Menpro Ical
Menpro Ical
04 PEKERJAAN ARSITEKTUR
04.01 PEKERJAAN DINDING
04.01.01 Pasangan Dinding Batako m2 301.03
04.01.02 Plaster & Aci m2 602.06
04.01.03 Partisi GRC + Rangka Partisi m2 11.82
05.02 SANITARI
05.02.01 Kitchen sink + kran set 1.00
05.02.02 Washbasin + kran set 2.00
05.02.03 Closet + kran set 2.00
05.02.04 Jet Shower + kran set 2.00
05.02.05 Bath Shower + kran & accessories set 2.00
05.02.06 Floor Drain set 2.00
05.03 PERPIPAAN
05.03.01 Septic Tank unit 1.00
05.03.02 Pipa Air Bersih titik 9.00
05.03.03 Pipa Air Bekas titik 5.00
05.03.04 Pipa Air Kotor titik 2.00
Total
GGARAN BIAYA
TUTORIAL
RAB
HARGA SATUAN JUMLAH HARGA TOTAL HARGA KETERANGAN
Rp 14,211,970.00
Rp 21,450.00 Rp 3,603,600.00
Rp 108,691.00 Rp 7,608,370.00
Rp 1,000,000.00 Rp 1,000,000.00
Rp 1,500,000.00 Rp 1,500,000.00
Rp 500,000.00 Rp 500,000.00
Rp 2,962,900.05
Rp 78,111.00 Rp 1,629,211.90
Rp 46,744.50 Rp 892,558.18
Rp 55,000.00 Rp 441,129.98
Rp 18,371,521.29
Rp 292,534.00 Rp 2,106,244.80
Rp 23,202.30 Rp 13,769,636.96
Rp 1,155,388.67 Rp 2,495,639.54
Rp 2,974,377.45
Rp 11,962.50 Rp 386,248.19
Rp 80,157.00 Rp 1,154,260.80
Rp 80,157.00 Rp 1,433,868.46
Rp 38,512,204.39
Rp 313,984.00 Rp 14,977,664.77
Rp 19,737.30 Rp 19,400,963.33
Rp 1,155,388.67 Rp 4,133,576.29
Rp 8,865,010.88
Rp 597,542.00 Rp 6,023,223.36
Rp 19,737.30 Rp 2,342,659.61
Rp 1,155,388.67 Rp 499,127.91
Rp 66,069,480.12
Rp 25,000.00 Rp 4,200,000.00
Rp 11,962.50 Rp 2,009,700.00
Rp 80,157.00 Rp 13,466,376.00
Rp 313,984.00 Rp 19,467,008.00
Rp 1,155,388.67 Rp 19,410,529.72
Rp 19,737.30 Rp 3,315,866.40
Rp 25,000.00 Rp 4,200,000.00
Rp 28,626,597.63
Rp 597,542.00 Rp 19,449,992.10
Rp 19,737.30 Rp 7,564,838.33
Rp 1,155,388.67 Rp 1,611,767.20
Rp 16,051,585.52
Rp 597,542.00 Rp 9,878,086.31
Rp 19,737.30 Rp 5,089,193.74
Rp 1,155,388.67 Rp 1,084,305.47
Rp 35,279,413.49
Rp 610,247.00 Rp 21,423,331.18
Rp 19,737.30 Rp 11,422,417.82
Rp 1,155,388.67 Rp 2,433,664.49
Rp 135,630,774.00
Rp 312,000.00 Rp 72,009,600.00
Rp 127,655.00 Rp 29,462,774.00
Rp 148,000.00 Rp 34,158,400.00
Rp 127,804,133.04
Rp 153,359.25 Rp 46,165,735.03
Rp 128,962.63 Rp 77,643,238.01
Rp 338,000.00 Rp 3,995,160.00
Rp 56,949,670.00
Rp 227,000.00 Rp 1,178,130.00
Rp 210,000.00 Rp 32,596,200.00
Rp 227,000.00 Rp 13,113,790.00
Rp 145,000.00 Rp 10,061,550.00
Rp 35,286,680.00
Rp 179,000.00 Rp 3,633,700.00
Rp 238,000.00 Rp 1,235,220.00
Rp 179,000.00 Rp 431,390.00
Rp 179,000.00 Rp 653,350.00
Rp 179,000.00 Rp 27,519,460.00
Rp 238,000.00 Rp 1,813,560.00
Rp 37,900,000.00
Rp 13,560,000.00 Rp 13,560,000.00
Rp 1,950,000.00 Rp 7,800,000.00
Rp 410,000.00 Rp 820,000.00
Rp 1,815,000.00 Rp 14,520,000.00
Rp 600,000.00 Rp 1,200,000.00
Rp 26,663,864.83
Rp 32,599.60 Rp 13,211,639.89
Rp 32,599.60 Rp 7,112,580.73
Rp 32,599.60 Rp 6,339,644.21
Rp 1,207,000.00
Rp 1,207,000.00
Rp 1,207,000.00
Rp 29,000.00
Rp 32,000.00
Rp 50,000.00
Rp 86,000.00
Rp 141,000.00
Rp 765,000.00
Rp 93,000.00
Rp 31,500.00
Rp 21,034,000.00
Rp 2,500,000.00 Rp 2,500,000.00
Rp 2,097,000.00 Rp 4,194,000.00
Rp 5,420,000.00 Rp 10,840,000.00
Rp 650,000.00 Rp 1,300,000.00
Rp 950,000.00 Rp 1,900,000.00
Rp 150,000.00 Rp 300,000.00
Rp 55,200,000.00
Rp 4,500,000.00 Rp 4,500,000.00
Rp 2,800,000.00 Rp 25,200,000.00
Rp 3,500,000.00 Rp 17,500,000.00
Rp 4,000,000.00 Rp 8,000,000.00
Rp 715,389,212.69 Rp 715,389,212.69
ANALISA HARGA SATUAN PEKERJAAN TUTORIAL
RAB
Jenis Pekerjaan : PEMBESIHAN LAPANGAN
Satuan / Unit : M2
Analisa : AHSP PU A.2.2.1.9
Jenis Pekerjaan : Membuat Beton Mutu F'c = 7.4 Mpa (K 100), Slump (12 ± 2) cm,W/c= 0.87
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.1
Jenis Pekerjaan : Membuat Beton Mutu F'c = 9.8 Mpa (K 125),Slump (12± 2) cm,W/c= 0.78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175),Slump (12± 2) cm,W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200),Slump (12± 2) cm,W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225),Slump (12 ± 2) cm,W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250),Slump (12 ± 2) cm,W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275),Slump (12 ± 2) cm,W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Beton Mutu F'c = 26,4 Mpa (K 300),Slump (12± 2) cm,W/c = 0,52
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 3 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.8
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
Jenis Pekerjaan : Pasangan Dinding Bata Tebal 1/2 Bata Camp. 1Pc: 5 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.10
Jenis Pekerjaan : Memasang Langit-Langit Tripleks Ukuran (120 x 240) cm, tebal 4 mm
Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.5
Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu dan Kusen Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 25 cm Kayu Kelas I atau Kelas II
Satuan / Unit : M1
Analisa : AHSP PU A.4.6.1.21
Jenis Pekerjaan : Cat Bidang Kayu Baru ( 1 x Plamir,1 x Cat Dasar 2x Cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
Jenis Pekerjaan : Pengecatan Tembok Baru (1 x Plamir,1 x Cat Dasar,2 x Cat Penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
UPAH
NO. TENAGA SATUAN HARGA
1 Mandor Orang Rp 150,000.00
2 Kepala Tukang Orang Rp 140,000.00
3 Tukang Orang Rp 130,000.00
4 Pekerja Orang Rp 120,000.00
BAHAN
NO. MATERIAL BAHAN SATUAN HARGA
1 Air Liter Rp 125.00
2 Atap Seng Genteng Lembar Rp 70,000.00
3 Batu Bata Buah Rp 900.00
4 Batu Kali/Batu belah (Sungaai/Gunung) M3 Rp 195,000.00
5 Batu Belah 5 - 7 M3 Rp 185,000.00
6 Batu Pecah 2 - 3 M3 Rp 310,000.00
7 Besi Beton Polos Kg Rp 15,000.00
8 Besi Beton Ulir Kg Rp 18,000.00
9 Bubungan Genteng M1 Rp 45,000.00
10 Besi Baja IWF Kg Rp 18,000.00
11 Besi Strip Profil Kg Rp 17,000.00
12 Cat Dasar Tembok/Sealer Setara Vinilex Kg Rp 30,000.00
13 Cat Dasar Kayu Kg Rp 50,000.00
14 Cat Kayu Mengkilat Kg Rp 60,000.00
15 Cat Kayu Penutup Kg Rp 55,000.00
16 Cat Menie Besi Kg Rp 35,000.00
17 Cat Dasar Tembok Kg Rp 40,000.00
18 Cat Tembok Setara Vinilex Kg Rp 50,000.00
19 Dempul Kayu Kg Rp 18,000.00
20 Dolken Kayu Ø 8 - 10/400 cm Batang Rp 70,000.00
21 Door Holder Pasang Rp 130,000.00
22 Engsel Jendela Pasang Rp 25,000.00
23 Engsel Pintu Pasang Rp 25,000.00
24 Floor Drain Buah Rp 25,000.00
25 Gagang Jendela Buah Rp 15,000.00
26 Gypsum Board Tebal 9 mm Lembar Rp 120,000.00
27 Hak Angin Pasang Rp 16,000.00
28 Jaring Kawat Baja Kg Rp 35,000.00
29 Kaca Bening Uk. 3 mm M2 Rp 85,000.00
30 Kaca Bening Uk. 5 mm M2 Rp 110,000.00
31 Kaca Rayband Uk. 5 mm M2 Rp 130,000.00
32 Kaso-Kaso (5 x 7) cm M3 Rp 3,250,000.00
33 Kawat Beton Kg Rp 19,000.00
34 Kayu Kelas I (Seumantok /Ulim /dll) M3 Rp 5,500,000.00
35 Kayu Kelas II (Kamper /Kruing /dll) M3 Rp 4,750,000.00
36 Kayu Kelas III (Borneo /dll) M3 Rp 3,900,000.00
37 Kayu Kelas IV (Sengon /dll) M3 Rp 3,500,000.00
38 Kayu Dolken Btg Rp 70,000.00
39 Keramik Uk. 10 x 10 cm Bh Rp 3,000.00
40 Keramik Uk. 20 x 20 cm Bh Rp 5,000.00
41 Keramik UK. 30 x 30 cm Bh Rp 7,000.00
42 Keramik Uk. 40 x 40 cm Bh Rp 12,000.00
43 Keramik Uk. 60 x 60 cm Bh Rp 40,000.00
44 Keramik Uk. 20 x 25 cm Bh Rp 10,000.00
45 Kertas Amplas Lembar Rp 2,500.00
46 Kloset Duduk Keramik Setara toto + Tabung Buah Rp 1,500,000.00
47 Kloset Jongkok Keramik Setara toto Buah Rp 400,000.00
48 Kran Air 3/4" Buah Rp 20,000.00
49 Kuas Cat Buah Rp 15,000.00
50 Kunci Pintu (Standar) Buah Rp 150,000.00
51 Kunci Pintu Biasa Buah Rp 100,000.00
52 Karawang /Roster Buah Rp 50,000.00
53 Lampu Hemat Energi 11 Watt Setara Hannochs Buah Rp 35,000.00
54 Lampu Hemat Energi 18 Watt Setara Hannochs Buah Rp 40,000.00
55 Lampu Hemat Energi 20 Watt Setara Hannochs Buah Rp 45,000.00
56 Lem Kayu Kg Rp 18,000.00
57 List Eternit Kayu M1 Rp 8,000.00
58 Minyak Cat Liter Rp 25,000.00
59 Minyak Bekisting Liter Rp 8,000.00
60 Multipleks 3 mm Lembar Rp 80,000.00
61 Multipleks 4 mm Lembar Rp 90,000.00
62 Multipleks 6 mm Lembar Rp 130,000.00
63 Multipleks 9 mm Lembar Rp 150,000.00
64 Pacok Jendela dan Ventilasi Pasang Rp 8,000.00
65 Paku Asbes Kg Rp 20,000.00
66 Paku Beton 8 Inci Kotak Rp 19,000.00
67 Paku Kait Buah Rp 1,000.00
68 Paku Kayu Kg Rp 18,000.00
69 Paku Triplek Kg Rp 19,000.00
70 Paku Seng Kg Rp 20,000.00
71 Paku Sumbat Buah Rp 1,200.00
72 Paku Sekrup Kg Rp 24,000.00
73 Pasir Batu (Sirtu) - Material Jalan M3 Rp 300,000.00
74 Pasir Beton / Kerikil M3 Rp 200,000.00
75 Pasir Pasang M3 Rp 185,000.00
76 Pasir Urug M3 Rp 150,000.00
77 Pelumas / Oil Liter Rp 35,000.00
78 Plamur Kayu Kg Rp 25,000.00
79 Plamur Tembok Kg Rp 30,000.00
80 Plywood Tebal 9 mm Lembar Rp 140,000.00
81 Plin Keramik Buah Rp 4,500.00
82 Residu Kg Rp 10,000.00
83 Reservoir Air 1000 Liter Buah Rp 1,200,000.00
84 Reservoir Air 1500 Liter Buah Rp 1,850,000.00
85 Schakelar Buah Rp 12,000.00
86 Semen @ 40 Kg Buah Rp 55,000.00
87 Semen @ 40 Kg Kg Rp 1,375.00
88 Semen Putih @ 50 Kg Zak Rp 90,000.00
89 Semen Warna Kg Rp 18,000.00
90 Seng Genteng Metal M2 Rp 65,000.00
91 Seng BJLS 0,20 Cat Pabrik M 2
Rp 65,000.00
92 Seng Gelombang BJLS 30 M2 Rp 47,500.00
93 Seng Plat BJLS 20 M2 Rp 55,000.00
94 Sekrup Fixer Buah Rp 500.00
95 Sealant Kg Rp 15,000.00
96 Sumur + Pompa Tangan Terpasang Unit Rp 1,750,000.00
97 Tanah Timbun M3 Rp 65,000.00
98 Teralis Besi M2 Rp 375,000.00
99 Titik Lampu + Instalasi Titik Rp 150,000.00
