No Kode
A.2.2.1.11aRob.CK
P.07.b.rob
No Kode
AH KABUPATEN INDRAMAYU
N, KAWASAN PERMUKIMAN DAN
PERTANAHAN
A Indramayu Kode Pos 45212 Jawa Barat
234) 273076 Email. dpkp2indramayu@gmail.com
( EE ; OE ; SWAKELOLA )
HARGA SATUAN UPAH ANALISA HARGA SATUAN PEKERJAAN
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
TAHUN ANGGARAN 2020
CETAKAN BULAN JANUARI
Keterangan :
- Jumlah orang hari kerja yaitu 8 jam / hari (istirahat 1 jam)
SURYONO, ST., M.Si.
NIP. 19670508 199403 1 004
PEMERINTAH KABUPATEN INDRAMAYU
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN
PERTANAHAN
Jl. Wiralodra No. 35/A Indramayu Kode Pos 45212 Jawa Barat
Telp. (0234) 272015 Fax. (0234) 273076 Email. dpkp2indramayu@gmail.com
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Bottom M' 931,000.00
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Middle M' 931,000.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Bottom M' 959,000.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Middle M' 959,000.00
Kode Uraian Satuan Harga (Rp.)
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Bottom M' 1,333,000.00
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Middle M' 1,465,000.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Bottom M' 1,253,000.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Middle M' 1,342,000.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Bottom M' 1,214,000.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Middle M' 1,279,000.00
Tiang Pancang Beton Bulat d. 600 (p. 15 s/d. 16) Bottom M' 1,190,000.00
Tiang Pancang Beton Bulat d. 600 (p. 15 s/d. 16) Middle M' 1,242,000.00
D. GIRDER H-90 cm
PC. I Girder H-90 cm L-12,6m, Ctc-185, K.500 M' 77,883,000.00
PC. I Girder H-90 cm L-13,5m, Ctc-185, K.500 M' 83,680,000.00
PC. I Girder H-90 cm L-14,6m, Ctc-185, K.500 M' 93,569,000.00
PC. I Girder H-90 cm L-15,6m, Ctc-185, K.500 M' 100,500,000.00
PC. I Girder H-90 cm L-16,6m, Ctc-185, K.500 M' 107,432,000.00
F. GIRDER H-125 cm -
PC. I Girder H-125 cm L-16,6m, Ctc-185, K.500 M' 105,233,000.00
PC. I Girder H-125 cm L-17,6m, Ctc-185, K.500 M' 109,038,000.00
PC. I Girder H-125 cm L-18,6m, Ctc-185, K.500 M' 114,376,000.00
PC. I Girder H-125 cm L-19,6m, Ctc-185, K.500 M' 122,984,000.00
PC. I Girder H-125 cm L-20,6m, Ctc-185, K.500 M' 131,859,000.00
PC. I Girder H-125 cm L-21,6m, Ctc-185, K.500 M' 140,734,000.00
PC. I Girder H-125 cm L-22,6m, Ctc-185, K.600 M' 147,074,000.00
PC. I Girder H-125 cm L-23,6m, Ctc-185, K.700 M' 157,217,000.00
G. GIRDER H-160 cm -
PC. I Girder H-160 cm L-22,6m, Ctc-185, K.500 M' 183,574,000.00
PC. I Girder H-160 cm L-23,6m, Ctc-185, K.500 M' 191,673,000.00
PC. I Girder H-160 cm L-24,6m, Ctc-185, K.500 M' 197,911,000.00
PC. I Girder H-160 cm L-25,6m, Ctc-185, K.500 M' 206,076,000.00
PC. I Girder H-160 cm L-26,6m, Ctc-185, K.500 M' 214,663,000.00
PC. I Girder H-160 cm L-27,6m, Ctc-185, K.500 M' 222,417,000.00
PC. I Girder H-160 cm L-28,6m, Ctc-185, K.500 M' 232,759,000.00
PC. I Girder H-160 cm L-29,6m, Ctc-185, K.500 M' 240,729,000.00
PC. I Girder H-160 cm L-30,6m, Ctc-140, K.600 M' 242,462,000.00
PC. I Girder H-160 cm L-31,6m, Ctc-140, K.600 M' 252,424,000.00
H. GIRDER H-170 cm -
PC. I Girder H-170 cm L-30,6m, Ctc-185, K.500 M' 289,578,000.00
PC. I Girder H-170 cm L-31,6m, Ctc-185, K.500 M' 300,797,000.00
PC. I Girder H-170 cm L-32,6m, Ctc-185, K.500 M' 312,330,000.00
PC. I Girder H-170 cm L-33,6m, Ctc-185, K.500 M' 322,737,000.00
PC. I Girder H-170 cm L-34,6m, Ctc-185, K.500 M' 337,691,000.00
PC. I Girder H-170 cm L-35,6m, Ctc-185, K.500 M' 359,956,000.00
PC. I Girder H-170 cm L-36,6m, Ctc-185, K.700 M' 378,441,000.00
PC. I Girder H-170 cm L-37,6m, Ctc-185, K.700 M' 401,940,000.00
PC. I Girder H-170 cm L-38,6m, Ctc-185, K.700 M' 418,898,000.00
PC. I Girder H-170 cm L-39,6m, Ctc-140, K.700 M' 406,564,000.00
PC. I Girder H-170 cm L-40,6m, Ctc-140, K.700 M' 422,612,000.00
PC. I Girder H-170 cm L-41,6m, Ctc-140, K.700 M' 439,321,000.00
I. GIRDER H-210 cm -
PC. I Girder H-210 cm L-35,6m, Ctc-185, K.500 M' 343,239,000.00
PC. I Girder H-210 cm L-36,6m, Ctc-185, K.500 M' 351,759,000.00
PC. I Girder H-210 cm L-37,6m, Ctc-185, K.500 M' 412,163,000.00
PC. I Girder H-210 cm L-38,6m, Ctc-185, K.500 M' 425,222,000.00
PC. I Girder H-210 cm L-39,6m, Ctc-185, K.500 M' 438,585,000.00
PC. I Girder H-210 cm L-40,6m, Ctc-185, K.600 M' 457,731,000.00
PC. I Girder H-210 cm L-41,8m, Ctc-185, K.600 M' 477,093,000.00
Kode Uraian Satuan Harga (Rp.)
J. DIAFRAGMA
Diafragma PC. I Girder H-90cm, K.350 M' 4,874,000.00
Diafragma PC. I Girder H-125cm, K.350 M' 5,144,000.00
Diafragma PC. I Girder H-160cm, K.350 M' 5,956,000.00
Diafragma PC. I Girder H-170cm, K.350 M' 6,227,000.00
Diafragma PC. I Girder H-210cm, K.350 M' 7,310,000.00
Plat Dek Pracetak (100cm x 145cm x 7cm, K.350) M' 866,000.00
Ukuran 10 x 10 M2 185,000.00
Ukuran 15 x 15 M2 263,000.00
Ukuran 15 x 30 M2 263,000.00
Ukuran 20 x 20 M2 263,000.00
Ukuran 30 x 30 M2 287,000.00
Kode Uraian Satuan Harga (Rp.)
Batu Templek -
Acak Garut M2 95,000.00
Ukuran 10 x 20 M2 95,000.00
Ukuran 10 x 30 M2 103,000.00
Ukuran 15 x 30 M2 109,000.00
Ukuran 20 x 40 M2 165,000.00
Ukuran 30 x 30 M2 167,000.00
Batu Bobos Palimanan Corak -
Ukuran 10 x 20 M2 68,000.00
Ukuran 20 x 20 M2 68,000.00
Ukuran 20 x 30 M2 79,000.00
Ukuran 20 x 40 M2 84,000.00
Ukuran 15 x 30 M2 74,000.00
Batu Bobos Palimanan Putih -
Ukuran 10 x 20 M2 110,000.00
Ukuran 15 x 30 M2 107,000.00
Batu Andesit Susun Sirih -
Ukuran 3 x 20 M2 128,000.00
Ukuran 3 x 30 M2 140,000.00
Ukuran 3 x 40 M2 157,000.00
Ukuran 3 x 50 M2 152,000.00
Ukuran 5 x 30 M2 74,000.00
Ukuran 5 x 40 M2 90,000.00
Batu Alam Profil -
Ukuran 5 x 30 M2 96,000.00
Ukuran 3 x 50 M2 52,000.00
Ukuran 4 x 50 M2 52,000.00
Ukuran 5 x 50 M2 79,000.00
Ukuran 3 x 40 M2 61,000.00
Ukuran 4 x 40 M2 74,000.00
Ukuran 5 x 40 M2 81,000.00
Batu Candi -
Ukuran 10 x 20 M2 102,000.00
Ukuran 15 x 30 M2 109,000.00
Ukuran 20 x 40 M2 115,000.00
Koral -
Koral Pancawarna M2 102,000.00
Koral bengkulu hitam M2 102,000.00
Koral Flores hijau M2 102,000.00
Koral Orange Bali M2 102,000.00
Koral Hitam Garut M2 102,000.00
Batu Sikat M2 102,000.00
Basaltu Bandung -
Ukuran 10 x 20 M2 203,000.00
Ukuran 10 x 30 M2 215,000.00
Ukuran 15 x 30 M2 225,000.00
Ukuran 20 x 40 M2 237,000.00
Ukuran 30 x 60 M2 260,000.00
Batu Curi Subang -
Ukuran 10 x 20 M2 102,000.00
Ukuran 10 x 30 M2 107,000.00
Ukuran 15 x 30 M2 119,000.00
Ukuran 20 x 40 M2 124,000.00
Ukuran 30 x 30 M2 135,000.00
Ukuran 30 x 60 M2 158,000.00
Batu Bilik Gelombang -
Ukuran 15 x 30 M2 119,000.00
N. BAHAN KACA
Kaca polos 3 mm M2 96,000.00
Kaca polos 5 mm M2 141,000.00
Kaca polos 8 mm M2 142,000.00
Kaca polos 10 mm M2 239,000.00
Kaca polos 12 mm M2 538,000.00
Kaca rayband 3 mm M2 116,000.00
Kaca rayband 5 mm M2 170,000.00
Kode Uraian Satuan Harga (Rp.)
S. ALAT BANTU
Cangkul atau sekop Bh 87,000.00
Parang Bh 75,000.00
Pikulan dan 2 Bakul Bh 52,000.00
Tiang Pancang Beton Bulat d. 450 (p. 12 s/d. 14) Bottom M' 721,000.00
Tiang Pancang Beton Bulat d. 450 (p. 12 s/d. 14) Middle M' 756,000.00
Tiang Pancang Beton Bulat d. 450 (p. 15 s/d. 16) Bottom M' 783,900.00
Tiang Pancang Beton Bulat d. 450 (p. 15 s/d. 16) Middle M' 783,900.00
Tiang Pancang Beton Bulat d. 500 (p. 6 s/d. 8) Bottom M' 963,000.00
Tiang Pancang Beton Bulat d. 500 (p. 6 s/d. 8) Middle M' 1,053,000.00
Tiang Pancang Beton Bulat d. 500 (p. 9 s/d. 11) Bottom M' 981,500.00
Tiang Pancang Beton Bulat d. 500 (p. 9 s/d. 11) Middle M' 981,500.00
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Bottom M' 950,000.00
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Middle M' 950,000.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Bottom M' 978,900.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Middle M' 978,900.00
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Bottom M' 1,360,000.00
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Middle M' 1,495,000.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Bottom M' 1,279,000.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Middle M' 1,369,000.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Bottom M' 1,239,000.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Middle M' 1,305,000.00
Tiang Pancang Beton Bulat d. 600 (p. 15 s/d. 16) Bottom M' 1,214,000.00
Tiang Pancang Beton Bulat d. 600 (p. 15 s/d. 16) Middle M' 1,267,000.00
D. GIRDER H-90 cm
PC. I Girder H-90 cm L-12,6m, Ctc-185, K.500 M' 79,472,000.00
PC. I Girder H-90 cm L-13,5m, Ctc-185, K.500 M' 85,388,000.00
PC. I Girder H-90 cm L-14,6m, Ctc-185, K.500 M' 95,479,000.00
PC. I Girder H-90 cm L-15,6m, Ctc-185, K.500 M' 102,551,000.00
PC. I Girder H-90 cm L-16,6m, Ctc-185, K.500 M' 109,624,000.00
F. GIRDER H-125 cm -
PC. I Girder H-125 cm L-16,6m, Ctc-185, K.500 M' 107,381,000.00
PC. I Girder H-125 cm L-17,6m, Ctc-185, K.500 M' 111,263,000.00
PC. I Girder H-125 cm L-18,6m, Ctc-185, K.500 M' 116,710,000.00
PC. I Girder H-125 cm L-19,6m, Ctc-185, K.500 M' 125,494,000.00
PC. I Girder H-125 cm L-20,6m, Ctc-185, K.500 M' 134,550,000.00
PC. I Girder H-125 cm L-21,6m, Ctc-185, K.500 M' 143,606,000.00
PC. I Girder H-125 cm L-22,6m, Ctc-185, K.600 M' 150,075,000.00
PC. I Girder H-125 cm L-23,6m, Ctc-185, K.700 M' 160,425,000.00
G. GIRDER H-160 cm -
PC. I Girder H-160 cm L-22,6m, Ctc-185, K.500 M' 187,320,000.00
PC. I Girder H-160 cm L-23,6m, Ctc-185, K.500 M' 195,585,000.00
PC. I Girder H-160 cm L-24,6m, Ctc-185, K.500 M' 201,950,000.00
PC. I Girder H-160 cm L-25,6m, Ctc-185, K.500 M' 210,282,000.00
PC. I Girder H-160 cm L-26,6m, Ctc-185, K.500 M' 219,044,000.00
PC. I Girder H-160 cm L-27,6m, Ctc-185, K.500 M' 226,956,000.00
PC. I Girder H-160 cm L-28,6m, Ctc-185, K.500 M' 237,509,000.00
PC. I Girder H-160 cm L-29,6m, Ctc-185, K.500 M' 245,642,000.00
PC. I Girder H-160 cm L-30,6m, Ctc-140, K.600 M' 247,410,000.00
PC. I Girder H-160 cm L-31,6m, Ctc-140, K.600 M' 257,576,000.00
H. GIRDER H-170 cm -
PC. I Girder H-170 cm L-30,6m, Ctc-185, K.500 M' 295,488,000.00
PC. I Girder H-170 cm L-31,6m, Ctc-185, K.500 M' 306,936,000.00
PC. I Girder H-170 cm L-32,6m, Ctc-185, K.500 M' 318,704,000.00
PC. I Girder H-170 cm L-33,6m, Ctc-185, K.500 M' 329,323,000.00
PC. I Girder H-170 cm L-34,6m, Ctc-185, K.500 M' 344,583,000.00
PC. I Girder H-170 cm L-35,6m, Ctc-185, K.500 M' 367,302,000.00
PC. I Girder H-170 cm L-36,6m, Ctc-185, K.700 M' 386,164,000.00
PC. I Girder H-170 cm L-37,6m, Ctc-185, K.700 M' 410,143,000.00
Kode Uraian Satuan Harga (Rp.)
J. DIAFRAGMA
Diafragma PC. I Girder H-90cm, K.350 M' 4,973,000.00
Diafragma PC. I Girder H-125cm, K.350 M' 5,249,000.00
Diafragma PC. I Girder H-160cm, K.350 M' 6,078,000.00
Diafragma PC. I Girder H-170cm, K.350 M' 6,354,000.00
Diafragma PC. I Girder H-210cm, K.350 M' 7,459,000.00
Plat Dek Pracetak (100cm x 145cm x 7cm, K.350) M' 884,000.00
Ukuran 30 x 30 M2 132,000.00
Batu Andesit Bakar tebal. 5 cm -
Ukuran 10 x 10 M2 254,000.00
Ukuran 15 x 15 M2 359,000.00
Ukuran 15 x 30 M2 359,000.00
Ukuran 20 x 20 M2 359,000.00
Ukuran 20 x 40 M2 379,000.00
Ukuran 30 x 30 M2 399,000.00
Batu Andesit Bakar tebal. 3 cm -
Ukuran 10 x 10 M2 189,000.00
Ukuran 15 x 15 M2 268,000.00
Ukuran 15 x 30 M2 268,000.00
Ukuran 20 x 20 M2 268,000.00
Ukuran 30 x 30 M2 293,000.00
Batu Templek -
Acak Garut M2 97,000.00
Ukuran 10 x 20 M2 97,000.00
Ukuran 10 x 30 M2 105,000.00
Ukuran 15 x 30 M2 111,000.00
Ukuran 20 x 40 M2 168,000.00
Ukuran 30 x 30 M2 170,000.00
Batu Bobos Palimanan Corak -
Ukuran 10 x 20 M2 69,000.00
Ukuran 20 x 20 M2 69,000.00
Ukuran 20 x 30 M2 81,000.00
Ukuran 20 x 40 M2 86,000.00
Ukuran 15 x 30 M2 75,000.00
Batu Bobos Palimanan Putih -
Ukuran 10 x 20 M2 112,000.00
Ukuran 15 x 30 M2 109,000.00
Batu Andesit Susun Sirih -
Ukuran 3 x 20 M2 131,000.00
Ukuran 3 x 30 M2 143,000.00
Ukuran 3 x 40 M2 160,000.00
Ukuran 3 x 50 M2 155,000.00
Ukuran 5 x 30 M2 75,000.00
Ukuran 5 x 40 M2 92,000.00
Batu Alam Profil -
Ukuran 5 x 30 M2 98,000.00
Ukuran 3 x 50 M2 53,000.00
Ukuran 4 x 50 M2 53,000.00
Ukuran 5 x 50 M2 81,000.00
Ukuran 3 x 40 M2 62,000.00
Ukuran 4 x 40 M2 76,000.00
Ukuran 5 x 40 M2 83,000.00
Batu Candi -
Ukuran 10 x 20 M2 104,000.00
Ukuran 15 x 30 M2 111,000.00
Ukuran 20 x 40 M2 117,000.00
Koral -
Koral Pancawarna M2 104,000.00
Koral bengkulu hitam M2 104,000.00
Koral Flores hijau M2 104,000.00
Koral Orange Bali M2 104,000.00
Koral Hitam Garut M2 104,000.00
Batu Sikat M2 104,000.00
Kode Uraian Satuan Harga (Rp.)
Basaltu Bandung -
Ukuran 10 x 20 M2 207,000.00
Ukuran 10 x 30 M2 219,000.00
Ukuran 15 x 30 M2 230,000.00
Ukuran 20 x 40 M2 242,000.00
Ukuran 30 x 60 M2 265,000.00
Batu Curi Subang -
Ukuran 10 x 20 M2 104,000.00
Ukuran 10 x 30 M2 109,000.00
Ukuran 15 x 30 M2 121,000.00
Ukuran 20 x 40 M2 127,000.00
Ukuran 30 x 30 M2 138,000.00
Ukuran 30 x 60 M2 161,000.00
Batu Bilik Gelombang -
Ukuran 15 x 30 M2 121,000.00
N. BAHAN KACA
Kaca polos 3 mm M2 98,000.00
Kaca polos 5 mm M2 144,000.00
Kaca polos 8 mm M2 145,000.00
Kaca polos 10 mm M2 244,000.00
Kaca polos 12 mm M2 549,000.00
Kaca rayband 3 mm M2 118,000.00
Kaca rayband 5 mm M2 173,000.00
Kaca Tempered 8 mm M2 550,000.00
Kaca Tempered 10 mm M2 753,000.00
Kaca Tempered 12 mm M2 868,000.00
Kaca Patri M2 2,990,000.00
Kaca Es t. 5 mm M2 170,000.00
Kaca Es random t. 5 mm M2 208,000.00
Kaca Pasta M2 536,000.00
Kaca Grafir t. 8 mm M2 1,725,000.00
Kaca Grafir corak t. 5 mm M2 1,942,000.00
Glass Block 20 x 20 cm Bh 27,000.00
Jendela naco + Rangka Daun 62,000.00
Pintu besi M2 310,000.00
Jendela besi / tralis M2 253,000.00
Skrup Kg 26,000.00
Sealant Tube 14,000.00
S. ALAT BANTU
Cangkul atau sekop Bh 87,000.00
Parang Bh 65,400.00
Pikulan dan 2 Bakul Bh 45,400.00
Kode Uraian Satuan Harga (Rp.)
HARGA SWAKELOLA
HARGA SATUAN BAHAN ANALISA HARGA SATUAN PEKERJAAN
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
TAHUN ANGGARAN 2020
CETAKAN BULAN JANUARI
Tiang Pancang Beton Bulat d. 350 (p. 12 s/d. 14) Bottom M' 409,500.00
Tiang Pancang Beton Bulat d. 350 (p. 12 s/d. 14) Middle M' 429,300.00
Tiang Pancang Beton Bulat d. 350 (p. 15) Bottom M' 430,560.00
Tiang Pancang Beton Bulat d. 350 (p. 15) Middle M' 430,560.00
Tiang Pancang Beton Bulat d. 400 (p. 6 s/d. 8) Bottom M' 591,300.00
Tiang Pancang Beton Bulat d. 400 (p. 6 s/d. 8) Middle M' 643,500.00
Tiang Pancang Beton Bulat d. 400 (p. 9 s/d. 11) Bottom M' 559,800.00
Tiang Pancang Beton Bulat d. 400 (p. 9 s/d. 11) Middle M' 595,800.00
Tiang Pancang Beton Bulat d. 400 (p. 12 s/d. 14) Bottom M' 544,500.00
Tiang Pancang Beton Bulat d. 400 (p. 12 s/d. 14) Middle M' 571,500.00
Tiang Pancang Beton Bulat d. 400 (p. 15 s/d. 16) Bottom M' 565,110.00
Tiang Pancang Beton Bulat d. 400 (p. 15 s/d. 16) Middle M' 565,110.00
Tiang Pancang Beton Bulat d. 450 (p. 6 s/d. 8) Bottom M' 708,300.00
Tiang Pancang Beton Bulat d. 450 (p. 6 s/d. 8) Middle M' 768,600.00
Tiang Pancang Beton Bulat d. 450 (p. 9 s/d. 11) Bottom M' 668,700.00
Tiang Pancang Beton Bulat d. 450 (p. 9 s/d. 11) Middle M' 710,100.00
Tiang Pancang Beton Bulat d. 450 (p. 12 s/d. 14) Bottom M' 648,900.00
Tiang Pancang Beton Bulat d. 450 (p. 12 s/d. 14) Middle M' 680,400.00
Tiang Pancang Beton Bulat d. 450 (p. 15 s/d. 16) Bottom M' 705,510.00
Tiang Pancang Beton Bulat d. 450 (p. 15 s/d. 16) Middle M' 705,510.00
Tiang Pancang Beton Bulat d. 500 (p. 6 s/d. 8) Bottom M' 866,700.00
Tiang Pancang Beton Bulat d. 500 (p. 6 s/d. 8) Middle M' 947,700.00
Tiang Pancang Beton Bulat d. 500 (p. 9 s/d. 11) Bottom M' 883,350.00
Tiang Pancang Beton Bulat d. 500 (p. 9 s/d. 11) Middle M' 883,350.00
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Bottom M' 855,000.00
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Middle M' 855,000.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Bottom M' 881,010.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Middle M' 881,010.00
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Bottom M' 1,224,000.00
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Middle M' 1,345,500.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Bottom M' 1,151,100.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Middle M' 1,232,100.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Bottom M' 1,115,100.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Middle M' 1,174,500.00
Tiang Pancang Beton Bulat d. 600 (p. 15 s/d. 16) Bottom M' 1,092,600.00
D. GIRDER H-90 cm
PC. I Girder H-90 cm L-12,6m, Ctc-185, K.500 M' 71,524,800.00
PC. I Girder H-90 cm L-13,5m, Ctc-185, K.500 M' 76,849,200.00
PC. I Girder H-90 cm L-14,6m, Ctc-185, K.500 M' 85,931,100.00
PC. I Girder H-90 cm L-15,6m, Ctc-185, K.500 M' 92,295,900.00
PC. I Girder H-90 cm L-16,6m, Ctc-185, K.500 M' 98,661,600.00
F. GIRDER H-125 cm -
PC. I Girder H-125 cm L-16,6m, Ctc-185, K.500 M' 96,642,900.00
PC. I Girder H-125 cm L-17,6m, Ctc-185, K.500 M' 100,136,700.00
PC. I Girder H-125 cm L-18,6m, Ctc-185, K.500 M' 105,039,000.00
PC. I Girder H-125 cm L-19,6m, Ctc-185, K.500 M' 112,944,600.00
PC. I Girder H-125 cm L-20,6m, Ctc-185, K.500 M' 121,095,000.00
PC. I Girder H-125 cm L-21,6m, Ctc-185, K.500 M' 129,245,400.00
PC. I Girder H-125 cm L-22,6m, Ctc-185, K.600 M' 135,067,500.00
PC. I Girder H-125 cm L-23,6m, Ctc-185, K.700 M' 144,382,500.00
G. GIRDER H-160 cm -
Kode Uraian Satuan Harga (Rp.)
J. DIAFRAGMA
Diafragma PC. I Girder H-90cm, K.350 M' 4,475,700.00
Diafragma PC. I Girder H-125cm, K.350 M' 4,724,100.00
Diafragma PC. I Girder H-160cm, K.350 M' 5,470,200.00
Diafragma PC. I Girder H-170cm, K.350 M' 5,718,600.00
Diafragma PC. I Girder H-210cm, K.350 M' 6,713,100.00
Plat Dek Pracetak (100cm x 145cm x 7cm, K.350) M' 795,600.00
Ukuran 3 x 20 M2 117,900.00
Ukuran 3 x 30 M2 128,700.00
Ukuran 3 x 40 M2 144,000.00
Ukuran 3 x 50 M2 139,500.00
Ukuran 5 x 30 M2 67,500.00
Ukuran 5 x 40 M2 82,800.00
Batu Alam Profil -
Ukuran 5 x 30 M2 88,200.00
Ukuran 3 x 50 M2 47,700.00
Ukuran 4 x 50 M2 47,700.00
Ukuran 5 x 50 M2 72,900.00
Ukuran 3 x 40 M2 55,800.00
Ukuran 4 x 40 M2 68,400.00
Ukuran 5 x 40 M2 74,700.00
Batu Candi -
Ukuran 10 x 20 M2 93,600.00
Ukuran 15 x 30 M2 99,900.00
Ukuran 20 x 40 M2 105,300.00
Koral -
Koral Pancawarna M2 93,600.00
Koral bengkulu hitam M2 93,600.00
Koral Flores hijau M2 93,600.00
Koral Orange Bali M2 93,600.00
Koral Hitam Garut M2 93,600.00
Batu Sikat M2 93,600.00
Basaltu Bandung -
Ukuran 10 x 20 M2 186,300.00
Ukuran 10 x 30 M2 197,100.00
Ukuran 15 x 30 M2 207,000.00
Ukuran 20 x 40 M2 217,800.00
Ukuran 30 x 60 M2 238,500.00
Batu Curi Subang -
Ukuran 10 x 20 M2 93,600.00
Ukuran 10 x 30 M2 98,100.00
Ukuran 15 x 30 M2 108,900.00
Ukuran 20 x 40 M2 114,300.00
Ukuran 30 x 30 M2 124,200.00
Ukuran 30 x 60 M2 144,900.00
Batu Bilik Gelombang -
Ukuran 15 x 30 M2 108,900.00
N. BAHAN KACA
Kaca polos 3 mm M2 88,200.00
Kaca polos 5 mm M2 129,600.00
Kaca polos 8 mm M2 130,500.00
Kaca polos 10 mm M2 219,600.00
Kaca polos 12 mm M2 494,100.00
Kaca rayband 3 mm M2 106,200.00
Kaca rayband 5 mm M2 155,700.00
Kaca Tempered 8 mm M2 495,000.00
Kaca Tempered 10 mm M2 677,700.00
Kaca Tempered 12 mm M2 781,200.00
Kaca Patri M2 2,691,000.00
Kaca Es t. 5 mm M2 153,000.00
Kaca Es random t. 5 mm M2 187,200.00
Kaca Pasta M2 482,400.00
Kaca Grafir t. 8 mm M2 1,552,500.00
Kaca Grafir corak t. 5 mm M2 1,747,800.00
Glass Block 20 x 20 cm Bh 24,300.00
Jendela naco + Rangka Daun 55,800.00
Pintu besi M2 279,000.00
Kode Uraian Satuan Harga (Rp.)
S. ALAT BANTU
Cangkul atau sekop Bh 78,300.00
Parang Bh 67,500.00
Pikulan dan 2 Bakul Bh 46,800.00
HARGA DASAR
HARGA SATUAN BAHAN ANALISA HARGA SATUAN PEKERJAAN
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
TAHUN ANGGARAN 2020
CETAKAN BULAN JANUARI
Tiang Pancang Beton Bulat d. 400 (p. 6 s/d. 8) Bottom M' 572,400.00
Tiang Pancang Beton Bulat d. 400 (p. 6 s/d. 8) Middle M' 622,900.00
Tiang Pancang Beton Bulat d. 400 (p. 9 s/d. 11) Bottom M' 541,900.00
Tiang Pancang Beton Bulat d. 400 (p. 9 s/d. 11) Middle M' 576,800.00
Tiang Pancang Beton Bulat d. 400 (p. 12 s/d. 14) Bottom M' 527,100.00
Tiang Pancang Beton Bulat d. 400 (p. 12 s/d. 14) Middle M' 553,200.00
Tiang Pancang Beton Bulat d. 400 (p. 15 s/d. 16) Bottom M' 547,100.00
Tiang Pancang Beton Bulat d. 400 (p. 15 s/d. 16) Middle M' 547,100.00
Tiang Pancang Beton Bulat d. 450 (p. 6 s/d. 8) Bottom M' 685,700.00
Tiang Pancang Beton Bulat d. 450 (p. 6 s/d. 8) Middle M' 744,000.00
Tiang Pancang Beton Bulat d. 450 (p. 9 s/d. 11) Bottom M' 647,300.00
Tiang Pancang Beton Bulat d. 450 (p. 9 s/d. 11) Middle M' 687,400.00
Tiang Pancang Beton Bulat d. 450 (p. 12 s/d. 14) Bottom M' 628,200.00
Tiang Pancang Beton Bulat d. 450 (p. 12 s/d. 14) Middle M' 658,700.00
Tiang Pancang Beton Bulat d. 450 (p. 15 s/d. 16) Bottom M' 683,000.00
Tiang Pancang Beton Bulat d. 450 (p. 15 s/d. 16) Middle M' 683,000.00
Tiang Pancang Beton Bulat d. 500 (p. 6 s/d. 8) Bottom M' 839,000.00
Tiang Pancang Beton Bulat d. 500 (p. 6 s/d. 8) Middle M' 917,400.00
Tiang Pancang Beton Bulat d. 500 (p. 9 s/d. 11) Bottom M' 855,100.00
Tiang Pancang Beton Bulat d. 500 (p. 9 s/d. 11) Middle M' 855,100.00
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Bottom M' 827,700.00
Tiang Pancang Beton Bulat d. 500 (p. 12 s/d. 14) Middle M' 827,700.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Bottom M' 852,900.00
Tiang Pancang Beton Bulat d. 500 (p. 15 s/d. 16) Middle M' 852,900.00
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Bottom M' 1,184,900.00
Tiang Pancang Beton Bulat d. 600 (p. 6 s/d. 8) Middle M' 1,302,500.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Bottom M' 1,114,300.00
Tiang Pancang Beton Bulat d. 600 (p. 9 s/d. 11) Middle M' 1,192,700.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Bottom M' 1,079,500.00
Tiang Pancang Beton Bulat d. 600 (p. 12 s/d. 14) Middle M' 1,137,000.00
Tiang Pancang Beton Bulat d. 600 (p. 15 s/d. 16) Bottom M' 1,057,700.00
D. GIRDER H-90 cm
PC. I Girder H-90 cm L-12,6m, Ctc-185, K.500 M' 69,240,000.00
PC. I Girder H-90 cm L-13,5m, Ctc-185, K.500 M' 74,394,300.00
PC. I Girder H-90 cm L-14,6m, Ctc-185, K.500 M' 83,186,100.00
PC. I Girder H-90 cm L-15,6m, Ctc-185, K.500 M' 89,347,600.00
PC. I Girder H-90 cm L-16,6m, Ctc-185, K.500 M' 95,509,900.00
F. GIRDER H-125 cm -
PC. I Girder H-125 cm L-16,6m, Ctc-185, K.500 M' 93,555,700.00
PC. I Girder H-125 cm L-17,6m, Ctc-185, K.500 M' 96,937,900.00
PC. I Girder H-125 cm L-18,6m, Ctc-185, K.500 M' 101,683,600.00
PC. I Girder H-125 cm L-19,6m, Ctc-185, K.500 M' 109,336,600.00
PC. I Girder H-125 cm L-20,6m, Ctc-185, K.500 M' 117,226,700.00
PC. I Girder H-125 cm L-21,6m, Ctc-185, K.500 M' 125,116,700.00
PC. I Girder H-125 cm L-22,6m, Ctc-185, K.600 M' 130,752,800.00
PC. I Girder H-125 cm L-23,6m, Ctc-185, K.700 M' 139,770,300.00
G. GIRDER H-160 cm -
PC. I Girder H-160 cm L-22,6m, Ctc-185, K.500 M' 163,202,600.00
PC. I Girder H-160 cm L-23,6m, Ctc-185, K.500 M' 170,403,400.00
PC. I Girder H-160 cm L-24,6m, Ctc-185, K.500 M' 175,948,900.00
PC. I Girder H-160 cm L-25,6m, Ctc-185, K.500 M' 183,208,200.00
Kode Uraian Satuan Harga (Rp.)
J. DIAFRAGMA
Diafragma PC. I Girder H-90cm, K.350 M' 4,333,000.00
Diafragma PC. I Girder H-125cm, K.350 M' 4,574,000.00
Diafragma PC. I Girder H-160cm, K.350 M' 5,296,000.00
Diafragma PC. I Girder H-170cm, K.350 M' 5,536,000.00
Diafragma PC. I Girder H-210cm, K.350 M' 6,499,000.00
Plat Dek Pracetak (100cm x 145cm x 7cm, K.350) M' 771,000.00
Ukuran 15 x 30 M2 233,500.00
Ukuran 20 x 20 M2 233,500.00
Ukuran 30 x 30 M2 255,300.00
Batu Templek
Acak Garut M2 84,600.00
Ukuran 10 x 20 M2 84,600.00
Ukuran 10 x 30 M2 91,500.00
Ukuran 15 x 30 M2 96,800.00
Ukuran 20 x 40 M2 146,400.00
Ukuran 30 x 30 M2 148,200.00
Batu Bobos Palimanan Corak
Ukuran 10 x 20 M2 60,200.00
Ukuran 20 x 20 M2 60,200.00
Ukuran 20 x 30 M2 70,600.00
Ukuran 20 x 40 M2 75,000.00
Ukuran 15 x 30 M2 65,400.00
Batu Bobos Palimanan Putih
Ukuran 10 x 20 M2 97,600.00
Ukuran 15 x 30 M2 95,000.00
Batu Andesit Susun Sirih
Ukuran 3 x 20 M2 114,200.00
Ukuran 3 x 30 M2 124,600.00
Ukuran 3 x 40 M2 139,400.00
Ukuran 3 x 50 M2 135,100.00
Ukuran 5 x 30 M2 65,400.00
Ukuran 5 x 40 M2 80,200.00
Batu Alam Profil
Ukuran 5 x 30 M2 85,400.00
Ukuran 3 x 50 M2 46,200.00
Ukuran 4 x 50 M2 46,200.00
Ukuran 5 x 50 M2 70,600.00
Ukuran 3 x 40 M2 54,100.00
Ukuran 4 x 40 M2 66,300.00
Ukuran 5 x 40 M2 72,400.00
Batu Candi
Ukuran 10 x 20 M2 90,700.00
Ukuran 15 x 30 M2 96,800.00
Ukuran 20 x 40 M2 102,000.00
Koral
Koral Pancawarna M2 90,700.00
Koral bengkulu hitam M2 90,700.00
Koral Flores hijau M2 90,700.00
Koral Orange Bali M2 90,700.00
Koral Hitam Garut M2 90,700.00
Batu Sikat M2 90,700.00
Basaltu Bandung
Ukuran 10 x 20 M2 180,400.00
Ukuran 10 x 30 M2 190,900.00
Ukuran 15 x 30 M2 200,400.00
Ukuran 20 x 40 M2 210,900.00
Ukuran 30 x 60 M2 230,900.00
Batu Curi Subang
Ukuran 10 x 20 M2 90,700.00
Ukuran 10 x 30 M2 95,000.00
Ukuran 15 x 30 M2 105,500.00
Ukuran 20 x 40 M2 110,700.00
Ukuran 30 x 30 M2 120,300.00
Ukuran 30 x 60 M2 140,300.00
Batu Bilik Gelombang
Ukuran 15 x 30 M2 105,500.00
Kode Uraian Satuan Harga (Rp.)
N. BAHAN KACA
Kaca polos 3 mm M2 85,400.00
Kaca polos 5 mm M2 125,500.00
Kaca polos 8 mm M2 126,400.00
Kaca polos 10 mm M2 212,600.00
Kaca polos 12 mm M2 478,400.00
Kaca rayband 3 mm M2 102,900.00
Kaca rayband 5 mm M2 150,800.00
Kaca Tempered 8 mm M2 479,200.00
Kaca Tempered 10 mm M2 656,100.00
Kaca Tempered 12 mm M2 756,300.00
Kaca Patri M2 2,605,100.00
Kaca Es t. 5 mm M2 148,200.00
Kaca Es random t. 5 mm M2 181,300.00
Kaca Pasta M2 467,000.00
Kaca Grafir t. 8 mm M2 1,503,000.00
Kaca Grafir corak t. 5 mm M2 1,692,000.00
Glass Block 20 x 20 cm Bh 23,600.00
Jendela naco + Rangka Daun 54,100.00
Pintu besi M2 270,100.00
Jendela besi / tralis M2 220,500.00
Skrup Kg 22,700.00
Sealant Tube 12,200.00
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 72,000.00 14,400.00
Tukang Kayu L.02.04 OH 0.4000 103,000.00 41,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0200 120,000.00 2,400.00
JUMLAH TENAGA KERJA 60,100.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 60,100.00 75,125.00
Semen portland Kg 2.5000 1,264.00 3,160.00
Seng gelombang Lbr 1.2000 52,300.00 62,760.00
Pasir beton m3 0.0050 270,100.00 1,350.50
Koral beton m3 0.0090 271,000.00 2,439.00
Kayu Kaso 5/7 m3 0.0720 4,007,800.00 288,561.60
Paku 5 - 12 cm Kg 0.0600 20,900.00 1,254.00
Meni besi Liter 0.4500 39,300.00 17,685.00
JUMLAH HARGA BAHAN 452,335.10
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 512,435.10
E Overhead & Profit 15 % 15.00% 76,865.27
F Harga Satuan Pekerjaan (D+E) - 589,300.00
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 72,000.00 14,400.00
Tukang Kayu L.02.04 OH 0.3000 103,000.00 30,900.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0200 120,000.00 2,400.00
JUMLAH TENAGA KERJA 49,800.00
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1.0000 60,100.00 60,100.00
Semen portland Kg 2.0000 1,264.00 2,528.00
Kawat duri M’ 25.0000 15,700.00 392,500.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 142/478
Pasir beton m3 0.0050 270,100.00 1,350.50
Koral beton m3 0.0090 271,000.00 2,439.00
Paku 5 - 12 cm Kg 0.0600 20,900.00 1,254.00
JUMLAH HARGA BAHAN 460,171.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 509,971.50
E Overhead & Profit 15 % 15.00% 76,495.73
F Harga Satuan Pekerjaan (D+E) - 586,467.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 143/478
A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.1000 72,000.00 7,200.00
Tukang Kayu L.02.04 OH 0.1000 103,000.00 10,300.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 19,150.00
B BAHAN - -
Kayu Kaso 5/7 m3 0.0120 4,007,800.00 48,093.60
Paku 5 - 10 cm Kg 0.0200 17,400.00 348.00
Kayu papan 3/20 m3 0.0070 2,904,700.00 20,332.90
JUMLAH HARGA BAHAN 68,774.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 87,924.50
E Overhead & Profit 15 % 15.00% 13,188.68
F Harga Satuan Pekerjaan (D+E) - 101,113.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 144/478
A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1.0000 72,000.00 72,000.00
Tukang Kayu L.02.04 OH 2.0000 103,000.00 206,000.00
Kepala Tukang L.03.01 OH 0.2000 105,000.00 21,000.00
Mandor L.04.01 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 305,000.00
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1.7000 60,100.00 102,170.00
Kayu Kaso 5/7 m3 0.2100 4,007,800.00 841,638.00
Paku 5 - 12 cm Kg 0.3000 20,900.00 6,270.00
Semen portland Kg 10.5000 1,264.00 13,272.00
Pasir beton m3 0.0300 270,100.00 8,103.00
Koral beton m3 0.0500 271,000.00 13,550.00
Seng gelombang Lbr 1.5000 52,300.00 78,450.00
Seng plat Lbr 0.2500 50,600.00 12,650.00
JUMLAH HARGA BAHAN 1,076,103.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,381,103.00
E Overhead & Profit 15 % 15.00% 207,165.45
F Harga Satuan Pekerjaan (D+E) - 1,588,268.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 145/478
JUMLAH HARGA BAHAN 38,274.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 343,274.80
E Overhead & Profit 15 % 15.00% 51,491.22
F Harga Satuan Pekerjaan (D+E) - 394,766.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 146/478
A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Tukang Kayu L.02.04 OH 0.3000 103,000.00 30,900.00
Kepala Tukang L.03.01 OH 0.0300 105,000.00 3,150.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN - -
Kayu papan kelas III m3 0.0360 2,904,700.00 104,569.20
Kaso 5/7 kelas III m3 0.0140 4,007,800.00 56,109.20
Paku 5 - 12 cm kg 0.0800 20,900.00 1,672.00
JUMLAH HARGA BAHAN 162,350.40
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 196,400.40
E Overhead & Profit 15 % 15.00% 29,460.06
F Harga Satuan Pekerjaan (D+E) - 225,860.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 147/478
JUMLAH HARGA BAHAN 32,852.94
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 41,434.94
E Overhead & Profit 15 % 15.00% 6,215.24
F Harga Satuan Pekerjaan (D+E) - 47,650.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 148/478
A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3750 72,000.00 27,000.00
Tukang Batu L.02.01 OH 0.1250 77,000.00 9,625.00
Kepala Tukang L.03.01 OH 0.0120 105,000.00 1,260.00
Mandor L.04.01 OH 0.0190 120,000.00 2,280.00
JUMLAH TENAGA KERJA 40,165.00
B BAHAN - -
Panel Beton Pracetak Lbr 0.9860 152,470.00 150,335.42
Kolom Benton Pracetak Batang 0.5250 397,290.00 208,577.25
Semen portland Kg 45.0000 1,264.00 56,880.00
Pasir beton m3 0.0740 270,100.00 19,987.40
Koral beton m3 0.1460 271,000.00 39,566.00
JUMLAH HARGA BAHAN 475,346.07
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 515,511.07
E Overhead & Profit 15 % 15.00% 77,326.66
F Harga Satuan Pekerjaan (D+E) - 592,837.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 149/478
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 75,840.00
E Overhead & Profit 15 % 15.00% 11,376.00
F Harga Satuan Pekerjaan (D+E) - 87,216.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 150/478
A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 1.5000 72,000.00 108,000.00
Mandor L.04.01 OH 0.0600 120,000.00 7,200.00
JUMLAH TENAGA KERJA 115,200.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 115,200.00
E Overhead & Profit 15 % 15.00% 17,280.00
F Harga Satuan Pekerjaan (D+E) - 132,480.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 151/478
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.5000 72,000.00 36,000.00
Mandor L.04.01 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 42,000.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 42,000.00
E Overhead & Profit 15 % 15.00% 6,300.00
F Harga Satuan Pekerjaan (D+E) - 48,300.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 152/478
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Mandor L.04.01 OH 0.0100 120,000.00 1,200.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN - -
Pasir urug M3 1.2000 180,349.00 216,418.80
JUMLAH HARGA BAHAN 216,418.80
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 239,218.80
E Overhead & Profit 15 % 15.00% 35,882.82
F Harga Satuan Pekerjaan (D+E) - 275,101.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 153/478
JUMLAH TENAGA KERJA 196,875.00
B BAHAN - -
Batu belah m3 1.2000 265,700.00 318,840.00
Semen portland Kg 202.0000 1,264.00 255,328.00
Pasir Pasang m3 0.4850 230,900.00 111,986.50
JUMLAH HARGA BAHAN 686,154.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 883,029.50
E Overhead & Profit 15 % 15.00% 132,454.43
F Harga Satuan Pekerjaan (D+E) - 1,015,483.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 154/478
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 72,000.00 108,000.00
Tukang Batu L.02.03 OH 0.7500 96,000.00 72,000.00
Kepala Tukang L.03.01 OH 0.0750 105,000.00 7,875.00
Mandor L.04.01 OH 0.0750 120,000.00 9,000.00
JUMLAH TENAGA KERJA 196,875.00
B BAHAN - -
Batu belah m3 1.2000 265,700.00 318,840.00
Semen portland Kg 163.0000 1,264.00 206,032.00
Pasir Pasang m3 0.5200 230,900.00 120,068.00
JUMLAH HARGA BAHAN 644,940.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 841,815.00
E Overhead & Profit 15 % 15.00% 126,272.25
F Harga Satuan Pekerjaan (D+E) - 968,087.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 155/478
E Overhead & Profit 15 % 15.00% 114,837.69
F Harga Satuan Pekerjaan (D+E) - 880,422.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 156/478
A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.5000 72,000.00 108,000.00
Tukang Batu L.02.03 OH 0.7500 96,000.00 72,000.00
Kepala Tukang L.03.01 OH 0.0750 105,000.00 7,875.00
Mandor L.04.01 OH 0.0750 120,000.00 9,000.00
JUMLAH TENAGA KERJA 196,875.00
B BAHAN
Batu belah m3 1.2000 265,700.00 318,840.00
Kapur m3 0.1700 117,619.00 19,995.23
Semen portland Kg 0.1700 1,264.00 214.88
Pasir Pasang m3 0.3400 230,900.00 78,506.00
JUMLAH HARGA BAHAN 417,556.11
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 614,431.11
E Overhead & Profit 15 % 15.00% 92,164.67
F Harga Satuan Pekerjaan (D+E) - 706,595.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 157/478
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 499,125.77
E Overhead & Profit 15 % 15.00% 74,868.87
F Harga Satuan Pekerjaan (D+E) - 573,994.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 158/478
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 72,000.00 244,800.00
Tukang Batu L.02.03 OH 0.8500 96,000.00 81,600.00
Kepala Tukang L.03.01 OH 0.0850 105,000.00 8,925.00
Mandor L.04.01 OH 0.1700 120,000.00 20,400.00
JUMLAH TENAGA KERJA 355,725.00
B BAHAN
Batu belah m3 0.4800 265,700.00 127,536.00
Semen portland Kg 194.0000 1,264.00 245,216.00
Pasir Beton m3 0.3120 270,100.00 84,271.20
Kerikil m3 0.4680 271,000.00 126,828.00
Besi beton (polos/ulir) Kg 126.0000 12,600.00 1,587,600.00
Kawat beton Kg 1.8000 28,800.00 51,840.00
JUMLAH HARGA BAHAN 2,223,291.20
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,579,016.20
E Overhead & Profit 15 % 15.00% 386,852.43
F Harga Satuan Pekerjaan (D+E) - 2,965,868.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 159/478
Pasir Beton (kg) kg 828.0000 225.08 186,369.00
Kerikil (Maks 30 mm) kg 1012.0000 150.56 152,362.22
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 689,766.72
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 847,866.72
E Overhead & Profit 15 % 15.00% 127,180.01
F Harga Satuan Pekerjaan (D+E) - 975,046.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 160/478
A.4.1.1.3 Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 72,000.00 118,800.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Kepala Tukang L.03.01 OH 0.0280 105,000.00 2,940.00
Mandor L.04.01 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 158,100.00
B BAHAN
Semen portland kg 299.0000 1,264.00 377,936.00
Pasir Beton (kg) kg 799.0000 225.08 179,841.58
Kerikil (Maks 30 mm) kg 1017.0000 150.56 153,115.00
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 713,064.08
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 871,164.08
E Overhead & Profit 15 % 15.00% 130,674.61
F Harga Satuan Pekerjaan (D+E) - 1,001,838.00
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 72,000.00 86,400.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0600 120,000.00 7,200.00
JUMLAH TENAGA KERJA 114,900.00
B BAHAN
Semen portland kg 230.0000 1,264.00 290,720.00
Pasir Beton (kg) kg 893.0000 225.08 200,999.42
Kerikil (Maks 30 mm) kg 1027.0000 150.56 154,620.56
Air Liter 200.0000 10.10 2,020.00
JUMLAH HARGA BAHAN 648,359.97
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 763,259.97
E Overhead & Profit 15 % 15.00% 114,489.00
F Harga Satuan Pekerjaan (D+E) - 877,748.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 72,000.00 118,800.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Kepala Tukang L.03.01 OH 0.0280 105,000.00 2,940.00
Mandor L.04.01 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 158,100.00
B BAHAN
Semen portland kg 326.0000 1,264.00 412,064.00
Pasir Beton (kg) kg 760.0000 225.08 171,063.33
Kerikil (Maks 30 mm) kg 1029.0000 150.56 154,921.67
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 740,220.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 898,320.50
E Overhead & Profit 15 % 15.00% 134,748.08
F Harga Satuan Pekerjaan (D+E) - 1,033,068.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 72,000.00 118,800.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Kepala Tukang L.03.01 OH 0.0280 105,000.00 2,940.00
Mandor L.04.01 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 158,100.00
B BAHAN
Semen portland kg 352.0000 1,264.00 444,928.00
Pasir Beton (kg) kg 731.0000 225.08 164,535.92
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 161/478
Kerikil (Maks 30 mm) kg 1031.0000 150.56 155,222.78
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 766,858.19
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 924,958.19
E Overhead & Profit 15 % 15.00% 138,743.73
F Harga Satuan Pekerjaan (D+E) - 1,063,701.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 162/478
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 72,000.00 118,800.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Kepala Tukang L.03.01 OH 0.0280 105,000.00 2,940.00
Mandor L.04.01 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 158,100.00
B BAHAN
Semen portland kg 371.0000 1,264.00 468,944.00
Pasir Beton (kg) kg 698.0000 225.08 157,108.17
Kerikil (Maks 30 mm) kg 1047.0000 150.56 157,631.67
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 785,855.33
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 943,955.33
E Overhead & Profit 15 % 15.00% 141,593.30
F Harga Satuan Pekerjaan (D+E) - 1,085,548.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 72,000.00 118,800.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Kepala Tukang L.03.01 OH 0.0280 105,000.00 2,940.00
Mandor L.04.01 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 158,100.00
B BAHAN
Semen portland kg 384.0000 1,264.00 485,376.00
Pasir Beton (kg) kg 692.0000 225.08 155,757.67
Kerikil (Maks 30 mm) kg 1039.0000 150.56 156,427.22
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 799,732.39
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 957,832.39
E Overhead & Profit 15 % 15.00% 143,674.86
F Harga Satuan Pekerjaan (D+E) - 1,101,507.00
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 72,000.00 118,800.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Kepala Tukang L.03.01 OH 0.0280 105,000.00 2,940.00
Mandor L.04.01 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 158,100.00
B BAHAN
Semen portland kg 406.0000 1,264.00 513,184.00
Pasir Beton (kg) kg 684.0000 225.08 153,957.00
Kerikil (Maks 30 mm) kg 1026.0000 150.56 154,470.00
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 823,782.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 981,882.50
E Overhead & Profit 15 % 15.00% 147,282.38
F Harga Satuan Pekerjaan (D+E) - 1,129,164.00
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 72,000.00 118,800.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Kepala Tukang L.03.01 OH 0.0280 105,000.00 2,940.00
Mandor L.04.01 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 158,100.00
B BAHAN
Semen portland kg 413.0000 1,264.00 522,032.00
Pasir Beton (kg) kg 681.0000 225.08 153,281.75
Kerikil (Maks 30 mm) kg 1021.0000 150.56 153,717.22
Air Liter 215.0000 10.10 2,171.50
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 163/478
JUMLAH HARGA BAHAN 831,202.47
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 989,302.47
E Overhead & Profit 15 % 15.00% 148,395.37
F Harga Satuan Pekerjaan (D+E) - 1,137,697.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 164/478
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 72,000.00 151,200.00
Tukang Batu L.02.03 OH 0.3500 96,000.00 33,600.00
Kepala Tukang L.03.01 OH 0.0350 105,000.00 3,675.00
Mandor L.04.01 OH 0.1050 120,000.00 12,600.00
JUMLAH TENAGA KERJA 201,075.00
B BAHAN
Semen portland kg 439.0000 1,264.00 554,896.00
Pasir Beton (kg) kg 670.0000 225.08 150,805.83
Kerikil (Maks 30 mm) kg 1006.0000 150.56 151,458.89
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 859,332.22
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,060,407.22
E Overhead & Profit 15 % 15.00% 159,061.08
F Harga Satuan Pekerjaan (D+E) - 1,219,468.00
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 72,000.00 151,200.00
Tukang Batu L.02.03 OH 0.3500 96,000.00 33,600.00
Kepala Tukang L.03.01 OH 0.0350 105,000.00 3,675.00
Mandor L.04.01 OH 0.1050 120,000.00 12,600.00
JUMLAH TENAGA KERJA 201,075.00
B BAHAN
Semen portland kg 448.0000 1,264.00 566,272.00
Pasir Beton (kg) kg 667.0000 225.08 150,130.58
Kerikil (Maks 30 mm) kg 1000.0000 150.56 150,555.56
Air Liter 215.0000 10.10 2,171.50
JUMLAH HARGA BAHAN 869,129.64
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,070,204.64
E Overhead & Profit 15 % 15.00% 160,530.70
F Harga Satuan Pekerjaan (D+E) - 1,230,735.00
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 165/478
Semen portland kg 400.0000 1,264.00 505,600.00
Pasir Beton m3 0.4800 270,100.00 129,648.00
Kerikil m3 0.8000 271,000.00 216,800.00
Strorox - 100 kg 1.2000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 166/478
A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0600 72,000.00 4,320.00
Tukang Pipa L.02.13 OH 0.0300 77,000.00 2,310.00
Kepala Tukang L.03.01 OH 0.0030 105,000.00 315.00
Mandor L.04.01 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 7,305.00
B BAHAN
Waterstop lebar 150 mm m 1.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 168/478
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0250 72,000.00 1,800.00
Tukang Besi L.02.05 OH 0.0250 96,000.00 2,400.00
Kepala Tukang L.03.01 OH 0.0250 105,000.00 2,625.00
Mandor L.04.01 OH 0.0010 120,000.00 120.00
JUMLAH TENAGA KERJA 6,945.00
B BAHAN
Jaring kawat baja dilas kg 10.2000 28,800.00 293,760.00
Kawat beton kg 0.0500 28,800.00 1,440.00
JUMLAH HARGA BAHAN 295,200.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 302,145.00
E Overhead & Profit 15 % 15.00% 45,321.75
F Harga Satuan Pekerjaan (D+E) - 347,466.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 169/478
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 170/478
A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6600 72,000.00 47,520.00
Tukang Kayu L.02.04 OH 0.3300 103,000.00 33,990.00
Kepala Tukang L.03.01 OH 0.0330 105,000.00 3,465.00
Mandor L.04.01 OH 0.0330 120,000.00 3,960.00
JUMLAH TENAGA KERJA 88,935.00
B BAHAN
Kayu kelas III m3 0.0400 2,355,000.00 94,200.00
Paku 5 - 12 cm kg 0.4000 17,400.00 6,960.00
Minyak bekisting Liter 0.2000 #N/A #N/A
Balok kayu kelas II m3 0.0180 4,508,700.00 81,156.60
Plywood 9 mm Lbr 0.3500 96,700.00 33,845.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 60,100.00 120,200.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 171/478
Mandor L.04.01 OH 0.0330 120,000.00 3,960.00
JUMLAH TENAGA KERJA 88,935.00
B BAHAN
Kayu kelas III m3 0.0300 2,355,000.00 70,650.00
Paku 5 - 12 cm kg 0.4000 17,400.00 6,960.00
Minyak bekisting Liter 0.1500 #N/A #N/A
Balok kayu kelas II m3 0.0150 4,508,700.00 67,630.50
Plywood 9 mm Lbr 0.3500 96,700.00 33,845.00
Dolken kayu Ø 8-10/400 cm Batang 2.0000 60,100.00 120,200.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 172/478
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 72,000.00 10,800.00
Tukang Kayu L.02.04 OH 0.0500 103,000.00 5,150.00
Kepala Tukang L.03.01 OH 0.0050 105,000.00 525.00
Mandor L.04.01 OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 17,435.00
B BAHAN
Kayu kelas III (papan) m3 0.0264 2,904,700.00 76,684.08
Paku 5 - 12 cm kg 0.6000 17,400.00 10,440.00
Dolken kayu Ø 8-10/400 cm Batang 0.5000 60,100.00 30,050.00
JUMLAH HARGA BAHAN 117,174.08
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 134,609.08
E Overhead & Profit 15 % 15.00% 20,191.36
F Harga Satuan Pekerjaan (D+E) - 154,800.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 173/478
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0500 72,000.00 507,600.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Tukang Kayu L.02.04 OH 1.6500 103,000.00 169,950.00
Tukang Besi L.02.05 OH 2.1000 96,000.00 201,600.00
Kepala Tukang L.03.01 OH 0.4030 105,000.00 42,315.00
Mandor L.04.01 OH 0.3530 120,000.00 42,360.00
JUMLAH TENAGA KERJA 990,225.00
B BAHAN
Kayu kelas III m3 0.4000 2,355,000.00 942,000.00
Paku 5 - 12 cm kg 4.0000 17,400.00 69,600.00
Minyak bekisting Liter 2.0000 #N/A #N/A
