1. Daftar Harga Satuan Bahan Material dan Alat Bantu Kerja
Harga Satuan Bahan
Jenis Bahan / Material/ Alat
No Satuan Hasil Survey Suplier Sumber Keterangan
Bantu kerja Langsiran Realisasi
Suplier A Suplier B Lainnya
1 Batu kali m3 240,000.00 250,000.00 240,000.00 ................
2 Pasir m3 270,000.00 275,000.00 270,000.00 ................
3 Portland cement (PC) zak 52,000.00 52,000.00 52,000.00 ................
4 Kerikil m3 290,000.00 295,000.00 290,000.00 ................
5 Triplek/Multiplek tebal 12 mm Lbr 145,000.00 155,000.00 145,000.00 ................
6 Kayu kaso m3 2,857,142.86 3,100,000.00 2,857,142.86 ................
7 Paku kg 18,000.00 18,000.00 18,000.00 ................
8 Minyak bekisting Liter 10,000.00 10,000.00 10,000.00 ................
9 Sewa molen hari 200,000.00 200,000.00 200,000.00 ................
10 Plastik m2 2,000.00 25,000.00 2,000.00
0.4 b. Begisting
4 X 0.10 X 0.40 X 680.00 = 108.80 m2
c. Galian Tanah
0.15
1 X 0.15 X 0.80 X 670.00 = 80.15 m3
m3
0.2 0.4 0.2 = 80.15 m3
d. Pembersihan Lahan
0.80 X 670.00 = 536.00 m2
e. Plastik Beton
1.10 X 680.00 = 748.00 m2
Secang, September 2020
Dibantu, Dibuat
Tenaga Pendamping Masyarakat TIM Perencana
Diusulkan
Ketua P3a Dharma Tirta
Agus Setyono
NIK : 330820220880002
PERHITUNGN VOLUME PERENCANAAN
P3A/GP3A/IP3A : Dharma Tirta
Nama Pekerjaan : Peningkatan Jaringan Irigasi Tersier D.I. Balong Kali
Desa, Kecamatan : Madusari, Secang
Kabupaten : Magelang
Propinsi : Jawa tengah
Tahun Anggaran : 2020
Dibantu, Dibuat
Tenaga Pendamping Masyarakat TIM Perencana
Diusulkan
Ketua P3a Dharma Tirta
Agus Setyono
NIK : 330820220880002
ANALISA HARGA SATUAN
Harga Satuan
No Uraian Satuan Koefisien Jumlah (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1. Pekerja OH 0.100 60,000.00 6,000.00
2. Mandor OH 0.050 - -
Jumlah Harga Tenaga Kerja 6,000.00
B Bahan
Jumlah Harga Bahan -
C Peralatan
1. Dandang/linggis - -
Jumlah Harga Peralatan -
Jumlah Harga Satuan Pekerjaan 6,000.00
Jumlah Harga Satuan Pekerjaan dibulatkan 6,000.00
Ket : *) AHSP-SDA, berdasarkan Permen PUPERA No : 28/PRT/M/2016
Secang, 10 September 2020
Dibantu, Dibuat
Tenaga Pendamping Masyarakat TIM Perencana
Diusulkan
Ketua P3A Dharma Tirta
Agus Setyono
ANALISA HARGA SATUAN
1 2 3 4 5 6
A Tenaga Kerja
1. Pekerja OH 0.750 60,000.00 45,000.00
2. Mandor OH 0.025 - -
Jumlah Harga Tenaga Kerja 45,000.00
B Bahan
Jumlah Harga Bahan -
C Peralatan
- -
Jumlah Harga Peralatan -
Jumlah Harga Satuan Pekerjaan 45,000.00
Jumlah Harga Satuan Pekerjaan dibulatkan 45,000.00
Ket : *) AHSP-SDA, berdasarkan Permen PUPERA No : 28/PRT/M/2016
Secang, September 2020
Dibantu, Dibuat
Tenaga Pendamping Masyarakat TIM Perencana
Diusulkan