100 Urinoir Keramik Buah Rp 2,350,000.00
101 Zakering Buah Rp 300,000.00
102 Pemasangan Atap Baja Ringan M2 Rp 300,000.00
103 Wire Mesh (Ulir) Titik Rp 150,000.00
104 Tiang Pancang M1 Rp 250,000.00
105 Pipa PVC 1" Batang Rp 35,000.00
106 Pipa PVC 2" Batang Rp 55,000.00
107 Pipa PVC 3" Batang Rp 100,000.00
No. Alat
1 Stamper Jam Rp 25,000.00
2 Dump Truck Jam Rp 75,000.00
3 Molen Jam Rp 50,000.00
REKAPITULASI
ENGINEER ESTIMATE (EE)
PEMBANGUNAN BILIK SANTRI
DAYAH BAYANUDDIN
SIMPANG ULIM
1 LANTAI 1
A PEKERJAAN PERSIAPAN Rp 14,747,322.40
B PEKERJAAN TANAH DAN PONDASI Rp 38,312,272.25
C PEKERJAAN PASANGAN DAN PLASTERAN Rp 41,303,521.85
D PEKERJAAN BETON BERTULANG Rp 171,609,460.27
E PEKERJAAN LANTAI Rp 32,859,438.70
F PEKERJAAN TANGGA Rp 32,952,736.63
G PEKERJAAN PINTU, JENDELA DAN KUNCI Rp 31,070,554.70
H PEKERJAAN INSTALASI LISTRIK Rp 377,000.00
I PEKERJAAN PLAFOND Rp 12,348,827.70
J PEKERJAAN PENGECATAN Rp 15,199,260.74
B. LANTAI 2
A PEKERJAAN BETON BERTULANG Rp 155,572,852.84
B PEKERJAAN PASANGAN DAN PLESTERAN Rp 59,804,534.07
C PEKERJAAN LANTAI Rp 204,685,082.52
D PEKERJAAN PINTU, JENDELA DAN KUNCI Rp 30,007,126.85
E PEKERJAAN ATAP DAN PLAFOND Rp 100,592,919.70
F PEKERJAAN INSTALASI LISTRIK Rp 520,000.00
G PEKERJAAN PENGECATAN Rp 27,032,985.55
JUMLAH Rp 968,995,896.76
SUB TOTAL Rp 968,995,896.76
DIBULATKAN Rp 968,990,000.00
TERBILANG : Delapan Ratus Delapan Belas Juta Lima Ratus Tujuh Puluh Ribu Rupiah
Nama
Jabatan
ENGINEER ESTIMATE (EE)
Pekerjaan Lantai 1
1 2 3 4 5 6 7=3x6
A PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 211.20 m2 AHSP PU A.2.2.1.9 Rp 21,450.00 Rp 4,530,240.00
2 Pengukuran / Pemasangan Bouplank 66.40 m1 AHSP PU A.2.2.1.4 Rp 108,691.00 Rp 7,217,082.40
3 Administrasi dan Dokumentasi 1.00 Ls Taksir Rp 1,000,000.00 Rp 1,000,000.00
4 K3 dan Lain-lain 1.00 Ls Taksir Rp 1,500,000.00 Rp 1,500,000.00
5 Papan Nama Proyek 1.00 Ls Taksir Rp 500,000.00 Rp 500,000.00
Sub Jumlah Rp 14,747,322.40
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Tapak 20.44 m3 AHSP PU A.2.3.1.8a 78,111.00 Rp 1,596,276.40
Urugan Kembali Galian Pondasi Tapak 15.33 m3 AHSP PU A.2.3.1.9 46,744.50 Rp 716,452.95
Pas. Pasir Alas 1.36 m3 AHSP PU A.2.3.1.11 239,250.00 Rp 325,954.20
Pas. Batu Kosoeng / Aanstamping 1.36 m3 AHSP PU A.3.2.1.9 499,851.00 Rp 680,997.00
2 Anak Tangga
Beton K-250 0.54 m3 AHSP PU A.4.1.1.8 Rp 1,155,388.67 Rp 623,909.88
Besi Tulangan Pokok ø 12 73.94 kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 1,459,454.91
Bekisting + Perawatan Beton 4.50 m2 AHSP PU A.4.1.1.26 Rp 652,817.00 Rp 2,937,676.50
3 Plat Bordes
Beton K-250 0.57 m3 AHSP PU A.4.1.1.8 Rp 1,155,388.67 Rp 660,882.32
Besi Tulangan Pokok ø 12 136.93 kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 2,702,694.28
Bekisting + Perawatan Beton 8.33 m2 AHSP PU A.4.1.1.26 Rp 652,817.00 Rp 5,440,141.67
4 Keramik
Pas. Keramik Anak Tangga + Bordes 11.86 m2 AHSP PU A.4.4.3.34.a Rp 290,851.00 Rp 3,449,492.86
5 Relling Tangga
Besi Hollow 33.81 m1 Taksir Rp 200,000.00 Rp 6,762,000.00
Sub Jumlah Rp 32,952,736.63
G PEKERJAAN PINTU, JENDELA DAN KUNCI
1 Pas. Pintu P1
Kusen Pintu 0.167 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,840,839.69
Daun Pintu 6.72 m2 AHSP PU A.4.6.1.5 Rp 834,350.00 Rp 5,606,832.00
Kusen Ventilasi 0.10 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,057,795.94
Papan Ventilasi/Jelusi 0.06 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 53,635.57
Kunci Pintu (Standar) 4.00 Buah AHSP PU A.4.6.2.4 Rp 245,355.00 Rp 981,420.00
Engsel Pintu 8.00 Buah AHSP PU A.4.6.2.5 Rp 53,372.00 Rp 426,976.00
Pacok Pintu 4.00 Buah Taksir Rp 15,000.00 Rp 60,000.00
2 Pas. Jendela J1
Kusen Jendela 0.168 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,854,577.30
Daun Jendela 3.84 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 2,395,008.00
- Kaca 5 mm 2.50 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 399,876.01
Kusen Ventilasi 0.14 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,545,481.08
Papan Ventilasi / Jelusi 0.09 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 71,514.09
- Hak Angin / Gagang Jendela 16.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 695,552.00
- Engsel Jendela 16.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 853,952.00
- Pacok Jendela 8.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 277,376.00
3 Jendela J2
Kusen Jendela 0.227 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,500,244.95
Daun Jendela 5.76 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 3,592,512.00
- Kaca 5 mm 3.75 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 599,814.02