Besi beton (polos/ulir) kg 315.0000 42,700.00 13,450,500.00
Kawat beton kg 4.5000 28,800.00 129,600.00
Semen portland kg 336.0000 1,264.00 424,704.00
Pasir Beton m3 0.5400 270,100.00 145,854.00
Kerikil m3 0.8100 271,000.00 219,510.00
Kayu kelas II balok M3 0.1500 4,508,700.00 676,305.00
Plywood 9 mm Lbr 3.5000 96,700.00 338,450.00
Dolken kayu Ø 8-10/400 cm Batang 20.0000 60,100.00 1,202,000.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 175/478
A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5300 72,000.00 38,160.00
Tukang Batu L.02.03 OH 0.2750 96,000.00 26,400.00
Tukang Kayu L.02.04 OH 1.3000 103,000.00 133,900.00
Tukang Besi L.02.05 OH 1.0500 96,000.00 100,800.00
Kepala Tukang L.03.01 OH 0.2620 105,000.00 27,510.00
Mandor L.04.01 OH 0.2650 120,000.00 31,800.00
JUMLAH TENAGA KERJA 358,570.00
B BAHAN
Kayu kelas III m3 0.2400 2,355,000.00 565,200.00
Paku 5 - 12 cm kg 3.2000 17,400.00 55,680.00
Minyak bekisting Liter 1.6000 #N/A #N/A
Besi beton (polos/ulir) kg 157.5000 42,700.00 6,725,250.00
Kawat beton kg 2.2500 28,800.00 64,800.00
Semen portland kg 336.0000 1,264.00 424,704.00
Pasir Beton m3 0.5400 270,100.00 145,854.00
Kerikil m3 0.8100 271,000.00 219,510.00
Kayu kelas II balok m3 0.1600 4,508,700.00 721,392.00
Plywood 9 mm Lembar 2.8000 96,700.00 270,760.00
Dolken kayu Ø 8-10/400 cm Batang 24.0000 60,100.00 1,442,400.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 177/478
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2970 72,000.00 21,384.00
Tukang Batu L.02.03 OH 0.0330 96,000.00 3,168.00
Tukang Kayu L.02.04 OH 0.0330 103,000.00 3,399.00
Tukang Besi L.02.05 OH 0.0330 96,000.00 3,168.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 33,969.00
B BAHAN
Kayu kelas III m3 0.0030 2,355,000.00 7,065.00
Paku 5 - 12 cm kg 0.0200 17,400.00 348.00
Minyak bekisting Liter 1.2000 #N/A #N/A
Besi beton (polos/ulir) kg 3.6000 42,700.00 153,720.00
Kawat beton kg 0.0500 28,800.00 1,440.00
Semen portland kg 5.5000 1,264.00 6,952.00
Pasir Beton m3 0.0090 270,100.00 2,430.90
Kerikil m3 0.0150 271,000.00 4,065.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1650 72,000.00 11,880.00
Tukang Batu L.02.03 OH 0.0280 96,000.00 2,688.00
Kepala Tukang L.03.01 OH 0.0030 105,000.00 315.00
Mandor L.04.01 OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 15,843.00
B BAHAN
Semen portland Kg 32.6000 1,264.00 41,206.40
Pasir beton (kg) Kg 76.0000 225.08 17,106.33
Kerikil (Maks 30 mm) Kg 102.9000 150.56 15,492.17
Air L 21.5000 10.10 217.15
JUMLAH HARGA BAHAN 74,022.05
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 89,865.05
E Overhead & Profit 15 % 15.00% 13,479.76
F Harga Satuan Pekerjaan (D+E) - 103,344.00
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1980 72,000.00 14,256.00
Tukang Batu L.02.03 OH 0.0330 96,000.00 3,168.00
Kepala Tukang L.03.01 OH 0.0030 105,000.00 315.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 178/478
Mandor L.04.01 OH 0.0100 120,000.00 1,200.00
JUMLAH TENAGA KERJA 18,939.00
B BAHAN
Semen portland Kg 39.1200 1,264.00 49,447.68
Pasir beton (kg) Kg 91.2000 225.08 20,527.60
Kerikil (Maks 30 mm) Kg 123.4800 150.56 18,590.60
Air L 25.8000 10.10 260.58
JUMLAH HARGA BAHAN 88,826.46
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 107,765.46
E Overhead & Profit 15 % 15.00% 16,164.82
F Harga Satuan Pekerjaan (D+E) - 123,930.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 179/478
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2480 72,000.00 17,856.00
Tukang Batu L.02.03 OH 0.0410 96,000.00 3,936.00
Kepala Tukang L.03.01 OH 0.0040 105,000.00 420.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 23,772.00
B BAHAN
Semen portland Kg 48.9000 1,264.00 61,809.60
Pasir beton (kg) Kg 114.0000 225.08 25,659.50
Kerikil (Maks 30 mm) Kg 154.3500 150.56 23,238.25
Air L 32.2500 10.10 325.73
JUMLAH HARGA BAHAN 111,033.08
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 134,805.08
E Overhead & Profit 15 % 15.00% 20,220.76
F Harga Satuan Pekerjaan (D+E) - 155,025.00
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 72,000.00 288.00
Tukang Batu L.02.03 OH 0.0380 96,000.00 3,648.00
Kepala Tukang L.03.01 OH 0.0040 105,000.00 420.00
Mandor L.04.01 OH 0.0010 120,000.00 120.00
JUMLAH TENAGA KERJA 4,476.00
B BAHAN
Kayu kaso 5/7 m3 0.0050 4,007,800.00 20,039.00
Phenol film 12mm Lbr 0.0430 292,100.00 12,560.30
Minyak bekisting L 0.2000 #N/A #N/A
Dynabol dia 12 x 120 mm Bh 0.6930 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 72,000.00 288.00
Tukang Batu L.02.03 OH 0.0380 96,000.00 3,648.00
Kepala Tukang L.03.01 OH 0.0040 105,000.00 420.00
Mandor L.04.01 OH 0.0010 120,000.00 120.00
JUMLAH TENAGA KERJA 4,476.00
B BAHAN
Kayu kaso 5/7 m3 0.0040 4,007,800.00 16,031.20
Phenol film 12mm Lbr 0.0480 292,100.00 14,020.80
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 180/478
Minyak bekisting L 0.2000 #N/A #N/A
Paku 5 - 12 cm Kg 0.0460 20,900.00 961.40
Dynabol dia 12 x 120 mm Bh 0.6930 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 181/478
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0530 72,000.00 3,816.00
Tukang Kayu L.02.04 OH 0.0180 103,000.00 1,854.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 6,270.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 6,270.00
E Overhead & Profit 15 % 15.00% 940.50
F Harga Satuan Pekerjaan (D+E) - 7,210.00
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0890 72,000.00 6,408.00
Tukang Kayu L.02.04 OH 0.0300 103,000.00 3,090.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 10,098.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10,098.00
E Overhead & Profit 15 % 15.00% 1,514.70
F Harga Satuan Pekerjaan (D+E) - 11,612.00
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0710 72,000.00 5,112.00
Tukang Kayu L.02.04 OH 0.0240 103,000.00 2,472.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 8,184.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8,184.00
E Overhead & Profit 15 % 15.00% 1,227.60
F Harga Satuan Pekerjaan (D+E) - 9,411.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 182/478
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 51,471.00
E Overhead & Profit 15 % 15.00% 7,720.65
F Harga Satuan Pekerjaan (D+E) - 59,191.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 183/478
A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0610 72,000.00 4,392.00
Tukang Batu L.02.03 OH 0.2130 96,000.00 20,448.00
Tukang vibrator L.02.14 OH 0.1220 77,000.00 9,394.00
Kepala Tukang L.03.01 OH 0.0330 105,000.00 3,465.00
Mandor L.04.01 OH 0.0730 120,000.00 8,760.00
JUMLAH TENAGA KERJA 46,459.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 46,459.00
E Overhead & Profit 15 % 15.00% 6,968.85
F Harga Satuan Pekerjaan (D+E) - 53,427.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 184/478
A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Operator crane L.10.01 OH 0.061 113,000.00 6,893.00
Pembantu operator crane L.10.02 OH 0.061 100,000.00 6,100.00
Pekerja L.01.01 OH 0.061 72,000.00 4,392.00
Tukang Batu L.02.03 OH 0.061 96,000.00 5,856.00
Tukang ereksi L.02.09 OH 0.122 79,000.00 9,638.00
Kepala Tukang L.03.01 OH 0.061 105,000.00 6,405.00
Mandor L.04.01 OH 0.061 120,000.00 7,320.00
JUMLAH TENAGA KERJA 46,604.00
B BAHAN
Solar L 6.11 5,150.00 31,466.50
JUMLAH HARGA BAHAN 31,466.50
C PERALATAN
Sewa crane unit hari 0.061 #N/A #N/A
Sewa pipe support Buah hari 1.1 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 185/478
A.4.1.2.16. Ereksi 1 buah komponen untuk Kolom pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Operator crane L.10.01 OH 0.083 113,000.00 9,379.00
Pembantu operator crane L.10.02 OH 0.083 100,000.00 8,300.00
Pekerja L.01.01 OH 0.083 72,000.00 5,976.00
Tukang Batu L.02.03 OH 0.083 96,000.00 7,968.00
Tukang ereksi L.02.09 OH 0.166 79,000.00 13,114.00
Kepala Tukang L.03.01 OH 0.083 105,000.00 8,715.00
Mandor L.04.01 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 63,412.00
B BAHAN
Solar L 8.277 5,150.00 42,626.55
JUMLAH HARGA BAHAN 42,626.55
C PERALATAN
Sewa crane unit hari 0.083 #N/A #N/A
Sewa pipe support Buah hari 2.2 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 186/478
A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0190 72,000.00 1,368.00
Tukang Batu L.02.03 OH 0.0380 96,000.00 3,648.00
Operator crane L.10.01 OH 0.0190 113,000.00 2,147.00
Pembantu operator crane L.10.02 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 9,063.00
B BAHAN
Solar L 1.8970 5,150.00 9,769.55
JUMLAH HARGA BAHAN 9,769.55
C PERALATAN
Sewa crane UH 0.0190 590,300.00 11,215.70
JUMLAH HARGA ALAT 11,215.70
D Jumlah (A+B+C) - 30,048.25
E Overhead & Profit 15 % 15.00% 4,507.24
F Harga Satuan Pekerjaan (D+E) - 34,555.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 187/478
JUMLAH TENAGA KERJA -
B BAHAN - -
Semen grout Kg 1850.0000 3,895.00 7,205,750.00
Air L 400.0000 10.10 4,040.00
JUMLAH HARGA BAHAN 7,209,790.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,209,790.00
E Overhead & Profit 15 % 15.00% 1,081,468.50
F Harga Satuan Pekerjaan (D+E) - 8,291,258.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 188/478
A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Tukang Batu L.02.03 OH 0.3670 96,000.00 35,232.00
Kepala Tukang L.03.01 OH 0.0740 105,000.00 7,770.00
Mandor L.04.01 OH 0.0370 120,000.00 4,440.00
JUMLAH TENAGA KERJA 47,442.00
B BAHAN - -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 47,442.00
E Overhead & Profit 15 % 15.00% 7,116.30
F Harga Satuan Pekerjaan (D+E) - 54,558.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 190/478
A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 72,000.00 7,200.00
Tukang Besi Konstruksi L.02.06 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0010 105,000.00 105.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 17,505.00
B BAHAN
Solar Liter 1.0000 #N/A #N/A
Minyak pelumas Liter 0.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Sewa alat Perakitan Baja IWF Jam 0.8000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0500 72,000.00 75,600.00
Tukang Las L.02.11 OH 1.0500 103,000.00 108,150.00
Kepala Tukang L.03.01 OH 0.1050 105,000.00 11,025.00
Mandor L.04.01 OH 0.0520 120,000.00 6,240.00
JUMLAH TENAGA KERJA 201,015.00
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 #N/A #N/A
Besi plat baja Kg 32.8000 #N/A #N/A
Kawat las Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 191/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 192/478
A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 72,000.00 86,400.00
Tukang Las L.02.11 OH 1.2000 103,000.00 123,600.00
Kepala Tukang L.03.01 OH 0.1200 105,000.00 12,600.00
Mandor L.04.01 OH 0.0060 120,000.00 720.00
JUMLAH TENAGA KERJA 223,320.00
B BAHAN
Pintu gulung besi m2 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 194/478
A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0850 72,000.00 6,120.00
Tukang Alumunium L.02.02 OH 0.0850 101,000.00 8,585.00
Kepala Tukang L.03.01 OH 0.0085 105,000.00 892.50
Mandor L.04.01 OH 0.0042 120,000.00 504.00
JUMLAH TENAGA KERJA 16,101.50
B BAHAN
Profil alluminium m 4.4000 #N/A #N/A
Aluminium strip m 14.6000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 196/478
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 72,000.00 14,400.00
Tukang Kayu L.02.01 OH 0.2000 77,000.00 15,400.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0010 120,000.00 120.00
JUMLAH TENAGA KERJA 32,020.00
B BAHAN
Jendela nako (rangka + kaca 5 mm) m2 1.1000 #N/A #N/A
Paku skrup (buah) buah 10.0000 #N/A #N/A
Besi strip (Tralis) (m') m 7.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 72,000.00 10,800.00
Tukang Kayu L.02.01 OH 0.3000 77,000.00 23,100.00
Kepala Tukang L.03.01 OH 0.0300 105,000.00 3,150.00
Mandor L.04.01 OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 38,010.00
B BAHAN
Seng plat m 1.0500 #N/A #N/A
Paku 5 - 12 cm kg 0.0100 #N/A #N/A
Besi strip (Tralis) (kg) kg 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 72,000.00 18,000.00
Tukang Besi L.02.05 OH 0.2500 96,000.00 24,000.00
Kepala Tukang L.03.01 OH 0.0250 105,000.00 2,625.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 46,185.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 #N/A #N/A
Assesoris (perkuatan, las dll) Ls 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 197/478
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 198/478
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 72,000.00 25,200.00
Tukang Besi L.02.05 OH 0.3500 96,000.00 33,600.00
Kepala Tukang L.03.01 OH 0.0350 105,000.00 3,675.00
Mandor L.04.01 OH 0.0180 120,000.00 2,160.00
JUMLAH TENAGA KERJA 64,635.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 #N/A #N/A
Assesoris (perkuatan, las dll) Ls 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 72,000.00 52,848.00
Tukang Besi L.02.05 OH 0.7340 96,000.00 70,464.00
Kepala Tukang L.03.01 OH 0.0730 105,000.00 7,665.00
Mandor L.04.01 OH 0.0370 120,000.00 4,440.00
JUMLAH TENAGA KERJA 135,417.00
B BAHAN
Baja ringan canai dingin C75 (kg) kg 3.0650 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
Alat Rangka Atap Baja Canai Dingin 0.1000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 72,000.00 54,748.80
Tukang Besi L.02.05 OH 0.7604 96,000.00 72,998.40
Kepala Tukang L.03.01 OH 0.0760 105,000.00 7,980.00
Mandor L.04.01 OH 0.0380 120,000.00 4,560.00
JUMLAH TENAGA KERJA 140,287.20
B BAHAN
Baja ringan canai dingin C75 (kg) kg 4.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 72,000.00 14,400.00
Tukang Besi L.02.05 OH 0.4500 96,000.00 43,200.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 64,650.00
B BAHAN
Baja ringan canai dingin C75 (m') M' 3.7200 #N/A #N/A
Baut (Screw driver) bh 28.0000 #N/A #N/A
Dynabol dia 12 x 120 mm bh 2.0000 #N/A #N/A
Reng Canai Dingin M' 5.4000 #N/A #N/A
Talang / Jurai Canai Dingin M' 0.1240 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 199/478
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 200/478
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 72,000.00 43,200.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 68,100.00
B BAHAN
Bata merah Buah 140.0000 #N/A #N/A
Semen portland Kg 43.5000 #N/A #N/A
Pasir Pasang m3 0.0800 230,900.00 18,472.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 72,000.00 43,200.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 68,100.00
B BAHAN
Bata merah Buah 140.0000 #N/A #N/A
Semen portland Kg 32.9500 #N/A #N/A
Pasir Pasang m3 0.0910 230,900.00 21,011.90
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 72,000.00 43,200.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 68,100.00
B BAHAN
Bata merah Buah 140.0000 #N/A #N/A
Semen portland Kg 26.5500 #N/A #N/A
Pasir Pasang m3 0.0930 230,900.00 21,473.70
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 72,000.00 43,200.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 68,100.00
B BAHAN
Bata merah Buah 140.0000 #N/A #N/A
Semen portland Kg 22.2000 #N/A #N/A
Pasir Pasang m3 0.1020 230,900.00 23,551.80
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 201/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 202/478
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 72,000.00 43,200.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 68,100.00
B BAHAN
Bata merah Buah 140.0000 #N/A #N/A
Semen portland Kg 18.5000 #N/A #N/A
Pasir Pasang m3 0.1220 230,900.00 28,169.80
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 72,000.00 43,200.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 68,100.00
B BAHAN
Bata merah m3 140.0000 #N/A #N/A
Semen portland Kg 10.0800 #N/A #N/A
Kapur m3 0.0275 #N/A #N/A
Pasir Pasang m3 0.0925 230,900.00 21,358.25
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen portland Kg 18.9500 #N/A #N/A
Pasir Pasang m3 0.0380 230,900.00 8,774.20
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen portland Kg 14.3700 #N/A #N/A
Pasir Pasang m3 0.0400 230,900.00 9,236.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 203/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 204/478
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen portland Kg 11.5000 #N/A #N/A
Pasir Pasang m3 0.0430 230,900.00 9,928.70
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen portland Kg 9.6800 #N/A #N/A
Pasir Pasang m3 0.0450 230,900.00 10,390.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen portland Kg 8.3200 #N/A #N/A
Pasir Pasang m3 0.0490 230,900.00 11,314.10
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen portland Kg 6.5000 #N/A #N/A
Pasir Pasang m3 0.0500 230,900.00 11,545.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 205/478
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 206/478
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen portland Kg 4.5000 #N/A #N/A
Kapur m3 0.0150 #N/A #N/A
Pasir Pasang m3 0.0500 230,900.00 11,545.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen Merah Kg 0.0180 #N/A #N/A
Kapur m3 0.0180 #N/A #N/A
Pasir Pasang m3 0.0180 230,900.00 4,156.20
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata merah Buah 70.0000 #N/A #N/A
Semen Merah Kg 0.0140 #N/A #N/A
Kapur m3 0.0140 #N/A #N/A
Pasir Pasang m3 0.0280 230,900.00 6,465.20
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 207/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 208/478
A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP:4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 72,000.00 25,200.00
Tukang Batu L.02.03 OH 0.1500 96,000.00 14,400.00
Kepala Tukang L.03.01 OH 0.0150 105,000.00 1,575.00
Mandor L.04.01 OH 0.0180 120,000.00 2,160.00
JUMLAH TENAGA KERJA 43,335.00
B BAHAN
HB-20 m3 0.1250 #N/A #N/A
Semen portland Kg 24.2600 #N/A #N/A
Pasir Pasang m3 0.7720 230,900.00 178,254.80
Besi angker dia 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 209/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 210/478
A.4.4.1.21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
HB-10 m3 0.0125 #N/A #N/A
Semen portland Kg 12.1300 #N/A #N/A
Pasir Pasang m3 0.3880 230,900.00 89,589.20
Besi angker dia 8 Kg 0.2800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata rooster m3 0.0300 #N/A #N/A
Semen portland Kg 11.0000 #N/A #N/A
Pasir Pasang m3 0.0350 230,900.00 8,081.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 34,050.00
B BAHAN
Bata berongga m3 0.0300 #N/A #N/A
Semen portland Kg 11.0000 #N/A #N/A
Pasir Pasang m3 0.0350 230,900.00 8,081.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 211/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 212/478
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.670 72,000.00 48,240.00
Tukang Batu L.02.03 OH 1.300 96,000.00 124,800.00
Kepala Tukang L.03.01 OH 0.130 105,000.00 13,650.00
Mandor L.04.01 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 187,050.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.084 #N/A #N/A
Mortar siap pakai Kg 0.473 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.671 72,000.00 48,312.00
Tukang Batu L.02.03 OH 1.300 96,000.00 124,800.00
Kepala Tukang L.03.01 OH 0.130 105,000.00 13,650.00
Mandor L.04.01 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 187,122.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.084 #N/A #N/A
Mortar siap pakai Kg 0.063 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 213/478
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 214/478
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1500 96,000.00 14,400.00
Kepala Tukang L.03.01 OH 0.0150 105,000.00 1,575.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 39,375.00
B BAHAN
Semen portland Kg 7.7760 #N/A #N/A
Pasir Pasang m3 0.0230 230,900.00 5,310.70
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 216/478
A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1500 96,000.00 14,400.00
Kepala Tukang L.03.01 OH 0.0150 105,000.00 1,575.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 39,375.00
B BAHAN
Semen portland Kg 3.4560 #N/A #N/A
Pasir Pasang m3 0.0290 230,900.00 6,696.10
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 217/478
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 218/478
A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3600 72,000.00 25,920.00
Tukang Batu L.02.03 OH 0.1200 96,000.00 11,520.00
Kepala Tukang L.03.01 OH 0.0120 105,000.00 1,260.00
Mandor L.04.01 OH 0.0180 120,000.00 2,160.00
JUMLAH TENAGA KERJA 40,860.00
B BAHAN
Semen portland (m3) m3 0.0070 #N/A #N/A
Kapur Pasang m3 0.0070 #N/A #N/A
Pasir Pasang m3 0.0150 230,900.00 3,463.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 219/478
A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 72,000.00 18,720.00
Tukang Batu L.02.03 OH 0.2000 96,000.00 19,200.00
Kepala Tukang L.03.01 OH 0.0200 105,000.00 2,100.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 41,580.00
B BAHAN
Semen portland Kg 10.3680 #N/A #N/A
Pasir Pasang m3 0.0310 230,900.00 7,157.90
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 221/478
A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 72,000.00 10,800.00
Tukang Batu L.02.03 OH 0.0750 96,000.00 7,200.00
Kepala Tukang L.03.01 OH 0.0080 105,000.00 840.00
Mandor L.04.01 OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 19,800.00
B BAHAN
Semen portland Kg 5.1840 #N/A #N/A
Pasir Pasang m3 0.0260 230,900.00 6,003.40
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 223/478
A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 72,000.00 10,800.00
Tukang Batu L.02.03 OH 0.0750 96,000.00 7,200.00
Kepala Tukang L.03.01 OH 0.0080 105,000.00 840.00
Mandor L.04.01 OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 19,800.00
B BAHAN
Semen portland Kg 3.1080 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 72,000.00 21,600.00
Tukang Batu L.02.03 OH 0.1500 96,000.00 14,400.00
Kepala Tukang L.03.01 OH 0.0150 105,000.00 1,575.00
Mandor L.04.01 OH 0.0150 120,000.00 1,800.00
JUMLAH TENAGA KERJA 39,375.00
B BAHAN
Semen portland Kg 6.3400 #N/A #N/A
Pasir Pasang m3 0.0120 230,900.00 2,770.80
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 225/478
A.4.4.2.29. Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 72,000.00 14,400.00
Tukang Batu L.02.03 OH 0.1000 96,000.00 9,600.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0100 120,000.00 1,200.00
JUMLAH TENAGA KERJA 26,250.00
B BAHAN
Semen mortar Acian Kg 3.2500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 226/478
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 227/478
A.4.4.3.4. Pemasangan 1m2 lantai ubin warna ukuran 40cm x40 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 72,000.00 18,000.00
Tukang Batu L.02.03 OH 0.1250 96,000.00 12,000.00
Kepala Tukang L.03.01 OH 0.0130 105,000.00 1,365.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 32,925.00
B BAHAN
ubin warna ukuran 40cm x40 cm Bh 6.6300 #N/A #N/A
Semen portland kg 9.8000 #N/A #N/A
Semen Warna Kg 0.6000 15,683.00 9,409.80
Pasir Pasang M3 0.0450 230,900.00 10,390.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 228/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 229/478
A.4.4.3.8. Pemasangan 1m2 lantai ubin teraso ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 72,000.00 18,720.00
Tukang Batu L.02.03 OH 0.1300 96,000.00 12,480.00
Kepala Tukang L.03.01 OH 0.0130 105,000.00 1,365.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 34,125.00
B BAHAN
ubin teraso ukuran 30cm x30cm Bh 11.8700 #N/A #N/A
Semen portland kg 10.0000 #N/A #N/A
Semen Warna Kg 1.5000 15,683.00 23,524.50
Pasir Pasang M3 0.0450 230,900.00 10,390.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 72,000.00 18,000.00
Tukang Batu L.02.03 OH 0.1250 96,000.00 12,000.00
Kepala Tukang L.03.01 OH 0.0130 105,000.00 1,365.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 32,925.00
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 #N/A #N/A
Semen portland kg 9.8000 #N/A #N/A
Semen Warna Kg 1.3000 15,683.00 20,387.90
Pasir Pasang M3 0.0450 230,900.00 10,390.50
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 230/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 231/478
A.4.4.3.12. Pemasangan 1m2 lantai ubin teralux ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 72,000.00 18,720.00
Tukang Batu L.02.03 OH 0.1300 96,000.00 12,480.00
Kepala Tukang L.03.01 OH 0.0130 105,000.00 1,365.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 34,125.00
B BAHAN
ubin teralux ukuran 30cm x30cm Bh 11.8700 #N/A #N/A
Semen portland kg 10.0000 #N/A #N/A
Semen Warna Kg 1.5000 15,683.00 23,524.50
Pasir Pasang M3 0.0450 230,900.00 10,390.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 72,000.00 17,280.00
Tukang Batu L.02.03 OH 0.1200 96,000.00 11,520.00
Kepala Tukang L.03.01 OH 0.0120 105,000.00 1,260.00
Mandor L.04.01 OH 0.0120 120,000.00 1,440.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 #N/A #N/A
Semen portland kg 9.6000 #N/A #N/A
Semen Warna Kg 1.5000 15,683.00 23,524.50
Pasir Pasang M3 0.0450 230,900.00 10,390.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 72,000.00 18,000.00
Tukang Batu L.02.03 OH 0.1250 96,000.00 12,000.00
Kepala Tukang L.03.01 OH 0.0130 105,000.00 1,365.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 32,925.00
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 #N/A #N/A
Semen portland kg 9.8000 #N/A #N/A
Semen Warna Kg 1.3000 15,683.00 20,387.90
Pasir Pasang M3 0.0450 230,900.00 10,390.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 72,000.00 18,720.00
Tukang Batu L.02.03 OH 0.1300 96,000.00 12,480.00
Kepala Tukang L.03.01 OH 0.0130 105,000.00 1,365.00
Mandor L.04.01 OH 0.0130 120,000.00 1,560.00
JUMLAH TENAGA KERJA 34,125.00
B BAHAN
ubin teralux marmer ukuran 30cm x30cm Bh 11.8700 #N/A #N/A
Semen portland kg 10.0000 #N/A #N/A
Semen Warna Kg 1.5000 15,683.00 23,524.50
Pasir Pasang M3 0.0450 230,900.00 10,390.50
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 232/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 233/478
A.4.4.3.16. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 15cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0900 72,000.00 6,480.00
Tukang Batu L.02.03 OH 0.0900 96,000.00 8,640.00
Kepala Tukang L.03.01 OH 0.0090 105,000.00 945.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 16,665.00
B BAHAN
Plint ubin Pc abu-abu ukuran 15cm x 20cm Bh 5.3000 #N/A #N/A
Semen portland kg 1.6500 #N/A #N/A
Pasir Pasang M3 0.0040 230,900.00 923.60
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 234/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 235/478
A.4.4.3.20. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0900 72,000.00 6,480.00
Tukang Batu L.02.03 OH 0.0900 96,000.00 8,640.00
Kepala Tukang L.03.01 OH 0.0090 105,000.00 945.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 16,665.00
B BAHAN
Plint ubin warna ukuran 10cm x 30cm Bh 3.5300 #N/A #N/A
Semen portland kg 1.1400 #N/A #N/A
Semen Warna Kg 0.1000 15,683.00 1,568.30
Pasir Pasang M3 0.0030 230,900.00 692.70
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 236/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 237/478
A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10cm x 40cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0900 72,000.00 6,480.00
Tukang Batu L.02.03 OH 0.0900 96,000.00 8,640.00
Kepala Tukang L.03.01 OH 0.0090 105,000.00 945.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 16,665.00
B BAHAN
Plint ubin granit ukuran 10cm x 40cm Bh 2.6500 #N/A #N/A
Semen portland kg 1.1400 #N/A #N/A
Semen Warna Kg 0.1000 15,683.00 1,568.30
Pasir Pasang M3 0.0030 230,900.00 692.70
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 238/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 239/478
A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 60cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0900 72,000.00 6,480.00
Tukang Batu L.02.03 OH 0.0900 96,000.00 8,640.00
Kepala Tukang L.03.01 OH 0.0090 105,000.00 945.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 16,665.00
B BAHAN
plint ubin teralux marmer ukuran 10cm x 60cm Bh 1.7000 #N/A #N/A
Semen portland kg 1.1400 #N/A #N/A
Semen Warna Kg 0.1000 15,683.00 1,568.30
Pasir Pasang M3 0.0030 230,900.00 692.70
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 240/478
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 241/478
A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 72,000.00 50,400.00
Tukang Batu L.02.03 OH 0.3500 96,000.00 33,600.00
Kepala Tukang L.03.01 OH 0.0350 105,000.00 3,675.00
Mandor L.04.01 OH 0.0350 120,000.00 4,200.00
JUMLAH TENAGA KERJA 91,875.00
B BAHAN
keramik artistik 10cm x 20cm Bh 53.0000 #N/A #N/A
Semen portland Kg 8.1900 #N/A #N/A
Pasir Pasang M3 0.0450 230,900.00 10,390.50
Semen warna Kg 2.7500 15,683.00 43,128.25
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 72,000.00 50,400.00
Tukang Batu L.02.03 OH 0.3500 96,000.00 33,600.00
Kepala Tukang L.03.01 OH 0.0350 105,000.00 3,675.00
Mandor L.04.01 OH 0.0350 120,000.00 4,200.00
JUMLAH TENAGA KERJA 91,875.00
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm Bh 106.0000 #N/A #N/A
Semen portland Kg 8.1900 #N/A #N/A
Pasir Pasang M3 0.0450 230,900.00 10,390.50
Semen Warna Kg 3.2000 15,683.00 50,185.60
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 242/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 243/478
A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 72,000.00 50,400.00
Tukang Batu L.02.03 OH 0.3500 96,000.00 33,600.00
Kepala Tukang L.03.01 OH 0.0350 105,000.00 3,675.00
Mandor L.04.01 OH 0.0350 120,000.00 4,200.00
JUMLAH TENAGA KERJA 91,875.00
B BAHAN
Keramik Lantai uk. 20cm x 20cm (polos) Bh 26.5000 #N/A #N/A
Semen portland Kg 10.4000 #N/A #N/A
Pasir Pasang M3 0.0450 230,900.00 10,390.50
Semen Warna Kg 0.5000 15,683.00 7,841.50
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 244/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 245/478
A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10cm x 10cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0900 72,000.00 6,480.00
Tukang Batu L.02.03 OH 0.0900 96,000.00 8,640.00
Kepala Tukang L.03.01 OH 0.0350 105,000.00 3,675.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 19,395.00
B BAHAN
Plint keramik ukuran 10cm x 10cm Bh 10.6000 #N/A #N/A
Semen portland Kg 1.1400 #N/A #N/A
Pasir Pasang M3 0.0030 230,900.00 692.70
Semen Warna Kg 0.0500 15,683.00 784.15
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 246/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 248/478
JUMLAH TENAGA KERJA 118,125.00
B BAHAN
Keramik Dinding artistik Bh 53.0000 #N/A #N/A
Semen portland Kg 9.3000 #N/A #N/A
Pasir Pasang M3 0.0180 230,900.00 4,156.20
Semen Warna Kg 2.7500 15,683.00 43,128.25
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 249/478
A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100cm x 100cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.3000 72,000.00 93,600.00
Tukang Batu L.02.03 OH 0.6500 96,000.00 62,400.00
Kepala Tukang L.03.01 OH 0.0650 105,000.00 6,825.00
Mandor L.04.01 OH 0.0650 120,000.00 7,800.00
JUMLAH TENAGA KERJA 170,625.00
B BAHAN
marmer Dinding 100cm x 100cm Bh 1.0600 #N/A #N/A
Semen portland Kg 12.4400 #N/A #N/A
Semen portland M3 0.0250 #N/A #N/A
Pasir Pasang Kg 0.6500 230,900.00 150,085.00
Semen Warna Bh 3.0300 15,683.00 47,519.49
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 250/478
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 252/478
C PERALATAN -
Peralatan Kerja Paving Blok % 0.1000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 72,000.00 7,200.00
Tukang Kayu L.02.04 OH 0.1000 103,000.00 10,300.00
Kepala Tukang L.03.01 OH 0.0100 105,000.00 1,050.00
Mandor L.04.01 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 19,150.00
B BAHAN
Tripleks Lembar 0.3750 #N/A #N/A
Paku tripleks kg 0.0300 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 72,000.00 36,000.00
Tukang Kayu L.02.04 OH 0.5000 103,000.00 51,500.00
Kepala Tukang L.03.01 OH 0.0500 105,000.00 5,250.00
Mandor L.04.01 OH 0.0250 120,000.00 3,000.00
JUMLAH TENAGA KERJA 95,750.00
B BAHAN
Profil Allum"T" m 3.6000 #N/A #N/A
Kawat dia 4 mm kg 0.1500 #N/A #N/A
Ramset Buah 1.0500 #N/A #N/A
Akustik 60 x 120 Lembar 1.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 255/478
B BAHAN
Plafond PVC (setara Shunda Plafon, Flat Gloss Half Silver) m2 1.0500 #N/A #N/A
Screw bh 18.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 257/478
Rooflight 90x180 Lbr 0.6000 #N/A #N/A
Paku 5 - 12 cm Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 258/478
Paku pancing 6x23 Kg 0.1200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 263/478
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 264/478
Pasir Pasang M3 0.0320 230,900.00 7,388.80
Semen warna Kg 1.0000 15,683.00 15,683.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 265/478
JUMLAH TENAGA KERJA 16,170.00
B BAHAN
Seng gelombang Lbr 0.7000 #N/A #N/A
Paku 5 - 12 cm Kg 0.0200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 72,000.00 432,000.00
Tukang Kayu L.02.04 OH 18.0000 103,000.00 1,854,000.00
Kepala Tukang L.03.01 OH 1.8000 105,000.00 189,000.00
Mandor L.04.01 OH 0.3000 120,000.00 36,000.00
JUMLAH TENAGA KERJA 2,511,000.00
B BAHAN
Balok kayu m3 1.2000 #N/A #N/A
Paku 5 - 12 cm Kg 1.2500 #N/A #N/A
Lem Kayu/Karet Kg 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 72,000.00 25,200.00
Tukang Kayu L.02.04 OH 1.0500 103,000.00 108,150.00
Kepala Tukang L.03.01 OH 0.1050 105,000.00 11,025.00
Mandor L.04.01 OH 0.0180 120,000.00 2,160.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 267/478
JUMLAH TENAGA KERJA 146,535.00
B BAHAN
kayu Papan m3 0.0400 #N/A #N/A
Paku 5 - 12 cm Kg 0.0500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 72,000.00 72,000.00
Tukang Kayu L.02.04 OH 3.0000 103,000.00 309,000.00
Kepala Tukang L.03.01 OH 0.3000 105,000.00 31,500.00
Mandor L.04.01 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 418,500.00
B BAHAN
kayu Papan m3 0.0400 #N/A #N/A
Lem Kayu/Karet Kg 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 72,000.00 57,600.00
Tukang Kayu L.02.04 OH 2.4000 103,000.00 247,200.00
Kepala Tukang L.03.01 OH 0.2400 105,000.00 25,200.00
Mandor L.04.01 OH 0.0400 120,000.00 4,800.00
JUMLAH TENAGA KERJA 334,800.00
B BAHAN
kayu Papan m3 0.0240 #N/A #N/A
Lem Kayu/Karet Kg 0.3000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 72,000.00 72,000.00
Tukang Kayu L.02.04 OH 3.0000 103,000.00 309,000.00
Kepala Tukang L.03.01 OH 0.3000 105,000.00 31,500.00
Mandor L.04.01 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 418,500.00
B BAHAN
kayu Papan kelas II m3 0.0640 #N/A #N/A
Lem Kayu/Karet Kg 0.5000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 72,000.00 50,400.00
Tukang Kayu L.02.04 OH 2.1000 103,000.00 216,300.00
Kepala Tukang L.03.01 OH 0.2100 105,000.00 22,050.00
Mandor L.04.01 OH 0.0350 120,000.00 4,200.00
JUMLAH TENAGA KERJA 292,950.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 268/478
B BAHAN
kayu Papan kelas II m3 0.0250 #N/A #N/A
Paku 5 - 12 cm kg 0.0300 #N/A #N/A
Lem Kayu/Karet kg 0.5000 #N/A #N/A
Plywood 4 mm Lembar 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 72,000.00 57,600.00
Tukang Kayu L.02.04 OH 2.4000 103,000.00 247,200.00
Kepala Tukang L.03.01 OH 0.2400 105,000.00 25,200.00
Mandor L.04.01 OH 0.0400 120,000.00 4,800.00
JUMLAH TENAGA KERJA 334,800.00
B BAHAN
kayu Papan kelas II m3 0.0256 #N/A #N/A
Paku 5 - 12 cm kg 0.0300 #N/A #N/A
Lem Kayu/Karet kg 0.5000 #N/A #N/A
Plywood 4 mm Lembar 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 269/478
Pekerja L.01.01 OH 0.85 72,000.00 61,200.00
Tukang Kayu L.02.04 OH 2.550 103,000.00 262,650.00
Kepala Tukang L.03.01 OH 0.255 105,000.00 26,775.00
Mandor L.04.01 OH 0.043 120,000.00 5,160.00
JUMLAH TENAGA KERJA 355,785.00
B BAHAN
Kayu Papan kelas II m3 0.025 #N/A #N/A
Paku 5 - 12 cm kg 0.03 #N/A #N/A
Lem Kayu/Karet kg 0.8 #N/A #N/A
Teakwood 4 mm 90 x 220 cm Lembar 1.000 #N/A #N/A
Formika Lembar 0.5 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.000 72,000.00 288,000.00
Tukang Kayu L.02.04 OH 12.000 103,000.00 1,236,000.00
Kepala Tukang L.03.01 OH 1.200 105,000.00 126,000.00
Mandor L.04.01 OH 0.2 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,674,000.00
B BAHAN
Balok kayu m3 1.100 #N/A #N/A
Besi strip (4mm x 30 mm; 5,4 kg) kg 15.000 #N/A #N/A
Paku 5 - 12 cm kg 5.600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 270/478
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 72,000.00 10,800.00
Tukang Kayu L.02.04 OH 0.3 103,000.00 30,900.00
Kepala Tukang L.03.01 OH 0.03 105,000.00 3,150.00
Mandor L.04.01 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 53,850.00
B BAHAN
Kaso 5/7 kelas II m3 0.0154 #N/A #N/A
Paku 5 - 12 cm kg 0.2 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 271/478
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2 72,000.00 14,400.00
Tukang Kayu L.02.04 OH 0.3 103,000.00 30,900.00
Kepala Tukang L.03.01 OH 0.03 105,000.00 3,150.00
Mandor L.04.01 OH 0.01 120,000.00 1,200.00
JUMLAH TENAGA KERJA 49,650.00
B BAHAN
Kaso 5/7 kelas II m3 0.0163 #N/A #N/A
Paku 5 - 12 cm kg 0.25 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 72,000.00 7,200.00
Tukang Kayu L.02.04 OH 0.2 103,000.00 20,600.00
Kepala Tukang L.03.01 OH 0.02 105,000.00 2,100.00
Mandor L.04.01 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 30,500.00
B BAHAN
Kayu Papan m3 0.0108 #N/A #N/A
Paku 5 - 12 cm kg 0.1 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 72,000.00 7,200.00
Tukang Kayu L.02.04 OH 0.2 103,000.00 20,600.00
Kepala Tukang L.03.01 OH 0.02 105,000.00 2,100.00
Mandor L.04.01 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 30,500.00
B BAHAN
Kayu Papan kelas II m3 0.011 #N/A #N/A
Paku 5 - 12 cm kg 0.05 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 72,000.00 10,800.00
Tukang Kayu L.02.04 OH 0.4500 103,000.00 46,350.00
Kepala Tukang L.03.01 OH 0.0450 105,000.00 4,725.00
Mandor L.04.01 OH 0.0080 120,000.00 960.00
JUMLAH TENAGA KERJA 62,835.00
B BAHAN
Balok kayu m3 0.0280 #N/A #N/A
Paku 5 - 12 cm kg 0.1500 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 272/478
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 273/478
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 278/478
Kaca cermin 5 mm m2 1.1000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 279/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 72,000.00 5,040.00
Tukang cat L.02.08 OH 0.009 96,000.00 864.00
Kepala Tukang L.03.01 OH 0.006 105,000.00 630.00
Mandor L.04.01 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 6,894.00
B BAHAN
Cat menie kayu merah Kg 0.200 #N/A #N/A
Plamuur (Dempul) Kg 0.150 #N/A #N/A
Cat dasar Kayu Kg 0.170 #N/A #N/A
Cat Penutup Kayu Kg 0.260 #N/A #N/A
Kuas 2,5 inch Bh 0.010 #N/A #N/A
Pengencer Kg 0.030 #N/A #N/A
Ampelas Lbr 0.200 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 72,000.00 5,040.00
Tukang cat L.02.08 OH 0.105 96,000.00 10,080.00
Kepala Tukang L.03.01 OH 0.004 105,000.00 420.00
Mandor L.04.01 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,900.00
B BAHAN
Cat menie kayu merah Kg 0.200 #N/A #N/A
Plamuur (Dempul) Kg 0.150 #N/A #N/A
Cat dasar Kayu Kg 0.170 #N/A #N/A
Cat Penutup Kayu Kg 0.350 #N/A #N/A
Kuas 2,5 inch Bh 0.010 #N/A #N/A
Pengencer Kg 0.030 #N/A #N/A
Ampelas Lbr 0.200 #N/A #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 280/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0200 72,000.00 1,440.00
Tukang cat L.02.08 OH 0.0630 96,000.00 6,048.00
Kepala Tukang L.03.01 OH 0.0063 105,000.00 661.50
Mandor L.04.01 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 8,509.50
B BAHAN
Plamuur Kg 0.1000 #N/A #N/A
Cat dasar Tembok Alkali Kg 0.1000 #N/A #N/A
Cat Penutup Tembok Kg 0.2600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0280 72,000.00 2,016.00
Tukang cat L.02.08 OH 0.0420 96,000.00 4,032.00
Kepala Tukang L.03.01 OH 0.0042 105,000.00 441.00
Mandor L.04.01 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 6,849.00
B BAHAN
Cat dasar Tembok Alkali Kg 0.1200 #N/A #N/A
Cat Penutup Tembok Kg 0.1800 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 282/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 283/478
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 72,000.00 4,320.00
Tukang cat L.02.08 OH 0.060 96,000.00 5,760.00
Kepala Tukang L.03.01 OH 0.012 105,000.00 1,260.00
Mandor L.04.01 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 11,700.00
B BAHAN
Cat Besi Kg 0.300 #N/A #N/A
Kuas 2,5 inch Bh 0.010 #N/A #N/A
Pengencer L 0.010 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.400 72,000.00 28,800.00
Tukang cat L.02.08 OH 0.700 96,000.00 67,200.00
Kepala Tukang L.03.01 OH 0.070 105,000.00 7,350.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 284/478
Mandor L.04.01 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 105,750.00
B BAHAN
Cat Besi Kg 0.300 #N/A #N/A
Pengencer L 0.010 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 286/478
A.5.1.1 7. (K3) Pemasangan 1 buah bak fibreglass vol 1 m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.000 72,000.00 216,000.00
Tukang Batu L.02.03 OH 4.500 96,000.00 432,000.00
Kepala Tukang L.03.01 OH 0.050 105,000.00 5,250.00
Mandor L.04.01 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 761,250.00
B BAHAN
Bak fibreglass Unit 1.000 #N/A #N/A
Perlengkapan % 12.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.000 72,000.00 432,000.00
Tukang Batu L.02.03 OH 3.000 96,000.00 288,000.00
Kepala Tukang L.03.01 OH 0.300 105,000.00 31,500.00
Mandor L.04.01 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 755,100.00
B BAHAN
Bata merah M3 150.000 #N/A #N/A
Semen portland Kg 120.000 #N/A #N/A
Pasir Pasang M3 0.300 230,900.00 69,270.00
Porselen 11x11 bh 360.000 #N/A #N/A
Semen warna Kg 6.000 15,683.00 94,098.00
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 287/478
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 288/478
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.160 72,000.00 155,520.00
Tukang Batu L.02.03 OH 0.720 96,000.00 69,120.00
Kepala Tukang L.03.01 OH 0.072 105,000.00 7,560.00
Mandor L.04.01 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 233,520.00
B BAHAN
Bata merah bh 40.000 #N/A #N/A
Semen portland Kg 44.000 #N/A #N/A
Pasir Pasang M3 0.070 230,900.00 16,163.00
Pasir beton M3 0.060 270,100.00 16,206.00
Kerikil M3 0.070 #N/A #N/A
Besi beton (polos/ulir) Kg 1.600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 72,000.00 230,400.00
Tukang Batu L.02.03 OH 1.150 96,000.00 110,400.00
Kepala Tukang L.03.01 OH 0.011 105,000.00 1,155.00
Mandor L.04.01 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 343,875.00
B BAHAN
Bata merah bh 70.000 #N/A #N/A
Semen portland Kg 77.000 #N/A #N/A
Pasir Pasang M3 0.130 230,900.00 30,017.00
Pasir beton M3 0.090 270,100.00 24,309.00
Kerikil M3 0.020 #N/A #N/A
Besi beton (polos/ulir) Kg 2.600 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 72,000.00 230,400.00
Tukang Batu L.02.03 OH 1.150 96,000.00 110,400.00
Kepala Tukang L.03.01 OH 0.011 105,000.00 1,155.00
Mandor L.04.01 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 343,875.00
B BAHAN
Bata merah bh 123.000 #N/A #N/A
Semen portland Kg 114.000 #N/A #N/A
Pasir Pasang M3 0.184 230,900.00 42,485.60
Pasir beton M3 0.120 270,100.00 32,412.00
Kerikil M3 0.033 #N/A #N/A
Besi beton (polos/ulir) Kg 4.850 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 289/478
A TENAGA
Pekerja L.01.01 OH 0.054 72,000.00 3,888.00
Tukang Batu L.02.03 OH 0.090 96,000.00 8,640.00
Kepala Tukang L.03.01 OH 0.009 105,000.00 945.00
Mandor L.04.01 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 16,713.00
B BAHAN
Pipa galvanis ½” M 1.200 #N/A #N/A
Perlengkapan % 35.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 290/478
Pekerja L.01.01 OH 0.108 72,000.00 7,776.00
Tukang Batu L.02.03 OH 0.180 96,000.00 17,280.00
Kepala Tukang L.03.01 OH 0.018 105,000.00 1,890.00
Mandor L.04.01 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 27,546.00
B BAHAN
Pipa galvanis 11/2” M 1.200 #N/A #N/A
Perlengkapan % 35.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 291/478
Tukang Batu L.02.03 OH 0.060 96,000.00 5,760.00
Kepala Tukang L.03.01 OH 0.006 105,000.00 630.00
Mandor L.04.01 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 9,222.00
B BAHAN
Pipa PVC 3/4” M 1.200 #N/A #N/A
Perlengkapan % 35.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 292/478
Kepala Tukang L.03.01 OH 0.0135 105,000.00 1,417.50
Mandor L.04.01 OH 0.0040 120,000.00 480.00
JUMLAH TENAGA KERJA 20,689.50
B BAHAN
Pipa PVC 21/2” M 1.200 #N/A #N/A
Perlengkapan % 35.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 72,000.00 4,320.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 293/478
Tukang Batu L.02.03 OH 0.030 96,000.00 2,880.00
Kepala Tukang L.03.01 OH 0.003 105,000.00 315.00
Mandor L.04.01 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,875.00
B BAHAN
Pipa tanah Bh 1.600 #N/A #N/A
Semen portland Kg 0.680 #N/A #N/A
Pasir Pasang M3 0.013 230,900.00 3,001.70
Pasir urug M3 0.011 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 294/478
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel.
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan
gambar kerja.
