I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
1 Pasang pondasi batu kali pondasi batu kali : 0.80 x 0.40 x 25.00 x
2 Plesteran dinding saluran dan pondasi dinding penahan pondasi batu kali : 0.80 x 0.50 x 25.00 x
4 Benangan : - x - x 25.00 x
IV PEKERJAAN BETON
- = 1.00 Ls
1.00 = 22.50 m2
1.00 = 18.00 m3
18.00 m3
1.00 = 18.00 m3
1.00 = 8.00 m3
1.00 = 3.00 m3
11.00
1.00 = 32.50 m2
1.00 = 12.50 m2
45.00 m2
1.00 = 32.50 m2
1.00 = 12.50 m2
45.00 m2
1.00 = 25.00 m1
- = 0.30 m3
- = 0.90 m3
PERHITUNGAN VOLUME : PEMBANGUNAN SALURAN PEMBUANGAN BE
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
5 Acian : - x - x - x
- = 1.00 Ls
1.00 = 22.50 m2
1.00 = 14.00 m3
- = 7.25 m3
1.00 = 0.88 m3
1.00 = 6.75 m3
25.00 = 5.50 m2
3.00 = 0.24 m3
3.00 = 0.09 m3
3.00 = 12.00 m2
3.00 = 13.80 m2
3.00 = 3.00 m2
16.80 m2
- = 16.80 m2
24.00 m'
PERHITUNGAN VOLUME : PEMBANGUNAN SALURAN PEMBUANGAN U-D
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
- = 1.00 Ls
1.00 = 18.75 m2
1.00 = 11.25 m3
11.25 m3
1.00 = 2.25 m3
1.00 = 9.00 m3
1.00 = 25.00 m1
25.00 = 3.70 m2
- = 0.90 m3
RENCANA ANGGARAN BIAYA ( RAB )
I PEKERJAAN TANAH
Jumlah
II PEKERJAAN PASANGAN
Jumlah
Jumlah
Dibulatkan
#NAME?
Dibuat oleh,
UNTUNG SETYO S, ST
JUMLAH HARGA
Rp 1,800,000.00
Rp 540,000.00
Rp 2,340,000.00
Rp 8,415,000.00
Rp 1,987,643.81
Rp 762,496.88
Rp 223,125.00
Rp 11,388,265.69
Rp 450,000.00
Rp 3,150,000.00
Rp 3,600,000.00
Rp 17,328,265.69
Rp 17,300,000.00
Desember 2019
G SETYO S, ST
RENCANA ANGGARAN BIAYA ( RAB )
I PEKERJAAN TANAH
1 Galian tanah keras 14.00 m3
2 Buangan tanah hasil galian 7.25 m3
3 Urugan pasir urug 0.88 m3
4 Urugan kembali 6.75 m3
#NAME?
Rp 100,000.00 Rp 1,400,000.00
Rp 30,000.00 Rp 217,500.00
Rp 147,465.00 Rp 129,031.88
Rp 20,762.50 Rp 140,146.88
Jumlah Rp 1,886,678.75
Rp 360,074.36 Rp 9,001,859.06
Rp 140,476.58 Rp 771,918.78
Rp 3,500,000.00 Rp 3,150,000.00
Jumlah Rp 12,923,777.84
Rp 3,500,000.00 Rp 840,000.00
Rp 1,500,000.00 Rp 135,000.00
Rp 140,476.58 Rp 1,685,718.90
Rp 44,169.86 Rp 742,053.69
Rp 16,944.38 Rp 284,665.50
Rp 8,925.00 Rp 214,200.00
Jumlah Rp 3,901,638.09
UNTUNG SETYO S, ST
RENCANA ANGGARAN BIAYA ( RAB )
#NAME?
UNTUNG SETYO S, ST
JUMLAH HARGA
Rp 1,125,000.00
Rp 112,500.00
Rp 270,000.00
Rp 1,507,500.00
Rp 20,000,000.00
Rp 3,150,000.00
Rp 23,150,000.00
Rp 24,657,500.00
Rp 24,600,000.00
Desember 2019
NG SETYO S, ST
PERHITUNGAN ATAP RANGKA BESI
Terbilang : ..................................
NTUK TINGGI 6 M
Rp 194,500.00 Rp 7,780,000.00
Rp 182,500.00 Rp 9,125,000.00
Rp 115,600.00 Rp 2,312,000.00
Rp 735,000.00 Rp 8,820,000.00
Rp 200,000.00 Rp 200,000.00
Rp 12,000.00 Rp 2,160,000.00
Rp 140,000.00 Rp 15,120,000.00
Rp 70,000.00 Rp 1,120,000.00
Rp 2,500,000.00 Rp 2,500,000.00
Rp 2,500,000.00 Rp 2,500,000.00
..
BESI
NTUK TINGGI 6 M
Rp 194,500.00 Rp 7,780,000.00
Rp 182,500.00 Rp 9,125,000.00
Rp 115,600.00 Rp 2,312,000.00
Rp 735,000.00 Rp 8,820,000.00
Rp 200,000.00 Rp 200,000.00
Rp 12,000.00 Rp 2,160,000.00
Rp 90,000.00 Err:509
Rp 50,000.00 Rp 800,000.00
Rp 2,500,000.00 Rp 2,500,000.00
Rp 2,500,000.00 Rp 2,500,000.00
..
PEKERJAAN
LOKASI
TAHUN ANGGARAN
No JENIS PEKE
I PEKERJAAN PASANGAN
III -
IV -
1 -
2 -
3 -
4 -
( PAGU )
RENCANA ANGGARAN BIAYA ( RAB )
0
TPU KASIN - KOTA MALANG
HUN ANGGARAN 2016
PEKERJAAN PASANGAN
Jumlah Rp -
- m2 Rp - Rp -
- m2 Rp - Rp -
- m2 Rp - Rp -
- m2 Rp - Rp -
Jumlah Rp -
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Tee PVC 0 2 " M537 bh 1.0000 22,500.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Knee Galvanis Ø 2 " M396 Buah 1.0000 33,975.00
2 Seal Tape / TBA M481 bh 0.0250 2,625.00
C PERALATAN
A. TENAGA
B BAHAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
Tenaga
0.372 Org Pekerja
39,375.00 0.105 Org Tukang Listrik
- 0.005 Org Kepala tukang
-
1,687.50
Keuntungan & over
41,062.50
41,062.50
JUMLAH
HARGA
(Rp.)
15,750.00
-
-
1,012.50
16,762.50
16,762.50
JUMLAH
HARGA
(Rp.)
525.00
6,375.00
789.38
337.50
8,026.88
58,275.00
65.63
58,340.63
66,367.50
JUMLAH
HARGA
(Rp.)
9,082.50
5,546.25
3,394.31
1,350.00
19,373.06
22,500.00
22,500.00
41,873.06
JUMLAH
HARGA
(Rp.)
5,600.00
7,840.00
8,400.00
8,960.00
30,800.00
43,800.00
43,800.00
-
74,600.00
JUMLAH
HARGA
(Rp.)
500.00
7,000.00
750.00
674.15
8,924.15
12,900.00
65.63
12,965.63
21,889.78
JUMLAH
HARGA
(Rp.)
500.00
7,000.00
750.00
674.15
8,924.15
9,675.00
65.63
9,740.63
18,664.78
JUMLAH
HARGA
(Rp.)
2,835.00
5,737.50
710.44
182.25
9,465.19
40,500.00
14,175.00
54,675.00
64,140.19
0.00
64,140.19
JUMLAH
HARGA
(Rp.)
52,500.00
-
-
2,160.00
54,660.00
54,660.00
JUMLAH
HARGA
(Rp.)
5,670.00
11,475.00
1,420.88
364.50
18,930.38
222,660.00
77,931.00
300,591.00
319,521.38
0.00
319,521.38
JUMLAH
HARGA
(Rp.)
500.00
7,000.00
750.00
674.15
8,924.15
33,975.00
65.63
34,040.63
42,964.78
JUMLAH
HARGA
(Rp.)
500.00
7,000.00
750.00
674.15
8,924.15
2013 2014
10,100.00 ### 10,132.50 10,100.00
65.63
10,165.63
-
19,089.78
JUMLAH
HARGA
(Rp.)
5,880.00
7,140.00
8,841.00
7,560.00
29,421.00
43,800.00
43,800.00
-
73,221.00
JUMLAH
HARGA
(Rp.)
26,250.00
15,937.50
1,973.44
1,687.50
45,848.44
-
-
45,848.44
JUMLAH
HARGA
(Rp.)