Kusen Ventilasi 0.19 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,088,116.66
Papan Ventilasi / Jelusi 0.13 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,428,711.40
- Hak Angin / Gagang Jendela 24.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 1,043,328.00
- Engsel Jendela 24.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 1,280,928.00
- Pacok Jendela 12.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 416,064.00
Sub Jumlah Rp 31,070,554.70
H PEKERJAAN INSTALASI LISTRIK
1 Lampu Saving Energi 18 Watt 9 Bh Taksir Rp 23,000.00 Rp 207,000.000
2 Saklar Tunggal 1 Bh Taksir Rp 10,000.00 Rp 10,000.000
3 Saklar Ganda 4 Bh Taksir Rp 15,000.00 Rp 60,000.000
4 Stop Kontak 5 Bh Taksir Rp 20,000.00 Rp 100,000.000
Sub Jumlah Rp 377,000.000
I PEKERJAAN PLAFOND
1 Rangka Plafond Kayu Klas II 54.76 m2 AHSP PU A.4.6.1.20 Rp 138,792.50 Rp 7,600,277.30
2 Plafon Triplek 6 mm 54.76 m2 AHSP PU A.4.5.1.7 Rp 60,280.00 Rp 3,300,932.80
3 Kayu List Plafond 59.20 m1 AHSP PU A.4.5.1.9 Rp 24,453.00 Rp 1,447,617.60
Sub Jumlah Rp 12,348,827.700
J PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dan Dalam 285.90 m2 AHSP PU A.4.7.1.10 Rp 32,599.60 Rp 9,320,382.12
2 Cat Plafond 54.76 m2 AHSP PU A.4.7.1.4 Rp 32,599.60 Rp 1,785,154.10
3 Cat Kusen, Daun Pintu / Jendela / Papan Jelusi 81.24 m2 AHSP PU A.4.7.1.4 Rp 50,391.00 Rp 4,093,724.53
Sub Jumlah Rp 15,199,260.74
Pekerjaan Lantai 2
A PEKERJAAN BETON BERTULANG
1 Beton Bertulang Kolom K1- 30/30
Beton K-250 4.82 M3 AHSP PU A.4.1.1.8 Rp 1,155,388.67 Rp 5,573,594.96
Besi Tulangan Pokok ø 14 518.14 Kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 10,226,609.46
Besi Tulangan Sengkang ø 8 - 10 cm 185.86 Kg AHSP PU A.4.1.1.17 Rp 19,737.30 Rp 3,668,430.91
Bekisting + Perawatan Beton 32.16 M2 AHSP PU A.4.1.1.22 Rp 597,542.00 Rp 19,216,950.72
2 Pek. Keramik
Pas. Keramik Lantai 40/40 77.78 m2 AHSP PU A.4.4.3.34.a Rp 290,851.00 Rp 22,621,692.74
Sub Jumlah Rp 204,685,082.52
D PEKERJAAN PINTU, JENDELA DAN KUNCI
1 Pas. Pintu P1
Kusen Pintu 0.17 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,840,839.69
Daun Pintu 6.72 m2 AHSP PU A.4.6.1.5 Rp 834,350.00 Rp 5,606,832.00
Kusen Ventilasi 0.10 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,057,795.94
Papan Ventilasi/Jelusi 0.06 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 53,635.57
Kunci Pintu (Standar) 4.00 Buah AHSP PU A.4.6.2.4 Rp 245,355.00 Rp 981,420.00
Engsel Pintu 12.00 Buah AHSP PU A.4.6.2.5 Rp 53,372.00 Rp 640,464.00
Pacok Pintu 4.00 Buah Taksir Rp 15,000.00 Rp 60,000.00
2 Jendela J1
Kusen Jendela 0.17 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,854,577.30
Daun Jendela 3.84 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 2,395,008.00
- Kaca 5 mm 2.50 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 399,876.01
Kusen Ventilasi 0.14 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 1,545,481.08
Papan Ventilasi / Jelusi 0.14 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 116,038.49
- Hak Angin / Gagang Jendela 16.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 695,552.00
- Engsel Jendela 16.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 853,952.00
- Pacok Jendela 8.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 277,376.00
3 Jendela J2
Kusen Jendela 0.23 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,500,244.95
Daun Jendela 5.76 m2 AHSP PU A.4.6.1.6 Rp 623,700.00 Rp 3,592,512.00
- Kaca 5 mm 3.75 m2 AHSP PU A.6.2.17 Rp 159,797.00 Rp 599,814.02
Kusen Ventilasi 0.19 m3 AHSP PU A.4.6.1.1 Rp 11,007,700.00 Rp 2,088,116.66
Papan Ventilasi / Jelusi 0.13 m3 AHSP PU A.4.6.1.10 Rp 826,485.00 Rp 107,271.14
- Hak Angin / Gagang Jendela 24.00 Buah AHSP PU A.4.6.2.9 Rp 43,472.00 Rp 1,043,328.00
- Engsel Jendela 24.00 Buah AHSP PU A.4.6.2.6 Rp 53,372.00 Rp 1,280,928.00
- Pacok Jendela 12.00 Buah AHSP PU A.4.6.2.10 Rp 34,672.00 Rp 416,064.00
Sub Jumlah Rp 30,007,126.85
E PEKERJAAN ATAP DAN PLAFOND
1 Rangka kuda-kuda baja ringan C-75 154.00 M2 TAKSIR Rp 300,000.00 Rp 46,200,000.00
2 Penutup Atap Genteng Metal 0,35 160.80 M2 AHSP PU A.4.5.2.32 Rp 127,655.00 Rp 20,526,924.00
3 Rabung Genteng Metal 0,30 20.00 M1 AHSP PU A.4.5.2.39.a Rp 40,095.00 Rp 801,900.00
4 Papan Listplank Uk. 2,5/25 cm 55.40 M1 AHSP PU A.4.6.1.21 Rp 131,835.00 Rp 7,303,659.00
5 Rangka Plafond Kayu Klas II 108.82 M2 AHSP PU A.4.6.1.20 Rp 138,792.50 Rp 15,102,733.65
6 Plafon Triplek 6 mm 108.82 M2 AHSP PU A.4.5.1.7 Rp 60,280.00 Rp 6,559,380.26
7 Kayu List Plafond 167.60 M1 AHSP PU A.4.5.1.9 Rp 24,453.00 Rp 4,098,322.80
Sub Jumlah Rp 100,592,919.70