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 299/478
A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 300 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.170 72,000.00 12,240.00
Tukang Pipa L.02.13 OH 0.085 77,000.00 6,545.00
Mandor L.04.01 OH 0.017 120,000.00 2,040.00
JUMLAH TENAGA KERJA 20,825.00
B BAHAN
Pipa HDPE Ø 300 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.065 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 301/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 1.205 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 303/478
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA -
Pekerja L.01.01 OH 1.212 72,000.00 87,264.00
Tukang Pipa L.02.13 OH 0.606 77,000.00 46,662.00
Mandor L.04.01 OH 0.121 120,000.00 14,520.00
JUMLAH TENAGA KERJA 148,446.00
B BAHAN
Pipa GIP Ø 400 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.000 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 306/478
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 308/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 309/478
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 310/478
A.8.4.1.69 (K3) Pemasangan pipa baja Ø 250 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.325 72,000.00 95,400.00
Tukang Pipa L.02.13 OH 0.265 77,000.00 20,405.00
Mandor L.04.01 OH 0.133 120,000.00 15,960.00
JUMLAH TENAGA KERJA 131,765.00
B BAHAN
Pipa Baja Ø 250 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.004 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 312/478
Tukang Pipa L.02.13 OH 0.979 77,000.00 75,383.00
Mandor L.04.01 OH 0.489 120,000.00 58,680.00
JUMLAH TENAGA KERJA 486,503.00
B BAHAN
Pipa Baja Ø 1000 mm m 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Sewa excavator type 225 kap 0,5 -1,0 m3 hari 0.058 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 0.133 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 313/478
Mandor L.04.01 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 1,667.00
B BAHAN
Pipa PVC Ø 90 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.003 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 314/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T1/manual (gergaji) /saw hari 0.030 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 316/478
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.429 72,000.00 102,888.00
Tukang Pipa L.02.13 OH 0.715 77,000.00 55,055.00
Mandor L.04.01 OH 0.143 120,000.00 17,160.00
JUMLAH TENAGA KERJA 175,103.00
B BAHAN
Pipa PVC Ø 1100 mm bh 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 0.213 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 318/478
Mandor L.04.01 OH 0.0090 120,000.00 1,080.00
Operator Alat Pipa L.11.01 OH 0.2710 113,000.00 30,623.00
JUMLAH TENAGA KERJA 41,648.00
B BAHAN
Pipa HDPE Ø 300 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 0.0300 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 319/478
Operator Alat Pipa L.11.01 OH 0.5710 113,000.00 64,523.00
JUMLAH TENAGA KERJA 105,318.00
B BAHAN
Pipa HDPE Ø 600 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 0.1010 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 325/478
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 326/478
A.8.4.2.57 (K3) Pemotongan 1 buah pipa DCI Ø 500 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.3120 72,000.00 94,464.00
Tukang Pipa L.02.13 OH 0.2620 77,000.00 20,174.00
Mandor L.04.01 OH 0.1310 120,000.00 15,720.00
JUMLAH TENAGA KERJA 130,358.00
B BAHAN
Pipa DCI Ø 500 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1920 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 328/478
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.0400 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 330/478
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.4370 72,000.00 103,464.00
Tukang Pipa L.02.13 OH 0.2870 77,000.00 22,099.00
Mandor L.04.01 OH 0.1440 120,000.00 17,280.00
JUMLAH TENAGA KERJA 142,843.00
B BAHAN
Pipa Baja Ø 600 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.1130 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6460 72,000.00 118,512.00
Tukang Pipa L.02.13 OH 0.8230 77,000.00 63,371.00
Mandor L.04.01 OH 0.1650 120,000.00 19,800.00
JUMLAH TENAGA KERJA 201,683.00
B BAHAN
Pipa Ø 100 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.6500 #N/A #N/A
Sewa Genset 1500 watt hari 0.1590 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 1.0780 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 0.9110 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.0960 72,000.00 150,912.00
Tukang Pipa L.02.13 OH 1.0480 77,000.00 80,696.00
Mandor L.04.01 OH 0.2100 120,000.00 25,200.00
JUMLAH TENAGA KERJA 256,808.00
B BAHAN
Pipa Ø 150 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.7600 #N/A #N/A
Sewa Genset 1500 watt hari 0.3690 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 1.3530 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 1.0260 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.5460 72,000.00 183,312.00
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 339/478
Tukang Pipa L.02.13 OH 1.2730 77,000.00 98,021.00
Mandor L.04.01 OH 0.2550 120,000.00 30,600.00
JUMLAH TENAGA KERJA 311,933.00
B BAHAN
Pipa Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.8700 #N/A #N/A
Sewa Genset 1500 watt hari 0.5790 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 1.6280 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 1.1410 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.9960 72,000.00 215,712.00
Tukang Pipa L.02.13 OH 1.4980 77,000.00 115,346.00
Mandor L.04.01 OH 0.3000 120,000.00 36,000.00
JUMLAH TENAGA KERJA 367,058.00
B BAHAN
Pipa Ø 250 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.9800 #N/A #N/A
Sewa Genset 1500 watt hari 0.7890 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 1.9030 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 1.2560 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4460 72,000.00 248,112.00
Tukang Pipa L.02.13 OH 1.7230 77,000.00 132,671.00
Mandor L.04.01 OH 0.3450 120,000.00 41,400.00
JUMLAH TENAGA KERJA 422,183.00
B BAHAN
Pipa Ø 300 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.0900 #N/A #N/A
Sewa Genset 1500 watt hari 0.9990 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 2.1780 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 1.3710 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.3460 72,000.00 312,912.00
Tukang Pipa L.02.13 OH 2.1730 77,000.00 167,321.00
Mandor L.04.01 OH 0.4350 120,000.00 52,200.00
JUMLAH TENAGA KERJA 532,433.00
B BAHAN
Pipa Ø 400 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.3100 #N/A #N/A
Sewa Genset 1500 watt hari 1.4190 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 2.7280 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 1.6010 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 340/478
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.7960 72,000.00 345,312.00
Tukang Pipa L.02.13 OH 2.3980 77,000.00 184,646.00
Mandor L.04.01 OH 0.4800 120,000.00 57,600.00
JUMLAH TENAGA KERJA 587,558.00
B BAHAN
Pipa Ø 450 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.4200 #N/A #N/A
Sewa Genset 1500 watt hari 1.6290 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 3.0030 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 1.7160 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.2460 72,000.00 377,712.00
Tukang Pipa L.02.13 OH 2.6230 77,000.00 201,971.00
Mandor L.04.01 OH 0.5250 120,000.00 63,000.00
JUMLAH TENAGA KERJA 642,683.00
B BAHAN
Pipa Ø 500 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.5300 #N/A #N/A
Sewa Genset 1500 watt hari 1.8390 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 3.2780 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 1.8310 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.1460 72,000.00 442,512.00
Tukang Pipa L.02.13 OH 3.0730 77,000.00 236,621.00
Mandor L.04.01 OH 0.6150 120,000.00 73,800.00
JUMLAH TENAGA KERJA 752,933.00
B BAHAN
Pipa Ø 600 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.7500 #N/A #N/A
Sewa Genset 1500 watt hari 2.2590 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 3.8280 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 2.0610 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0460 72,000.00 507,312.00
Tukang Pipa L.02.13 OH 3.5230 77,000.00 271,271.00
Mandor L.04.01 OH 0.7050 120,000.00 84,600.00
JUMLAH TENAGA KERJA 863,183.00
B BAHAN
Pipa Ø 700 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 341/478
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.9700 #N/A #N/A
Sewa Genset 1500 watt hari 2.6790 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 4.3780 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 2.2910 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.)Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.9460 72,000.00 572,112.00
Tukang Pipa L.02.13 OH 3.9730 77,000.00 305,921.00
Mandor L.04.01 OH 0.7950 120,000.00 95,400.00
JUMLAH TENAGA KERJA 973,433.00
B BAHAN
Pipa Ø 800 mm bh 1.0000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 2.1900 #N/A #N/A
Sewa Genset 1500 watt hari 3.0990 #N/A #N/A
Sewa Pompa Submersible 3m3/h hari 4.9280 #N/A #N/A
Sewa Tripot/Tackel & handle crane 2 T hari 2.5210 #N/A #N/A
JUMLAH HARGA ALAT #N/A
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 342/478
Bahan bakar liter 0.0600 #N/A #N/A
Minyak Pelumas liter 0.0020 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 343/478
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
Keterangan untuk analisa di barisan bawah berikut ini untuk analisa yang disesuai dengan Analisa DCK 2016 :
- ** Penggunaan Kode.Analisa untuk Kelompok Pekerjaan (Level) & Jenis Pekerjaan (Sub Level) menyesuaikan Permen 28/16
- ** Kode analisa diberi akhir-an sebagai berikut : …………...CK
-** Contoh : Memasang Instalasi Penerangan Lampu TL. 4 Lampur - kode Analisa A.8.4.6.2.CK
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 345/478
D Jumlah (A+B+C) - #N/A
E Overhead & Profit 15 % 15.00% #N/A
F Harga Satuan Pekerjaan (D+E) - #N/A
AHSP Bidang Perumahan dan Penyehatan Lingkungan - Cetakan Januari 2019 Hal. 346/478
PEMERINTAH KABUPATEN INDRAMAYU
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN
PERTANAHAN
Jl. Wiralodra No. 35/A Indramayu Kode Pos 45212 Jawa Barat
Telp. (0234) 272015 Fax. (0234) 273076 Email. dpkp2indramayu@gmail.com
KODE HARGA SA
NO URAIAN PEKERJAAN
ANALISA TENAGA KERJA
1 2 3 4
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon 74,330.25
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 155,729.55
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75 161,330.28
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG 74,347.50
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP :
A.4.4.1.6 3KP : 10PP 78,315.00
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
A.4.4.1.7 2PP 39,157.50
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :
A.4.4.1.8 3PP 39,157.50
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
A.4.4.1.9 39,157.50
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8
A.4.4.1.12 PP 39,157.50
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :
A.4.4.1.13 3KP :10PP 39,157.50
Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM :
A.4.4.1.14 1KP :1PP 39,157.50
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM :
A.4.4.1.15 1KP :2PP 39,157.50
A.4.4.1.16 Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 49,835.25
A.4.4.1.17 Pemasangan 1m2 dinding conblock HB20 campuran 1SP:4PP 49,835.25
A.4.4.1.18 Pemasangan 1m2 dinding conblock HB15 campuran 1SP :3PP 43,401.00
A.4.4.1.19 Pemasangan 1 cm2 dinding conblock HB15 campuran 1SP :4PP 43,401.00
A.4.4.1.20 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :3PP 39,157.50
A.4.4.1.21 Pemasangan 1 cm2 dinding conblock HB10 campuran 1SP :4PP 39,157.50
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 39,157.50
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 39,157.50
A.4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP 45,281.25
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B. 215,107.50
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai 215,190.30
KODE HARGA SA
NO URAIAN PEKERJAAN
ANALISA TENAGA KERJA
1 2 3 4
A.4.4.2 PEKERJAAN PLESTERAN
A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. 45,281.25
A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. 45,281.25
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 45,281.25
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 45,281.25
A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 45,281.25
A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 45,281.25
A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 45,281.25
A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 45,281.25
A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 46,989.00
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 46,989.00
A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 46,989.00
A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 46,989.00
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 60,651.00
A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 47,817.00
A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. 60,651.00
A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 60,651.00
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 60,651.00
A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm 66,412.50
A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 22,770.00
A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 56,166.00
A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 68,051.25
A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1cm 68,051.25
A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 39,157.50
A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah 22,770.00
A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 10,695.00
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. 45,281.25
A.4.4.2.27. Pemasangan 1 m2 acian. 30,187.50
A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) 66,412.50
A.4.4.2.29. Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP) 30,187.50
A. PEKERJAAN PERSIAPAN
NO URAIAN INDEKS SAT. HARGA SAT. UPAH BAHAN JUMLAH
(KODE) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
A.1a 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK
BAHAN
Kayu Kaso 5/7 (Albasia) 0.0120 M3 2,588,000.00 - 31,056.00 31,056.00
Paku Biasa 2" - 5" 0.0200 Kg 20,000.00 - 400.00 400.00
Kayu Papan 3/20 (Albasia) 0.0070 M3 3,134,000.00 - 21,938.00 21,938.00
UPAH
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 53,394.00 69,924.00
A.1b 1 M' PEMASANGAN DAN PENGUKURAN BOUWPLANK (ALAT UKUR)
BAHAN
Kayu Kaso 5/7 ( Albasia ) 0.0120 M3 2,588,000.00 - 31,056.00 31,056.00
Paku Biasa 2" - 5" 0.0200 Kg 20,000.00 - 400.00 400.00
Kayu Papan 3/20 ( Albasia ) 0.0070 M3 3,134,000.00 - 21,938.00 21,938.00
Alat Ukur (Theodolit & Water Pas) 1.0000 Ls 25,000.00 - 25,000.00 25,000.00
UPAH
Juru Ukur 0.2000 Org 88,000.00 17,600.00 - 17,600.00
Asisten Juru Ukur 0.1000 Org 74,000.00 7,400.00 - 7,400.00
Tukang Batu Terampil 0.0100 Org 77,000.00 770.00 - 770.00
Pekerja Terampil 0.0200 Org 62,000.00 1,240.00 - 1,240.00
JUMLAH .......................... 27,010.00 78,394.00 105,404.00
A.5 1 M2 PEMBUATAN KANTOR SEMENTARA (DIREKSI KEET) LANTAI PLESTERAN
BAHAN
Kayu Albasia, Balok 0.1800 M3 2,588,000.00 - 465,840.00 #VALUE!
Kayu Dolken d. 8 - 10 P. 4 M 1.2500 Btg 63,000.00 78,750.00 78,750.00
Seng Plat 0.0250 Lbr 37,000.00 - 925.00 #VALUE!
Paku Biasa 2" - 5" 0.0800 Kg 20,000.00 - 1,600.00 #VALUE!
Besi stip 0.0800 Kg 11,400.00 912.00 912.00
Play wood 4 mm 0.0600 Lbr 135,000.00 - 8,100.00 #VALUE!
Semen Portland 35.0000 Kg 1,400.00 - 49,000.00 #VALUE!
Pasir Pasang 0.1500 M3 242,000.00 - 36,300.00 #VALUE!
Pasir Beton 0.1000 M3 289,000.00 - 28,900.00 #VALUE!
Koral Beton 0.1500 M3 247,000.00 - 37,050.00 #VALUE!
Bata Merah 30.0000 Bh 900.00 - 27,000.00 #VALUE!
Jendela Nako 0.2000 Bh 61,000.00 - 12,200.00 #VALUE!
Kaca Polos 0.0800 M3 115,000.00 - 9,200.00 #VALUE!
Kunci Tanam 0.1500 Bh 117,000.00 - 17,550.00 #VALUE!
UPAH
Pekerja 2.0000 OH 62,000.00 124,000.00 - 124,000.00
Tukang Kayu 2.0000 OH 89,000.00 178,000.00 178,000.00
Tukang batu 1.0000 OH 83,000.00 83,000.00 83,000.00
Kepala Tukang 0.3000 OH 91,000.00 27,300.00 27,300.00
Mandor 0.0500 OH 104,000.00 5,200.00 5,200.00
JUMLAH .......................... 417,500.00 773,327.00 1,190,827.00
A.8 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 11,400.00 - 11,400.00
A.9 1 TITIK CERUCUK BAMBU Ø 8 CM - 10 CM, Uk. P. 1 M - 1,5 M
BAHAN
Bambu Ø 8 - 10 (600) cm 0.2000 Btg 25,000.00 - 5,000.00 5,000.00
UPAH
Pekerja 0.0120
Org 62,000.00 744.00 - 744.00
Mandor 0.0016
Org 104,000.00 166.40 - 166.40
JUMLAH .......................... 910.40 5,000.00 5,910.40
A.10 1 BUAH PEMBUATAN KOTAK ADUKAN UKURAN 40 X 50 X 25 CM
BAHAN
Papan Terentang ( Albasia ) 0.0360 M3 3,134,000.00 - 112,824.00 112,824.00
Halaman 373
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Paku Biasa 2" - 5" 0.0800 Kg 20,000.00 - 1,600.00 1,600.00
Kayu Kaso 5/7 ( Borneo ) 0.0140 M3 4,298,000.00 - 60,172.00 60,172.00
UPAH
Tukang Kayu 0.3000 OH 89,000.00 26,700.00 - 26,700.00
Kepala Tukang 0.0300 OH 104,000.00 3,120.00 - 3,120.00
JUMLAH .......................... 29,820.00 174,596.00 204,416.00
Halaman 374
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
A.11 1 M2 PEMBUATAN STEGER/PERANCA DARI BAMBU
BAHAN
Bambu Ø 6 - 8 (600) cm 1.2500 Btg 21,000.00 - 26,250.00 26,250.00
UPAH
Pekerja 1.0000
OH 62,000.00 62,000.00 - 62,000.00
Tukang Kayu 2.0000
OH 89,000.00 178,000.00 - 178,000.00
Kepala Tukang 0.2000
OH 91,000.00 18,200.00 - 18,200.00
Mandor 0.0500
OH 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 263,400.00 26,250.00 289,650.00
A.11a.Rob 1 M2 PEMBUATAN PAPAN NAMA PROYEK DIGITAL PRINTING
BAHAN
Cetak nama digital 1.0000 M2 35,000.00 - 35,000.00 35,000.00
Kayu Reng 2/3 (Kruing) 0.0060 M3 7,136,000.00 - 42,816.00 42,816.00
Kayu Kaso 5/7 (Kruing) 0.0280 M3 6,063,000.00 - 169,764.00 169,764.00
Paku Biasa 2" - 5" 0.2000 Kg 20,000.00 - 4,000.00 4,000.00
UPAH
Disain Cetak Digital 1.0000 Ls 30,000.00 30,000.00 - 30,000.00
Ongkos Pasang 1.0000 Ls 25,000.00 25,000.00 - 25,000.00
JUMLAH .......................... 55,000.00 251,580.00 306,580.00
A.11b 1 M' PEMBUATAN PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
BAHAN
Seng Gelombang BJLS 28 (80 x 180 cm) 1.2000 Lbr 74,000.00 - 88,800.00 88,800.00
Kayu Dolken d. 8 - 10 P. 4 M 1.2500 Btg 63,000.00 - 78,750.00 #VALUE!
Kayu Kaso 5/7 ( Borneo ) 0.0720 M3 4,298,000.00 - 309,456.00 #VALUE!
Semen portland 2.5000 Kg 1,400.00 - 3,500.00 #VALUE!
Pasir Beton 0.0050 M3 289,000.00 - 1,445.00 #VALUE!
Koral Beton 0.0090 M3 247,000.00 - 2,223.00 #VALUE!
Meni Besi 0.4500 Kg 53,000.00 - 23,850.00 #VALUE!
Paku Biasa 5" - 7" 0.7200 Kg 20,000.00 - 14,400.00 #VALUE!
UPAH
Pekerja 0.2000 OH 62,000.00 12,400.00 - 12,400.00
Tukang Kayu 0.4000 OH 89,000.00 35,600.00 - 35,600.00
Kepala Tukang 0.0200 OH 91,000.00 1,820.00 - 1,820.00
Mandor 0.0200 OH 104,000.00 2,080.00 - 2,080.00
JUMLAH .......................... 51,900.00 522,424.00 574,324.00
A.11c 1 M2 PASANGAN STOOT WERK
BAHAN
Kayu Stoot (dinding 2 x pakai) 50% 9.0000 Btg 46,000.00 - 207,000.00 207,000.00
Papan Terentang ( Albasia ) 0.0160 M3 3,134,000.00 - 50,144.00 50,144.00
Paku Biasa 5" - 7" 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
UPAH
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.2000 Org 91,000.00 18,200.00 - 18,200.00
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Mandor 0.0170 Org 104,000.00 1,768.00 - 1,768.00
JUMLAH .......................... 47,068.00 267,144.00 314,212.00
A.13 1 M3 BONGKARAN BETON BERTULANG
UPAH
Pekerja 13.3340 Org 62,000.00 826,708.00 - 826,708.00
Mandor 0.6660 Org 104,000.00 69,264.00 - 69,264.00
JUMLAH .......................... 895,972.00 - 895,972.00
A.14 1 M3 BONGKARAN DINDING TEMBOK BATA
UPAH
Pekerja 6.6670 Org 62,000.00 413,354.00 - 413,354.00
Mandor 0.3330 Org 104,000.00 34,632.00 - 34,632.00
JUMLAH .......................... 447,986.00 - 447,986.00
B. PEKERJAAN TANAH
B.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER
UPAH
Pekerja 0.7500 Org 62,000.00 46,500.00 - 46,500.00
Mandor 0.0250 Org 104,000.00 2,600.00 - 2,600.00
JUMLAH .......................... 49,100.00 - 49,100.00
B.2 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER
UPAH
Pekerja 0.9000 Org 62,000.00 55,800.00 - 55,800.00
Mandor 0.0450 Org 104,000.00 4,680.00 - 4,680.00
JUMLAH .......................... 60,480.00 - 60,480.00
B.3 1 M3 GALIAN TANAH BIASA SEDALAM 3 METER
UPAH
Pekerja 0.7350 Org 62,000.00 45,570.00 - 45,570.00
Mandor 0.0730 Org 104,000.00 7,592.00 - 7,592.00
Halaman 375
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
JUMLAH .......................... 53,162.00 - 53,162.00
B.4 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Mandor 0.0320 Org 104,000.00 3,328.00 - 3,328.00
JUMLAH .......................... 65,328.00 - 65,328.00
Halaman 376
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
B.4a 1 M3 URUGAN TANAH PENINGGIAN BANGUNAN DIPADATKAN
BAHAN
Beli Tanah + Angkut Max 10 km 1.2000 M3 70,000.00 - 84,000.00 84,000.00
UPAH
Pek. Galian 0.6000 M3 49,100.00 14,730.00 - 14,730.00
Pek. Galian tanah berbatu 0.6000 M3 65,328.00 19,598.40 - 19,598.40
Pek. Grading Plant 6.0000 M2 200.00 600.00 - 600.00
JUMLAH .......................... 34,928.40 84,000.00 118,928.40
B.5 1 M3 GALIAN TANAH CADAS SEDALAM 1 METER
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Mandor 0.0600 Org 104,000.00 6,240.00 - 6,240.00
JUMLAH .......................... 99,240.00 - 99,240.00
B.6 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER
UPAH
Pekerja 1.2000 Org 62,000.00 74,400.00 - 74,400.00
Mandor 0.0450 Org 104,000.00 4,680.00 - 4,680.00
JUMLAH .......................... 79,080.00 - 79,080.00
B.7 1 M2 PEKERJAAN STRIPING TANAH TEBING SETINGGI 1 METER
UPAH
Pekerja 0.0500 Org 62,000.00 3,100.00 - 3,100.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 3,620.00 - 3,620.00
B.8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER
UPAH
Pekerja 0.3300 Org 62,000.00 20,460.00 - 20,460.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 21,500.00 - 21,500.00
B.9 1 M3 URUGAN KEMBALI GALIAN TANAH
UPAH
Pekerja 0.5000 Org 62,000.00 31,000.00 - 31,000.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 36,200.00 - 36,200.00
B.10 1 M3 PEMADATAN TANAH PER 20 CM
UPAH
Pekerja 0.5000 Org 62,000.00 31,000.00 - 31,000.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 36,200.00 - 36,200.00
B.11 1 M3 URUGAN PASIR
BAHAN
Pasir Urug 1.2000 M3 190,000.00 - 228,000.00 228,000.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 19,640.00 228,000.00 247,640.00
B.11a 1 M3 URUGAN TANAH MERAH
BAHAN
Tanah Merah 1.2000 M3 207,000.00 - 248,400.00 248,400.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 19,640.00 248,400.00 268,040.00
B.15 1 M3 URUGAN SIRTU
BAHAN
Sirtu 1.2000 M3 215,000.00 - 258,000.00 258,000.00
UPAH
Pekerja 0.2500 Org 62,000.00 15,500.00 - 15,500.00
Mandor 0.0250 Org 104,000.00 2,600.00 - 2,600.00
JUMLAH .......................... 18,100.00 258,000.00 276,100.00
B.16 1 M2 PEMBUATAN JALAN SEMENTARA
BAHAN
Batu belah 0.1500 M3 276,000.00 - 41,400.00 41,400.00
Batu Pecah 0.0900 M3 422,000.00
Pasir Pasang 0.0100 M3 242,000.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 62,520.00 41,400.00 103,920.00
Halaman 377
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
C. PEKERJAAN PONDASI
C.2 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps
BAHAN
Batu Belah 15 cm / 20 cm 1.2000 M3 276,000.00 - 331,200.00 331,200.00
Semen Portland 267.0000 Kg 1,400.00 - 373,800.00 373,800.00
Pasir Pasang 0.4270 M3 242,000.00 - 103,334.00 103,334.00
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.7500 Org 83,000.00 62,250.00 - 62,250.00
Kepala Tukang 0.0750 Org 91,000.00 6,825.00 - 6,825.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 169,875.00 808,334.00 978,209.00
C.4 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps
BAHAN
Batu Belah 15 cm / 20 cm 1.2000 M3 276,000.00 - 331,200.00 331,200.00
Semen Portland 202.0000 Kg 1,400.00 - 282,800.00 282,800.00
Pasir Pasang 0.4850 M3 242,000.00 - 117,370.00 117,370.00
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.7500 Org 83,000.00 62,250.00 - 62,250.00
Kepala Tukang 0.0750 Org 91,000.00 6,825.00 - 6,825.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 169,875.00 731,370.00 901,245.00
C.4a 1 M3 PASANG PONDASI BATU LAMA 1 PC : 3 PS
BAHAN
Semen Portland 202.0000 Kg 1,400.00 - 282,800.00 282,800.00
Pasir Pasang 0.4850 M3 242,000.00 - 117,370.00 117,370.00
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.7500 Org 83,000.00 62,250.00 - 62,250.00
Kepala Tukang 0.0750 Org 91,000.00 6,825.00 - 6,825.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 169,875.00 400,170.00 570,045.00
C.5 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps
BAHAN
Batu Belah 15 cm / 20 cm 1.2000 M3 276,000.00 - 331,200.00 331,200.00
Semen Portland 163.0000 Kg 1,400.00 - 228,200.00 228,200.00
Pasir Pasang 0.5200 M3 242,000.00 - 125,840.00 125,840.00
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.7500 Org 83,000.00 62,250.00 - 62,250.00
Kepala Tukang 0.0750 Org 91,000.00 6,825.00 - 6,825.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 169,875.00 685,240.00 855,115.00
C.6 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps
BAHAN
Batu Belah 15 cm / 20 cm 1.2000 M3 276,000.00 - 331,200.00 331,200.00
Semen Portland 136.0000 Kg 1,400.00 - 190,400.00 190,400.00
Pasir Pasang 0.5440 M3 242,000.00 - 131,648.00 131,648.00
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.7500 Org 83,000.00 62,250.00 - 62,250.00
Kepala Tukang 0.0750 Org 91,000.00 6,825.00 - 6,825.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 169,875.00 653,248.00 823,123.00
C.6a 1 M3 PASANG PONDASI BATU LAMA
BAHAN
Semen Portland 136.0000 Kg 1,400.00 - 190,400.00 190,400.00
Pasir Pasang 0.5440 M3 242,000.00 - 131,648.00 131,648.00
UPAH 0.00
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.7500 Org 83,000.00 62,250.00 - 62,250.00
Kepala Tukang 0.0750 Org 91,000.00 6,825.00 - 6,825.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 169,875.00 322,048.00 491,923.00
C.14 1 M3 PASANG BATU KOSONG (AANSTAMPING)
BAHAN
Batu Belah 15 cm / 20 cm 1.2000 M3 276,000.00 - 331,200.00 331,200.00
Pasir Urug 0.4320 M3 190,000.00 - 82,080.00 82,080.00
UPAH
Pekerja 0.7800 Org 62,000.00 48,360.00 - 48,360.00
Tukang Batu 0.3900 Org 83,000.00 32,370.00 - 32,370.00
Halaman 378
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Kepala Tukang 0.0390 Org 91,000.00 3,549.00 - 3,549.00
Mandor 0.0390 Org 104,000.00 4,056.00 - 4,056.00
JUMLAH .......................... 88,335.00 413,280.00 501,615.00
Halaman 379
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
C.15 1 M3 PASANG PONDASI SIKLOP 60% BETON CAMPURAN 1 PC : 2 PB : 3 KR DAN 40% BATU BELAH
BAHAN
Batu Belah 15 cm / 20 cm 0.4800 M3 276,000.00 - 132,480.00 #VALUE!
Semen Portland 194.0000 Kg 1,400.00 - 271,600.00 #VALUE!
Pasir Beton 0.3120 M3 289,000.00 - 90,168.00 #VALUE!
Koral Beton 0.4680 M3 247,000.00 - 115,596.00 #VALUE!
Besi Beton 126.0000 Kg 13,500.00 - 1,701,000.00 #VALUE!
Kawat Beton 1.8000 Kg 23,000.00 - 41,400.00 #VALUE!
UPAH
Pekerja 3.4000 Org 62,000.00 210,800.00 - 210,800.00
Tukang Batu 0.8500 Org 83,000.00 70,550.00 - 70,550.00
Kepala Tukang 0.0850 Org 91,000.00 7,735.00 - 7,735.00
Mandor 0.1700 Org 104,000.00 17,680.00 - 17,680.00
JUMLAH .......................... 306,765.00 2,352,244.00 2,659,009.00
C.16 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM
BAHAN
Batu Belah 15 cm / 20 cm 0.4500 M3 276,000.00 - 124,200.00 124,200.00
Semen Portland 194.0000 Kg 1,400.00 - 271,600.00 271,600.00
Pasir Beton 0.3120 M3 289,000.00 - 90,168.00 90,168.00
Koral Beton 0.4680 M3 247,000.00 - 115,596.00 115,596.00
UPAH
Pekerja 2.4000 Org 62,000.00 148,800.00 - 148,800.00
Tukang Batu 0.8000 Org 83,000.00 66,400.00 - 66,400.00
Kepala Tukang 0.0800 Org 91,000.00 7,280.00 - 7,280.00
Mandor 0.1190 Org 104,000.00 12,376.00 - 12,376.00
JUMLAH .......................... 234,856.00 601,564.00 836,420.00
D. PEKERJAAN DINDING
D.10 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 PP
BAHAN
Bata Merah 70.0000 Bh 900.00 - 63,000.00 63,000.00
Semen Portland 14.3700 Kg 1,400.00 - 20,118.00 20,118.00
Pasir Pasang 0.0400 M3 242,000.00 - 9,680.00 9,680.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 29,370.00 92,798.00 122,168.00
D.11 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 PP
BAHAN
Bata Merah 70.0000 Bh 900.00 - 63,000.00 63,000.00
Semen Portland 11.5000 Kg 1,400.00 - 16,100.00 16,100.00
Pasir Pasang 0.0430 M3 242,000.00 - 10,406.00 10,406.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 29,370.00 89,506.00 118,876.00
D.12 1 M2 PASANG BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 PP
BAHAN
Bata Merah 70.0000 Bh 900.00 - 63,000.00 63,000.00
Semen Portland 9.6800 Kg 1,400.00 - 13,552.00 13,552.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
UPAH 0.00
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 29,370.00 87,442.00 116,812.00
D.12.Rob 1 M2 PASANG DINDING TERAWANG (ROSTER) UK. 12 X 11 X 24 cm, 1 PC : 4 PP
BAHAN
Roster terawang 30.0000 Bh 14,000.00 - 420,000.00 420,000.00
Semen Portland 11.0000 Kg 1,400.00 - 15,400.00 15,400.00
Pasir Pasang 0.0350 M3 242,000.00 - 8,470.00 8,470.00
UPAH 0.00
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 29,370.00 443,870.00 473,240.00
Halaman 380
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
D.12.a 1 M2 PASANG BATA MERAH TEBAL 1 BATA, 1 Pc : 5 PP
BAHAN
Bata Merah 140.0000 Bh 900.00 - 126,000.00 126,000.00
Semen Portland 22.2000 Kg 1,400.00 - 31,080.00 31,080.00
Pasir Pasang 0.1020 M3 242,000.00 - 24,684.00 24,684.00
UPAH
Pekerja 0.6000 Org 62,000.00 37,200.00 - 37,200.00
Tukang Batu 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0300 Org 104,000.00 3,120.00 - 3,120.00
JUMLAH .......................... 58,740.00 181,764.00 240,504.00
D.13 1 M2 PASANG BATA RINGAN TEBAL 15 CM
BAHAN
Bata Ringan 8.0000 Bh 10,000.00 - 80,000.00 80,000.00
Semen Perekat Bata Ringan ( PM - 110 ) 4.1400 Kg 4,300.00 - 17,802.00 17,802.00
Alat Bantu 1.0000 Ls 10,000.00 - 10,000.00 10,000.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 29,370.00 107,802.00 137,172.00
D.22 1 M2 PASANG DINDING ROSTER CETAK UKURAN. 12 x 11 x 24 CM, 1 PC : 3 PP
BAHAN
Roster 30.0000 Bh 14,000.00 - 420,000.00 420,000.00
Semen Portland 14.0000 Kg 1,400.00 - 19,600.00 19,600.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH 0.00
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 29,370.00 447,344.00 476,714.00
D.23 1 M2 PASANG DINDING HOLLOW BLOCK / CONCREATE BLOCK 10, 1 PC : 4 PP
BAHAN
HB / CB 10 12.5000 Bh 16,000.00 - 200,000.00 200,000.00
Semen Portland 12.1300 Kg 1,400.00 - 16,982.00 16,982.00
Pasir Pasang 0.3880 M3 242,000.00 - 93,896.00 93,896.00
Besi Angkur d. 8 mm 0.2800 Kg 13,500.00 - 3,780.00 3,780.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.1500 Org 104,000.00 15,600.00 - 15,600.00
JUMLAH .......................... 43,410.00 314,658.00 358,068.00
D.24 1 M2 PASANG DINDING BILIK RANGKA KAYU BORNEO
BAHAN
Bilik Bambu 1.5000 M2 22,000.00 - 33,000.00 33,000.00
Kayu Kaso 5/7 ( Borneo ) 0.0140 M3 4,298,000.00 - 60,172.00 60,172.00
Paku Biasa 2" - 5" 0.0120 Kg 20,000.00 - 240.00 240.00
List Kayu 2/4 0.0030 M' 5,000.00 - 15.00 15.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Batu 0.0500 Org 83,000.00 4,150.00 - 4,150.00
Kepala Tukang 0.0050 Org 91,000.00 455.00 - 455.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 11,325.00 93,427.00 104,752.00
D.25 1 M2 MEMBUAT DINDING DIORAMA
BAHAN
Semen Portland 65.0000 Kg 1,400.00 - 91,000.00 91,000.00
Pasir Pasang 0.1000 M3 242,000.00 - 24,200.00 24,200.00
Finishing dengan cat setara Duco 1.6000 Kg 92,000.00 - 147,200.00 147,200.00
Peralatan 1.0000 Lot 40,000.00 - 40,000.00 40,000.00
UPAH
Assisten Pematung 1.0000 Org 352,000.00 352,000.00 - 352,000.00
Art design / pematung 0.5000 Org 544,000.00 272,000.00 - 272,000.00
Mandor 0.0006 Org 104,000.00 62.40 - 62.40
JUMLAH .......................... 624,062.40 302,400.00 926,462.40
D.26 1 M2 MEMBUAT DINDING LAMBRIZERING DARI PAPAN BORNEO
BAHAN
Papan Kayu Borneo 0.0070 M3 5,750,000.00 - 40,250.00 40,250.00
Paku 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
Paku Skrup 0.1500 Kg 30,000.00 - 4,500.00 4,500.00
Halaman 381
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
UPAH
Pekerja 0.6000 Org 62,000.00 37,200.00 - 37,200.00
Tukang Kayu 1.8000 Org 89,000.00 160,200.00 - 160,200.00
Kepala Tukang 0.1800 Org 91,000.00 16,380.00 - 16,380.00
Mandor 0.0300 Org 104,000.00 3,120.00 - 3,120.00
JUMLAH .......................... 216,900.00 46,750.00 263,650.00
Halaman 382
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
D.27 1 M2 MEMBUAT DINDING LAMBRIZERING PLYWOOD UK. 120 X 240 cm
BAHAN
Playwood t. 4mm 0.4000 Lbr 135,000.00 - 54,000.00 54,000.00
Paku 1/2" - 1" 0.0500 Kg 22,000.00 - 1,100.00 1,100.00
UPAH
Pekerja 0.0250 Org 62,000.00 1,550.00 - 1,550.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0010 Org 104,000.00 104.00 - 104.00
JUMLAH .......................... 9,057.00 55,100.00 64,157.00
E. PEKERJAAN PLESTERAN
E.1 1 M2 PLESTERAN, 1Pc : 3PP, TEBAL 20 mm
BAHAN
Semen Portland 10.3680 Kg 1,400.00 - 14,515.20 14,515.20
Pasir Pasang 0.0310 M3 242,000.00 - 7,502.00 7,502.00
UPAH
Pekerja 0.2600 Org 62,000.00 16,120.00 - 16,120.00
Tukang Batu 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0130 Org 104,000.00 1,352.00 - 1,352.00
JUMLAH .......................... 35,892.00 22,017.20 57,909.20
E.2 1 M2 PLESTERAN, 1Pc : 4PP, TEBAL 20 mm
BAHAN
Semen Portland 8.3200 Kg 1,400.00 - 11,648.00 11,648.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Batu 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0220 Org 104,000.00 2,288.00 - 2,288.00
JUMLAH .......................... 45,508.00 19,392.00 64,900.00
E.3 1 M2 PLESTERAN, 1Pc : 5PP, TEBAL 20 mm
BAHAN
Semen Portland 6.9120 Kg 1,400.00 - 9,676.80 9,676.80
Pasir Pasang 0.0350 M3 242,000.00 - 8,470.00 8,470.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Batu 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0220 Org 104,000.00 2,288.00 - 2,288.00
JUMLAH .......................... 45,508.00 18,146.80 63,654.80
E.3.a 1 M2 PLESTERAN DINDING BATA RINGAN
BAHAN
Semen Plesteran (PM-200) Premium Plester 20.0000 Kg 2,300.00 - 46,000.00 46,000.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Batu 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0220 Org 104,000.00 2,288.00 - 2,288.00
JUMLAH .......................... 45,508.00 46,000.00 91,508.00
E.4 1 M2 ACIAN
BAHAN
Semen Portland 3.2500 Kg 1,400.00 - 4,550.00 4,550.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 22,650.00 4,550.00 27,200.00
E.4.a 1 M2 ACIAN DINDING BATA RINGAN (FINE COAT-PM 300)
BAHAN
Semen Acian (PM-300) Fine Coat 4.0000 Kg 4,800.00 - 19,200.00 19,200.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 22,650.00 19,200.00 41,850.00
E.5 1 M2 KAMPROTAN 1Pc : 2PP
BAHAN
Semen Portland 4.3200 Kg 1,400.00 - 6,048.00 6,048.00
Pasir Pasang 0.0060 M3 242,000.00 - 1,452.00 1,452.00
UPAH
Halaman 383
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 29,370.00 7,500.00 36,870.00
Halaman 384
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
E.6 1 M2 PLESTERAN SIAR ADUKAN 1Pc : 2PP
BAHAN
Semen Portland 6.3400 Kg 1,400.00 - 8,876.00 8,876.00
Pasir Pasang 0.0120 M3 242,000.00 - 2,904.00 2,904.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Batu 0.1500 Org 83,000.00 12,450.00 - 12,450.00
Kepala Tukang 0.0150 Org 91,000.00 1,365.00 - 1,365.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 33,975.00 11,780.00 45,755.00
F. PEKERJAAN KAYU
F.2 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KAMPER
BAHAN
Kayu Kamper, Balok 1.1000 M3 10,542,000.00 - 11,596,200.00 11,596,200.00
Paku 10 cm 1.2500 Kg 20,000.00 - 25,000.00 25,000.00
Lem Kayu 1.0000 Kg 20,000.00 - 20,000.00 20,000.00
UPAH
Pekerja 7.0000 Org 62,000.00 434,000.00 - 434,000.00
Tukang Kayu 21.0000 Org 89,000.00 1,869,000.00 - 1,869,000.00
Kepala Tukang 2.1000 Org 91,000.00 191,100.00 - 191,100.00
Mandor 0.3500 Org 104,000.00 36,400.00 - 36,400.00
JUMLAH .......................... 2,530,500.00 11,641,200.00 14,171,700.00
F.3 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU BORNEO
BAHAN
Kayu Borneo, Balok 1.1000 M3 4,888,000.00 - 5,376,800.00 5,376,800.00
Paku 10 cm 1.2500 Kg 20,000.00 - 25,000.00 25,000.00
Lem Kayu 1.0000 Kg 20,000.00 - 20,000.00 20,000.00
UPAH
Pekerja 7.0000 Org 62,000.00 434,000.00 - 434,000.00
Tukang Kayu 21.0000 Org 89,000.00 1,869,000.00 - 1,869,000.00
Kepala Tukang 2.1000 Org 91,000.00 191,100.00 - 191,100.00
Mandor 0.3500 Org 104,000.00 36,400.00 - 36,400.00
JUMLAH .......................... 2,530,500.00 5,421,800.00 7,952,300.00
F.4 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KRUING
BAHAN
Kayu Kruing, Balok 1.1000 M3 8,010,000.00 - 8,811,000.00 8,811,000.00
Paku 10 cm 1.2500 Kg 20,000.00 - 25,000.00 25,000.00
Lem Kayu 1.0000 Kg 20,000.00 - 20,000.00 20,000.00
UPAH
Pekerja 7.0000 Org 62,000.00 434,000.00 - 434,000.00
Tukang Kayu 21.0000 Org 89,000.00 1,869,000.00 - 1,869,000.00
Kepala Tukang 2.1000 Org 91,000.00 191,100.00 - 191,100.00
Mandor 0.3500 Org 104,000.00 36,400.00 - 36,400.00
JUMLAH .......................... 2,530,500.00 8,856,000.00 11,386,500.00
F.5 1 M' PASANG KUSEN ALLUMUNIUM STANDAR NATURAL 4"
BAHAN
Profil Alumunium 4" 1.1000 M' 104,000.00 - 114,400.00 114,400.00
Sealant 0.0600 Tube 13,000.00 - 780.00 780.00
Skrup fixer 2.0000 Bh 1,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.4300 Org 62,000.00 26,660.00 - 26,660.00
Tukang Almunium 0.4300 Org 87,000.00 37,410.00 - 37,410.00
Kepala Tukang 0.0430 Org 91,000.00 3,913.00 - 3,913.00
Mandor 0.0210 Org 104,000.00 2,184.00 - 2,184.00
JUMLAH .......................... 70,167.00 117,180.00 187,347.00
F.5a 1 M' PASANG KUSEN ALLUMUNIUM STANDAR NATURAL 3"
BAHAN
Kusen Alumunium 3" 1.1000 M' 81,000.00 - 89,100.00 89,100.00
Sealant 0.0600 Tube 13,000.00 - 780.00 780.00
Skrup fixer 2.0000 Bh 1,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.4300 Org 62,000.00 26,660.00 - 26,660.00
Tukang Almunium 0.4300 Org 87,000.00 37,410.00 - 37,410.00
Kepala Tukang 0.0430 Org 91,000.00 3,913.00 - 3,913.00
Mandor 0.0210 Org 104,000.00 2,184.00 - 2,184.00
JUMLAH .......................... 70,167.00 91,880.00 162,047.00
F.5b 1 M' PASANG KUSEN ALLUMUNIUM WARNA 4"
BAHAN
Kusen Alumunium Warna 4" 1.1000 M' 121,000.00 - 133,100.00 133,100.00
Sealant 1.0000 Tube 13,000.00 - 13,000.00 13,000.00
Skrup fixer 2.0000 Bh 1,000.00 - 2,000.00 2,000.00
UPAH
Halaman 385
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 0.4300 Org 62,000.00 26,660.00 - 26,660.00
Tukang Almunium 0.4300 Org 87,000.00 37,410.00 - 37,410.00
Kepala Tukang 0.0430 Org 91,000.00 3,913.00 - 3,913.00
Mandor 0.0210 Org 104,000.00 2,184.00 - 2,184.00
JUMLAH .......................... 70,167.00 148,100.00 218,267.00
Halaman 386
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.5c 1 M' PASANG KUSEN ALLUMUNIUM WARNA 3"
BAHAN
Kusen Alumunium Warna 3" 1.1000 M' 104,000.00 - 114,400.00 114,400.00
Sealant 1.0000 Tube 13,000.00 - 13,000.00 13,000.00
Skrup fixer 2.0000 Bh 1,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.4300 Org 62,000.00 26,660.00 - 26,660.00
Tukang Almunium 0.4300 Org 87,000.00 37,410.00 - 37,410.00
Kepala Tukang 0.0430 Org 91,000.00 3,913.00 - 3,913.00
Mandor 0.0210 Org 104,000.00 2,184.00 - 2,184.00
JUMLAH .......................... 70,167.00 129,400.00 199,567.00
F.5d 1 M' PASANG KUSEN ALLUMUNIUM WARNA DOFT 4"
BAHAN
Kusen Alumunium Warna Doft 4" 1.1000 M' 98,000.00 - 107,800.00 107,800.00
Sealant 1.0000 Tube 13,000.00 - 13,000.00 13,000.00
Skrup fixer 2.0000 Bh 1,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.4300 Org 62,000.00 26,660.00 - 26,660.00
Tukang Almunium 0.4300 Org 87,000.00 37,410.00 - 37,410.00
Kepala Tukang 0.0430 Org 91,000.00 3,913.00 - 3,913.00
Mandor 0.0210 Org 104,000.00 2,184.00 - 2,184.00
JUMLAH .......................... 70,167.00 122,800.00 192,967.00
F.5e 1 M' PASANG KUSEN ALLUMUNIUM WARNA DOFT 3"
BAHAN
Kusen Alumunium Warna Doft 3" 1.1000 M' 86,000.00 - 94,600.00 94,600.00
Sealant 1.0000 Tube 13,000.00 - 13,000.00 13,000.00
Skrup fixer 2.0000 Bh 1,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.4300
Org 62,000.00 26,660.00 - 26,660.00
Tukang Almunium 0.4300
Org 87,000.00 37,410.00 - 37,410.00
Kepala Tukang 0.0430
Org 91,000.00 3,913.00 - 3,913.00
Mandor 0.0210
Org 104,000.00 2,184.00 - 2,184.00
JUMLAH .......................... 70,167.00 109,600.00 179,767.00
F.6 1 M2 PASANG RANGKA BESI HOLLOW 1 X 40.40.2 MM, MODUL 60 X 120 CM UNTUK PARTISI
BAHAN
Rangka metal hollow 40.40.2 mm 3.5000 M' 24,833.33 - 86,916.67 86,916.67
Acesories (perkuatan, las dll.) 1.0000 Ls 86,916.67 - 86,916.67 86,916.67
UPAH
Pekerja 0.2500 Org 62,000.00 15,500.00 - 15,500.00
Tukang Besi 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.0250 Org 91,000.00 2,275.00 - 2,275.00
Mandor 0.0130 Org 104,000.00 1,352.00 - 1,352.00
JUMLAH .......................... 39,877.00 173,833.33 213,710.33
F.6a 1 M2 PASANG RANGKA BESI HOLLOW 1 X 40.40.2 MM, MODUL 60 X 60 CM UNTUK PLAFOND
BAHAN
Rangka metal hollow 40.40.2 mm 4.0000 M' 24,833.33 - 99,333.33 99,333.33
Acesories (perkuatan, las dll.) 1.0000 Ls 99,333.33 - 99,333.33 99,333.33
UPAH
Pekerja 0.3500 Org 62,000.00 21,700.00 - 21,700.00
Tukang Besi 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0180 Org 104,000.00 1,872.00 - 1,872.00
JUMLAH .......................... 55,807.00 198,666.67 254,473.67
F.8 1 M2 PASANG PINTU PANEL KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0400 M3 11,227,000.00 - 449,080.00 449,080.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Tukang Kayu 3.0000 Org 89,000.00 267,000.00 - 267,000.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 336,930.00 459,080.00 796,010.00
F.8b 1 M2 PASANG PINTU PANEL KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0400 M3 9,209,000.00 - 368,360.00 368,360.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Tukang Kayu 3.0000 Org 89,000.00 267,000.00 - 267,000.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 336,930.00 378,360.00 715,290.00
Halaman 387
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.9 1 M2 PASANG PINTU PANEL KAYU JATI JABAR
BAHAN
Kayu Jati Jabar, Papan 0.0400 M3 17,538,000.00 - 701,520.00 701,520.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Tukang Kayu 3.0000 Org 89,000.00 267,000.00 - 267,000.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 336,930.00 711,520.00 1,048,450.00
F.10 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0350 M3 11,227,000.00 - 392,945.00 392,945.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Tukang Kayu 3.0000 Org 89,000.00 267,000.00 - 267,000.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 336,930.00 402,945.00 739,875.00
F.11a 1 M2 PASANG PINTU DAN JENDELA KACA KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0350 M3 9,209,000.00 - 322,315.00 322,315.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Tukang Kayu 3.0000 Org 89,000.00 267,000.00 - 267,000.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 336,930.00 332,315.00 669,245.00
F.17 1 M2 PASANG JALUSI MATI KUSEN KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0600 M3 11,227,000.00 - 673,620.00 673,620.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.6700 Org 62,000.00 41,540.00 - 41,540.00
Tukang Kayu 2.0000 Org 89,000.00 178,000.00 - 178,000.00
Kepala Tukang 0.2000 Org 91,000.00 18,200.00 - 18,200.00
Mandor 0.3350 Org 104,000.00 34,840.00 - 34,840.00
JUMLAH .......................... 272,580.00 676,620.00 949,200.00
F.17b 1 M2 PASANG JALUSI MATI KUSEN KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0600 M3 9,209,000.00 - 552,540.00 552,540.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.6700 Org 62,000.00 41,540.00 - 41,540.00
Tukang Kayu 2.0000 Org 89,000.00 178,000.00 - 178,000.00
Kepala Tukang 0.2000 Org 91,000.00 18,200.00 - 18,200.00
Mandor 0.3350 Org 104,000.00 34,840.00 - 34,840.00
JUMLAH .......................... 272,580.00 555,540.00 828,120.00
F.20 1 M2 PASANG PINTU TEACKWOOD RANGKAP, RANGKA KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0250 M3 11,227,000.00 - 280,675.00 280,675.00
Paku Biasa 1/2" - 1" 0.0300 Kg 22,000.00 - 660.00 660.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
Teackwood 4' x 8' x 4 mm 1.0000 Lbr 135,000.00 - 135,000.00 135,000.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Kayu 2.1000 Org 89,000.00 186,900.00 - 186,900.00
Kepala Tukang 0.2100 Org 91,000.00 19,110.00 - 19,110.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 253,050.00 426,335.00 679,385.00
F.20a 1 M2 PASANG PINTU PANEL MULTIPLEX, RANGKA KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0250 M3 11,227,000.00 - 280,675.00 280,675.00
Paku Biasa 1/2" - 1" 0.0300 Kg 22,000.00 - 660.00 660.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
Multiplex 9 mm 1.0000 Lbr 153,000.00 - 153,000.00 153,000.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Kayu 2.1000 Org 89,000.00 186,900.00 - 186,900.00
Kepala Tukang 0.2100 Org 91,000.00 19,110.00 - 19,110.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
Halaman 388
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
JUMLAH .......................... 253,050.00 444,335.00 697,385.00
Halaman 389
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.20b 1 M2 PASANG PINTU TEACKWOOD RANGKAP, RANGKA KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0250 M3 9,209,000.00 - 230,225.00 230,225.00
Paku Biasa 1/2" - 1" 0.0300 Kg 22,000.00 - 660.00 660.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
Teackwood 4' x 8' x 4 mm 1.0000 Lbr 135,000.00 - 135,000.00 135,000.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Kayu 2.1000 Org 89,000.00 186,900.00 - 186,900.00
Kepala Tukang 0.2100 Org 91,000.00 19,110.00 - 19,110.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 253,050.00 375,885.00 628,935.00
F.20b.Rob 1 M2 PASANG TEACKWOOD
BAHAN
Lem Kuning (Aibon) 0.5000 Kg 54,000.00 - 27,000.00 27,000.00
Teackwood 4' x 8' x 4 mm 0.3500 Lbr 135,000.00 - 47,250.00 47,250.00
UPAH
Pekerja 0.3000 Org 62,000.00 18,600.00 - 18,600.00
Tukang Kayu 1.0000 Org 89,000.00 89,000.00 - 89,000.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0150 Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 118,260.00 74,250.00 192,510.00
F.20b.Rob1 1 M2 PASANG PELAPIS TIMBAL TEBAL 3 mm
BAHAN
Paku Biasa 1/2" - 1" 0.3000 Kg 22,000.00 - 6,600.00 6,600.00
Timbal t. 3 mm 0.1000 Lbr 17,250,000.00 - 1,725,000.00 1,725,000.00
UPAH
Pekerja 0.3000
Org 62,000.00 18,600.00 - 18,600.00
Tukang Kayu 1.0000
Org 89,000.00 89,000.00 - 89,000.00
Kepala Tukang 0.1000
Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0150
Org 104,000.00 1,560.00 - 1,560.00
JUMLAH .......................... 118,260.00 1,731,600.00 1,849,860.00
F.20c 1 M2 PASANG PINTU DOUBLE TRIPLEK , RANGKA KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0250 M3 9,209,000.00 - 230,225.00 230,225.00
Paku Biasa 1/2" - 1" 0.0300 Kg 22,000.00 - 660.00 660.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
Triplek 3 mm 1.0000 Lbr 66,000.00 - 66,000.00 66,000.00
UPAH 0.00
Pekerja 0.7000
Org 62,000.00 43,400.00 - 43,400.00
Tukang Kayu 2.1000
Org 89,000.00 186,900.00 - 186,900.00
Kepala Tukang 0.2100
Org 91,000.00 19,110.00 - 19,110.00
Mandor 0.0350
Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 253,050.00 306,885.00 559,935.00
F.20c Rob 1 M2 PASANG PINTU TRIPLEK , RANGKA KAYU KRUING LAPIS SENG
BAHAN
Kayu Kruing, Papan 0.0250 M3 9,209,000.00 - 230,225.00 230,225.00
Paku Biasa 1/2" - 1" 0.0300 Kg 22,000.00 - 660.00 660.00
Lem Kayu 0.5000 Kg 20,000.00 - 10,000.00 10,000.00
Triplek 3 mm 1.0000 Lbr 66,000.00 - 66,000.00 66,000.00
Seng BJLS 28 2.8000 M2 37,000.00 - 103,600.00 103,600.00
UPAH 0.00
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Kayu 2.1000 Org 89,000.00 186,900.00 - 186,900.00
Kepala Tukang 0.2100 Org 91,000.00 19,110.00 - 19,110.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 253,050.00 410,485.00 663,535.00
F.28 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KAMPER
BAHAN
Kayu Kamper, Balok 1.1000 M3 10,542,000.00 - 11,596,200.00 11,596,200.00
Besi Strip 15.0000 Kg 11,400.00 - 171,000.00 171,000.00
Paku Biasa 2" - 5" 5.6000 Kg 20,000.00 - 112,000.00 112,000.00
UPAH
Pekerja 4.0000 Org 62,000.00 248,000.00 - 248,000.00
Tukang Kayu 12.0000 Org 89,000.00 1,068,000.00 - 1,068,000.00
Kepala Tukang 1.2000 Org 91,000.00 109,200.00 - 109,200.00
Mandor 0.2000 Org 104,000.00 20,800.00 - 20,800.00
JUMLAH .......................... 1,446,000.00 11,879,200.00 13,325,200.00
F.28.a 1 M3 PASANG GORDING KAYU KAMPER
BAHAN
Kayu Kamper, Balok 1.1000 M3 10,542,000.00 - 11,596,200.00 11,596,200.00
Besi strip 15.0000 Kg 11,400.00
Paku Biasa 2" - 5" 3.0000 Kg 20,000.00 - 60,000.00 60,000.00
Halaman 390
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
UPAH
Pekerja 2.4000 Org 62,000.00 148,800.00 - 148,800.00
Tukang Kayu 7.2000 Org 89,000.00 640,800.00 - 640,800.00
Kepala Tukang 0.7200 Org 91,000.00 65,520.00 - 65,520.00
Mandor 0.1200 Org 104,000.00 12,480.00 - 12,480.00
JUMLAH .......................... 867,600.00 11,656,200.00 12,523,800.00
Halaman 391
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.29 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU BORNEO
BAHAN
Kayu Borneo, Balok 1.1000 M3 4,888,000.00 - 5,376,800.00 5,376,800.00
Besi Strip 15.0000 Kg 11,400.00 - 171,000.00 171,000.00
Paku Biasa 2" - 5" 5.6000 Kg 20,000.00 - 112,000.00 112,000.00
UPAH
Pekerja 4.0000 Org 62,000.00 248,000.00 - 248,000.00
Tukang Kayu 12.0000 Org 89,000.00 1,068,000.00 - 1,068,000.00
Kepala Tukang 1.2000 Org 91,000.00 109,200.00 - 109,200.00
Mandor 0.2000 Org 104,000.00 20,800.00 - 20,800.00
JUMLAH .......................... 1,446,000.00 5,659,800.00 7,105,800.00
F.29.a 1 M3 PASANG GORDING KAYU BORNEO
BAHAN
Kayu Borneo, Balok 1.1000 M3 4,888,000.00 - 5,376,800.00 5,376,800.00
Besi Strip 15.0000 Kg 11,400.00 - 171,000.00 171,000.00
Paku Biasa 2" - 5" 3.0000 Kg 20,000.00 - 60,000.00 60,000.00
UPAH
Pekerja 2.4000 Org 62,000.00 148,800.00 - 148,800.00
Tukang Kayu 7.2000 Org 89,000.00 640,800.00 - 640,800.00
Kepala Tukang 0.7200 Org 91,000.00 65,520.00 - 65,520.00
Mandor 0.1200 Org 104,000.00 12,480.00 - 12,480.00
JUMLAH .......................... 867,600.00 5,607,800.00 6,475,400.00
F.30 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KRUING
BAHAN
Kayu Kruing, Balok 1.1000 M3 8,010,000.00 - 8,811,000.00 8,811,000.00
Besi Strip 15.0000 Kg 11,400.00 - 171,000.00 171,000.00
Paku Biasa 2" - 5" 5.6000 Kg 20,000.00 - 112,000.00 112,000.00
UPAH
Pekerja 4.0000 Org 62,000.00 248,000.00 - 248,000.00
Tukang Kayu 12.0000 Org 89,000.00 1,068,000.00 - 1,068,000.00
Kepala Tukang 1.2000 Org 91,000.00 109,200.00 - 109,200.00
Mandor 0.2000 Org 104,000.00 20,800.00 - 20,800.00
JUMLAH .......................... 1,446,000.00 9,094,000.00 10,540,000.00
F.30.a 1 M3 PASANG GORDING KAYU KRUING
BAHAN
Kayu Kruing, Balok 1.1000 M3 8,010,000.00 - 8,811,000.00 8,811,000.00
Besi Strip 15.0000 Kg 11,400.00 - 171,000.00 171,000.00
Paku Biasa 2" - 5" 3.0000 Kg 20,000.00 - 60,000.00 60,000.00
UPAH
Pekerja 2.4000 Org 62,000.00 148,800.00 - 148,800.00
Tukang Kayu 7.2000 Org 89,000.00 640,800.00 - 640,800.00
Kepala Tukang 0.7200 Org 91,000.00 65,520.00 - 65,520.00
Mandor 0.1200 Org 104,000.00 12,480.00 - 12,480.00
JUMLAH .......................... 867,600.00 9,042,000.00 9,909,600.00
F.30.Rob 1 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU LAMA
BAHAN
Besi Strip 15.0000 Kg 11,400.00 - 171,000.00 171,000.00
Paku Biasa 2" - 5" 5.6000 Kg 20,000.00 - 112,000.00 112,000.00
UPAH
Pekerja 4.0000 Org 62,000.00 248,000.00 - 248,000.00
Tukang Kayu 12.0000 Org 89,000.00 1,068,000.00 - 1,068,000.00
Kepala Tukang 1.2000 Org 91,000.00 109,200.00 - 109,200.00
Mandor 0.2000 Org 104,000.00 20,800.00 - 20,800.00
JUMLAH .......................... 1,446,000.00 283,000.00 1,729,000.00
F.32 1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU BORNEO
BAHAN
Kayu Kaso 5/7 ( Borneo ) 0.0120 M3 4,298,000.00 - 51,576.00 51,576.00
Kayu Reng 2/3 ( Borneo ) 0.0030 M3 5,657,000.00 - 16,971.00 16,971.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 71,547.00 88,077.00
F.32a 1 M3 PASANG KASO + RENG GENTENG PALENTONG KAYU KRUING
BAHAN
Kayu Kaso 5/7 ( Kruing ) 0.0120 M3 6,063,000.00 - 72,756.00 72,756.00
Kayu Reng 2/3 ( Kruing ) 0.0030 M3 7,136,000.00 - 21,408.00 21,408.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Halaman 392
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 97,164.00 113,694.00
Halaman 393
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.32a.Rob 1 M3 PASANG RANGKA ATAP KASO LAMA, RENG KAYU KRUING
BAHAN
Kayu Reng 2/3 ( Kruing ) 0.0030 M3 7,136,000.00 - 21,408.00 21,408.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 24,408.00 40,938.00
F.32b 1 M3 PASANG KASO + RENG GENTENG PALENTONG KAYU DOLKEN
BAHAN
Kayu Kaso Dolken d. 6 cm 1.0000 Btg 46,000.00 - 46,000.00 46,000.00
Kayu Reng Dolken d. 2-3 cm 1.5000 Btg 46,000.00 - 69,000.00 69,000.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 118,000.00 134,530.00
F.32b.Rob 1 M3 PASANG KASO DOLKEN + RENG BAMBU, ATAP IJUK
BAHAN
Kayu Kaso Dolken d. 6 cm 1.0000 Btg 46,000.00 - 46,000.00 46,000.00
Bambu d. 6 cm 1.5000 Btg 5,250.00 - 7,875.00 7,875.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 56,875.00 73,405.00
F.32.c 1 M2 PASANG KASO DOLKEN + RENG KAYU BORNEO, GENTENG PALENTONG
BAHAN
Kayu Kaso Dolken 6 cm 1.0000 Btg 46,000.00 - 46,000.00 46,000.00
Kayu Reng 2/3 ( Borneo ) 0.0030 M3 5,657,000.00 - 16,971.00 16,971.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 65,971.00 82,501.00
F.32c.Rob 1 M3 PASANG RANGKA ATAP KASO LAMA, RENG KAYU BORNEO
BAHAN
Kayu Reng 2/3 ( Borneo ) 0.0030 M3 5,657,000.00 - 16,971.00 16,971.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 19,971.00 36,501.00
F.35 1 M2 PASANG KASO + RENG GENTENG MORANDO KAYU BORNEO
BAHAN
Kayu Kaso 5/7 ( Borneo ) 0.0120 M3 4,298,000.00 - 51,576.00 51,576.00
Kayu Reng 2/3 ( Borneo ) 0.0030 M3 5,657,000.00 - 16,971.00 16,971.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 71,547.00 88,077.00
F.35b 1 M2 PASANG KASO + RENG GENTENG MORANDO KAYU KRUING
BAHAN
Kayu Kaso 5/7 ( Kruing ) 0.0140 M3 6,063,000.00 - 84,882.00 84,882.00
Kayu Reng 2/3 ( Kruing ) 0.0030 M3 7,136,000.00 - 21,408.00 21,408.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Halaman 394
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 109,290.00 125,820.00
Halaman 395
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.35.Rob 1 M2 PASANG RANGKA ATAP GENTENG TEGOLA KAYU BORNEO
BAHAN
Kayu Kaso 5/7 ( Borneo ) 0.0120 M3 4,298,000.00 - 51,576.00 51,576.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 54,576.00 71,106.00
F.40 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00 x 1.00) m, KAYU BORNEO
BAHAN
Kayu Borneo, Balok 0.0120 M3 4,888,000.00 - 58,656.00 58,656.00
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.2500 Org 89,000.00 22,250.00 - 22,250.00
Kepala Tukang 0.0250 Org 91,000.00 2,275.00 - 2,275.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 41,625.00 60,656.00 102,281.00
F.40a 1 M2 PASANG RANGKA LANGIT-LANGIT (1.00 x 1.00) m, KAYU KRUING
BAHAN
Kayu Kruing, Balok 0.0120 M3 8,010,000.00 - 96,120.00 96,120.00
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.2500 Org 89,000.00 22,250.00 - 22,250.00
Kepala Tukang 0.0250 Org 91,000.00 2,275.00 - 2,275.00
Mandor 0.0750 Org 104,000.00 7,800.00 - 7,800.00
JUMLAH .......................... 41,625.00 98,120.00 139,745.00
F.48 1 M' PASANG LISTPLANK (3 x 20) cm, KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0108 M3 11,227,000.00 - 121,251.60 121,251.60
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 123,251.60 149,591.60
F.48b 1 M' PASANG LISTPLANK (3 x 20) cm, KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0108 M3 9,209,000.00 - 99,457.20 99,457.20
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH 0.00
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 101,457.20 127,797.20
F.48c 1 M' PASANG LISTPLANK (3 x 5) cm, KAYU BORNEO
BAHAN
Kayu Borneo, Papan 0.0108 M3 5,750,000.00 - 62,100.00 62,100.00
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH 0.00
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 64,100.00 90,440.00
F.49 1 M' PASANG LISTPLANK (2 x 20) cm, KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0072 M3 9,209,000.00 - 66,304.80 66,304.80
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH 0.00
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 68,304.80 94,644.80
F.50 1 M' PASANG LISTPLANK (3 x 30) cm, KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0110 M3 11,227,000.00 - 123,497.00 123,497.00
Halaman 396
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 125,497.00 151,837.00
F.50b 1 M' PASANG LISTPLANK (3 x 30) cm, KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0110 M3 9,209,000.00 - 101,299.00 101,299.00
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH 0.00
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 103,299.00 129,639.00
F.51 1 M' PASANG LISTPLANK 2(3 x 20) cm, KAYU KAMPER
BAHAN
Kayu Kamper, Papan 0.0216 M3 11,227,000.00 - 242,503.20 242,503.20
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 244,503.20 270,843.20
F.51b 1 M' PASANG LISTPLANK 2(3 x 20) cm, KAYU KRUING
BAHAN
Kayu Kruing, Papan 0.0216 M3 9,209,000.00 - 198,914.40 198,914.40
Paku Biasa 2" - 5" 0.1000 Kg 20,000.00 - 2,000.00 2,000.00
UPAH 0.00
Pekerja 0.1000Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 200,914.40 227,254.40
F.51b.Rob 1 M' PASANG LISTPLANK GRC TUMPANGSARI (1/20 +1/10) CM
BAHAN
GRC Lebar 20 cm 0.4167 Lbr 45,000.00 - 18,750.00 18,750.00
GRC Lebar 10 cm 0.4167 Lbr 377,000.00 - 157,083.33 157,083.33
Paku Biasa 2" - 5" 0.0600 Kg 20,000.00 - 1,200.00 1,200.00
UPAH 0.00
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 177,033.33 203,373.33
F.51c.Rob 1 M' PASANG LISTPLANK GRC TUMPANGSARI (1/30 +1/10) CM
BAHAN
GRC Lebar 30 cm 0.4167 Lbr 67,000.00 - 27,916.67 27,916.67
GRC Lebar 10 cm 0.4167 Lbr 377,000.00 - 157,083.33 157,083.33
Paku Biasa 2" - 5" 0.0600 Kg 20,000.00 - 1,200.00 1,200.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 186,200.00 212,540.00
F.51d 1 M' PASANG LISTPLANK GRC 1/30 CM
BAHAN
GRC Lebar 30 cm 0.4167 Lbr 67,000.00 - 27,916.67 27,916.67
Paku Biasa 2" - 5" 0.0600 Kg 20,000.00 - 1,200.00 1,200.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 26,340.00 29,116.67 55,456.67
F.54 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER
BAHAN
Kayu Kamper, Balok 0.0280 M3 10,542,000.00 - 295,176.00 295,176.00
Kayu Kamper, Papan 0.0070 M3 11,227,000.00 - 78,589.00 78,589.00
Halaman 397
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 376,765.00 431,042.00
F.55 1 M2 PASANG RANGKA DINDING PEMISAH KAYU BORNEO
BAHAN
Kayu Borneo, Balok 0.0280 M3 4,888,000.00 - 136,864.00 136,864.00
Kayu Borneo, Papan 0.0070 M3 5,750,000.00 - 40,250.00 40,250.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 180,114.00 234,391.00
Halaman 398
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.55a 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KRUING
BAHAN
Kayu Kruing, Balok 0.0280 M3 8,010,000.00 - 224,280.00 224,280.00
Kayu Kruing, Papan 0.0070 M3 9,209,000.00 - 64,463.00 64,463.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 291,743.00 346,020.00
F.55a.Rob 1 M2 PASANG RANGKA DINDING TRIPLEK 6 MM KAYU BORNEO
BAHAN
Kayu Broneo, Balok 0.0280 M3 4,888,000.00 - 136,864.00 136,864.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
Lem Kayu 0.5600 Kg 20,000.00 - 11,200.00 11,200.00
Triplek 6 mm 0.8600 Lbr 104,000.00 - 89,440.00 89,440.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Kayu 0.6000 Org 89,000.00 53,400.00 - 53,400.00
Kepala Tukang 0.0600 Org 91,000.00 5,460.00 - 5,460.00
Mandor 0.0010 Org 104,000.00 104.00 - 104.00
JUMLAH .......................... 71,364.00 240,504.00 311,868.00
F.56 1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER
BAHAN
Kayu Kamper, Balok 0.0280 M3 10,542,000.00 - 295,176.00 295,176.00
Kayu Kamper, Papan 0.0070 M3 11,227,000.00 - 78,589.00 78,589.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
Lem Kayu 0.5600 Kg 20,000.00 - 11,200.00 11,200.00
Teackwood 4 mm 0.8600 Lbr 135,000.00 - 116,100.00 116,100.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 504,065.00 558,342.00
F.57 1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU BORNEO
BAHAN
Kayu Borneo, Balok 0.0280 M3 4,888,000.00 - 136,864.00 136,864.00
Kayu Borneo, Papan 0.0070 M3 5,750,000.00 - 40,250.00 40,250.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
Lem Kayu 0.5600 Kg 20,000.00 - 11,200.00 11,200.00
Teackwood 4 mm 0.8600 Lbr 135,000.00 - 116,100.00 116,100.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 307,414.00 361,691.00
F.57.Rob 1 M2 PASANG DINDING PEMISAH MULTIPLEK 9 MM, RANGKA KAYU KRUING
BAHAN
Kayu Kruing, Balok 0.0280 M3 8,010,000.00 - 224,280.00 224,280.00
Kayu Kruing, Papan 0.0070 M3 9,209,000.00 - 64,463.00 64,463.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
Lem Kayu 0.5600 Kg 20,000.00 - 11,200.00 11,200.00
Multiplek 9 mm 0.8600 Lbr 153,000.00 - 131,580.00 131,580.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 434,523.00 488,800.00
F.57a 1 M2 PASANG DINDING PEMISAH TRIPLEK 3 MM, RANGKA KAYU BORNEO
BAHAN
Kayu Borneo, Balok 0.0280 M3 4,888,000.00 - 136,864.00 136,864.00
Kayu Borneo, Papan 0.0070 M3 5,750,000.00 - 40,250.00 40,250.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
Lem Kayu 0.5600 Kg 20,000.00 - 11,200.00 11,200.00
Triplek 3 mm 0.8600 Lbr 66,000.00 - 56,760.00 56,760.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Halaman 399
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 248,074.00 302,351.00
Halaman 400
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.57b 1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KRUING
BAHAN
Kayu Kruing, Balok 0.0280 M3 8,010,000.00 - 224,280.00 224,280.00
Kayu Kruing, Papan 0.0070 M3 9,209,000.00 - 64,463.00 64,463.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
Lem Kayu 0.5600 Kg 20,000.00 - 11,200.00 11,200.00
Teakwood 4 mm 0.8600 Lbr 135,000.00 - 116,100.00 116,100.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 419,043.00 473,320.00
F.57Rob 1 M2 PASANG DINDING PEMISAH MULTIPLEK 9 MM, RANGKA KAYU KRUING
BAHAN
Kayu Kruing, Balok 0.0280 M3 8,010,000.00 - 224,280.00 224,280.00
Kayu Kruing, Papan 0.0070 M3 9,209,000.00 - 64,463.00 64,463.00
Paku Biasa 2" - 5" 0.1500 Kg 20,000.00 - 3,000.00 3,000.00
Lem Kayu 0.5600 Kg 20,000.00 - 11,200.00 11,200.00
Multiplek 9 mm 0.8600 Lbr 153,000.00 - 131,580.00 131,580.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.4500 Org 89,000.00 40,050.00 - 40,050.00
Kepala Tukang 0.0450 Org 91,000.00 4,095.00 - 4,095.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 54,277.00 434,523.00 488,800.00
F.57c 1 M2 PASANG PARTISI RANGKA MULTIPLEK 9 MM LAPIS HPL
BAHAN
Rangka Kayu Kaso Borneo 5/7 0.0195 M3 4,298,000.00 - 83,811.00 83,811.00
Multiplek 9 mm 0.6944 M2 153,000.00 - 106,243.20 106,243.20
Lapisan HPL 0.6944 M2 190,000.00 - 131,936.00 131,936.00
List Stainless T 4.0000 M' 46,000.00 - 184,000.00 184,000.00
Lem kayu 2.0000 Kg 20,000.00 - 40,000.00 40,000.00
UPAH
Pekerja 0.7200 Org 62,000.00 44,640.00 - 44,640.00
Tukang Kayu 1.2800 Org 89,000.00 113,920.00 - 113,920.00
Kepala Tukang 0.1280 Org 91,000.00 11,648.00 - 11,648.00
Mandor 0.0360 Org 104,000.00 3,744.00 - 3,744.00
JUMLAH .......................... 173,952.00 545,990.20 719,942.20
F.57c.Rob 1 M2 PASANG PARTISI RANGKA BLOCK BOARD LAPIS HPL
BAHAN
Rangka Partisi Block Board 18 mm 0.3472 M2 95,486.11 - 33,152.78 33,152.78
Multiplek 9 mm 0.6944 M2 153,000.00 - 106,243.20 106,243.20
Lapisan HPL 0.6944 M2 190,000.00 - 131,936.00 131,936.00
List Stainless T 4.0000 M' 46,000.00 - 184,000.00 184,000.00
Lem kayu 2.0000 Kg 20,000.00 - 40,000.00 40,000.00
UPAH
Pekerja 0.7200 Org 62,000.00 44,640.00 - 44,640.00
Tukang Kayu 1.2800 Org 89,000.00 113,920.00 - 113,920.00
Kepala Tukang 0.1280 Org 91,000.00 11,648.00 - 11,648.00
Mandor 0.0360 Org 104,000.00 3,744.00 - 3,744.00
JUMLAH .......................... 173,952.00 495,331.98 669,283.98
F.57d 1 M2 PASANG PINTU RANGKA BLOCK BOARD 24 MM LAPIS HPL (SWING)
BAHAN
Rangka BB 24 mm 0.3472 M2 350,000.00 - 121,520.00 #VALUE!
