RENCANA ANGGARAN BIAYA
DANA DESA ( DD )
DESA KAPLONGAN LOR KECAMATAN KARANGAMPEL
TAHUN ANGGARAN 2018
HARGA
NO URAIAN VOLUME SAT JUMLAH
SATUAN
1 2 3 4 5 6
I. PEK. PERSIAPAN :
1 Pek. Pas. Papan Proyek Digital Printing 1.00 Ls 150,000.00 150,000.00
2 Pek. Pemasangan Prasasti 1.00 Ls 400,000.00 400,000.00
Jumlah I ( Pek. Persiapan ) 550,000.00
II. HONORARIUM PANITIA :
1 Ketua 1.00 Ls 200,000.00 200,000.00
2 Sekretaris 1.00 Ls 150,000.00 150,000.00
3 Anggota 1.00 Ls 150,000.00 150,000.00
Jumlah II ( Honorarium Panitia ) 500,000.00
III. PEK. KONSTRUKSI :
- Pemb. Saluran Drainase 132.00 M'
A UPAH TENAGA KERJA
1 Pekerja 169.00 HOK 60,000.00 10,140,000.00
2 Tukang Batu 68.00 HOK 77,000.00 5,236,000.00
3 Kepala Tukang 6.00 HOK 81,000.00 486,000.00
4 Mandor 11.00 HOK 96,000.00 1,056,000.00
JUMLAH. III.A 16,918,000.00
B BAHAN / MATERIAL
1 Sement Portland 12,550.00 KG 1,300.00 16,315,000.00
2 Batu Belah 78.00 M3 232,000.00 18,096,000.00
3 Pasir Pasang 42.00 M3 265,000.00 11,130,000.00
JUMLAH. III.B 45,541,000.00
JUMLAH PEK. KONSTR. III.A + III.B 62,459,000.00
HARGA
NO URAIAN VOLUME SAT JUMLAH
NO URAIAN VOLUME SAT JUMLAH
SATUAN
1 2 3 4 5 6
REKAPITULASI :
Indramayu, 2018.
TABRONI
7
68.00
26.00
2.00
4.00
6,139.38
32.00
15.00
7
153,751,200.00
PEMERINTAH KABUPATEN INDRAMAYU
Indramayu, 2018.
TABRONI
550,000.00
Jumlah Total Hal. 2 (Dua), Daftar Analisa Biaya Konstruksi. Pembangunan Jalan Lingkungan & Jalan Setapak
Harga ( Rp )
10 PAPAN 150,000.00 1.00 1.00 150,000.00 150,000.00 PAPAN
84.48 PRASASTI 400,000.00 1.00 1.00 400,000.00 400,000.00 PRASASTI
HONOR 500,000.00 1.00 1.00 500,000.00 500,000.00 HONOR
3,840.00 3.3792 Pekerja 60,000.00 172.89 169.00 10,373,616.00 10,140,000.00
24,000.00 33.792 Tukang Bat 77,000.00 66.16 68.00 5,094,196.80 5,236,000.00
27,840.00 Kepala Tuk 81,000.00 6.57 6.00 532,461.60 486,000.00
72.60 Mandor 96,000.00 10.94 11.00 1,049,875.20 1,056,000.00
Sement Port 1,300.00 12,575.11 12,550.00 16,347,645.60 16,315,000.00 50
211,900.00 11,833.8000 Batu Belah 232,000.00 79.86 78.00 18,527,520.00 18,096,000.00 251
255,200.00 79.8600 Pasir Pasan 265,000.00 39.76 42.00 10,535,976.00 11,130,000.00
137,800.00 37.7520 63,511,291.20 63,509,000.00
63,509,000.00 RAB
90,000.00 108.9000
46,200.00 43.5600 -
4,860.00 4.3560
7,200.00 5.4450
753,160.00
105.60
9,126.00 741.312
5,035.00 2.0064
17,160.00 30.2016
16,478.00 22.5984
1,701.00 2.2176
1,920.00 2.1120
51,420.00
mayu, 2018.
16,918,000.00
24
100
15242160
DAFTAR HARGA SATUAN UPAH DAN BAHAN
DANA DESA ( DD )
DESA KAPLONGAN LOR KECAMATAN KARANGAMPEL
TAHUN ANGGARAN 2018
Bidang : Pelaksanaan Pembangunan Desa
Kegiatan : Pembangunan Saluran Drainase
Lokasi : RT. 11 ( LAPANGAN BOLA )
Harga Satuan
No Uraian Satuan
( Rp )
1 2 3 4
I UPAH KERJA :
II BAHAN BANGUNAN :
Indramayu, 2018.
TABRONI ………………………….
Hal.2 ( dua ) : H.S.Upah, Bahan dan Alat Pembangunan Jalan Lingkungan dan Jalan Setapak
RENCANA ANGGARAN BIAYA
DANA DESA ( DD )
DESA KAPLONGAN LOR KECAMATAN KARANGAMPEL
TAHUN ANGGARAN 2018
REKAPITULASI :
Indramayu, 2018.
TABRONI ....................................
0.3
0.5 0.3
0.8 0.5
2 2
0.5 0.8
0.5
PER SATU METER 264.00
0.64 2,351,923.20
0.55 54,679,416.00
0.80 5,429,952.00
425
341
84 852677000
170535400
153,751,200.00 682141600
90,242,200.00 50000000
632141600
88538000
543603600