SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
(Rp) (Rp)
H I
370,000.00 370,000.00
450,000.00 450,000.00
300,000.00 300,000.00
490,000.00 490,000.00
Jumlah 1,610,000.00
60,225.00 2,876,797.69
16,665.00 265,348.46
16,665.00 80,554.44
Jumlah 3,222,700.59
651,678.00 12,577,385.40
113,245.00 14,088,867.07
48,752.00 12,130,521.39
54,505.00 632,258.00
54,505.00 1,316,209.45
113,245.00 2,033,436.66
48,752.00 1,750,789.95
11,693.00 -
Jumlah 44,529,467.92
3,617,038.33 5,235,662.99
4,329,875.04 #REF!
3,617,038.33 #REF!
3,617,038.33 4,188,530.39
3,617,038.33 651,066.90
3,617,038.33 765,365.31
4,329,875.04 #REF!
10,000.00 80,000.00
Jumlah #REF!
6,881,864.00 2,705,398.38
6,078,336.00 1,517,152.67
8,111,345.00 4,049,183.42
78,565.00 11,587,551.85
33,130.00 430,690.00
9,866,518.00 #REF!
798,538.00 6,388,304.00
544,074.00 1,224,166.50
12,000.00 48,000.00
Jumlah #REF!
47,685.00 7,032,941.44
93,720.00 1,265,220.00
94,939.00 8,548,782.26
23,284.00 2,350,985.48
10,000.00 728,000.00
15,000.00 568,875.00
Jumlah 20,494,804.17
150,000.00 600,000.00
22,000.00 176,000.00
15,000.00 240,000.00
12,000.00 96,000.00
12,000.00 192,000.00
12,000.00 192,000.00
10,000.00 160,000.00
Jumlah 1,656,000.00
106,754.00 8,204,044.90
106,754.00 2,305,886.40
Jumlah 10,509,931.30
17,000.00 255,000.00
106,196.00 841,072.32
75,000.00 2,925,000.00
Jumlah 4,021,072.32
150,000.00 1,500,000.00
50,000.00 500,000.00
150,000.00 300,000.00
125,000.00 250,000.00
150,000.00 300,000.00
200,000.00 200,000.00
125,000.00 125,000.00
Jumlah 3,175,000.00
15,518.00 4,491,304.91
45,160.00 #REF!
15,518.00 588,520.15
16,969.00 2,502,715.39 76.48
6,200.00 626,014.00
11,013.00 1,111,982.61
Jumlah #REF!
60,225.00 171,641.25
16,665.00 15,831.75
60,225.00 5,149,237.50
54,505.00 828,476.00
152,089.00 5,718,546.40
794,366.00 1,779,379.84
Jumlah 13,663,112.74
JUMLAH HARGA
(Rp)
1,610,000.00 #REF! #REF!
3,222,700.59 #REF! #REF!
44,529,467.92 #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
20,494,804.17 #REF! #REF!
1,656,000.00 #REF! #REF!
10,509,931.30 #REF! #REF!
4,021,072.32 #REF! #REF!
3,175,000.00 #REF! #REF!
#REF! #REF! #REF!
13,663,112.74 #REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
LAPORAN PRESTASI PEKERJAAN
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
Jumlah #REF! -
Tngkt Pnyelesaian
Sesuai TS
Deviasi
Terbilang :
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
H I
370,000.00 370,000.00
450,000.00 450,000.00
300,000.00 300,000.00
490,000.00 490,000.00
Jumlah 1,610,000.00
60,225.00 2,876,797.69
16,665.00 265,348.46
16,665.00 80,554.44
Jumlah 3,222,700.59
651,678.00 12,577,385.40
113,245.00 14,088,867.07
48,752.00 12,130,521.39
54,505.00 632,258.00
54,505.00 1,316,209.45
113,245.00 2,033,436.66
48,752.00 1,750,789.95
11,693.00 -
Jumlah 44,529,467.92
3,617,038.33 5,235,662.99
4,329,875.04 #REF!
3,617,038.33 #REF!
3,617,038.33 4,188,530.39
3,617,038.33 651,066.90
3,617,038.33 765,365.31
4,329,875.04 #REF!
10,000.00 80,000.00
Jumlah #REF!
6,881,864.00 2,705,398.38
6,078,336.00 1,517,152.67
8,111,345.00 4,049,183.42
78,565.00 11,587,551.85
33,130.00 430,690.00
9,866,518.00 #REF!
798,538.00 6,388,304.00
544,074.00 1,224,166.50
12,000.00 48,000.00
Jumlah #REF!
47,685.00 7,032,941.44
93,720.00 1,265,220.00
94,939.00 8,548,782.26
23,284.00 2,350,985.48
10,000.00 728,000.00
15,000.00 568,875.00
Jumlah 12,892,987.74
150,000.00 600,000.00
22,000.00 176,000.00
15,000.00 240,000.00
12,000.00 96,000.00
12,000.00 192,000.00
12,000.00 192,000.00
10,000.00 160,000.00
Jumlah 1,656,000.00
106,754.00 8,204,044.90
106,754.00 2,305,886.40
Jumlah 10,509,931.30
17,000.00 255,000.00
106,196.00 841,072.32
75,000.00 2,925,000.00
Jumlah 4,021,072.32
150,000.00 1,500,000.00
50,000.00 500,000.00
150,000.00 300,000.00
125,000.00 250,000.00
150,000.00 300,000.00
200,000.00 200,000.00
125,000.00 125,000.00
Jumlah 3,050,000.00
15,518.00 4,491,304.91
45,160.00 #REF!
15,518.00 588,520.15
16,969.00 2,502,715.39 76.48
6,200.00 626,014.00
11,013.00 1,111,982.61
Jumlah #REF!