24,225.00
12,112.50
1,499.81
1,282.50
39,119.81
RCP Ø 200 mm, Type RJ, Cls-2 AS
30,000.000
30,000.00
69,119.81
Rp 3,150.00 Rp 47,250.00
Rp 2,300.00 Rp 2,300.00
Rp 15,000.00 Rp 15,000.00
Rp 1,000.00 Rp 1,000.00
Rp 2,500.00 Rp 2,500.00
Rp 7,500.00 Rp 7,500.00
Rp 2,500.00 Rp 2,500.00
Jumlah (1) Rp 78,050.00
Rp 52,500.00 Rp 19,503.75
Rp 63,750.00 Rp 6,693.75
Rp 78,937.50 Rp 394.69
Jumlah (2) Rp 26,592.19
Jumlah (1) + (2) Rp 104,642.19
10.0% Rp 10,464.22
Jumlah Rp 115,106.41
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN (RAHSP)
DINAS KEBERSIHAN DAN PERTAMANAN
TAHUN ANGGARAN 2014
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
I. PEKERJAAN PERSIAPAN
A.001 Pagar sementara dari kayu, tinggi 2 meter m1
A.002 Pagar sementara dari seng gelombang, tinggi 2 meter m1
A.003 Pagar sementara dari kawat duri, tinggi 1.8 meter m1
A.004 Pasang pagar kawat jaring galvanis, tinggi 1 m m1
A.005 Pengukuran dan pemasangan bouwplank m1
A.006 Pembuatan kantor sementara m2
A.007 Pembuatan gudang semen dan alat-alat m2
A.008 Pembuatan rumah jaga/konstruksi kayu m2
A.009 Membersihkan lapangan dan perataan m2
A.010 Pembuatan bedeng buruh m2
A.011 Pembuatan bak adukan, ukuran (40x50x20) cm bh
A.012 Pembuatan jalan sementara m2
A.013 Bongkar pasang kayu kuda-kuda / kusen / loteng m3
A.014 Bongkaran beton bertulang m3
A.015 Bongkaran tembok bata merah m3
A.016 Bongkaran atap m2
A.017 Bongkaran lantai m2
A.018 Bongkaran plafon m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
B.019 Galian tanah keras sedalam > 10 m m3
B.020 Pembuangan tanah sejauh > 1 km m3
B.021 Perataan Lahan m3
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
C.008 Pasang pondasi batu kali 1/4 Pc : 1 Kp : 4 Ps m3
C.009 Pasang pondasi batu kosong m3
C.010 Pasang pondasi siklop, 40% batu kali m3
C.011 Pasang pondasi sumuran, diameter 100 cm m3
C.012 Mortar Tipe M (setara dengan campuran 1 Pc : 2 Pp) m3
C.013 Mortar Tipe S (setara dengan campuran 1 Pc : 3 Pp) m3
C.014 Mortar Tipe N (setara dengan campuran 1 Pc : 4 Pp) m3
C.015 Mortar Tipe O (setara dengan campuran 1 Pc : 5 Pp) m3
C.016 Siaran dengan Mortar Tipe M (setara dengan campuran 1 Pc : 2 Pp) m2
C.017 Siaran dengan Mortar Tipe S (setara dengan campuran 1 Pc : 3 Pp) m2
C.018 Trasraam tebal 1 cm dengan mortar tipe M (setara dengan campuran 1 Pc m2
C.019 Plesteran tebal 1 cm dengan mortar tipe S (setara dengan campuran 1 Pc m2
C.020 Plesteran tebal 1 cm dengan mortar tipe N (setara dengan campuran 1 Pc m2
C.021 Trasraam tebal 1,5 cm dengan mortar tipe M (setara dengan campuran 1 P m2
C.022 Plesteran tebal 1,5 cm dengan mortar tipe S (setara dengan campuran 1 P m2
C.023 Plesteran tebal 1,5 cm dengan mortar tipe N (setara dengan campuran 1 P m2
C.024 Pasangan batu kosong m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
D.025 Pasang Batu Bata Tahan Api m2
V. PEKERJAAN PLESTERAN
E.001 Plesteran 1 Pc : 1 Ps tebal 15 mm m2
E.002 Plesteran 1 Pc : 2 Ps tebal 15 mm m2
E.003 Plesteran 1 Pc : 3 Ps tebal 15 mm m2
E.004 Plesteran 1 Pc : 4 Ps tebal 15 mm m2
E.005 Plesteran 1 Pc : 5 Ps tebal 15 mm m2
E.006 Plesteran 1 Pc : 6 Ps tebal 15 mm m2
E.007 Plesteran 1 Pc : 7 Ps tebal 15 mm m2
E.008 Plesteran 1 Pc : 8 Ps tebal 15 mm m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
E.009 Plesteran 1 Pc : 0.5 Kp : 3 Ps tebal 15 mm m2
E.010 Plesteran 1 Pc : 2 Kp : 8 Ps tebal 15 mm m2
E.011 Plesteran 1 Kp : 1 Sm : 1 Ps tebal 15 mm m2
E.012 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 15 mm m2
E.013 Plesteran 1 Pc : 2 Ps tebal 20 mm m2
E.014 Plesteran 1 Pc : 3 Ps tebal 20 mm m2
E.015 Plesteran 1 Pc : 4 Ps tebal 20 mm m2
E.016 Plesteran 1 Pc : 5 Ps tebal 20 mm m2
E.017 Plesteran 1 Pc : 6 Ps tebal 20 mm m2
E.018 Plesteran 1 Kp : 1 Sm : 2 Ps tebal 20 mm m2
E.019 Berapen 1 Pc : 5 Ps, tebal 15 mm m2
E.020 Plesteran skoning 1 Pc : 2 Ps tebal 10 mm m2
E.021 Plesteran granito 1 Pc warna : 2 granito tebal 10 mm m2
E.022 Plesteran teraso 1 Pc warna : 2 batu teraso, tebal 10 mm m2
E.023 Plesteran ciprat 1 Pc : 2 Ps m2
E.024 Plesteran siar pasangan batu kali adukan 1 Pc : 2 Ps m2
E.025 Benangan m1
E.026 Acian m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.024 Pasang pintu plywood rangkap, rangka kayu meranti m2
F.025 Pasang jalusi mati kusen kayu jati m2
F.026 Pasang jalusi mati kusen kayu kamper m2
F.027 Pasang jalusi mati kusen kayu borneo m2
F.028 Pasang jalusi mati kusen kayu meranti m2
F.029 Pasang pintu teakwood rangkap, rangka kayu jati m2
F.030 Pasang pintu teakwood rangkap, rangka kayu kamper m2
F.031 Pasang pintu teakwood rangkap, rangka kayu borneo m2
F.032 Pasang pintu teakwood rangkap, rangka kayu meranti m2
F.033 Pasang pintu plywood dan formika, rangka kayu jati m2
F.034 Pasang pintu plywood dan formika, rangka kayu kamper m2
F.035 Pasang pintu plywood dan formika, rangka kayu borneo m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.036 Pasang pintu plywood dan formika, rangka kayu meranti m2
F.037 Pasang pintu teakwood dan formika, rangka kayu jati m2
F.038 Pasang pintu teakwood dan formika, rangka kayu borneo (divernis) m2
F.039 Pasang pintu teakwood dan formika, rangka kayu meranti (divernis) m2
F.040 Pasang konstruksi kuda-kuda kayu jati m3
F.041 Pasang konstruksi kuda-kuda kayu kamper m3
F.042 Pasang konstruksi kuda-kuda kayu borneo m3
F.043 Pasang konstruksi kuda-kuda kayu kruing m3
F.044 Pasang konstruksi kuda-kuda kayu meranti m3
F.045 Pasang konstruksi kuda-kuda ekspose kayu jati m3
F.046 Pasang konstruksi kuda-kuda ekspose kayu kamper m3
F.047 Pasang konstruksi gording kayu kamper m3
F.048 Pasang konstruksi gording kayu meranti m3
F.049 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu jati m2
F.050 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kamper m2
F.051 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu borneo m2
F.052 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu kruing m2
F.053 Pasang kaso 5/7 + reng 3/5 genteng biasa kayu meranti m2
F.054 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu jati m2
F.055 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kamper m2
F.056 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu borneo m2
F.057 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu kruing m2
F.058 Pasang kaso 5/7 + reng 3/5 genteng karangpilang kayu meranti m2
F.059 Pasang kaso 5/7 + reng 3/5 genteng beton kayu jati m2
F.060 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kamper m2
F.061 Pasang kaso 5/7 + reng 3/5 genteng beton kayu borneo m2
F.062 Pasang kaso 5/7 + reng 3/5 genteng beton kayu kruing m2
F.063 Pasang kaso 5/7 + reng 3/5 genteng beton kayu meranti m2
F.064 Pasang kaso 5/7 + reng 3/5 atap sirap kayu jati m2
F.065 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kamper m2
F.066 Pasang kaso 5/7 + reng 3/5 atap sirap kayu borneo m2
F.067 Pasang kaso 5/7 + reng 3/5 atap sirap kayu kruing m2
F.068 Pasang kaso 5/7 + reng 3/5 atap sirap kayu meranti m2
F.069 Pasang rangka langit-langit (0.5 x 1.0) m, kayu jati m2
F.070 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kamper m2
F.071 Pasang rangka langit-langit (0.5 x 1.0) m, kayu borneo m2
F.072 Pasang rangka langit-langit (0.5 x 1.0) m, kayu kruing m2
F.073 Pasang rangka langit-langit (0.5 x 1.0) m, kayu meranti m2
F.074 Pasang lisplang ukuran (3 x 20) cm, kayu jati m1
F.075 Pasang lisplang ukuran (3 x 20) cm, kayu kamper m1
F.076 Pasang lisplang ukuran (3 x 20) cm, kayu borneo m1
F.077 Pasang lisplang ukuran (3 x 20) cm, kayu kruing m1
F.078 Pasang lisplang ukuran (3 x 20) cm, kayu meranti m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.079 Pasang lisplang ukuran (3 x 30) cm, kayu jati m1
F.080 Pasang lisplang ukuran (3 x 30) cm, kayu kamper m1
F.081 Pasang lisplang ukuran (3 x 30) cm, kayu borneo m1
F.082 Pasang lisplang ukuran (3 x 30) cm, kayu kruing m1
F.083 Pasang lisplang ukuran (3 x 30) cm, kayu meranti m1
F.084 Pasang rangka dinding pemisah kayu jati m1
F.085 Pasang rangka dinding pemisah kayu kamper m1
F.086 Pasang rangka dinding pemisah kayu borneo m1
F.087 Pasang rangka dinding pemisah kayu meranti m1
F.088 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu jati m2
F.089 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu kamper m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
F.090 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu borneo m2
F.091 Pasang rangka dinding pemisah teakwood rangkap, rangka kayu meranti m2
F.092 Pasang rangka dinding pemisah plywood rangkap, rangka kayu jati m2
F.093 Pasang rangka dinding pemisah plywood rangkap, rangka kayu kamper m2
F.094 Pasang rangka dinding pemisah plywood rangkap, rangka kayu borneo m2
F.095 Pasang rangka dinding pemisah plywood rangkap, rangka kayu meranti m2
F.096 Pasang dinding lambriziring dari papan jati m2
F.097 Pasang dinding lambriziring dari papan kamper m2
VII. PEKERJAAN BETON
G.001 Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87 (Manual) m3
G.001a Beton mutu fc'=7,4 Mpa (K100) slump (12 ± 2) cm, w/c = 0,87 (dengan m3
G.002 Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 (Manual) m3
G.002a Beton mutu fc'=9,8 Mpa (K125) slump (12 ± 2) cm, w/c = 0,78 (dengan m3
G.003 Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72 (Manual m3
G.003a Beton mutu fc'=12,2 Mpa (K150) slump (12 ± 2) cm, w/c = 0,72 (dengan m3
G.004 Lantai kerja beton mutu fc'=7,4 Mpa (K100) slump (3 - 6) cm, w/c = 0,87 m3
G.005 Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66 (Manual m3
G.005a Beton mutu fc'=14,5 Mpa (K175) slump (12 ± 2) cm, w/c = 0,66 (dengan m3
G.006 Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61 (Manual m3
G.006a Beton mutu fc'=16,9 Mpa (K200) slump (12 ± 2) cm, w/c = 0,61 (dengan m3
G.007 Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 (Manual m3
