jumlah Harga
62,400.00
39,000.00
5,850.00
3,315.00
110,565.00
216,000.00 0.00
58,752.00
274,752.00
385,317.00
38,531.70
423,848.70
Jumlah Harga
24,000.00 0.19
10,000.00 9.5
1,500.00
1,275.00
36,775.00
72,800.00 0.00
24,429.00
6,000.00
103,229.00
140,004.00
14,000.40
154,004.40
Jumlah Harga
14,000.00
12,500.00
1,500.00
1,275.00
29,275.00
0.00
72,800.00
19,550.00
6,750.00
99,100.00
128,375.00
12,837.50
141,212.50
Jumlah Harga
14,000.00
10,000.00
2,250.00
1,275.00
27,525.00
0.00
13,219.20
4,140.00
17,359.20
44,884.20
4,488.42
49,372.62
Jumlah Harga
24,000.00
10,000.00
2,250.00
1,275.00
37,525.00 0.00
8,812.80
4,680.00
3.250
13,492.80
51,017.80
5,101.78
56,119.58
Jumlah Harga
12,000.00
7,500.00
150.00
85.00
19,735.00 0.00
5,525.00
5,525.00
25,260.00
2,526.00
27,786.00
Jumlah Harga
An. SNI 6.4 1 M2 Pekerjaan Pasang Lantai Keramik 40 x 40 Cm
12,000.00 0.250 Org/ Hr
7,500.00 0.013 Org/ Hr
150.00 - Org/ Hr
85.00 0.012 Org/ Hr
19,735.00 8.160 Kg
0.023 M3
5,525.00 6.630 Bh
3,150.00 0.900 Kg
-
8,675.00
28,410.00
2,841.00
31,251.00
Jumlah Harga
56,000.00
35,000.00
5,250.00 0.00
2,975.00
99,225.00
83,991.60
17,000.00 0.00
6,750.00
11,250.00
118,991.60
218,216.60
21,821.66
240,038.26
Jumlah Harga An. SNI 6.44 1 M2 Pekerjaan Pasang Lantai Keramik KM/WC 20 x 20 Cm
0.620 Org/ Hr 1.050
6,400.00 0.030 Org/ Hr 11.380
4,000.00 0.350 Org/ Hr 0.042
600.00 - Org/ Hr 1.500
340.00 11.380 Kg
11,340.00 0.042 M3 0.370
25.000 Bh 0.195
9,166.67 1.500 Kg 0.035
2,040.00 0.00 0.00 0.030
450.00
1,250.00
12,906.67
24,246.67
2,424.67
26,671.33
Jumlah Harga
452,000.00
27,500.00
156,000.00
140,000.00
48,450.00
24,055.00
848,005.00
40,000.00
8,000.00
432,000.00
2,125,907.29
54,296.00
571,200.00
81,000.00
214,800.00
3,527,203.29
4,375,208.29
437,520.83
4,812,729.12
Jumlah Harga
424,000.00
27,500.00
130,000.00
105,000.00
39,750.00
22,525.00
748,775.00
512,000.00
64,000.00
1,769,784.28
45,188.00
571,200.00
81,000.00
214,800.00
288,000.00
252,000.00
446,720.00
4,244,692.28
4,993,467.28
499,346.73
5,492,814.01
Jumlah Harga
424,000.00
27,500.00
130,000.00
105,000.00
39,750.00
22,525.00
748,775.00
512,000.00
64,000.00
1,802,633.51
40,788.00
571,200.00
81,000.00
214,800.00
336,000.00
252,000.00
446,720.00
4,321,141.51
5,069,916.51
506,991.65
5,576,908.16
Jumlah Harga
508,000.00
27,500.00
156,000.00
140,000.00
49,950.00
27,030.00
908,480.00
512,000.00
64,000.00
2,041,375.62
55,594.00
571,200.00
81,000.00
214,800.00
2,100.00
25,200.00
446,720.00
4,013,989.62
4,922,469.62
492,246.96
5,414,716.58
Jumlah Harga
41,600.00
26,000.00
3,900.00
2,210.00
73,710.00
32,000.00
6,000.00
0.00
38,000.00
111,710.00
11,171.00
122,881.00
Jumlah Harga
132,000.00
27,500.00
4,125.00
7,055.00
170,680.00
419,900.00
93,107.14
166,500.00
679,507.14
850,187.14
85,018.71
935,205.86
Jumlah Harga
132,000.00
27,500.00
4,125.00
7,055.00
170,680.00
554,200.00
74,785.71
214,071.43
843,057.14
1,013,737.14
101,373.71
1,115,110.86
Jumlah Harga
5,600.00
7,000.00
1,050.00
340.00
13,990.00
129,230.75
3,300.00
132,530.75
146,520.75
14,652.07
161,172.82
16,117.28
Jumlah Harga
14,400.00
6,000.00