60,225.00 171,641.25
16,665.00 15,831.75
60,225.00 5,149,237.50
54,505.00 828,476.00
152,089.00 5,718,546.40
794,366.00 1,779,379.84
Jumlah 13,663,112.74
JUMLAH HARGA
(Rp)
1,610,000.00 #REF! #REF!
3,222,700.59 #REF! #REF!
44,529,467.92 #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
12,892,987.74 #REF! #REF!
1,656,000.00 #REF! #REF!
10,509,931.30 #REF! #REF!
4,021,072.32 #REF! #REF!
3,050,000.00 #REF! #REF!
#REF! #REF! #REF!
13,663,112.74 #REF! #REF!
#REF!
#REF! J #REF!
#REF!
#REF!
#REF!
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
Bobot
HARGA SATUAN
NO JENIS PEKERJAAN VOLUME SATUAN Pekerjaan
(%)
(Rp)
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls 370,000.00
2 Bongkaran bangunan yang disambung 1.00 Ls 450,000.00
3 Papan Nama Kegiatan 1.00 Bh 300,000.00
4 Bowplank 1.00 LS 490,000.00
Jumlah
B PEKERJAAN TANAH DAN PASIR
1 Galian Tanah 47.77 M3 60,225.00
2 Urugan Tanah Kembali 15.92 M3 16,665.00
3 Urugan tanah ( material tersedia) 4.83 M3 16,665.00
Jumlah
C PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan pondasi batu Kali 1:3:10 19.30 M3 651,678.00
2 Pasangan Dinding Bata 1:3:10 124.41 M2 113,245.00
3 Plester Dinding Bata 1:3:10 248.82 M2 48,752.00
4 Pasang bata Trasram 1:4 11.60 M2 54,505.00
5 Plester beton dan pondasi 1:4 24.1 M2 54,505.00
6 Pasang bata gunung-gunung 1:3:10 17.96 M2 113,245.00
7 Plester gunung-Gunung 1:3:10 35.91 M2 48,752.00
8 Sponengan 1:4 - M' 11,693.00
Jumlah
D PEKERJAAN BETON DAN BETON BERTULANG
1 Slof 15/20 1.45 M3 3,617,038.33
2 Kolom 20 x 25 Jadi #REF! M3 4,329,875.04
3 Kolom Skelet 12/20 #REF! M3 3,617,038.33
4 Ring Balok 12/20 1.16 M3 3,617,038.33
5 Beton Latiu 12 x 15 0.18 M3 3,617,038.33
6 Ring Gunung-Gunung 12/20 0.21 M3 3,617,038.33
7 Beton Konsol #REF! M3 4,329,875.04
8 Dook beton 8.00 bh 10,000.00
Jumlah
E PEKERJAAN KAYU DAN RANGKA ATAP
1 Kuda Kuda Kayu Bengkirai 0.39 M3 6,881,864.00
2 Murplat Kayu Bengkirai 8/12 0.25 M3 6,078,336.00
3 Nok Gording Bengkirai 8/12 0.50 M3 8,111,345.00
4 Usuk 5/7 kayu kruing reng 2/3 bengkiri. 147.49 M2 78,565.00
5 Pasang ritter 2/15 cm,kayu kruing. 13.00 M' 33,130.00
6 Kosen Pintu dan Jedela Kayu bengkiri #REF! M3 9,866,518.00
7 Daun Pintu Multiplek 9 mm, kayu Jati lokal 8.00 M2 798,538.00
8 Daun Jendela Kaca Rangka kayu Jati lokal. 2.25 M2 544,074.00
9 Irung-irung 4/3 Kayu lokal. 4.00 M' 12,000.00
Jumlah
F PEKERJAAN PENUTUP ATAP
1 Genteng Beton 147.49 M2 47,685.00
2 Kerpusan genteng beton 13.50 M' 93,720.00
3 Rangka Plafon kayu kruing 90.05 M2 94,939.00
4 Pasang eternit kalsibort 1 x1 m 100.97 M2 23,284.00
5 Lis Gypsum 72.80 M' 10,000.00
6 Lisplang Calciplank 0,8/20 37.93 M' 15,000.00
Jumlah
G PEKERJAAN PENGGANTUNG DAN PENGUNCI
1### Slot tanam besar 2 x putar 4.00 BH 150,000.00
2 Engsel Pintu 8.00 BH 22,000.00
3 Engsel Jendela 16.00 BH 15,000.00
4 Kait angin pintu 8.00 BH 12,000.00
5 Kait angin Jendela 16.00 BH 12,000.00
6 Handel Jendela 16.00 BH 12,000.00
7 Grendel Jendela 16.00 BH 10,000.00
Jumlah
H PEKERJAAN LANTAI
1 Keramik 30 x 30 Putih 76.85 M2 106,754.00
2 Keramik lantai permukaan kasar 30 x 30 warna. 21.6 M2 106,754.00
Jumlah
I PEKERJAAN BESI DAN KACA
1 Baut, 15.00 Kg 17,000.00
2 Kaca mati bening 5 mm 7.92 M2 106,196.00
3 Pipa stainlistell Ǿ 2 " ( rilling pengarah ) dan asesoris. 39.00 m' 75,000.00
Jumlah
J PEKERJAAN LISTRIK
1 Instalasi Titik lampu 10.00 Ttk 150,000.00
2 Pasang lampu SL 18 Watt 10.00 Ttk 50,000.00
3 Pasang Saklar Dobel + instalasi 2.00 Ttk 150,000.00
4 Pasang Saklar tunggal + instalasi 2.00 Ttk 125,000.00
5 Pasang Stop Kontak + Instalasi 2.00 Ttk 150,000.00
6 Penyambungan 1.00 Ls 200,000.00
7 Pasang Sekering Automatis 1.00 Ttk 125,000.00
Jumlah
K PEKERJAAN CAT-CATAN
1 Cat tembok 289.43 M2 15,518.00
2 Cat Kayu #REF! M2 45,160.00
3 Cat Lisplang 37.93 M2 15,518.00
4 Cat Genteng 147.49 M2 16,969.00
5 Compon Gypsum Eternit 100.97 M2 6,200.00
6 Cat Eternit 100.97 M2 11,013.00
Jumlah
II PEKERJAAN HALAMAN
1 Galian tanah 2.85 M3 60,225.00
2 Urugan tanah kembali 0.95 M3 16,665.00
4 Pemotongan tanah dan pengurukan 85.50 M3 60,225.00