G.007a Beton mutu fc'=19,3 Mpa (K225) slump (12 ± 2) cm, w/c = 0,58 (denga m3
G.008 Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56 (Manual m3
G.008a Beton mutu fc'=21,7 Mpa (K250) slump (12 ± 2) cm, w/c = 0,56 (dengan m3
G.009 Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53 (Manual m3
G.009a Beton mutu fc'=24,0 Mpa (K275) slump (12 ± 2) cm, w/c = 0,53 (dengan m3
G.010 Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52 (Manual m3
G.010a Beton mutu fc'=26,4 Mpa (K300) slump (12 ± 2) cm, w/c = 0,52 (dengan m3
G.011 Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49 (Manual m3
G.011a Beton mutu fc'=28,8 Mpa (K325) slump (12 ± 2) cm, w/c = 0,49 (dengan m3
G.012 Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48 (Manual m3
G.012a Beton mutu fc'=31,2 Mpa (K350) slump (12 ± 2) cm, w/c = 0,48 (dengan m3
G.013 Beton kedap air dengan strorox - 100 m3
G.014 Pasang PVC Waterstop lebar 150 mm m1
G.015 Pasang PVC Waterstop lebar 200 mm m1
G.016 Pasang PVC Waterstop lebar 230 mm ~ 320 mm m1
G.016a Pasang PVC Waterstop Rubber lebar 150 mm - 200 mm m1
G.017 Pembesian dengan besi polos kg
G.018 Pembesian dengan besi ulir kg
G.018a Penambahan koefisien mengangkut/menaikkan tulangan
setiap kenaikan 4 m vertikal atau setiap 25 m horizontal ke lokasi (Manua kg
G.018b Penambahan koefisien mengangkut/menaikkan tulangan
setiap kenaikan 4 m vertikal atau setiap 25 m horizontal ke lokasi (Meka kg
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.018c Penambahan koefisien mengangkut/menaikkan tulangan setiap kenaikan 4 m vertikal
atau setiap 25 m horizontal ke lokasi (Mekanis penambahan 25 m) kg
G.019 Kabel prestressed polos/strands kg
G.020 Memasang 1 kg jaring kawat baja / wire mesh kg
G.021 Pasang bekisting untuk pondasi m2
G.022 Pasang bekisting untuk pondasi (2x pakai) m2
G.023 Pasang bekisting untuk sloof m2
G.024 Pasang bekisting untuk sloof (2x pakai) m2
G.025 Pasang bekisting untuk kolom m2
G.026 Pasang bekisting untuk kolom (2x pakai) m2
G.027 Pasang bekisting untuk balok m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.028 Pasang bekisting untuk balok (2x pakai) m2
G.029 Pasang bekisting untuk plat lantai m2
G.030 Pasang bekisting untuk plat lantai (2x pakai) m2
G.031 Pasang bekisting untuk dinding m2
G.032 Pasang bekisting untuk dinding (2x pakai) m2
G.033 Pasang bekisting untuk tangga m2
G.034 Pasang bekisting untuk tangga (2x pakai) m2
G.035 Pasang jembatan cor / Talang Cor m2
G.036 Pondasi beton bertulang (150 kg besi + bekisting) m3
G.037 Sloof beton bertulang (200 kg besi + bekisting) m3
G.038 Kolom beton bertulang (150 kg besi + bekisting) m3
G.039 Kolom beton bertulang (300 kg besi + bekisting) m3
G.040 Balok beton bertulang (200 kg besi + bekisting) m3
G.041 Dinding beton bertulang (150 kg besi + bekisting) m3
G.042 Dinding beton bertulang (200 kg besi + bekisting) m3
G.043 Kolom penguat beton bertulang (11 x 11) cm m1
G.044 Ring balok beton bertulang (10 x 15) cm m1
G.045 Sloof beton bertulang (10 x 15) cm m1
G.046 Beton untuk Lantai Kerja (bedding) m3
G.047 Bongkar Bekisting secara biasa m2
G.048 Bongkar Bekisting secara hati-hati m2
G.049 Menggenangi air 100 m2 permukaan Beton 100 m2
G.050 Memasang 100 m2 terpal/karung goni basah pada permukaan beton 100 m2
G.051 Menyirami Terpal/karung goni dengan air selama 4 hari m2
G.052 Bongkar Beton secara Konvensional (dlm Rangka Renovasi) m2
G.053 Bongkar Beton dengan Jack Hammer m2
G.054 Pemancangan Tiang Pancang Kayu gelondongan dengan Hammer/tanpa M m'
G.055 Pemancangan Tiang Pancang Baja Pipa dengan Hammer/tanpa Mesin m'
G.056 Pemancangan Tiang Pancang Baja Kotak dengan Hammer/tanpa Mesin m'
G.057 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Hammer/ m'
G.058 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Hammer/ m'
G.059 Pemancangan Turap Kayu Dolken dengan Hammer/tanpa Mesin m'
G.060 Pemancangan Turap Baja Profil Larsen dengan Hammer/tanpa Mesin m'
G.061 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Hamm m'
G.062 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Hamm m'
G.063 Pemancangan Tiang Pancang Kayu gelondongan dengan Mesin Tenaga Ua m'
G.064 Pemancangan Tiang Pancang Baja Pipa (30 x 30 cm) dengan Mesin Tenag m'
G.065 Pemancangan Tiang Pancang Baja Kotak (30 x 30 cm) dengan Mesin Tena m'
G.066 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Mesin Te m'
G.067 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Mesin Te m'
G.068 Pemancangan Turap Kayu Dolken dengan Mesin Tenaga Uap m'
G.069 Pemancangan Turap Baja Profil Larsen dengan Mesin Tenaga Uap m'
G.070 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Mesin m'
G.071 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Mesin m'
G.072 Pemancangan Tiang Pancang Kayu gelondongan dengan Mesin Tenaga Ua m'
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.073 Pemancangan Tiang Pancang Baja Pipa (30 x 30 cm) dengan Mesin Tenag m'
G.074 Pemancangan Tiang Pancang Baja Kotak (30 x 30 cm) dengan Mesin Tena m'
G.075 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Mesin Te m'
G.076 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Mesin Te m'
G.077 Pemancangan Turap Kayu Dolken dengan Mesin Tenaga Uap m'
G.078 Pemancangan Turap Baja Profil Larsen dengan Mesin Tenaga Uap m'
G.079 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Mesin m'
G.080 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Mesin m'
G.081 Pemancangan Tiang Pancang Kayu gelondongan dengan Kompressor Uda m'
G.082 Pemancangan Tiang Pancang Baja Pipa (30 x 30 cm) dengan Kompressor m'
G.083 Pemancangan Tiang Pancang Baja Kotak (30 x 30 cm) dengan Kompresso m'
G.084 Pemancangan Tiang Baja Beton Bertulang (30 x 30 cm) dengan Kompress m'
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.085 Pemancangan Tiang Baja Beton Bertulang (40 x 40 cm) dengan Kompress m'
G.086 Pemancangan Turap Kayu Dolken dengan Kompressor Udara m'
G.087 Pemancangan Turap Baja Profil Larsen dengan Kompressor Udara m'
G.088 Pemancangan Turap Beton Bertulang Precast (30 x 12 cm) dengan Kompr m'
G.089 Pemancangan Turap Beton Bertulang Precast (40 x 15 cm) dengan Kompr m'
G.090 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 12 mm (tanpa p m2
G.091 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 12 mm (tanpa p m2
G.092 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 18 mm (tanpa p m2
G.093 Bekisting untuk Permukaan Beton Biasa dengan Multiplek 18 mm (tanpa p m2
G.094 Bekisting untuk Permukaan Beton Biasa dengan Papan Ukuran 3/20 cm (ta m2
G.095 Bekisting untuk Permukaan Beton Biasa dengan Papan Ukuran 3/20 cm (ta m2
G.096 Bekisting untuk Permukaan Beton Expose dengan Multiplek 12 mm-kasso 5 m2
G.097 Bekisting untuk Permukaan Beton Expose dengan Multiplek 12 mm-kasso 5 m2
G.098 Bekisting untuk Permukaan Beton Expose dengan Multiplek 18 mm-kasso 5 m2
G.099 Bekisting untuk Permukaan Beton Expose dengan Multiplek 18 mm-kasso 5 m2
G.100 Perancah bekisting kasso 5/7 tinggi 4 m untuk 1 kali pakai m2
G.101 Perancah bekisting kasso 5/7 tinggi 4 m untuk 2 kali pakai m2
G.102 Perancah bekisting kayu dolken diameter 8 cm - 10 cm, tinggi 4 m untuk 1 m2
G.103 Perancah bekisting kayu dolken diameter 8 cm - 10 cm, tinggi 4 m untuk 2 m2
G.104 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 12 mm (tanpa per m2
G.105 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 12 mm (tanpa per m2
G.106 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 18 mm (tanpa per m2
G.107 Bekisting Balok Biasa dibuat ditempat dengan Multiplek 18 mm (tanpa per m2
G.108 Perancah Bekisting Balok Biasa dibuat ditempat dengan Kasso 5/7, tinggi 4 m2
G.109 Perancah Bekisting Balok Biasa dibuat ditempat dengan Kasso 5/7, tinggi 4 m2
G.110 Perancah Bekisting Balok dengan kayu Dolken diameter 8 cm dibuat ditemp m2
G.111 Perancah Bekisting Balok dengan kayu Dolken diameter 8 cm dibuat ditemp m2
G.112 Bekisting Kolom Beton dengan Multiplek 12 mm dibuat di tempat (1x paka m2
G.113 Bekisting Kolom Beton dengan Multiplek 12 mm dibuat di tempat (2x paka m2
G.114 Bekisting Kolom Beton dengan Multiplek 18 mm dibuat di tempat (1x paka m2
G.115 Bekisting Kolom Beton dengan Multiplek 12 mm dibuat di tempat (2x paka m2
G.116 Bekisting Kolom Beton Biasa dengan papan ukuran 3/20 dibuat di tempat m2
G.117 Bekisting Kolom Beton Biasa dengan papan ukuran 3/20 dibuat di tempat m2
G.118 Bekisting Dinding Beton Biasa dengan Multiplek 12 mm dibuat di tempat ( m2
G.119 Bekisting Dinding Beton Biasa dengan Multiplek 12 mm dibuat di tempat ( m2
G.120 Bekisting Dinding Beton Biasa dengan Multiplek 18 mm dibuat di tempat ( m2
G.121 Bekisting Dinding Beton Biasa dengan Multiplek 18 mm dibuat di tempat ( m2
G.122 Bekisting Dinding Beton Biasa dengan papan ukuran 3/20 dibuat di tempa m2
G.123 Bekisting Dinding Beton Biasa dengan papan ukuran 3/20 dibuat di tempa m2
G.124 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 12 mm dibuat d m2
G.125 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 12 mm dibuat d m2
G.126 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 18 mm dibuat d m2
G.127 Bekisting Pondasi dan Sloof Beton Biasa dengan Multiplek 18 mm dibuat d m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
G.128 Bekisting Pondasi dan Sloof Beton Biasa dengan papan ukuran 3/20 dibuat m2
G.129 Bekisting Pondasi dan Sloof Beton Biasa dengan papan ukuran 3/20 dibuat m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
H.009 Pasang bubung genteng karangpilang ex. Trenggalek m1
H.010 Pasang bubung genteng karangpilang ex. Surabaya m1
H.011 Pasang atap genteng palentong kecil m2
H.012 Pasang atap genteng kodok glazuur m2
H.013 Pasang atap genteng palentong super / besar m2
H.014 Pasang atap genteng beton m2
H.015 Pasang atap genteng aspal m2
H.016 Pasang atap genteng metal m2
