1 2 3 4 5
A PEKERJAAN DINDING
Total Pasangan
= 55.06 - 26.51 = 28.55 M2 28.55 M2
3 LUAS PLESTERAN
Dinding = 28.55 x 2.00 = 57.10
Kolom = 0.80 x 3.20 x 6.00 = 15.36
Balok = 0.50 x 24.00 = 12.00
84.46 84.46 M2
B PEKERJAAN BETON
24.70 M2
7 Plesteran dinding bata 1 Pc : 2 PP
2Luas
x luas
= pasangan bata 1:2
= 2.00 x 24.70 = 49.40 m2
49.40 M2
2 Penutup Atap Seng Genteng Metal 0,30 Luas = 10.22 x 15.86 = 162.09 m2
162.09 M2
H PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) 310.81 M2
3 Cat Mengkilat Listplang Kayu 13.04 M2
4 Cat Mengkilat Kosen Pintu/Jendela Luas = Panjang x (Lebar + Tebal 2x)
= 34.70 x 0.13 x 0.12 = 8.68 m2 8.68 M2
REKAPITULASI BIAYA
A PEKERJAAN DINDING
#REF! #REF!
C PEKERJAAN BETON BERTULANG
D PEKERJAAN PASANGAN DAN PLESTERAN
E PEKERJAAN LANTAI
F PEKERJAAN ATAP DAN PLAFOND
G PEKERJAAN PINTU, JENDELA DAN KUNCI
H PEKERJAAN PENGECATAN
Terbilang :
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG AULA/RUANG RAPAT
DINAS PERIZINAN
KABUPATEN ACEH TENGAH
1 2 3 4
A PEKERJAAN PONDASI
1 Galian Pondasi
- Pondasi Setempat 2 Titik Pjg Lbr Tgi Jml. Titik
Vol = 0.8 x 0.8 x 1.55 x 2.00 = 1.98 M3
- Pondasi Menerus 10 m
Vol = 10 x 0.8 x 0.85 x 2.00 = 13.60 M3
2 Tanah urug
1 Pondasi Setempat
Pjg Lbr Tgi Jml. Titik
Vol. Ponds = 0.8 x 0.8 x 0.3 x 2.00 = 0.38 M3
0.3 x 0.25 x 1.25 x 2.00 = 0.19 M3
Jumlah = 0.57 M3
Vol. Tanah Urug Bekas Galian
= 1.98 - 0.57 = 1.41 M3
2 Pondasi Menerus
Lebar Tgi Pjg
Vol. Pond = 0.70 + 0.4
x 0.7 x 10 = 3.85 M3
2
Vol. Tanah Urug Bekas Galian
= 13.60 - 3.85 = 9.75 M3
Volume Total = 11.16 M3 11.16 M3
3 Pasir Urug
1 Pondasi Setempat
Pjg Lbr Tgi Jml. Titik
Volume = 0.8 x 0.8 x 0.1 x 2.00 = 0.13 M3
2 Pondasi Menerus
Volume = 10 x 0.8 x 0.1 x 2.00 = 1.60 M3
B PEKERJAAN DINDING
Lantai 2
R. Tangga = 3.85 x 3.20 x 2 = 24.64 M2
Depan = 3.85 x 3.20 x 2 = 24.64 M2
Belakang = 3.85 x 3.20 x 2 = 24.64 M2
Samping = 3.85 x 3.20 x 2 = 24.64 M2
Pagar Teras = 13.90 x 0.50 x = 6.95 M2
T. Layar = 3.85 x 1.50 x 2 = 5.78 M2
2
Luas Total = 135.93 M2
Total Pasangan
Luas Dinding - Luas Kusen
= 135.93 - 27.31 = 108.62 M2 108.62 M2
3 Luas Plesteran
Dinding = 108.62 x 2.00 = 217.24
Kolom = 0.80 x 3.20 x 10.00 = 25.60
Balok = 0.50 x 24.00 = 12.00
254.84 254.84 M2
C PEKERJAAN BETON
1 Pondasi Setempat
Pjg Lbr Tgi Jml. Titik
Vol. Ponds = 0.8 x 0.8 x 0.3 x 2.00 = 0.38 M3
0.3 x 0.25 x 1.25 x 2.00 = 0.19 M3
Jumlah = 0.57 M3 0.57 m3
4 Balok 30/40 Elv. 3.46 m Volume Balok 30/40 Ring Balok Lantai 1 (Ruang Tangga)
= 0.30 x 0.40 x 10.00 = 1.20 1.20 m3
5 Balok Latai 13/13 Elv. 6.10 m Volume Balok latai 13/13 di atas Jendela (Samping dan Belakang)
= 0.13 x 0.13 x 19.00 = 0.32 0.32 m3
6 Balok 13/13 Tombak Layar Volume Balok latai 13/13 (Tombak Layar)
= 0.13 x 0.13 x 10.20 = 0.17 0.17 m3
9 Struktur Tangga
Diatas Ventilasi
Luas = 1.72 x 0.70 x 2 = 2.408 m2
2x Pakai = 1.20 m2
Vol. Total = 3.50 m2 3.50 M2
9 Struktur Tangga
1 Balok Plat Bordes dinding
3 Plat Bordes
= Panjang x lebar x Tebal
= 3.00 x 1.40 x 0.12 = 0.50 m3 0.50 M3
4 Anak Tangga
= 1.38 x 0.30 x 0.18
x 18.00 = 0.67 M3
2
Besi Beton Polos
Dia. 10 mm Jumlah Pjng/set Sat / Kg
= 6.00 x 0.74 x 0.62 = 2.74 Kg
18 Anak Tangga = 49.27 Kg
E PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan panjang x lebar x tinggi
1 Timbunan Tanah Bawah Lantai Volume = 4 x 3 x 0.10 = 1.20 m3
1.20 M3
2 Urugan Pasir Bawah Lantai panjang x lebar x tinggi
Volume = 4 x 3 x 0.10 = 1.20 m3
1.20 M3
3 Pasangan Keramik 40 x 40 (Permukaan Halus) Panjang x Lebar
Lantai 1 = 4.00 x 3.00 = 12.00 m2
Lantai 2 = 8.00 x 4.00 = 32.00 m2
44.00 M2
4 Pasangan Keramik 40 x 40 (Permukaan Kasar) Panjang x Lebar
Teras Depan
Lantai 1 = 3.00 x 1.30 = 3.90 m2
Lantai 2 = 11.00 x 1.30 = 14.30 m2
35.39 M2
5 Bon-bon Keramik Tangga
Anak Tangga = 1.38 x 20 = 27.60
27.60 M1
H PEKERJAAN PENGECATAN
1 Cat Tembok (L/D) 254.84 M2
3 Cat Mengkilat Listplang Kayu 10.68 M2
4 Cat Mengkilat Kosen Pintu/Jendela Luas = Panjang x (Lebar + Tebal 2x)
= 29.61 x 0.13 x 0.12 = 7.40 m2 7.40 M2