5 Plester 1:3 15.20 M2 54,505.00
6 Saluran air hujan buis beton 1/2 Ǿ 20 cm. 37.60 m' 152,089.00
7 Selasar rabat beton 1 : 3 : 5 ;tebal 7 cm. 2.24 m3 794,366.00
Jumlah
REKAPITULASI DAFTAR KUANTITAS
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
NO JENIS PEKERJAAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN TANAH DAN PASIR
C PEKERJAAN PASANGAN DAN PLESTERAN
D PEKERJAAN BETON DAN BETON BERTULANG
E PEKERJAAN KAYU DAN RANGKA ATAP
F PEKERJAAN PENUTUP ATAP
G PEKERJAAN PENGGANTUNG DAN PENGUNCI
H PEKERJAAN LANTAI
I PEKERJAAN BESI DAN KACA
J PEKERJAAN LISTRIK
K PEKERJAAN CAT-CATAN
II PEKERJAAN HALAMAN
JUMLAH
PPN
JUMLAH
DIBULATKAN
Terbilang :
TITAS DAN HARGA
JUMLAH HARGA
(Rp)
370,000.00
450,000.00
300,000.00
490,000.00
1,610,000.00
2,876,797.69
265,348.46
80,554.44
3,222,700.59
12,577,385.40
14,088,867.07
12,130,521.39
632,258.00
1,316,209.45
2,033,436.66
1,750,789.95
-
44,529,467.92
5,235,662.99
#REF!
#REF!
4,188,530.39
651,066.90
765,365.31
#REF!
80,000.00
#REF!
2,705,398.38
1,517,152.67
4,049,183.42
11,587,551.85
430,690.00
#REF!
6,388,304.00
1,224,166.50
48,000.00
#REF!
7,032,941.44
1,265,220.00
8,548,782.26
2,350,985.48
728,000.00
568,875.00
20,494,804.17
600,000.00
176,000.00
240,000.00
96,000.00
192,000.00
192,000.00
160,000.00
1,656,000.00
8,204,044.90
2,305,886.40
10,509,931.30
255,000.00
841,072.32
2,925,000.00
4,021,072.32
1,500,000.00
500,000.00
300,000.00
250,000.00
300,000.00
200,000.00
125,000.00
3,175,000.00
4,491,304.91
#REF!
588,520.15
2,502,715.39 76.48
626,014.00
1,111,982.61
#REF!
171,641.25
15,831.75
5,149,237.50
828,476.00
5,718,546.40
1,779,379.84
13,663,112.74
JUMLAH HARGA
(Rp)
1,610,000.00
3,222,700.59
44,529,467.92
#REF!
#REF!
20,494,804.17
1,656,000.00
10,509,931.30
4,021,072.32
3,175,000.00
#REF!
13,663,112.74
#REF!
#REF!
#REF!
#REF!
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
#REF!
1,500.00
REKAPITULASI DAFTAR KUANTITAS
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp)
### #REF!
A PEKERJAAN PERSIAPAN #REF!
B PEKERJAAN TANAH DAN PASIR #REF!
C PEKERJAAN PASANGAN DAN PLESTERAN #REF!
D PEKERJAAN BETON DAN BETON BERTULANG #REF!
E PEKERJAAN KAYU DAN RANGKA ATAP #REF!
F PEKERJAAN PENUTUP ATAP #REF!
### #REF! #REF!
### #REF! #REF!
### #REF! #REF!
### #REF! #REF!
### #REF! #REF!
### #REF! #REF!
JUMLAH #REF!
PPN #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Terbilang :
Konsultan Perencana
CV. DHIAN KARTIKA
IMAM KUDORI, ST
Direktur
#REF!
0
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
(Rp) (Rp)
I PEKERJAAN LANTAI 1
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls -
2 BOUPLANK 48.00 M -
3 Papan Nama Kegiatan 1.00 Bh -
4 ADMIN / DOKUMENTASI 1.00 LS -
Jumlah -
B PEKERJAAN TANAH DAN PASIR
1 Galian Tanah 3.06 M3 60,225.00
2 Urugan Tanah Kembali 15.92 M3 16,665.00 265,348.46
3 URUGAN PASIR BAWAH PONDASI 1.44 M3 261,690.00 376,833.60
Jumlah 642,182.06
C PEKERJAAN BETON DAN BTN TULANG
1 FOOTPLAT 10.41 M3 4,250,922.00 44,260,599.86
2 SLOOF 20 /25 2.28 M2 3,617,038.33 8,246,847.40
3 KOLOM 30/40 5.33 M2 4,329,875.04 23,069,574.21
4 BALOK 30/60 1.39 M2 3,632,862.28 5,035,147.12
5 BALOK 25 / 40 3.4 M2 5,008,080.04 17,127,633.74
6 PLAT LANTAI 9.02 M2 3,617,038.33 32,614,382.52
Jumlah 130,354,184.85
D PEKERJAAN LANTAI 2
PEKERJAAN BETON BERTULANG
1 KOLOM 20 / 30 1.92 M3 -
2 Kolom 20 x 25 Jadi 1.60 M3 -
3 RING BALOK 15 / 25 1.74 M3 -
Jumlah -
E PEKERJAAN KAYU DAN RANGKA ATAP
1 luas atap= usuk + reng 143.62 M2 -
2 nok+ gording + murplat 0.19 M2 -
3 kerpusan 32.80 M' -
4 reuter 32.80 M2 -
5 jurai 0.28 m3
6 batas angin2 6/12 0.07 m3
6### kuda-kuda 0.87 m3 -
Jumlah -
F PEKERJAAN PENUTUP ATAP
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN VOLUME SATUAN
(Rp) (Rp)
1 Genteng Beton 143.62 M2 -
Jumlah -
Konsultan Perencana
CV. DHIAN KARTIKA
IMAM KUDORI, ST
Direktur
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
MEI
NO JENIS PEKERJAAN VOLUME SATUAN BOBOT
I II III
12-17 18-24 25-31
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls #REF! #REF!