Rangka Multiplek 9 mm 0.6944 M2 153,000.00 - 106,243.20 #VALUE!
Lapisan HPL 0.6944 M2 190,000.00 - 131,936.00 #VALUE!
Edging 4,2 cm 3.1000 M' 20,000.00 - 62,000.00 #VALUE!
Lem kayu 2.0000 M' 20,000.00 - 40,000.00 #VALUE!
Kaca 5 mm 0.1800 M2 137,000.00 24,660.00 24,660.00
Engsel Ecoline 1.0000 bh 26,000.00 26,000.00 26,000.00
Kunci Dekson 1.0000 bh 190,000.00 190,000.00 190,000.00
Handle Tanam 1.0000 bh 81,000.00 81,000.00 81,000.00
Door Closer Dekson 1.0000 bh 220,000.00 220,000.00 220,000.00
UPAH
Pekerja 0.7200 Org 62,000.00 44,640.00 - 44,640.00
Tukang Kayu 1.2800 Org 89,000.00 113,920.00 - 113,920.00
Kepala Tukang 0.1280 Org 91,000.00 11,648.00 - 11,648.00
Mandor 0.0360 Org 104,000.00 3,744.00 - 3,744.00
JUMLAH .......................... 173,952.00 1,003,359.20 1,177,311.20
Halaman 401
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
F.57e 1 M2 PASANG PLAFOND RANGKA MULTIPLEKS 9 MM FIN. HPL
BAHAN
Rangka Multiplek 18 mm 0.3472 M2 4,298,000.00 - 1,492,265.60 1,492,265.60
Rangka Multiplek 9 mm 0.3472 M2 153,000.00 - 53,121.60 53,121.60
Lapisan HPL 0.3472 M2 190,000.00 - 65,968.00 65,968.00
Lem kayu 1.0000 M' 20,000.00 - 20,000.00 20,000.00
UPAH
Pekerja 0.7200 Org 62,000.00 44,640.00 - 44,640.00
Tukang Kayu 1.2800 Org 89,000.00 113,920.00 - 113,920.00
Kepala Tukang 0.1280 Org 91,000.00 11,648.00 - 11,648.00
Mandor 0.0360 Org 104,000.00 3,744.00 - 3,744.00
JUMLAH .......................... 173,952.00 1,631,355.20 1,805,307.20
F.59 1 M2 PASANG TEACKWOOD TEBAL 4 MM UNTUK DINDING
BAHAN
Teakwood 4' x 8' x 4 mm 0.3472 Lbr 135,000.00 - 46,872.00 46,872.00
Paku Biasa 1/2" - 1" 0.0500 Kg 22,000.00 - 1,100.00 1,100.00
UPAH
Pekerja 0.0250 Org 62,000.00 1,550.00 - 1,550.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0013 Org 104,000.00 135.20 - 135.20
JUMLAH .......................... 9,042.70 47,972.00 57,014.70
F.60 1 M' PASANG LIST PLAFOND - KAYU PROFIL
BAHAN
Kayu Profil 1.0500 M' 5,000.00 - 5,250.00 5,250.00
Paku 1/2. s.d. 1" 0.0100 Kg 22,000.00 - 220.00 220.00
UPAH
Pekerja 0.0500 Org 62,000.00 3,100.00 - 3,100.00
Tukang Kayu 0.0500 Org 89,000.00 4,450.00 - 4,450.00
Kepala Tukang 0.0050 Org 91,000.00 455.00 - 455.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 8,317.00 5,470.00 13,787.00
F.61 1 M' PASANG LIST PLAFOND GYPSUM PROFIL 10 cm
BAHAN
Gypsum Profil 10 cm 1.0500 M' 17,000.00 - 17,850.00 17,850.00
Tepung Gypsum / Semen adhesive 0.1500 Kg 4,600.00 - 690.00 690.00
UPAH
Pekerja 0.0600 Org 62,000.00 3,720.00 - 3,720.00
Tukang Kayu 0.0600 Org 89,000.00 5,340.00 - 5,340.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 9,918.00 18,540.00 28,458.00
G. PEKERJAAN BETON
G.1 1 M3 MEMBUAT BETON TUMBUK, 1Pc : 3Ps : 5Kr
BAHAN
Semen Portland 218.0000 Kg 1,400.00 - 305,200.00 305,200.00
Pasir Beton 0.5200 M3 289,000.00 - 150,280.00 150,280.00
Koral Beton 0.8700 M3 247,000.00 - 214,890.00 214,890.00
UPAH
Pekerja 1.6500 Org 62,000.00 102,300.00 - 102,300.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.0250 Org 91,000.00 2,275.00 - 2,275.00
Mandor 0.0800 Org 104,000.00 8,320.00 - 8,320.00
JUMLAH .......................... 133,645.00 670,370.00 804,015.00
G.4a 1 M3 COR BETON SITE MIX K. 175
BAHAN
Semen Portland 340.0000 Kg 1,400.00 - 476,000.00 476,000.00
Split pecah mesin 2/3 0.8300 M3 296,000.00 - 245,680.00 245,680.00
Pasir Beton 0.5400 M3 289,000.00 - 156,060.00 156,060.00
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.5000 Org 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0500 Org 91,000.00 4,550.00 - 4,550.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Peralatan 0.0750 Lot 50,000.00 3,750.00 - 3,750.00
JUMLAH .......................... 143,840.00 877,740.00 1,021,580.00
G.4b 1 M3 COR BETON SITE MIX K. 225
BAHAN
Semen Portland 394.0000 Kg 1,400.00 - 551,600.00 551,600.00
Split pecah mesin 2/3 0.8100 M3 296,000.00 - 239,760.00 239,760.00
Pasir Beton 0.4900 M3 289,000.00 - 141,610.00 141,610.00
UPAH
Halaman 402
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.5000 Org 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0500 Org 91,000.00 4,550.00 - 4,550.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Peralatan 0.0700 Lot 50,000.00 3,500.00 - 3,500.00
JUMLAH .......................... 143,590.00 932,970.00 1,076,560.00
Halaman 403
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
G.4b.Rob 1 M3 COR BETON 1 PC : 2 PS : 3 SCREENING
BAHAN
Semen Portland 394.0000 Kg 1,400.00 - 551,600.00 551,600.00
Split pecah mesin 0,5 - 1 0.8100 M3 322,000.00 - 260,820.00 260,820.00
Pasir Beton 0.4900 M3 289,000.00 - 141,610.00 141,610.00
UPAH
Pekerja 1.5000 Org 62,000.00 93,000.00 - 93,000.00
Tukang Batu 0.5000 Org 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0500 Org 91,000.00 4,550.00 - 4,550.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Peralatan 0.0700 Lot 50,000.00 3,500.00 - 3,500.00
JUMLAH .......................... 143,590.00 954,030.00 1,097,620.00
G.4c 1 M2 MEMASANG FLOOR HARDENER
BAHAN
Floor Hardener 5.0000 Kg 7,000.00 - 35,000.00 35,000.00
UPAH
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Batu 0.1200 Org 83,000.00 9,960.00 - 9,960.00
Kepala Tukang 0.0120 Org 91,000.00 1,092.00 - 1,092.00
Mandor 0.0060 Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 19,116.00 35,000.00 54,116.00
G.4e 1 M3 COR BETON K. 225 READY MIX
BAHAN
Adukan K. 225 Ready Mix 1.0000 M3 1,022,700.00 - 1,022,700.00 1,022,700.00
UPAH
Pekerja 2.5000 Org 62,000.00 155,000.00 - 155,000.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Alat bantu (Vibrator) 0.0450 Lot 25,000.00 1,125.00 - 1,125.00
JUMLAH .......................... 187,015.00 1,022,700.00 1,209,715.00
G.4f 1 M3 COR BETON K. 250 READY MIX
BAHAN
Adukan K. 250 Ready Mix 1.0000 M3 1,048,950.00 - 1,048,950.00 1,048,950.00
UPAH
Pekerja 2.5000 Org 62,000.00 155,000.00 - 155,000.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Alat bantu (Vibrator) 0.0450 Lot 25,000.00 1,125.00 - 1,125.00
JUMLAH .......................... 187,015.00 1,048,950.00 1,235,965.00
G.4g 1 M3 COR BETON K. 300 READY MIX
BAHAN
Adukan K. 300 Ready Mix 1.0000 M3 1,062,600.00 - 1,062,600.00 1,062,600.00
UPAH
Pekerja 2.5000 Org 62,000.00 155,000.00 - 155,000.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Alat bantu (Vibrator) 0.0450 Lot 25,000.00 1,125.00 - 1,125.00
JUMLAH .......................... 187,015.00 1,062,600.00 1,249,615.00
G.4h 1 M3 COR BETON K. 350 READY MIX
BAHAN
Adukan K. 350 Ready Mix 1.0000 M3 1,128,750.00 - 1,128,750.00 1,128,750.00
UPAH
Pekerja 2.5000 Org 62,000.00 155,000.00 - 155,000.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Alat bantu (Vibrator) 0.0450 Lot 25,000.00 1,125.00 - 1,125.00
JUMLAH .......................... 187,015.00 1,128,750.00 1,315,765.00
G.4i 1 M3 COR BETON K. 400 READY MIX
BAHAN
Adukan K. 400 Ready Mix 1.0000 M3 1,156,050.00 - 1,156,050.00 1,156,050.00
UPAH
Pekerja 2.5000 Org 62,000.00 155,000.00 - 155,000.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Alat bantu (Vibrator) 0.0450 Lot 25,000.00 1,125.00 - 1,125.00
JUMLAH .......................... 187,015.00 1,156,050.00 1,343,065.00
Halaman 404
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
G.4i.1 1 M3 COR BETON K. 450 READY MIX
BAHAN
Adukan K. 450 Ready Mix 1.0000 M3 1,195,950.00 - 1,195,950.00 1,195,950.00
UPAH
Pekerja 2.5000 Org 62,000.00 155,000.00 - 155,000.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Alat bantu (Vibrator) 0.0450 Lot 25,000.00 1,125.00 - 1,125.00
JUMLAH .......................... 187,015.00 1,195,950.00 1,382,965.00
G.4i.2 1 M3 COR BETON K. 500 READY MIX
BAHAN
Adukan K. 500 Ready Mix 1.0000 M3 1,328,250.00 - 1,328,250.00 1,328,250.00
UPAH
Pekerja 2.5000 Org 62,000.00 155,000.00 - 155,000.00
Tukang Batu 0.2500 Org 83,000.00 20,750.00 - 20,750.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
Alat bantu (Vibrator) 0.0450 Lot 25,000.00 1,125.00 - 1,125.00
JUMLAH .......................... 187,015.00 1,328,250.00 1,515,265.00
G.4j 1 KG GANTUNGAN PLAFOND BESI D. 10 mm
BAHAN
Besi beton rata-rata 1.0500 Kg 13,500.00 - 14,175.00 14,175.00
Kawat Beton 0.0100 Kg 23,000.00 - 230.00 230.00
UPAH
Tukang Besi 50% 0.0400 Org 83,000.00 1,660.00 - 1,660.00
Kepala Tukang 50% 0.0100 Org 91,000.00 455.00 - 455.00
Mandor 50 % 0.0050 Org 104,000.00 260.00 - 260.00
Peralatan, spenser 50% 0.0200 Lot 10,000.00 100.00 - 100.00
JUMLAH .......................... 2,475.00 14,405.00 16,880.00
G.4p 1 M2 BEGISTING MULTIPLEX 9 MM
BAHAN
Kaso 5/7 Borneo Super (2x pakai) 50% 0.0170 M3 4,298,000.00 - 36,533.00 36,533.00
Multiplex 9 mm (3x pakai) 75% 0.3470 Lbr 153,000.00 - 39,818.25 39,818.25
Paku Biasa 2" - 5" 0.4000 Kg 20,000.00 - 8,000.00 8,000.00
UPAH
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.1500 Org 91,000.00 13,650.00 - 13,650.00
Pembantu Tukang 0.1200 Org 65,000.00 7,800.00 - 7,800.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 47,440.00 84,351.25 131,791.25
G.4p.Rob 1 M2 PASANG MULTIPLEX 9 MM
BAHAN
Multiplex 9 mm 0.3472 Lbr 153,000.00 - 53,121.60 53,121.60
Paku Biasa 1/2" -1" 0.0100 Kg 22,000.00 - 220.00 220.00
UPAH
Pekerja 0.0600 Org 62,000.00 3,720.00 - 3,720.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Mandor 0.0250 Org 104,000.00 2,600.00 - 2,600.00
JUMLAH .......................... 12,995.00 53,341.60 66,336.60
G.4q 1 M2 BEGISTING MULTIPLEX 12 MM
BAHAN
Kaso 5/7 Borneo Super (2x pakai) 50% 0.0170 M3 4,298,000.00 - 36,533.00 36,533.00
Multiplex 12 mm (3x pakai) 75% 0.3470 Lbr 216,000.00 - 56,214.00 56,214.00
Paku Biasa 2" - 5" 0.4000 Kg 20,000.00 - 8,000.00 8,000.00
UPAH
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.1500 Org 91,000.00 13,650.00 - 13,650.00
Pembantu Tukang 0.1200 Org 65,000.00 7,800.00 - 7,800.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 47,440.00 100,747.00 148,187.00
G.25a 1 KG PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
BAHAN
Besi Beton (polos / ulir) 1.0500 Kg 13,500.00 - 14,175.00 14,175.00
Kawat Beton 0.0150 Kg 23,000.00 - 345.00 345.00
UPAH
Pekerja 0.0070 Org 62,000.00 434.00 - 434.00
Tukang Besi 0.0070 Org 83,000.00 581.00 - 581.00
Kepala Tukang 0.0007 Org 91,000.00 63.70 - 63.70
Mandor 0.0004 Org 104,000.00 41.60 - 41.60
JUMLAH .......................... 1,120.30 14,520.00 15,640.30
Halaman 405
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
G.25a.1 PEMBESIAN SLOOF 15/20 166.67 Kg / M3 186,720.40 2,420,048.40 2,606,768.80
G.25a.2 PEMBESIAN SLOOF 15/25 163.47 Kg / M3 183,135.44 2,373,584.40 2,556,719.84
G.25a.3 PEMBESIAN SLOOF 20/25 140.40 Kg / M3 157,290.12 2,038,608.00 2,195,898.12
G.25a.4 PEMBESIAN SLOOF 20/30 125.00 Kg / M3 140,037.50 1,815,000.00 1,955,037.50
G.25a.5 PEMBESIAN KOLOM PRAKTIS 12/12 235.42 Kg / M3 263,741.03 3,418,298.40 3,682,039.43
G.25a.6 PEMBESIAN KOLOM 20/20 200.00 Kg / M3 224,060.00 2,904,000.00 3,128,060.00
G.25a.7 PEMBESIAN KOLOM 20/25 180.80 Kg / M3 202,550.24 2,625,216.00 2,827,766.24
G.25a.8 PEMBESIAN KOLOM 25/25 192.64 Kg / M3 215,814.59 2,797,132.80 3,012,947.39
G.25a.9 PEMBESIAN KOLOM 25/30 200.53 Kg / M3 224,653.76 2,911,695.60 3,136,349.36
G.25a.10 PEMBESIAN KOLOM 30/30 172.44 Kg / M3 193,184.53 2,503,828.80 2,697,013.33
G.25a.11 PEMBESIAN KOLOM 30/35 179.43 Kg / M3 201,015.43 2,605,323.60 2,806,339.03
G.25a.12 PEMBESIAN KOLOM 40/40 180.50 Kg / M3 202,214.15 2,620,860.00 2,823,074.15
G.25a.13 PEMBESIAN RINGBALK 15/20 166.67 Kg / M3 186,720.40 2,420,048.40 2,606,768.80
G.25a.14 PEMBESIAN BALOK 15/25 163.47 Kg / M3 183,135.44 2,373,584.40 2,556,719.84
G.25a.15 PEMBESIAN BALOK 15/30 200.89 Kg / M3 225,057.07 2,916,922.80 3,141,979.87
G.25a.16 PEMBESIAN BALOK LATEI 10/10 320.00 Kg / M3 358,496.00 4,646,400.00 5,004,896.00
G.25a.17 PEMBESIAN PLAT DAK BETON T. 12 CM 152.42 Kg / M3 170,756.13 2,213,138.40 2,383,894.53
G.25a.17a PEMBESIAN PLAT DAK BETON T. 10 CM 119.10 Kg / M3 133,427.73 1,729,332.00 1,862,759.73
G.25a.18 PEMBESIAN BALOK 20/30 190.00 Kg / M3 212,857.00 2,758,800.00 2,971,657.00
G.25a.19 PEMBESIAN BALOK 20/40 213.25 Kg / M3 238,903.98 3,096,390.00 3,335,293.98
G.25a.20 PEMBESIAN BALOK 25/50 192.80 Kg / M3 215,993.84 2,799,456.00 3,015,449.84
G.25a.21 PEMBESIAN BALOK 30/60 190.56 Kg / M3 213,484.37 2,766,931.20 2,980,415.57
G.25a.22 PEMBESIAN PONDASI POOR 105.00 Kg / M3 117,631.50 1,524,600.00 1,642,231.50
G.25a.23 PEMBESIAN PONDASI FOOT PLAT T.20 CM 166.00 Kg / M3 185,969.80 2,410,320.00 2,596,289.80
G.25a.24 PEMBESIAN PONDASI FOOT PLAT T.25 CM 137.80 Kg / M3 154,377.34 2,000,856.00 2,155,233.34
G.25a.25 PEMBESIAN PONDASI FOOT PLAT T.15 CM 208.87 Kg / M3 233,997.06 3,032,792.40 3,266,789.46
G.25a.26 PEMBESIAN BALOK 20/35 217.71 Kg / M3 243,900.51 3,161,149.20 3,405,049.71
G.25a.27 PEMBESIAN BALOK 25/40 204.60 Kg / M3 229,213.38 2,970,792.00 3,200,005.38
G.25a.28 PEMBESIAN BALOK 25/45 198.04 Kg / M3 221,864.21 2,875,540.80 3,097,405.01
G.25a.29 PEMBESIAN BALOK 30/55 187.27 Kg / M3 209,798.58 2,719,160.40 2,928,958.98
G.25a.30 PEMBESIAN KOLOM 15/15 211.56 Kg / M3 237,010.67 3,071,851.20 3,308,861.87
G.25a.31 PEMBESIAN KOLOM 15/20 226.00 Kg / M3 253,187.80 3,281,520.00 3,534,707.80
G.25a.32 PEMBESIAN KOLOM 15/25 187.20 Kg / M3 209,720.16 2,718,144.00 2,927,864.16
G.25a.33 PEMBESIAN KOLOM 15/30 200.89 Kg / M3 225,057.07 2,916,922.80 3,141,979.87
G.25a.34 PEMBESIAN KOLOM 20/30 200.67 Kg / M3 224,810.60 2,913,728.40 3,138,539.00
G.25a.35 PEMBESIAN KOLOM 30/40 184.00 Kg / M3 206,135.20 2,671,680.00 2,877,815.20
G.25a.36 PEMBESIAN KOLOM 50/50 176.24 Kg / M3 197,441.67 2,559,004.80 2,756,446.47
G.25a.37 PEMBESIAN KOLOM 35/35 180.25 Kg / M3 201,934.08 2,617,230.00 2,819,164.08
G.25a.38 PEMBESIAN KOLOM 45/45 176.20 Kg / M3 197,396.86 2,558,424.00 2,755,820.86
G.25a.39 PEMBESIAN PLAT LISTPLANK, KANOPI T. 8 CM 83.13 Kg / M3 93,130.54 1,207,047.60 1,300,178.14
G.29 1 M2 PASANG BEGISTING PAPAN
BAHAN
Kaso 5/7 Borneo (2x Pakai) 50% 0.0170 M3 4,298,000.00 - 36,533.00 36,533.00
Papan Terentang (3x Pakai) 75% 0.0240 M3 3,134,000.00 - 56,412.00 56,412.00
Paku Biasa 2" - 5" 0.4000 Kg 20,000.00 - 8,000.00 8,000.00
UPAH
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.1500 Org 91,000.00 13,650.00 - 13,650.00
Pembantu Tukang 0.1200 Org 65,000.00 7,800.00 - 7,800.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 47,440.00 100,945.00 148,385.00
Halaman 406
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 17,489.50 100,000.00 117,489.50
Halaman 407
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
H.2a 1 M2 PASANG ATAP GENTENG KODOK NATURAL
BAHAN
Genteng Kodok Natural 25.0000 Bh 4,000.00 - 100,000.00 100,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 17,489.50 100,000.00 117,489.50
H.2c 1 M2 PASANG ATAP GENTENG MORANDO NATURAL
BAHAN
Genteng Morando Natural 18.0000 Bh 4,000.00 - 72,000.00 72,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 17,489.50 72,000.00 89,489.50
H.2d 1 M2 PASANG ATAP GENTENG MORANDO TRANSPARANT
BAHAN
Genteng Morando Transparant 18.0000 Bh 4,000.00 - 72,000.00 72,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 17,489.50 72,000.00 89,489.50
H.2e 1 M2 PASANG ATAP GENTENG MORANDO WARNA
BAHAN
Genteng Morando Warna 18.0000 Bh 5,000.00 - 90,000.00 90,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 17,489.50 90,000.00 107,489.50
H.2f 1 M2 PASANG PENUTUP ATAP GENTENG LAMA
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 17,489.50 - 17,489.50
H.3 1 M2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR
BAHAN
Genteng Palentong Super 12.0000 Bh 3,000.00 - 36,000.00 36,000.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 17,489.50 36,000.00 53,489.50
H.4 1 M' PASANG GENTENG BUBUNG PALENTONG
BAHAN
Genteng Bubung Palentong 5.0000 Bh 4,000.00 - 20,000.00 20,000.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 44,628.00 38,944.00 83,572.00
H.5 1 M' PASANG BUBUNG GENTENG KODOK GLAZUUR
BAHAN
Genteng Bubung Kodok 5.0000 Bh 8,000.00 - 40,000.00 40,000.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
Halaman 408
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
JUMLAH .......................... 44,628.00 58,944.00 103,572.00
Halaman 409
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
H.5a 1 M' PASANG BUBUNG GENTENG KODOK / ALTO NATURAL
BAHAN
Genteng Bubung Kodok / Alto Natural 5.0000 Bh 6,000.00 - 30,000.00 30,000.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 44,628.00 48,944.00 93,572.00
H.5c 1 M' PASANG BUBUNG GENTENG MORANDO NATURAL
BAHAN
Genteng Bubung Morando Natural 4.0000 Bh 5,000.00 - 20,000.00 20,000.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 44,628.00 38,944.00 83,572.00
H.5d 1 M' PASANG BUBUNG GENTENG MORANDO TRANSPARANT
BAHAN
Genteng Bubung Morando Transparant 4.0000 Bh 8,000.00 - 32,000.00 32,000.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 44,628.00 50,944.00 95,572.00
H.5e 1 M' PASANG BUBUNG GENTENG MORANDO WARNA
BAHAN
Genteng Bubung Morando Warna 4.0000 Bh 9,000.00 - 36,000.00 36,000.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 44,628.00 54,944.00 99,572.00
H.6 1 M' PASANG BUBUNG GENTENG PALENTONG BESAR
BAHAN
Genteng Bubung Palentong Besar 4.0000 Bh 5,000.00 - 20,000.00 20,000.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
UPAH 0.00
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 44,628.00 38,944.00 83,572.00
H.8 1 M2 PASANG ATAP ASBES GELOMBANG (2,50 x 0,92) x 5 mm
BAHAN
Asbes Gelombang 0.5000 Lbr 88,000.00 - 44,000.00 44,000.00
Paku Pancing 60 x 230 6.0000 Bh 2,000.00 - 12,000.00 12,000.00
UPAH
Pekerja 0.1400 Org 62,000.00 8,680.00 - 8,680.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 16,915.00 56,000.00 72,915.00
H.8a 1 M2 PASANG ATAP ASBES GELOMBANG (2,50 x 0,92) x 4 mm
BAHAN
Asbes Gelombang 0.5000 Lbr 86,000.00 - 43,000.00 43,000.00
Paku Pancing 60 x 230 6.0000 Bh 2,000.00 - 12,000.00 12,000.00
UPAH
Pekerja 0.1400 Org 62,000.00 8,680.00 - 8,680.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Halaman 410
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 16,915.00 55,000.00 71,915.00
Halaman 411
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
H.9 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 5 mm (GORDING CANAL)
BAHAN
Asbes Gelombang 0.6000 Lbr 80,000.00 - 48,000.00 48,000.00
Paku Pancing 60 x 230 6.0000 Bh 2,000.00 - 12,000.00 12,000.00
UPAH
Pekerja 0.1400 Org 62,000.00 8,680.00 - 8,680.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 16,915.00 60,000.00 76,915.00
H.9a 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 4 mm
BAHAN
Asbes Gelombang 0.6000 Lbr 76,000.00 - 45,600.00 45,600.00
Paku Pancing 60 x 230 6.0000 Bh 2,000.00 - 12,000.00 12,000.00
UPAH
Pekerja 0.1400 Org 62,000.00 8,680.00 - 8,680.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 16,915.00 57,600.00 74,515.00
H.9b 1 M2 PASANG ATAP SENG GELOMBANG BJLS 28
BAHAN
Seng Gelombang BJLS 28 ( 80 x 180 cm ) 0.7000 Lbr 59,000.00 - 41,300.00 41,300.00
Paku Pancing 60 x 230 6.0000 Bh 2,000.00 - 12,000.00 12,000.00
UPAH 0.00
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Kayu 0.0600 Org 89,000.00 5,340.00 - 5,340.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0060 Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 13,950.00 53,300.00 67,250.00
H.9.Rob 1 M2 PASANG ATAP ASBES GELOMBANG LAMA
BAHAN
Paku Pancing 6.0000 Bh 2,000.00 - 12,000.00 12,000.00
UPAH 0.00
Pekerja 0.1400 Org 62,000.00 8,680.00 - 8,680.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 16,915.00 12,000.00 28,915.00
H.10 1 M2 PASANG ATAP ASBES GELOMBANG (2,25 x 0,92) x 5 mm (GORDING KAYU)
BAHAN
Asbes Gelombang 0.6000 Lbr 80,000.00 - 48,000.00 48,000.00
Paku Payung asbes 6.0000 Bh 616.67 - 3,700.00 3,700.00
UPAH
Pekerja 0.1400 Org 62,000.00 8,680.00 - 8,680.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 16,915.00 51,700.00 68,615.00
H.10.Rob 1 M2 PASANG ATAP ASBES GELOMBANG LAMA
BAHAN
Paku Payung asbes 6.0000 Bh 616.67 - 3,700.00 3,700.00
UPAH
Pekerja 0.1400 Org 62,000.00 8,680.00 - 8,680.00
Tukang Kayu 0.0750 Org 89,000.00 6,675.00 - 6,675.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0080 Org 104,000.00 832.00 - 832.00
JUMLAH .......................... 16,915.00 3,700.00 20,615.00
H.22 1 M' PASANG BUBUNG STEL GELOMBANG 0.92 M
BAHAN
Bubung Stel Gelombang 2.4000 M' 48,000.00 - 115,200.00 115,200.00
Paku Sekrup 6.0000 Bh 2.25 - 13.50 13.50
UPAH
Pekerja 0.0840 Org 62,000.00 5,208.00 - 5,208.00
Tukang Kayu 0.1250 Org 89,000.00 11,125.00 - 11,125.00
Kepala Tukang 0.0130 Org 91,000.00 1,183.00 - 1,183.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 17,932.00 115,213.50 133,145.50
H.30 1 M2 PASANG ATAP GENTENG BETON
BAHAN
Genteng Beton 11.0000 Bh 6,000.00 - 66,000.00 66,000.00
Paku Biasa 2" - 5" 0.0300 Kg 20,000.00 - 600.00 600.00
UPAH
Halaman 412
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 23,250.00 66,600.00 89,850.00
Halaman 413
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
H.32 1 M2 PASANG ATAP GENTENG METAL BERPASIR
BAHAN
Genteng Metal Berpasir 1.0200 Lbr 129,000.00 - 131,580.00 131,580.00
Paku Biasa 2" - 5" 0.0200 Kg 20,000.00 - 400.00 400.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 23,250.00 131,980.00 155,230.00
H.34 1 M' PASANG NOK GENTENG BETON
BAHAN
Nok Genteng beton 3.5000 Bh 7,000.00 - 24,500.00 24,500.00
Paku Biasa 2" - 5" 0.0500 Kg 20,000.00 - 1,000.00 1,000.00
Semen Portland 10.8000 Kg 1,400.00 - 15,120.00 15,120.00
Pasir Pasang 0.0320 M3 242,000.00 - 7,744.00 7,744.00
Semen Warna 1.0000 Kg 15,500.00 - 15,500.00 15,500.00
UPAH
Pekerja 0.4000 Org 62,000.00 24,800.00 - 24,800.00
Tukang Kayu 0.2000 Org 89,000.00 17,800.00 - 17,800.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0200 Org 104,000.00 2,080.00 - 2,080.00
JUMLAH .......................... 46,500.00 63,864.00 110,364.00
H.36 1 M' PASANG NOK GENTENG METAL
BAHAN
Genteng Decra Bond 1.1000 M' 51,000.00 - 56,100.00 56,100.00
Paku Biasa 1/2" - 1" 0.0500 Kg 22,000.00 - 1,100.00 1,100.00
UPAH
Pekerja 0.2500 Org 62,000.00 15,500.00 - 15,500.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.0150 Org 91,000.00 1,365.00 - 1,365.00
Mandor 0.0130 Org 104,000.00 1,352.00 - 1,352.00
JUMLAH .......................... 31,567.00 57,200.00 88,767.00
H.38 1 M2 PASANG ATAP SENG GELOMBANG
BAHAN
Seng Gelombang 3" x 6" BJLS 28 0.7000 Lbr 59,000.00 - 41,300.00 41,300.00
Paku Biasa 1/2" - 1" 0.0200 Kg 22,000.00 - 440.00 440.00
UPAH
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Kayu 0.0600 Org 89,000.00 5,340.00 - 5,340.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0060 Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 13,950.00 41,740.00 55,690.00
H.39 1 M' PASANG NOK SENG
BAHAN
Seng Plat BJLS 28 0.3000 Lbr 57,000.00 - 17,100.00 17,100.00
Paku Biasa 1/2" - 1" 0.0400 Kg 22,000.00 - 880.00 880.00
UPAH 0.00
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0080 Org 91,000.00 728.00 - 728.00
Mandor 0.0060 Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 16,882.00 17,980.00 34,862.00
I. PEKERJAAN LANGIT-LANGIT
I.2 1 M2 LANGIT-LANGIT ASBES (1,00 X 1,00) M, TEBAL 5 mm
BAHAN
Plat asbes tebal 5 mm 1.1000 Lbr 72,000.00 - 79,200.00 79,200.00
Paku Biasa 1/2" - 1" 0.0100 Kg 22,000.00 - 220.00 220.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 79,420.00 88,563.00
I.3 1 M2 LANGIT-LANGIT ASBES (1,00 X 1,00) M, TEBAL 4 mm
BAHAN
Plat asbes tebal 4 mm 1.1000 Lbr 27,000.00 - 29,700.00 29,700.00
Paku Biasa 1/2" - 1" 0.0100 Kg 22,000.00 - 220.00 220.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Halaman 414
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 29,920.00 39,063.00
Halaman 415
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
I.20 1 M2 LANGIT-LANGIT ASBES (1,00x1,00) m, TEBAL 4 mm, RANGKA BORNEO
BAHAN
Kayu Borneo, Balok 0.0120 M3 4,888,000.00 - 58,656.00 58,656.00
Paku Biasa 1/2" - 1" 0.0100 Kg 22,000.00 - 220.00 220.00
Asbes 1,00 x 1,00 m 1.1000 Lbr 27,000.00 - 29,700.00 29,700.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 88,576.00 97,719.00
I.20a 1 M2 LANGIT-LANGIT ASBES (1,00x1,00) m, TEBAL 4 mm, RANGKA KRUING
BAHAN
Kayu Kruing, Balok 0.0120 M3 8,010,000.00 - 96,120.00 96,120.00
Paku Biasa 1/2" - 1" 0.0600 Kg 22,000.00 - 1,320.00 1,320.00
Asbes 1,00 x 1,00 m 1.1000 Lbr 27,000.00 - 29,700.00 29,700.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 127,140.00 136,283.00
I.20.Rob 1 M2 LANGIT-LANGIT ASBES (1,00x1,00) m, TEBAL 4 mm, RANGKA KAYU LAMA
BAHAN
Paku Biasa 1/2" - 1" 0.0600 Kg 22,000.00 - 1,320.00 1,320.00
Asbes 1,00 x 1,00 m t. 4 mm 1.1000 Lbr 27,000.00 - 29,700.00 29,700.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 31,020.00 40,163.00
I.20c 1 M2 LANGIT-LANGIT GRC, RANGKA KAYU BORNEO
BAHAN
Kayu Borneo, Balok 0.0120 M3 4,888,000.00 - 58,656.00 58,656.00
Paku Biasa 1/2" - 1" 0.0600 Kg 22,000.00 - 1,320.00 1,320.00
Plafond GRC 0.3472 Lbr 72,000.00 - 25,000.00 25,000.00
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 1,656.00
Compoun 0.1250 Zak 82,000.00 - 10,250.00 10,250.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 96,882.00 106,025.00
I.20c.Rob 1 M2 LANGIT-LANGIT GRC, RANGKA KAYU LAMA
BAHAN
Paku Biasa 1/2" - 1" 0.0600 Kg 22,000.00 - 1,320.00 1,320.00
Plafond GRC 0.3472 Lbr 72,000.00 - 25,000.00 25,000.00
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 1,656.00
Compoun 0.1250 Zak 82,000.00 - 10,250.00 10,250.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 38,226.00 47,369.00
I.20d 1 M2 LANGIT-LANGIT GRC, RANGKA KAYU KRUING
BAHAN
Kayu Kruing. Balok 0.0120 M3 8,010,000.00 - 96,120.00 96,120.00
Paku Biasa 1/2" - 1" 0.0600 Kg 22,000.00 - 1,320.00 1,320.00
Plafond GRC 0.3472 Lbr 72,000.00 - 25,000.00 25,000.00
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 1,656.00
Compoun 0.1250 Zak 82,000.00 - 10,250.00 10,250.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Kayu 0.0700 Org 89,000.00 6,230.00 - 6,230.00
Kepala Tukang 0.0070 Org 91,000.00 637.00 - 637.00
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 9,143.00 134,346.00 143,489.00
Halaman 416
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
I.20e 1 M2 LANGIT-LANGIT GRC + RANGKA HOLLOW
BAHAN
Hollow 4/4 zincromate 0.4150 Btg 156,000.00 - 64,740.00 #VALUE!
Hollow 2/4 zincromate 0.1500 Btg 234,000.00 - 35,100.00 #VALUE!
Plafond GRC 0.3472 Lbr 72,000.00 - 25,000.00 #VALUE!
Ramset/dina bolt 4.0000 Bh 6,000.00 - 24,000.00 #VALUE!
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 #VALUE!
Compoun 0.1250 Zak 82,000.00 - 10,250.00 #VALUE!
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.0500 Org 89,000.00 4,450.00 - 4,450.00
Kepala Tukang 0.0050 Org 91,000.00 455.00 - 455.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 11,625.00 160,746.00 172,371.00
I.20f 1 M2 LANGIT-LANGIT GYPSUM BOARD Tbl = 9 mm, RANGKA HOLLOW
BAHAN
Hollow 4/4 zincromate 0.4150 Btg 156,000.00 - 64,740.00 #VALUE!
Hollow 2/4 zincromate 0.1500 Btg 234,000.00 - 35,100.00 #VALUE!
Plafond Gypsum 0.3472 Lbr 88,000.00 - 30,555.56 #VALUE!
Dina bolt 4.0000 Bh 6,000.00 - 24,000.00 #VALUE!
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 #VALUE!
Compoun 0.1250 Zak 82,000.00 - 10,250.00 #VALUE!
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.0500 Org 89,000.00 4,450.00 - 4,450.00
Kepala Tukang 0.0050 Org 91,000.00 455.00 - 455.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 11,625.00 166,301.56 177,926.56
I.20g 1 M2 LANGIT-LANGIT AKUISTIK (60 X 120) Cm, RANGKA ALUMUNIUM
BAHAN
Profil Almunium T 3.6000 M' 46,000.00 - 165,600.00 165,600.00
Kawat F 4 mm 0.1500 Btg 2,000.00 - 300.00 300.00
Ramset/dina bolt 1.0500 Bh 6,000.00 - 6,300.00 6,300.00
Plafond Akustik 60 x 120 cm 1.5000 Lbr 138,000.00 - 207,000.00 207,000.00
UPAH
Pekerja 0.1800 Org 62,000.00 11,160.00 - 11,160.00
Tukang Kayu 0.3200 Org 89,000.00 28,480.00 - 28,480.00
Kepala Tukang 0.0320 Org 91,000.00 2,912.00 - 2,912.00
Mandor 0.0090 Org 104,000.00 936.00 - 936.00
JUMLAH .......................... 43,488.00 379,200.00 422,688.00
I.21 1 M2 LANGIT-LANGIT TRIPLEK 6 mm, RANGKA BORNEO
BAHAN
Kayu Borneo, Balok 0.0120 M3 4,888,000.00 - 58,656.00 58,656.00
Paku Biasa 1/2" - 1" 0.0300 Kg 22,000.00 - 660.00 660.00
Triplek 6 mm 0.3750 Lbr 104,000.00 - 39,000.00 39,000.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 98,316.00 114,846.00
I.21.Rob 1 M2 LANGIT-LANGIT LAMBERSERING KAYU 9 CM
BAHAN
Paku Biasa 1/2" - 1" 0.0100 Kg 22,000.00 - 220.00 220.00
Triplek 6 mm 0.0150 Lbr 104,000.00 - 1,560.00 1,560.00
Lambersering 1.0000 M2 200,000.00 - 200,000.00 200,000.00
UPAH
Pekerja 0.8000 Org 62,000.00 49,600.00 - 49,600.00
Tukang Kayu 0.8000 Org 89,000.00 71,200.00 - 71,200.00
Kepala Tukang 0.0800 Org 91,000.00 7,280.00 - 7,280.00
Mandor 0.0400 Org 104,000.00 4,160.00 - 4,160.00
JUMLAH .......................... 132,240.00 201,780.00 334,020.00
I.22 1 M2 LANGIT-LANGIT TRIPLEK 6 mm, KAYU LAMA
BAHAN
Paku Biasa 1/2" - 1" 0.0100 Kg 22,000.00 - 220.00 220.00
Triplek 6 mm 0.0150 Lbr 104,000.00 - 1,560.00 1,560.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 16,530.00 1,780.00 18,310.00
Halaman 417
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
I.24 1 M2 LANGIT-LANGIT GYPSUM BOARD, TEBAL 9 mm, TANPA RANGKA
BAHAN
Gypsum Board (120 x 240 x 9) mm 0.3640 Lbr 88,000.00 - 32,032.00 32,032.00
Paku Sekrup gypsum 0.1100 Kg 30,000.00 - 3,300.00 3,300.00
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 1,656.00
Compoun 0.1250 Zak 82,000.00 - 10,250.00 10,250.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.0500 Org 89,000.00 4,450.00 - 4,450.00
Kepala Tukang 0.0050 Org 91,000.00 455.00 - 455.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 11,625.00 47,238.00 58,863.00
I.24a 1 M2 LANGIT-LANGIT GYPSUM BOARD TEBAL 9 mm, RANGKA BORNEO
BAHAN
Kayu Borneo, Balok 0.0120 M3 4,888,000.00 - 58,656.00 #VALUE!
Paku Biasa 2" - 5" 0.0600 Kg 20,000.00 - 1,200.00 #VALUE!
Paku Sekrup gypsum 0.1100 Kg 30,000.00 - 3,300.00 #VALUE!
Plafond Gypsum 0.3640 Lbr 88,000.00 - 32,032.00 #VALUE!
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 #VALUE!
Compoun 0.1250 Zak 82,000.00 - 10,250.00 #VALUE!
UPAH
Pekerja 0.1800 Org 62,000.00 11,160.00 - 11,160.00
Tukang Kayu 0.3200 Org 89,000.00 28,480.00 - 28,480.00
Kepala Tukang 0.0320 Org 91,000.00 2,912.00 - 2,912.00
Mandor 0.0090 Org 104,000.00 936.00 - 936.00
JUMLAH .......................... 43,488.00 107,094.00 150,582.00
I.24a.Rob 1 M2 LANGIT-LANGIT GRC, RANGKA BORNEO
BAHAN
Kayu Borneo, Balok 0.0120 M3 4,888,000.00 - 58,656.00 58,656.00
Paku Biasa 0.1700 Kg 20,000.00 - 3,400.00 3,400.00
Plafond G R C 0.3640 Lbr 72,000.00 - 26,208.00 26,208.00
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 1,656.00
Compoun 0.1250 Zak 82,000.00 - 10,250.00 10,250.00
UPAH
Pekerja 0.1800 Org 62,000.00 11,160.00 - 11,160.00
Tukang Kayu 0.3200 Org 89,000.00 28,480.00 - 28,480.00
Kepala Tukang 0.0320 Org 91,000.00 2,912.00 - 2,912.00
Mandor 0.0090 Org 104,000.00 936.00 - 936.00
JUMLAH .......................... 43,488.00 100,170.00 143,658.00
I.24b 1 M2 LANGIT-LANGIT GYPSUM BOARD TEBAL 9 mm, RANGKA KRUING
BAHAN
Kayu Kruing, Balok 0.0120 M3 8,010,000.00 - 96,120.00 #VALUE!
Paku Biasa 2" - 5" 0.0600 Kg 20,000.00 - 1,200.00 #VALUE!
Paku Sekrup gypsum 0.1100 Kg 30,000.00 - 3,300.00 #VALUE!
Plafond Gypsum 0.3640 Lbr 88,000.00 - 32,032.00 #VALUE!
Cotton Plaster 0.0720 Bh 23,000.00 - 1,656.00 #VALUE!
Compoun 0.1250 Zak 82,000.00 - 10,250.00 #VALUE!