F PEKERJAAN INSTALASI LISTRIK
1 Lampu Saving Energi 18 Watt 15.00 Bh Taksir Rp 23,000.00 Rp 345,000.000
3 Saklar Ganda 5.00 Bh Taksir Rp 15,000.00 Rp 75,000.000
4 Stop Kontak 5.00 Bh Taksir Rp 20,000.00 Rp 100,000.000
Sub Jumlah Rp 520,000.000
G PEKERJAAN PENGECATAN
1 Cat Dinding Luar Dan Dalam 418.61 M2 AHSP PU A.4.7.1.10 Rp 32,599.60 Rp 13,646,629.39
2 Cat Plafond 108.82 M2 AHSP PU A.4.7.1.4 Rp 32,599.60 Rp 3,547,331.99
3 Cat Kusen, Daun Pintu / Jendela / Papan Jelusi 84.45 M2 AHSP PU A.4.7.1.4 Rp 50,391.00 Rp 4,255,701.36
4 Cat Lisplank 2,5 x 25 110.80 M2 AHSP PU A.4.7.1.4 Rp 50,391.00 Rp 5,583,322.80
Sub Jumlah Rp 27,032,985.55
Sub Total Rp 968,995,896.76
BACK UP DATA VOLUME PEKERJAAN
22.00
A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan
Lebar = 13.20 m
Panjang = 16 m
Luas = (PxL)
= ( 16 x 13.2 ) 211.20 M²
2. Pemasangan Bouwplank
Lebar = 13.20 m 20.00
1.00 18.00
Panjang = 20 m
Keliling = 2 (P + L )
= 2 x ( 16 + 13.20 ) 66.40
Lebar = 1.31 m
Panjang = 1.30 m 30
Jumlah = 12 m Lantai Keramik 40x40
Spesi t=4cm
Cor Lantai 1: 3 :5=5Cm
Volume = ( P x L x T ) x Unit Pasir urug
Ø8 - 1
= (1.30 x 1.31 x 1) x 16 20.44 M³ Tanah Urug
8 - Ø1
Volume = ( P x L x T ) x Unit
= ( 1.31 x 1,3 x 0,05 ) x 16 Unit 1.36 M³
Tanah Urug
1.d. Aanstamping 8 - Ø14
Tinggi = 0.05 m Ø8 - 100
Lebar = 1.3 m
Panjang = 1.31 m Pondasi Tapak 8 Ø14 - 150
Jumlah = 16 Unit
Aanstamping
Lapisan Pasir
Volume = ( P x L x T ) x Unit
30
= ( 1.31 x 1,3 x 0,05 ) x 16 Unit 1.36 M³ 5 110
120
1.e. Pandestal Pondasi Tapak
Tinggi = 0.6 m
Lebar = 0.30 m
Panjang = 0.30 m
Jumlah = 16 Unit
volume = ( P x L x T ) x Unit
= (0.30 x 0.30 x 0.6) x 16 0.864 M³
volume = ( P x L x T ) x Unit
= (1.31 x 1.30 x 0.20)x 16 5.45 M³
2.a. Galian Pondasi Menerus
Tinggi = 0.70 m 1 2 3 4
18.00
Lebar = 0.60 m 4.00 4.00 2.00 4.00
Panjang = 70.00 m
Tinggi = 0.05 m
Lebar = 1.31 m
Panjang = 70.00 m
Volume = (PxLxT)
= ( 70 x 1,31 x 0,05 ) 4.59 M³
2.d. Aanstamping
Tinggi = 0.05 m
Lebar = 1.31 m
Panjang = 70.00 m
Volume = (PxLxT)
= ( 70 x 1,31 x 0,05 ) 4.59 M³
Volume = (( a + b )/2 x P x T ))
= (( 0,40 + 0,80)/2 x 60 x 0,80) 29.40 M³
Volume = (PxLxT)
= (20.10 x 0.40 x 0.25) 2.010 M³
Volume = (PxLxT)
= ( 20.10 x 0.40 x 0.05 ) 0.402 M³
Volume = (PxLxT)
= ( 20.10 x 0.40 x 0.05 ) 1.206 M³
C. PEKERJAAN RAAM
1.a. Lantai kerja 1 : 3 : 5
Tinggi = 0.55 m
Lebar = 2.50 m
Alas = 1.20 m
Volume = ( 1/2 x A x T x L )
= ( 1/2 x 1.20 x 0.55 x 2.50) 0.825 M³
Volume = (PxLxT)
= ( 6.30 x 0.70 x 0.15 ) 0.662 M³
2.a. Pasir Alas Tangga Depan
Tinggi = 0.05 m
Lebar = 0.70 m
Panjang = 6.30 m
Volume = (PxLxT) 90
= ( 6.30 x 0.70 x 0.05 ) 0.2205 M³
30 30 30
3.a. Lantai kerja 1 : 3 : 5
Tinggi = 0.10 m
Lebar = 0.70 m
Panjang = 6.30 m
Volume = (PxLxT)
= ( 6.30 x 0.70 x 0.10) 0.441 M³
Volume = (PxLxT)
= ( 6.30 x 0.30 x 0.10 ) 0.189 M³
Volume = (PxLxT)
= ( 6.30 x 0.30 x 0.25 ) 0.47 M³
90
Jumlah Total Tanah Urug 2 + 3 0.66 M³ 30 30 30
5.a. Pasir Bawah Tangga (1)
Tinggi = 0.05 m
Lebar = 0.17 m
Panjang = 6.30 m
Volume = (PxLxT)
= ( 6.30 x 0.17 x 0.05 ) 0.05 M³
Volume = (PxLxT)
= ( 6.30 x 0.17 x 0.10 ) 0.10 M³
Volume = (PxLxT)
= ( 6.30 x 0.08 x 0.10 ) 0.05 M³
1 2 3 4
2.00
1. Sloof (30/40)
Sloof 30/ 40
Sloof 30/ 40
Sloof 30/ 40
Sloof 30/ 40
Tinggi = 0.30 m 5.20
2.00
Lebar = 0.30 m Sloof 30/ 40 Sloof 30/ 40 Sloof 30/ 40 Sloof 30/ 40
Volume = ( P x L x T ) x Unit
= ( 0.30 x 0.30 x 3.20 ) x 16 4.61 M³
40
3. Kolom K1 (30/30) Lantai 2
Tinggi = 3.35 m
Lebar = 0.30 m
Panjang = 0.30 m 30
Jumlah = 16 Unit
Sloof 30/ 40
40
30
Sloof 30/ 40
Volume = ( P x L x T ) x Unit
= ( 0.30 x 0.30 x 3.35) x 16 4.824 M³
4. Kolom KP (15/15) Lantai 1
Tinggi = 3.20 m 1 2 3 4
18.00
Lebar = 0.15 m
4.00 4.00 2.00 4.00
Panjang = 0.15 m
Jumlah = 6 Unit K1 K1 K1 K1
2.00
KP KP KP KP
Volume = ( P x L x T ) x Unit 5.20
2.00
= ( 0.15 x 0.15 x 3.20 ) x 6 0.43 M³ K1 K1 K1 K1
1.20 KP KP KP KP KP KP KP
5. Kolom KP (15/15) Lantai 2
2.00 2.00 2.00 2.00 2.00 2.00 2.00
Tinggi = 3.35 m 18.00
Lebar = 0.15 m
Panjang = 0.15 m
Jumlah = 6 Unit
Volume = ( P x L x T ) x Unit
= ( 0.15 x 0.15 x 3.35 ) x 6 0.45225 M³
Volume = ( P x L x T ) x Unit
= ( 0.13 x 0.13 x 0.87 ) x 12 0.15 M³
Volume = (PxLxT)
= ( 180 x 0.15 x 0.30 ) 8.10 M³
Volume = (PxLxT)
= ( 108 x 0.15 x 0.15 ) 2.43 M³
Volume = ( P x L x T ) x Unit
= ( 12.00 x 13.00 x 0.12 ) x 1 18.72 M³
Ø12-150 Ø12-150
Beton Plat Lantai Selasar 30
Tinggi = 0.12 m
Lebar = 0.95 m 40
Panjang = 3.70 m
Jumlah = 4 unit
100 200
400
Volume = ( P x L x T ) x Unit
= ( 3.70 x0.95 x 0.12 ) x 4 1.69 M³
Volume = ( P x L x T ) x Unit
= ( 1.70 x 0.95 x 0.12 ) x 1 0.19 M³
Volume = ( P x L x T ) x Unit
= ( 32 x 0.13 x 0.20 ) x 8 6.66 M³