2 Bongkaran bangunan yang disambung 1.00 Ls #REF! #REF!
3 Papan Nama Kegiatan 1.00 Bh #REF! #REF!
4 Bowplank 1.00 LS #REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF!
#REF!
WAKTU PELAKSANAAN
JUNI JULI Skala
IV V VI VII VIII IX X XI Bobot
1-7 8-14 15-21 22-18 19-5 6-12 13-19 20-26 %
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
(15.70) - - - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
12.00
10.00
8.00
Row 57
6.00
4.00
2.00
-
1 2 3 4 5 6 7 8 9 10 11
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
(Rp) (Rp)
47,685.00 7,032,941.44 43 #REF! #REF!
93,720.00 1,265,220.00 44 #REF! #REF!
63 0 #REF!
17,000.00 255,000.00 64 #REF! #REF!
106,196.00 841,072.32 65 #REF! #REF!
75,000.00 2,925,000.00 66 #REF! #REF!
Konsultan Perencana
CV. DHIAN KARTIKA
IMAM KUDORI, ST
Direktur
DAFTAR KUANTITAS DAN HARGA
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
(Rp) (Rp)
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 Ls 370,000.00 370,000.00
2 Bongkaran bangunan yang disambung 1.00 Ls 450,000.00 450,000.00
3 Papan Nama Kegiatan 1.00 Bh 300,000.00 300,000.00
4 Bowplank 1.00 LS 490,000.00 490,000.00
Jmlh Jumlah 1,610,000.00
B PEKERJAAN TANAH DAN PASIR
1 Galian Tanah 47.77 M3 60,225.00 2,876,797.69
2 Urugan Tanah Kembali 15.92 M3 16,665.00 265,348.46
3 Urugan tanah ( material tersedia) 4.83 M3 16,665.00 80,554.44
Jmlh Jumlah 3,222,700.59
C PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan pondasi batu Kali 1:3:10 19.30 M3 651,678.00 12,577,385.40
2 Pasangan Dinding Bata 1:3:10 124.41 M2 113,245.00 14,088,867.07
3 Plester Dinding Bata 1:3:10 248.82 M2 48,752.00 12,130,521.39
4 Pasang bata Trasram 1:4 11.60 M2 53,384.00 619,254.40
5 Plester beton dan pondasi 1:4 24.1 M2 54,505.00 1,316,209.45
6 Pasang bata gunung-gunung 1:3:10 17.96 M2 113,245.00 2,033,436.66
7 Plester gunung-Gunung 1:3:10 35.91 M2 48,752.00 1,750,789.95
8 Sponengan 1:4 - M' 11,693.00 -
Jmlh Jumlah 44,516,464.32
D PEKERJAAN BETON DAN BETON BERTULANG
1 Slof 15/20 1.45 M3 3,617,038.33 5,235,662.99
2 Kolom 20 x 25 Jadi #REF! M3 4,329,875.04 #REF!
3 Kolom Skelet 12/20 #REF! M3 3,617,038.33 #REF!
4 Ring Balok 12/20 1.16 M3 3,617,038.33 4,188,530.39
5 Beton Latiu 12 x 15 0.18 M3 3,617,038.33 651,066.90
6 Ring Gunung-Gunung 12/20 0.21 M3 3,617,038.33 765,365.31
7 Beton Konsol #REF! M3 4,329,875.04 #REF!
8 Dook beton 8.00 bh 10,000.00 80,000.00
Jmlh Jumlah #REF!
E PEKERJAAN KAYU DAN RANGKA ATAP
1 Kuda Kuda Kayu Bengkirai 0.39 M3 6,881,864.00 2,705,398.38
2 Murplat Kayu Bengkirai 8/12 0.25 M3 6,078,336.00 1,517,152.67
3 Nok Gording Bengkirai 8/12 0.50 M3 8,111,345.00 4,049,183.42
4 Usuk 5/7 kayu kruing reng 2/3 bengkiri. 147.49 M2 78,565.00 11,587,551.85
5 Pasang ritter 2/15 cm,kayu kruing. 13.00 M' 33,130.00 430,690.00
6 Kosen Pintu dan Jedela Kayu bengkiri #REF! M3 9,866,518.00 #REF!
7 Daun Pintu Multiplek 9 mm, kayu Jati lokal 8.00 M2 798,538.00 6,388,304.00
8 Daun Jendela Kaca Rangka kayu Jati lokal. 2.25 M2 544,074.00 1,224,166.50
9 Irung-irung 4/3 Kayu lokal. 4.00 M' 12,000.00 48,000.00
Jmlh Jumlah #REF!