900.00
765.00
22,065.00
19,200.00
200.00
25,329.23
6,800.00
900.00
2,700.00
55,129.23
77,194.23
7,719.42
84,913.65
16,000.00
15,000.00
2,250.00
850.00
34,100.00
0.00
17,640.00
480.00
45,600.00
63,720.00
97,820.00
9,782.00
107,602.00
Jumlah Harga
24,000.00
30,000.00
4,500.00
1,275.00
59,775.00
42,000.00
45,900.00
12,500.00
17,500.00
2,500.00
120,400.00
180,175.00
18,017.50
198,192.50
Jumlah Harga
16,000.00
10,000.00
1,500.00
85.00
27,585.00
55,200.00
18,000.00
73,200.00
100,785.00
10,078.50
110,863.50
4.000 Bh
0.050 Kg
74,455.00
7,445.50 0.250 Oh
81,900.50 0.150 Oh
0.015 Oh
0.013 Oh
Jumlah Harga
12,000.00
7,000.00
1,200.00
510.00
20,710.00
15,750.00
12,000.00
27,750.00
48,460.00
4,846.00
53,306.00
Jumlah Harga
28,000.00
35,000.00
5,250.00
1,530.00
69,780.00
60,000.00
15,000.00 15,000.00
75,000.00
144,780.00
14,478.00
159,258.00
Jumlah Harga
8,000.00
5,000.00
750.00
425.00
14,175.00
36,450.00
6,600.00
43,050.00
57,225.00
5,722.50
62,947.50
Jumlah Harga
4,000.00
5,000.00
7,500.00
255.00
16,755.00
26,250.00
600.00
26,850.00
43,605.00
4,360.50
47,965.50
Jumlah Harga
1,600.00
6,300.00
900.00
255.00
9,055.00
2,800.00
4,000.00
2,320.00
26,000.00
185.00
35,305.00
44,360.00
4,436.00
48,796.00
Jumlah Harga
5,600.00
900.00
900.00
255.00
7,655.00
4,828.00
4,920.00
4,000.00
20,000.00
11,560.00
17,680.00
1,040.00
64,028.00
71,683.00
7,168.30
78,851.30
Jumlah Harga
480,000.00
1,800,000.00
270,000.00
25,500.00
2,575,500.00
2,640,000.00
25,000.00
22,400.00
2,687,400.00
5,262,900.00
526,290.00
5,789,190.00
Jumlah Harga
80,000.00
300,000.00
45,000.00
4,250.00
429,250.00
96,000.00
11,200.00
107,200.00
536,450.00
53,645.00
590,095.00
Jumlah Harga
64,000.00
240,000.00
36,000.00
3,400.00
343,400.00
72,000.00
6,720.00
78,720.00
422,120.00
42,212.00
464,332.00
Jumlah Harga
1,200.00
15,000.00
2,250.00
63.75
18,513.75
193,600.00
193,600.00
212,113.75
21,211.38
233,325.13
Jumlah Harga
800.00
50,000.00
1,500.00
425.00
52,725.00
136,000.00
136,000.00
188,725.00
18,872.50
207,597.50
Jumlah Harga
1,200.00
15,000.00
2,250.00
63.75
18,513.75
27,000.00
27,000.00
45,513.75
4,551.38
50,065.13
Jumlah Harga
800.00
10,000.00
1,500.00
85.00
12,385.00
14,400.00
14,400.00
26,785.00
2,678.50
29,463.50
Jumlah Harga
800.00
10,000.00
1,500.00
42.50
12,342.50
12,500.00
12,500.00
24,842.50
2,484.25
27,326.75
Jumlah Harga
1,200.00
15,000.00
2,250.00
63.75
18,513.75
15,000.00
15,000.00
33,513.75
3,351.38
36,865.13
Jumlah Harga
12,000.00
30,000.00
1,700.00
43,700.00
54,000.00
75,000.00
10,000.00
7,500.00
15,000.00
54,000.00
18,000.00
7,500.00
27,000.00
6,000.00
10,000.00
10,000.00
294,000.00
337,700.00
33,770.00
371,470.00
Jumlah Harga
12,000.00
30,000.00
1,275.00
43,275.00
54,000.00
75,000.00
10,000.00
124,000.00
20,000.00
54,000.00
18,000.00
27,000.00
6,000.00
10,000.00
398,000.00
441,275.00
44,127.50
485,402.50
Jumlah Harga
800.00
10,000.00
1,500.00
63.75
12,363.75 0.00
25,000.00
25,000.00
37,363.75
3,736.38
41,100.13
Jumlah Harga
800.00
10,000.00
1,500.00
63.75
12,363.75
55,000.00
55,000.00
67,363.75
6,736.38
74,100.13
Jumlah Harga
800.00
10,000.00
1,500.00
