Anda di halaman 1dari 4

DAFTAR HARGA JUAL PRELAUNCHING - TAHAP 1

Berlaku per : 28 Oktober 2022


STANDARD CARA PEMBAYARAN

CASH BERTAHAP BALLOON KPR


CASH KERAS
PAYMENT
DIMENSI LB LT 12 BULAN 24 BULAN KPR 1 - 5 *) KPR 6
TIPE BLOK NO
KAVLING (m²) (m²) DP Min DP Min DP Min
DP Min 50% DP Min 50%
1 BLN TANPA DP TANPA DP 5% /10% 5% /10% 10%
23 BLN 23 BLN
1 BLN 5 BLN 10 BLN
A10 32 s/d 58
A12 18
A15 05
A17 16 s/d 27
02 s/d 16
LINNEA 6 x 15 A18 85 90 1,522,821,594 1,620,022,972 1,719,208,052 1,810,127,708 1,647,068,430 1,709,571,980 1,790,336,573 1,934,109,058
19 s/d 31
02 s/d 15
A19
18 s/d 28
02 s/d 12
A20
17 s/d 23
A10 61 s/d 75
A12 02 s/d 09, 12
MALVA 7 x 15 95 105 1,727,821,907 1,838,108,412 1,950,645,662 2,053,804,807 1,868,794,696 1,939,712,394 2,031,349,414 2,194,476,369
A16 11 s/d 22
A17 02 s/d 11
A9 18 s/d 28
PIVOINE 8 x 15 141 120 2,440,612,412 2,596,396,183 2,755,359,214 2,901,075,327 2,639,741,695 2,739,915,570 2,869,356,252 3,099,779,116
A10 02 s/d 15
A1 02 s/d 09
PRIMIVERE 10 x 15 190 150 3,148,192,437 3,349,140,891 3,554,190,333 3,742,152,322 3,405,053,093 3,534,269,282 3,701,237,284 3,998,464,125
A16 02 s/d 08
PL-001/MKT-CGST/X/2022
- Khusus Tipe Pivoine (L8) dan Tipe Primivere (L10) terdapat pilihan warna A atau B
- Uang Tanda Jadi (UTJ): Rp 15,000,000,- (Lima Belas Juta Rupiah)
- Harga sudah termasuk PPN
- Harga belum termasuk biaya surat-surat (BBN, BPTHB & AJB)
- *) KPR 1-5:
Besaran DP untuk KPR 1 : Minimal 5%
Besaran DP untuk KPR 2-5 : Minimal 10%
- Besaran suku bunga, Down Payment (DP), dan syarat-syarat mengenai KPR akan mengikuti ketentuan yang ditetapkan oleh Peraturan Bank Indonesia (PBI) dan Bank Pemberi Kredit
- Harga dan ketentuan diatas dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
DAFTAR HARGA JUAL PRELAUNCHING - TAHAP 1