F PEKERJAAN PENUTUP ATAP
1 Genteng Beton 147.49 M2 47,685.00 7,032,941.44
2 Kerpusan genteng beton 13.50 M' 93,720.00 1,265,220.00
3 Rangka Plafon kayu kruing 90.05 M2 94,939.00 8,548,782.26
4 Pasang eternit kalsibort 1 x1 m 100.97 M2 23,284.00 2,350,985.48
5 Lis Gypsum 72.80 M' 10,000.00 728,000.00
6 Lisplang Calciplank 0,8/20 37.93 M' 15,000.00 568,875.00
Jmlh Jumlah 20,494,804.17
G PEKERJAAN PENGGANTUNG DAN PENGUNCI
1### Slot tanam besar 2 x putar 4.00 BH 150,000.00 600,000.00
2 Engsel Pintu 8.00 BH 22,000.00 176,000.00
3 Engsel Jendela 16.00 BH 15,000.00 240,000.00
4 Kait angin pintu 8.00 BH 12,000.00 96,000.00
5 Kait angin Jendela 16.00 BH 12,000.00 192,000.00
6 Handel Jendela 16.00 BH 12,000.00 192,000.00
7 Grendel Jendela 16.00 BH 10,000.00 160,000.00
Jmlh Jumlah 1,656,000.00
H PEKERJAAN LANTAI
1 Keramik 30 x 30 Putih 90.05 M2 106,754.00 9,612,663.93
2 Keramik lantai permukaan kasar 30 x 30 warna. 21.6 M2 106,754.00 2,305,886.40
Jmlh Jumlah 11,918,550.33
I PEKERJAAN BESI DAN KACA
1 Baut, 15.00 Kg 17,000.00 255,000.00
2 Kaca mati bening 5 mm 7.92 M2 106,196.00 841,072.32
3 Pipa stainlistell Ǿ 2 " ( rilling pengarah ) dan asesoris. 39.00 m' 75,000.00 2,925,000.00
Jmlh Jumlah 4,021,072.32
J PEKERJAAN LISTRIK
1 Instalasi Titik lampu 10.00 Ttk 150,000.00 1,500,000.00
2 Pasang lampu SL 18 Watt 10.00 Ttk 50,000.00 500,000.00
3 Pasang Saklar Dobel + instalasi 2.00 Ttk 150,000.00 300,000.00
4 Pasang Saklar tunggal + instalasi 2.00 Ttk 125,000.00 250,000.00
5 Pasang Stop Kontak + Instalasi 2.00 Ttk 150,000.00 300,000.00
6 Penyambungan 1.00 Ls 200,000.00 200,000.00
7 Pasang Sekering Automatis 1.00 Ttk 125,000.00 125,000.00
Jmlh Jumlah 3,175,000.00
K PEKERJAAN CAT-CATAN
1 Cat tembok 289.43 M2 15,518.00 4,491,304.91
2 Cat Kayu #REF! M2 45,160.00 #REF!
3 Cat Lisplang 37.93 M2 15,518.00 588,520.15
4 Cat Genteng 147.49 M2 16,969.00 2,502,715.39
5 Compon Gypsum Eternit 100.97 M2 6,200.00 626,014.00
6 Cat Eternit 100.97 M2 11,013.00 1,111,982.61
Jmlh Jumlah #REF!
II PEKERJAAN HALAMAN
1 Galian tanah 2.85 M3 60,225.00 171,641.25
2 Urugan tanah kembali 0.95 M3 16,665.00 15,831.75
4 Pemotongan tanah dan pengurukan 85.50 M3 60,225.00 5,149,237.50
5 Plester 1:3 15.20 M2 54,505.00 828,476.00
6 Saluran air hujan buis beton 1/2 Ǿ 20 cm. 37.60 m' 152,089.00 5,718,546.40
7 Selasar rabat beton 1 : 3 : 5 ;tebal 7 cm. 2.24 m3 794,366.00 1,779,379.84
Jmlh Jumlah 13,663,112.74
SATUAN KERJA : DINAS PENDIDIKAN, PEMUDA DAN OLAH RAGA PROPINSI DIY
PEKERJAAN : PEMBANGUNAN 2 RUANG KELAS SELUAS 72 M2 DAN PENATAAN HALAMAN
LOKASI : KECAMATAN PAKEM, KABUPATEN SLEMAN, YOGYAKARTA
TAHUN ANGG. : 2011
JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp)
A PEKERJAAN PERSIAPAN 1,610,000.00
B PEKERJAAN TANAH DAN PASIR 3,222,700.59
C PEKERJAAN PASANGAN DAN PLESTERAN 44,516,464.32
D PEKERJAAN BETON DAN BETON BERTULANG #REF!
E PEKERJAAN KAYU DAN RANGKA ATAP #REF!
F PEKERJAAN PENUTUP ATAP 20,494,804.17
G PEKERJAAN PENGGANTUNG DAN PENGUNCI 1,656,000.00
H PEKERJAAN LANTAI 11,918,550.33
I PEKERJAAN BESI DAN KACA 4,021,072.32
J PEKERJAAN LISTRIK 3,175,000.00
K PEKERJAAN CAT-CATAN #REF!
II PEKERJAAN HALAMAN 13,663,112.74
JUMLAH #REF!