63.75
12,363.75
30,000.00
30,000.00
42,363.75
4,236.38
46,600.13
Jumlah Harga
800.00
10,000.00
1,500.00
63.75
12,363.75
40,000.00
40,000.00
52,363.75
5,236.38
57,600.13
URAIAN PEKERJAAN HARGA SATUAN HARGA UPAH HARGA BAHAN
1.500
0.750
0.075
0.075
Pekerja 0.15 Oh @ 0.00
Tukang Batu 0.10 Oh @ 0.00
Bahan
Bumbungan Atap Rp. 0.00 = Rp. 0.00
Paku Rp. 0.00 = Rp. 0.00
Tenaga
Pekerja Rp. 0.00 = Rp. 0.00
Tukang Rp. 0.00 = Rp. 0.00
1 2 3 4 5
UPAH TUKANG
1 Pekerja Oh Rp. 80,000.00
2 Tukang Batu Oh Rp. 100,000.00
3 Tukang Kayu Oh Rp. 100,000.00
4 Tukang Besi Oh Rp. 100,000.00
5 Tukang Listrik Oh Rp. 100,000.00
6 Tukang Cat Oh Rp. 100,000.00
7 Kepala Tukang Oh Rp. 150,000.00
8 Mandor Oh Rp. 85,000.00
BAHAN KAYU
1 Kayu Klas II M3 Rp. 2,400,000
2 Kayu Terentang / Mall ( Kelas III ) M3 Rp. 1,600,000
3 Dolken Kayu Galam Ø 8 - 10 P = 4 m Btg Rp. 13,960.00
4 Bambu Ø 6 - 10 P = 6 m Btg Rp. 18,160.00
5 Playwood Lembar Rp. 90,000.00
BAHAN PAKU
1 Paku Biasa Kg Rp. 20,000.00
2 Paku Seng Kg Rp. 32,000.00
3 Paku Sekrup Kg Rp. 60,000.00
4 Paku Sekrup Pcs Rp. 1,500.00
5 Sekrup Pcs Rp. 15,000.00
BAHAN FINISHING
1 Plamir Tembok Kg Rp. 28,000.00
2 Plamir Kayu Kg Rp. 32,800.00
3 Kuas Bh Rp. 16,000.00
4 Cat Penutup Tembok Kualitas Tinggi Kg Rp. 100,000.00
5 Cat Dasar Tembok Kg Rp. 23,200.00
6 Lem Kayu Kg Rp. 22,400.00
7 Cat Meni Kayu Kg Rp. 28,400.00
8 Dumpul Kayu Kg Rp. 32,800.00
9 Cat Dasar Kayu Kg Rp. 68,000.00
10 Cat kayu Penutup Kg Rp. 68,000.00
11 Amplas ( Kertas Pasir) Lbr Rp. 8,000.00
12 Tinner Ltr Rp. 40,000.00
13 Roll Bh Rp. 18,500.00
BAHAN LISTRIK
1 Kabel NYM 2 x 1.5 mm² M1 Rp. 4,500.00
2 Kabel NYM 3 x 4 mm² M1 Rp. 7,500.00
3 Kabel NYM 4 x 6 M1 Rp. 9,000.00
4 Conduit Bh Rp. 15,000.00
5 Tee Doss Bh Rp. 10,000.00
6 One Way Bh Rp. 7,500.00
7 Sock Bh Rp. 5,000.00
8 Klem Bh Rp. 6,000.00
9 Lasdop Bh Rp. 6,000.00
10 Fleksible Pipa Bh Rp. 7,500.00
11 Fisher Bh Rp. 2,500.00
12 Elbow Bh Rp. 5,000.00
13 Outlet box metal Bh Rp. 124,000.00
14 Instalasi Titik Lampu Ttk Rp. 45,000.00
15 Instalasi Stop Kontak Ttk Rp. 45,000.00
16 Lampu Pijar 10 - 40 Watt Bh Rp. 12,500.00
17 Lampu ESL 18 Watt Bh Rp. 50,000.00
18 Saklar Tunggal Bh Rp. 30,000.00
19 Saklar Ganda Bh Rp. 40,000.00
20 Stop kontak Bh Rp. 30,000.00
21 Box MCB Bh Rp. 85,000.00
22 Lampu sl 1o watt + Stand lamp Bh Rp. 25,000.00
23 Lampu sl 23 watt + Stand lamp Bh Rp. 55,000.00
73 Box MCB Bh Rp. 85,000.00
ABD. HALIM
Direktur
ENGINEER ESTIMATE (EE)
REKAPITULASI
PROGAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMELIHARAAN RUTIN / BERKALA GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN AULA / RUANG KANTOR
LOKASI : KOMPLEKS PERKANTORAN FONUASINGKO
SUMBER DANA : DAU
TAHUN ANGGARAN : 2017
1 2 3
Konsultan Perencana
CV. RIDHO Enginering Consultan
ABD. HALIM
Direktur
=
JADWAL PELAKSANAAN PEKERJAAN
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
KEGIATAN : PEMELIHARAAN RUTIN / BERKALA GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN AULA / RUANG KANTOR
LOKASI : KOMPLEKS PERKANTORAN FONUASINGKO
SUMBER DANA : DAU
TAHUN ANGGARAN: 2017
BOBOT Bulan
PEKERJAAN I II III KET.