Berlaku per : 28 Oktober 2022


SUDUT / IRREGULAR CARA PEMBAYARAN

CASH BERTAHAP BALLOON KPR


CASH KERAS
PAYMENT
DIMENSI LB LT 12 BULAN 24 BULAN KPR 1 - 5 *) KPR 6
TIPE BLOK NO
KAVLING (m²) (m²) DP Min DP Min DP Min
DP Min 50% DP Min 50%
1 BLN TANPA DP TANPA DP 5% /10% 5% /10% 10%
23 BLN 23 BLN
1 BLN 5 BLN 10 BLN
31 119 1,783,370,761 1,897,202,937 2,013,358,219 2,119,833,894 1,928,875,774 2,002,073,451 2,096,656,568 2,265,027,996
Var x 15 A10
59 165 2,100,059,436 2,234,105,783 2,370,887,770 2,496,271,257 2,271,403,041 2,357,599,067 2,468,978,132 2,667,248,741
16 120 1,790,255,297 1,904,526,912 2,021,130,600 2,128,017,315 1,936,322,019 2,009,802,269 2,104,750,515 2,273,771,925
Var x 15 A12
17 119 1,783,370,761 1,897,202,937 2,013,358,219 2,119,833,894 1,928,875,774 2,002,073,451 2,096,656,568 2,265,027,996
Var x 15 01 144 1,953,886,959 2,078,603,147 2,205,864,565 2,322,520,864 2,113,304,369 2,193,500,809 2,297,127,448 2,481,597,635
6 x 17 02 102 1,613,783,881 1,716,791,363 1,821,901,039 1,918,251,574 1,745,452,321 1,811,689,378 1,897,278,260 2,049,638,668
Var x 15 03 119 1,783,370,761 1,897,202,937 2,013,358,219 2,119,833,894 1,928,875,774 2,002,073,451 2,096,656,568 2,265,027,996
A15
6 x 16.5 09 99 1,591,043,309 1,692,599,265 1,796,227,792 1,891,220,608 1,720,856,348 1,786,160,029 1,870,542,838 2,020,756,266
6 x 18 10 s/d 16 109 1,668,026,286 1,774,496,049 1,883,138,665 1,982,727,729 1,804,120,357 1,872,583,771 1,961,049,461 2,118,530,998
Var x 18 17 143 1,958,780,669 2,083,809,222 2,211,389,378 2,328,337,855 2,118,597,356 2,198,994,656 2,302,880,839 2,487,813,051
LINNEA 85
Var x 15 A17 15, 28 119 1,783,370,761 1,897,202,937 2,013,358,219 2,119,833,894 1,928,875,774 2,002,073,451 2,096,656,568 2,265,027,996
01, 32 119 1,783,370,761 1,897,202,937 2,013,358,219 2,119,833,894 1,928,875,774 2,002,073,451 2,096,656,568 2,265,027,996
Var x 15 A18
17, 18 165 2,100,059,436 2,234,105,783 2,370,887,770 2,496,271,257 2,271,403,041 2,357,599,067 2,468,978,132 2,667,248,741
01, 16 119 1,783,370,761 1,897,202,937 2,013,358,219 2,119,833,894 1,928,875,774 2,002,073,451 2,096,656,568 2,265,027,996
Var x 15 A19 17 137 1,906,143,387 2,027,812,114 2,151,963,876 2,265,769,658 2,061,665,405 2,139,902,231 2,240,996,735 2,420,959,360
29 159 2,056,699,249 2,187,977,924 2,321,935,756 2,444,730,436 2,224,505,101 2,308,921,427 2,418,000,834 2,612,177,726
01 152 2,008,881,324 2,137,107,791 2,267,951,126 2,387,890,849 2,172,785,718 2,255,239,378 2,361,782,706 2,551,445,016
15 154 2,021,211,529 2,150,225,031 2,281,871,461 2,402,547,356 2,186,121,943 2,269,081,691 2,376,278,966 2,567,105,394
Var x 15 A20
16 140 1,928,412,109 2,051,502,243 2,177,104,421 2,292,239,751 2,085,751,028 2,164,901,865 2,267,177,416 2,449,242,474
25 139 1,919,796,800 2,042,337,021 2,167,378,063 2,281,999,018 2,076,432,798 2,155,230,022 2,257,048,650 2,438,300,321

- Khusus Tipe Pivoine (L8) dan Tipe Primivere (L10) terdapat pilihan warna A atau B
- Uang Tanda Jadi (UTJ): Rp 15,000,000,- (Lima Belas Juta Rupiah)
- Harga sudah termasuk PPN
- Harga belum termasuk biaya surat-surat (BBN, BPTHB & AJB)
- *) KPR 1-5:
Besaran DP untuk KPR 1 : Minimal 5%
Besaran DP untuk KPR 2-5 : Minimal 10%
- Besaran suku bunga, Down Payment (DP), dan syarat-syarat mengenai KPR akan mengikuti ketentuan yang ditetapkan oleh Peraturan Bank Indonesia (PBI) dan Bank Pemberi Kredit
- Harga dan ketentuan diatas dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
DAFTAR HARGA JUAL PRELAUNCHING - TAHAP 1