PPN #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Terbilang :
76.48
35
6 1 m3 Urugan kembali
0.1920 Pekerja Rp. 70,000.00 Rp. 13,440.00
0.0190 Mandor Rp. 90,000.00 Rp. 1,710.00
Jumlah Rp. 15,150.00
Jasa 10% Rp. 1,515.00
Jumlah Rp. 16,665.00
Dibulatkan Rp. 16,665.00
8 1 m3 Urugan tanah
1.2000 m3 Tanah urug Rp. 70,000.00 Rp. 84,000.00
0.3000 Pekerja Rp. 90,000.00 Rp. 27,000.00
0.0100 Mandor Rp. 90,000.00 Rp. 900.00
Jumlah Rp. 27,900.00
Jasa 10% Rp. 2,790.00
Jumlah Rp. 30,690.00
Dibulatkan Rp. 30,690.00
36
9 1 m3 Urugan pasir
1.2000 m3 Pasir urug Rp. 180,000.00 Rp. 216,000.00
0.3000 Pekerja Rp. 70,000.00 Rp. 21,000.00
0.0100 Mandor Rp. 90,000.00 Rp. 900.00 237,900.00
Jumlah Rp. 237,900.00
Jasa 10% Rp. 23,790.00
Jumlah Rp. 261,690.00
Dibulatkan Rp. 261,690.00
11 1 m3 Urugan Sirtu
1.2000 m3 Sirtu Rp. 90,000.00 Rp. 108,000.00
0.2500 Pekerja Rp. 70,000.00 Rp. 17,500.00
0.0250 Mandor Rp. 90,000.00 Rp. 2,250.00
Jumlah Rp. 19,750.00
Jasa 10% Rp. 1,975.00
Jumlah Rp. 21,725.00
Dibulatkan Rp. 21,725.00
PEKERJAAN BETON
21 1M3 membuat beton mutu Fc=7,4 Mpa (K100) Slump ( 12 ±2) cm w/c = 0,87
247.0000 Kg PC Rp. 1,000.00 Rp. 247,000.00
0.6207 m3 Pasir beton Rp. 180,000.00 Rp. 111,726.00
0.7400 m3 Koral Beton Rp. 250,000.00 Rp. 185,000.00
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 597,476.00
1.6500 oh Pekerja Rp. 70,000.00 Rp. 115,500.00
0.2750 oh Tukang Batu Rp. 80,000.00 Rp. 22,000.00
0.0280 oh Kepala Tukang Rp. 85,000.00 Rp. 2,380.00
0.0830 oh Mandor Rp. 90,000.00 Rp. 7,470.00 Rp. 147,350.00
Jumlah Rp. 744,826.00
Jasa ### Rp. 74,482.60
Jumlah Rp. 819,308.60
Dibulatkan Rp. 819,308.00
22 1 M3 membuat beton mutu Fc=9,8 Mpa (K125) Slump ( 12 ±2) cm w/c = 0,78
276.0000 Kg PC Rp. 1,000.00 Rp. 276,000.00
0.5914 m3 Pasir beton Rp. 180,000.00 Rp. 106,452.00
0.7496 m3 Koral Beton Rp. 250,000.00 Rp. 187,400.00
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 623,602.00
1.6500 oh Pekerja Rp. 70,000.00 Rp. 115,500.00
0.2750 oh Tukang Batu Rp. 80,000.00 Rp. 22,000.00
0.0280 oh Kepala Tukang Rp. 85,000.00 Rp. 2,380.00
0.0830 oh Mandor Rp. 90,000.00 Rp. 7,470.00 Rp. 147,350.00
Jumlah Rp. 770,952.00
Jasa ### Rp. 77,095.20
Jumlah Rp. 848,047.20
Dibulatkan Rp. 848,047.00
23 1 M3 membuat beton mutu Fc=12,2 Mpa (K150) Slump ( 12 ±2) cm w/c = 0,72
299.0000 Kg PC Rp. 1,000.00 Rp. 299,000.00
0.5707 m3 Pasir beton Rp. 180,000.00 Rp. 102,726.00
0.7533 m3 Koral Beton Rp. 250,000.00 Rp. 188,325.00
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 643,801.00
1.6500 oh Pekerja Rp. 70,000.00 Rp. 115,500.00
0.2750 oh Tukang Batu Rp. 80,000.00 Rp. 22,000.00
0.0280 oh Kepala Tukang Rp. 85,000.00 Rp. 2,380.00
0.0830 oh Mandor Rp. 90,000.00 Rp. 7,470.00 Rp. 147,350.00
Jumlah Rp. 791,151.00
Jasa ### Rp. 79,115.10
Jumlah Rp. 870,266.10
Dibulatkan Rp. 870,266.00
39
24 1 M3 membuat beton mutu Fc=7,4 Mpa (K100) Slump ( 12 ±2) cm w/c = 0,87
230.0000 Kg PC Rp. 1,000.00 Rp. 230,000.00
0.5707 m3 Pasir beton Rp. 180,000.00 Rp. 102,726.00
0.7533 m3 Koral Beton Rp. 250,000.00 Rp. 188,325.00
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 574,801.00
1.6500 oh Pekerja Rp. 70,000.00 Rp. 115,500.00
0.2750 oh Tukang Batu Rp. 80,000.00 Rp. 22,000.00
0.0280 oh Kepala Tukang Rp. 85,000.00 Rp. 2,380.00
0.0830 oh Mandor Rp. 90,000.00 Rp. 7,470.00 Rp. 147,350.00
Jumlah Rp. 722,151.00
Jasa ### Rp. 72,215.10
Jumlah Rp. 794,366.10
Dibulatkan Rp. 794,366.00
25 1 M3 membuat beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
326.0000 Kg PC Rp. 1,000.00 Rp. 326,000.00
0.5429 m3 Pasir beton Rp. 180,000.00 Rp. 97,722.00
0.7622 m3 Koral Beton Rp. 250,000.00 Rp. 190,550.00
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 668,022.00
1.6500 oh Pekerja Rp. 70,000.00 Rp. 115,500.00
0.2750 oh Tukang Batu Rp. 80,000.00 Rp. 22,000.00
0.0280 oh Kepala Tukang Rp. 85,000.00 Rp. 2,380.00
0.0830 oh Mandor Rp. 90,000.00 Rp. 7,470.00 Rp. 147,350.00
Jumlah Rp. 815,372.00