H.017 Pasang atap sirap m2
H.018 Pasang bubung genteng palentong kecil m1
H.019 Pasang bubung genteng kodok glazuur m1
H.020 Pasang bubung genteng palentong super / besar m1
H.021 Pasang bubung genteng beton m1
H.022 Pasang bubung genteng aspal m1
H.023 Pasang bubung genteng metal m1
H.024 Pasang bubung atap sirap m1
H.025 Pasang atap asbes gelombang (3.00 x 1.05 m) x 4 mm m2
H.026 Pasang atap asbes gelombang (2.70 x 1.05 m) x 4 mm m2
H.027 Pasang atap asbes gelombang (2.40 x 1.05 m) x 4 mm m2
H.028 Pasang atap asbes gelombang (2.10 x 1.05 m) x 4 mm m2
H.029 Pasang atap asbes gelombang (1.50 x 1.05 m) x 4 mm m2
H.030 Pasang atap asbes gelombang (2.50 x 0.92 m) x 5 mm m2
H.031 Pasang atap asbes gelombang (2.25 x 0.92 m) x 5 mm m2
H.032 Pasang atap asbes gelombang (2.00 x 0.92 m) x 5 mm m2
H.033 Pasang atap asbes gelombang (1.80 x 0.92 m) x 5 mm m2
H.034 Pasang atap asbes gelombang (3.00 x 1.08 m) x 6 mm m2
H.035 Pasang atap asbes gelombang (2.70 x 1.08 m) x 6 mm m2
H.036 Pasang atap asbes gelombang (2.10 x 1.08 m) x 6 mm m2
H.037 Pasang atap asbes gelombang (1.80 x 1.08 m) x 6 mm m2
H.038 Pasang nok stel gelombang 0.92 m m1
H.039 Pasang nok stel gelombang 1.05 m m1
H.040 Pasang nok stel gelombang 1.08 m m1
H.041 Pasang nok paten 0.92 m m1
H.042 Pasang nok paten 1.05 m m1
H.043 Pasang nok paten 1.08 m m1
H.044 Pasang nok stel rata 0.92 m m1
H.045 Pasang nok stel rata 1.05 m m1
H.046 Pasang atap seng gelombang m2
H.047 Pasang bubung seng gelombang m1
H.048 Pasang Atap Aluminium m2
H.049 Pasang Bubung Atap Aluminium m2
H.050 Pasang Lapisan Aluminium Foil/Sesalation m2
H.051 Pasang roof light fibreglass m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
H.052 Pasang atap polycarbonat m2
H.053 Pasang Atap Seng Galvalum m2
H.054 Pasang Bubung Atap Seng Galvalum m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
I.007 Langit-langit akustik (60 x 120) cm m2
I.008 Langit-langit plywood (30 x 60) cm, tebal 4 mm m2
I.009 Langit-langit plywood (30 x 60) cm, tebal 6 mm m2
I.010 Langit-langit plywood (60 x 120) cm, tebal 4 mm m2
I.011 Langit-langit plywood (60 x 120) cm, tebal 6 mm m2
I.012 Langit-langit teakwood (30 x 60) cm, tebal 4 mm m2
I.013 Langit-langit teakwood (60 x 120) cm, tebal 4 mm m2
I.014 Langit-langit lat kayu jati m2
I.015 Langit-langit lat kayu kamper m2
I.016 Langit-langit soft board m2
I.017 Langit-langit akustik (60 x 120) cm + rangka aluminium m2
I.018 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu jati m2
I.019 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kamper m2
I.020 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu borneo m2
I.021 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu kruing m2
I.022 Langit-langit asbes (1,00 x 1,00) m x 3,5 mm + rangka kayu meranti m2
I.023 Langit-langit plywood 4 mm + rangka kayu jati m2
I.024 Langit-langit plywood 4 mm + rangka kayu kamper m2
I.025 Langit-langit plywood 4 mm + rangka kayu borneo m2
I.026 Langit-langit plywood 4 mm + rangka kayu kruing m2
I.027 Langit-langit plywood 4 mm + rangka kayu meranti m2
I.028 Langit-langit akustik (30 x 60) cm + rangka kayu jati m2
I.029 Langit-langit akustik (30 x 60) cm + rangka kayu kamper m2
I.030 Langit-langit akustik (30 x 60) cm + rangka kayu borneo m2
I.031 Langit-langit akustik (30 x 60) cm + rangka kayu kruing m2
I.032 Langit-langit akustik (30 x 60) cm + rangka kayu meranti m2
I.033 Langit-langit akustik (30 x 30) cm + rangka kayu jati m2
I.034 Langit-langit akustik (30 x 30) cm + rangka kayu kamper m2
I.035 Langit-langit akustik (30 x 30) cm + rangka kayu borneo m2
I.036 Langit-langit akustik (30 x 30) cm + rangka kayu kruing m2
I.037 Langit-langit akustik (30 x 30) cm + rangka kayu meranti m2
I.038 Langit-langit gypsum board (120x240x9) mm, tebal 9 mm m2
I.039 Langit-langit tripleks (120 x 240) cm, tebal 3 mm m2
I.040 Langit-langit tripleks (120 x 240) cm, tebal 4 mm m2
I.041 Langit-langit lambriziring kayu jati, tebal 9 mm m2
I.042 Langit-langit lambriziring kayu kamper, tebal 9 mm m2
I.043 List langit-langit kayu profil m1
I.044 List langit-langit gypsum m1
X. PEKERJAAN SANITASI
J.001 Pasang kloset jongkok teraso bh
J.002 Pasang kloset jongkok porselin kw. A bh
J.003 Pasang kloset jongkok lux bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.004 Pasang kloset duduk porselin kw. A bh
J.005 Pasang kloset duduk lux bh
J.006 Pasang buah urinoir bh
J.007 Pasang wastafel kw. A bh
J.008 Pasang wastafel lux bh
J.009 Pasang tempat sabun keramik bh
J.010 Pasang bak mandi teraso volume 0.3 m3 bh
J.011 Pasang bak mandi fibreglass volume 0.3 m3 bh
J.012 Pasang bak mandi batu bata volume 0.3 m3 bh
J.013 Pasang badkip porselen bh
J.014 Pasang bak beton volume 1.0 m3 bh
J.015 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm m1
J.016 Pasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.017 Pasang pipa beton Ø 20 cm m1
J.018 Pasang pipa beton Ø 30 cm m1
J.019 Pasang pipa beton Ø 40 cm m1
J.020 Pasang pipa beton Ø 50 cm m1
J.021 Pasang pipa beton Ø 60 cm m1
J.022 Pasang pipa beton Ø 80 cm m1
J.023 Pasang pipa beton Ø 90 cm m1
J.024 Pasang pipa beton Ø 100 cm m1
J.025 Pasang pipa beton U Ø 20 cm m1
J.026 Pasang pipa beton U Ø 30 cm m1
J.027 Pasang bak kontrol pasangan batu bata (30 x 30 x 35) cm bh
J.028 Pasang bak kontrol pasangan batu bata (45 x 45 x 50) cm bh
J.029 Pasang bak kontrol pasangan batu bata (60 x 60 x 65) cm bh
J.030 Pasang pipa galvanis Ø 1/2" m1
J.031 Pasang pipa galvanis Ø 3/4" m1
J.032 Pasang pipa galvanis Ø 1" m1
J.033 Pasang pipa galvanis Ø 1 1/2" m1
J.034 Pasang pipa galvanis Ø 2" m1
J.035 Pasang pipa galvanis Ø 2 1/2" m1
J.036 Pasang pipa galvanis Ø 3" m1
J.037 Pasang pipa galvanis Ø 4" m1
J.038 Pasang pipa PVC tipe AW Ø 1/2" m1
J.039 Pasang pipa PVC tipe AW Ø 3/4" m1
J.040 Pasang pipa PVC tipe AW Ø 1" m1
J.041 Pasang pipa PVC tipe AW Ø 1 1/2" m1
J.042 Pasang pipa PVC tipe AW Ø 2" m1
J.043 Pasang pipa PVC tipe AW Ø 2.5" m1
J.044 Pasang pipa PVC tipe AW Ø 3" m1
J.045 Pasang pipa PVC tipe AW Ø 4" m1
J.046 Pasang pipa PVC tipe AW Ø 6" m1
J.047 Pasang pipa PVC tipe AW Ø 8" m1
J.048 Pasang pipa PVC tipe D Ø 1/2" m1
J.049 Pasang pipa PVC tipe D Ø 3/4" m1
J.050 Pasang pipa PVC tipe D Ø 1" m1
J.051 Pasang pipa PVC tipe D Ø 1 1/2" m1
J.052 Pasang pipa PVC tipe D Ø 2" m1
J.053 Pasang pipa PVC tipe D Ø 2.5" m1
J.054 Pasang pipa PVC tipe D Ø 3" m1
J.055 Pasang pipa PVC tipe D Ø 4" m1
J.056 Pasang pipa PVC tipe C Ø 1/2" m1
J.057 Pasang pipa PVC tipe C Ø 3/4" m1
J.058 Pasang pipa PVC tipe C Ø 1" m1
J.059 Pasang pipa PVC tipe C Ø 1 1/2" m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.060 Pasang pipa PVC tipe C Ø 2" m1
J.061 Pasang pipa PVC tipe C Ø 2.5" m1
J.062 Pasang pipa PVC tipe C Ø 3" m1
J.063 Pasang pipa PVC tipe C Ø 4" m1
J.064 Pasang bak cuci piring stainles steel bh
J.065 Pasang bak cuci piring teraso bh
J.066 Pasang kran Ø 1/2" bh
J.067 Pasang kran Ø 3/4" bh
J.068 Pasang Afor Stainless Steel bh
J.069 Pasang Afor Plastik bh
J.070 Pasang Kaca Wastafel m2
J.071 Pasang pipa screen PVC tipe AW Ø 3" m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
J.072 Pasang pipa screen PVC tipe AW Ø 4" m1
J.073 Pasang pipa beton bertulang RCP Ø 40 cm m1
J.074 Pasang pipa beton bertulang RCP Ø 50 cm m1
J.075 Pasang pipa beton bertulang RCP Ø 60 cm m1
J.076 Pasang pipa beton bertulang RCP Ø 80 cm m1
J.077 Pasang pipa beton bertulang RCP Ø 105 cm m1
J.078 Pasang Box Culvert Monolit 40 x 40 cm m1
J.079 Pasang Box Culvert Monolit 50 x 50 cm m1
J.080 Pasang Box Culvert Monolit 60 x 60 cm m1
J.081 Pasang Box Culvert Monolit 80 x 80 cm m1
J.082 Pasang Box Culvert Monolit 100 x 100 cm m1
J.083 Pasang Box U Beton Bertulang ukuran dalam 40 x 60 cm, tebal 5 cm (U 4 m1
J.084 Pasang Tutup Box U Beton Bertulang ukuran 50 x 60 cm, tebal 10 cm (Co m1
J.085 Pasang Tutup Box U Beton Bertulang ukuran 50 x 60 cm, tebal 8 cm (Cov m1
J.086 Pasang Box U Beton Bertulang ukuran dalam 50 x 60 cm, tebal 7,5 cm (U m1
J.087 Pasang Tutup Box U Beton Bertulang ukuran dalam 65 x 60 cm, tebal 12 m1
J.088 Pasang Tutup Box U Beton Bertulang ukuran dalam 65 x 60 cm, tebal 10 m1
J.089 Pasang Box U Beton Bertulang ukuran dalam 60 x 60 cm, tebal 7,5 cm (U m1
J.090 Pasang Tutup Box U Beton Bertulang ukuran 75 x 60 cm, tebal 12 cm (Co m1
J.091 Pasang Tutup Box U Beton Bertulang ukuran 75 x 60 cm, tebal 10 cm (Co m1
J.092 Pasang Box U Beton Bertulang ukuran dalam 60 x 70 cm, tebal 7,5 cm (U m1
J.093 Pasang Beton Bertulang ukuran dalam 60 x 80 cm, tebal 7,5 cm (U 60/80 m1
J.094 Pasang Beton Bertulang ukuran dalam 80 x 80 cm, tebal 7,5 cm (U 80/80 m1
J.095 Pasang Box U Beton Bertulang ukuran dalam 80 x 90 cm, tebal 7,5 cm (U m1
J.096 Pasang Tutup Box U Beton Bertulang ukuran 95 x 60 cm, tebal 15 cm (Co m1
J.097 Pasang Tutup Box U Beton Bertulang ukuran 95 x 60 cm, tebal 10 cm (Co m1
J.098 Pasang Box U Beton Bertulang ukuran dalam 100 x 100 cm, tebal 8,5 cm m1
J.099 Pasang Box U Beton Bertulang ukuran dalam 100 x 120 cm, tebal 8,5 cm m1
J.100 Pasang Tutup Box U Beton Bertulang ukuran 117 x 60 cm, tebal 17 cm (C m1
J.101 Pasang Tutup Box U Beton Bertulang ukuran 117 x 60 cm, tebal 10 cm ( m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
K.012 Pasang Kusen Alluminium Coklat m1
K.013 Pasang pintu Alluminium coklat strip lebar 8 cm m2
K.014 Pasang Pintu Kaca Rangka Aluminium Coklat m2
K.015 Pasang venetion blinds dan vertical blinds (tirai) m2
K.016 Pasang teralis besi (2 x 3) mm m2
K.017 Pasang kawat nyamuk m2
K.018 Pasang jendela nako & trails m2
K.019 Pasang pintu fiber KM Unit
K.020 Pasang talang datar, seng bjls 30 L = 0.60 m m1
K.021 Pasang talang datar, seng bjls 30 L = 0.90 m m1
K.022 Pasang talang miring, seng bjls 30 L = 0.60 m m1
K.023 Pasang talang miring, seng bjls 30 L = 0.90 m m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