Berlaku per : 28 Oktober 2022


SUDUT / IRREGULAR CARA PEMBAYARAN

CASH BERTAHAP BALLOON KPR


CASH KERAS
PAYMENT
DIMENSI LB LT 12 BULAN 24 BULAN KPR 1 - 5 *) KPR 6
TIPE BLOK NO
KAVLING (m²) (m²) DP Min DP Min DP Min
DP Min 50% DP Min 50%
1 BLN TANPA DP TANPA DP 5% /10% 5% /10% 10%
23 BLN 23 BLN
1 BLN 5 BLN 10 BLN
60 135 1,993,856,446 2,121,123,879 2,250,988,606 2,370,031,273 2,156,534,962 2,238,371,932 2,344,118,399 2,532,362,182
Var x 15 A10
76 157 2,149,377,412 2,286,571,714 2,426,565,901 2,554,893,905 2,324,744,865 2,412,965,126 2,526,959,826 2,729,886,639
Var x 16 01 169 2,240,836,404 2,383,868,515 2,529,819,648 2,663,608,187 2,423,665,986 2,515,640,141 2,634,485,474 2,846,047,104
7 x 16 A11 02 s/d 05 112 1,781,993,301 1,895,737,554 2,011,803,118 2,118,196,553 1,927,385,927 2,000,527,067 2,095,037,129 2,263,278,508
Var x 16 06 152 2,119,247,182 2,254,518,278 2,392,550,010 2,519,079,097 2,292,156,313 2,379,139,892 2,491,536,600 2,691,618,761
01 135 1,993,856,446 2,121,123,879 2,250,988,606 2,370,031,273 2,156,534,962 2,238,371,932 2,344,118,399 2,532,362,182
MALVA 10 95 134 1,936,554,404 2,060,164,260 2,186,296,766 2,301,918,229 2,094,557,653 2,174,042,686 2,276,750,074 2,459,583,861
Var x 15 A12
11 131 1,914,199,365 2,036,382,303 2,161,058,771 2,275,345,533 2,070,378,669 2,148,946,149 2,250,467,911 2,431,191,117
15 134 1,986,734,512 2,113,547,353 2,242,948,211 2,361,565,665 2,148,831,950 2,230,376,604 2,335,745,350 2,523,316,738
10 180 2,314,343,486 2,462,067,539 2,612,806,367 2,750,983,627 2,503,170,502 2,598,161,724 2,720,905,589 2,939,407,163
Var x 15 A16
23 134 1,986,734,512 2,113,547,353 2,242,948,211 2,361,565,665 2,148,831,950 2,230,376,604 2,335,745,350 2,523,316,738
01 134 1,986,734,512 2,113,547,353 2,242,948,211 2,361,565,665 2,148,831,950 2,230,376,604 2,335,745,350 2,523,316,738
Var x 15 A17
12 149 2,091,663,393 2,225,173,822 2,361,408,954 2,486,291,159 2,262,321,966 2,348,173,380 2,459,107,151 2,656,585,074
17 165 2,841,858,173 3,023,253,375 3,208,350,521 3,378,022,904 3,073,725,051 3,190,367,883 3,341,089,096 3,609,394,336
Var x 15 A9
29 192 3,031,456,881 3,224,954,129 3,422,400,300 3,603,392,624 3,278,793,096 3,403,217,925 3,563,994,723 3,850,200,338
PIVOINE 141
01 172 2,890,550,125 3,075,053,324 3,263,321,895 3,435,901,419 3,126,389,774 3,245,031,146 3,398,334,792 3,671,237,132
Var x 15 A10
16 165 2,841,858,173 3,023,253,375 3,208,350,521 3,378,022,904 3,073,725,051 3,190,367,883 3,341,089,096 3,609,394,336
01 180 3,448,385,316 3,668,495,017 3,893,096,753 4,098,981,677 3,729,738,674 3,871,276,149 4,054,165,225 4,379,733,847
Var x 15 A1
10 223 3,755,087,140 3,994,773,554 4,239,351,526 4,463,548,001 4,061,464,264 4,215,590,182 4,414,745,542 4,769,270,467
PRIMIVERE 190
01 223 3,755,087,140 3,994,773,554 4,239,351,526 4,463,548,001 4,061,464,264 4,215,590,182 4,414,745,542 4,769,270,467
Var x 15 A16
09 241 3,882,262,096 4,130,066,059 4,382,927,246 4,614,716,668 4,199,015,409 4,358,361,168 4,564,261,398 4,930,793,152
PL-001/MKT-CGST/X/2022
- Khusus Tipe Pivoine (L8) dan Tipe Primivere (L10) terdapat pilihan warna A atau B
- Uang Tanda Jadi (UTJ): Rp 15,000,000,- (Lima Belas Juta Rupiah)
- Harga sudah termasuk PPN
- Harga belum termasuk biaya surat-surat (BBN, BPTHB & AJB)
- *) KPR 1-5:
Besaran DP untuk KPR 1 : Minimal 5%
Besaran DP untuk KPR 2-5 : Minimal 10%
- Besaran suku bunga, Down Payment (DP), dan syarat-syarat mengenai KPR akan mengikuti ketentuan yang ditetapkan oleh Peraturan Bank Indonesia (PBI) dan Bank Pemberi Kredit
- Harga dan ketentuan diatas dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
KETENTUAN CARA PEMBAYARAN