Jasa ### Rp. 81,537.20
Jumlah Rp. 896,909.20
Dibulatkan Rp. 896,909.00
26 1 M3 membuat beton mutu Fc= 16,9 Mpa (K200) Slump ( 12 ±2) cm w/c = 0,61
352.0000 Kg PC Rp. 1,000.00 Rp. 352,000.00
0.5221 m3 Pasir beton Rp. 180,000.00 Rp. 93,978.00
0.7637 m3 Koral Beton Rp. 250,000.00 Rp. 190,925.00
215.0000 Ltr Air Rp. 250.00 Rp. 53,750.00 Rp. 690,653.00
1.6500 oh Pekerja Rp. 70,000.00 Rp. 115,500.00
0.2750 oh Tukang Batu Rp. 80,000.00 Rp. 22,000.00
0.0280 oh Kepala Tukang Rp. 85,000.00 Rp. 2,380.00
0.0830 oh Mandor Rp. 90,000.00 Rp. 7,470.00 Rp. 147,350.00
Jumlah Rp. 838,003.00
Jasa ### Rp. 83,800.30
Jumlah Rp. 921,803.30
Dibulatkan Rp. 921,803.00
27 1 M3 membuat lantai kerja beton mutu Fc= 7,4 Mpa (K100) Slump ( 3-6) cm w/c = 0,87
230.0000 Kg PC Rp. 1,000.00 Rp. 230,000.00
0.6379 m3 Pasir beton Rp. 180,000.00 Rp. 114,822.00
0.7607 m3 Koral Beton Rp. 250,000.00 Rp. 190,175.00
200.0000 Ltr Air Rp. 250.00 Rp. 50,000.00 Rp. 584,997.00
1.2000 oh Pekerja Rp. 70,000.00 Rp. 84,000.00
0.2000 oh Tukang Batu Rp. 80,000.00 Rp. 16,000.00
0.0200 oh Kepala Tukang Rp. 85,000.00 Rp. 1,700.00
0.0600 oh Mandor Rp. 90,000.00 Rp. 5,400.00 Rp. 107,100.00
Jumlah Rp. 692,097.00
Jasa ### Rp. 69,209.70
Jumlah Rp. 761,306.70
Dibulatkan Rp. 761,306.00
34 1M3 membuat beton mutu Fc=7,4 Mpa (K100) Slump ( 12 ±2) cm w/c = 0,87
1 M3 Campuran Beton Rp 819,308.00
125 Kg Tulangan Rp 1,340,875.00
8 M2 Cetakan dengan papan Rp 1,504,336.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 3,972,519.00
35 1 M3 membuat slof 15/20 beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
108.00 Kg Tulangan Rp 1,158,516.00
6.7 M2 Cetakan dengan papan dipakai 50% Rp 1,253,613.33
1 M3 Membongkar cetakan Rp 308,000.00
Rp 3,617,038.33
41
36 1 M3 Membuat Konsol beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
125 Kg Tulangan Rp 1,340,875.00
8 M2 Cetakan dengan papan dipakai 50% Rp 1,504,336.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 4,050,120.00
37 1 M3 membuat beton mutu Fc=7,4 Mpa (K100) Slump ( 12 ±2) cm w/c = 0,87
1 M3 Campuran Beton Rp 794,366.00
125 Kg Tulangan Rp 1,340,875.00
8 M2 Cetakan dengan papan Rp 1,504,336.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 3,947,577.00
38 1 M3 membuat kolom 30/40 beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
134.92 Kg Tulangan Rp 1,447,286.84
11.67 M2 Cetakan dengan Rp 1,677,679.20
1 M3 Membongkar cetakan Rp 308,000.00
Rp 4,329,875.04
38 1 M3 membuat balok30/60 beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
134.92 Kg Tulangan Rp 1,447,286.84
11.67 M2 Cetakan dengan Rp 1,677,679.20
1 m3 beton(butuh scappolding) Rp 678,205.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 5,008,080.04
39 1 M3 membuat kolom 30x50 beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
154.86 Kg Tulangan Rp 1,661,233.28
10.6666667 M2 Cetakan dengan papan dipakai 50% Rp 766,720.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 3,632,862.28
40 1 M3 membuat footplat 1.2X1.2 beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
190.00 Kg Tulangan Rp 2,038,130.00
1.62 M2 Cetakan dengan papan dipakai Rp 1,007,883.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 4,250,922.00
41 1 M3 membuat pelat lantai tebal 12.5cm beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
110.00 Kg Tulangan Rp 1,179,970.00
8.33 M2 Cetakan dengan papan Rp 1,197,520.80
1 M3 Scafolding Rp 678,205.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 4,260,604.80
42 1 M3 membuat pelat tangga beton mutu Fc= 14,5 Mpa (K175) Slump ( 12 ±2) cm w/c = 0,66
1 M3 Campuran Beton Rp 896,909.00
157.71 Kg Tulangan Rp 1,691,755.17
7.0262 M2 Cetakan dengan multiplek Rp 1,010,086.51
1 M3 Scafolding Rp 678,205.00
1 M3 Membongkar cetakan Rp 308,000.00
Rp 4,584,955.68
42
PEKERJAAN PLESTERAN
21 1 m2 Plesteran 1 pc : 3 ps tebal 15 mm
7.7760 kg Portland Cement Rp. 1,000.00 Rp. 7,776.00
0.0230 m3 Pasir saring Rp. 210,000.00 Rp. 4,830.00 Rp. 12,606.00