UPAH
Pekerja 0.1800 Org 62,000.00 11,160.00 - 11,160.00
Tukang Kayu 0.3200 Org 89,000.00 28,480.00 - 28,480.00
Kepala Tukang 0.0320 Org 91,000.00 2,912.00 - 2,912.00
Mandor 0.0090 Org 104,000.00 936.00 - 936.00
JUMLAH .......................... 43,488.00 144,558.00 188,046.00
I.24c 1 M2 PLAFOND SPANDRELL
BAHAN
Rangka Hollow 40x40x0,8 mm 2.0000 M' 56,000.00 - 112,000.00 #VALUE!
Rangka Hollow 40x20x0,8 mm 2.0000 M' 45,000.00 - 90,000.00 #VALUE!
Spandrell CA 2.0000 Lbr 383,000.00 - 766,000.00 #VALUE!
Siku Alumunium 2.0000 M' 35,000.00 - 70,000.00 #VALUE!
Paku Sekrup 0.1100 Kg 26,000.00 - 2,860.00 #VALUE!
Alat Bantu 0.2000 Kg 30,000.00 - 6,000.00 #VALUE!
UPAH
Pekerja 0.5760 Org 62,000.00 35,712.00 - 35,712.00
Tukang Alumunium 1.0240 Org 87,000.00 89,088.00 - 89,088.00
Kepala Tukang 0.1024 Org 91,000.00 9,318.40 - 9,318.40
Mandor 0.0288 Org 104,000.00 2,995.20 - 2,995.20
JUMLAH .......................... 137,113.60 1,046,860.00 1,183,973.60
J. PEKERJAAN SANITASI
J.1 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK (SETARA INA)
BAHAN
Kloset duduk / monoblok 1.0000 Bh 1,734,000.00 - 1,734,000.00 1,734,000.00
Perlengkapan (6% Harga Closet duduk) 1.0000 Ls 104,040.00 - 104,040.00 104,040.00
Halaman 418
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
UPAH
Pekerja 3.3000 Org 62,000.00 204,600.00 - 204,600.00
Tukang Batu 1.1000 Org 83,000.00 91,300.00 - 91,300.00
Kepala Tukang 0.0010 Org 91,000.00 91.00 - 91.00
Mandor 0.1600 Org 104,000.00 16,640.00 - 16,640.00
JUMLAH .......................... 312,631.00 1,838,040.00 2,150,671.00
Halaman 419
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
J.2 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOK (SETARA TOTO)
BAHAN
Kloset duduk / monoblok 1.0000 Bh 2,310,000.00 - 2,310,000.00 2,310,000.00
Perlengkapan (6% Harga Closet duduk) 1.0000 Ls 138,600.00 - 138,600.00 138,600.00
UPAH
Pekerja 3.3000 Org 62,000.00 204,600.00 - 204,600.00
Tukang Batu 1.1000 Org 83,000.00 91,300.00 - 91,300.00
Kepala Tukang 0.0010 Org 91,000.00 91.00 - 91.00
Mandor 0.1600 Org 104,000.00 16,640.00 - 16,640.00
JUMLAH .......................... 312,631.00 2,448,600.00 2,761,231.00
J.3 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN
BAHAN
Kloset Jongkok Porselen 1.0000 Bh 191,000.00 - 191,000.00 191,000.00
Semen Portland 6.0000 Kg 1,400.00 - 8,400.00 8,400.00
Pasir Pasang 0.0100 M3 242,000.00 - 2,420.00 2,420.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Tukang Batu 1.5000 Org 83,000.00 124,500.00 - 124,500.00
Kepala Tukang 0.1500 Org 91,000.00 13,650.00 - 13,650.00
Mandor 0.1600 Org 104,000.00 16,640.00 - 16,640.00
JUMLAH .......................... 216,790.00 201,820.00 418,610.00
J.4 MEMASANG 1 BUAH URINOIR
BAHAN
Urinoir 1.0000 Bh 1,842,000.00 - 1,842,000.00 1,842,000.00
Semen Portland 6.0000 Kg 1,400.00 - 8,400.00 8,400.00
Pasir Pasang 0.0100 M3 242,000.00 - 2,420.00 2,420.00
Perlengkapan (30% Harga Urinoir) 1.0000 Ls 552,600.00 - 552,600.00 552,600.00
UPAH
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Tukang Batu 1.0000 Org 83,000.00 83,000.00 - 83,000.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 159,300.00 2,405,420.00 2,564,720.00
J.5 MEMASANG 1 BUAH WASHTAFEL
BAHAN
Washtafel 1.0000 Bh 1,294,000.00 - 1,294,000.00 1,294,000.00
Semen Portland 6.0000 Kg 1,400.00 - 8,400.00 8,400.00
Pasir Pasang 0.1000 M3 242,000.00 - 24,200.00 24,200.00
Perlengkapan (12% Harga Washtafel) 1.0000 Ls 155,280.00 - 155,280.00 155,280.00
UPAH
Pekerja 1.2000 Org 62,000.00 74,400.00 - 74,400.00
Tukang Batu 1.4500 Org 83,000.00 120,350.00 - 120,350.00
Kepala Tukang 0.1500 Org 91,000.00 13,650.00 - 13,650.00
Mandor 0.0600 Org 104,000.00 6,240.00 - 6,240.00
JUMLAH .......................... 214,640.00 1,481,880.00 1,696,520.00
J.6 MEMASANG 1 BUAH BATHTUB
BAHAN
Bathtub 1.0000 Bh 4,025,000.00 - 4,025,000.00 4,025,000.00
Perlengkapan (20% Harga Bathtub) 1.0000 Ls 805,000.00 - 805,000.00 805,000.00
UPAH
Pekerja 0.0750
Org 62,000.00 4,650.00 - 4,650.00
Tukang Batu 0.7500
Org 83,000.00 62,250.00 - 62,250.00
Kepala Tukang 0.0750
Org 91,000.00 6,825.00 - 6,825.00
Mandor 0.0030
Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 74,037.00 4,830,000.00 4,904,037.00
J.8 MEMASANG 1 BUAH BAK MANDI BATU BATA LAPIS KERAMIK VOLUME 0,3 M3
BAHAN
Batu Bata 150.0000 Bh 900.00 - 135,000.00 135,000.00
Semen Portland 120.0000 Kg 1,400.00 - 168,000.00 168,000.00
Pasir Pasang 0.3000 M3 242,000.00 - 72,600.00 72,600.00
Keramik Dinding 20 x 25 cm 3.7900 M2 65,000.00 - 246,350.00 246,350.00
Semen Nat 6.0000 Kg 15,500.00 - 93,000.00 93,000.00
UPAH
Pekerja 6.0000 Org 62,000.00 372,000.00 - 372,000.00
Tukang Batu 3.0000 Org 83,000.00 249,000.00 - 249,000.00
Kepala Tukang 0.3000 Org 91,000.00 27,300.00 - 27,300.00
Mandor 0.0300 Org 104,000.00 3,120.00 - 3,120.00
JUMLAH .......................... 651,420.00 714,950.00 1,366,370.00
Halaman 420
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
J.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (30 x 30) cm, T = 35 cm
BAHAN
Batu Bata 40.0000 Bh 900.00 - 36,000.00 #VALUE!
Semen Portland 44.0000 Kg 1,400.00 - 61,600.00 #VALUE!
Pasir Pasang 0.0700 M3 242,000.00 - 16,940.00 #VALUE!
Batu Kerikil 0.0700 M3 247,000.00 - 17,290.00 #VALUE!
Baja Tulangan 1.6000 Kg 13,500.00 - 21,600.00 #VALUE!
Pasir Beton 0.0600 M3 289,000.00 - 17,340.00 #VALUE!
UPAH
Pekerja 2.1600 Org 62,000.00 133,920.00 - 133,920.00
Tukang Batu 0.7200 Org 83,000.00 59,760.00 - 59,760.00
Kepala Tukang 0.0720 Org 91,000.00 6,552.00 - 6,552.00
Mandor 0.0110 Org 104,000.00 1,144.00 - 1,144.00
JUMLAH .......................... 201,376.00 170,770.00 372,146.00
J.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45 x 45) cm, T = 50 cm
BAHAN
Batu Bata 70.0000 Bh 900.00 - 63,000.00 #VALUE!
Semen Portland 77.0000 Kg 1,400.00 - 107,800.00 #VALUE!
Pasir Pasang 0.1300 M3 242,000.00 - 31,460.00 #VALUE!
Batu Kerikil 0.0200 M3 247,000.00 - 4,940.00 #VALUE!
Baja Tulangan 2.6000 Kg 13,500.00 - 35,100.00 #VALUE!
Pasir Beton 0.0900 M3 289,000.00 - 26,010.00 #VALUE!
UPAH
Pekerja 3.2000 Org 62,000.00 198,400.00 - 198,400.00
Tukang Batu 1.1500 Org 83,000.00 95,450.00 - 95,450.00
Kepala Tukang 0.0110 Org 91,000.00 1,001.00 - 1,001.00
Mandor 0.0160 Org 104,000.00 1,664.00 - 1,664.00
JUMLAH .......................... 296,515.00 268,310.00 564,825.00
J.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1/2"
BAHAN
Pipa Galvanis d. 1/2" 1.2000 M' 26,000.00 - 31,200.00 31,200.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 9,100.00 - 9,100.00 9,100.00
UPAH
Pekerja 0.0540 Org 62,000.00 3,348.00 - 3,348.00
Tukang Batu 0.0900 Org 83,000.00 7,470.00 - 7,470.00
Kepala Tukang 0.0090 Org 91,000.00 819.00 - 819.00
Mandor 0.0270 Org 104,000.00 2,808.00 - 2,808.00
JUMLAH .......................... 14,445.00 40,300.00 54,745.00
J.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3/4"
BAHAN
Pipa Galvanis d. 3/4" 1.2000 M' 35,000.00 - 42,000.00 42,000.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 12,250.00 - 12,250.00 12,250.00
UPAH
Pekerja 0.0540 Org 62,000.00 3,348.00 - 3,348.00
Tukang Batu 0.0900 Org 83,000.00 7,470.00 - 7,470.00
Kepala Tukang 0.0090 Org 91,000.00 819.00 - 819.00
Mandor 0.0270 Org 104,000.00 2,808.00 - 2,808.00
JUMLAH .......................... 14,445.00 54,250.00 68,695.00
J.25 MEMASANG 1 M' PIPA PVC TIPE AW d. 1/2"
BAHAN
Pipa PVC d. 1/2" 1.2000 M' 6,000.00 - 7,200.00 7,200.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 2,100.00 - 2,100.00 2,100.00
UPAH
Pekerja 0.0360 Org 62,000.00 2,232.00 - 2,232.00
Tukang Batu 0.0600 Org 83,000.00 4,980.00 - 4,980.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 7,966.00 9,300.00 17,266.00
J.26 MEMASANG 1 M' PIPA PVC TIPE AW d. 3/4"
BAHAN
Pipa PVC d. 3/4" 1.2000 M' 8,000.00 - 9,600.00 9,600.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 2,800.00 - 2,800.00 2,800.00
UPAH
Pekerja 0.0360 Org 62,000.00 2,232.00 - 2,232.00
Tukang Batu 0.0600 Org 83,000.00 4,980.00 - 4,980.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 7,966.00 12,400.00 20,366.00
J.27 MEMASANG 1 M' PIPA PVC TIPE AW d. 1"
BAHAN
Pipa PVC d. 1" 1.2000 M' 15,000.00 - 18,000.00 18,000.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 5,250.00 - 5,250.00 5,250.00
UPAH
Halaman 421
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 0.0360 Org 62,000.00 2,232.00 - 2,232.00
Tukang Batu 0.0600 Org 83,000.00 4,980.00 - 4,980.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 7,966.00 23,250.00 31,216.00
Halaman 422
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
J.28 MEMASANG 1 M' PIPA PVC TIPE AW d. 1 1/2"
BAHAN
Pipa PVC d. 1 1/2" 1.2000 M' 30,000.00 - 36,000.00 36,000.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 10,500.00 - 10,500.00 10,500.00
UPAH
Pekerja 0.0540 Org 62,000.00 3,348.00 - 3,348.00
Tukang Batu 0.0900 Org 83,000.00 7,470.00 - 7,470.00
Kepala Tukang 0.0090 Org 91,000.00 819.00 - 819.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 11,949.00 46,500.00 58,449.00
J.31 MEMASANG 1 M' PIPA PVC TIPE AW d. 3"
BAHAN
Pipa PVC d. 3" 1.2000 M' 44,000.00 - 52,800.00 52,800.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 15,400.00 - 15,400.00 15,400.00
UPAH
Pekerja 0.0810 Org 62,000.00 5,022.00 - 5,022.00
Tukang Batu 0.1350 Org 83,000.00 11,205.00 - 11,205.00
Kepala Tukang 0.0135 Org 91,000.00 1,228.50 - 1,228.50
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 17,871.50 68,200.00 86,071.50
J.32 MEMASANG 1 M' PIPA PVC TIPE AW d. 4"
BAHAN
Pipa PVC d. 4" 1.2000 M' 64,000.00 - 76,800.00 76,800.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 22,400.00 - 22,400.00 22,400.00
UPAH
Pekerja 0.0810 Org 62,000.00 5,022.00 - 5,022.00
Tukang Batu 0.1350 Org 83,000.00 11,205.00 - 11,205.00
Kepala Tukang 0.0135 Org 91,000.00 1,228.50 - 1,228.50
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 17,871.50 99,200.00 117,071.50
J.32.a MEMASANG 1 M' PIPA PVC TIPE AW d. 6"
BAHAN
Pipa PVC d. 6" 1.2000 M' 87,000.00 - 104,400.00 104,400.00
Perlengkapan 35% dari harga pipa 1.0000 Ls 30,450.00 - 30,450.00 30,450.00
UPAH
Pekerja 0.0810 Org 62,000.00 5,022.00 - 5,022.00
Tukang Batu 0.1350 Org 83,000.00 11,205.00 - 11,205.00
Kepala Tukang 0.0135 Org 91,000.00 1,228.50 - 1,228.50
Mandor 0.0040 Org 104,000.00 416.00 - 416.00
JUMLAH .......................... 17,871.50 134,850.00 152,721.50
J.33 MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS STEEL
BAHAN
Bak cuci stainless steel 1.0000 Bh 358,000.00 - 358,000.00 358,000.00
Water drain + accessories 1.0000 Set 81,000.00 - 81,000.00 81,000.00
UPAH
Pekerja 0.0300 Org 62,000.00 1,860.00 - 1,860.00
Tukang Batu 0.3000 Org 83,000.00 24,900.00 - 24,900.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0015 Org 104,000.00 156.00 - 156.00
JUMLAH .......................... 29,646.00 439,000.00 468,646.00
J.35 MEMASANG 1 BUAH KRAN d. 3/4" ATAU d. 1/2"
BAHAN
Kran Air 1.0000 Bh 91,000.00 - 91,000.00 91,000.00
Seal Tape 0.0250 Bh 4,000.00 - 100.00 100.00
UPAH
Pekerja 0.0100 Org 62,000.00 620.00 - 620.00
Tukang Batu 0.4000 Org 83,000.00 33,200.00 - 33,200.00
Kepala Tukang 0.0400 Org 91,000.00 3,640.00 - 3,640.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 37,980.00 91,100.00 129,080.00
J.36 MEMASANG 1 BUAH FLOOR DRAIN PLASTIK
BAHAN
Floor Drain Plastik 1.0000 Bh 12,000.00 - 12,000.00 12,000.00
UPAH
Pekerja 0.0100 Org 62,000.00 620.00 - 620.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 10,350.00 12,000.00 22,350.00
J.36.Rob MEMASANG 1 BUAH FLOOR DRAIN STAINLESS
BAHAN
Floor Drain Stainless 1.0000 Bh 157,000.00 - 157,000.00 157,000.00
UPAH
Halaman 423
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 0.0100 Org 62,000.00 620.00 - 620.00
Tukang Batu 0.1000 Org 83,000.00 8,300.00 - 8,300.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 10,350.00 157,000.00 167,350.00
Halaman 424
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
J.36a MEMASANG 1 UNIT SEPTIKTANK 2.5 x 1.5 x 2 + REMBESAN (KANTOR TIPE BESAR)
Galian Tanah 7.5000 M3 60,480.00 453,600.00 - #VALUE!
Pasir Urug 0.3570 M3 247,640.00 7,011.48 81,396.00 88,407.48
Lantai Kerja 3.7500 M3 804,015.00 501,168.75 2,513,887.50 3,015,056.25
Pas. Bata 1 : 3 25.0000 M2 122,168.00 734,250.00 2,319,950.00 3,054,200.00
Plesteran 1 Ps : 3 Pc 25.0000 M2 57,909.20 897,300.00 550,430.00 1,447,730.00
Acian 25.0000 M2 27,200.00 566,250.00 113,750.00 680,000.00
Plat Beton Penutup + Balok 0.5000 M3 2,470,143.14 142,205.27 1,092,866.30 1,235,071.57
Pipa PVC 4" + Sambungan 9.0000 M' 117,071.50 160,843.50 892,800.00 1,053,643.50
Pipa GI. 1 1/2" 2.0000 M' 68,695.00 28,890.00 108,500.00 137,390.00
Galian Tanah untuk rembesan 5.6250 M3 60,480.00 340,200.00 - #VALUE!
Pasangan ijuk 9.0000 Kg 44,000.00 - 396,000.00 #VALUE!
Urugan Kerikil 1.7500 M3 247,000.00 - 432,250.00 #VALUE!
Urugan Kembali perataan tanah 1.8750 M3 36,200.00 67,875.00 - #VALUE!
Tambahan Upah 0.0850 Ls 60,000.00 5,100.00 - #VALUE!
JUMLAH .......................... 3,904,694.00 8,501,829.80 12,406,523.80
J.36b MEMASANG 1 UNIT SEPTIKTANK 2.5 x 1.5 x 1.5 + REMBESAN (KANTOR TIPE KECIL)
Galian Tanah 4.5000 M3 60,480.00 272,160.00 - #VALUE!
Pasir Urug 0.2140 M3 247,640.00 4,202.96 48,792.00 52,994.96
Lantai Kerja 2.2500 M3 804,015.00 300,701.25 1,508,332.50 1,809,033.75
Pas. Bata 1 : 3 15.0000 M2 122,168.00 440,550.00 1,391,970.00 1,832,520.00
Plesteran 1 Ps : 3 Pc 15.0000 M2 57,909.20 538,380.00 330,258.00 868,638.00
Acian 15.0000 M2 27,200.00 339,750.00 68,250.00 408,000.00
Plat Beton Penutup + Balok 0.3000 M3 2,470,143.14 85,323.16 655,719.78 741,042.94
Pipa PVC 4" + Sambungan 5.4000 M' 117,071.50 96,506.10 535,680.00 632,186.10
Pipa GI. 1 1/2" 1.2000 M' 68,695.00 17,334.00 65,100.00 82,434.00
Galian Tanah untuk rembesan 3.3750 M3 60,480.00 204,120.00 - #VALUE!
Pasangan ijuk 5.4000 Kg 44,000.00 - 237,600.00 #VALUE!
Urugan Kerikil 1.0500 M3 247,000.00 - 259,350.00 #VALUE!
Urugan Kembali perataan tanah 1.1250 M3 36,200.00 40,725.00 - #VALUE!
Tambahan Upah 0.0920 Ls 60,000.00 5,520.00 - #VALUE!
JUMLAH .......................... 2,345,272.47 5,101,052.28 7,446,324.75
J.36c MEMASANG 1 UNIT SEPTIKTANK 1.5 x 1 x 1.5 + REMBESAN (RUMAH TIPE KECIL)
Galian Tanah 2.2500 M3 60,480.00 136,080.00 - #VALUE!
Pasir Urug 0.1070 M3 247,640.00 2,101.48 24,396.00 26,497.48
Lantai Kerja 1.1250 M3 804,015.00 150,350.63 754,166.25 904,516.88
Pas. Bata 1 : 3 7.5000 M2 122,168.00 220,275.00 695,985.00 916,260.00
Plesteran 1 Ps : 3 Pc 7.5000 M2 57,909.20 269,190.00 165,129.00 434,319.00
Acian 7.5000 M2 27,200.00 169,875.00 34,125.00 204,000.00
Plat Beton Penutup + balok 0.1500 M3 2,470,143.14 42,661.58 327,859.89 370,521.47
Pipa PVC 4" + Sambungan 9.0000 M' 117,071.50 160,843.50 892,800.00 1,053,643.50
Pipa GI. 1 1/2" 0.6000 M' 68,695.00 8,667.00 32,550.00 41,217.00
Galian Tanah untuk rembesan 0.1680 M3 60,480.00 10,160.64 - #VALUE!
Pasangan ijuk 2.7000 Kg 44,000.00 - 118,800.00 #VALUE!
Urugan Kerikil 3.5 cm 0.5250 M3 247,000.00 - 129,675.00 #VALUE!
Urugan Kembali perataan tanah 0.5620 M3 36,200.00 20,344.40 - #VALUE!
Tambahan Upah 0.0650 Ls 60,000.00 3,900.00 - #VALUE!
JUMLAH .......................... 1,194,449.23 3,175,486.14 4,369,935.37
J.37 1 M' SALURAN GREVEL BETON 1/2 d. 20 CM + PASANGAN
Galian Tanah 0.1500 M3 49,100.00 7,365.00 - #VALUE!
Grevel Beton 20 cm 1.0000 Bh 47,000.00 - 47,000.00 #VALUE!
Pas. Bata 1 : 3 1.0000 M2 122,168.00 29,370.00 92,798.00 122,168.00
Plesteran 1 Ps : 3 Pc 1.0000 M2 57,909.20 35,892.00 35,892.00 71,784.00
Acian 1.0000 M2 27,200.00 22,650.00 4,550.00 27,200.00
Upah Kerja 0.3500 Ls 5,000.00 1,750.00 - #VALUE!
JUMLAH .......................... 97,027.00 180,240.00 277,267.00
J.38 1 M' SALURAN GREVEL BETON 1/2 d. 30 CM + PASANGAN
Galian Tanah 0.2000 M3 49,100.00 9,820.00 - #VALUE!
Grevel Beton 30 cm 1.0000 Bh 64,000.00 - 64,000.00 #VALUE!
Pas. Bata 1 : 3 1.0000 M' 122,168.00 29,370.00 92,798.00 122,168.00
Plesteran 1 Ps : 3 Pc 1.0000 M' 57,909.20 35,892.00 22,017.20 57,909.20
Acian 1.0000 M' 27,200.00 22,650.00 4,550.00 27,200.00
Upah Kerja 0.1500 Ls 5,000.00 750.00 - #VALUE!
JUMLAH .......................... 98,482.00 183,365.20 281,847.20
J.38.a 1 M' SALURAN AIR LIMBAH BUIS BETON D = 30 Cm
BAHAN
Buis Beton Ø 30 cm 1.1000 Bh 122,000.00 - 134,200.00 134,200.00
Bata Merah 25.0000 Bh 900.00 - 22,500.00 22,500.00
Semen PC 10.3000 Kg 1,400.00 - 14,420.00 14,420.00
Pasir Pasang 0.0610 M3 242,000.00 - 14,762.00 14,762.00
Pasir Urug 0.0690 M3 190,000.00 - 13,110.00 13,110.00
UPAH
Halaman 425
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 0.3800 Org 62,000.00 23,560.00 - 23,560.00
Tukang Batu 0.1900 Org 83,000.00 15,770.00 - 15,770.00
Kepala Tukang 0.0190 Org 91,000.00 1,729.00 - 1,729.00
Mandor 0.0190 Org 104,000.00 1,976.00 - 1,976.00
JUMLAH .......................... 43,035.00 198,992.00 242,027.00
Halaman 426
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
J.38.b 1 M' SALURAN AIR LIMBAH BUIS BETON D = 60 Cm
BAHAN
Buis Beton Ø 60 cm 1.1000 Bh 184,000.00 - 202,400.00 202,400.00
Bata Merah 25.0000 Bh 900.00 - 22,500.00 22,500.00
Semen PC 0.2060 Kg 1,400.00 - 288.40 288.40
Pasir Pasang 0.0610 M3 242,000.00 - 14,762.00 14,762.00
Pasir Urug 0.0690 M3 190,000.00 - 13,110.00 13,110.00
UPAH
Pekerja 0.3800 Org 62,000.00 23,560.00 - 23,560.00
Tukang Batu 0.1900 Org 83,000.00 15,770.00 - 15,770.00
Kepala Tukang 0.0190 Org 91,000.00 1,729.00 - 1,729.00
Mandor 0.0190 Org 104,000.00 1,976.00 - 1,976.00
JUMLAH .......................... 43,035.00 253,060.40 296,095.40
J.38.c 1 BUAH TANGKI AIR FIBREGLASS VOLUME 1 M3
BAHAN
Bak Fibreglass Kapasitas 1 M3 1.0000 Bh 2,602,000.00 - 2,602,000.00 2,602,000.00
Perlengkapan 6% harga bak 0.0600 Lot 156,120.00 - 9,367.20 9,367.20
UPAH
Pekerja 3.3000 Org 62,000.00 204,600.00 - 204,600.00
Tukang Batu 1.1000 Org 83,000.00 91,300.00 - 91,300.00
Kepala Tukang 0.0010 Org 91,000.00 91.00 - 91.00
Mandor 0.1600 Org 104,000.00 16,640.00 - 16,640.00
JUMLAH .......................... 312,631.00 2,611,367.20 2,923,998.20
J.39 1 M2 PASANGAN PAVING BLOCK WARNA TEBAL 6 CM
BAHAN
Paving Block Warna 6 cm 1.0100 M2 69,000.00 - 69,690.00 69,690.00
Pasir Urug 0.0500 M3 190,000.00 - 9,500.00 9,500.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0500 OH 91,000.00 4,550.00 - 4,550.00
Mandor 0.0013 OH 104,000.00 135.20 - 135.20
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 66,685.20 79,190.00 145,875.20
J.40 1 M2 PASANGAN PAVING BLOCK WARNA TEBAL 8 CM
BAHAN
Paving Block Warna 8 cm 1.0100 M2 66,000.00 - 66,660.00 66,660.00
Pasir Urug 0.0700 M3 190,000.00 - 13,300.00 13,300.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0500 OH 91,000.00 4,550.00 - 4,550.00
Mandor 0.0013 OH 104,000.00 135.20 - 135.20
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 66,685.20 79,960.00 146,645.20
J.41 1 M2 PASANGAN PAVING BLOCK NATURAL TEBAL 6 CM
BAHAN
Paving Block Natural 6 cm 1.0100 M2 58,000.00 - 58,580.00 58,580.00
Pasir Urug 0.0500 M3 190,000.00 - 9,500.00 9,500.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250 OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030 OH 104,000.00 312.00 - 312.00
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 68,080.00 132,667.00
J.42 1 M2 PASANGAN PAVING BLOCK NATURAL TEBAL 8 CM
BAHAN
Paving Block Natural 8 cm 1.0100 M2 75,000.00 - 75,750.00 75,750.00
Pasir Urug 0.0700 M3 190,000.00 - 13,300.00 13,300.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0500 OH 91,000.00 4,550.00 - 4,550.00
Mandor 0.0013 OH 104,000.00 135.20 - 135.20
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 66,685.20 89,050.00 155,735.20
J.43 1 M2 PASANGAN PAVING BLOCK LAMA
BAHAN
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Halaman 427
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0500 OH 91,000.00 4,550.00 - 4,550.00
Mandor 0.0013 OH 104,000.00 135.20 - 135.20
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 66,685.20 19,000.00 85,685.20
Halaman 428
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
J.44 1 M2 PASANGAN PAVING TON NATURAL TEBAL 6 CM
BAHAN
Paving Ton Natural 6 cm 1.0100 M2 245,000.00 - 247,450.00 247,450.00
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250 OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030 OH 104,000.00 312.00 - 312.00
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 266,450.00 331,037.00
J.45 1 M2 PASANGAN PAVING TON NATURAL TEBAL 8 CM
BAHAN
Paving Ton Natural 8 cm 1.0100 M2 286,000.00 - 288,860.00 288,860.00
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250 OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030 OH 104,000.00 312.00 - 312.00
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 307,860.00 372,447.00
J.45.Rob 1 M2 PASANGAN PAVING TON NATURAL T. 10 CM
BAHAN
Paving Ton Natural 10 cm 1.0100 M2 282,000.00 - 284,820.00 284,820.00
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250 OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030 OH 104,000.00 312.00 - 312.00
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 303,820.00 368,407.00
J.46 1 M2 PASANGAN PAVING TON WARNA T. 6 CM
BAHAN
Paving Ton Warna 6 cm 1.0100 M2 278,000.00 - 280,780.00 280,780.00
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250 OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030 OH 104,000.00 312.00 - 312.00
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 299,780.00 364,367.00
J.47 1 M2 PASANGAN PAVING TON WARNA T. 8 CM
BAHAN
Paving Ton Warna 8 cm 1.0100 M2 318,000.00 - 321,180.00 321,180.00
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500
OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000
OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250
OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030
OH 104,000.00 312.00 - 312.00
Peralatan 1.0000
Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 340,180.00 404,767.00
J.48 1 M2 PASANGAN PAVING BLOCK NATURAL UK. 20 X 10 T. 6 CM
BAHAN
Paving Block Natural Uk. 20 x 10 t. 6 cm 1.0100 M2 81,000.00 - 81,810.00 81,810.00
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250 OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030 OH 104,000.00 312.00 - 312.00
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 100,810.00 165,397.00
J.49 1 M2 PASANGAN PAVING BLOCK WARNA UK. 20 X 10 T. 6 CM
BAHAN
Paving Block warna Uk. 20 x 10 t. 6 cm 1.0100 M2 86,000.00 - 86,860.00 86,860.00
Pasir Urug 0.1000 M3 190,000.00 - 19,000.00 19,000.00
UPAH
Pekerja 0.2500 OH 62,000.00 15,500.00 - 15,500.00
Halaman 429
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Tukang Batu 0.5000 OH 83,000.00 41,500.00 - 41,500.00
Kepala Tukang 0.0250 OH 91,000.00 2,275.00 - 2,275.00
Mandor 0.0030 OH 104,000.00 312.00 - 312.00
Peralatan 1.0000 Lot 5,000.00 5,000.00 - 5,000.00
JUMLAH .......................... 64,587.00 105,860.00 170,447.00
Halaman 430
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
K. PEKERJAAN BAJA
K.1 1 KG PEK. BAJA IWF EX. DN
BAHAN
Besi IWF 1.1500 Kg 15,500.00 - 17,825.00 17,825.00
UPAH
Tukang Las Konstruksi 0.0600 Org 89,000.00 5,340.00 - 5,340.00
Pekerja 0.0600 Org 62,000.00 3,720.00 - 3,720.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 9,918.00 17,825.00 27,743.00
K.2 1 KG PEK. BAJA SIKU / PROFIL EX. DN
BAHAN
Baja Siku / profil ex. DN SII 1.1500 Kg 14,000.00 - 16,100.00 16,100.00
UPAH
Pekerja 0.0600 Org 62,000.00 3,720.00 - 3,720.00
Tukang Las Konstruksi 0.0600 Org 89,000.00 5,340.00 - 5,340.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 9,918.00 16,100.00 26,018.00
K.3 1 CM PEK. PENGELASAN LAS LISTRIK TEBAL KAWAT 4 MM
BAHAN
Kawat Las Listrik 0.0040 Kg 27,000.00 - 108.00 108.00
Bahan Bakar Solar 0.0300 Ltr 6,000.00 - 180.00 180.00
Pelumas 0.0040 Ltr 12,000.00 - 48.00 48.00
UPAH
Pekerja 0.0040 Org 62,000.00 248.00 - 248.00
Tukang Las 0.0020 Org 89,000.00 178.00 - 178.00
Kepala Tukang 0.0020 Org 91,000.00 182.00 - 182.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
Alat bantu 0.1700 Lot 10,000.00 1,700.00 - 1,700.00
JUMLAH .......................... 2,516.00 336.00 2,852.00
K.4 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BETON
UPAH
Pekerja 0.0500 Org 62,000.00 3,100.00 - 3,100.00
Tukang Las 0.0200 Org 89,000.00 1,780.00 - 1,780.00
Kepala Tukang 0.0030 Org 91,000.00 273.00 - 273.00
Mandor 0.0010 Org 104,000.00 104.00 - 104.00
Alat bantu 0.2500 Lot 10,000.00 2,500.00 - 2,500.00
JUMLAH .......................... 7,757.00 - 7,757.00
K.5 1 Kg PEKERJAAN PERAKITAN BAJA
BAHAN
Solar 0.0100 Ltr 6,000.00 - 60.00 60.00
Minayk Pelumas 0.0010 Ltr 12,000.00 - 12.00 12.00
UPAH
Pekerja 0.0010 Org 83,000.00 83.00 - 83.00
Tukang besi konstruksi 0.0010 Org 77,000.00 77.00 - 77.00
Kepala Tukang 0.00001 Org 86,000.00 0.86 - 0.86
Mandor 0.00005 Org 88,000.00 4.40 - 4.40
Alat bantu 0.0080 Lot 10,000.00 80.00 - 80.00
JUMLAH .......................... 245.26 72.00 317.26
K.6 1 Kg PEKERJAAN PEMBESIAN 1 M2 WIREMESH M-10
BAHAN
Wiramesh M-10 1.0500 M2 95,000.00 - 99,750.00 99,750.00
Kawat Beton 0.0100 Kg 23,000.00 - 230.00 230.00
UPAH
Tukang Besi 0.0400 Org 77,000.00 3,080.00 - 3,080.00
Kepala Tukang 0.01000 Org 86,000.00 860.00 - 860.00
Mandor 0.00500 Org 88,000.00 440.00 - 440.00
Peralatan, spenser 0.0200 Lot 8,000.00 160.00 - 160.00
JUMLAH .......................... 4,540.00 99,980.00 104,520.00
K.8 1 M2 PASANG ROLLING DOOR ALLUMINIUM
BAHAN
Rolling Door 1.0000 M2 511,000.00 - 511,000.00 511,000.00
UPAH
Tukang Alluminium 1.0000 Org 87,000.00 87,000.00 - 87,000.00
Pekerja 1.0000 Org 62,000.00 62,000.00 - 62,000.00
Kepala Tukang 0.1000 Org 91,000.00 9,100.00 - 9,100.00
Mandor 0.0500 Org 104,000.00 5,200.00 - 5,200.00
JUMLAH .......................... 163,300.00 511,000.00 674,300.00
K.9 1 M2 PEKERJAAN PINTU BESI PLAT BAJA TEBAL. 2 mm RANGKAP, RANGKA BAJA SIKU
BAHAN
Besi Siku L. 30.30.3 15.0000 Kg 11,400.00 - 171,000.00 171,000.00
Besi Plat Baja 32.8000 Kg 11,400.00 - 373,920.00 373,920.00
Halaman 431
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Kawat Las 0.0500 Kg 27,000.00 - 1,350.00 1,350.00
UPAH
Tukang Las 1.0500 Org 89,000.00 93,450.00 - 93,450.00
Pekerja 1.0500 Org 62,000.00 65,100.00 - 65,100.00
Kepala Tukang 0.1050 Org 91,000.00 9,555.00 - 9,555.00
Mandor 0.0520 Org 104,000.00 5,408.00 - 5,408.00
JUMLAH .......................... 173,513.00 546,270.00 719,783.00
K.10 1 M' PASANG PAGAR BETON PRACETAK (5 x40 x 240) CM, TINGGI 2 M
BAHAN
Panel Beton Pracetak 2.0833 Lbr 168,000.00 - 349,994.40 349,994.40
UPAH
Pekerja 0.3750 Org 62,000.00 23,250.00 - 23,250.00
Tukang Batu 0.1250 Org 83,000.00 10,375.00 - 10,375.00
Kepala Tukang 0.0120 Org 91,000.00 1,092.00 - 1,092.00
Mandor 0.0190 Org 104,000.00 1,976.00 - 1,976.00
JUMLAH .......................... 36,693.00 349,994.40 386,687.40
Halaman 432
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
K.10.a 1 BTG PASANG TIANG PAGAR PRACETAK TINGGI 3 M
BAHAN
Kolom Beton Pracetak Panjang 3 M' 1.0000 Btg 425,000.00 - 425,000.00 425,000.00
Pasir Beton 0.0740 M3 289,000.00 - 21,386.00 21,386.00
Batu Pecah mesin 2/3 0.1460 M3 296,000.00 - 43,216.00 43,216.00
Semen Portland 45.0000 Kg 1,400.00 - 63,000.00 63,000.00
UPAH
Pekerja 0.3750 Org 62,000.00 23,250.00 - 23,250.00
Tukang Batu 0.1250 Org 83,000.00 10,375.00 - 10,375.00
Kepala Tukang 0.0120 Org 91,000.00 1,092.00 - 1,092.00
Mandor 0.0190 Org 104,000.00 1,976.00 - 1,976.00
JUMLAH .......................... 36,693.00 552,602.00 589,295.00
K.11 1 M2 PAGAR BRC LENGKAP DENGAN TIANG t. 120 cm P. 240 cm
BAHAN
Pagar BRC 0.4340 Lbr 275,000.00 - 119,350.00 #VALUE!
Pipa GI Ø 2" 1.7000 M' 91,000.00 - 154,700.00 #VALUE!
Semen Portland 2.0000 Kg 1,400.00 - 2,800.00 #VALUE!
Kawat Duri 2.5000 M' 4,000.00 - 10,000.00 #VALUE!
Pasir Beton 0.0050 M3 289,000.00 - 1,445.00 #VALUE!
Batu Pecah mesin 2/3 0.0090 M3 296,000.00 - 2,664.00 #VALUE!
UPAH
Pekerja 0.3750 Org 62,000.00 23,250.00 - 23,250.00
Tukang Batu 0.1250 Org 83,000.00 10,375.00 - 10,375.00
Kepala Tukang 0.0120 Org 91,000.00 1,092.00 - 1,092.00
Mandor 0.0190 Org 104,000.00 1,976.00 - 1,976.00
JUMLAH .......................... 36,693.00 290,959.00 327,652.00
K.12 1 M2 PASANGAN TRALIS BESI STRIP (2 x 3 mm)
BAHAN
Besi Strip 6.1770 Kg 11,400.00 - 70,417.80 70,417.80
Pengelasan 27.0800 cm 2,852.00 - 77,232.16 77,232.16
UPAH
Tukang Las 1.6700 Org 89,000.00 148,630.00 - 148,630.00
Pekerja 1.6700 Org 62,000.00 103,540.00 - 103,540.00
Kepala Tukang 0.1670 Org 91,000.00 15,197.00 - 15,197.00
Mandor 0.0830 Org 104,000.00 8,632.00 - 8,632.00
JUMLAH .......................... 275,999.00 147,649.96 423,648.96
K.13 1 M2 PASANGAN KAWAT HARMONIKA
BAHAN
Kawat harmonika 1.1000 M2 29,000.00 - 31,900.00 31,900.00
Paku Biasa 1/2" - 1" 0.0200 Kg 22,000.00 - 440.00 440.00
Kayu Kamper, Papan 0.0018 M3 11,227,000.00 - 20,208.60 20,208.60
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0005 Org 104,000.00 52.00 - 52.00
JUMLAH .......................... 16,062.00 52,548.60 68,610.60
K.14 1 M2 PASANGAN KAWAT NYAMUK (KAYU)
BAHAN
Kawat Nyamuk 1.1000 M2 25,000.00 - 27,500.00 27,500.00
Paku Biasa 1/2" - 1" 0.0200 Kg 22,000.00 - 440.00 440.00
Kayu Kamper, Papan 0.0018 M3 11,227,000.00 - 20,208.60 20,208.60
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0005 Org 104,000.00 52.00 - 52.00
JUMLAH .......................... 16,062.00 48,148.60 64,210.60
K.15 1 M2 PASANGAN KAWAT NYAMUK (BESI)
BAHAN
Kawat Nyamuk 1.1000 M2 25,000.00 - 27,500.00 27,500.00
Pengelasan 11.1100 cm 2,852.00 - 31,685.72 31,685.72
Baja Strip (0,2 x 2) cm 1.7160 Kg 11,400.00 - 19,562.40 19,562.40
UPAH
Pekerja 0.1000
Org 62,000.00 6,200.00 - 6,200.00
Tukang Kayu 0.1000
Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100
Org 91,000.00 910.00 - 910.00
Mandor 0.0005
Org 104,000.00 52.00 - 52.00
JUMLAH .......................... 16,062.00 78,748.12 94,810.12
K.18 1 M2 PASANGAN TALANG DATAR / JUREY SENG BJLS 28 L. 90 cm
BAHAN
Seng Plat 3" x 6", BJLS 28 1.0500 Lbr 37,000.00 - 38,850.00 38,850.00
Paku Biasa 1/2" - 1" 0.0150 Kg 22,000.00 - 330.00 330.00
Halaman 433
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Kayu Borneo, Papan 0.0190 M3 5,750,000.00 - 109,250.00 109,250.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Kayu 0.4000 Org 89,000.00 35,600.00 - 35,600.00
Kepala Tukang 0.0250 Org 91,000.00 2,275.00 - 2,275.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 51,315.00 148,430.00 199,745.00
K.19 1 M' PASANG TALANG MIRING, SENG BJLS 28
BAHAN
Seng Plat 3" x 6" BJLS 28 0.5000 Lbr 37,000.00 - 18,500.00 18,500.00
Paku Biasa 1/2" - 1" 0.0150 Kg 22,000.00 - 330.00 330.00
Kayu Borneo, Papan 0.0190 M3 5,750,000.00 - 109,250.00 109,250.00
Plincote 0.3000 Kg 41,000.00 - 12,300.00 12,300.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Kayu 0.4000 Org 89,000.00 35,600.00 - 35,600.00
Kepala Tukang 0.0250 Org 91,000.00 2,275.00 - 2,275.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 51,315.00 140,380.00 191,695.00
L. PEKERJAAN KUNCI DAN KACA
L.2 1 BH PASANG KUNCI TANAM DOUBLE SLAAG
BAHAN
Kunci Tanam Double Slaag 1.0000 Bh 117,000.00 - 117,000.00 117,000.00
UPAH
Pekerja 0.0100 Org 62,000.00 620.00 - 620.00
Tukang Kayu 0.5000 Org 89,000.00 44,500.00 - 44,500.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 46,550.00 117,000.00 163,550.00
L.2.Rob 1 BH PASANG KUNCI TANAM DOUBLE SLAAG BESAR
BAHAN
Kunci Tanam Double Slaag Besar 1.0000 Bh 173,000.00 - 173,000.00 173,000.00
UPAH
Pekerja 0.0100 Org 62,000.00 620.00 - 620.00
Tukang Kayu 0.5000 Org 89,000.00 44,500.00 - 44,500.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 46,550.00 173,000.00 219,550.00
L.5 1 BH PASANG ENGSEL PINTU
BAHAN
Engsel Pintu 1.0000 Bh 32,000.00 - 32,000.00 32,000.00
UPAH
Pekerja 0.0150 Org 62,000.00 930.00 - 930.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.0150 Org 91,000.00 1,365.00 - 1,365.00
Mandor 0.0008 Org 104,000.00 78.00 - 78.00
JUMLAH .......................... 15,723.00 32,000.00 47,723.00
L.6 1 BH PASANG ENGSEL JENDELA KUPU-KUPU
BAHAN
Engsel Jendela 1.0000 Bh 18,000.00 - 18,000.00 18,000.00
UPAH
Pekerja 0.0100 Org 62,000.00 620.00 - 620.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0005 Org 104,000.00 52.00 - 52.00
JUMLAH .......................... 10,482.00 18,000.00 28,482.00
L.9 1 BH PASANG KAIT ANGIN
BAHAN
Kait Angin 1.0000 Bh 21,000.00 - 21,000.00 21,000.00
UPAH
Pekerja 0.0150 Org 62,000.00 930.00 - 930.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.0150 Org 91,000.00 1,365.00 - 1,365.00
Mandor 0.0008 Org 104,000.00 78.00 - 78.00
JUMLAH .......................... 15,723.00 21,000.00 36,723.00
L.11 1 BH PASANG KUNCI SELOT
BAHAN
Kunci Selot 1.0000 Bh 15,000.00 - 15,000.00 15,000.00
UPAH
Pekerja 0.0100 Org 62,000.00 620.00 - 620.00
Tukang Kayu 0.1000 Org 89,000.00 8,900.00 - 8,900.00
Kepala Tukang 0.0100 Org 91,000.00 910.00 - 910.00
Mandor 0.0005 Org 104,000.00 52.00 - 52.00
Halaman 434
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
JUMLAH .......................... 10,482.00 15,000.00 25,482.00
L.12 1 BH PASANG PEGANGAN PINTU / DOOR HOLDER
BAHAN
Door Holder 1.0000 Bh 183,000.00 - 183,000.00 183,000.00
UPAH
Pekerja 0.0500 Org 62,000.00 3,100.00 - 3,100.00
Tukang Kayu 0.5000 Org 89,000.00 44,500.00 - 44,500.00
Kepala Tukang 0.0500 Org 91,000.00 4,550.00 - 4,550.00
Mandor 0.0025 Org 104,000.00 260.00 - 260.00
JUMLAH .......................... 52,410.00 183,000.00 235,410.00
Halaman 435
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
L.17 1 M2 PASANG KACA POLOS, TEBAL 5 mm
BAHAN
Kaca Polos t. 5 mm 1.1000 M2 137,000.00 - 150,700.00 150,700.00
UPAH
Pekerja 0.0150 Org 62,000.00 930.00 - 930.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.0150 Org 91,000.00 1,365.00 - 1,365.00
Mandor 0.0008 Org 104,000.00 83.20 - 83.20
JUMLAH .......................... 15,728.20 150,700.00 166,428.20
L.17a 1 M2 PASANG KACA RAYBAND, TEBAL 5 mm
BAHAN
Kaca Rayband t. 5 mm 1.1000 M2 141,000.00 - 155,100.00 155,100.00
UPAH
Pekerja 0.0150 Org 62,000.00 930.00 - 930.00
Tukang Kayu 0.1500 Org 89,000.00 13,350.00 - 13,350.00
Kepala Tukang 0.0150 Org 91,000.00 1,365.00 - 1,365.00
Mandor 0.0008 Org 104,000.00 83.20 - 83.20
JUMLAH .......................... 15,728.20 155,100.00 170,828.20
L.17b 1 M2 PASANG KACA, TEBAL 10 mm
BAHAN
Kaca 10 mm 1.1000 M' 236,000.00 - 259,600.00 259,600.00
Sealant 4.0000 M' 13,000.00 - 52,000.00 52,000.00
UPAH
Pekerja 0.0500 Org 62,000.00 3,100.00 - 3,100.00
Tukang Aluminium 0.4950 Org 68,000.00 33,660.00 - 33,660.00
Kepala Tukang 0.0500 Org 91,000.00 4,550.00 - 4,550.00
Mandor 0.0024 Org 104,000.00 249.60 - 249.60
JUMLAH .......................... 41,559.60 311,600.00 353,159.60
L.17b.Rob 1 M2 PASANG KACA, TEBAL 12 mm
BAHAN
Kaca 12 mm 1.1000 M' 533,000.00 - 586,300.00 586,300.00
Sealant 4.0000 M' 13,000.00 - 52,000.00 52,000.00
UPAH
Pekerja 0.0594 Org 62,000.00 3,682.80 - 3,682.80
Tukang Aluminium 0.5940 Org 68,000.00 40,392.00 - 40,392.00
Kepala Tukang 0.0594 Org 91,000.00 5,405.40 - 5,405.40
Mandor 0.0029 Org 104,000.00 299.52 - 299.52
JUMLAH .......................... 49,779.72 638,300.00 688,079.72
L.18 1 M2 PASANG CURTAIN WALL (DINDING KACA)
BAHAN
Rangka Holow 20/40/4 2.0000 M' 39,000.00 - 78,000.00 #VALUE!
Profil 6023 3.0000 M' 150,000.00 - 450,000.00 #VALUE!
Profil 4135 3.0000 M' 140,000.00 - 420,000.00 #VALUE!
Kaca Polos 8 mm 1.0000 M2 141,000.00 - 141,000.00 #VALUE!
Sealant 4.0000 M' 13,000.00 - 52,000.00 #VALUE!
Skrup 0.0500 Kg 26,000.00 - 1,300.00 #VALUE!
Alat Bantu 1.0000 Lot 30,000.00 - 30,000.00 #VALUE!
UPAH
Pekerja 1.2000
Org 62,000.00 74,400.00 - 74,400.00
Tukang Las 0.4300
Org 89,000.00 38,270.00 - 38,270.00
Kepala Tukang 0.0120
Org 91,000.00 1,092.00 - 1,092.00
Mandor 0.0060
Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 114,386.00 1,172,300.00 1,286,686.00
L.20 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 0,9 M x 2,1 M
BAHAN
Kaca Tempered 12 mm 1.8900 M2 657,000.00 - 1,241,730.00 #VALUE!
Floor Hing CISA (Engsel Tanam) 1.0000 unit 2,110,000.00 - 2,110,000.00 #VALUE!
Glass door Handel 1.0000 psg 1,396,000.00 - 1,396,000.00 #VALUE!
Kunci Pintu Tempered 1.0000 psg 782,000.00 - 782,000.00 #VALUE!
Bottom straightrap 1.0000 psg 360,000.00 - 360,000.00 #VALUE!
Top straighinge 1.0000 psg 462,000.00 - 462,000.00 #VALUE!
UPAH
Pemasangan 1.0000 unit 500,000.00 500,000.00 - 500,000.00
JUMLAH .......................... 500,000.00 6,351,730.00 6,851,730.00
L.21 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,8 M x 2 M
BAHAN
Kaca Tempered 12 mm 3.6000 M2 657,000.00 - 2,365,200.00 #VALUE!
Floor Hing CISA (Engsel Tanam) 2.0000 unit 2,110,000.00 - 4,220,000.00 #VALUE!
Glass door Handel 2.0000 psg 1,396,000.00 - 2,792,000.00 #VALUE!
Kunci Pintu Tempered 1.0000 psg 782,000.00 - 782,000.00 #VALUE!
Bottom straightrap 2.0000 psg 360,000.00 - 720,000.00 #VALUE!
Halaman 436
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Top straighinge 2.0000 psg 462,000.00 - 924,000.00 #VALUE!
UPAH
Pemasangan 1.0000 unit 500,000.00 500,000.00 - 500,000.00
JUMLAH .......................... 500,000.00 11,803,200.00 12,303,200.00
Halaman 437
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
L.22 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,6 M x 2 M
BAHAN
Kaca Tempered 12 mm 3.2000 M2 657,000.00 - 2,102,400.00 #VALUE!
Floor Hing CISA (Engsel Tanam) 2.0000 unit 2,110,000.00 - 4,220,000.00 #VALUE!
Glass door Handel 2.0000 psg 1,396,000.00 - 2,792,000.00 #VALUE!
Kunci Pintu Tempered 1.0000 psg 782,000.00 - 782,000.00 #VALUE!
Bottom straightrap 2.0000 psg 360,000.00 - 720,000.00 #VALUE!
Top straighinge 2.0000 psg 462,000.00 - 924,000.00 #VALUE!
UPAH
Pemasangan 1.0000 unit 500,000.00 500,000.00 - 500,000.00
JUMLAH .......................... 500,000.00 11,540,400.00 12,040,400.00
L.23 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,4 M x 2 M
BAHAN
Kaca Tempered 12 mm 2.8000 M2 657,000.00 - 1,839,600.00 #VALUE!
Floor Hing CISA (Engsel Tanam) 2.0000 unit 2,110,000.00 - 4,220,000.00 #VALUE!
Glass door Handel 2.0000 psg 1,396,000.00 - 2,792,000.00 #VALUE!
Kunci Pintu Tempered 1.0000 psg 782,000.00 - 782,000.00 #VALUE!
Bottom straightrap 2.0000 psg 360,000.00 - 720,000.00 #VALUE!
Top straighinge 2.0000 psg 462,000.00 - 924,000.00 #VALUE!
UPAH
Pemasangan 1.0000 unit 500,000.00 500,000.00 - 500,000.00
JUMLAH .......................... 500,000.00 11,277,600.00 11,777,600.00
L.24 1 UNIT PINTU KACA TEMPERED 12 mm TYPE PU ; Uk. 1,2 M x 2 M
BAHAN
Kaca Tempered 12 mm 2.4000 M2 657,000.00 - 1,576,800.00 #VALUE!
Floor Hing CISA (Engsel Tanam) 2.0000 unit 2,110,000.00 - 4,220,000.00 #VALUE!
Glass door Handel 2.0000 psg 1,396,000.00 - 2,792,000.00 #VALUE!
Kunci Pintu Tempered 1.0000 psg 782,000.00 - 782,000.00 #VALUE!
Bottom straightrap 2.0000 psg 360,000.00 - 720,000.00 #VALUE!
Top straighinge 2.0000 psg 462,000.00 - 924,000.00 #VALUE!