K.024 Pasang talang tegak pipa PVC Ø 3" m1
K.025 Pasang talang tegak pipa PVC Ø 4" m1
K.026 Pasang talang 1/2 lingkaran D-15 cm bjls 30, L = 45 cm m1
K.027 Pasang pagar BRC tinggi 1 m m1
K.028 Pasang tiang pagar BRC Dia 2" tinggi 1 m m1
K.029 Pasang pintu pagar BRC tinggi 1 m m1
K.030 Pasang pagar besi m1
K.031 Pasang pintu pagar besi m1
K.032 Pasang Atap Baja Ringan untuk Penutup Atap Genteng m1
K.033 Pasang Atap Baja Ringan untuk Penutup Atap Asbes Gelombang m1
K.034 Pasang Rangka Plafon Metal Furing m2
K.035 Pasang sunscreen besi hollow m2
K.036 Pasang pagar besi hollow m2
K.037 Pasang Pintu pagar besi hollow m2
K.038 Pasang Besi Wiremesh diameter 6 ukuran lubang 15x15 cm (M6) m²
K.039 Pasang Tutup Avoor dari Cor Besi Tuang, 60x80 cm Unit
K.040 Pasang Tutup Bak Kontrol Cor Besi Tuang, 100x100 cm Unit
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
L.026 Pasang kaca cermin, tebal 5 mm m2
L.027 Pasang kaca cermin, tebal 6 mm m2
L.028 Pasang kaca cermin, tebal 8 mm m2
L.029 Pasang kaca rayben, tebal 3 mm m2
L.030 Pasang kaca rayben, tebal 5 mm m2
L.031 Pasang kaca rayben, tebal 8 mm m2
L.032 Pasang kaca rayben, tebal 12 mm m2
L.033 Pasang kaca " wireglass", tebal 5 mm m2
L.034 Pasang kaca patri, tebal 5 mm m2
L.035 Pasang glass block bh
L.036 Pasang kaca painting glass m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
XIII. PEKERJAAN LANTAI DAN DINDING
M.001 Pasang lantai ubin pc abu-abu ukuran 40 x 40 cm m2
M.002 Pasang lantai ubin pc abu-abu ukuran 30 x 30 cm m2
M.003 Pasang lantai ubin pc abu-abu ukuran 20 x 20 cm m2
M.004 Pasang lantai ubin pc warna ukuran 40 x 40 cm m2
M.005 Pasang lantai ubin pc warna ukuran 30 x 30 cm m2
M.006 Pasang lantai ubin pc warna ukuran 20 x 20 cm m2
M.007 Pasang lantai ubin teraso ukuran 40 x 40 cm m2
M.008 Pasang lantai ubin teraso ukuran 30 x 30 cm m2
M.009 Pasang lantai ubin granito ukuran 40 x 40 cm m2
M.010 Pasang lantai ubin granito ukuran 30 x 30 cm m2
M.011 Pasang lantai ubin teralux kerang ukuran 40 x 40 cm m2
M.012 Pasang lantai ubin teralux kerang ukuran 30 x 30 cm m2
M.013 Pasang lantai ubin teralux marmer ukuran 60 x 60 cm m2
M.014 Pasang lantai ubin teralux marmer ukuran 40 x 40 cm m2
M.015 Pasang lantai ubin teralux marmer ukuran 30 x 30 cm m2
M.016 Pasang plint ubin pc abu-abu ukuran 15 x 20 cm m1
M.017 Pasang plint ubin pc abu-abu ukuran 10 x 30 cm m1
M.018 Pasang plint ubin pc abu-abu ukuran 10 x 40 cm m1
M.019 Pasang plint ubin pc warna ukuran 10 x 20 cm m1
M.020 Pasang plint ubin pc warna ukuran 10 x 30 cm m1
M.021 Pasang plint ubin pc warna ukuran 10 x 40 cm m1
M.022 Pasang plint ubin teraso ukuran 10 x 30 cm m1
M.023 Pasang plint ubin teraso ukuran 10 x 40 cm m1
M.024 Pasang plint ubin granito ukuran 10 x 40 cm m1
M.025 Pasang plint ubin granito ukuran 10 x 30 cm m1
M.026 Pasang teraso cor di tempat, tebal 3cm m2
M.027 Pasang lantai keramik artistik 10 x 20 cm m2
M.028 Pasang lantai keramik artistik 10 x 10 cm m2
M.029 Pasang lantai keramik artistik 5 x 20 cm m2
M.030 Pasang dinding keramik artistik 10 x 20 cm m2
M.031 Pasang dinding keramik artistik 5 x 20 cm m2
M.032 Pasang plint keramik artistik 10 x 20 cm m1
M.033 Pasang plint keramik artistik 10 x 10 cm m1
M.034 Pasang plint keramik artistik 5 x 20 cm m1
M.035 Pasang internal cove artistik (5 x 5 x 20) cm m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
M.042 Pasang lantai keramik ukuran 30 x 30 cm putih m2
M.043 Pasang lantai keramik ukuran 30 x 30 cm warna/motif m2
M.044 Pasang lantai keramik ukuran 40 x 40 cm putih m2
M.045 Pasang lantai keramik ukuran 40 x 40 cm warna/motif m2
M.046 Pasang lantai marmer ukuran (100x100)cm m2
M.047 Pasang plint ubin keramik lantai ukuran 10 x 20 cm m1
M.048 Pasang plint ubin keramik lantai ukuran 10 x 30 cm m1
M.049 Pasang plint ubin keramik lantai ukuran 10 x 40 cm m1
M.050 Pasang dinding porselin ukuran 15 x 15 cm, putih m2
M.051 Pasang dinding porselin ukuran 11 x 11 cm, putih m2
M.052 Pasang dinding porselin ukuran 11 x 11 cm, warna m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
M.053 Pasang dinding porselin ukuran 15 x 15 cm, warna m2
M.054 Pasang dinding porselin ukuran 10 x 20 cm, warna m2
M.055 Pasang dinding porselin ukuran 20 x 20 cm, warna m2
M.056 Pasang dinding keramik ukuran 20 x 20 cm m2
M.057 Pasang dinding keramik ukuran 20 x 25 cm m2
M.058 Pasang dinding batu tempel hitam m2
M.059 Pasang lantai vinyl ukuran (30x30) cm Klas I m2
M.060 Pasang wallpaper m2
M.061 Pasang dinding batu palimanan m2
M.062 Pasang dinding batu granito m2
M.063 Pasang dinding marmer ukuran (100x100)cm m2
M.064 Pasang dinding batu teraso m2
M.065 Pasang paving stone (blok) segi empat biasa m2
M.066 Pasang paving stone (blok) segi empat warna m2
M.067 Pasang paving stone (blok) segi enam biasa m2
M.068 Pasang paving stone (blok) segi enam warna m2
M.069 Pasang paving stone (blok) tiga berlian berlian biasa m2
M.070 Pasang paving stone (blok) tiga berlian berlian warna m2
M.071 Pasang Batu Ampyangan Granit m2
M.072 Pasang lantai keramik 5 x 30 cm m2
M.073 Pasang lantai keramik 5 x 40 cm m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
N.021 Pengecatan plafon (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2
N.022 Pengecatan permukaan baja dengan meni besi m2
N.023 Pengecatan permukaan baja m2
N.024 Pengecatan permukaan baja dengan meni besi dan perancah m2
N.025 Pengecatan permukaan baja lapis seng (galbani) secara manual, 1 lapis m2
N.026 Pengecatan permukaan baja lapis seng (galbani) secara manual, 3 lapis m2
N.027 Pengecatan permukaan baja lapis seng (galbani) secara semprot, 1 lapis m2
N.028 Pekerjaan Waterproofing m2
N.029 Pengecatan Kerb m2
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
XVI. PEKERJAAN INSTALASI LISTRIK
P.001 Pemasangan Stop Kontak Titik
P.002 Pemasangan Saklar Tunggal Titik
P.003 Pemasangan Saklar Ganda Titik
P.004 Pemasangan titik lampu pijar 5 - 40 watt Titik
P.005 Pemasangan titik lampu pijar 50 - 100 watt Titik
P.006 Pemasangan titik lampu TL 20 Watt Titik
P.007 Pemasangan titik lampu TL 40 Watt Titik
P.008 Pemasangan titik lampu XL 5 Watt Titik
P.009 Pemasangan titik lampu XL 8 Watt Titik
P.010 Pemasangan titik lampu XL 14 Watt Titik
P.011 Pemasangan titik lampu XL 18 Watt Titik
P.012 Pemasangan titik lampu XL 23 Watt Titik
P.013 Pemasangan Sekering 1 Group Unit
P.014 Pemasangan Sekering 2 Group Unit
P.015 Pemasangan Sekering 3 Group Unit
P.016 Pemasangan Penangkal Petir Unit
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
Q.027 Pengadaan dan pemasangan pipa sounding SWL PVC-AW Ø 1" m1
Q.028 Pengisian gravel pack Ø 5 mm - 10 mm m3
Q.029 Beton Mortar 1 pc : 1 ps m3
Q.030 Pencucian sumur bor, kedalaman < 200 m Titik
Q.031 Pencucian sumur bor, kedalaman > 200 m Titik
Q.032 Pumping test dan test nonstop 24 jam Jam
Q.033 Pasang pipa PVC Moof 6 m S-12.5 Ø 2" m1
Q.034 Pasang pipa PVC Moof 6 m S-12.5 Ø 2,5" m1
Q.035 Pasang pipa PVC Moof 6 m S-12.5 Ø 3" m1
Q.036 Pasang pipa PVC Moof 6 m S-12.5 Ø 4" m1
Q.037 Pasang pipa PVC Moof 6 m S-12.5 Ø 6" m1
Q.038 Pasang pipa PVC Moof 6 m S-12.5 Ø 8" m1
Q.039 Pasang pipa Moof S-12.5 Ø 2" lintas jalan m1
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
Q.040 Pasang pipa Moof S-12.5 Ø 3" lintas jalan m1
Q.041 Pasang pipa Moof S-12.5 Ø 4" lintas jalan m1
Q.042 Pasang pompa air Unit
Q.043 Pasang tandon air PVC V = 0.5 m3 Unit
Q.044 Pasang tandon air PVC V = 1.0 m3 Unit
Q.045 Pasang tandon air stainless V = 0.5 m3 Unit
Q.046 Pasang tandon air stainless V = 1.0 m3 Unit
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
R.037 Pintu Kayu Rangka Besi Ukuran Lebar 1,2 m dan tinggi 1,4 m, Ulir Double bh
R.038 Pintu Kayu Rangka Besi Ukuran Lebar 1 m dan tinggi 2 m, Ulir Double bh
R.039 Pintu Kayu Rangka Besi Ukuran Lebar 1,4 m dan tinggi 2,5 m, Ulir Double bh
R.040 Pintu Kayu Rangka Besi Ukuran Lebar 1,6 m dan tinggi 2,5 m, Ulir Double bh
R.041 Pintu Kayu Rangka Besi Ukuran Lebar 1,8 m dan tinggi 2,5 m, Ulir Double bh
R.042 Pintu Kayu Rangka Besi Ukuran Lebar 2 m dan tinggi 2,5 m, Ulir Double bh
R.043 Pintu Air Elektromekanikal Ukuran Lebar 2 m dan tinggi 2,5 m, Ulir Doub bh
R.044 Pintu Air Elektromekanikal Ukuran Lebar 2,5 m dan tinggi 3,5 m, Ulir Do bh
R.045 Pintu Air Elektromekanikal Ukuran Lebar 3 m dan tinggi 3,5 m, Ulir Doub bh
R.046 Pintu Air Elektromekanikal Ukuran Lebar 3,5 m dan tinggi 4,5 m, Ulir Do bh
R.047 Ruang Kontrol Pintu Air bh
R.048 Kistdam Pasir/Tanah dibungkus karung plastik Bagor (sebesar karung ber bh
R.049 Kerangka kayu untuk Kistdam pasir/tanah ukuran 23 x 65 cm m3
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
R.050 Kerangka baja profil L.40.40.4 atau profil Union berlubang untuk kistdam m3
R.051 Pompa air diesel daya 5 kW dengan suction head max 3 m dan discharge bh/hari
R.052 Pompa air diesel daya 10 kW dengan suction head max 3 m dan discharg bh/hari
R.053 Pompa air diesel daya 20 kW dengan suction head max 3 m dan discharg bh/hari
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
S.040 Pasang Flange Gate Valve Ø 2" bh
S.041 Pasang Flange Gate Valve Ø 3" bh
S.042 Pasang Flange Gate Valve Ø 4" bh
S.043 Pasang Bend All Flange GI Ø 2" x 90 bh
S.044 Pasang Bend All Flange GI Ø 2" x 45 bh
S.045 Pasang Bend All Flange GI Ø 3" x 90 bh
S.046 Pasang Bend All Flange GI Ø 3" x 45 bh
S.047 Pasang Bend All Flange GI Ø 4" x 90 bh
S.048 Pasang Bend All Flange GI Ø 4" x 45 bh
S.049 Pasang Flange Socket Ø 2" Unit
S.050 Pasang Flange Socket Ø 3" m1
S.051 Pasang Flange Socket Ø 4" m1
S.052 Pasang Flange Spigot Ø 2" bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
S.053 Pasang Flange Spigot Ø 3" bh
S.054 Pasang Flange Spigot Ø 4" bh
S.055 Pasang Straatport Ø 2" Ls
S.056 Pasang Straatport Ø 3" m1
S.057 Pasang Straatport Ø 4" bh
S.058 Pasang Straatport Ø 6" bh
S.059 Pasang Dop PVC Ø 2" bh