Ketua P3A Dharma Tirta
Agus Setyono
ANALISA HARGA SATUAN
Harga Satuan
No Uraian Satuan Koefisien Jumlah (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1. Pekerja OH 3.400 60,000.00 204,000.00
2. Tukang batu OH 0.850 75,000.00 63,750.00
3. Kepala Tukang OH 0.085 - -
4. Mandor OH 0.170 - -
Jumlah Harga Tenaga Kerja 267,750.00
B Bahan
1. PC / Portland Cement kg 194.000 1,040.00 201,760.00
2. Pasir m 3
0.312 270,000.00 84,240.00
3. Kr / Krikil m 3
0.468 290,000.00 135,720.00
4. Batu kali m3 0.480 240,000.00 115,200.00
Jumlah Harga Bahan 536,920.00
C Peralatan
1 Molen Sewa-hari 0.250 200,000.00 50,000.00
Jumlah Harga Peralatan 50,000.00
Jumlah Harga Satuan Pekerjaan 854,670.00
Jumlah Harga Satuan Pekerjaan dibulatkan 854,670.00
Ket : *) AHSP-SDA, berdasarkan Permen PUPERA No : 28/PRT/M/2016
Secang, 10 September 2020
Dibantu, Dibuat
Tenaga Pendamping Masyarakat TIM Perencana
Diusulkan
Ketua P3A Dharma Tirta
Agus Setyono
ANALISA HARGA SATUAN
1 m2 Bekisting untuk dinding permukaan beton biasa dengan multiflex 12 mm (tanpa perancah)
Harga Satuan
No Uraian Satuan Koefisien Jumlah (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja OH 0.240 60,000.00 14,400.00
2 Tukang kayu OH 0.120 75,000.00 9,000.00
3 Kepala tukang OH 0.012 - -
4 Mandor OH 0.024 - -
Jumlah Harga Tenaga Kerja 23,400.00
B Bahan
1 Multiflex 12 mm lbr 0.353 145,000.00 51,185.00
2 Kaso 5/7 cm m3 0.016 2,857,142.86 45,714.29
3 Paku 5 cm dan 7 cm kg 0.24 18,000.00 4,320.00
4 Minyak bekisting L 0.2 10,000.00 2,000.00
Jumlah Harga Bahan 103,219.29
C Peralatan
Jumlah Harga Peralatan
Jumlah Harga Satuan Pekerjaan 126,619.29
Jumlah Harga Satuan Pekerjaan dibulatkan 126,619.00
Ket : *) AHSP-SDA, berdasarkan Permen PUPERA No : 28/PRT/M/2016
Secang, September 2020
Dibantu, Dibuat
Tenaga Pendamping Masyarakat TIM Perencana
Diusulkan
Ketua P3A Dharma Tirta
Agus Setyono
ANALISA KEBUTUHAN BAHAN
89.11 m3 91.39 m3
89.00 m3 91.00 m3
ANALISA KEBUTUHAN TENAGA KERJA
Pekerja Tukang
Uraian Vol Sat
Koof Jumlah Koof Jumlah
Pembersihan 536.00 m2 0.10 53.60
Galian tanah biasa 80.15 m3 0.75 60.11
Beton siklop 190.40 m3 3.40 647.36 0.85 161.84
Begisting 108.80 m2 0.24 26.11 0.12 13.06
Bongkar Begisting 1,099.00 m2 0.06 65.94
Kebutuhan Tenaga 853.12 174.90
Dibulatkan 853.00 175.00
A
Sewa Molen
Koof Jumlah
0.25 47.60
47.60
47.00
RENCANA ANGGARAN BIAYA (RAB)
BIAYA LAIN - LAIN
P3A : Dharma tirta Kecamatan : Secang
Nama Pekerjaan : Peningkatan Jaringan Irigasi Tersier D.I. Balong Kali Kabupaten : Magelang
Desa : Madusari, Secang Provinsi : Jawa Tengah
HARGA JUMLAH TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN (Rp) HARGA (Rp) BIAYA (RP)
I BIAYA LAIN-LAIN (MAKSIMAL5% X 195.000.000= 9.750.000)