Uang Tanda Jadi (UTJ) Rp. 15 JUTA : Pada saat transaksi 9 KPR 2 - 5 (DP min. 10% = 10 Bulan)
DP 1a : 0.50% : Hari ke 15 setelah UTJ
1 CASH KERAS (1 BULAN) DP 1b : 0.50% : Hari ke 30 setelah UTJ
Angsuran 1 : 10.00% : Hari ke 15 setelah UTJ DP 2 s.d 10 : 9.00% dibagi 9 Bln : Hari ke 60 s.d hari ke 300 setelah UTJ
Pelunasan : 90.00% : Hari ke 30 setelah UTJ Akad Kredit - 90% : 1 bulan sejak pelunasan DP

2 CASH BERTAHAP 12 BULAN (TANPA DP) 10 KPR 6 (DP min. 50% = 23 Bulan)
Angsuran 1a : 4.17% : Hari ke 15 setelah UTJ Angsuran 1a : 1.09% : Hari ke 15 setelah UTJ
Angsuran 1b : 4.17% : Hari ke 30 setelah UTJ Angsuran 1b : 1.09% : Hari ke 30 setelah UTJ
Angsuran 2 s/d 12 : 91.66% dibagi 11 Bln : Hari ke 60 s.d hari ke 360 setelah UTJ Angsuran 2 s.d 23 : 47.82% dibagi 23 Bln : Hari ke 60 s.d hari ke 690 setelah UTJ
Akad Kredit - 50% : 1 bulan sejak pelunasan DP
3 CASH BERTAHAP 24 BULAN (TANPA DP)
Angsuran 1a : 2.08% : Hari ke 15 setelah UTJ HARGA SUDAH TERMASUK
Angsuran 1b : 2.08% : Hari ke 30 setelah UTJ 1 PPN: sesuai peraturan pemerintah yang berlaku
Angsuran 2 s/d 24 : 95.83% dibagi 23 Bln : Hari ke 60 s.d hari ke 720 setelah UTJ (Apabila terjadi peraturan pemerintah yang menyebabkan tarif PPN berubah, maka selisihnya wajib ditanggung dan
dibayarkan pembeli pada saat pembayaran angsuran atau selambat-lambatnya sebelum penandatanganan AJB)
4 BALLOON PAYMENT 24 BULAN (DP 50% = 23 BULAN)
Angsuran 1a : 1.09% : Hari ke 15 setelah UTJ HARGA BELUM TERMASUK
Angsuran 1b : 1.09% : Hari ke 30 setelah UTJ 1 Biaya surat-surat (BBN, BPTHB & AJB)
Angsuran 2 s/d 23 : 47.82% dibagi 23 Bln : Hari ke 60 s.d hari ke 690 setelah UTJ 2 Cara bayar KPR: harga belum termasuk Biaya KPR
Pelunasan - 50% : Hari ke 720 setelah UTJ (Segala kekurangan biaya pajak yang mengalami perubahan akibat peraturan pemerintah wajib ditanggung
dan dibayarkan pembeli sebelum penandatanganan AJB)
5 KPR 1 (DP min. 5% = 1 Bulan)
DP 1a : 2.50% : Hari ke 15 setelah UTJ CATATAN
DP 1b : 2.50% : Hari ke 30 setelah UTJ 1 Unit yang sudah dibeli tidak dapat ditukar/diganti