9.b. Balok Latai (BLT) (13/20) Lantai 2
Tinggi = 0.20 m
Lebar = 0.13 m
Panjang = 32 m
Jumlah = 8 unit
Volume = ( P x L x T ) x Unit
= ( 32 x 0.13 x 0.20 ) x 8 6.66 M³
Volume = ( P x L x T ) x Unit
= ( 32 x 0.13 x 0.20 ) x 8 0.30 M³
8 13
Ø12-200 Ø1
Panjang = 4.65 m 3
Volume = (PxLxT) 1
Volume = (PxLxT)
= ( 6.60 x 0,15 x 0,20 ) 0.20 M³
78
Volume = (PxLxT)
= ( 1.30 x 1.00 x 0.12 ) 0.16 M³ 82
Volume = (PxLxT)
= (1.30 x 1.00 x 0.32 ) 0.42 M³
160
Volume = (PxL)
= ( 2 .00 x 1.30 ) 2.86 M²
3.b. Keramik Anak Tangga
Panjang = 1.00 m
Lebar = 0.50 m
jumlah = 18 unit
Volume = ( P x L ) x unit
= ( 1.00 x 0.50 ) x 19 9.00 M²
Luas = (PxT)
= ( 53.02 x 0.40 ) 21.21 M² 4.00
Selasar
Tinggi = 0.50 m
Panjang = 20.40 m 10.15 Balok30/ 40
Luas = (PxT)
Plafond+3.50
= ( 20.40 x 0.50 ) 10.20 M² 1.95
Tangga 4.00
Tinggi = 0.60 m
Panjang = 2.00 m Lant ai Keramik 40 x40
2.05 Spesi t =4cm
Jumlah = 2.00 Unit Cor Lant ai 1 :3:6
Pasir urug
Tanah Urug
Luas = ( P x T ) x Unit 0.50
= (2x2)x2 2.40 M²
Pas. Bat a Transram1:2
Sloof 30/ 40
Volume Total Dinding + Selasar + Tangga Bata 1 : 2 33.81 M²
Plesteran Dinding Bata 1 PC : 4 PP LT 1
= ( 33.81 ) x 2 67.62 M²
Pintu P1 4.00
Tinggi = 0.40 m
Lebar = 0.92 m
Jumlah = 4 unit 1
Luas = ( L x T ) x unit
= ( 0.92 x 0.40 ) x 4 1.47 M²
Luas = (PxT )
= (53.02 x 3.20 ) 169.66 M²
2.a. Lantai 2 Pas. Dinding Bata 1 : 4
Tinggi = 3.70 m
Panjang = 53.02 m
Luas = (PxT)
Volume = ( 53.02 x 3.70 ) 196.17 M²
Luas = (PxT)
Volume = (18.57 x 0.87 ) 16.16 M²
Luas = ( P x T ) x unit
Volume = (1.20x 2.14 ) x 4 10.75 M²
Luas = ( L x T ) x unit
= ( 2,62 x 0.90 ) x 15 35.37 M²
A A
13
6 80 6
92
B
Jendela J1
Tinggi = 1.78 m
Lebar = 0.82 m
Jumlah = 8 unit
Luas = ( L x T ) x unit
= ( 0.82 x 1.78 ) x 8 11.68 M²
Jendela J2
Tinggi = 1.78 m
Lebar = 1.58 m
Jumlah = 6 unit
Luas = ( L x T ) x unit
= ( 1.58 x 1.78 ) x 6 16.87 M²
Ventilasi P1
Tinggi = 0.52 m
Lebar = 0.82 m
Jumlah = 2 unit
Luas = ( L x T ) x unit A A
= ( 0.82 x 0.52 ) x 2 0.85 M²
Ventilasi J1
Tinggi = 0.62 m
Lebar = 1.38 m
Jumlah = 4 unit B
Luas = ( L x T ) x unit
= ( 0.62 x 1.38 ) x 8 3.42 M²
13
Ventilasi J2
Tinggi = 0.62 m 6 80 6
Lebar = 2.04 m
Jumlah
92
= 4 unit
Luas = ( L x T ) x unit
= ( 0.62 x 2.04 ) x 8 5.06 M²
Luas = ( L x T ) x unit
= ( 2,16 x 0.92 ) x 4 7.95 M²
Jendela J1
Tinggi = 0.92 m A
Lebar = 1.38 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.92 x 1.380 ) x 8 5.08 M² B
138
Jendela J2
Tinggi = 0.92 m
Lebar = 2.04 m 6 60 6 60 6 60
Jumlah = 4 unit 204
Luas = ( L x T ) x unit
= ( 0.92 x 2.04 ) x 8 7.51 M²
Ventilasi P1
Tinggi = 0.62 m
Lebar = 0.92 m
Jumlah = 4 unit
Luas = ( L x T ) x unit
= ( 0.62 x 0.92 ) x 8 2.28 M²
Ventilasi J1
Tinggi = 0.62 m
Lebar = 1.38 m
Jumlah = 4 unit
B
Luas = ( L x T ) x unit
51
= ( 0.62 x 1.38 ) x 8 3.42 M²
Ventilasi J2 6
Tinggi = 0.62 m 51
Lebar = 2.04 m 25
Jumlah = 4 unit A
6
Luas = ( L x T ) x unit B
= ( 0.62 x 2.04 ) x 8 5.06 M²
13
Ventilasi V1
Tinggi = 1.34 m 66 30 66 66 30 66
Lebar = 0.42 m 54 54
Jumlah = 2 unit
Luas = ( L x T ) x unit
= ( 1.43 x 0.42 ) x 2 1.13 M²
1 2 3 4
VI PEKERJAAN LANTAI DAN PAS. KERAMIK
A Tanah timbunan dibawah lantai dalam ruangan 18.00
Tinggi = 0.40 m 4.00 4.00 2.00 4.00
Lebar = 3.70 m
Panjang = 3.70 m 2.00 1.70
Jumlah = 4.00 Unit
3.70 TANAHTIMBUN TANAHTIMBUN
5.20
Luas = ( P x L x T ) x unit 2.00
Luas = (PxLxT)
= ( 3.70 x 1.70 x 0,40 ) 2.52 M³
Luas = ( P x L x T ) x unit
1 2 3 4
= ( 18.05 x 0.95 x 0,35 ) 6.00 M³
18.00
Tanah timbunan dibawah lantai tangga Teras 4.00 4.00 2.00 4.00
Tinggi = 0.35 m
Lebar = 0.08 m
2.00 1.70
Panjang = 2.00 m
Jumlah = 2.00 Unit 3.70 URUGANPASIR URUGANPAS
5.20
2.00
Luas = ( P x L x T ) x unit
= ( 2 x 2 x 0,35 ) 0.11 M²
1.20 18.04
Luas = (PxLxT) 1 2 3 4
= ( 3.70 x 1.70 x 0,10 ) 0.63 M³
18.00
Urugan Pasir Bawah Selasar 4.00 4.00 2.00 4.00
Tinggi = 0.10 m
Lebar = 0.95 m
2.00 1.70
Panjang = 18.05 m
3.70 URUGANPASIR URUGANPAS
Luas = (PxLxT) 5.20
2.00
= ( 18.05 x 0.95 x 0.10 ) 1.71 M³
1.20 18.04
Urugan Pasir Bawah Lantai, Selasar dan Ruangan 7.82 M³
0.30
0.30 1.20
0.30
C Cor Lantai 1 : 3 : 6 dalam Ruangan 2.00 2.50
Tinggi = 0.05 m
Lebar = 3.70 m
Panjang = 3.70 m
Jumlah = 4.00 Unit
Luas = ( P x L x T ) x unit
= ( 3,70 x 3,70 x 0,10 ) x 4 2.74 M³
18.00
Luas = (PxLxT)
4.00 4.00 2.00 4.00
= ( 3.70 x 1.70 x 0.05) 0.31 M³
Luas = ( P x L) x unit
= ( 3,87 x 3,87 ) x 4 59.91 M²
Luas = ( P x L)
= ( 3.87 x 1.89) 7.31 M²
Luas = (PxL)
= ( 18.13 x 1.14 ) 20.67 M² 1 2 3 4 5
18.00
Pas. Keramik 40/40 Lantai, Selasar dan Ruangan Lt 1 87.89 M²
4.00 4.00 2.00 4.00
Luas = ( P x L) x unit
= ( 3,87 x 3,87 ) x 4 59.91 M² 1.20 Selasar Keramik 40x40 Cm
- 0.05
Selasar Keram
- 0.