Diverifikasi,
Tim Pelaksana Balai Tenaga Ahli Muda
Kabupaten Magelang- Kabupaten Magelang
Catatan : Bila AKTE NOTARIS sudah ada, maka biaya pembuatan akte dialihkan ke biaya fisik
RENCANA ANGGARAN BIAYA ( RAB )
B PEKERJAAN SALURAN
1 Galian tanah biasa m3 80.15 45,000.00 3,606,750.00 1.91
2 Beton siklop m3 190.40 854,670.00 162,729,168.00 86.20
3 Begisting m2 108.80 126,619.00 13,776,147.20 7.30
4 Plastik Beton m2 748.00 2,000.00 1,496,000.00 0.79
5 Bongkar Begisiting m3 1,099.00 3,600.00 3,956,400.00 2.10
II BIAYA LAIN-LAIN
A Biaya Operasional Ls 1.00 3,800,000.00 3,800,000.00 1.95
B Biaya Alat Pelindung Diri Ls 1.00 1,690,000.00 1,690,000.00 0.87
C Biaya Akte Notaris Ls 1.00 750,000.00 750,000.00 0.38
Diverifikasi,
Tim Pelaksana Balai Tenaga Ahli Muda
Kabupaten Magelang- Kabupaten Magelang
B TENAGA KERJA
1 Pekerja OH 853.00 60,000.00 51,180,000.00
2 Tukang OH 175.00 75,000.00 13,125,000.00
Diverifikasi,
Tim Pelaksana Balai Tenaga Ahli Muda
Kabupaten Magelang- Kabupaten Magelang
B TENAGA KERJA
1 Pekerja OH 853.00 60,000.00 51,180,000.00
2 Tukang OH 175.00 75,000.00 13,125,000.00
Meyetujui, Diusulkan,
Kepala Desa Ketua P3A
B TENAGA KERJA
1 Pekerja OH 597.00 60,000.00 35,820,000.00
2 Tukang OH 122.00 75,000.00 9,150,000.00
Total 136,453,000.00
Di bulatkan 136,400,000.00
Terbilang : Seratus tiga puluh enam juta lima ratus ribu rupiah
Secang, 10 September 2020
Meyetujui, Diusulkan,
Kepala Desa Ketua P3A
B TENAGA KERJA
1 Pekerja OH 256.00 60,000.00 15,360,000.00
2 Tukang OH 53.00 75,000.00 3,975,000.00
Total 58,581,000.00
Di bulatkan 58,500,000.00
Terbilang : Lima puluh delapan juta lima ratus ribu rupiah
Secang, 5 Oktober 2020
Meyetujui, Diusulkan,
Kepala Desa Ketua P3A
JAWA TENGAH
Kecamatan Secang
KABUPATEN :
MAGELANG
KECAMATAN :
SECANG
Bale Desa Madusari
DESA :
MADUSARI
DAERAH IRIGASI :
IRIGASI SEKUNDER
JL Mgl - Semarang
BALONG KALI
PEKERJAAN :
sta awal 0+000
PENNGKATAN JARAINGAN IRIGASI TERSIER
NAMA GAMBAR :
LOKASI PEKERJAAN SKET LOKASI
SKALA :
ROFIUDIN
PELAKSANA KRGIATAN
………..
SODIKUN ………..
Kepala Desa Maduasri
ROFIUDIN
TPELAKSANA
………..
SODIKUN ………..
Kepala Desa Maduasri
Beton CIKLOOP
Camp. : 1 SP :2 PB : 3 Kr
Kepala UPTD Pemeliharaan Jalan
dan Irigasi Wilayah Grabag
………..
SITI SHOLIHAH, SE, MM
NIP. 196904201992102001
PROGRAM PERCEPATAN
SKEMA JARINGAN IRIGASI PENINGKATAN TATA GUNA AIR
IRIGASI (P3-TGAI)
D I ...............................
TAHUN ANGGARAN 2020
Dusun PROVINSI :
Dusun Nangka JAWA TENGAH
Pisang KABUPATEN :
......................................
P.0 KECAMATAN :
......................................
DESA :
......................................
DAERAH IRIGASI :
......................................