S.060 Pasang Dop PVC Ø 3" bh
S.061 Pasang Dop PVC Ø 4" bh
S.062 Pasang Reducer PVC Moof 3" x 2" bh
S.063 Pasang Reducer PVC Moof 4" x 3" bh
S.064 Pasang Flange Check Valve Ø 2" bh
S.065 Pasang Flange Check Valve Ø 3" bh
S.066 Pasang Flange Air Valve Ø 1" bh
S.067 Pasang Flange Air Valve Ø 2" bh
S.068 Pasang Flange Water Meter Ø 2" bh
S.069 Pasang Flange Water Meter Ø 3" bh
S.070 Pasang Manometer 10 bar bh
S.071 Pasang Watermeter Ø 1/2" bh
S.072 Pasang Stopkran Ø 1/2" bh
S.073 Pasang Box Meter (plat tebal 1 mm) bh
S.074 Pasang Clamp Saddle Ø 2" x 1/2" bh
S.075 Pasang Knee GI Ø 1/2" bh
S.076 Pasang Tee GI Ø 1/2" bh
S.077 Pasang Double Neple Ø 1/2" bh
S.078 Pasang Kran Ø 1/2" bh
S.079 Pasang Double Neple GI Ø 2" bh
S.080 Pasang Double Neple GI Ø 3" bh
S.081 Pasang Double Neple GI Ø 4" bh
S.082 Pasang Flange Las Ø 2" bh
S.083 Pasang Flange Las Ø 3" bh
S.084 Pasang Flange Las Ø 4" bh
S.085 Pasang Flange Drat Ø 2" bh
S.086 Pasang Flange Drat Ø 3" bh
S.087 Pasang Flange Drat Ø 4" bh
S.088 Pasang Flange Buta Ø 2" bh
S.089 Pasang Flange Buta Ø 3" bh
S.090 Pasang Flange Buta Ø 4" bh
S.091 Pasang Sock Drat GI Ø 2" bh
S.092 Pasang Sock Drat GI Ø 3" bh
S.093 Pasang Sock Drat GI Ø 4" bh
S.094 Pasang Kenie Drat GI Ø 2" bh
S.095 Pasang Kenie Drat GI Ø 3" bh
S.096 Pasang Kenie Drat GI Ø 4" bh
S.097 Pasang Elbow Drat GI Ø 2" bh
S.098 Pasang Elbow Drat GI Ø 3" bh
S.099 Pasang Elbow Drat GI Ø 4" bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
S.100 Pasang Giboult Joint Ø 2" bh
S.101 Pasang Giboult Joint Ø 3" bh
S.102 Pasang Giboult Joint Ø 4" bh
S.103 Uji Coba Instalasi Pipa bh
S.104 Pasang Kabel Pompa NYYHY 3 x 6 mm bh
S.105 Pasang Kabel Pompa NYYHY 3 x 4 mm bh
S.106 Pasang Kabel Elektrode NYYHY 3 x 1.5 mm bh
S.107 Pasang Panel Pompa bh
S.108 Pasang Junction Box bh
S.109 Pasang Elektrode Pompa bh
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
T.01 Pembersihan dan striping/kosrekan m2
T.02 Tebas/tebang berupa memotong dan membersihkan lokasi dari tanaman m2
T.03 Cabut tunggul tanaman keras min. Dia. 15 cm dgn membuang sisa tungul per pohon
T.04 Uitset trase saluran pembawa dan pembuang m1
T.05 Pasang profil melintang galian tanah jarak 50 m pd ruas saluran yang lur m1
T.06 Pasang profil melintang galian tanah jarak 25 m pd ruas saluran tikungan m1
T.07a Galian tanah biasa pada saluran sedalam ≤ 1 m dan membuang hasil galian ke tempat
pembuangan dengan jarak angkut ≤ 3 m termasuk perataan dan perapih m3
T.07b Galian tanah biasa pada saluran sedalam > 1 m dan sampai dengan 2 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m3
T.07c Mengangkut hasil galian ketempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.07d Mengangkut hasil galian ketempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.07e Mengangkut hasil galian ketempat pembuangan dengan jarak angkut setiap 100 m
termasuk perataan dan perapihan m3
T.08a Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
perataan dan perapihan m3
T.08b Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam > 1 m
sampai dengan 2 m dan membuang hasil galian ke tempat pembuangan dengan
jarak angkut ≤ 3 m termasuk perataan dan perapihan m3
T.08c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.08d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.08e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m
termasuk perataan dan perapihan m3
T.09a Galian tanah berbatu pada saluran sedalam ≤ 1 m dan membuang hasil galian ke
tempat pembuangan dengan jarak angkut ≤ 3 m termasuk perataan dan m3
T.09b Galian tanah berbatu pada saluran sedalam > 1 m sampai dengan 2 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m
termasuk perataan dan perapihan m3
T.09c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.09d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.09e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap
100 m termasuk perataan dan perapihan m3
T.10a Galian tanah lumpur pada saluran sedalam ≤ 1 m dan membuang hasil galian ke
tempat pembuangan dengan jarak angkut ≤ 3 m termasuk perataan dan m3
T.10b Galian tanah lumpur pada saluran sedalam > 1 m sampai dengan 2 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m
termasuk perataan dan perapihan m3
T.10c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.10d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.10e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap
100 m termasuk perataan dan perapihan m3
T.11a Galian tanah cadas dengan bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
membuang hasil galian ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
perataan dan perapihan m3
T.11b Galian tanah keras dengan bantuan alat pemecah pada saluran sedalam > 1 m
sampai dengan 2 m dan membuang hasil galian ke tempat pembuangan dengan
jarak angkut ≤ 3 m termasuk perataan dan perapihan m3
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
T.11c Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 3 m
sampai ≤ 10 m termasuk perataan dan perapihan m3
T.11d Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut > 10 m
sampai ≤ 50 m termasuk perataan dan perapihan m3
T.11e Mengangkut hasil galian ke tempat pembuangan dengan jarak angkut setiap 100 m
termasuk perataan dan perapihan m3
T.12 Galian pasir untuk pondasi bangunan sedalam ≤ 1 m dan membuang hasil galian
ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk perataan d m3
T.14a Timbunan tanah dengan bahan tanah telah tersedia di lokasi rencana timbunan
termasuk perataan dan perapian m3
T.14b Pemadatan tanah m3
T.14c Timbunan pasir sebagai bahan pengisi m3
T.14d Pemadatan pasir sebagai bahan pengisi m3
T.15 Timbunan tanah menggunakan buldoser m3
T.16 Galian tanah menggunakan exavator m3
T.17 Biaya operasional dump truck (mengangkut material tanah, jarak angkut -
T.18 Biaya operasional vibro roller -
T.19 Bor Crossing Jalan Ø 2" m'
T.20 Bor Crossing Jalan Ø 3" m'
T.21 Bor Crossing Jalan Ø 4" m'
T.22 Bor Crossing Jalan Ø 6" m'
T.23 Bor Crossing Jalan Ø 8" m'
T.24 Pengadaan dan Pemasangan Tiang Okt. Galv. H7 Cab 1 Unit
T.25 Pengadaan dan Pemasangan Tiang Okt. Galv. H7 Cab 2 Unit
T.26 Pengadaan dan Pemasangan Tiang Okt. Galv. H9 Cab 1 Unit
T.27 Pengadaan dan Pemasangan Tiang Okt. Galv. H9 Cab 2 Unit
T.28 Pengadaan dan Pemasangan Tiang Ornament P 3 m Unit
T.29 Pengadaan dan Pemasangan Tiang Ornament P 6 m Unit
T.30 Pengadaan dan Pemasangan Lampu PJU Spark Led SPL 48 55 Watt m'
T.31 Pengadaan dan Penarikan Kabel Udara Twisted 3x25 + 25 mm2 m'
T.32 Pengadaan dan Penarikan Kabel Tanah NYM 4 x 6mm2 m'
Rekap Analisa
KODE
ANALIS JENIS PEKERJAAN SATUAN
A
1 2 3
Malang,
KEPALA DINAS KEBERSIHAN DAN PERTAMANAN
KOTA MALANG
Rekap Analisa
ANALISA HARGA SATUAN PEKERJAAN (RAHSP)
AS KEBERSIHAN DAN PERTAMANAN
TAHUN ANGGARAN 2014
HARGA
SATUAN
(Rp.)
4
545,337.38
670,129.88
###
63,000.75
143,972.40
###
###
###
8,625.00
###
405,987.75
98,514.75
643,912.50
372,495.00
352,245.00
61,125.00
11,175.00
15,473.63
41,062.50
50,287.50
59,647.50
54,660.00
82,800.00
66,037.50
2,962.50
18,000.00
16,762.50
29,625.00
147,465.00
186,702.90
163,756.50
121,387.50
196,702.50
123,352.50
128,815.31
103,628.62
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
257,861.17
49,553.00
34,117.21
964,265.81
872,911.31
809,612.51
765,094.61
704,114.51
455,024.81
606,555.41
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
562,701.71
318,137.96
###
942,904.20
###
###
###
945,344.63
46,451.66
44,014.46
49,209.26
46,101.86
43,019.96
65,752.01
60,203.51
56,620.01
381,869.10
345,282.75
320,924.55
305,067.15
296,056.35
291,247.35
262,994.25
165,038.78
153,822.38
147,197.78
143,019.38
140,476.58
136,066.88
130,989.38
116,261.78
117,647.78
207,483.20
193,047.92
170,067.75
159,230.91
131,698.70
124,527.32
424,778.48
417,822.38
222,860.66
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
70,745.06
58,206.26
52,657.76
48,972.26
46,742.06
44,169.86
44,022.26
43,029.56
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
46,411.65
40,995.75
32,879.70
33,804.00
77,820.45
62,464.95
65,431.35
62,534.85
60,154.95
46,595.78
32,663.06
37,409.40
529,211.81
391,961.81
36,330.68
46,451.66
8,925.00
16,944.38
###
###
###
###
840,972.94
663,600.94
639,072.94
464,148.94
###
862,518.75
837,990.75
663,066.75
678,095.70
571,672.50
556,955.70
452,001.30
###
###
###
883,910.55
866,218.50
755,361.00
740,031.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
630,703.50
###
###
###
756,964.50
796,399.13
685,541.63
670,211.63
560,884.13
###
909,003.19
893,673.19
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
784,345.69
932,635.69
841,360.69
732,033.19
###
###
###
###
###
###
###
###
###
364,403.06
258,768.47
244,925.42
174,677.90
148,522.40
364,403.06
258,768.47
244,925.42
174,677.90
148,522.40
393,725.33
278,755.35
264,209.63
187,891.43
159,515.18
289,129.73
208,641.49
195,639.08
141,466.28
121,109.40
290,338.94
215,216.58
203,081.00
152,519.72
133,519.97
210,988.86
172,334.85
169,045.44
112,376.22
111,044.58
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
226,022.93
177,245.63
170,500.43
112,781.78
122,396.33
484,393.09
372,610.09
341,908.09
236,158.39
596,558.59
484,775.59
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
454,073.59
348,323.89
685,078.65
573,295.65
542,593.65
436,843.95
298,949.48
267,909.38
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
57,557.06
100,101.00
116,091.00
58,680.19
15,302.01
21,452.01
234.75
148.69
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
engangkut/menaikkan tulangan setiap kenaikan 4 m vertikal
148.69
41,191.22
40,360.50
344,280.38
195,981.38
380,367.00
214,024.69
542,816.06
301,668.00
555,030.19
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
307,775.06
678,716.06
369,618.00
569,374.69
314,947.31
470,470.31
265,495.13
151,588.99
