STRUKTUR TAHAP 1 PROYEK PIK
Jakarta, 27 November 2022
Pile Cap + Tie Beam
a Bekisting + Rolag
b Pembesian
c Pengecoran
d Bongkar bekisting
Pedestal + Stek Kolom
a Bekisting
b Pembesian
c Pengecoran
d Bongkar bekisting
Pekerjaan Urug
a Urug
b Pemadatan 1
c Pemadatan 2
Retaining Wall Pagar
a Pembesian retaining wall
b Bekisting retaining wall
c Pengecoran retaining wall
d Bongkar bekisting
Sloof + Stek Kolom
a Bekisting
b Pembesian
c Pengecoran
d Galian & urug tanah
e Bongkar bekisting