NO. URAIAN
(%) Minggu
1 2 3 4 5 6 7 8 9 10 11 12
100
I PEKERJAAN PERSIAPAN 1.70 1.70
II PEKERJAAN TANAH DAN PASIR 0.96 0.48 0.48
III PEKERJAAN PASANGAN 17.74 2.22 2.22 2.22 2.22 2.22 2.22 2.22 2.22
IV PEKERJAAN BETON 4.85 0.97 0.97 0.97 0.97 0.97
V PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI 6.15 2.05 2.05 2.05
VI PEKERJAAN KAP, ATAP DAN PLAFOND 34.12 8.53 8.53 8.53 8.53 50
VII PEKERJAAN PENGECATAN 21.25 5.31 5.31 5.31 5.31
VIII PEKERJAAN ALAT PENGGANTUNG 3.32 3.32
IX PEKERJAAN INSTALASI LISTRIK 7.55 3.77 3.77
X PEKERJAAN AKHIR 2.36 2.36 0
ABD. HALIM
Direktur
50
27
22
Pondasi 16 25
78.5 panjang 12
1 77
0.7
0.25 0.475
37.2875 36.575
Batu kosong
0.7
0.15 0.11
8.24
10 70
Pasr urug
0.7
0.05 0.04
2.75 Pelesteran pondasi
Galian tanah 0.778 78.5
0.5
0.7 0.35
27.48
Pas.Batu bata
78.5 pjg Luas Kusen
3.8 tggi
298.3 38.30 260.00
Jendela 2
2.00 2.00 0.05 0.15 0.0075 0.03
1.20 4.00 0.05 0.15 0.0075 0.04
0.07 10.00
Jendela 1 1.35 2.00 0.05 0.15 0.0075 0.02
1.20 3.00 0.05 0.15 0.0075 0.03
0.05 1.00
Lisplank
61.15
0.3
18.345
5 9.00 0.4 8.60
16.00 0.4 15.60
70
Urugan Sirtu Bawah Lantai 134.16
22.00 0.75 3.00 0.4 2.60
50 9.00 198 148.5 6.00 0.4 5.60
14.56
Urugan Pasir Bawah Lantai 4.00 0.4 3.60
20 22.00 0.05 6.00 0.4 5.60
10 9.00 198 9.9 20.16
2.00 0.4 1.60
6.00 0.4 5.60
0.05 8.892 8.96
177.84
61.073000
Volume m3 Luas M2 Kusen Pintu ,Jendela & Ventilasi Luas M2 Pintu Panil
2.00
1.30
0.66 2.60 10.00 26.00
1.35
1.30
0.05 1.76 1.00 1.76
2.1 1.52
1.6 2.05
0.04 3.36 1.00 3.36 3.12 1.00 3.12
0.9 0.82
2.1 2.05
0.08 1.89 2.00 3.78 1.68 2.00 3.36
6.48
0.28
0.38
0.28 0.11 32.00 3.40
1.10 38.30
Plafond
9.00 0.13 8.87 17.74
16.00 0.13 15.87 140.7669 31.74 49.48 16
9
3.00 0.13 2.87 5.74 22
6.00 0.13 5.87 16.8469 11.74 17.48 10.75
57.75
7.00 0.13 6.87 13.74
6.00 0.13 5.87 40.3269 11.74 25.48
Luas M2 Daun Pintu Jendela Kaca Luas M2 Kaca Bening % mm Jendela Kaca
1.22 2.00 0.07 0.17 1.10
0.62 2.00 0.07 0.09 0.50
0.26 0.55
32 8.24 17.60
32.00
21.50
119.90