UPAH
Pemasangan 1.0000 unit 500,000.00 500,000.00 - 500,000.00
JUMLAH .......................... 500,000.00 11,014,800.00 11,514,800.00
L.25 1 M2 PASANG PINTU KACA RANGKA ALLUMINIUM
BAHAN
Pintu Alluminium 4.4000 M' 104,000.00 - 457,600.00 457,600.00
Profil Kaca 4.5000 M' 35,000.00 - 157,500.00 157,500.00
Sealant 0.2700 Tube 13,000.00 - 3,510.00 3,510.00
UPAH
Pekerja 0.0850 Org 62,000.00 5,270.00 - 5,270.00
Tukang Alluminium 0.0850 Org 91,000.00 7,735.00 - 7,735.00
Kepala Tukang 0.0090 Org 65,000.00 585.00 - 585.00
Mandor 0.0050 Org 104,000.00 520.00 - 520.00
JUMLAH .......................... 14,110.00 618,610.00 632,720.00
M. PEKERJAAN PENUTUP LANTAI DAN DINDING
M.4 1 M2 PASANG LANTAI TEGEL BADAK WARNA 30 X 30 CM
BAHAN
Tegel Badak Warna 30 x 30 cm 11.8700 Bh 7,000.00 - 83,090.00 83,090.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 0.0130 Kg 15,500.00 - 201.50 201.50
UPAH
Pekerja 0.2600 Org 62,000.00 16,120.00 - 16,120.00
Tukang Batu 0.1300 Org 83,000.00 10,790.00 - 10,790.00
Kepala Tukang 0.0130 Org 91,000.00 1,183.00 - 1,183.00
Mandor 0.0130 Org 104,000.00 1,352.00 - 1,352.00
JUMLAH .......................... 29,445.00 108,181.50 137,626.50
M.4a 1 M2 PASANG LANTAI TEGEL BADAK LAMA
BAHAN
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 0.0130 Kg 15,500.00 - 201.50 201.50
UPAH
Pekerja 0.2600 Org 62,000.00 16,120.00 - 16,120.00
Tukang Batu 0.1300 Org 83,000.00 10,790.00 - 10,790.00
Halaman 438
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Kepala Tukang 0.0130 Org 91,000.00 1,183.00 - 1,183.00
Mandor 0.0130 Org 104,000.00 1,352.00 - 1,352.00
JUMLAH .......................... 29,445.00 25,091.50 54,536.50
M.5a 1 M2 PASANG LANTAI KERAMIK PUTIH UKURAN 30 x 30 cm
BAHAN
Keramik Putih 30 x 30 cm 1.1870 M2 46,000.00 - 54,602.00 54,602.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 102,742.00 182,017.00
M.5a.Rob 1 M2 PASANG LANTAI KERAMIK ESSENZA 40 x 40 cm
BAHAN
Keramik Essenza 40 x 40 cm 1.1870 M2 244,000.00 - 289,628.00 289,628.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 337,768.00 417,043.00
M.5b 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 30 x 30 cm
BAHAN
Keramik Warna 30 x 30 cm 1.1870 M2 57,000.00 - 67,659.00 67,659.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 115,799.00 195,074.00
M.5b.Rob 1 M2 PASANG LANTAI GRANIT TILE UKURAN 40 x 40 cm
BAHAN
Granit Tile 40 x 40 cm 1.1870 M2 236,000.00 - 280,132.00 280,132.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 328,272.00 407,547.00
M.5b.1 1 M2 PASANG LANTAI MARMER
BAHAN
Marmer 1.0600 M2 1,599,000.00 - 1,694,940.00 1,694,940.00
Semen Portland 8.1900 Kg 1,400.00 - 11,466.00 11,466.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 0.6500 Kg 15,500.00 - 10,075.00 10,075.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 1,727,371.00 1,806,646.00
M.5b.2 1 M2 PASANG LANTAI GRANIT SLAB DN
BAHAN
Granit slab DN 1.1870 M2 1,739,000.00 - 2,064,193.00 2,064,193.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH 0.00
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Halaman 439
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Mandor 0.0350
Org 104,000.00 3,640.00 - 3,640.00
Upah poles + bahan poles 1.0000
Ls 35,000.00 35,000.00 - 35,000.00
JUMLAH .......................... 114,275.00 2,112,333.00 2,226,608.00
M.5c 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 40 x 40 cm
BAHAN
Keramik Warna 40 x 40 cm 1.1870 M2 60,000.00 - 71,220.00 71,220.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH 0.00
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 119,360.00 198,635.00
Halaman 440
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
M.5c.Rob 1 M2 PASANG LANTAI GRANIT TILE UKURAN 60 x 60 cm
BAHAN
Granit Tile 60 x 60 cm 1.1870 M2 254,000.00 - 301,498.00 301,498.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 349,638.00 428,913.00
M.5c.Rob1 1 M2 PASANG LANTAI GRANIT TILE UKURAN 80 x 80 cm
BAHAN
Granit Tile 80 x 80 cm 1.1870 M2 428,000.00 - 508,036.00 508,036.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 556,176.00 635,451.00
M.5c.Rob2 1 M2 PASANG LANTAI GRANIT TILE 3D UKURAN 60 x 60 cm
BAHAN
Granit Tile 3D 60 x 60 cm 1.1870 M2 399,000.00 - 473,613.00 473,613.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000
Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500
Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350
Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350
Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 521,753.00 601,028.00
M.5d 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 33 x 33 cm
BAHAN
Keramik setara Roman Grace Warna 33 x 33 cm 1.1870 M2 123,000.00 - 146,001.00 146,001.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH 0.00
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 194,141.00 273,416.00
M.5e 1 M2 PASANG LANTAI KERAMIK PUTIH UKURAN 40 x 40 cm
BAHAN
Keramik Putih 40 x 40 cm 1.1870 M2 53,000.00 - 62,911.00 62,911.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH 0.00
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 111,051.00 190,326.00
M.5f 1 M2 PASANG LANTAI KERAMIK WARNA UKURAN 50 x 50 cm
BAHAN
Keramik Warna 50 x 50 cm 1.1870 M2 100,000.00 - 118,700.00 118,700.00
Semen Portland 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH 0.00
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 166,840.00 246,115.00
Halaman 441
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
M.68 1 M2 PASANG DINDING KERAMIK WARNA 20 x 25 cm
BAHAN
Keramik Warna 20 x 25 cm 1.1870 M2 65,000.00 - 77,155.00 77,155.00
Semen Abu-abu 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 125,295.00 204,570.00
M.68a 1 M2 PASANG LANTAI KERAMIK WARNA 20 x 20 cm, ANTI SLIP KM/WC
BAHAN
Keramik Warna 20 x 20 cm, anti slip 1.1870 M2 63,000.00 - 74,781.00 74,781.00
Semen Abu-abu 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 122,921.00 202,196.00
M.68b 1 M2 PASANG LANTAI KERAMIK WARNA 30 x 30 cm, ANTI SLIP KM/WC
BAHAN
Keramik Warna 30 x 30 cm, anti slip 1.1870 M2 73,000.00 - 86,651.00 86,651.00
Semen Abu-abu 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 134,791.00 214,066.00
M.68d 1 M2 PASANG LANTAI PARQUET JATI
BAHAN
Parquet Jati 1.0500 M2 252,000.00 - 264,600.00 264,600.00
Lem Vynil 0.6000 Kg 62,000.00 - 37,200.00 37,200.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Kayu 0.3500 Org 89,000.00 31,150.00 - 31,150.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 81,375.00 301,800.00 383,175.00
M.68d.1 1 M2 PASANG LANTAI KAYU (GYMFLOOR)
BAHAN
Gymfloor 1.0500 M2 - 0.00 0.00
Lem Vynil 0.6000 Kg 62,000.00 - 37,200.00 37,200.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Kayu 0.3500 Org 89,000.00 31,150.00 - 31,150.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 81,375.00 37,200.00 118,575.00
M.68d.2 1 M2 PASANG LANTAI KARPET
BAHAN
Karpet 1.0500 M2 - 0.00 0.00
Lem Vynil 0.3500 Kg 62,000.00 - 21,700.00 21,700.00
UPAH
Pekerja 0.1700 Org 62,000.00 10,540.00 - 10,540.00
Tukang Kayu 0.1700 Org 89,000.00 15,130.00 - 15,130.00
Kepala Tukang 0.0170 Org 91,000.00 1,547.00 - 1,547.00
Mandor 0.0090 Org 104,000.00 936.00 - 936.00
JUMLAH .......................... 28,153.00 21,700.00 49,853.00
M.68e 1 M2 PASANG WALL PAPER L. 50 cm
BAHAN
Wall Paper 2.2000 M2 41,000.00 - 90,200.00 90,200.00
Perekat / Lem Vynil 0.2500 Kg 62,000.00 - 15,500.00 15,500.00
UPAH
Pekerja 0.3500 Org 62,000.00 21,700.00 - 21,700.00
Tukang Kayu 0.1750 Org 89,000.00 15,575.00 - 15,575.00
Halaman 442
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Kepala Tukang 0.0170 Org 91,000.00 1,547.00 - 1,547.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 39,030.00 105,700.00 144,730.00
Halaman 443
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
M.68f 1 M2 PASANG FLOOR HARDENER
BAHAN
Floor Hardener 5.0000 Kg 7,000.00 - 35,000.00 35,000.00
UPAH
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Batu 0.1200 Org 83,000.00 9,960.00 - 9,960.00
Kepala Tukang 0.0120 Org 91,000.00 1,092.00 - 1,092.00
Mandor 0.0060 Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 19,116.00 35,000.00 54,116.00
M.68g 1 M' PASANG PLIN KAYU BORNEO T. 2 cm L.10 cm
BAHAN
Papan Kayu Borneo 0.0030 Kg 5,750,000.00 - 17,250.00 17,250.00
Paku 2" - 5" 0.0500 Kg 20,000.00 - 1,000.00 1,000.00
UPAH
Pekerja 0.1200 Org 62,000.00 7,440.00 - 7,440.00
Tukang Kayu 0.1200 Org 89,000.00 10,680.00 - 10,680.00
Kepala Tukang 0.0120 Org 91,000.00 1,092.00 - 1,092.00
Mandor 0.0060 Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 19,836.00 18,250.00 38,086.00
M.68.Rob 1 M2 PASANG DINDING KERAMIK WARNA 25 x 33 cm
BAHAN
Keramik Warna 25 x 33 cm 1.1870 M2 77,000.00 - 91,399.00 91,399.00
Semen Abu-abu 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 139,539.00 218,814.00
M.68.Rob1 1 M2 PASANG DINDING MARMER UK. 1 X 1 m
BAHAN
Marmer 1.0600 M2 1,599,000.00 - 1,694,940.00 1,694,940.00
Semen Abu-abu 12.4400 Kg 1,400.00 - 17,416.00 17,416.00
Pasir Pasang 0.0250 M3 242,000.00 - 6,050.00 6,050.00
Semen Warna 0.6500 Kg 15,500.00 - 10,075.00 10,075.00
Paku 2" - 5" 3.0000 Bh 400.00 - 1,200.00 1,200.00
UPAH
Pekerja 0.7200 Org 62,000.00 44,640.00 - #VALUE!
Tukang Batu 0.6500 Org 83,000.00 53,950.00 - #VALUE!
Kepala Tukang 0.0650 Org 91,000.00 5,915.00 - #VALUE!
Mandor 0.0350 Org 104,000.00 3,640.00 - #VALUE!
Alat Bantu 1.0000 Lot 50,000.00 50,000.00 - #VALUE!
JUMLAH .......................... 158,145.00 1,729,681.00 1,887,826.00
M.68.Rob2 1 M2 PASANG DINDING KERAMIK WARNA 25 x 40 cm
BAHAN
Keramik Warna 25 x 40 cm 1.1870 M2 86,000.00 - 102,082.00 102,082.00
Semen Abu-abu 10.0000 Kg 1,400.00 - 14,000.00 14,000.00
Pasir Pasang 0.0450 M3 242,000.00 - 10,890.00 10,890.00
Semen Warna 1.5000 Kg 15,500.00 - 23,250.00 23,250.00
UPAH
Pekerja 0.7000 Org 62,000.00 43,400.00 - 43,400.00
Tukang Batu 0.3500 Org 83,000.00 29,050.00 - 29,050.00
Kepala Tukang 0.0350 Org 91,000.00 3,185.00 - 3,185.00
Mandor 0.0350 Org 104,000.00 3,640.00 - 3,640.00
JUMLAH .......................... 79,275.00 150,222.00 229,497.00
M.69a.1 1 M2 PASANG BATU ANDESIT ALUR UK. 10 X 20 CM
BAHAN
Batu Andesit Alur Uk. 10 x 20 cm 1.0100 M2 132,000.00 - 133,320.00 133,320.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 151,780.00 259,780.00
M.69a.2 1 M2 PASANG BATU ANDESIT ALUR UK. 15 X 30 CM
BAHAN
Batu Andesit Alur Uk. 15 x 30 cm 1.0100 M2 153,000.00 - 154,530.00 154,530.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 172,990.00 280,990.00
Halaman 444
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
M.69a.3 1 M2 PASANG BATU ANDESIT ALUR UK. 20 X 40 CM
BAHAN
Batu Andesit Alur Uk. 20 x 40 cm 1.0100 M2 153,000.00 - 154,530.00 154,530.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 172,990.00 280,990.00
M.69b.1 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 10 X 20 CM
BAHAN
Batu Andesit Bakar Polos Uk.10x20 cm 1.0100 M2 130,000.00 - 131,300.00 131,300.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 149,760.00 257,760.00
M.69b.2 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 10 X 30 CM
BAHAN
Batu Andesit Bakar Polos Uk.10x30 cm 1.0100 M2 137,000.00 - 138,370.00 138,370.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 156,830.00 264,830.00
M.69b.3 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 15 X 30 CM
BAHAN
Batu Andesit Bakar Polos Uk.15x30 cm 1.0100 M2 153,000.00 - 154,530.00 154,530.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 172,990.00 280,990.00
M.69b.4 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 15 X 15 CM
BAHAN
Batu Andesit Bakar Polos Uk.15x15 cm 1.0100 M2 151,000.00 - 152,510.00 152,510.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 170,970.00 278,970.00
M.69b.5 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 20 X 30 CM
BAHAN
Batu Andesit Bakar Polos Uk.20x30 cm 1.0100 M2 170,000.00 - 171,700.00 171,700.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 190,160.00 298,160.00
M.69b.6 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 20 X 20 CM
BAHAN
Batu Andesit Bakar Polos Uk.20x20 cm 1.0100 M2 153,000.00 - 154,530.00 154,530.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 172,990.00 280,990.00
M.69b.7 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 30 X 30 CM
BAHAN
Batu Andesit Bakar Polos Uk.30x30 cm 1.0100 M2 179,000.00 - 180,790.00 180,790.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 199,250.00 307,250.00
M.69b.8 1 M2 PASANG BATU ANDESIT BAKAR POLOS UK. 30 X 60 CM
BAHAN
Batu Andesit Bakar Polos Uk.30x60 cm 1.0100 M2 193,000.00 - 194,930.00 194,930.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 213,390.00 321,390.00
M.69c.1 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 10 CM UK. 10 X 10 CM
Halaman 445
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
BAHAN
Batu Andesit Bakar t.10 cm Uk. 10 x 10 cm 1.0100 M2 86,000.00 - 86,860.00 86,860.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 105,320.00 213,320.00
M.69c.2 1 M2 PASANG BATU ANDESIT BAKAR BINTIK Uk.10 X 30 CM
BAHAN
Batu Andesit Bakar Bintik 1.0100 M2 98,000.00 - 98,980.00 98,980.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 117,440.00 225,440.00
M.69c.3 1 M2 PASANG BATU ANDESIT BAKAR BINTIK UK. 30 X 30 CM
BAHAN
Batu Andesit Bakar Bintik Uk. 30 x 30 cm 1.0100 M2 132,000.00 - 133,320.00 133,320.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 151,780.00 259,780.00
M.69d.1 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 5 CM UK. 10 X 10 CM
BAHAN
Batu Andesit Bakar t. 5 cm Uk. 10 x 10 cm 1.0100 M2 250,000.00 - 252,500.00 252,500.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 270,960.00 378,960.00
M.69d.2 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 5 CM UK. 15 X 15 CM
BAHAN
Batu Andesit Bakar t.5 cm 1.0100 M2 354,000.00 - 357,540.00 357,540.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 376,000.00 484,000.00
M.69d.3 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 5 CM UK. 30 X 30 CM
BAHAN
Batu Andesit Bakar t.5 cm Uk. 30 x 30 cm 1.0100 M2 393,000.00 - 396,930.00 396,930.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 415,390.00 523,390.00
M.69e.1 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 3 CM UK. 10 X 10 CM
BAHAN
Batu Andesit Bakar t.3 cm Uk. 10 x 10 cm 1.0100 M2 186,000.00 - 187,860.00 187,860.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 206,320.00 314,320.00
M.69e.2 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 3 CM UK. 15 X 15 CM, 15 x 30 CM, 20 X 20 CM
BAHAN
Batu Andesit Bakar t.3 cm 1.0100 M2 264,000.00 - 266,640.00 266,640.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 285,100.00 393,100.00
M.69e.3 1 M2 PASANG BATU ANDESIT BAKAR TEBAL 3 CM UK. 30 X 30 CM
BAHAN
Batu Andesit Bakar t.3 cm Uk. 30 x 30 cm 1.0100 M2 289,000.00 - 291,890.00 291,890.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu andesit 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 310,350.00 418,350.00
M.69f.1 1 M2 PASANG BATU TEMPLEK ACAK
BAHAN
Halaman 446
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Batu Templek Acak 1.0100 M2 96,000.00 - 96,960.00 96,960.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek Acak 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 115,420.00 218,420.00
M.69f.2 1 M2 PASANG BATU TEMPLEK MOTIF
BAHAN
Batu Templek Acak 1.0100 M2 96,000.00 - 96,960.00 96,960.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek Motif 1.0000 Ls 140,000.00 140,000.00 - 140,000.00
JUMLAH .......................... 140,000.00 115,420.00 255,420.00
M.69g.1 1 M2 PASANG BATU TEMPLEK UK. 10 X 20 CM
BAHAN
Batu Templek UK. 10 X 20 CM 1.0100 M2 96,000.00 - 96,960.00 96,960.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 115,420.00 218,420.00
M.69g.2 1 M2 PASANG BATU TEMPLEK UK. 10 X 30 CM
BAHAN
Batu Templek UK. 10 X 30 CM 1.0100 M2 103,000.00 - 104,030.00 104,030.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 122,490.00 225,490.00
M.69g.3 1 M2 PASANG BATU TEMPLEK UK. 15 X 30 CM
BAHAN
Batu Templek UK. 15 X 30 CM 1.0100 M2 109,000.00 - 110,090.00 110,090.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 128,550.00 231,550.00
M.69g.4 1 M2 PASANG BATU TEMPLEK UK. 20 X 40 CM, & 30 X 30 CM
BAHAN
Batu Templek UK. 20 X 40 CM & 30 X 30 CM 1.0100 M2 166,000.00 - 167,660.00 167,660.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 186,120.00 289,120.00
M.69g.5 1 M2 PASANG BATU TEMPLEK UK. 10 X 20 CM
BAHAN
Batu Templek UK. 10 X 20 CM 1.1000 M2 96,000.00 - 105,600.00 105,600.00
Semen Portland 11.7500 Kg 1,400.00 - 16,450.00 16,450.00
Pasir Pasang 0.0350 M3 242,000.00 - 8,470.00 8,470.00
UPAH
Pemasangan Batu Templek 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 130,520.00 233,520.00
M.69g.6 1 M2 PASANG BATU TEMPLEK 10 X 30 CM
BAHAN
Batu Templek UK. 10 x 30 CM 1.0100 M2 103,000.00 - 104,030.00 104,030.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 122,490.00 225,490.00
M.69g.7 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 10 X 20 CM
BAHAN
Batu Bobos Palimanan Corak UK. 10 X 20 CM 1.0100 M2 66,000.00 - 66,660.00 66,660.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Templek 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 85,120.00 188,120.00
M.69h.2 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 20 X 20 CM
BAHAN
Batu Bobos Palimanan Corak UK. 20 X 20 CM 1.0100 M2 69,000.00 - 69,690.00 69,690.00
Halaman 447
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Bobos Palimanan corak Ls1.0000 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 88,150.00 191,150.00
M.69h.3 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 20 X 40 CM
BAHAN
Batu Bobos Palimanan Corak UK. 20 X 40 CM 1.0100 M2 86,000.00 - 86,860.00 86,860.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 105,320.00 208,320.00
M.69h.4 1 M2 PASANG BATU BOBOS PALIMANAN CORAK UK. 15 X 30 CM
BAHAN
Batu Bobos Palimanan Corak UK. 15 X 30 CM 1.0100 M2 78,000.00 - 78,780.00 78,780.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 97,240.00 200,240.00
M.69i.1 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 20 CM
BAHAN
Batu Andesit Susun Sirih UK. 3 X 20 CM 1.0100 M2 129,000.00 - 130,290.00 130,290.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Andesit Susun Siri 1.0000 Ls 130,000.00 130,000.00 - 130,000.00
JUMLAH .......................... 130,000.00 148,750.00 278,750.00
M.69i.2 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 30 CM
BAHAN
Batu Andesit Susun Sirih UK. 3 X 30 CM 1.0100 M2 141,000.00 - 142,410.00 142,410.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Andesit Susun Siri 1.0000 Ls 130,000.00 130,000.00 - 130,000.00
JUMLAH .......................... 130,000.00 160,870.00 290,870.00
M.69i.3 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 40 CM
BAHAN
Batu Andesit Susun Sirih UK. 3 X 40 CM 1.0100 M2 158,000.00 - 159,580.00 159,580.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Andesit Susun Siri 1.0000 Ls 130,000.00 130,000.00 - 130,000.00
JUMLAH .......................... 130,000.00 178,040.00 308,040.00
M.69i.4 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 50 CM
BAHAN
Batu Andesit Susun Sirih UK. 3 X 50 CM 1.0100 M2 153,000.00 - 154,530.00 154,530.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Andesit Susun Siri 1.0000 Ls 130,000.00 130,000.00 - 130,000.00
JUMLAH .......................... 130,000.00 172,990.00 302,990.00
M.69i.5 1 M2 PASANG BATU ANDESIT SUSUN SIRI UK. 3 X 60 CM
BAHAN
Batu Andesit Susun Sirih UK. 3 X 60 CM 1.0100 M2 75,000.00 - 75,750.00 75,750.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Andesit Susun Siri 1.0000 Ls 130,000.00 130,000.00 - 130,000.00
JUMLAH .......................... 130,000.00 94,210.00 224,210.00
M.69j 1 M2 PASANG BATU PROFIL UK. 3 X 50 CM, 4 x 50 CM & 5 X 50 CM
BAHAN
Batu Profil 1.0100 M2 52,000.00 - 52,520.00 52,520.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Profil 1.0000 Ls 103,000.00 103,000.00 - 103,000.00
JUMLAH .......................... 103,000.00 70,980.00 173,980.00
M.69k.1 1 M2 PASANG BATU CANDI UK. 10 X 20 CM
BAHAN
Batu Batu Candi Uk. 10 x 20 CM 1.0100 M2 102,000.00 - 103,020.00 103,020.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Halaman 448
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Candi 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 121,480.00 229,480.00
M.69k.2 1 M2 PASANG BATU CANDI UK. 15 X 30 CM
BAHAN
Batu Candi Uk. 15 x 30 CM 1.0100 M2 109,000.00 - 110,090.00 110,090.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Candi 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 128,550.00 236,550.00
M.69k.3 1 M2 PASANG BATU CANDI UK. 20 X 40 CM
BAHAN
Batu Candi Uk. 20 x 40 CM 1.0100 M2 115,000.00 - 116,150.00 116,150.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Candi 1.0000 Ls 108,000.00 108,000.00 - 108,000.00
JUMLAH .......................... 108,000.00 134,610.00 242,610.00
BAHAN
Batu Pancawarna 1.0100 M2 104,000.00 - 105,040.00 105,040.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Koral Motif 1.0000 Ls 162,000.00 162,000.00 - 162,000.00
JUMLAH .......................... 162,000.00 123,500.00 285,500.00
Halaman 449
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
M.69l.2 1 M2 PASANG BATU KORAL BENGKULU HITAM
BAHAN
Batu Bengkulu Hitam 1.0100 M2 104,000.00 - 105,040.00 105,040.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Koral 1.0000 Ls 140,000.00 140,000.00 - 140,000.00
JUMLAH .......................... 140,000.00 123,500.00 263,500.00
M.69l.3 1 M2 PASANG BATU KORAL FLORES HIJAU
BAHAN
Batu Flores Hijau 1.0100 M2 104,000.00 - 105,040.00 105,040.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Koral 1.0000 Ls 140,000.00 140,000.00 - 140,000.00
JUMLAH .......................... 140,000.00 123,500.00 263,500.00
M.69l.4 1 M2 PASANG BATU KORAL ORANGE BALI
BAHAN
Batu Orange Bali 1.0100 M2 104,000.00 - 105,040.00 105,040.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Koral 1.0000 Ls 140,000.00 140,000.00 - 140,000.00
JUMLAH .......................... 140,000.00 123,500.00 263,500.00
M.69l.5 1 M2 PASANG BATU KORAL HITAM GARUT
BAHAN
Batu Hitam Garut 1.0100 M2 104,000.00 - 105,040.00 105,040.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Koral 1.0000 Ls 140,000.00 140,000.00 - 140,000.00
JUMLAH .......................... 140,000.00 123,500.00 263,500.00
M.69m.1 1 M2 PASANG BATU SIKAT
BAHAN
Batu Sikat 1.0100 M2 104,000.00 - 105,040.00 105,040.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Sikat 1.0000 Ls 140,000.00 140,000.00 - 140,000.00
JUMLAH .......................... 140,000.00 123,500.00 263,500.00
M.69m.2 1 M2 PASANG BATU SIKAT MOTIF
BAHAN
Batu Sikat 1.0100 M2 104,000.00 - 105,040.00 105,040.00
Semen Portland 8.0000 Kg 1,400.00 - 11,200.00 11,200.00
Pasir Pasang 0.0300 M3 242,000.00 - 7,260.00 7,260.00
UPAH
Pemasangan Batu Sikat Motif 1.0000
Ls 162,000.00 162,000.00 - 162,000.00
JUMLAH .......................... 162,000.00 123,500.00 285,500.00
M.70 1 M2 PASANG DINDING ALUMUNIUM COMPOSIT PANEL + RANGKA HOLOW 40X40X0,4
BAHAN
Rangka Holow 40/40/4 4.0000 M' 26,000.00 - 104,000.00 104,000.00
Plat Alumunium Composit Panel 1.1000 M2 269,000.00 - 295,900.00 295,900.00
Sealant 4.0000 M' 13,000.00 - 52,000.00 52,000.00
Skrup 0.2000 Kg 26,000.00 - 5,200.00 5,200.00
Alat Bantu 1.0000 Lot 125,000.00 - 125,000.00 125,000.00
UPAH
Pemasangan 1.0000 unit 250,000.00 250,000.00 - 250,000.00
JUMLAH .......................... 250,000.00 582,100.00 832,100.00
N. PEKERJAAN PENGECATAN
N.1 1 M2 MENGIKIS / MENGEROK PERMUKAAN CAT DINDING LAMA
BAHAN
Soda Api 0.0500 Kg 51,000.00 - 2,550.00 2,550.00
UPAH
Pekerja 0.1500 Org 62,000.00 9,300.00 - 9,300.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 9,612.00 2,550.00 12,162.00
N.6 1 M2 MENDEMPUL DAN MENGGOSOK KAYU
BAHAN
Dempul Jadi 0.0800 Kg 54,000.00 - 4,320.00 4,320.00
Minyak Cat 0.0200 Ltr 30,000.00 - 600.00 600.00
Batu Apung 0.0100 Kg 65,000.00 - 650.00 650.00
Ampelas 0.5000 Lbr 5,000.00 - 2,500.00 2,500.00
UPAH
Halaman 450
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Pekerja 0.0400 Org 62,000.00 2,480.00 - 2,480.00
Tukang Cat 0.0400 Org 83,000.00 3,320.00 - 3,320.00
Kepala Tukang 0.0040 Org 91,000.00 364.00 - 364.00
Mandor 0.0025 Org 104,000.00 260.00 - 260.00
JUMLAH .......................... 6,424.00 8,070.00 14,494.00
N.7 1 M2 PENGECATAN BIDANG KAYU LAMA
BAHAN
Plamir 0.1500 Kg 35,000.00 - 5,250.00 #VALUE!
Cat Dasar 0.1700 Kg 61,000.00 - 10,370.00 #VALUE!
Cat Penutup 0.1700 Kg 61,000.00 - 10,370.00 #VALUE!
Ampelas 0.2667 Lbr 5,000.00 - 1,333.50 #VALUE!
Minyak Cat 0.1000 Ltr 30,000.00 - 3,000.00 #VALUE!
Kuas 0.0330 Bh 10,000.00 - 330.00 #VALUE!
UPAH
Pekerja 0.0700 Org 62,000.00 4,340.00 - 4,340.00
Tukang Cat 0.0750 Org 83,000.00 6,225.00 - 6,225.00
Kepala Tukang 0.0075 Org 91,000.00 682.50 - 682.50
Mandor 0.0025 Org 104,000.00 260.00 - 260.00
JUMLAH .......................... 11,507.50 30,653.50 42,161.00
Halaman 451
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
N.8 1 M2 PENGECATAN BID. KAYU BARU (1 LAPIS PLAMIR),
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
BAHAN
Cat Meni 0.2000 Kg 41,000.00 - 8,200.00 #VALUE!
Plamir 0.1500 Kg 35,000.00 - 5,250.00 #VALUE!
Cat Dasar 0.1700 Kg 61,000.00 - 10,370.00 #VALUE!
Cat Penutup 2 x 0.2600 Kg 61,000.00 - 15,860.00 #VALUE!
Ampelas 0.0200 Lbr 5,000.00 - 100.00 #VALUE!
Minyak Cat 0.0300 Ltr 30,000.00 - 900.00 #VALUE!
Kuas 0.0100 Bh 10,000.00 - 100.00 #VALUE!
UPAH
Pekerja 0.0700 Org 62,000.00 4,340.00 - 4,340.00
Tukang Cat 0.0090 Org 83,000.00 747.00 - 747.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 5,945.00 40,780.00 46,725.00
N.8a 1 M2 PENGECATAN KANSTIN
BAHAN
Cat Penutup 2 x 0.2600 Kg 61,000.00 - 15,860.00 15,860.00
Minyak Cat 0.1500 Ltr 30,000.00 - 4,500.00 4,500.00
Kuas 0.0500 Bh 10,000.00 - 500.00 500.00
UPAH
Pekerja 0.0700 Org 62,000.00 4,340.00 - 4,340.00
Tukang Cat 0.0090 Org 83,000.00 747.00 - 747.00
Kepala Tukang 0.0060 Org 91,000.00 546.00 - 546.00
Mandor 0.0025 Org 104,000.00 260.00 - 260.00
JUMLAH .......................... 5,893.00 20,860.00 26,753.00
N.9 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR),
1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP
BAHAN
Cat Meni 0.2000 Kg 41,000.00 - 8,200.00 #VALUE!
Plamir 0.1500 Kg 35,000.00 - 5,250.00 #VALUE!
Cat Dasar 0.1700 Kg 61,000.00 - 10,370.00 #VALUE!
Cat Penutup 3 x 0.3500 Kg 61,000.00 - 21,350.00 #VALUE!
Ampelas 0.0200 Lbr 5,000.00 - 100.00 #VALUE!
Minyak Cat 0.0300 Ltr 30,000.00 - 900.00 #VALUE!
Kuas 0.0100 Bh 10,000.00 - 100.00 #VALUE!
UPAH
Pekerja 0.0700 Org 62,000.00 4,340.00 - 4,340.00
Tukang Cat 0.1050 Org 83,000.00 8,715.00 - 8,715.00
Kepala Tukang 0.0040 Org 91,000.00 364.00 - 364.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 13,731.00 46,270.00 60,001.00
N.11 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR
BAHAN
Politur 0.1500 Ltr 98,000.00 - 14,700.00 14,700.00
Politur Jadi 0.3720 Ltr 35,000.00 - 13,020.00 13,020.00
Ampelas 2.0000 Lbr 5,000.00 - 10,000.00 10,000.00
Spirtus 0.2000 Ltr 14,000.00 - 2,800.00 2,800.00
Kuas 3" 0.0100 Bh 10,000.00 - 100.00 100.00
UPAH
Pekerja 0.0400 Org 62,000.00 2,480.00 - 2,480.00
Tukang Cat 0.0600 Org 83,000.00 4,980.00 - 4,980.00
Kepala Tukang 0.0160 Org 91,000.00 1,456.00 - 1,456.00
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 9,228.00 40,620.00 49,848.00
N.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER
BAHAN
Residu atau Ter 0.3500 Ltr 63,000.00 - 22,050.00 22,050.00
UPAH
Pekerja 0.1000 Org 62,000.00 6,200.00 - 6,200.00
Mandor 0.0060 Org 104,000.00 624.00 - 624.00
JUMLAH .......................... 6,824.00 22,050.00 28,874.00
N.14 1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
BAHAN
Plamir 0.1000 Kg 21,000.00 - 2,100.00 2,100.00
Cat Dasar 0.1000 Kg 47,000.00 - 4,700.00 4,700.00
Cat Penutup 2x 0.2600 Kg 47,000.00 - 12,220.00 12,220.00
Roll Cat 0.0100 Bh 30,000.00 - 300.00 300.00
Ampelas 0.5000 Lbr 5,000.00 - 2,500.00 2,500.00
UPAH
Pekerja 0.0200 Org 62,000.00 1,240.00 - 1,240.00
Halaman 452
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Tukang Cat 0.0630 Org 83,000.00 5,229.00 - 5,229.00
Kepala Tukang 0.0063 Org 91,000.00 573.30 - 573.30
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 7,354.30 21,820.00 29,174.30
Halaman 453
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
N.14.a 1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP DULUX
BAHAN
Plamir 0.1000 Kg 21,000.00 - 2,100.00 2,100.00
Cat Dasar Dulux 0.1000 Kg 84,000.00 - 8,400.00 8,400.00
Cat Penutup 2x Dulux 0.2600 Kg 84,000.00 - 21,840.00 21,840.00
Roll Cat 0.0100 Bh 30,000.00 - 300.00 300.00
Ampelas 0.5000 Lbr 5,000.00 - 2,500.00 2,500.00
UPAH
Pekerja 0.0200 Org 62,000.00 1,240.00 - 1,240.00
Tukang Cat 0.0630 Org 83,000.00 5,229.00 - 5,229.00
Kepala Tukang 0.0063 Org 91,000.00 573.30 - 573.30
Mandor 0.0025 Org 104,000.00 260.00 - 260.00
JUMLAH .......................... 7,302.30 35,140.00 42,442.30
N.15 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR,
2 LAPIS CAT PENUTUP
BAHAN
Cat Dasar 0.1200 Kg 47,000.00 - 5,640.00 5,640.00
Cat Penutup 2x 0.1800 Kg 47,000.00 - 8,460.00 8,460.00
Roll Cat 0.0100 Bh 30,000.00 - 300.00 300.00
Ampelas 0.5000 Lbr 5,000.00 - 2,500.00 2,500.00
UPAH
Pekerja 0.0280 Org 62,000.00 1,736.00 - 1,736.00
Tukang Cat 0.0420 Org 83,000.00 3,486.00 - 3,486.00
Kepala Tukang 0.0042 Org 91,000.00 382.20 - 382.20
Mandor 0.0030 Org 104,000.00 312.00 - 312.00
JUMLAH .......................... 5,916.20 16,900.00 22,816.20
N.15.a 1 M2 PENGECATAN TEMBOK LAMA 1 LAPIS CAT DASAR,
2 LAPIS CAT PENUTUP DULUX
BAHAN
Cat Dasar Dulux 0.1200 Kg 84,000.00 - 10,080.00 10,080.00
Cat Penutup 2x Dulux 0.1800 Kg 84,000.00 - 15,120.00 15,120.00
Roll Cat 0.0100 Bh 30,000.00 - 300.00 300.00
Ampelas 0.5000 Lbr 5,000.00 - 2,500.00 2,500.00
UPAH
Pekerja 0.0280 Org 62,000.00 1,736.00 - 1,736.00
Tukang Cat 0.0420 Org 83,000.00 3,486.00 - 3,486.00
Kepala Tukang 0.0042 Org 91,000.00 382.20 - 382.20
Mandor 0.0025 Org 104,000.00 260.00 - 260.00
JUMLAH .......................... 5,864.20 28,000.00 33,864.20
N.20 1 M2 MENGECAT PERMUKAAN BAJA DENGAN MENI BESI
BAHAN
Meni Besi 0.1000 Kg 41,000.00 - 4,100.00 4,100.00
Kuas 0.0100 Kg 10,000.00 - 100.00 100.00
UPAH
Pekerja 0.0200 Org 62,000.00 1,240.00 - 1,240.00
Tukang Cat 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0025 Org 104,000.00 260.00 - 260.00
JUMLAH .......................... 19,920.00 4,200.00 24,120.00
N.20.a 1 M2 MENGECAT PERMUKAAN BAJA DENGAN MENI BESI ZINGCHROMATE
BAHAN
Meni Besi Zingchromate 0.1000 Kg 53,000.00 - 5,300.00 5,300.00
Kuas 0.0100 Kg 10,000.00 - 100.00 100.00
UPAH
Pekerja 0.0200 Org 62,000.00 1,240.00 - 1,240.00
Tukang Cat 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 20,700.00 5,400.00 26,100.00
N.20.b 1 M2 MENGECAT DENGAN CAT DUCO
BAHAN
Cat Duco 0.1000 Kg 92,000.00 - 9,200.00 9,200.00
Kuas 0.0100 Kg 10,000.00 - 100.00 100.00
UPAH
Pekerja 0.0200 Org 62,000.00 1,240.00 - 1,240.00
Tukang Cat 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0200 Org 91,000.00 1,820.00 - 1,820.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 20,700.00 9,300.00 30,000.00
Halaman 454
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
N.21 1 M2 MENGECAT BESI ( 3x )
BAHAN
Meni Besi 0.1670 Kg 41,000.00 - 6,847.00 6,847.00
Cat Besi 0.2000 Kg 62,000.00 - 12,400.00 12,400.00
Ampelas Besi 0.4000 Lbr 5,000.00 - 2,000.00 2,000.00
Minyak Cat Thiner 0.1500 Ltr 30,000.00 - 4,500.00 4,500.00
Kuas 0.0500 Bh 10,000.00 - 500.00 500.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Cat 0.3000 Org 83,000.00 24,900.00 - 24,900.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 41,070.00 26,247.00 67,317.00
N.21.a 1 M2 MENGECAT BESI ( 3x ) POLLY URETHANE
BAHAN
Meni Besi Zingchromate 0.1670 Kg 53,000.00 - 8,851.00 8,851.00
Cat Besi Pollyurethane 0.2000 Kg 300,000.00 - 60,000.00 60,000.00
Ampelas Besi 0.4000 Lbr 5,000.00 - 2,000.00 2,000.00
Minyak Cat Thiner 0.1500 Ltr 30,000.00 - 4,500.00 4,500.00
Kuas 0.0500 Bh 10,000.00 - 500.00 500.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Cat 0.3000 Org 83,000.00 24,900.00 - 24,900.00
Kepala Tukang 0.0300 Org 91,000.00 2,730.00 - 2,730.00
Mandor 0.0100 Org 104,000.00 1,040.00 - 1,040.00
JUMLAH .......................... 41,070.00 75,851.00 116,921.00
N.21.b 1 M2 MENGECAT BESI Lama ( 3x )
BAHAN
Cat Besi 0.2000 Kg 62,000.00 - 12,400.00 12,400.00
Ampelas Besi 0.4000 Lbr 5,000.00 - 2,000.00 2,000.00
Minyak Cat Thiner 0.1500 Ltr 30,000.00 - 4,500.00 4,500.00
Kuas 0.0500 Bh 10,000.00 - 500.00 500.00
UPAH
Pekerja 0.2000 Org 62,000.00 12,400.00 - 12,400.00
Tukang Cat 0.2000 Org 83,000.00 16,600.00 - 16,600.00
Kepala Tukang 0.0020 Org 91,000.00 182.00 - 182.00
Mandor 0.0020 Org 104,000.00 208.00 - 208.00
JUMLAH .......................... 29,390.00 19,400.00 48,790.00
Halaman 455
1 2 3 4 5 6 = (3 x 5) 7 = (3 x 5) 8=(6+7)
Halaman 456
PEMERINTAH KABUPATEN INDRAMAYU
S PERUMAHAN, KAWASAN PERMUKIMAN
DAN PERTANAHAN
lan Wiralodra No. 35/A Telp. (0234) 273076
INDRAMAYU - 45212
1 2 3
A. BAHAN AGGREGAT, BAHAN PELEKAT,
BAHAN JADINYA
1 Pasir Urug / Timbun M3 133,900.00 133,900.00 130,600.00
2 Pasir pasang (PP) M3 206,000.00 206,000.00 200,900.00
3 Pasir beton M3 274,700.00 274,700.00 267,900.00
Pasir beton (kg) kg 200.00 200.00 195.00
4 Kerikil / Koral beton M3 213,400.00 213,400.00 208,100.00
5 Batu pecah 0,5 - 1 cm M3 275,500.00 275,500.00 268,700.00
6 Batu pecah 1 - 2 cm M3 248,000.00 248,000.00 241,800.00
7 Batu pecah 2 - 3 cm M3 200.00 200.00 195.00
Kerikil (Maks 30mm) KG 200.00 200.00 195.00
Kerikil (2cm/3cm) KG 200.00 200.00 195.00
8 Batu pecah 5 - 7 cm M3 216,300.00 216,300.00 210,900.00
9 Batu pecah bergradasi Klas A M3 257,500.00 257,500.00 251,100.00
10 Sirtu M3 185,400.00 185,400.00 180,800.00
11 Batu belah (pondasi) M3 206,000.00 206,000.00 200,900.00
12 Batu Bodol / Batu Putih M3 149,400.00 149,400.00 145,700.00
13 Ready mix dengan Additive B 0 M3 824,000.00 824,000.00 803,400.00
14 Ready mix dengan Additive K. 125 M3 844,600.00 844,600.00 823,500.00
15 Ready mix dengan Additive K. 175 M3 865,200.00 865,200.00 843,600.00
16 Ready mix dengan Additive K. 225 M3 896,100.00 896,100.00 873,700.00
17 Ready mix dengan Additive K. 250 M3 916,700.00 916,700.00 893,800.00
18 Ready mix dengan Additive K. 275 M3 937,300.00 937,300.00 913,900.00
19 Ready mix dengan Additive K. 300 M3 957,900.00 957,900.00 934,000.00
20 Ready mix dengan Additive K. 350 M3 999,100.00 999,100.00 974,200.00
21 Ready mix dengan Additive K. 400 M3 1,040,300.00 1,040,300.00 1,014,300.00
22 Ready mix dengan Additive K. 450 M3 1,060,900.00 1,060,900.00 1,034,400.00
23 Ready mix dengan Additive K. 500 M3 1,550,000.00 1,550,000.00 1,511,300.00
24 Tanah lokal M3 30,000.00 30,000.00 29,300.00
Tanah Liat 30,000.00 30,000.00 29,300.00
25 Tanah merah (Curah) M3 137,300.00 137,300.00 133,900.00
26 Bata merah Bh 700.00 700.00 683.00
27 Lem kayu (lem Fox) Kg 8,200.00 8,200.00 8,000.00
28 Lem kuning (aibbon) Kg 41,200.00 41,200.00 40,200.00
Lem 41,200.00 41,200.00 40,200.00
29 Semen Portland (PC) Kg 1,400.00 1,400.00 1,370.00
SM Kg 1,400.00 1,400.00 1,370.00
30 Semen portland (PC) Holcim Kg 1,300.00 1,300.00 1,270.00
31 Semen warna Kg 10,300.00 10,300.00 10,050.00
32 Semen putih Kg 3,600.00 3,600.00 3,510.00
33 Semen Adhesive Kg 6,200.00 6,200.00 6,050.00
34 Floor Hardener (MU 700) Kg 5,900.00 5,900.00 5,760.00
Floor Hardener Kg 5,900.00 5,900.00 5,760.00
35 Compound Zak 79,400.00 79,400.00 77,500.00
36 Perekat / Lem vinyl Ltr 70,000.00 70,000.00 68,300.00
37 Roster kerawang 10 x 20 Bh 4,600.00 4,600.00 4,490.00
38 Roster kerawang 20 x 20 Bh 5,200.00 5,200.00 5,070.00
39 Roster Beton 20 x 20 Bh 30,900.00 30,900.00 30,200.00
40 Roster Kayu uk. 15 x 30 Bh 46,400.00 46,400.00 45,300.00
41 Roster Kayu uk. 20 x 20 Bh 41,200.00 41,200.00 40,200.00
42 Roster batu alam uk.15 x 15 Bh 70,000.00 70,000.00 68,300.00
43 Roster batu alam uk. 20 x 20 Bh 20,600.00 20,600.00 20,100.00
44 Roster batu alam uk. 30 x 30 Bh 100,000.00 100,000.00 97,500.00
45 Roster batu alam uk. 20 x 40 Bh 131,300.00 131,300.00 128,100.00
46 Roster batu alam uk. 20 x 50 Bh 160,000.00 160,000.00 156,000.00
47 Roster batu alam uk. 30 x 60 Bh 173,000.00 173,000.00 168,700.00
48 Melati beton Bh 107,000.00 107,000.00 104,400.00
49 Conblock Bh 7,000.00 7,000.00 6,830.00
50 Panel Beton Pracetak Uk.5 x 40 x 240 cm K.350 Lbr 200,900.00 200,900.00 195,900.00
51 Kolom Beton Pracetak Panjang 3 M' K.350 Btg 360,500.00 360,500.00 351,500.00
52 Kapur padam (KP) M3 130,000.00 130,000.00 126,800.00
- -
- -
B. BAHAN KAYU BERIKUT BAHAN JADINYA - -
1 Bambu d. 8 s/d 10 cm / 6 M' Btg 23,700.00 23,700.00 23,200.00
2 Bambu d. 6 / 6 M' Btg 20,600.00 20,600.00 20,100.00
2 Bambu d. 6-8/600 cm Btg 20,600.00 20,600.00 20,100.00
3 Bilik bambu tanpa kulit M2 20,000.00 20,000.00 19,500.00
Bilik bambu 20,000.00 20,000.00 19,500.00
4 Gedeg bambu M2 17,500.00 17,500.00 17,100.00
5 Tali ijuk Kg 30,900.00 30,900.00 30,200.00
6 Ijuk Kg 38,100.00 38,100.00 37,200.00
- -
7 Kayu Terentang ( Albasia ) M3 1,957,000.00 1,957,000.00 1,908,100.00
8 Papan Terentang ( Albasia ) M3 2,523,500.00 2,523,500.00 2,460,500.00
Kayu papan kelas III 2,523,500.00 2,523,500.00 2,460,500.00
Kayu kelas III (papan) 3,675,000.00 3,675,000.00 3,583,200.00
Kayu kelas III 3,675,000.00 3,675,000.00 3,583,200.00
Kayu 3,675,000.00 3,675,000.00 3,583,200.00
15 Kayu borneo, balok M3 4,635,000.00 4,635,000.00 4,519,200.00
Kayu balok borneo 4,635,000.00 4,635,000.00 4,519,200.00
Papan kayu kelas II atau III 5,150,000.00 5,150,000.00 5,021,300.00
Kayu balok 5/7 kelas III 3,675,000.00 3,675,000.00 3,583,200.00
Kayu Balok Borneo 5/7 3,675,000.00 3,675,000.00 3,583,200.00
16 Kayu borneo, papan (2/30) M3 5,150,000.00 5,150,000.00 5,021,300.00
23 Kayu kaso 5/7 Borneo M3 3,675,000.00 3,675,000.00 3,583,200.00
Kaso-kaso 5 x 7cm 3,675,000.00 3,675,000.00 3,583,200.00
25 Kayu reng 2/3 Borneo M3 3,950,100.00 3,950,100.00 3,851,400.00
Reng 2 x 3 cm 3,950,100.00 3,950,100.00 3,851,400.00
- -
Balok kayu kelas II M3 5,211,800.00 5,211,800.00 5,081,600.00
26 Kayu reng 2/3 Kruing M3 5,021,300.00 5,021,300.00 4,895,800.00
24 Kayu kaso 5/7 Kruing M3 5,211,800.00 5,211,800.00 5,081,600.00
17 Kayu kruing, balok M3 6,180,000.00 6,180,000.00 6,025,500.00
18 Kayu kruing, papan (2/30) M3 6,901,000.00 6,901,000.00 6,728,500.00
19 Kayu cin, balok M3 6,184,000.00 6,184,000.00 6,029,400.00
20 Kayu cin, papan (2/30) M3 7,434,000.00 7,434,000.00 7,248,200.00
- -
9 Kayu Jati Jabar, balok M3 15,465,000.00 15,465,000.00 15,078,400.00
10 Kayu Jati Jabar, papan M3 17,334,000.00 17,334,000.00 16,900,700.00
11 Kayu Merbau, balok M3 15,000,000.00 15,000,000.00 14,625,000.00
12 Kayu Merbau, Papan M3 16,500,000.00 16,500,000.00 16,087,500.00
13 Kayu kamper balok M3 9,118,900.00 9,118,900.00 8,891,000.00
14 Kayu kamper, papan (2/30) M3 10,204,700.00 10,204,700.00 9,949,600.00
21 Kayu Bengkirai / Balau, Balok M3 10,815,000.00 10,815,000.00 10,544,700.00
22 Kayu Bengkirai / Balau, Papan (2/30) M3 11,330,000.00 11,330,000.00 11,046,800.00