PEKERJAAN :
Jembatan
...................................... JARINGAN IRIGAS
NAMA GAMBAR :
SKET LOKASI DAN POTONGAN
Area SKALA :
Persawahan
U ...................................
TIM PERENCANA
...................................
KETUA P3A .......................
...................................
Saluran TPM
Irigasi ..................
...
...................................
KEPALA DESA ....................
...................................
KMB KAB. ......................
...................................
NIP : ....................................
PROGRAM PERCEPATAN
PENINGKATAN TATA GUNA AIR
Potongan 1 - 1 IRIGASI (P3-TGAI)
Panjang : 0.00 Meter TAHUN ANGGARAN 2020
PROVINSI :
JAWA TENGAH
KABUPATEN :
......................................
0.6 KECAMATAN :
......................................
DESA :
......................................
0.3 DAERAH IRIGASI :
Beton CYCLOP
Camp. : 1 SP :2 PB : 3 Kr ......................................
PEKERJAAN :
PENINGKATAN JARINGAN IRIGASI
NAMA GAMBAR :
0.25 0.4 0.25 POTONGAN 1-1 DAN POTONGAN 2-2
SKALA :
Potongan 2 - 2 ...................................
Panjang : 680.00 Meter TIM PERENCANA
...................................
KETUA P3A .......................
...................................
0.4 TPM
...................................
KEPALA DESA ....................
0.15
...................................
KMB KAB. ......................
Beton CYCLOP
Camp. : 1 SP :2 PB : 3 Kr 0.2 0.4 0.2 TPB KAB. .........................
...................................
NIP : ....................................
GRAM PERCEPATAN
KATAN TATA GUNA AIR
RIGASI (P3-TGAI)
NGGARAN 2020
OVINSI :
A TENGAH
UPATEN :
.......................
AMATAN :
.......................
ESA :
.......................
H IRIGASI :
.......................
ERJAAN :
...... JARINGAN IRIGASI
GAMBAR :
DAN POTONGAN
KALA :
………..
………..
………..
………..
………..
………..
………..
GRAM PERCEPATAN
KATAN TATA GUNA AIR
RIGASI (P3-TGAI)
NGGARAN 2020
OVINSI :
A TENGAH
UPATEN :
.......................
AMATAN :
.......................
ESA :
.......................
H IRIGASI :
.......................
ERJAAN :
JARINGAN IRIGASI
GAMBAR :
DAN POTONGAN 2-2
KALA :
………..
………..
………..
………..
………..
………..
PROGRAM PERCEPATAN
SKEMA JARINGAN IRIGASI PENINGKATAN TATA GUNA AIR
IRIGASI (P3-TGAI)
D I SIGETAK
TAHUN ANGGARAN 2018
Dusun PROVINSI :
Dusun Gedongan JAWA TENGAH
Kalisaten KABUPATEN :
TEMANGGUNG
P.0 KECAMATAN :
KANDANGAN
DESA :
NGEMPLAK
DAERAH IRIGASI :
SIGETAK
PEKERJAAN :
Jembatan
PENINGKATAN JARINGAN IRIGASI
NAMA GAMBAR :
SKET LOKASI DAN POTONGAN
Area SKALA :
Persawahan
U MANARUDIN ………..
TIM PERENCANA
SRIYANTO ………..
KETUA TIRTO MULYO
PANTJORO, ST ………..
TAMir KAB. TEMANGGUNG
Potongan 2 - 2
Panjang 50 m MANARUDIN ………..
TIM PERENCANA
SRIYANTO ………..
KETUA TIRTO MULYO
MANARUDIN ………..
Potongan 4 - 4 TIM PERENCANA
Panjang 648,76 m
SRIYANTO ………..
KETUA TIRTO MULYO
0,10 0,10 Beton bertulangi Wire Mesh
0,40 Camp. : 1 SP :2 PB : 3 Kr
OKTA ASIANI, ST ………..
TPM
0,10
PANTJORO, ST ………..
0,10 0,10
0,40 TAMir KAB. TEMANGGUNG
MANARUDIN ………..
TIM PERENCANA
SRIYANTO ………..
KETUA TIRTO MULYO
PANTJORO, ST ………..
TAMir KAB. TEMANGGUNG