0.30
0.30 1.20
0.30
Pas. Keramik 40/40 Selasar
2.00 2.50 2.0
Lebar = 1.00 m
Panjang = 17.87 m
Luas = (PxL)
= ( 17.87 x 1.00 ) 17.87 M²
Pas. Keramik 40/40 Lantai, Selasar dan Ruangan Lt 2 77.78 M²
VI PEKERJAAN PINTU, JENDELA DAN KUNCI B
Kusen Untuk Lantai 1
Kusen Pintu P1
Panjang = 5.36 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 5,36 x 0,13 x 0,06 ) x 4 0.17 M³
Daun Pintu P1
Panjang = 2.10 m
Lebar = 0.80 m
Jumlah = 4 unit
Engsel Pintu P1
Buah = 3 Bh
A A
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (3)x4 12.00 Bh
B 1
Kunci Pintu P1
3,5/ 10 Panel
Buah = 1 Bh
Jumlah = 4 unit 13
66 80 66
Luas = ( Bh ) x unit 104
= (1)x4 4.00 Bh
Kusen Ventilasi P1
Panjang = 3.08 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 3.08 x 0,13 x 0,06 ) x 4 0.10 M³
Papan Ventilasi P1
Panjang = 6.24 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 6.24 x 0,13 x 0,02 ) x 4 0.06 M³
Kusen Jendela J1
Panjang = 5.40 m B
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 5,40 x 0,13 x 0,06 ) x 4 0.17 M²
Kaca 5 MM Kaca 5 MM
A A
B
Kaca Mati 5 mm 3,5 / 8
66 60 6 60 66
150
Daun Jendela J1
Panjang = 0.80 m
Lebar = 0.60 m
Jumlah = 8 unit
Kaca 5 MM Kaca 5 MM
A A
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 8 3.84 M²
Kaca Jendela J1
Panjang = 0.68 m
Lebar = 0.46 m B
Jumlah = 8 unit Kaca Mati 5 mm 3,5 / 8
Luas = ( P x L ) x unit 1
= ( 0.68 x 0.46 ) x 8 2.50 M² 66 60 6 60 66
150
Engsel Jendela J1
Buah = 4 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Pacok Jendela J1
Buah = 2 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (2)x4 8.00 Bh
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Kusen Ventilasi J1
Panjang = 4.50 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 4.50x 0,13 x 0,06 ) x 4 0.14 M³
Papan Ventilasi J1
Panjang = 8.32 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 8.32 x 0,13 x 0,02 ) x 4 0.09 M³
Kusen Jendela J2
Panjang = 7.28 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 7.28 x 0,13 x 0,06 ) x 4 0.23 M²
Daun Jendela J2
Panjang = 0.80 m
Lebar = 0.60 m
Jumlah = 12 unit
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 12 5.76 M²
Kaca Jendela J2
Panjang = 0.68 m
Lebar = 0.46 m
Jumlah = 12 unit
Luas = ( P x L ) x unit B
= ( 0.68 x 0.46 ) x 12 3.75 M²
Engsel Jendela J2
Buah = 6 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (6)x4 24.00 Bh
Pacok Jendela J2
Buah = 3 Bh
Jumlah = 4 unit
Kaca 5 MM Kaca 5 MM Kaca 5 MM
A
Luas = ( Bh ) x unit
= (3)x4 12.00 Bh
Kusen Ventilasi J2
Panjang = 6.08 m 66 60 6 60 6 60
Lebar = 0.13 m 216
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 6.08 x 0,13 x 0,06 ) x 4 0.19 M²
Papan Ventilasi J2
Panjang = 12.48 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 12.48 x 0,13 x 0,02 ) x 4 0.13 M³
Luas = ( P x L x T ) x unit
= ( 5,36 x 0,13 x 0,06 ) x 4 0.17 M³
Daun Pintu P1
Panjang = 2.10 m
Lebar = 0.80 m
Jumlah = 4 unit
Engsel Pintu P1
Buah = 3 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (3)x4 12.00 Bh
Kunci Pintu P1
Buah = 1 Bh
Jumlah = 4 unit
B
Luas = ( Bh ) x unit
= (1)x4 4.00 Bh
Kusen Ventilasi P1
Panjang = 3.08 m
Lebar = 0.13 m
Tinggi = 0.06 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 3.08 x 0,13 x 0,06 ) x 4 0.10 M³
Papan Ventilasi P1
Panjang = 6.24 m
Lebar = 0.13 m
Kaca 5 MM Kaca 5 MM
Tinggi = 0.02 m A
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 6.24 x 0,13 x 0,02 ) x 4 0.06 M³
Kusen Jendela J1
Panjang = 5.40 m
Lebar = 0.13 m B
Tinggi = 0.06
Kaca Mati 5 mm 3,5 / 8
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 5,40 x 0,13 x 0,06 ) x 4 0.17 M²
66 60 6 60 6
Daun Jendela J1 150
Panjang = 0.80 m
Lebar = 0.60 m
Jumlah = 8 unit
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 8 3.84 M²
Kaca Jendela J1
Panjang = 0.68 m
Lebar = 0.46 m
Jumlah = 8 unit
Luas = ( P x L ) x unit
= ( 0.68 x 0.46 ) x 8 2.50 M²
Engsel Jendela J1
Buah = 4 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Pacok Jendela J1
Buah = 2 Bh
Jumlah = 4 unit
Luas = ( Bh ) x unit
= (2)x4 8.00 Bh
Luas = ( Bh ) x unit
= (4)x4 16.00 Bh
Kusen Ventilasi J1
Panjang = 4.50 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 4.50x 0,13 x 0,06 ) x 4 0.14 M²
Papan Ventilasi J1
Panjang = 8.32 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 8.32 x 0,13 x 0,02 ) x 4 0.09 M³
Kusen Jendela J2
Panjang = 7.28 m