- -
- -
27 List Kayu profil M' 4,200.00 4,200.00 4,100.00
List kayu 2/4 4,200.00 4,200.00 4,100.00
28 Dolken kayu d. 5 cm Btg 15,100.00 15,100.00 14,800.00
29 Dolken kayu d. 8 cm Btg 56,700.00 56,700.00 55,300.00
30 Dolken kayu d. 10 cm Btg 65,200.00 65,200.00 63,600.00
Dolken kayu d. 8-10/400 cm Btg 65,200.00 65,200.00 63,600.00
31 Playwood t. 18 mm ( 120 x 240 ) Lbr 283,300.00 283,300.00 276,300.00
32 Teackwood 4 mm Lbr 130,000.00 130,000.00 126,800.00
33 Formika ukuran pintu Lbr 105,000.00 105,000.00 102,400.00
Formika 105,000.00 105,000.00 102,400.00
34 Multiplex 9 mm ( 120 x 240 ) Lbr 146,700.00 146,700.00 143,100.00
35 Multiplex 12 mm ( 120 x 240 ) Lbr 182,500.00 182,500.00 178,000.00
36 Multiplex 18 mm ( 120 x 240 ) Lbr 306,000.00 306,000.00 298,400.00
37 Triplek 3 mm Lbr 61,300.00 61,300.00 59,800.00
38 Triplek 4 mm 69,000.00 69,000.00 67,300.00
39 Triplek 5 mm Lbr 87,550.00 87,550.00 85,400.00
40 Triplek 6 mm Lbr 91,200.00 91,200.00 89,000.00
41 Lambresering M2 191,000.00 191,000.00 186,300.00
- -
C. BAHAN LOGAM DAN BAHAN JADINYA - -
1 Baja kontruksi IWF DN Kg 13,200.00 13,200.00 12,900.00
Besi baja IWF kg 13,200.00 13,200.00 12,900.00
Bondek uk. 100 x 6 139,100.00 139,100.00 135,700.00
2 Baja kontruksi H BM Kg 13,200.00 13,200.00 12,900.00
3 Besi profil Kg 12,000.00 12,000.00 11,700.00
4 Besi Polos Kg 12,000.00 12,000.00 11,700.00
Kawat Ø 4 mm 12,000.00 12,000.00 11,700.00
5 Besi Angkur Kg 18,000.00 18,000.00 17,600.00
6 Besi Sagrod Bh 35,000.00 35,000.00 34,200.00
7 Roda Pintu Bh 30,900.00 30,900.00 30,200.00
8 Besi polos d. 6 mm - 12 mtr ( 2,644 kg ) Btg 22,500.00 22,500.00 22,000.00
9 Besi polos d. 8 mm - 12 mtr ( 4,716 kg ) Btg 39,300.00 39,300.00 38,400.00
10 Besi polos d. 10 mm - 12 mtr ( 7,440 kg ) Btg 56,700.00 56,700.00 55,300.00
11 Besi polos d. 12 mm - 12 mtr ( 10,644 kg ) Btg 86,200.00 86,200.00 84,100.00
12 Besi polos d. 16 mm - 12 mtr ( 18,960 kg ) Btg 112,600.00 112,600.00 109,800.00
13 Besi beton BJTD 24 (Polos) Kg 11,700.00 11,700.00 11,500.00
14 Besi beton BJTD 39 (Ulir) Kg 11,800.00 11,800.00 11,600.00
15 Besi strip / plat besi Uk. 5 x 5 x 6 m Kg 11,300.00 11,300.00 11,100.00
16 Besi siku 70.70 .7 (6 m) Btg 309,000.00 309,000.00 301,300.00
17 Besi siku 60.60 .6 (6 m) Btg 284,600.00 284,600.00 277,500.00
18 Besi siku 50.50 .5 (6 m) Btg 160,300.00 160,300.00 156,300.00
19 Besi siku 40.40 .4 (6 m) Btg 108,200.00 108,200.00 105,500.00
20 Besi siku 30.30 .3 (6 m) Btg 69,700.00 69,700.00 68,000.00
21 Water mur kecil Bh 17,900.00 17,900.00 17,500.00
22 Water mur sedang Bh 26,100.00 26,100.00 25,500.00
23 Water mur besar Bh 40,200.00 40,200.00 39,200.00
24 Rantai besi kecil Kg 23,200.00 23,200.00 22,700.00
25 Rantai besi besar Kg 23,200.00 23,200.00 22,700.00
26 Platiser (plat besi) 90 x 180 x 1 ,1 Lbr 123,600.00 123,600.00 120,600.00
27 Platiser (plat besi) 90 x 180 x 1 ,2 Lbr 133,900.00 133,900.00 130,600.00
28 Platiser (plat besi) 90 x 180 x 1 ,3 Lbr 179,000.00 179,000.00 174,600.00
29 Platiser (plat besi) 90 x 180 x 1 ,4 Lbr 194,000.00 194,000.00 189,200.00
30 Platiser (plat besi) 120 x 240 x 0,9 (Putih) Lbr 193,100.00 193,100.00 188,300.00
31 Platiser (plat besi) 120 x 240 x 1 (Hitam) Lbr 213,700.00 213,700.00 208,400.00
32 Platiser (plat besi) 120 x 240 x 1,2 (Hitam) Lbr 252,400.00 252,400.00 246,100.00
33 Platiser (plat besi) 120 x 240 x 1,4 (Hitam) Lbr 288,400.00 288,400.00 281,200.00
34 Platiser (plat besi) 120 x 240 x 1,5 (Hitam) Lbr 306,400.00 306,400.00 298,800.00
35 Platiser (plat besi) 120 x 240 x 1,6 (Hitam) Lbr 329,600.00 329,600.00 321,400.00
36 Platiser (plat besi) 120 x 240 x 1,8 (Hitam) Lbr 347,600.00 347,600.00 339,000.00
37 Platiser (plat besi) 120 x 240 x 2 (Hitam) Lbr 373,400.00 373,400.00 364,100.00
38 Platiser (plat besi) 120 x 240 x 2,2 (Hitam) Lbr 412,000.00 412,000.00 401,700.00
39 Platiser (plat besi) 120 x 240 x 2,3 (Hitam) Lbr 419,700.00 419,700.00 409,300.00
40 Platiser (plat besi) 120 x 240 x 2,6 (Hitam) Lbr 450,600.00 450,600.00 439,400.00
41 Platiser (plat besi) 120 x 240 x 2,8 (Hitam) Lbr 527,900.00 527,900.00 514,800.00
42 Platiser (plat besi) 120 x 240 x 3 (Hitam) Lbr 576,800.00 576,800.00 562,400.00
43 Platiser (plat besi) 120 x 240 x 3,2 (Hitam) Lbr 659,200.00 659,200.00 642,800.00
44 Platiser (plat besi) 120 x 240 x 4 (Hitam) Lbr 782,800.00 782,800.00 763,300.00
45 Platiser (plat besi) 120 x 240 x 4,8 (Hitam) Lbr 844,600.00 844,600.00 823,500.00
46 Platiser (plat besi) 120 x 240 x 7,8 (Hitam) Lbr 1,369,900.00 1,369,900.00 1,335,700.00
47 Platiser (plat besi) 120 x 240 x 9,8 (Hitam) Lbr 1,720,100.00 1,720,100.00 1,677,100.00
48 Hollow Galvanis 20.20.1,1 ( 6 m) Btg 35,000.00 35,000.00 34,200.00
49 Hollow Galvanis 20.40.1,3 ( 6 m) Btg 72,600.00 72,600.00 70,800.00
50 Hollow Galvanis 30.15.1,1 ( 6 m) Btg 51,500.00 51,500.00 50,300.00
51 Hollow Galvanis 30.30.1,4 ( 6 m) Btg 77,300.00 77,300.00 75,400.00
52 Hollow Galvanis 30.60.1,7 ( 6 m) Btg 124,600.00 124,600.00 121,500.00
53 Hollow Galvanis 40.40.1,6 ( 6 m) Btg 96,800.00 96,800.00 94,400.00
54 Hollow Galvanis 40.60.1,5 ( 6 m) Btg 139,000.00 139,000.00 135,600.00
55 Hollow Galvanis 40.80.1,6 ( 6 m) Btg 200,900.00 200,900.00 195,900.00
56 Hollow Galvanis 50.50.1,3 ( 6 m) Btg 131,800.00 131,800.00 128,600.00
57 Hollow Galvanis 50.100.1,6 ( 6 m) Btg 247,200.00 247,200.00 241,100.00
58 Hollow Hitam 20.20.1,2 ( 6 m) Btg 52,000.00 52,000.00 50,700.00
59 Hollow Hitam 20.40.1,3 ( 6 m) Btg 75,200.00 75,200.00 73,400.00
60 Hollow Hitam 25.25.0,8 ( 6 m) Btg 57,680.00 57,680.00 56,300.00
61 Hollow Hitam 30.75.1,8 ( 6 m) Btg 70,000.00 70,000.00 68,300.00
62 Hollow Hitam 30.30.1,4 ( 6 m) Btg 82,100.00 82,100.00 80,100.00
63 Hollow Hitam 30.60.1,4 ( 6 m) Btg 144,200.00 144,200.00 140,600.00
64 Hollow Hitam 40.40.1,1 ( 6 m) Btg 123,600.00 123,600.00 120,600.00
65 Hollow Hitam 40.60.1,4 ( 6 m) Btg 159,700.00 159,700.00 155,800.00
66 Hollow Hitam 60.60.1,4 ( 6 m) Btg 190,600.00 190,600.00 185,900.00
67 Rangka Hollow 40 x 40 x 0,8 mm M' 45,800.00 45,800.00 44,700.00
68 Rangka Hollow 40 x 40 x 0,4 mm M' 27,000.00 27,000.00 26,400.00
69 Rangka Hollow 40 x 20 x 0,8 mm M' 31,900.00 31,900.00 31,200.00
70 Rangka Hollow 40 x 20 x 0,4 mm M' 21,000.00 21,000.00 20,500.00
71 Spandrell Lbr 220,000.00 220,000.00 214,500.00
72 UNP 150.70 (6 m) Btg 661,600.00 661,600.00 645,100.00
73 UNP 120.70 (6 m) Btg 417,200.00 417,200.00 406,800.00
74 UNP 100.70 (6 m) Btg 289,000.00 289,000.00 281,800.00
75 UNP 70.40 (6 m) Btg 193,100.00 193,100.00 188,300.00
76 UNP 50.40 (6 m) Btg 141,100.00 141,100.00 137,600.00
77 CNP 125.50.20 tebal 2,2 mm (6 m) Btg 190,600.00 190,600.00 185,900.00
78 CNP 125.50.20 tebal 3 mm (6 m) Btg 273,000.00 273,000.00 266,200.00
79 CNP 100.50.20 tebal 2,2 mm (6 m) Btg 208,700.00 208,700.00 203,500.00
80 CNP 100.50.20 tebal 3 mm (6 m) Btg 247,200.00 247,200.00 241,100.00
81 CNP 75.45.20 tebal 2,2 mm (6 m) Btg 175,100.00 175,100.00 170,800.00
82 CNP 75.45.15 tebal 2,2 mm (6 m) Btg 139,000.00 139,000.00 135,600.00
83 CNP 75.45.15 tebal 1,8 mm (6 m) Btg 103,000.00 103,000.00 100,500.00
84 CNP 75.35.15 tebal 1,5 mm (6 m) Btg 112,000.00 112,000.00 109,200.00
85 Canal 100 MMI (6 m) Btg 104,000.00 104,000.00 101,400.00
86 Canal 75 MMI (6 m) Btg 61,800.00 61,800.00 60,300.00
87 Canal 75 Polos (6 m) Btg 65,900.00 65,900.00 64,300.00
88 Canal 75 JP (6 m) Btg 71,000.00 71,000.00 69,300.00
89 Canal 75 GG (6 m) Btg 67,000.00 67,000.00 65,400.00
90 Canal 72 MMI (6 m) Btg 70,000.00 70,000.00 68,300.00
91 Canal 72 Polos (6 m) Btg 69,000.00 69,000.00 67,300.00
92 Reng 32 MMI Btg 34,000.00 34,000.00 33,200.00
93 Reng 30 MMI Btg 32,000.00 32,000.00 31,200.00
94 Reng 28 MMI Btg 29,400.00 29,400.00 28,700.00
95 Reng 32 JP Btg 32,000.00 32,000.00 31,200.00
96 Reng 30 JP Btg 29,900.00 29,900.00 29,200.00
97 Plat Aluminium ( 90 x 200 ) cm Lbr 117,000.00 117,000.00 114,100.00
98 Aluminium Composit Panel (ACP) t. 4 mm M2 206,000.00 206,000.00 200,900.00
99 Besi tempa untuk teralis M2 959,000.00 959,000.00 935,100.00
100 Kawat beton Kg 19,700.00 19,700.00 19,300.00
101 Kawat F4, t. 4 mm (Penggantung Plafond) Btg 1,000.00 1,000.00 980.00
102 Kawat harmonika M2 27,500.00 27,500.00 26,900.00
Kawat jaring Lembar 33,000.00 33,000.00 32,200.00
Jaring kawat baja dilas Kg 12,000.00 12,000.00 11,700.00
103 Kawat nyamuk (Ram nyamuk hijau) M2 19,100.00 19,100.00 18,700.00
104 Kawat duri M' 3,300.00 3,300.00 3,220.00
105 Ram Kawat Hitam (saringan) M2 29,000.00 29,000.00 28,300.00
106 Paku sekrup (buah) Bh 200.00 200.00 200.00
Paku sekrup kg 91,000.00 91,000.00 88,800.00
Paku skrup 3,5” 200.00 200.00 200.00
107 Paku triplek Kg 24,700.00 24,700.00 24,100.00
108 Paku asbes Kg 26,800.00 26,800.00 26,200.00
109 Paku pancing Bh 1,500.00 1,500.00 1,470.00
110 Paku payung asbes Bh 300.00 300.00 300.00
111 Paku biasa 2"-5" Kg 16,200.00 16,200.00 15,800.00
112 Paku biasa 1/2" - 1" Kg 18,800.00 18,800.00 18,400.00
113 Paku gypsum Kg 26,800.00 26,800.00 26,200.00
114 Paku beton ( 2 cm s/d 12 cm) Kg 35,400.00 35,400.00 34,600.00
115 Baud D.12 mm Bh 5,200.00 5,200.00 5,070.00
116 Baud D.16 mm Bh 11,000.00 11,000.00 10,800.00
117 Baud D.19 mm Bh 14,000.00 14,000.00 13,700.00
118 Dina Bolt M 12 P. 6 - 12 cm Bh 2,400.00 2,400.00 2,340.00
119 Dina Bolt M 16 P. 6 - 14 cm 5,200.00 5,200.00 5,070.00
120 Dina Bolt M 20 P. 7,5 - 18 cm 10,800.00 10,800.00 10,600.00
121 Kawat las listrik Kg 30,900.00 30,900.00 30,200.00
122 Daun Pintu Aluminium Natural dengan kaca lengkap acesories Unit 1,500,000.00 1,500,000.00 1,462,500.00
123 Daun Pintu Aluminium Warna dengan kaca lengkap acesories Unit 1,785,000.00 1,785,000.00 1,740,400.00
124 Daun Pintu Swing Aluminium dengan kaca lengkap acesories Unit 1,802,500.00 1,802,500.00 1,757,500.00
125 Daun Pintu Frameless Kaca Bening 10 mm lengkap acesories Unit 4,995,500.00 4,995,500.00 4,870,700.00
126 Daun Pintu Sliding Aluminium dengan kaca lengkap acesories Unit 2,163,000.00 2,163,000.00 2,109,000.00
127 Daun Pintu Kaca Tempered t.12 mm lengkap acesories Unit 4,480,000.00 4,480,000.00 4,368,000.00
128 Siku Alumunium m' 1,545.00 1,545.00 1,510.00
129 List Stainless T M' 9,270.00 9,270.00 9,040.00
130 Lapisan HPL M2 252,000.00 252,000.00 245,700.00
131 Kusen Aluminium Standar Natural 4" M' 72,900.00 72,900.00 71,100.00
132 Kusen Aluminium Standar Natural 3" M' 63,100.00 63,100.00 61,600.00
133 Kusen Aluminium Warna Doff 4" M' 92,200.00 92,200.00 89,900.00
134 Kusen Aluminium Warna Doff 3" M' 79,800.00 79,800.00 77,900.00
135 Kusen Aluminium Warna 4" M' 83,400.00 83,400.00 81,400.00
136 Kusen Aluminium Warna 3" M' 73,600.00 73,600.00 71,800.00
137 Daun jendela Casement Allumunium Natural dgn kaca + Accs. M2 803,400.00 803,400.00 783,400.00
138 Daun jendela Casement Allumunium Warna dgn kaca + Accs. M2 824,000.00 824,000.00 803,400.00
139 Polycarbonate Sheet / Twin Lite Uk.11,8 x 2,1 t. 5 mm Lbr 1,892,600.00 1,892,600.00 1,845,300.00
140 Polycarbonate + kerangka besi M2 459,000.00 459,000.00 447,600.00
141 Polycarbonate + kerangka stainless steel M2 780,000.00 780,000.00 760,500.00
142 Pintu Lipat M2 592,250.00 592,250.00 577,500.00
143 Fibre Glass ( Acyrlic ) tebal 5 mm Lbr 1,339,000.00 1,339,000.00 1,305,600.00
144 Rolling Door / Grille M2 437,750.00 437,750.00 426,900.00
145 Pintu Henderson M2 1,734,000.00 1,734,000.00 1,690,700.00
146 Pagar BRC tinggi 120 cm, p.240 cm Lbr 212,600.00 212,600.00 207,300.00
147 Pagar BRC tinggi 60 cm, p.240 cm tbl. 5 mm Lbr 159,700.00 159,700.00 155,800.00
148 Pagar BRC tinggi 90 cm, p.240 cm tbl. 5 mm Lbr 180,900.00 180,900.00 176,400.00
149 Kuda - kuda Baja Ringan Zingallum tbl. 0,75 mm M2 198,000.00 198,000.00 193,100.00
150 Wiremesh M-6 uk. 2,10 x 5,40 m M2 28,400.00 28,400.00 27,700.00
151 Wiremesh M-8 uk. 2,10 x 5,40 m M2 50,500.00 50,500.00 49,300.00
152 Wiremesh M-10 uk. 2,10 x 5,40 m M2 80,700.00 80,700.00 78,700.00
- -
D. BAHAN PERPIPAAN, RIOLERING & SANITARY - -
1 Closet jongkok standar putih poselin setara INA Bh 167,700.00 167,700.00 163,600.00
2 Closet duduk setara INA Lengkap Unit 1,322,500.00 1,322,500.00 1,289,500.00
3 Closet jongkok standar putih poselin setara TOTO Bh 209,300.00 209,300.00 204,100.00
Closet jongkok Bh 209,300.00 209,300.00 204,100.00
4 Closet duduk setara TOTO Lengkap Unit 2,146,500.00 2,146,500.00 2,092,900.00
5 Urinoir Unit 1,725,300.00 1,725,300.00 1,682,200.00
6 Washtafel warna setara Toto Unit 665,400.00 665,400.00 648,800.00
7 Washtafel warna setara INA Unit 373,400.00 373,400.00 364,100.00
8 Shower merk Speed / DIVA Bh 108,200.00 108,200.00 105,500.00
9 Tempat sabun putih Bh 48,400.00 48,400.00 47,200.00
10 Bak mandi fibreglass standar Bh 334,800.00 334,800.00 326,500.00
Bak fiberglass Bh 334,800.00 334,800.00 326,500.00
11 Bathcuip Bh 2,987,000.00 2,987,000.00 2,912,400.00
12 Pipa GIP medium B d. 1/2" (P. 6 m / btg ) M' 21,100.00 21,100.00 20,600.00
13 Pipa GIP medium B d. 3/4" (P. 6 m / btg ) M' 29,000.00 29,000.00 28,300.00
14 Pipa GIP medium B d. 1" (P. 6 m / btg ) M' 35,200.00 35,200.00 34,400.00
15 Pipa GIP medium B d. 1 1/4" (P. 6 m / btg ) M' 40,000.00 40,000.00 39,000.00
16 Pipa GIP medium B d. 1 1/2" (P.6 m / btg ) M' 46,000.00 46,000.00 44,900.00
17 Pipa GIP medium B d. 2" (P.6 m / btg ) M' 51,500.00 51,500.00 50,300.00
18 Pipa PVC 1/2" Wavin M' 6,600.00 6,600.00 6,440.00
Pipa PVC 1/2” M' 6,600.00 6,600.00 6,440.00
19 Pipa PVC 3/4" Wavin M' 8,900.00 8,900.00 8,680.00
20 Pipa PVC 1” M' 13,200.00 13,200.00 12,900.00
Pipa PVC 2” M' 20,100.00 20,100.00 19,600.00
Pipa PVC 21/2” M' 29,700.00 29,700.00 29,000.00
21 Pipa PVC 1 1/4" M' 17,400.00 17,400.00 17,000.00
22 Pipa PVC 1 1/2” M' 20,200.00 20,200.00 19,700.00
23 Pipa PVC 3” M' 36,200.00 36,200.00 35,300.00
24 Pipa PVC 4" M' 55,800.00 55,800.00 54,500.00
25 Pipa PVC 6" M' 77,000.00 77,000.00 75,100.00
26 Pipa PVC 8" M' 164,200.00 164,200.00 160,100.00
27 Bak cuci piring stainnless steel Bh 267,300.00 267,300.00 260,700.00
Bak cuci piring Bh 267,300.00 267,300.00 260,700.00
28 Water drain besi (floor drain) Bh 43,800.00 43,800.00 42,800.00
Waterdrain Bh 43,800.00 43,800.00 42,800.00
Floor drain Bh 43,800.00 43,800.00 42,800.00
29 Water Turn 500 Lt (Penguin) Bh 1,236,000.00 1,236,000.00 1,205,100.00
30 Water Turn 1000 Lt (Penguin) Bh 1,900,000.00 1,900,000.00 1,852,500.00
31 Kran air Kw. 2 Bh 21,800.00 21,800.00 21,300.00
32 Kran air Kw. 1 Bh 42,200.00 42,200.00 41,200.00
Kran air Bh 42,200.00 42,200.00 41,200.00
33 Stop kran 3/4" Bh 53,800.00 53,800.00 52,500.00
34 Stop kran 1/2" Bh 59,400.00 59,400.00 58,000.00
35 Stop kran 1" Bh 57,500.00 57,500.00 56,100.00
36 Stop kran 2" Bh 87,600.00 87,600.00 85,500.00
37 Jet Pump 350 watt Bh 1,158,800.00 1,158,800.00 1,129,900.00
38 Pintu Vynil KM/WC ( 190 x 70 ) Cm kw1 Unit 266,100.00 266,100.00 259,500.00
39 Pintu Vynil serat jati KM/WC ( 190 x 70 ) Cm kw1 Unit 393,100.00 393,100.00 383,300.00
40 Seal tape Bh 3,100.00 3,100.00 3,030.00
41 Floor drain plastik Bh 12,100.00 12,100.00 11,800.00
42 Floor drain alumunium Bh 51,500.00 51,500.00 50,300.00
43 Grefel beton d. 20 cm (Pjg. 1 M) Bh 49,400.00 49,400.00 48,200.00
44 Grefel beton d. 30 cm (Pjg. 1 M) Bh 68,000.00 68,000.00 66,300.00
45 Paving block warna 6 cm ( 36 Bh ) M2 54,000.00 54,000.00 52,700.00
Paving block 6 cm berwarna 54,000.00 54,000.00 52,700.00
46 Paving block warna 8 cm ( 36 Bh ) M2 62,000.00 62,000.00 60,500.00
Paving block 8 cm berwarna 62,000.00 62,000.00 60,500.00
47 Paving block natural 6 cm ( 36 Bh ) M2 48,000.00 48,000.00 46,800.00
Paving block natural 6 cm 48,000.00 48,000.00 46,800.00
48 Paving block natural 8 cm ( 36 Bh ) M2 60,000.00 60,000.00 58,500.00
Paving block 8 cm natural 60,000.00 60,000.00 58,500.00
49 Paving Block natural uk. 20 x 10 t. 6 cm (50 Bh) M2 95,000.00 95,000.00 92,700.00
50 Paving Block Warna uk. 20 x 10 t. 6 cm (50 Bh) M2 101,000.00 101,000.00 98,500.00
51 Paving ton Truepave uk. 20 x 10 t. 6 cm (50 Bh) M2 166,000.00 166,000.00 161,900.00
52 Paving ton Truepave uk. 20 x 10 t. 8 cm (50 Bh) M2 190,000.00 190,000.00 185,300.00
53 Paving ton Truepave uk. 20 x 10 t. 10 cm (50 Bh) M2 237,000.00 237,000.00 231,100.00
54 Paving ton Halfpave uk. 10 x 10 t. 6 cm (100 Bh) M2 166,000.00 166,000.00 161,900.00
55 Paving ton Halfpave uk. 10 x 10 t. 8 cm (100 Bh) M2 190,000.00 190,000.00 185,300.00
56 Paving ton Halfpave uk. 10 x 10 t. 10 cm (100 Bh) M2 237,000.00 237,000.00 231,100.00
57 Paving ton Fullpave uk. 20 x 20 t. 6 cm (25 Bh) M2 172,000.00 172,000.00 167,700.00
58 Paving ton Fullpave uk. 20 x 20 t. 8 cm (25 Bh) M2 202,000.00 202,000.00 197,000.00
59 Paving ton Topi Uskup uk. 28x20x10 cm t. 6 cm (20 Bh) M2 172,000.00 172,000.00 167,700.00
60 Paving ton Topi Uskup uk. 28x20x10 cm t. 8 cm (20 Bh) M2 202,000.00 202,000.00 197,000.00
61 Paving ton Intepave uk. 20 x 10 cm t. 6 cm (50 Bh) M2 172,000.00 172,000.00 167,700.00
62 Paving ton Intepave uk. 20 x 10 cm t. 8 cm (50 Bh) M2 202,000.00 202,000.00 197,000.00
63 Paving ton Clasic Set t. 6 cm M2 208,000.00 208,000.00 202,800.00
64 Paving ton Clasic Set t. 8 cm M2 237,000.00 237,000.00 231,100.00
65 Paving ton Altstadt Set t. 6 cm M2 208,000.00 208,000.00 202,800.00
66 Paving ton Altstadt Set t. 8 cm M2 237,000.00 237,000.00 231,100.00
67 Paving ton Hexagon t. 6 cm M2 172,000.00 172,000.00 167,700.00
68 Paving ton Hexagon t. 8 cm M2 202,000.00 202,000.00 197,000.00
69 Paving ton Octagon t. 6 cm M2 172,000.00 172,000.00 167,700.00
70 Paving ton Octagon t. 8 cm M2 202,000.00 202,000.00 197,000.00
71 Paving ton Kubus uk. 8 x 8 cm t. 6 cm (156 Bh) M2 172,000.00 172,000.00 167,700.00
72 Paving ton Kubus uk. 8 x 8 cm t. 8 cm (156 Bh) M2 202,000.00 202,000.00 197,000.00
73 Paving ton Quatro uk. 10 x 20 cm t. 6 cm (50 Bh) M2 172,000.00 172,000.00 167,700.00
74 Paving ton Quatro uk. 10 x 20 cm t. 8 cm (50 Bh) M2 202,000.00 202,000.00 197,000.00
75 Grassblock ton uk. 45 x 30 cm t. 6 (7,5 Bh) M2 172,000.00 172,000.00 167,700.00
76 Grassblock ton uk. 40 x 40 cm t. 8 (6,25 Bh) M2 195,000.00 195,000.00 190,200.00
77 Grassblock ton uk. 45 x 30 cm t. 10 (7,5 Bh) M2 249,000.00 249,000.00 242,800.00
78 Pavington Persegi uk. 20 x 10 x 8 cm M2 165,000.00 165,000.00 160,900.00
79 Bataton U 14FS uk. 29 x 14 x 14 cm M' 14,000.00 14,000.00 13,700.00
80 Bataton U 14HS uk. 14 x 14 x 14 cm M' 18,000.00 18,000.00 17,600.00
81 Bataton H 14FS uk. 29 x 14 x 14 cm M2 124,000.00 124,000.00 120,900.00
82 Bataton H 14HS uk. 14 x 14 x 14 cm M2 127,000.00 127,000.00 123,900.00
83 Bataton H 10FS uk. 29 x 10 x 14 cm M2 103,000.00 103,000.00 100,500.00
84 Bataton H 10HS uk. 29 x 10 x 14 cm M2 107,000.00 107,000.00 104,400.00
85 Bataton Kolom uk. 29 x 29 x 14 cm M' 68,000.00 68,000.00 66,300.00
86 Genteng Micro Warna (MCR) uk. 50 x 25 cm M2 93,000.00 93,000.00 90,700.00
87 Genteng Micro Polos uk. 50 x 25 cm M2 69,000.00 69,000.00 67,300.00
88 Ridge Tile Warna (Bubungan) uk. 50 x 22 cm M' 20,000.00 20,000.00 19,500.00
89 Curve Tile uk. 50 x 30 cm M2 68,000.00 68,000.00 66,300.00
90 Kusen Pintu uk. 200 x 90 x 14 cm Bh 357,000.00 357,000.00 348,100.00
91 Kusen Pintu WC uk. 200 x 75 x 14 cm Bh 328,000.00 328,000.00 319,800.00
92 Kusen Jendela uk. 120 x 75 x 14 cm Bh 303,000.00 303,000.00 295,500.00
93 Kusen Jendela Double uk. 150 x 120 x 14 cm Bh 476,000.00 476,000.00 464,100.00
94 Kusen Jendela Minimalis uk. 120 x 60 x 14 Bh 303,000.00 303,000.00 295,500.00
95 Kusen Jendela Minimalis uk. 165 x 60 x 14 Bh 328,000.00 328,000.00 319,800.00
96 Kusen Pintu Double uk. 210 x 160 x 14 cm Bh 536,000.00 536,000.00 522,600.00
97 Support Beam 300 cm (Balok Penyangga) uk. 300x10x6 Bh 520,000.00 520,000.00 507,000.00
98 Support Beam 180 cm (Balok Penyangga) uk. 180x10x6 Bh 331,000.00 331,000.00 322,800.00
99 Support Beam 165 cm (Balok Penyangga) uk. 165x10x6 Bh 308,000.00 308,000.00 300,300.00
100 Support Beam 150 cm (Balok Penyangga) uk. 150x10x6 Bh 286,000.00 286,000.00 278,900.00
101 Kansteen Beton (Uk. 60 x 30 cm) Bh 41,200.00 41,200.00 40,200.00
102 Kansteen Beton (Uk. 50 x 25 cm) t. 10 cm Bh 28,800.00 28,800.00 28,100.00
103 Kansteen Type S 30,900.00 30,900.00 30,200.00
104 Buis beton D. 20 (Pjg. 1 M, T= 3.5 Cm) Bh 67,000.00 67,000.00 65,400.00
105 Buis beton D. 30 (Pjg. 1 M, T= 3.5 Cm) Bh 90,100.00 90,100.00 87,900.00
106 Buis beton D. 40 (Pjg. 1 M, T= 5 Cm) Bh 115,900.00 115,900.00 113,100.00
107 Buis beton D. 50 (Pjg. 1 M, T= 8 Cm) Bh 190,600.00 190,600.00 185,900.00
108 Buis beton D. 60 (Pjg. 1 M, T= 8 Cm) Bh 185,400.00 185,400.00 180,800.00
109 Buis beton D. 70 (Pjg. 1 M, T= 8 Cm) Bh 195,700.00 195,700.00 190,900.00
110 Buis beton D. 60 (Pjg. 0,5 M, T= 8 Cm) Bh 206,000.00 206,000.00 200,900.00
111 Buis beton D. 80 (Pjg. 0,5 M, T= 8 Cm) Bh 257,500.00 257,500.00 251,100.00
112 Buis beton D. 100 (Pjg. 0,5 M, T=10 Cm) Bh 283,300.00 283,300.00 276,300.00
113 Pipa PVC S. 12,5 RRJ Ø 2" M' 30,400.00 30,400.00 29,700.00
114 Pipa PVC S. 12,5 RRJ Ø 3" M' 62,700.00 62,700.00 61,200.00
115 Pipa PVC S. 12,5 RRJ Ø 4" M' 91,800.00 91,800.00 89,600.00
116 Pipa PVC S. 12,5 RRJ Ø 6" M' 195,900.00 195,900.00 191,100.00
117 Pipa PVC S. 12,5 RRJ Ø 8" M' 303,900.00 303,900.00 296,400.00
118 Pipa PVC S. 12,5 RRJ Ø 10" M' 474,200.00 474,200.00 462,400.00
119 Pipa PVC S. 12,5 RRJ Ø 12" M' 756,000.00 756,000.00 737,100.00
120 Pipa PVC S. 12,5 RRJ Ø 14" M' 1,064,300.00 1,064,300.00 1,037,700.00
121 Pipa PVC S. 12,5 RRJ Ø 16" M' 1,219,600.00 1,219,600.00 1,189,200.00
122 Pipa PVC S. 12,5 RRJ Ø 18" M' 1,793,900.00 1,793,900.00 1,749,100.00
123 Pipa PVC S. 12,5 RRJ Ø 20" M' 2,223,300.00 2,223,300.00 2,167,800.00
124 Pipa PVC S. 10 SCJ Ø 1/2" M' 6,000.00 6,000.00 5,850.00
125 Pipa PVC S. 10 SCJ Ø 3/4" M' 8,600.00 8,600.00 8,390.00
126 Pipa PVC S. 10 SCJ Ø 1" M' 10,800.00 10,800.00 10,600.00
127 Pipa PVC S. 10 SCJ Ø 11/4" M' 16,200.00 16,200.00 15,800.00
128 Pipa PVC S. 10 SCJ Ø 11/2" M' 21,600.00 21,600.00 21,100.00
129 Pipa PVC S. 10 SCJ Ø 2" M' 38,900.00 38,900.00 38,000.00
130 Pipa PVC S. 10 SCJ Ø 3" M' 76,800.00 76,800.00 74,900.00
131 Pipa PVC S. 10 SCJ Ø 4" M' 114,600.00 114,600.00 111,800.00
132 Pipa PVC S. 10 SCJ Ø 6" Bh 239,400.00 239,400.00 233,500.00
133 Bend All Socket (RR-RR) Ø 2"-11,25° Bh 58,900.00 58,900.00 57,500.00
134 Bend All Socket (RR-RR) Ø 2"-22,50° Bh 61,900.00 61,900.00 60,400.00
135 Bend All Socket (RR-RR) Ø 2"-45° Bh 67,500.00 67,500.00 65,900.00
136 Bend All Socket (RR-RR) Ø 2"- 90° Bh 78,300.00 78,300.00 76,400.00
137 Bend All Socket (RR-RR) Ø 3"- 11,25° Bh 111,800.00 111,800.00 109,100.00
138 Bend All Socket (RR-RR) Ø 3"- 22,50° Bh 119,900.00 119,900.00 117,000.00
139 Bend All Socket (RR-RR) Ø 3"-45° Bh 137,900.00 137,900.00 134,500.00
140 Bend All Socket (RR-RR) Ø 3"-90° Bh 156,600.00 156,600.00 152,700.00
141 Bend All Socket (RR-RR) Ø 4"-11,25° Bh 175,700.00 175,700.00 171,400.00
142 Bend All Socket (RR-RR) Ø 4"-22,50° Bh 192,900.00 192,900.00 188,100.00
143 Bend All Socket (RR-RR) Ø 4"-45° Bh 219,200.00 219,200.00 213,800.00
144 Bend All Socket (RR-RR) Ø 4"- 90° Bh 272,300.00 272,300.00 265,500.00
145 Bend All Socket (RR-RR) Ø 6"- 11,25° Bh 434,700.00 434,700.00 423,900.00
146 Bend All Socket (RR-RR) Ø 6"- 22,50° Bh 489,300.00 489,300.00 477,100.00
147 Bend All Socket (RR-RR) Ø 6"- 45° Bh 549,600.00 549,600.00 535,900.00
148 Bend All Socket (RR-RR) Ø 6"- 90° Bh 650,700.00 650,700.00 634,500.00
149 Bend All Socket (RR-RR) Ø 8"- 11,25° Bh 750,300.00 750,300.00 731,600.00
150 Bend All Socket (RR-RR) Ø 8"- 22,50° Bh 822,800.00 822,800.00 802,300.00
151 Bend All Socket (RR-RR) Ø 8"- 45° Bh 950,300.00 950,300.00 926,600.00
152 Bend All Socket (RR-RR) Ø 8"- 90° Bh 1,260,800.00 1,260,800.00 1,229,300.00
153 Bend All Socket (RR-RR) Ø 10" - 11,25° Bh 1,329,000.00 1,329,000.00 1,295,800.00
154 Bend All Socket (RR-RR) Ø 10" - 22,50° Bh 1,452,700.00 1,452,700.00 1,416,400.00
155 Bend All Socket (RR-RR) Ø 10" - 45° Bh 1,736,800.00 1,736,800.00 1,693,400.00
156 Bend All Socket (RR-RR) Ø 10" - 90° Bh 2,339,800.00 2,339,800.00 2,281,400.00
157 Bend All Socket (RR-RR) Ø 12" - 11,25° Bh 2,292,000.00 2,292,000.00 2,234,700.00
158 Bend All Socket (RR-RR) Ø 12" - 22,50° Bh 2,477,000.00 2,477,000.00 2,415,100.00
159 Bend All Socket (RR-RR) Ø 12" - 45° Bh 2,952,000.00 2,952,000.00 2,878,200.00
160 Bend All Socket (RR-RR) Ø 12" - 90° Bh 4,219,500.00 4,219,500.00 4,114,100.00
161 Tee PVC All Socket Ø 2" x 2" (RRJ) Bh 330,600.00 330,600.00 322,400.00
162 Tee PVC All Socket Ø 3" x 2" (RRJ) Bh 412,500.00 412,500.00 402,200.00
163 Tee PVC All Socket Ø 3" x 3" (RRJ) Bh 438,400.00 438,400.00 427,500.00
164 Tee PVC All Socket Ø 4" x 2" (RRJ) Bh 551,200.00 551,200.00 537,500.00
165 Tee PVC All Socket Ø 4" x 3" (RRJ) Bh 553,900.00 553,900.00 540,100.00
166 Tee PVC All Socket Ø 4" x 4" (RRJ) Bh 580,200.00 580,200.00 565,700.00
167 Tee PVC All Socket Ø 6" x 3" (RRJ) Bh 1,394,300.00 1,394,300.00 1,359,500.00
168 Tee PVC All Socket Ø 6" x 4" (RRJ) Bh 1,296,700.00 1,296,700.00 1,264,300.00
169 Tee PVC All Socket Ø 6" x 6" (RRJ) Bh 1,385,300.00 1,385,300.00 1,350,700.00
170 Tee PVC All Socket Ø 8" x 3" (RRJ) Bh 1,091,300.00 1,091,300.00 1,064,100.00
171 Tee PVC All Socket Ø 8" x 4" (RRJ) Bh 1,739,600.00 1,739,600.00 1,696,200.00
172 Tee PVC All Socket Ø 8" x 6" (RRJ) Bh 1,844,200.00 1,844,200.00 1,798,100.00
173 Tee PVC All Socket Ø 8" x 8" (RRJ) Bh 1,999,600.00 1,999,600.00 1,949,700.00
174 Tee PVC All Socket Ø 10" x 10" (RRJ) Bh 2,963,700.00 2,963,700.00 2,889,700.00
175 Tee Solvent Cement Ø 20" x 20" x 20" mm Bh 3,500.00 3,500.00 3,420.00
176 Tee Solvent Cement Ø 25" x 25" x 25" mm Bh 4,700.00 4,700.00 4,590.00
177 Tee Solvent Cement Ø 25" x 20" x 25" mm Bh 4,700.00 4,700.00 4,590.00
178 Tee Solvent Cement Ø 32" x 32" x 32" mm Bh 7,200.00 7,200.00 7,020.00
179 Tee Solvent Cement Ø 32" x 25" x 32" mm Bh 8,400.00 8,400.00 8,190.00
180 Tee Solvent Cement Ø 32" x 20" x 32" mm Bh 8,800.00 8,800.00 8,580.00
181 Tee Solvent Cement Ø 40" x 40" x 40" mm Bh 13,700.00 13,700.00 13,400.00
182 Tee Solvent Cement Ø 40" x 32" x 40" mm Bh 14,800.00 14,800.00 14,500.00
183 Tee Solvent Cement Ø 40" x 25" x 40" mm Bh 13,500.00 13,500.00 13,200.00
184 Tee Solvent Cement Ø 40" x 20" x 40" mm Bh 14,300.00 14,300.00 14,000.00
185 Blind flanged Ø 3" Bh 396,000.00 396,000.00 386,100.00
186 Blind flanged Ø 4" Bh 586,000.00 586,000.00 571,400.00
187 Blind flanged Ø 6" Bh 1,151,700.00 1,151,700.00 1,123,000.00
188 Blind flanged Ø 8" Bh 1,515,300.00 1,515,300.00 1,477,500.00
189 Blind flanged Ø 10" Bh 1,939,600.00 1,939,600.00 1,891,200.00
190 Blind flanged Ø 12" Bh 3,172,000.00 3,172,000.00 3,092,700.00
191 Bell Cap Ø 2" (RR) Bh 46,300.00 46,300.00 45,200.00
192 Bell Cap Ø 3" (RR) Bh 83,900.00 83,900.00 81,900.00
193 Bell Cap Ø 4" (RR) Bh 157,400.00 157,400.00 153,500.00
194 Bell Cap Ø 6" (RR) Bh 248,200.00 248,200.00 242,000.00
195 Bell Reducer Socket PVC Ø 3" x 2" Bh 94,400.00 94,400.00 92,100.00
196 Bell Reducer Socket PVC Ø 4" x 2" Bh 138,100.00 138,100.00 134,700.00
197 Bell Reducer Socket PVC Ø 4" x 3" Bh 145,000.00 145,000.00 141,400.00
198 Bell Reducer Socket PVC Ø 6" x 3" Bh 246,700.00 246,700.00 240,600.00
199 Bell Reducer Socket PVC Ø 6" x 4" Bh 269,300.00 269,300.00 262,600.00
200 Bell Reducer Socket PVC Ø 8" x 6" Bh 512,000.00 512,000.00 499,200.00
201 Bell Reducer Socket PVC Ø 8" x 4" Bh 446,700.00 446,700.00 435,600.00
202 Bell Reducer Socket PVC Ø 10" x 8" Bh 833,100.00 833,100.00 812,300.00
203 Bell Reducer Socket PVC Ø 10" x 6" Bh 796,400.00 796,400.00 776,500.00
204 Bell Reducer Socket PVC Ø 12" x 10" Bh 1,368,600.00 1,368,600.00 1,334,400.00
205 Cap PVC S. 10 SC Ø 1/2" Bh 2,800.00 2,800.00 2,730.00
206 Cap PVC S. 10 SC Ø 3/4" Bh 3,800.00 3,800.00 3,710.00
207 Cap PVC S. 10 SC Ø 1" Bh 5,500.00 5,500.00 5,370.00
208 Cap PVC S. 10 SC Ø 11/4" Bh 7,700.00 7,700.00 7,510.00
209 Cap PVC S. 10 SC Ø 11/2" Bh 11,800.00 11,800.00 11,600.00
210 Cap PVC S. 10 SC Ø 2" Bh 24,800.00 24,800.00 24,200.00
211 Cap PVC S. 10 SC Ø 3" Bh 41,200.00 41,200.00 40,200.00
212 Cap PVC S. 10 SC Ø 4" Bh 63,800.00 63,800.00 62,300.00
213 Cap PVC S. 10 SC Ø 6" Bh 143,200.00 143,200.00 139,700.00
214 Cap PVC S. 12,5 RRJ Ø 2" Bh 46,300.00 46,300.00 45,200.00
215 Cap PVC S. 12,5 RRJ Ø 3" Bh 83,900.00 83,900.00 81,900.00
216 Cap PVC S. 12,5 RRJ Ø 4" Bh 132,600.00 132,600.00 129,300.00
217 Cap PVC S. 12,5 RRJ Ø 6" Bh 208,000.00 208,000.00 202,800.00
218 Cap PVC S. 12,5 RRJ Ø 8" Bh 218,200.00 218,200.00 212,800.00
219 Clamp Saddle PVC Ø 11/2" - 1/2" Bh 42,200.00 42,200.00 41,200.00
220 Clamp Saddle PVC Ø 11/2" - 3/4" Bh 42,200.00 42,200.00 41,200.00
221 Clamp Saddle PVC Ø 11/2" - 1" Bh 42,200.00 42,200.00 41,200.00
222 Clamp Saddle PVC Ø 11/2" - 11/4" Bh 42,200.00 42,200.00 41,200.00
223 Clamp Saddle PVC Ø 2" - 1/2" Bh 49,200.00 49,200.00 48,000.00
224 Clamp Saddle PVC Ø 2" - 3/4" Bh 49,200.00 49,200.00 48,000.00
225 Clamp Saddle PVC Ø 2" - 1" Bh 49,200.00 49,200.00 48,000.00
226 Clamp Saddle PVC Ø 2" - 11/4" Bh 49,200.00 49,200.00 48,000.00
227 Clamp Saddle PVC Ø 2" - 11/2" Bh 49,200.00 49,200.00 48,000.00
228 Clamp Saddle PVC Ø 3" - 1/2" Bh 81,100.00 81,100.00 79,100.00
229 Clamp Saddle PVC Ø 3" - 3/4" Bh 81,100.00 81,100.00 79,100.00
230 Clamp Saddle PVC Ø 3" - 1" Bh 81,100.00 81,100.00 79,100.00
231 Clamp Saddle PVC Ø 3" - 11/4" Bh 81,100.00 81,100.00 79,100.00
232 Clamp Saddle PVC Ø 3" - 11/2" Bh 81,100.00 81,100.00 79,100.00
233 Clamp Saddle PVC Ø 4" - 1/2" Bh 92,900.00 92,900.00 90,600.00
234 Clamp Saddle PVC Ø 4" - 3/4" Bh 92,900.00 92,900.00 90,600.00
235 Clamp Saddle PVC Ø 4" - 1" Bh 92,900.00 92,900.00 90,600.00
236 Clamp Saddle PVC Ø 4" - 11/4" Bh 92,900.00 92,900.00 90,600.00
237 Clamp Saddle PVC Ø 4" - 11/2" Bh 92,900.00 92,900.00 90,600.00
238 Clamp Saddle PVC Ø 6" - 1/2" Bh 146,000.00 146,000.00 142,400.00
239 Clamp Saddle PVC Ø 6" - 3/4" Bh 146,000.00 146,000.00 142,400.00
240 Clamp Saddle PVC Ø 6" - 1" Bh 146,000.00 146,000.00 142,400.00
241 Clamp Saddle PVC Ø 6" - 11/4" Bh 146,000.00 146,000.00 142,400.00
242 Clamp Saddle PVC Ø 6" - 11/2" Bh 146,000.00 146,000.00 142,400.00
243 Flange Socket RR Ø 63" x 50" mm Bh 244,000.00 244,000.00 237,900.00
244 Flange Socket RR Ø 90" x 80" mm Bh 362,400.00 362,400.00 353,400.00
245 Flange Socket RR Ø 110" x 100" mm Bh 510,100.00 510,100.00 497,400.00
246 Flange Socket RR Ø 160" x 150" mm Bh 868,000.00 868,000.00 846,300.00
247 Flange Socket RR Ø 200" x 200" mm Bh 1,380,800.00 1,380,800.00 1,346,300.00
248 Flange Socket RR Ø 250" x 250" mm Bh 1,756,000.00 1,756,000.00 1,712,100.00
249 Flange Socket RR Ø 315" x 300" mm Bh 3,289,200.00 3,289,200.00 3,207,000.00
250 Loose Flange Ø 50" mm Bh 154,900.00 154,900.00 151,100.00
251 Loose Flange Ø 63" mm Bh 194,000.00 194,000.00 189,200.00
252 Loose Flange Ø 90" mm Bh 317,300.00 317,300.00 309,400.00
253 Loose Flange Ø 110" mm Bh 484,900.00 484,900.00 472,800.00
254 Loose Flange Ø 160" mm Bh 747,500.00 747,500.00 728,900.00
255 Loose Flange Ø 200" mm Bh 1,192,900.00 1,192,900.00 1,163,100.00
256 Loose Flange Ø 250" mm Bh 1,557,400.00 1,557,400.00 1,518,500.00
257 Loose Flange Ø 315" mm Bh 3,232,600.00 3,232,600.00 3,151,800.00
258 Knie PVC S.10 SCJ Ø 1/2" Bh 2,600.00 2,600.00 2,540.00
259 Knie PVC S.10 SCJ Ø 3/4" Bh 3,500.00 3,500.00 3,420.00
260 Knie PVC S.10 SCJ Ø 1" Bh 5,300.00 5,300.00 5,170.00
261 Knie PVC S.10 SCJ Ø 11/4" Bh 9,400.00 9,400.00 9,170.00
262 Knie PVC S.10 SCJ Ø 11/2" Bh 14,800.00 14,800.00 14,500.00
263 Knie PVC S.10 SCJ Ø 2" Bh 48,300.00 48,300.00 47,100.00
264 Knie PVC S.10 SCJ Ø 3" Bh 127,400.00 127,400.00 124,300.00
265 Knie PVC S.10 SCJ Ø 4" Bh 202,800.00 202,800.00 197,800.00
266 Reducer PVC S. 10 SCJ Ø 2" X 1 1/2" Bh 25,400.00 25,400.00 24,800.00
267 Reducer PVC S. 10 SCJ Ø 3/4" X 1/2" Bh 6,500.00 6,500.00 6,340.00
268 Reducer PVC S. 10 SCJ Ø 1" X 1/2" Bh 8,700.00 8,700.00 8,490.00
269 Reducer PVC S. 10 SCJ Ø 1" X 3/4" Bh 10,600.00 10,600.00 10,400.00
270 Reducer PVC S. 10 SCJ Ø 11/4" X 1" Bh 10,800.00 10,800.00 10,600.00
271 Reducer PVC S. 10 SCJ Ø 11/2" X 1" Bh 15,900.00 15,900.00 15,600.00
272 Reducer PVC S. 10 SCJ Ø 11/2" X 11/4" Bh 13,100.00 13,100.00 12,800.00
273 Reducer PVC S. 10 SCJ Ø 3" X 2" Bh 75,700.00 75,700.00 73,900.00
274 Reducer PVC S. 10 SCJ Ø 3" X 1 1/2" Bh 75,700.00 75,700.00 73,900.00
275 Reducer PVC S. 10 SCJ Ø 4" X 2" Bh 102,700.00 102,700.00 100,200.00
276 Reducer PVC S. 10 SCJ Ø 4" X 3" Bh 86,500.00 86,500.00 84,400.00
277 Reducer PVC S. 10 SCJ Ø 6" X 4" Bh 189,300.00 189,300.00 184,600.00
278 Sockdrat Dalam PVC S. 10 SCJ Ø 1/2" Bh 3,600.00 3,600.00 3,510.00
279 Sockdrat Dalam PVC S. 10 SCJ Ø 3/4" Bh 4,900.00 4,900.00 4,780.00
280 Sockdrat Dalam PVC S. 10 SCJ Ø 1" Bh 5,400.00 5,400.00 5,270.00
281 Sockdrat Dalam PVC S. 10 SCJ Ø 11/4" Bh 8,400.00 8,400.00 8,190.00
282 Sockdrat Luar PVC S. 10 SCJ Ø 1/2" Bh 6,100.00 6,100.00 5,950.00
283 Sockdrat Luar PVC S. 10 SCJ Ø 3/4" Bh 7,200.00 7,200.00 7,020.00
284 Sockdrat Luar PVC S. 10 SCJ Ø 1" Bh 7,600.00 7,600.00 7,410.00
285 Sockdrat Luar PVC S. 10 SCJ Ø 11/4" Bh 12,700.00 12,700.00 12,400.00
286 Sockdrat Luar PVC S. 10 SCJ Ø 11/2" Bh 19,700.00 19,700.00 19,300.00
287 Sockdrat Luar PVC S. 10 SCJ Ø 2" Bh 36,400.00 36,400.00 35,500.00
288 Sockdrat Luar PVC S. 10 SCJ Ø 3" Bh 108,300.00 108,300.00 105,600.00
289 Sockdrat Luar PVC S. 10 SCJ Ø 4" Bh 228,300.00 228,300.00 222,600.00
290 Solvent Cement Ltr 105,100.00 105,100.00 102,500.00
291 Pipa HDPE 100 SDR 9 (PN 20) Ø 1/2'' M' 7,700.00 7,700.00 7,510.00
292 Pipa HDPE 100 SDR 11 (PN 16) Ø 3/4'' M' 10,100.00 10,100.00 9,850.00
293 Pipa HDPE 100 SDR 11 (PN 16) Ø 1'' M' 16,100.00 16,100.00 15,700.00
294 Pipa HDPE 100 SDR 11 (PN 16) Ø 1 1/4'' M' 25,100.00 25,100.00 24,500.00
295 Pipa HDPE 100 SDR 17 (PN 10) Ø 1 1/2 '' M' 26,500.00 26,500.00 25,900.00
296 Pipa HDPE 100 SDR 17 (PN 10) Ø 2 '' M' 42,300.00 42,300.00 41,300.00
297 Pipa HDPE 100 SDR 17 (PN 10) Ø 2 1/2 '' M' 59,800.00 59,800.00 58,400.00
298 Pipa HDPE 100 SDR 17 (PN 10) Ø 3 '' M' 85,800.00 85,800.00 83,700.00
299 Pipa HDPE 100 SDR 17 (PN 10) Ø 4 '' M' 127,800.00 127,800.00 124,700.00
300 Pipa HDPE 100 SDR 17 (PN 10) Ø 6 '' M' 267,000.00 267,000.00 260,400.00
301 Pipa HDPE 100 SDR 17 (PN 10) Ø 8 '' M' 416,600.00 416,600.00 406,200.00
302 Pipa HDPE 100 SDR 17 (PN 10) Ø 10 '' M' 647,700.00 647,700.00 631,600.00
303 Pipa HDPE 100 SDR 17 (PN 10) Ø 12 '' M' 1,030,500.00 1,030,500.00 1,004,800.00
304 Pipa HDPE 100 SDR 17 (PN 10) Ø 14 '' M' 1,311,400.00 1,311,400.00 1,278,700.00
305 REDUCER PE 100 (PN 10 ) (PN 8) 2'' X 1 1/2'' Bh 57,300.00 57,300.00 55,900.00
306 REDUCER PE 100 (PN 10 ) (PN 8) 3'' X 1 1/2'' Bh 80,200.00 80,200.00 78,200.00
307 REDUCER PE 100 (PN 10 ) (PN 8) 3'' X 2'' Bh 165,900.00 165,900.00 161,800.00
308 REDUCER PE 100 (PN 10 ) (PN 8) 4'' X 2'' Bh 220,300.00 220,300.00 214,800.00
309 REDUCER PE 100 (PN 10 ) (PN 8) 4'' X 3'' Bh 220,300.00 220,300.00 214,800.00
310 REDUCER PE 100 (PN 10 ) (PN 8) 6'' X 2'' Bh 390,700.00 390,700.00 381,000.00
311 REDUCER PE 100 (PN 10 ) (PN 8) 6'' X 3'' Bh 536,300.00 536,300.00 522,900.00
312 REDUCER PE 100 (PN 10 ) (PN 8) 6'' X 4'' Bh 536,300.00 536,300.00 522,900.00
313 REDUCER PE 100 (PN 10 ) (PN 8) 8'' X 4'' Bh 570,000.00 570,000.00 555,800.00
314 REDUCER PE 100 (PN 10 ) (PN 8) 8'' X 6'' Bh 766,700.00 766,700.00 747,600.00
315 REDUCER PE 100 (PN 10 ) (PN 8) 10'' X 4'' Bh 1,160,000.00 1,160,000.00 1,131,000.00
316 REDUCER PE 100 (PN 10 ) (PN 8) 10'' X 6'' Bh 1,616,100.00 1,616,100.00 1,575,700.00
317 REDUCER PE 100 (PN 10 ) (PN 8) 10'' X 8'' Bh 1,563,700.00 1,563,700.00 1,524,700.00
318 REDUCER PE 100 (PN 10 ) (PN 8) 12'' X 8'' Bh 1,721,300.00 1,721,300.00 1,678,300.00
319 REDUCER PE 100 (PN 10 ) (PN 8) 12'' X 10'' Bh 1,721,300.00 1,721,300.00 1,678,300.00
320 REDUCER PE 100 (PN 10 ) (PN 8) 12'' X 10'' Bh 1,721,300.00 1,721,300.00 1,678,300.00
321 REDUCER PE 100 (PN 10 ) (PN 8) 12'' X 10'' Bh 1,721,300.00 1,721,300.00 1,678,300.00
322 REDUCER PE 100 (PN 10 ) (PN 8) 14'' X 8'' Bh 2,261,300.00 2,261,300.00 2,204,800.00
323 REDUCER PE 100 (PN 10 ) (PN 8) 14'' X 10'' Bh 2,120,600.00 2,120,600.00 2,067,600.00
324 REDUCER PE 100 (PN 10 ) (PN 8) 14'' X 12'' Bh 2,120,600.00 2,120,600.00 2,067,600.00
325 BEND PE 100 (PN 10 ) (PN 8) Ø 2'' - 45O Bh 167,200.00 167,200.00 163,100.00
326 BEND PE 100 (PN 10 ) (PN 8) Ø 3'' - 45O Bh 249,100.00 249,100.00 242,900.00
327 BEND PE 100 (PN 10 ) (PN 8) Ø 4'' - 45O Bh 384,100.00 384,100.00 374,500.00
328 BEND PE 100 (PN 10 ) (PN 8) Ø 6'' - 45O Bh 643,100.00 643,100.00 627,100.00
329 BEND PE 100 (PN 10 ) (PN 8) Ø 8'' - 45O Bh 1,154,500.00 1,154,500.00 1,125,700.00
330 BEND PE 100 (PN 10 ) (PN 8) Ø 10'' - 45O Bh 1,867,400.00 1,867,400.00 1,820,800.00
331 BEND PE 100 (PN 10 ) (PN 8) Ø 12'' - 45O Bh 2,975,500.00 2,975,500.00 2,901,200.00
332 BEND PE 100 (PN 10 ) (PN 8) Ø 14'' - 45O Bh 3,207,500.00 3,207,500.00 3,127,400.00
333 BEND PE 100 (PN 10 ) (PN 8) Ø 2'' - 90O Bh 198,100.00 198,100.00 193,200.00
334 BEND PE 100 (PN 10 ) (PN 8) Ø 3'' - 90O Bh 299,600.00 299,600.00 292,200.00
335 BEND PE 100 (PN 10 ) (PN 8) Ø 4'' - 90O Bh 453,100.00 453,100.00 441,800.00
336 BEND PE 100 (PN 10 ) (PN 8) Ø 6'' - 90O Bh 739,700.00 739,700.00 721,300.00
337 BEND PE 100 (PN 10 ) (PN 8) Ø 8'' - 90O Bh 1,349,900.00 1,349,900.00 1,316,200.00
338 BEND PE 100 (PN 10 ) (PN 8) Ø 10'' - 90O Bh 2,409,300.00 2,409,300.00 2,349,100.00
339 BEND PE 100 (PN 10 ) (PN 8) Ø 12'' - 90O Bh 3,756,400.00 3,756,400.00 3,662,500.00
340 BEND PE 100 (PN 10 ) (PN 8) Ø 14'' - 90O Bh 6,249,600.00 6,249,600.00 6,093,400.00
341 TEE PE 100 (PN 10 ) (PN 8) Ø 2'' x 2'' Bh 236,700.00 236,700.00 230,800.00
342 TEE PE 100 (PN 10 ) (PN 8) Ø 3'' x 3'' Bh 383,400.00 383,400.00 373,900.00
343 TEE PE 100 (PN 10 ) (PN 8) Ø 4'' x 4'' Bh 496,500.00 496,500.00 484,100.00
344 TEE PE 100 (PN 10 ) (PN 8) Ø 6'' x 6'' Bh 680,000.00 680,000.00 663,000.00
345 TEE PE 100 (PN 10 ) (PN 8) Ø 8'' x 8'' Bh 1,297,200.00 1,297,200.00 1,264,800.00
346 TEE PE 100 (PN 10 ) (PN 8) Ø 10'' x 10'' Bh 2,255,900.00 2,255,900.00 2,199,600.00
347 TEE PE 100 (PN 10 ) (PN 8) Ø 12'' x 12'' Bh 3,499,200.00 3,499,200.00 3,411,800.00
348 TEE PE 100 (PN 10 ) (PN 8) Ø 14'' x 14'' Bh 7,131,300.00 7,131,300.00 6,953,100.00
349 STUB FLANGE PE 100 (PN 10) (PN 8) Ø 2'' Bh 133,600.00 133,600.00 130,300.00
350 STUB FLANGE PE 100 (PN 10) (PN 8) Ø 3'' Bh 86,100.00 86,100.00 84,000.00
351 STUB FLANGE PE 100 (PN 10) (PN 8) Ø 4'' Bh 225,000.00 225,000.00 219,400.00
352 STUB FLANGE PE 100 (PN 10) (PN 8) Ø 6'' Bh 451,000.00 451,000.00 439,800.00
353 STUB FLANGE PE 100 (PN 10) (PN 8) Ø 8'' Bh 745,800.00 745,800.00 727,200.00
354 STUB FLANGE PE 100 (PN 10) (PN 8) Ø 10'' Bh 1,053,400.00 1,053,400.00 1,027,100.00
355 STUB FLANGE PE 100 (PN 10) (PN 8) Ø 12'' Bh 1,740,000.00 1,740,000.00 1,696,500.00
356 CLAMP SADDLE PE 100 Ø 2'' x 1/2'' Bh 61,400.00 61,400.00 59,900.00
357 CLAMP SADDLE PE 100 Ø 3'' x 1/2'' Bh 93,700.00 93,700.00 91,400.00
358 CLAMP SADDLE PE 100 Ø 3'' x 3/4'' Bh 93,700.00 93,700.00 91,400.00