###
###
###
###
###
###
###
89,856.75
111,684.53
110,529.53
###
22,350.00
33,525.00
44,700.00
44,971.88
44,700.00
193,125.00
86,481.00
315,405.00
780,987.20
787,720.61
285,393.75
465,825.00
186,356.25
557,625.00
404,025.00
516,656.25
322,905.00
809,112.20
815,845.61
324,768.75
484,575.00
254,568.75
557,625.00
329,025.00
516,656.25
348,405.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
812,862.20
819,595.61
330,018.75
492,075.00
258,318.75
602,250.00
467,775.00
589,781.25
349,905.00
814,737.20
821,470.61
332,643.75
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
495,825.00
260,193.75
604,875.00
471,525.00
604,406.25
252,148.88
189,033.38
281,496.38
205,803.38
521,610.94
368,008.31
###
206,307.75
###
223,077.75
676,451.25
432,167.25
416,741.25
299,741.25
985,000.88
189,033.38
###
205,803.38
920,735.25
554,309.25
416,741.25
299,741.25
985,000.88
585,994.88
###
602,764.88
###
343,579.91
914,410.88
585,994.88
916,507.13
602,764.88
###
343,579.91
985,000.88
585,994.88
###
602,764.88
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
948,182.81
51,327.75
53,202.75
141,327.75
101,952.75
128,202.75
76,390.35
84,265.35
92,140.35
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
95,140.35
105,265.35
85,077.75
146,952.75
79,178.63
75,195.38
126,794.06
147,466.88
243,705.94
88,765.35
108,265.35
101,665.35
122,927.85
173,272.61
160,484.06
97,247.74
48,066.56
50,880.56
48,772.31
48,695.81
46,337.81
81,164.25
83,556.75
75,621.56
67,724.06
105,100.31
55,156.31
58,837.31
60,485.81
155,334.94
145,997.44
143,679.94
78,384.94
77,934.94
82,614.94
84,684.94
70,659.94
81,940.13
44,862.00
188,534.25
218,187.38
52,002.19
118,985.06
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
295,246.31
102,040.50
224,397.38
39,122.06
32,769.56
29,964.56
28,974.56
411,662.25
224,116.88
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
79,486.88
587,776.88
689,566.88
188,724.38
240,924.38
318,076.88
127,524.38
478,819.05
385,519.65
72,501.00
311,956.88
251,839.80
193,302.90
183,846.60
144,448.20
129,643.20
489,735.45
377,539.73
359,415.15
283,901.55
255,525.30
629,475.45
517,279.73
499,155.15
423,641.55
395,265.30
870,977.36
739,269.34
717,992.66
629,346.26
717,992.66
47,180.89
37,132.88
43,151.63
364,145.63
305,833.50
26,112.94
36,218.44
292,469.25
480,944.25
876,944.25
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
###
###
739,797.53
###
48,751.88
363,226.13
738,902.04
###
###
###
234,250.16
310,893.75
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
102,487.16
209,500.04
261,975.95
360,074.36
399,762.77
572,942.09
630,450.50
743,728.91
97,702.16
263,894.36
343,502.06
531,824.81
801,032.93
92,388.94
116,324.44
154,353.94
230,461.88
319,521.38
438,834.38
467,143.88
634,325.34
24,656.63
33,647.63
42,152.63
54,424.13
64,140.19
87,832.69
124,766.16
186,852.66
322,139.68
432,054.08
14,086.13
18,338.63
21,983.63
30,610.13
34,737.19
52,476.19
76,287.66
90,017.16
12,385.13
15,301.13
18,217.13
22,226.63
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
33,886.69
40,569.19
51,015.66
60,857.16
393,969.38
380,765.63
60,517.50
66,367.50
83,701.88
39,001.88
278,637.19
133,588.20
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
195,674.70
309,569.81
491,977.31
583,794.81
776,619.81
###
849,569.81
###
###
###
###
546,644.81
273,029.95
198,779.95
810,994.81
397,904.95
296,654.95
670,269.81
462,029.95
343,904.95
793,494.81
859,269.81
###
###
###
904,154.95
###
###
###
###
32,667.56
32,667.56
39,738.75
18,305.06
32,667.56
###
4,771.12
###
###
442,410.00
###
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
148,327.93
910,730.72
684,738.94
700,615.31
302,152.61
125,264.59
429,626.25
474,105.47
243,688.69
256,446.19
243,688.69
256,446.19
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
71,460.00
81,791.25
80,451.38
417,813.81
296,388.81
698,676.86
545,044.37
770,230.63
368,566.10
330,618.01
120,219.05
767,257.31
812,570.56
895,169.33
44,821.28
###
###
161,388.75
170,026.88
142,275.94
213,224.06
180,746.25
33,932.81
53,434.69
37,798.13
38,209.69
22,798.13
49,278.75
40,684.69
25,123.13
248,990.63
188,840.63
52,348.13
208,488.75
119,329.69
174,769.69
326,239.69
467,397.19
177,872.81
258,227.81
289,421.34
454,833.84
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
278,637.19
353,052.19
478,123.97
172,294.69
246,957.19
493,963.97
89,548.97
814,474.69
###
43,594.69
726,942.19
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
80,235.47
90,018.19
103,497.38
108,364.69
117,008.44
139,635.38
114,828.94
128,581.69
423,621.19
413,461.69
411,687.19
592,401.94
302,940.75
505,157.44
846,123.19
35,723.14
29,662.84
26,695.09
28,776.34
28,235.59
28,180.09
34,854.34
36,130.09
58,390.09
54,445.84
42,144.98
707,780.81
###
###
722,705.59
###
127,641.34
240,171.34
125,632.09
244,113.71
400,832.81
382,011.56
162,171.00
194,891.81
198,866.81
196,879.31
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
194,162.81
214,638.56
225,398.51
246,188.51
614,318.81
71,991.34
96,970.84
110,312.59
199,675.28
235,975.28
261,775.28
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
199,675.28
221,855.59
211,736.59
239,561.59
238,505.59
207,928.31
###
215,043.19
204,542.06
131,225.81
664,238.44
106,025.81
114,693.94
124,818.94
127,443.94
131,643.94
115,818.94
120,768.94
193,795.22
238,115.59
256,865.59
9,435.00
10,500.00
10,500.00
10,500.00
873,900.00
9,200.25
37,685.53
49,624.88
63,437.25
13,505.81
66,430.50
19,016.25
33,266.25
32,629.81
39,129.81
34,332.31
27,102.79
5,712.79
21,210.84
17,811.17
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
37,920.81
20,652.00
25,107.00
55,597.44
31,952.25
137,330.25
114,397.50
70,559.31
28,332.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
167,053.13
133,378.13
168,328.13
190,973.44
205,298.44
231,623.44
307,598.44
205,673.44
206,273.44
211,073.44
214,148.44
221,648.44
163,831.13
268,222.41
377,940.47
###
###
###
424,701.42
530,876.77
637,052.13
796,315.16
###
###
###
###
19,072.85
###
353,917.85
424,701.42
530,876.77
707,835.69
910,074.46
###
###
406,950.00
406,950.00
418,950.00
383,700.00
383,700.00
360,825.00
65,250.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
39,000.00
596,205.00
###
###
###
534,242.34
57,913.31
77,194.69
114,816.66
161,796.66
340,182.43
83,583.64
#REF!
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
#REF!
#REF!
947,333.25
885,916.50
###
###
###
684,741.45
998,669.70
129,621.83
77,205.00
162,589.69
52,612.50
61,680.00
94,140.00
93,952.50
85,425.90
93,120.90
39,795.00
15,442.50
39,742.50
136,462.50
122,730.00
862,164.75
45,735.23
47,070.26
###
###
###
467,552.81
21,452.01
14,364.51
756,243.09
###
###
###
###
###
###
538,709.96
701,959.80
###
###
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
###
###
###
###
###
###
###
###
###
###
###
30,541.50
483,750.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
805,162.50
629,115.00
905,295.00
###
32,137.50
28,987.50
36,487.50
251,925.00
259,912.88
28,350.00
###
19,387.50
82.89
531.75
276.00
126.75
321.94
460,965.00
87,037.50
22,247.81
175,620.38
14,047.26
264,320.25
###
###
268,503.84
350,741.34
310,005.09
407,283.84
448,342.59
595,758.84
76,434.19
71,934.19
123,234.19
111,684.19
172,734.19
152,934.19
66,623.06
99,698.06
115,448.06
146,948.06
168,998.06
178,448.06
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
655,559.44
###
###
205,126.88
193,876.88
309,001.88
248,626.88
352,426.88
309,076.88
137,928.28
180,828.28
240,228.28
124,728.28
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
167,628.28
207,228.28
68,517.42
81,417.42
113,367.42
153,867.42
17,044.59
25,294.59
40,669.59
77,271.00
111,921.00
814,859.44
###
348,487.03
###
###
###
172,559.44
122,842.50
30,967.50
84,569.06
22,319.06
6,204.84
7,254.84
5,754.84
23,092.50
42,226.88
102,190.31
131,703.75
60,040.31
65,290.31
81,340.31
72,105.94
78,734.06
106,052.81
73,484.06
112,859.06
134,421.56
27,348.91
60,159.08
166,938.18
37,925.69
92,227.63
119,020.84
42,223.82
98,089.44
123,570.69
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
108,058.13
136,933.13
234,901.88
###
47,750.91
18,875.91
12,244.59
###
386,920.31
24,884.06
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
1,856.25
2,962.50
2,636.25
1,081.08
136,228.01
272,446.38
saluran sedalam ≤ 1 m dan membuang hasil galian ke tempat
37,173.75
44,583.75
13,560.00
39,420.00
ketempat pembuangan dengan jarak angkut setiap 100 m
69,675.00
an bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
63,975.00
68,478.75
18,000.00
18,000.00
ke tempat pembuangan dengan jarak angkut setiap 100 m
69,675.00
da saluran sedalam ≤ 1 m dan membuang hasil galian ke
89,163.75
89,163.75
18,000.00
30,465.00
69,675.00
58,706.25
76,331.25
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
18,000.00
30,465.00
69,675.00
an bantuan alat pemecah pada saluran sedalam ≤ 1 m dan
ke tempat pembuangan dengan jarak angkut ≤ 3 m termasuk
102,472.50
106,800.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
18,000.00
30,465.00
ke tempat pembuangan dengan jarak angkut setiap 100 m
69,675.00
si bangunan sedalam ≤ 1 m dan membuang hasil galian
46,518.75
32,609.10
44,099.10
305,760.00
35,998.20
###
###
###
###
159,853.13
205,003.13
277,031.25
415,546.88
554,062.50
###
###
###
###
483,444.02
646,569.02
###
166,612.00
85,748.51
22,875.00
38,862.00
53,674.50
27,937.50
13,425.00
13,800.00
13,425.00
Rekap Analisa
HARGA
SATUAN
(Rp.)
4
Malang,
KEPALA DINAS KEBERSIHAN DAN PERTAMANAN
Rekap Analisa
INFORMASI UMUM
No. URAIAN INFORMASI
7. Lebar jalan lama ( bahu + perkerasan + bahu ) ( 0.50 + 4.50 + 0.50 ) meter
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 9.73 Kilometer
7.45 Km = a C 7.45 Km = b
A B
6.0 Km = c
Base Camp --------->
D
20 ....................................
21 ....................................
22 ....................................