Lebar = 0.13 m
Tinggi = 0.06
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 7.28 x 0,13 x 0,06 ) x 4 0.23 M²
Daun Jendela J2
Panjang = 0.80 m
Lebar = 0.60 m
Jumlah = 12 unit
Luas = ( P x L ) x unit
= ( 0.80 x 0.60 ) x 12 5.76 M² B
Kaca Jendela J2
Panjang = 0.68 m
Lebar = 0.46 m
Jumlah = 12 unit
Luas = ( P x L ) x unit
= ( 0.68 x 0.46 ) x 12 3.75 M²
Engsel Jendela J2
Buah = 6 Bh
Jumlah = 4 unit
Kaca 5 MM Kaca 5 MM Kaca 5 MM
Luas = ( Bh ) x unit A
= (6)x4 24.00 Bh
Pacok Jendela J2
Buah = 3 Bh
Jumlah = 4 unit
B
Luas = ( Bh ) x unit
3,5 / 8
= (3)x4 12.00 Bh 3,5 / 8 Kaca Mati 5 mm
Papan Ventilasi J2
Panjang = 12.48 m 51
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
A
Luas = ( P x L x T ) x unit
= ( 12.48 x 0,13 x 0,02 ) x 4 0.13 M³ B
Kusen Ventilasi V1
Panjang = 1.97 m
Lebar = 0.13 m 66 30 66 66 30 66
Tinggi = 0.06 54 54
Jumlah = 4 unit
Luas = ( P x L x T ) x unit
= ( 1,97 x 0,13 x 0,06 ) x 4 0.06 M²
Papan Ventilasi V1
Panjang = 1.83 m
Lebar = 0.13 m
Tinggi = 0.02 m
Jumlah = 4 unit
R
Luas = ( P x L x T ) x unit G
0.60
Volume = (PxL)
20.00
= ( 20 x 4.02 ) x 2 160.80 M2
Volume = (PxU)
= ( 20 ) x 1 20.00 M¹
Volume = (PxU)
= ( 55 ) x 1 55.40 M¹
1.20 1.20
Volume = (PxL)
0.60 0.60
= ( 18.20 x 2.24 ) 40.77 M²
Volume = (PxL)
= ( 18.33 x 2.24 ) 6.66 M²
Cat Kolom Lt 1
Panjang = 3.60 m
Lebar = 0.84 m
Jumlah = 12.00 Unit
Volume = ( P x L ) x Unit
= ( 7,20 x 0,40 ) x 12 36.29 M²
Volume = ( P x L ) x Unit
= ( 56,80 x 0,50 ) x 2 56.80 M²
Cat Kolom Lt 2
Panjang = 3.70 m
Lebar = 0.84 m
Jumlah = 12.00 Unit
Volume = ( P x L ) x Unit
= ( 7,20 x 0,40 ) x 12 37.30 M²
Volume = (PxL)
= ( 18 x 4 ) x 1 54.76 M²
Cat Plafond Lantai 2 (ruangan)
Panjang = 16.59 m
Lebar = 3.70 m
Volume = (PxL)
= ( 16.59 x 3.70 ) 61.38 M²
Volume = (PxL)
1.20 1.20
= ( 18.20 x 2.24 ) 40.77 M² 0.60 0.60
Volume = (PxL)
= ( 18.33 x 2.24 ) 6.66 M²
Luas = ( P x L) x unit
= ( 5,24 x 0,25 ) x 4 5.24 M²
Luas = ( P x L) x unit
= ( 2.84 x 0.25) x 4 2.84 M²
B 13
Lebar = 0.17 m
13
Jumlah = 4 unit
66 80 66
Luas = ( P x L ) x unit 104
= ( 6.24 x 0,17) x 4 4.24 M²
Luas = ( P x L) x unit
= ( 5,08 x 0,25 ) x 4 5.08 M²
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 2.99 M²
Luas = ( P x L) x unit
= ( 8.32 x 0.17) x 4 5.66 M²
Luas = ( P x L) x unit
= ( 7.28 x 0,25 ) x 4 7.28 M² Kaca 5 MM Kaca 5 MM
A
Cat Daun Jendela J2
Panjang = 4.00 m
Lebar = 0.22 m
Jumlah = 4 unit
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 3.52 M² B
Cat Kusen Ventilasi J2 Kaca Mati 5 mm 3,5 / 8
Panjang = 4.76 m
Lebar = 0.25 m
Jumlah = 4 unit
66 60 6 60 6
Luas = ( P x L) x unit 150
= ( 4.76 x 0,25 ) x 4 4.76 M²
Luas = ( P x L) x unit
= ( 12.48 x 0.17) x 4 8.49 M² B
Luas = ( P x L) x unit
= ( 5,24 x 0,25 ) x 4 5.24 M²
Luas = ( P x L) x unit
= ( 4.20 x 1.60) x 4 26.88 M²
B
Cat Kusen Ventilasi P1 3,5 / 8 Kaca Mati 5 mm 3,5 / 8
Panjang = 2.84 m
Lebar = 0.25 m
Jumlah = 4 unit
66 60 6 60 6 60
Luas = ( P x L) x unit 216
= ( 2.84 x 0.25) x 4 2.84 M²
Luas = ( P x L ) x unit
= ( 6.24 x 0,17) x 4 4.24 M²
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 2.99 M²
Luas = ( P x L) x unit
= ( 4.26 x 0,25 ) x 4 4.26 M²
Luas = ( P x L) x unit
= ( 8.32 x 0.17) x 4 5.66 M²
Luas = ( P x L) x unit
= ( 7.28 x 0,25 ) x 4 7.28 M²
66 60 6 60 6
Cat Daun Jendela J2 150
Panjang = 4.00 m
Lebar = 0.22 m
Jumlah = 4 unit
Luas = ( P x L) x unit
= ( 2.80 x 0,22 ) x 4 3.52 M²
Luas = ( P x L) x unit
= ( 4.76 x 0,25 ) x 4 4.76 M²
Luas = ( P x L) x unit
= ( 12.48 x 0.17) x 4 8.49 M² 51
Cat Kusen Ventilasi V1
Panjang = 1.97 m
A
Lebar = 0.25 m
Jumlah = 4 unit
B
Luas = ( P x L ) x unit
= ( 1,97 x 0,25 ) x 4 1.97 M²
Luas = ( P x L x T ) x unit
= ( 1.83 x 0,17) x 4 1.24 M²
1 2 3
1 2 3
30
Berat besi Ø 8, = Byk begel x Pjg begel x 0.006165 x dia.2
= 38.5288 kg
30
4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan
Kolom30/ 30 = 13.33 m2 -------> 50%
1 2 3
Balok Blt 13/ 20 4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan
= 20.38 m2 -------> 50%
1 2 3
Balok Bordes 15/ 20 4. Papan mal = Pjg balok untuk 1 m3 beton x luas permukaan papan
= 18.33 m2 -------> 50%
40
Berat besi Ø 10, = Pjg*Jb*Jl*0.006162*d*d
= 769.018 Kg
100 200 100
400
Total Berat Besi = 1,538.04 Kg
1 2 3
1 2 3
D14-150
D14-150
8-D16-150 30 120
= 23.189 Kg
30
Total Berat Besi = 46.38 Kg
D14 - 150
Berat Besi Untuk 1 m3 Beton = 143.14 Kg / M3 Beton