359 CLAMP SADDLE PE 100 Ø 3'' x 1'' Bh 93,700.00 93,700.00 91,400.00
360 CLAMP SADDLE PE 100 Ø 4'' x 1/2'' Bh 100,600.00 100,600.00 98,100.00
361 CLAMP SADDLE PE 100 Ø 6'' x 1/2'' Bh 303,100.00 303,100.00 295,600.00
362 TEE PE 100 (PN 10 ) (PN 8) Ø 4'' x 2'' Bh 419,600.00 419,600.00 409,200.00
363 TEE PE 100 (PN 10 ) (PN 8) Ø 6'' x 4'' Bh 998,000.00 998,000.00 973,100.00
364 TEE PE 100 (PN 10 ) (PN 8) Ø 8'' x 6'' Bh 1,705,500.00 1,705,500.00 1,662,900.00
365 TEE PE 100 (PN 10 ) (PN 8) Ø 8'' x 4'' Bh 1,639,500.00 1,639,500.00 1,598,600.00
366 TEE PE 100 (PN 10 ) (PN 8) Ø 10'' x 6'' Bh 3,262,900.00 3,262,900.00 3,181,400.00
367 TEE PE 100 (PN 10 ) (PN 8) Ø 10'' x 8'' Bh 3,262,900.00 3,262,900.00 3,181,400.00
368 TEE PE 100 (PN 10 ) (PN 8) Ø 12'' x 10'' Bh 5,525,400.00 5,525,400.00 5,387,300.00
369 TEE PE 100 (PN 10 ) (PN 8) Ø 12'' x 8'' Bh 5,525,400.00 5,525,400.00 5,387,300.00
370 CAP PE 100 (PN 10 ) (PN 8) Ø 2'' Bh 141,600.00 141,600.00 138,100.00
371 CAP PE 100 (PN 10 ) (PN 8) Ø 3'' Bh 261,100.00 261,100.00 254,600.00
372 CAP PE 100 (PN 10 ) (PN 8) Ø 4'' Bh 404,400.00 404,400.00 394,300.00
- -
E. BAHAN PENUTUP ATAP, PLAFOND & RANGKANYA - -
1 List gypsum T.5 cm M' 12,400.00 12,400.00 12,100.00
2 List gypsum T.10 cm M' 14,500.00 14,500.00 14,200.00
3 List gypsum T.12 cm M' 16,500.00 16,500.00 16,100.00
4 List gypsum T.15 cm M' 21,000.00 21,000.00 20,500.00
5 Cotton Plaster Bh 18,000.00 18,000.00 17,600.00
6 Aqua Proof Kg 53,400.00 53,400.00 52,100.00
7 Papan Lisplank GRC L = 0,30 M, P. 2,40 M Lbr 87,600.00 87,600.00 85,500.00
8 Papan Lisplank GRC L = 0,20 M, P. 2,40 M Lbr 60,500.00 60,500.00 59,000.00
9 Papan Lisplank GRC L = 0,10 M, P. 2,40 M Lbr 36,100.00 36,100.00 35,200.00
10 Spandek t. 0,3 mm Uk. 110 x 600 cm Lbr 324,500.00 324,500.00 316,400.00
11 Spandek t. 0,25 mm Uk.110 x 600 cm Lbr 331,000.00 331,000.00 322,800.00
12 Plat asbes T = 4 mm Lbr 24,000.00 24,000.00 23,400.00
13 Plat asbes T = 5 mm Lbr 26,000.00 26,000.00 25,400.00
Asbes semen 26,000.00 26,000.00 25,400.00
14 Plafond GRC uk. 120 cm x 240 cm Lbr 68,500.00 68,500.00 66,800.00
15 Plafond gypsum uk. 120 cm x 240 cm Lbr 72,900.00 72,900.00 71,100.00
Gypsum Board 72,900.00 72,900.00 71,100.00
16 Plafond Akustik uk. 60 cm x 120 cm Lbr 113,300.00 113,300.00 110,500.00
Akustik ukuran (60 x 120)cm 113,300.00 113,300.00 110,500.00
17 Plafond Akustik uk. 60 cm x 60 cm 144,200.00 144,200.00 140,600.00
18 Asbes gelombang besar 5 mm 105 x 150 Lbr 72,100.00 72,100.00 70,300.00
19 Asbes gelombang besar 5 mm 105 x 300 Lbr 123,600.00 123,600.00 120,600.00
20 Asbes gelombang kecil 4 mm 105 x 150 Lbr 51,500.00 51,500.00 50,300.00
21 Asbes gelombang kecil 4 mm 80 x 150 Lbr 31,000.00 31,000.00 30,300.00
22 Asbes gelombang kecil 4 mm 80 x 180 Lbr 34,200.00 34,200.00 33,400.00
23 Asbes gelombang kecil 4 mm 80 x 210 Lbr 62,800.00 62,800.00 61,300.00
24 Asbes gelombang kecil 4 mm 80 x 240 Lbr 72,100.00 72,100.00 70,300.00
25 Asbes gelombang kecil 4 mm 80 x 360 Lbr 100,000.00 100,000.00 97,500.00
26 Asbes gelombang kecil 4 mm 105 x 210 Lbr 65,900.00 65,900.00 64,300.00
27 Asbes gelombang kecil 4 mm 105 x 240 Lbr 72,400.00 72,400.00 70,600.00
28 Asbes gelombang kecil 4 mm 105 x 300 Lbr 90,600.00 90,600.00 88,400.00
29 Asbes gelombang 5 mm 92 x 250 Lbr 83,000.00 83,000.00 81,000.00
30 Asbes gelombang 4 mm 92 x 250 Lbr 81,000.00 81,000.00 79,000.00
31 Asbes gelombang 5 mm 92 x 225 Lbr 76,000.00 76,000.00 74,100.00
32 Asbes gelombang 4 mm 92 x 225 Lbr 72,000.00 72,000.00 70,200.00
33 Baja Ringan Zincallume t. 0,75 mm M2 161,000.00 161,000.00 157,000.00
34 Baja Ringan Zincallume t. 1,00 mm M2 176,000.00 176,000.00 171,600.00
35 Rangka Baja Ringan Zincallume 70.60.0,7 (6 m) Btg 74,000.00 74,000.00 72,200.00
36 Rangka Baja Ringan Zincallume 70.60.0,75 (6 m) Btg 79,000.00 79,000.00 77,100.00
37 Rangka Baja Ringan Zincallume 70.60.0,8 (6 m) Btg 87,000.00 87,000.00 84,900.00
38 Reng Baja Ringan Zincallume t.0,6 mm (6 m) Btg 40,000.00 40,000.00 39,000.00
39 Reng Baja Ringan Zincallume t.0,65 mm (6 m) Btg 43,000.00 43,000.00 42,000.00
40 Reng Baja Ringan Zincallume t.0,75 mm (6 m) Btg 47,000.00 47,000.00 45,900.00
41 Genteng plentong kecil (bakar) Bh 1,800.00 1,800.00 1,760.00
Genteng plentong 1,800.00 1,800.00 1,760.00
42 Genteng plentong super (bakar) Bh 2,300.00 2,300.00 2,250.00
Genteng plentong super 2,300.00 2,300.00 2,250.00
43 Genteng kodok Natural Bh 3,500.00 3,500.00 3,420.00
44 Genteng kodok Glazuur Bh 3,700.00 3,700.00 3,610.00
Genteng kodok 3,700.00 3,700.00 3,610.00
45 Genteng kodok / Alto transparant (brown) Bh 4,300.00 4,300.00 4,200.00
46 Genteng keramik morando natural Bh 3,700.00 3,700.00 3,610.00
47 Genteng keramik morando transparan Bh 4,100.00 4,100.00 4,000.00
48 Genteng keramik morando warna Bh 5,000.00 5,000.00 4,880.00
49 Genteng beton Natural Bh 5,400.00 5,400.00 5,270.00
Genteng beton 5,400.00 5,400.00 5,270.00
50 Genteng metal 80 x 100 pasir 2 x 4 M2 114,800.00 114,800.00 112,000.00
51 Genteng metal 80 x 100 Multi Roof t. 0,4 mm M2 139,000.00 139,000.00 135,600.00
52 Genteng metal 80 x 100 Multi Roof t. 0,3 mm M2 119,000.00 119,000.00 116,100.00
53 Genteng metal 80 x 100 Multi Roof t. 25 mm M2 97,000.00 97,000.00 94,600.00
54 Genteng metal 80 x 100 Sakura t. 0,25 mm M2 48,000.00 48,000.00 46,800.00
55 Genteng metal 80 x 100 Sakura t. 0,3 mm M2 55,000.00 55,000.00 53,700.00
56 Genteng Tegola M2 357,000.00 357,000.00 348,100.00
57 Bubung genteng plentong kecil Bh 3,900.00 3,900.00 3,810.00
Genteng Bubung 3,900.00 3,900.00 3,810.00
58 Bubung genteng plentong super Bh 3,900.00 3,900.00 3,810.00
Genteng Bubung palentong besar 3,900.00 3,900.00 3,810.00
59 Bubung genteng kodok / Alto natural Bh 5,200.00 5,200.00 5,070.00
60 Bubung genteng kodok / Alto transparan (brown) Bh 7,800.00 7,800.00 7,610.00
Genteng Bubung glazuur 7,800.00 7,800.00 7,610.00
61 Bubung genteng morando natural Bh 4,100.00 4,100.00 4,000.00
62 Bubung genteng morando transparan Bh 7,200.00 7,200.00 7,020.00
63 Bubung genteng morando warna Bh 7,200.00 7,200.00 7,020.00
64 Bubung genteng beton natural Bh 6,000.00 6,000.00 5,850.00
65 Bubung Genteng metal 80 x 100 (p.90 cm) Bh 56,000.00 56,000.00 54,600.00
66 Bubung Genteng metal 80 x 100 natural Type U (p.100 cm) Bh 33,000.00 33,000.00 32,200.00
67 Bubung Genteng metal 80 x 100 natural Type 1/2 Lingkaran (p Bh 55,000.00 55,000.00 53,700.00
68 Bubung Genteng metal 80 x 100 Warna Kotak (p.100 cm) Bh 29,000.00 29,000.00 28,300.00
69 Bubung Genteng metal 80 x 100 Warna Type 1/2 Lingkaran (p. Bh 43,000.00 43,000.00 42,000.00
70 Genteng decra bond M' 48,000.00 48,000.00 46,800.00
71 Nok stel gelombang M' 33,000.00 33,000.00 32,200.00
72 Seng gelombang BJLS 28 (80 x 180) Lbr 51,500.00 51,500.00 50,300.00
73 Seng gelombang BJLS 30 (80 x 180) Lbr 77,000.00 77,000.00 75,100.00
74 Seng Plat BJLS 28 Lbr 54,000.00 54,000.00 52,700.00
75 Seng Plat BJLS L. 90 Cm M' 30,900.00 30,900.00 30,200.00
76 Seng Plat BJLS L. 60 Cm M' 18,500.00 18,500.00 18,100.00
- -
F. BAHAN LANTAI & PELAPIS DINDING - -
1 Keramik warna 10 x 20 cm Kw.1 M2 1,100.00 1,100.00 1,080.00
Ubin keramik artistik 10 cm x 20 cm 1,100.00 1,100.00 1,080.00
2 Keramik putih 20 x 20 cm Kw.1 M2 55,600.00 55,600.00 54,300.00
3 Keramik warna 20 x 20 cm Kw.1 M2 59,700.00 59,700.00 58,300.00
Ubin Keramik putih 20 x 20 cm Kw.1 59,700.00 59,700.00 58,300.00
4 Keramik putih 30 x 30 cm Kw.1 M2 48,900.00 48,900.00 47,700.00
Ubin Keramik putih 30 x 30 cm Kw.1 48,900.00 48,900.00 47,700.00
5 Keramik putih 40 x 40 cm Kw.1 M2 51,500.00 51,500.00 50,300.00
6 Keramik warna 30 x 30 cm Kw.1 M2 50,000.00 50,000.00 48,800.00
7 Keramik warna 40 x 40 cm Kw.1 M2 53,400.00 53,400.00 52,100.00
8 Keramik Roman Grace warna 33 x 33 cm M2 98,900.00 98,900.00 96,500.00
Ubin Keramik Roman Grace warna 33 x 33 cm 98,900.00 98,900.00 96,500.00
9 Keramik putih 20 x 20 cm Anti Slip Kw.1 M2 60,800.00 60,800.00 59,300.00
10 Keramik warna 20 x 20 cm Anti Slip Kw.1 M2 61,200.00 61,200.00 59,700.00
11 Keramik warna 20 x 20 cm Anti Slip Kw.2 M2 55,900.00 55,900.00 54,600.00
12 Keramik warna 30 x 30 cm Anti Slip Kw.1 M2 62,800.00 62,800.00 61,300.00
13 Keramik dinding Warna 20 x 25 cm M2 57,400.00 57,400.00 56,000.00
14 Keramik dinding Warna 25 x 33 cm M2 78,000.00 78,000.00 76,100.00
15 Keramik dinding Polos 20 x 25 cm M2 55,100.00 55,100.00 53,800.00
16 Keramik Essenza 40 x 40 cm M2 216,300.00 216,300.00 210,900.00
17 List keramik atas 10 x 20 cm Bh 4,100.00 4,100.00 4,000.00
Plint keramik 4,100.00 4,100.00 4,000.00
18 List keramik atas 10 x 25 cm Bh 10,800.00 10,800.00 10,600.00
19 List keramik atas 10 x 30 cm Bh 18,500.00 18,500.00 18,100.00
20 List keramik bawah 10 x 60 cm Bh 37,100.00 37,100.00 36,200.00
21 Granito 40 x 40 cm M2 231,800.00 231,800.00 226,100.00
22 Granito 80 x 80 cm M2 442,900.00 442,900.00 431,900.00
23 Granit tile 60 x 60 cm (Halus) M2 226,600.00 226,600.00 221,000.00
24 Granit tile 60 x 60 cm (Kasar) M2 326,500.00 326,500.00 318,400.00
25 Granit tile 60 x 60 cm (Black) M2 416,900.00 416,900.00 406,500.00
26 Granit tile 80 x 80 cm M2 727,200.00 727,200.00 709,100.00
27 Granit slab (Batu) DN M2 1,287,500.00 1,287,500.00 1,255,400.00
28 Marmer M2 1,184,500.00 1,184,500.00 1,154,900.00
Marmer (Buah) 1,184,500.00 1,184,500.00 1,154,900.00
29 Stepnose tangga Bh 18,000.00 18,000.00 17,600.00
30 Stepnose 10 x 30 cm / anti slip Bh 15,500.00 15,500.00 15,200.00
31 Stepnose 10 x 40 cm / anti slip Bh 18,000.00 18,000.00 17,600.00
32 Stepnose 10 x 60 cm / anti slip Bh 49,800.00 49,800.00 48,600.00
33 Kuku Macan Polos M' 7,700.00 7,700.00 7,510.00
34 Kuku Macan Spiral M' 7,500.00 7,500.00 7,320.00
35 Tegel Badak Natural 20 x 20 cm Bh 2,400.00 2,400.00 2,340.00
36 Tegel Badak Natural 30 x 30 cm Bh 2,700.00 2,700.00 2,640.00
37 Tegel Badak Warna 20 x 20 cm Bh 2,700.00 2,700.00 2,640.00
38 Tegel Badak Warna 30 x 30 cm Bh 5,900.00 5,900.00 5,760.00
39 Tegel Cor Beton press warna alami uk. 20 x 20 cm M2 22,000.00 22,000.00 21,500.00
40 Tegel Cor Beton press warna alami uk. 30 x 30 cm M2 28,000.00 28,000.00 27,300.00
41 Parquet jati M2 216,300.00 216,300.00 210,900.00
42 Wallpaper M2 97,000.00 97,000.00 94,600.00
Batu Andesit Alur/Motif - -
43 Ukuran 10 x 20 M2 122,600.00 122,600.00 119,600.00
44 Ukuran 15 x 30 M2 133,400.00 133,400.00 130,100.00
45 Ukuran 20 x 40 M2 144,200.00 144,200.00 140,600.00
Batu Andesit Bakar Polos - -
46 Ukuran 10 x 20 M2 116,900.00 116,900.00 114,000.00
47 Ukuran 10 x 30 M2 122,100.00 122,100.00 119,100.00
48 Ukuran 15 x 30 M2 135,600.00 135,600.00 132,300.00
49 Ukuran 15 x 15 M2 122,100.00 122,100.00 119,100.00
50 Ukuran 20 x 30 M2 137,500.00 137,500.00 134,100.00
51 Ukuran 20 x 20 M2 132,400.00 132,400.00 129,100.00
52 Ukuran 30 x 30 M2 142,700.00 142,700.00 139,200.00
53 Ukuran 30 x 60 M2 153,500.00 153,500.00 149,700.00
Batu Andesit Bakar tebal. 10 cm - -
54 Ukuran 10 x 10 M2 388,300.00 388,300.00 378,600.00
55 Ukuran 15 x 15 M2 545,900.00 545,900.00 532,300.00
56 Ukuran 15 x 30 M2 545,900.00 545,900.00 532,300.00
57 Ukuran 20 x 20 M2 545,900.00 545,900.00 532,300.00
58 Ukuran 30 x 30 M2 598,400.00 598,400.00 583,500.00
Batu Andesit Bakar tebal. 5 cm - -
59 Ukuran 10 x 10 M2 203,900.00 203,900.00 198,900.00
60 Ukuran 15 x 15 M2 288,400.00 288,400.00 281,200.00
61 Ukuran 15 x 30 M2 288,400.00 288,400.00 281,200.00
62 Ukuran 20 x 20 M2 288,400.00 288,400.00 281,200.00
63 Ukuran 30 x 30 M2 320,300.00 320,300.00 312,300.00
Batu Andesit Bakar tebal. 3 cm - -
64 Ukuran 10 x 10 M2 151,400.00 151,400.00 147,700.00
65 Ukuran 15 x 15 M2 215,300.00 215,300.00 210,000.00
66 Ukuran 15 x 30 M2 215,300.00 215,300.00 210,000.00
67 Ukuran 20 x 20 M2 215,300.00 215,300.00 210,000.00
68 Ukuran 30 x 30 M2 235,900.00 235,900.00 230,100.00
Batu Templek - -
69 Acak Garut M2 78,300.00 78,300.00 76,400.00
70 Ukuran 10 x 20 M2 78,300.00 78,300.00 76,400.00
71 Ukuran 10 x 30 M2 84,200.00 84,200.00 82,100.00
72 Ukuran 15 x 30 M2 88,600.00 88,600.00 86,400.00
73 Ukuran 20 x 40 M2 136,000.00 136,000.00 132,600.00
74 Ukuran 30 x 30 M2 136,000.00 136,000.00 132,600.00
75 Batu templek hitam Uk. 10 x 20 M2 121,500.00 121,500.00 118,500.00
Batu templek hitam Uk. 10 x 20 (Buah) 139,500.00 139,500.00 136,100.00
76 Batu templek hijau Uk.10 x 20 dan 10 x 10 M2 93,700.00 93,700.00 91,400.00
77 Batu templek kuning M2 87,600.00 87,600.00 85,500.00
78 Batu templek Salegedang M2 115,400.00 115,400.00 112,600.00
79 Batu templek Napoli Uk. 15/30 M2 115,400.00 115,400.00 112,600.00
80 Batu templek Napoli Uk. 10/20 M2 105,100.00 105,100.00 102,500.00
Batu Kuning / Palimanan - -
81 Ukuran 10 x 20 M2 111,800.00 111,800.00 109,100.00
82 Ukuran 20 x 20 M2 116,900.00 116,900.00 114,000.00
83 Ukuran 20 x 40 M2 127,200.00 127,200.00 124,100.00
84 Ukuran 15 x 30 M2 122,100.00 122,100.00 119,100.00
85 Ukuran 15 x 15 M2 111,800.00 111,800.00 109,100.00
Batu Andesit Susun Sirih - -
86 Ukuran 3 x 20 M2 106,300.00 106,300.00 103,700.00
87 Ukuran 3 x 30 M2 122,600.00 122,600.00 119,600.00
88 Ukuran 3 x 40 M2 128,000.00 128,000.00 124,800.00
89 Ukuran 3 x 50 M2 126,000.00 126,000.00 122,900.00
90 Ukuran 3 x 60 M2 140,000.00 140,000.00 136,500.00
Batu Alam Profil - -
91 Ukuran 5 x 50 M2 42,200.00 42,200.00 41,200.00
92 Ukuran 4 x 50 M2 42,200.00 42,200.00 41,200.00
93 Ukuran 3 x 50 M2 42,200.00 42,200.00 41,200.00
Batu Candi - -
94 Ukuran 10 x 20 M2 83,400.00 83,400.00 81,400.00
95 Ukuran 15 x 30 M2 88,600.00 88,600.00 86,400.00
96 Ukuran 20 x 40 M2 93,700.00 93,700.00 91,400.00
97 Ukuran 30 x 30 M2 98,900.00 98,900.00 96,500.00
98 Ukuran 30 x 60 M2 120,500.00 120,500.00 117,500.00
Koral - -
99 Koral Pancawarna M2 68,000.00 68,000.00 66,300.00
100 Koral bengkulu hitam M2 68,000.00 68,000.00 66,300.00
101 Koral Flores hijau M2 98,900.00 98,900.00 96,500.00
102 Koral Orange Bali M2 68,000.00 68,000.00 66,300.00
103 Koral Hitam Garut M2 46,400.00 46,400.00 45,300.00
104 Batu Sikat M2 42,200.00 42,200.00 41,200.00
- -
G. BAHAN KACA - -
1 Kaca polos 3 mm M2 77,300.00 77,300.00 75,400.00
Kaca tebal 3 mm 77,300.00 77,300.00 75,400.00
2 Kaca polos 5 mm M2 103,000.00 103,000.00 100,500.00
Kaca tebal 5 mm 103,000.00 103,000.00 100,500.00
3 Kaca polos 8 mm M2 277,000.00 277,000.00 270,100.00
Kaca tebal 8 mm 277,000.00 277,000.00 270,100.00
4 Kaca polos 10 mm M2 378,000.00 378,000.00 368,600.00
5 Kaca polos 12 mm M2 520,000.00 520,000.00 507,000.00
6 Kaca rayband 3 mm M2 114,000.00 114,000.00 111,200.00
7 Kaca rayband 5 mm M2 123,600.00 123,600.00 120,600.00
8 Kaca Tempered 8 mm M2 463,500.00 463,500.00 452,000.00
9 Kaca Tempered 10 mm M2 566,500.00 566,500.00 552,400.00
10 Kaca Tempered 12 mm M2 679,800.00 679,800.00 662,900.00
11 Kaca Patri M2 2,888,000.00 2,888,000.00 2,815,800.00
Kaca patri 5mm M2 2,888,000.00 2,888,000.00 2,815,800.00
12 Kaca Es t. 5 mm M2 149,000.00 149,000.00 145,300.00
13 Kaca Es random t. 5 mm M2 201,000.00 201,000.00 196,000.00
14 Kaca Pasta M2 519,000.00 519,000.00 506,100.00
15 Kaca Grafir t. 8 mm M2 1,270,000.00 1,270,000.00 1,238,300.00
16 Kaca Grafir corak t. 5 mm M2 982,000.00 982,000.00 957,500.00
17 Glass Block 20 x 20 cm Bh 22,700.00 22,700.00 22,200.00
18 Jendela naco + Rangka Daun 57,000.00 57,000.00 55,600.00
19 Pintu besi M2 429,200.00 429,200.00 418,500.00
20 Jendela besi / tralis M2 334,750.00 334,750.00 326,400.00
21 Skrup Kg 25,000.00 25,000.00 24,400.00
22 Sealant tube 27,900.00 27,900.00 27,300.00
- -
H. BAHAN FINISHING, LABURAN, PENGISI - -
DAN ALATNYA - -
1 Plamir tembok Kg 18,000.00 18,000.00 17,600.00
2 Plamir kayu Kg 32,800.00 32,800.00 32,000.00
Plamir 32,800.00 32,800.00 32,000.00
3 Roll cat tembok Bh 27,700.00 27,700.00 27,100.00
4 Plincote Kg 31,400.00 31,400.00 30,700.00
5 Kuas 3" Bh 9,300.00 9,300.00 9,070.00
6 Oker Kg 14,400.00 14,400.00 14,100.00
7 Spirtus Ltr 15,700.00 15,700.00 15,400.00
8 Dempul halus ( IMPRA) Kg 39,900.00 39,900.00 39,000.00
Dempul 39,900.00 39,900.00 39,000.00
9 Bahan plitur (sirlak) india Kg 87,600.00 87,600.00 85,500.00
10 Melamik Kg 61,800.00 61,800.00 60,300.00
11 Thiner Impala Ltr 30,700.00 30,700.00 30,000.00
Pengencer 30,700.00 30,700.00 30,000.00
Thinner 30,700.00 30,700.00 30,000.00
12 Terpentin Btl 8,200.00 8,200.00 8,000.00
13 Vernis Ltr 41,200.00 41,200.00 40,200.00
Teak oil 41,200.00 41,200.00 40,200.00
14 Ampelas Lbr 3,700.00 3,700.00 3,610.00
15 Meni kayu / besi Kg 31,200.00 31,200.00 30,500.00
Cat menie 31,200.00 31,200.00 30,500.00
Menie besi 31,200.00 31,200.00 30,500.00
Menie A 31,200.00 31,200.00 30,500.00
Menie B 31,200.00 31,200.00 30,500.00
16 Cat kayu Glotek Kg 51,500.00 51,500.00 50,300.00
Cat penutup 51,500.00 51,500.00 50,300.00
17 Cat kayu / besi Ftalit Kg 55,100.00 55,100.00 53,800.00
18 Cat tembok Metrolite Kg 24,600.00 24,600.00 24,000.00
19 Cat tembok Dulux Kg 50,500.00 50,500.00 49,300.00
20 Cat tembok Dulux Warna Kg 78,300.00 78,300.00 76,400.00
21 Cat tembok Mowilex Kg 71,000.00 71,000.00 69,300.00
22 Cat tembok Mowilex Warna Kg 97,000.00 97,000.00 94,600.00
23 Cat tembok Property Kg 21,700.00 21,700.00 21,200.00
24 Cat tembok Vinilex Kg 22,700.00 22,700.00 22,200.00
25 Cat tembok Catilex Kg 23,700.00 23,700.00 23,200.00
26 Coating batu alam (doof) Kg 79,000.00 79,000.00 77,100.00
27 Coating batu alam (natural) Kg 71,500.00 71,500.00 69,800.00
28 Cat genteng Kg 39,900.00 39,900.00 39,000.00
29 Cat besi Kg 56,200.00 56,200.00 54,800.00
30 Batu apung Kg 37,000.00 37,000.00 36,100.00
31 Residu atau ter (Solignium) Ltr 15,100.00 15,100.00 14,800.00
Residu atau ter 15,100.00 15,100.00 14,800.00
32 Prime coat Kg 9,700.00 9,700.00 9,460.00
33 Soda Api Kg 8,400.00 8,400.00 8,190.00
34 Bahan Plistur jadi merk Ultran - P Kg 51,500.00 51,500.00 50,300.00
35 Cat Duco Kg 97,000.00 97,000.00 94,600.00
36 Meni Besi Zingchromate Kg 60,400.00 60,400.00 58,900.00
37 Cat Besi Pollyurethane Kg 295,800.00 295,800.00 288,500.00
- -
I. BAHAN ALAT PENGGANTUNG & KUNCI - -
1 Kunci tanam double slaag Bh 96,100.00 96,100.00 93,700.00
Kunci tanam biasa 96,100.00 96,100.00 93,700.00
Kunci tanam KM 96,100.00 96,100.00 93,700.00
2 Kunci tanam double slaag besar Bh 177,700.00 177,700.00 173,300.00
3 Kunci Pintu Aluminium Bh 167,400.00 167,400.00 163,300.00
4 Kunci Pintu Tempered Psg 693,000.00 693,000.00 675,700.00
5 Hendel Aluminium Bh 61,800.00 61,800.00 60,300.00
6 Engsel pintu Psg 25,800.00 25,800.00 25,200.00
7 Engsel jendela Psg 17,500.00 17,500.00 17,100.00
8 Engsel koboy Psg 55,400.00 55,400.00 54,100.00
9 Floor Hing CISA (engsel tanam) Unit 1,890,000.00 1,890,000.00 1,842,800.00
10 Glass door Handel Psg 1,249,000.00 1,249,000.00 1,217,800.00
11 Bottom straightrap Psg 323,000.00 323,000.00 315,000.00
12 Top straighinge Psg 414,000.00 414,000.00 403,700.00
13 Kait angin Bh 18,400.00 18,400.00 18,000.00
14 Kunci Slot (grendel Pintu dan Jendela) Bh 21,200.00 21,200.00 20,700.00
Kunci slot 21,200.00 21,200.00 20,700.00
15 Slot jendela Bh 13,600.00 13,600.00 13,300.00
16 Slot pintu 3" Bh 19,900.00 19,900.00 19,500.00
17 Slot pintu 4" Bh 23,900.00 23,900.00 23,400.00
18 Door holder Bh 386,300.00 386,300.00 376,700.00
19 Door Closer Setara Dekson Bh 288,400.00 288,400.00 281,200.00
Door closer 288,400.00 288,400.00 281,200.00
20 Expanolete Ps 149,400.00 149,400.00 145,700.00
- -
J. BAHAN BAKAR & PELUMAS - -
1 Minyak begisting Ltr 7,000.00 7,000.00 6,830.00
2 Premium / Bensin Ltr 7,100.00 7,100.00 6,930.00
3 Solar Subsidi Ltr 5,700.00 5,700.00 5,560.00
4 Solar Non Subsidi Ltr 11,700.00 11,700.00 11,500.00
Solar 11,700.00 11,700.00 11,500.00
5 Minyak tanah Ltr 10,000.00 10,000.00 9,750.00
6 Aspal Kg 16,000.00 16,000.00 15,600.00
7 Aspal Emulsi Ltr 10,000.00 10,000.00 9,750.00
8 Material Hotmix (HRS) Ton 1,664,000.00 1,664,000.00 1,622,400.00
Bahan bakar Ltr 11,700.00 11,700.00 11,500.00
Oli Ltr 10,000.00 10,000.00 9,750.00
- -
K. BAHAN ALAT LISTRIK - -
1 Titik lampu komplit Ttk 12,400.00 12,400.00 12,100.00
2 Sakelar tunggal Broco Bh 20,600.00 20,600.00 20,100.00
3 Sakelar double Broco Bh 25,800.00 25,800.00 25,200.00
4 Sakelar Triple Broco Bh 18,500.00 18,500.00 18,100.00
5 Stop kontak Bh 19,600.00 19,600.00 19,200.00
6 Stop kontak AC Bh 72,100.00 72,100.00 70,300.00
7 Lampu capsul 18 watt (Phillip) Bh 41,200.00 41,200.00 40,200.00
8 Lampu pijar 25 watt (Philllip) Bh 6,200.00 6,200.00 6,050.00
9 Lampu pijar 40 watt (Phillip) Bh 7,200.00 7,200.00 7,020.00
10 Lampu pijar 60 watt (Phillip) Bh 10,300.00 10,300.00 10,050.00
11 Lampu TL 2 x 20 watt + kap (Phillip ) Bh 164,800.00 164,800.00 160,700.00
12 Lampu TL 2 x 36 watt + kap (Phillip ) Inbow Bh 257,500.00 257,500.00 251,100.00
13 Lampu TL 1 x 20 watt + kap (Phillip) Bh 154,500.00 154,500.00 150,700.00
14 Lampu TL 2 x 40 watt + kap (Phillip) Bh 206,000.00 206,000.00 200,900.00
15 Lampu TL 1 x 40 watt + kap (Phillip) Bh 185,400.00 185,400.00 180,800.00
- -
16 Lampu tembak 150 watt + kap (Metal Holide) (Phillip) Bh 195,700.00 195,700.00 190,900.00
17 Lampu tembak 300 watt + kap (Phillip) Bh 206,000.00 206,000.00 200,900.00
18 Lampu tembak 50 watt (LED Putih) (Phillip) Bh 412,000.00 412,000.00 401,700.00
19 Lampu tembak 80 watt (LED Putih) (Phillip) Bh 721,000.00 721,000.00 703,000.00
20 Lampu tembak 1000 watt (LED Putih) (Phillip) Bh 1,097,000.00 1,097,000.00 1,069,600.00
21 Lampu Spiral 5 watt (Phillip) Bh 41,200.00 41,200.00 40,200.00
22 Lampu Spiral 8 watt (Phillip) Bh 46,400.00 46,400.00 45,300.00
23 Lampu Jari 5 watt (Phillip) Bh 25,800.00 25,800.00 25,200.00
24 Lampu Jari 8 watt (Phillip) Bh 30,900.00 30,900.00 30,200.00
25 Lampu LED 4 watt (Phillip) Bh 51,500.00 51,500.00 50,300.00
26 Lampu LED 7 watt (Phillip) Bh 72,100.00 72,100.00 70,300.00
27 Lampu LED 9 watt (Phillip) Bh 92,700.00 92,700.00 90,400.00
28 Lampu LED 10 watt (Phillip) Bh 103,000.00 103,000.00 100,500.00
29 Lampu LED 13 watt (Phillip) Bh 113,300.00 113,300.00 110,500.00
30 TL. 1 x 40 W Phillip Bh 133,900.00 133,900.00 130,600.00
31 TL. 2 x 40 W Phillip Bh 216,000.00 216,000.00 210,600.00
32 TL. 1 x 20 W Phillip Bh 123,600.00 123,600.00 120,600.00
33 TL. 2 x 20 W Phillip Bh 162,000.00 162,000.00 158,000.00
34 TL. 2 x 20 W RM Bh 360,500.00 360,500.00 351,500.00
35 TL. 2 x 40 W RM Bh 412,000.00 412,000.00 401,700.00
36 Lampu Taman Bh 154,500.00 154,500.00 150,700.00
37 Armatur Lampu Baret Bh 257,500.00 257,500.00 251,100.00
38 Dudukan Downlight Stainlessteel Bh 82,400.00 82,400.00 80,400.00
39 Kabel NYM 3 x 2,5 mm setara Supreme M' 14,400.00 14,400.00 14,100.00
40 Kabel NYM 3 x 1,5 mm setara Supreme M' 9,300.00 9,300.00 9,070.00
41 Kabel NYM 2 x 2,5 mm setara Supreme M' 10,800.00 10,800.00 10,600.00
42 Kabel NYM 2 x 1,5 mm setara Supreme M' 7,700.00 7,700.00 7,510.00
43 Kabel NYY 3 x 4 mm setara Supreme M' 23,200.00 23,200.00 22,700.00
44 Kabel NYY 4 x 6 mm setara Supreme M' 46,400.00 46,400.00 45,300.00
45 Kabel NYY 3 x 2,5 mm setara Supreme M' 16,500.00 16,500.00 16,100.00
46 Kabel NYY 3 x 1,5 mm setara Supreme M' 13,400.00 13,400.00 13,100.00
47 Kabel NYY 2 x 2,5 mm setara Supreme M' 14,400.00 14,400.00 14,100.00
48 Kabel NYY 2 x 1,5 mm setara Supreme M' 10,300.00 10,300.00 10,050.00
49 Kawat BC 25 mm M' 37,100.00 37,100.00 36,200.00
50 Kawat BC 16 mm M' 26,800.00 26,800.00 26,200.00
51 Kawat BC 6 mm M' 18,500.00 18,500.00 18,100.00
52 Kap Gembreng Bh 30,900.00 30,900.00 30,200.00
53 Down Light 8" Bh 103,000.00 103,000.00 100,500.00
54 Down Light 6" Bh 82,400.00 82,400.00 80,400.00
55 Down Light 4" Bh 61,800.00 61,800.00 60,300.00
56 Down Light 3" Bh 51,500.00 51,500.00 50,300.00
57 Down Light Outbow bulat 3" Bh 103,000.00 103,000.00 100,500.00
58 Down Light Outbow bulat 3,5" Bh 113,300.00 113,300.00 110,500.00
59 Down Light Outbow bulat 4" Bh 128,800.00 128,800.00 125,600.00
60 Down Light Outbow bulat 5" Bh 206,000.00 206,000.00 200,900.00
61 Down Light Outbow kotak 4" Bh 133,900.00 133,900.00 130,600.00
62 Fitting Plafond kotak Bh 12,400.00 12,400.00 12,100.00
63 Photocell 6 A Bh 154,500.00 154,500.00 150,700.00
64 MCB Bh 56,700.00 56,700.00 55,300.00
65 Box MCB Uk. 40 x 50 cm + Dudukan Bh 726,200.00 726,200.00 708,100.00
66 Besi Arde (crum tembaga /2,70 cm) Btg 108,200.00 108,200.00 105,500.00
67 Besi Arde (crum tembaga / 2 m) Btg 82,400.00 82,400.00 80,400.00
68 Besi Arde (crum tembaga / 1,5 m) Btg 51,500.00 51,500.00 50,300.00
69 Biaya pemasangan Listrik daya 1300 Va Va 2,008,500.00 2,008,500.00 1,958,300.00
70 PEKERJA Orang / Hari 58,000.00 58,000.00 56,600.00
71 PEMBANTU TUKANG Orang / Hari 62,000.00 62,000.00 60,500.00
72 TUKANG KAYU Orang / Hari 75,000.00 75,000.00 73,200.00
73 TUKANG BATU Orang / Hari 73,000.00 73,000.00 71,200.00
Tukang Batu/Pipa 73,000.00 73,000.00 71,200.00
Tukang Batu Konstruksi 73,000.00 73,000.00 71,200.00
Tukang vibrator 73,000.00 73,000.00 71,200.00
74 TUKANG BESI Orang / Hari 73,000.00 73,000.00 71,200.00
75 TUKANG CAT Orang / Hari 73,000.00 73,000.00 71,200.00
76 TUKANG LAS Orang / Hari 75,000.00 75,000.00 73,200.00
77 TUKANG ALUMUNIUM Orang / Hari 75,000.00 75,000.00 73,200.00
78 TUKANG BESI KONSTRUKSI Orang / Hari 75,000.00 75,000.00 73,200.00
Tukang ereksi 75,000.00 75,000.00 73,200.00
Tukang besi 75,000.00 75,000.00 73,200.00
Tukang 75,000.00 75,000.00 73,200.00
79 KEPALA TUKANG Orang / Hari 80,000.00 80,000.00 78,000.00
80 MANDOR Orang / Hari 90,000.00 90,000.00 87,800.00
Mandor/Supervisor/ Penyelia 90,000.00 90,000.00 87,800.00
81 OPERATOR TERLATIH Orang / Hari 88,000.00 88,000.00 85,800.00
Operator 88,000.00 88,000.00 85,800.00
82 OPERATOR KURANG TERLATIH Orang / Hari 80,000.00 80,000.00 78,000.00
83 PEMBANTU OPERATOR Orang / Hari 70,000.00 70,000.00 68,300.00
84 JURU UKUR Orang / Hari 83,000.00 83,000.00 81,000.00
85 ASISTEN JURU UKUR Orang / Hari 70,000.00 70,000.00 68,300.00
86 SUPIR Orang / Hari 85,000.00 85,000.00 82,900.00
87 PEMBANTU SUPIR (KENEK) Orang / Hari 70,000.00 70,000.00 68,300.00
88 BURUH LAPANGAN TERLATIH Orang / Hari 60,000.00 60,000.00 58,500.00
89 BURUH LAPANGAN TAK TERLATIH Orang / Hari 55,000.00 55,000.00 53,700.00
90 ASSISTEN PEMATUNG Orang / Hari 340,000.00 340,000.00 331,500.00
91 ART. DESIGN /PEMATUNG Orang / Hari 500,000.00 500,000.00 487,500.00
92 UPAH PASANG BATU TEMPLEK ACAK Per M2 95,000.00 95,000.00 92,700.00
93 UPAH PASANG BATU TEMPLEK MOTIF Per M2 130,000.00 130,000.00 126,800.00
94 UPAH PASANG BATU ANDESIT SUSUN SIRIH Per M2 120,000.00 120,000.00 117,000.00
95 UPAH PASANG BATU ANDESIT Per M2 100,000.00 100,000.00 97,500.00
96 UPAH PASANG BATU CANDI Per M2 100,000.00 100,000.00 97,500.00
97 UPAH PASANG BATU PALIMANAN/PROFIL Per M2 95,000.00 95,000.00 92,700.00
98 UPAH PASANG BATU KORAL SIKAT Per M2 130,000.00 130,000.00 126,800.00
99 UPAH PASANG BATU KORAL SIKAT MOTIF Per M2 150,000.00 150,000.00 146,300.00
L. ALAT BANTU Set 144,200.00 144,200.00 140,600.00
Peralatan 144,200.00 144,200.00 140,600.00
1 Cangkul atau sekop Bh 56,700.00 56,700.00 55,300.00
2 Parang Bh 36,100.00 36,100.00 35,200.00
3 Pikulan dan 2 Bakul Bh 51,500.00 51,500.00 50,300.00
Peralatan potong pipa T1/manual (gergaji) /saw Hari 65,000.00 65,000.00 63,400.00
Peralatan potong pipa T2/mekanik / cilinder saw Hari 85,000.00 85,000.00 82,900.00
- -
BAHAN BARU - -
Batu granit kg 12,000.00 12,000.00 11,700.00
Batu traso kg 2,400.00 2,400.00 2,340.00
MSP kg 1,500.00 1,500.00 1,470.00
Mortar siap pakai 2,400.00 2,400.00 2,340.00
Ubin abu-abu buah 83,500.00 83,500.00 81,500.00
Ubin warna buah 83,500.00 83,500.00 81,500.00
Ubin teraso buah 83,500.00 83,500.00 81,500.00
Ubin granit buah 83,500.00 83,500.00 81,500.00
Ubin teralux buah 83,500.00 83,500.00 81,500.00
Ubin teralux marmer buah 83,500.00 83,500.00 81,500.00
Plint ubin PC buah 2,700.00 2,700.00 2,640.00
Plint ubin warna buah 3,600.00 3,600.00 3,510.00
Plint ubin teraso buah 15,000.00 15,000.00 14,700.00
Plint ubin granit buah 3,000.00 3,000.00 2,930.00
Plint teralux kerang buah 2,700.00 2,700.00 2,640.00
Plint teralux marmer buah 2,700.00 2,700.00 2,640.00
Teraso cor buah 1,000,000.00 1,000,000.00 975,000.00
Ubin keramik 10 cm x 10 cm atau 5 cmx 20 cm buah 1,100.00 1,100.00 1,080.00
Ubin keramik ukuran 10 cm x 33 cm untuk variasi/border buah 1,100.00 1,100.00 1,080.00
Plint keramik ukuran 10 cm x 10 cm buah 2,700.00 2,700.00 2,640.00
Plint keramik ukuran 5 cm x 20 cm buah 2,700.00 2,700.00 2,640.00
Internal cove buah 20,000.00 20,000.00 19,500.00
Karpet buah 250,000.00 250,000.00 243,800.00
Underlayer buah 66,000.00 66,000.00 64,400.00
Parquet buah 240,000.00 240,000.00 234,000.00
Porslen buah 600.00 600.00 585.00
Keramik dinding artistik 10 cm x 20 cm bh 4,000.00 4,000.00 3,900.00
Keramik dingding artistik 5 cm x 20 cm bh 3,750.00 3,750.00 3,660.00
Keramik dingding 10 cm x 20 cm bh 4,000.00 4,000.00 3,900.00
Keramik dingding 20 cm x 20 cm bh 4,000.00 4,000.00 3,900.00
Paku 12 cm bh 16,200.00 16,200.00 15,800.00
Bata pelapis 3 cm x 7 cm x 24 cm buah 3,000.00 3,000.00 2,930.00
Batu paras buah 21,000.00 21,000.00 20,500.00
Vynil buah 32,500.00 32,500.00 31,700.00
Ramset buah 8,000.00 8,000.00 7,800.00
Rooflight 90 x 180 Lbr 28,000.00 28,000.00 27,300.00
Paku pancing 6 x 23 kg 31,500.00 31,500.00 30,800.00
Asbes gel 92 x 200 Lbr 72,000.00 72,000.00 70,200.00
Asbes gel 92 x 180 Lbr 67,000.00 67,000.00 65,400.00
Asbes gel 105 x 270 Lbr 80,000.00 80,000.00 78,000.00
Asbes gelombang 1,08 m x 3,00 m x 6 mm Lbr 88,000.00 88,000.00 85,800.00
Asbes gelombang 1,08 m x 2,70 m x 6 mm Lbr 80,000.00 80,000.00 78,000.00
Asbes gelombang 1,08 m x 2,40 m x 6 mm Lbr 78,000.00 78,000.00 76,100.00
Asbes gelombang 1,08 m x 2,10 m x 6 mm Lbr 72,000.00 72,000.00 70,200.00
Asbes gelombang 1,08 m x 1,80 m x 6 mm Lbr 67,000.00 67,000.00 65,400.00
Akustik ukuran (30 x 30) cm Lbr 5,100.00 5,100.00 4,980.00
Akustik ukuran (30 x 60) cm Lbr 10,200.00 10,200.00 10,000.00
Profil Allum "T" m 12,800.00 12,800.00 12,500.00
Bubung stel gelombang 0,92 m Lbr 36,000.00 36,000.00 35,100.00
Bubung stel gelombang 1,05 m Lbr 45,000.00 45,000.00 43,900.00
Bubung stel gelombang 1,08 m Lbr 48,300.00 48,300.00 47,100.00
Nok paten 92 cm Lbr 39,000.00 39,000.00 38,100.00
Nok paten 105 cm Lbr 42,000.00 42,000.00 41,000.00
Nok paten 108 cm Lbr 45,300.00 45,300.00 44,200.00
Nok stel rata 92 cm Lbr 36,000.00 36,000.00 35,100.00
Genteng aspal bh 38,000.00 38,000.00 37,100.00
Plywood 6 mm Lbr 106,600.00 106,600.00 104,000.00
Plastic aerator bh 3,500.00 3,500.00 3,420.00
Genteng metal 80 x 100 bh 83,400.00 83,400.00 81,400.00
Sirap kayu bh 3,100.00 3,100.00 3,030.00
Nok genteng beton bh 4,000.00 4,000.00 3,900.00
Nok genteng aspal bh 37,900.00 37,900.00 37,000.00
Nok genteng metal bh 84,200.00 84,200.00 82,100.00
Aluminium gel tebal 0,55 Lbr 17,500.00 17,500.00 17,100.00
Paku hak panjang 15 cm kg 22,000.00 22,000.00 21,500.00
Nok standar 40 x 18 bh 38,000.00 38,000.00 37,100.00
- -
Aluminium foil m2 5,000.00 5,000.00 4,880.00
Paku 10 cm kg 16,200.00 16,200.00 15,800.00
Paku 5 – 7 cm kg 16,200.00 16,200.00 15,800.00
Paku skrup 10 cm kg 25,000.00 25,000.00 24,400.00
Paku 1 cm – 2,5 cm kg 18,800.00 18,800.00 18,400.00
Plywood tebal 4 mm Ukuran (90 x 220) cm lbr 95,000.00 95,000.00 92,700.00
Teakwood 4 mm lbr 90,000.00 90,000.00 87,800.00
90 x 220 cm
Plywood tebal 9 mm Lbr 165,000.00 165,000.00 160,900.00
Besi strip tebal 5 mm kg 11,300.00 11,300.00 11,100.00
Paku 5 dan 10 cm kg 16,200.00 16,200.00 15,800.00
Reng (3 x 4) cm m3 6,982,800.00 6,982,800.00 6,808,300.00
Paku 7 cm – 10 cm kg 16,200.00 16,200.00 15,800.00
Paku skrup 1 cm – 2,5 cm 25,000.00 25,000.00 24,400.00
Balok kayu, 6 x 12 m3 4,635,000.00 4,635,000.00 4,519,200.00
Plywood 4 mm, lbr 100,000.00 100,000.00 97,500.00
120 x 240
Kunci tanam antik bh 125,000.00 125,000.00 121,900.00
Kunci tanam KM bh 85,000.00 85,000.00 82,900.00
Kunci silinder bh 95,000.00 95,000.00 92,700.00
Engsel kupu-kupu bh 25,000.00 25,000.00 24,400.00
Engsel angin bh 25,000.00 25,000.00 24,400.00
Spring knip bh 75,000.00 75,000.00 73,200.00
Door stop bh 65,000.00 65,000.00 63,400.00
Rel pintu sorong bh 185,000.00 185,000.00 180,400.00
Kunci lemari bh 15,000.00 15,000.00 14,700.00
Kaca buram 12 mm m2 341,300.00 341,300.00 332,800.00
Kaca cermin 5 mm m2 170,600.00 170,600.00 166,400.00
Kaca cermin 8 mm m2 270,000.00 270,000.00 263,300.00
Kaca wireglassed 5 mm m2 759,000.00 759,000.00 740,100.00
Cat dasar kg 34,800.00 34,800.00 34,000.00
Politur lt 26,500.00 26,500.00 25,900.00
Politur jadi lt 85,000.00 85,000.00 82,900.00
Kalkarium kg 8,900.00 8,900.00 8,680.00
Kapur sirih kg 4,600.00 4,600.00 4,490.00
Alang-alang ikat 5,000.00 5,000.00 4,880.00
Perancah kayu m3 4,111,200.00 4,111,200.00 4,008,500.00
Cat antara kg 55,000.00 55,000.00 53,700.00
Sanding kg 55,000.00 55,000.00 53,700.00
Woodstain kg 65,000.00 65,000.00 63,400.00
Wood filler kg 25,200.00 25,200.00 24,600.00
Sabun kg 35,100.00 35,100.00 34,300.00
Air Lt 25.00 25.00 25.00
Bahan tambahan kimia 65,000.00 65,000.00 63,400.00
Strorox – 100 Lt 110,000.00 110,000.00 107,300.00
Waterstop lebar 150 mm m 18,000.00 18,000.00 17,600.00
Waterstop lebar 200 mm m 22,000.00 22,000.00 21,500.00
Waterstop lebar 230 mm - 320 mm m 32,000.00 32,000.00 31,200.00
Paku 5 cm – 12 cm kg 16,200.00 16,200.00 15,800.00
Penjaga jarak bekisting/spacer Buah 2,500.00 2,500.00 2,440.00
- -
Besi hollow (50 x 50
kg
x 3) mm 33,000.00 33,000.00 32,200.00
Phenol film 12 mm lbr 265,000.00 265,000.00 258,400.00
Dinabolt Ø 12mm (10 s.d.15 cm) bh 3,000.00 3,000.00 2,930.00
Sewa crane hari 7,500,000.00 7,500,000.00 7,312,500.00
Sewa pipe support hari 26,000.00 26,000.00 25,400.00
Sewa scaffolding hari 26,000.00 26,000.00 25,400.00
Semen grout kg 5,200.00 5,200.00 5,070.00
Screening kg 200.00 200.00 195.00
- -
Papan cor m3 2,523,500.00 2,523,500.00 2,460,500.00
Bata ringan tebal 7,5 cm m3 750,000.00 750,000.00 731,300.00
Minyak pelumas lt 10,000.00 10,000.00 9,750.00
Sewa alat hr 60,000.00 60,000.00 58,500.00
Besi pelat baja kg 11,300.00 11,300.00 11,100.00
Kawat las kg 30,900.00 30,900.00 30,200.00
Besi scuare tube m 4,635.00 4,635.00 4,520.00
Besi lis kaca (1 x 1) cm m 5,000.00 5,000.00 4,880.00
Pengelasan cm 350.00 350.00 342.00
Pintu gulung besi m2 437,750.00 437,750.00 426,900.00
- -
Sunscreen alluminium m2 250,000.00 250,000.00 243,800.00
Profil alluminium m 3,300.00 3,300.00 3,220.00
Skrup fixer buah 350.00 350.00 342.00
Aluminium strip m 3,300.00 3,300.00 3,220.00
Pintu aluminium m 1,308,400.00 1,308,400.00 1,275,700.00
Profil kaca m 1,545.00 1,545.00 1,510.00
Venetions blinds dan
m2
vertical blinds (tirai) 145,000.00 145,000.00 141,400.00
Baja strip (0,2 x 2) cm kg 11,300.00 11,300.00 11,100.00
Besi strip m 20,500.00 20,500.00 20,000.00
Rangka metal hollow 40.40.2 mm m 2,300.00 2,300.00 2,250.00
Baja ringan canai dingin C75 kg 15,000.00 15,000.00 14,700.00
HB-20 m3 1,800,000.00 1,800,000.00 1,755,000.00
Besi angker diameter 8 kg 11,300.00 11,300.00 11,100.00
HB-15 m3 2,064,600.00 2,064,600.00 2,013,000.00
HB-10 m3 2,650,000.00 2,650,000.00 2,583,800.00
Bata rooster m3 1,500,000.00 1,500,000.00 1,462,500.00
Bata berongga m3 750,000.00 750,000.00 731,300.00
Bata ringan tebal 10 cm m3 1,100,000.00 1,100,000.00 1,072,500.00
Tukang pipa OH 73,000.00 73,000.00 71,200.00
- -
- -
Operator alat berat OH 88,000.00 88,000.00 85,800.00
- -
Sewa excavator type 225 kapasitas 0,5 - 1,0 m3 hari 1,200,000.00 1,200,000.00 1,170,000.00
Sewa Genset 1500 watt hari 500,000.00 500,000.00 487,500.00
Sewa Pompa Submersible 3m3/h hari 350,000.00 350,000.00 341,300.00
Mobile crane 3 ton hari 2,560,000.00 2,560,000.00 2,496,000.00
Pipa DCI Ø 100 mm M' n n #VALUE!
Pipa DCI Ø 125 mm M' n n #VALUE!
Pipa DCI Ø 150 mm M' n n #VALUE!
Pipa DCI Ø 200 mm M' n n #VALUE!
Pipa DCI Ø 250 mm M' n n #VALUE!
Pipa DCI Ø 300 mm M' n n #VALUE!
Pipa DCI Ø 400 mm M' n n #VALUE!
Pipa DCI Ø 450 mm M' n n #VALUE!
Pipa DCI Ø 500 mm M' n n #VALUE!
Pipa DCI Ø 600 mm M' n n #VALUE!
Pipa DCI Ø 800 mm M' n n #VALUE!
Pipa DCI Ø 900 mm M' n n #VALUE!
Pipa DCI Ø 1000 mm M' n n #VALUE!
Pipa DCI Ø 1100 mm M' n n #VALUE!
Pipa DCI Ø 1200 mm M' n n #VALUE!
Pipa baja Ø 63 mm M' n n #VALUE!
Pipa baja Ø 100 mm M' n n #VALUE!
Pipa baja Ø 125 mm M' n n #VALUE!
Pipa baja Ø 150 mm M' n n #VALUE!
Pipa baja Ø 200 mm M' n n #VALUE!
Pipa baja Ø 250 mm M' n n #VALUE!
Pipa baja Ø 300 mm M' n n #VALUE!
Pipa baja Ø 400 mm M' n n #VALUE!
Pipa baja Ø 450 mm M' n n #VALUE!
Pipa baja Ø 500 mm M' n n #VALUE!
Pipa baja Ø 600 mm M' n n #VALUE!
Pipa baja Ø 800 mm M' n n #VALUE!
Pipa baja Ø 900 mm M' n n #VALUE!
Pipa baja Ø 1000 mm M' n n #VALUE!
Pipa baja Ø 1100 mm M' n n #VALUE!
Pipa baja Ø 1200 mm M' n n #VALUE!
Valve Ø 150 mm M' n n #VALUE!
Valve Ø 200 mm M' n n #VALUE!
Valve Ø 250 mm M' n n #VALUE!
Valve Ø 300 mm M' n n #VALUE!
Valve Ø 400 mm M' n n #VALUE!
Valve Ø 450 mm M' n n #VALUE!
Valve Ø 500 mm M' n n #VALUE!
Valve Ø 600 mm M' n n #VALUE!
Valve Ø 700 mm M' n n #VALUE!
Valve Ø 800 mm M' n n #VALUE!
Valve Ø 900 mm M' n n #VALUE!
Valve Ø 1000 mm M' n n #VALUE!
Valve Ø 1100 mm M' n n #VALUE!
Valve Ø 1200 mm M' n n #VALUE!
Tee Ø 150 mm Bh n n #VALUE!
Tee Ø 200 mm Bh n n #VALUE!
Tee Ø 250 mm Bh n n #VALUE!
Tee Ø 300 mm Bh n n #VALUE!
Tee Ø 400 mm Bh n n #VALUE!
Tee Ø 450 mm Bh n n #VALUE!
Tee Ø 500 mm Bh n n #VALUE!
Tee Ø 600 mm Bh n n #VALUE!
Tee Ø 700 mm Bh n n #VALUE!
Tee Ø 800 mm Bh n n #VALUE!
Tee Ø 900 mm Bh n n #VALUE!
Tee Ø 1000 mm Bh n n #VALUE!
Tee Ø 1100 mm Bh n n #VALUE!
Tee Ø 1200 mm Bh n n #VALUE!
Pipa Ø 80 mm Bh n n #VALUE!
Pipa Ø 100 mm Bh n n #VALUE!
Pipa Ø 150 mm Bh n n #VALUE!
Pipa Ø 200 mm Bh n n #VALUE!
Pipa Ø 300 mm Bh n n #VALUE!
Pipa Ø 250 mm Bh n n #VALUE!
Pipa Ø 400 mm Bh n n #VALUE!
Pipa Ø 450 mm Bh n n #VALUE!
Pipa Ø 500 mm Bh n n #VALUE!
Pipa Ø 600 mm Bh n n #VALUE!
Pipa Ø 700 mm Bh n n #VALUE!
Pipa Ø 800 mm Bh n n #VALUE!
Air test (air bersih) M3 25.00 25.00 25.00
- -
Porselen 11x11 Bh 600.00 600.00 585.00
- -
Baja tulangan kg 12,000.00 12,000.00 11,700.00
Kayu bekisting M2 2,450,000.00 2,450,000.00 2,388,800.00
Ubin porselen bh 600.00 600.00 585.00
Pipa galvanis ½” m 26,700.00 26,700.00 26,100.00
Pipa galvanis 3/4” m 34,400.00 34,400.00 33,600.00
Pipa galvanis 1” m 51,500.00 51,500.00 50,300.00
Pipa galvanis 11/2” m 78,200.00 78,200.00 76,300.00
Pipa galvanis 3” m 175,100.00 175,100.00 170,800.00
Pipa galvanis 4” m 252,400.00 252,400.00 246,100.00
Pipa tanah Bh 2,472,000.00 2,472,000.00 2,410,200.00
Pipa tanah dia 15 Bh 2,472,000.00 2,472,000.00 2,410,200.00
Sewa Tripot/Tackel & handle crane 2T Hari 85,000.00 85,000.00 82,900.00
- -
Pipa listrik 5/8” BTG 5,000.00 5,000.00 4,880.00
Kabel m 500.00 500.00 488.00
T Dus bh 3,000.00 3,000.00 2,930.00
L Bow bh 3,000.00 3,000.00 2,930.00
Las Dop bh 3,000.00 3,000.00 2,930.00
Klem bh 117,981.00 117,981.00 117,981.00
Mongkok bh 3,000.00 3,000.00 2,930.00
Saklar bh 22,000.00 22,000.00 21,500.00
Fitting bh 5,000.00 5,000.00 4,880.00
Klem biasa bh 125.00 125.00 122.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m2
KETERANGAN
Mba Wid
Anggs
Belum ada harga