DAFTAR UPAH
TAHUN ANGGARAN 2015
DAFTAR UPAH
DAFTAR PERALATAN
TAHUN ANGGARAN 2015
DAFTAR ALAT
KODE URAIAN SATUAN HARGA KETERANGAN
DAFTAR ALAT
DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2015
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
-
III. SEMEN -
1 M037 Portland Cement (PC) kg 2,550.00
2 M037.a Portland Cement (PC) Tahan Api kg 7,050.00
3 M038 Portland Cement (PC) Putih kg 2,025.00
4 M039 Portland Cement (PC) Warna kg 17,400.00
5 M040 Portland Cement (PC) Grouting kg 17,400.00
6 M041 Kapur m3 1,500.00
7 M042 Gamping kg 4,050.00
8 M043 Semen Merah m3 230,250.00
-
V. BUIS BETON -
1 M044 Buis Beton Ø 0.20 m m1 45,525.00
2 M045 Buis Beton Ø 0.30 m m1 60,825.00
3 M046 Buis Beton Ø 0.40 m m1 77,175.00
4 M046.a RCP Ø 400 mm, Type RJ, Cls-2 AS m1 223,575.00
5 M047 Buis Beton Ø 0.50 m m1 96,300.00
6 M047.a RCP Ø 500 mm, Type RJ, Cls-2 AS m1 369,075.00
7 M048 Buis Beton Ø 0.60 m m1 139,725.00
8 M048.a RCP Ø 600 mm, Type RJ, Cls-2 AS m1 482,175.00
9 M049 Buis Beton Ø 0.80 m m1 234,450.00
10 M049.a RCP Ø 800 mm, Type RJ, Cls-2 AS m1 675,000.00
11 M050 Buis Beton Ø 0.90 m m1 255,375.00
12 M051 Buis Beton Ø 1.00 m m1 327,000.00
13 M051.a RCP Ø 1050 mm, Type RJ, Cls-2 AS m1 1,265,625.00
14 M052 Buis Beton U Ø 0.20 m m1 40,650.00
10 M053 Buis Beton U Ø 0.30 m m1 51,450.00
11 M053.a Box Culvert monolit 400 x 400 mm m1 763,575.00
12 M053.b Box Culvert monolit 500 x 500 mm m1 953,400.00
13 M053.c Box Culvert monolit 600 x 600 mm m1 1,198,125.00
14 M053.d Box Culvert monolit 800 x 800 mm m1 1,974,375.00
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
Kayu Kamper -
25 M078 Reng : 2/3, 3/5 m3 11,103,825.00
26 M079 Usuk : 5/7 m3 11,412,075.00
27 M080 Balok m3 11,720,550.00
28 M081 Papan (2x20) cm m3 13,571,100.00
29 M082 Papan (3x20) cm m3 13,879,500.00
30 M083 Papan (3x30) cm m3 14,188,125.00
Kayu Lain-lain -
31 M084 Balok Kayu Kelas III m3 4,071,375.00
32 M085 Papan Kayu kelas III m3 7,217,325.00
35 M088 Bambu Ø 10 cm btg 29,400.00
36 M089 Dolken Kayu Ø 8 cm btg 33,975.00
37 M090 List Kayu Profil m1 18,525.00
38 M091 List Kayu 2/4 m3 4,318,125.00
39 M092 Gedeg (2.00 x 3.00) m lbr 56,175.00
40 M093 Bilik Bambu m2 116,475.00
Kayu Jati Ex. Malang -
41 M094 Reng : 2/3, 3/5 m3 16,290,150.00
42 M095 Usuk : 5/7 m3 16,290,150.00
43 M096 Balok m3 15,712,800.00
44 M097 Papan (2x20) cm m3 17,458,575.00
45 M098 Papan (3x20) cm m3 17,458,575.00
46 M099 Papan (3x30) cm m3 18,622,425.00
Kayu Jati Ex. Madiun/Ngawi -
47 M100 Reng : 2/3, 3/5 m3 23,278,125.00
48 M101 Usuk : 5/7 m3 32,589,300.00
49 M102 Balok m3 29,097,675.00
50 M103 Papan (2x20) cm m3 19,241,100.00
51 M104 Papan (3x20) cm m3 19,241,100.00
52 M105 Papan (3x30) cm m3 19,241,100.00
Kayu Jati Ex. Bojonegoro -
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
DAFTAR BAHAN
NO. KODE BAHAN BANGUNAN SATUAN HARGA
Malang,
KEPALA DINAS KEBERSIHAN DA
KOTA MALANG
......................................
DAFTAR BAHAN
HARGA BAHAN BANGUNAN
UN ANGGARAN 2015
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
2200 watt
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
DAFTAR BAHAN
KET.
......................................
DAFTAR BAHAN
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
1 Sewa Dump Truk (Dump E38
Tr hari 0.0133 2,366,475.00 31,553.00
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
1 Seng plat BJLS 28 (90 x 180) cmM177 lbr 0.4000 81,975.00 32,790.00
2 Paku Kayu Segala Ukuran M140 kg 0.1100 25,200.00 2,772.00
3 Papan (3x30) cm M065 m3 0.0040 ### 36,807.30
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A.
A. TENAGA
A.
A.
A.
A.
A.
A.
A.
A.
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Pipa Galvanis Ø 1/2 ", tebal 1.8 M376 m1 1.2000 50,175.00 60,210.00
2 Perlengkapan 0.3500 60,210.00 21,073.50
C PERALATAN
A. TENAGA
B BAHAN
1 Pipa Galvanis Ø 3/4 ", tebal 1.8 M377 m1 1.2000 64,950.00 77,940.00
2 Perlengkapan 0.3500 77,940.00 27,279.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Pipa Galvanis Ø 2.5 ", tebal 2.5 M381 m1 1.2000 259,200.00 311,040.00
2 Perlengkapan 0.3500 311,040.00 108,864.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 RCP Ø 400 mm, Type RJ, Cls-2 ASM046.a m1 1.000 223,575.00 223,575.000
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 RCP Ø 600 mm, Type RJ, Cls-2 ASM048.a m1 1.000 482,175.00 482,175.000
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
Tutup Box U Beton Bertulang
1 ukuran 75 x 60 cm, tebal 12 cm M053.m m1 1.000 452,250.00 452,250.000
(Cover 75x60x12 Crossing)
JUMLAH HARGA BAHAN 452,250.00
C PERALATAN
A. TENAGA
B BAHAN
Tutup Box U Beton Bertulang
1 ukuran 75 x 60 cm, tebal 10 cm M053.n m1 1.000 334,125.00 334,125.000
(Cover 75x60x10)
JUMLAH HARGA BAHAN 334,125.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) per Luas 5.76 692,461.75
E JUMLAH HARGA per 1 m2 120,219.05
ANALISA PEK. BESI & ALUMINIUM
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) per Luas 0.936 718,152.84
E JUMLAH HARGA per 1 m2 767,257.31
A. TENAGA
B BAHAN
C PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) per (Luas 2.78 ###
E JUMLAH HARGA per (Luas 1 m2) 812,570.56
ANALISA PEK. BESI & ALUMINIUM
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C) per (Luas 2.78 ###
E JUMLAH HARGA per (Luas 1 m2) 895,169.33
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Tutup Avoor dari Cor Besi Tuang, M148.h Unit 1.0000 1,875,000.00 ###
C PERALATAN
A. TENAGA
B BAHAN
1 Tutup Bak Kontrol Cor Besi TuangM148.i Unit 1.0000 2,250,000.00 ###
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
1 Sewa Alat Geolistrik E06 hari 1.0000 ### 2,475,075.00
2 Transportasi Alat dan Personil Ls 1.0000 650,000.00 650,000.00
3 Biaya Pembuatan Laporan Ls 1.0000 260,000.00 260,000.00
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 22.95 23,925.00 549,078.75
- Besi kanal kg 905.80 23,925.00 ###
- Plat Bronz kg 24.64 23,925.00 589,512.00
- Besi plate kg 541.61 23,925.00 ###
- Besi plate strip kg 195.78 23,925.00 4,684,036.50
- Besi beton kg 57.92 12,525.00 725,448.00
- pipa kg 11,100.00 -
###
2,804,160.00
IV. PEMBONGKARAN kg
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 226.00 23,925.00 5,407,050.00
- Besi plate kg 50.00 23,925.00 1,196,250.00
- Besi plate strip kg 34.00 23,925.00 813,450.00
- Besi beton kg 12.00 12,525.00 150,300.00
- pipa kg 1.00 11,100.00 11,100.00
7,578,150.00
IV. PEMBONGKARAN kg
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 115.00 23,925.00 2,751,375.00
- Besi plate kg 39.00 23,925.00 933,075.00
- Besi plate strip kg 26.00 23,925.00 622,050.00
- Besi beton kg 6.00 12,525.00 75,150.00
- pipa kg 1.00 11,100.00 11,100.00
4,392,750.00
IV. PEMBONGKARAN kg
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 138.00 23,925.00 3,301,650.00
- Besi plate kg 21.00 23,925.00 502,425.00
- Besi plate strip kg 31.00 23,925.00 741,675.00
- Besi beton kg 9.00 12,525.00 112,725.00
- pipa kg 1.00 11,100.00 11,100.00
4,669,575.00
IV. PEMBONGKARAN kg
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 161.00 23,925.00 3,851,925.00
- Besi plate kg 62.00 23,925.00 1,483,350.00
- Besi plate strip kg 36.00 23,925.00 861,300.00
- Besi beton kg 12.00 12,525.00 150,300.00
- pipa kg 1.00 11,100.00 11,100.00
6,357,975.00
IV. PEMBONGKARAN kg
I. BAHAN
1 Bahan konstruksi
- Besi siku kg 161.00 23,925.00 3,851,925.00
- Besi plate kg 62.00 23,925.00 1,483,350.00
- Besi plate strip kg 36.00 23,925.00 861,300.00
- Besi beton kg 12.00 12,525.00 150,300.00
- pipa kg 1.00 11,100.00 11,100.00
6,357,975.00
IV. PEMBONGKARAN kg
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
1 Mimic Panel untuk 6 channel pintu air set 1.0000 ### 7,500,000.00
(termasuk pengkabelan sistem sensor)
2 Perlengkapan ruang jaga set 1.0000 ### 2,500,000.00
(meja kursi)
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Air Bersih M486 37.50 1.5000 37.50 56.25
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 2" x 2" M537 bh 1.0000 47,250.00 47,250.00
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 3" x 2" M538 bh 1.0000 80,325.00 80,325.00
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 3" x 3" M539 bh 1.0000 96,075.00 96,075.00
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 4" x 2" M540 bh 1.0000 127,575.00 127,575.00
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 4" x 3" M541 bh 1.0000 149,625.00 149,625.00
C PERALATAN
A. TENAGA
B BAHAN
1 Tee All Socket PVC Ø 4" x 4" M542 bh 1.0000 159,075.00 159,075.00
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 2.1250 63,750.00 135,468.75
2 Tukang Batu L07 Org/hr - 78,937.50 -
3 Kepala Tukang Batu L02 Org/hr - 78,937.50 -
4 Mandor L01 Org/hr 0.3613 67,500.00 24,384.38
JUMLAH HARGA TENAGA 159,853.13
B BAHAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 2.7750 63,750.00 176,906.25
2 Tukang Batu L07 Org/hr - 78,937.50 -
3 Kepala Tukang Batu L02 Org/hr - 78,937.50 -
4 Mandor L01 Org/hr 0.4163 67,500.00 28,096.88
JUMLAH HARGA TENAGA 205,003.13
B BAHAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 3.7500 63,750.00 239,062.50
2 Tukang Batu L07 Org/hr - 78,937.50 -
3 Kepala Tukang Batu L02 Org/hr - 78,937.50 -
4 Mandor L01 Org/hr 0.5625 67,500.00 37,968.75
JUMLAH HARGA TENAGA 277,031.25
B BAHAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 5.6250 63,750.00 358,593.75
2 Tukang Batu L07 Org/hr - 78,937.50 -
3 Kepala Tukang Batu L02 Org/hr - 78,937.50 -
4 Mandor L01 Org/hr 0.8438 67,500.00 56,953.13
JUMLAH HARGA TENAGA 415,546.88
B BAHAN
A. TENAGA
1 Pekerja Biasa L17 Org/hr 7.5000 63,750.00 478,125.00
2 Tukang Batu L07 Org/hr - 78,937.50 -
3 Kepala Tukang Batu L02 Org/hr - 78,937.50 -
4 Mandor L01 Org/hr 1.1250 67,500.00 75,937.50
JUMLAH HARGA TENAGA 554,062.50
B BAHAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
ANALISA UTILITAS
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
ANALISA UTILITAS
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
A. TENAGA
B BAHAN
C PERALATAN
ANALISA UTILITAS
ANALISA HARGA SATUAN
A. TENAGA
B BAHAN
C PERALATAN
ANALISA UTILITAS