Akad Kredit - KPR 95% : 1 bulan sejak pelunasan DP 2 Penandatanganan PPJB (Perjanjian Pengikatan Jual Beli) 30 hari setelah tanda jadi
3 Bank Pemberi Kredit:
6 KPR 1 (DP min. 5% = 5 Bulan) BCA, MANDIRI, PANIN, CIMB NIAGA, PERMATA, MAYBANK, BNI, DANAMON, OCBC NISP, BTN, CCB
DP 1a : 0.50% : Hari ke 15 setelah UTJ 4 Ketentuan Khusus cara bayar KPR:
DP 1b : 0.50% : Hari ke 30 setelah UTJ a. Pembeli dengan status KPR Ke-1 : cara bayar yang bisa dipilih dari harga KPR 1, KPR 2 - 5 & KPR 6
DP 2 s.d 5 : 4% dibagi 4 Bln : Hari ke 60 s.d hari ke 150 setelah UTJ b. Pembeli dengan status KPR Ke-2-5 : cara bayar yang bisa dipilih dari harga KPR 2 - 5 & KPR 6
Akad Kredit - KPR 95% : 1 bulan sejak pelunasan DP c. Pembeli dengan status KPR Ke-6 : cara bayar yang bisa dipilih HANYA dari harga KPR 6
d. Penentuan bahwa pembeli merupakan KPR ke 1 - 5 atau ke 6, dst berdasarkan Analisa BI-Checking yang
7 KPR 2 - 5 (DP min. 10% = 1 Bulan) dilakukan Bank pemberi Kredit pada saat proses KPR dilaksanakan
DP 1a : 5.00% : Hari ke 15 setelah UTJ e. Besaran Suku Bunga, Down Payment (DP), dan syarat-syarat mengenai KPR akan mengikuti ketentuan yang
DP 1b : 5.00% : Hari ke 30 setelah UTJ ditetapkan oleh Peraturan Bank Indonesia (PBI) dan Bank Pemberi Kredit
Akad Kredit - 90% : 1 bulan sejak pelunasan DP 5 Harga dan ketentuan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
6 Dokumen KPR lengkap wajib diberikan ke developer:
8 KPR 2 - 5 (DP min. 10% = 5 Bulan) a. KPR 1 dan KPR 2-5: maksimal 14 Hari setelah UTJ
DP 1a : 1.00% : Hari ke 15 setelah UTJ b. KPR 1, KPR 2-5, dan KPR 6 dengan cicilan DP lebih dari 3 bulan: 3 bulan sebelum DP lunas
DP 1b : 1.00% : Hari ke 30 setelah UTJ 7 Untuk Pengalihan Hak/Ganti Nama, berlaku sesuai Surat Pesanan (Pph Final 2.5% + Biaya Admin 2.5%)
DP 2 s.d 5 : 8% dibagi 4 Bln : Hari ke 60 s.d hari ke 150 setelah UTJ 8 Serah Terima bangunan: 24 bulan sejak UTJ
Akad Kredit - 90% : 1 bulan sejak pelunasan DP
NOTE
CASH/CASH BERTAHAP : UTJ diperhitungkan di Total Harga
KPR : UTJ diperhitungkan di Total DP

Anda mungkin juga menyukai