0.3000 oh Pekerja Rp. 70,000.00 Rp. 21,000.00
0.1500 oh Tukang Batu Rp. 85,000.00 Rp. 12,750.00
0.0150 oh Kepala tukang Rp. 85,000.00 Rp. 1,275.00
0.0100 oh Mandor Rp. 90,000.00 Rp. 900.00 Rp. 35,925.00
Jumlah Rp. 48,531.00
Jasa 10% Rp. 4,853.10
Jumlah Rp. 53,384.10
Dibulatkan Rp. 53,384.00
22 1 m2 Plesteran 1 pc : 3 kp : 10 ps tebal 15 mm
1.8400 kg Portland Cement Rp. 1,000.00 Rp. 1,840.00
0.0060 m3 Kapur Pasang Rp. 250,000.00 Rp. 1,500.00
0.0140 m3 Pasir saring Rp. 210,000.00 Rp. 2,940.00 Rp. 6,280.00
0.3600 oh Pekerja Rp. 70,000.00 Rp. 25,200.00
0.1200 oh Tukang Batu Rp. 85,000.00 Rp. 10,200.00
0.0120 oh Kepala tukang Rp. 85,000.00 Rp. 1,020.00
0.0180 oh Mandor Rp. 90,000.00 Rp. 1,620.00 Rp. 38,040.00
Jumlah Rp. 44,320.00
Jasa 10% Rp. 4,432.00
Jumlah Rp. 48,752.00
Dibulatkan Rp. 48,752.00
46 1 m3 Pasang konstruksi atap ( gording, nok, balok tembok, gapit, ikatan angin ) kayu Bengkirai
1.1000 m3 Kayu Bengkirai (balok) Rp. 5,750,000.00 Rp. 6,325,000.00
15.0000 kg Besi Strip Rp. 13,000.00 Rp. 195,000.00
3.0000 kg Paku biasa 2" - 5" Rp. 12,650.00 Rp. 37,950.00 Rp. 6,557,950.00
2.4000 oh Pekerja Rp. 70,000.00 Rp. 168,000.00
7.2000 oh Tukang kayu Rp. 80,000.00 Rp. 576,000.00
0.7200 oh Kepala tukang Rp. 85,000.00 Rp. 61,200.00
0.1200 oh Mandor Rp. 90,000.00 Rp. 10,800.00 Rp. 816,000.00
Jumlah Rp. 7,373,950.00
Jasa 10% Rp. 737,395.00
Jumlah Rp. 8,111,345.00
Dibulatkan Rp. 8,111,345.00
47 1 m3 Pasang konstruksi atap ( gording, nok, balok tembok, gapit, ikatan angin ) kayu Kruing
1.1000 m3 Kayu Kruing (balok) Rp. 4,312,000.00 Rp. 4,743,200.00
7.5000 kg Besi Strip Rp. 13,000.00 Rp. 97,500.00
0.4000 kg Paku biasa 2" - 5" Rp. 12,650.00 Rp. 5,060.00 Rp. 4,845,760.00
2.0000 oh Pekerja Rp. 70,000.00 Rp. 140,000.00
6.0000 oh Tukang kayu Rp. 80,000.00 Rp. 480,000.00
0.6000 oh Kepala tukang Rp. 85,000.00 Rp. 51,000.00
0.1000 oh Mandor Rp. 90,000.00 Rp. 9,000.00 Rp. 680,000.00
Jumlah Rp. 5,525,760.00
Jasa 10% Rp. 552,576.00
Jumlah Rp. 6,078,336.00
Dibulatkan Rp. 6,078,336.00
48 1 m2 Pasang Kaso kayu Kruing 5/7 dan reng Bengkiraii 3/4 genteng beton
2.2000 m' Usuk Kruing 5/7 Rp. 17,829.82 Rp. 39,225.61
3.5000 m' Reng kayu bengkirai i 3/4 Rp. 4,000.00 Rp. 14,000.00
0.1500 kg Paku biasa 2" - 5" Rp. 12,650.00 Rp. 1,897.50 Rp. 55,123.11
0.1000 oh Pekerja Rp. 70,000.00 Rp. 7,000.00
0.1000 oh Tukang kayu Rp. 80,000.00 Rp. 8,000.00
0.0100 oh Kepala tukang Rp. 85,000.00 Rp. 850.00
0.0050 oh Mandor Rp. 90,000.00 Rp. 450.00 Rp. 16,300.00
Jumlah Rp. 71,423.11
Jasa 10% Rp. 7,142.31
Jumlah Rp. 78,565.43
Dibulatkan Rp. 78,565.00
49 1 m2 Pasang Kaso Bengkirai 5/7 dan reng Jati 2/3 genteng paris
2.2000 m' Kayu bengkirai 5/7 Rp. 26,450.00 Rp. 58,190.00
5.0000 m' Reng Jati 2/3 Rp. 4,000.00 Rp. 20,000.00
0.1500 kg Paku biasa 2" - 5" Rp. 12,650.00 Rp. 1,897.50 Rp. 80,087.50
0.1000 oh Pekerja Rp. 70,000.00 Rp. 7,000.00
0.1000 oh Tukang kayu Rp. 80,000.00 Rp. 8,000.00
0.0100 oh Kepala tukang Rp. 85,000.00 Rp. 850.00
0.0050 oh Mandor Rp. 90,000.00 Rp. 450.00 Rp. 16,300.00
Jumlah Rp. 96,387.50
Jasa 10% Rp. 9,638.75
Jumlah Rp. 106,026.25
Dibulatkan Rp. 106,026.00
PEKERJAAN LANGIT-LANGIT
63 1 m2 Pasang rangka Plafon datar Kayu kruing ( 100 x 100 )
0.0120 m3 Kayu Kruing, balok Rp. 4,312,000.00 Rp. 51,744.00
0.1000 kg Paku biasa Rp. 12,650.00 Rp. 1,265.00 Rp. 53,009.00
0.1500 oh Pekerja Rp. 70,000.00 Rp. 10,500.00
0.2500 oh Tukang kayu Rp. 80,000.00 Rp. 20,000.00
0.0250 oh Kepala tukang Rp. 85,000.00 Rp. 2,125.00
0.0075 oh Mandor Rp. 90,000.00 Rp. 675.00 Rp. 33,300.00
Jumlah Rp. 86,309.00
Jasa 10% Rp. 8,630.90
Jumlah Rp. 94,939.90
Dibulatkan Rp. 94,939.00
97 1 m2 Pengecatan tembok baru ( 1lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
0.1000 kg plamir Rp. 11,500.00 Rp. 1,150.00
0.1000 kg cat dasar Rp. 13,700.00 Rp. 1,370.00
0.3000 lb kertas gosok Rp. 2,750.00 Rp. 825.00
0.2600 kg Cat penutup 2 kali Rp. 13,700.00 Rp. 3,562.00
0.0200 oh Pekerja Rp. 70,000.00 Rp. 1,400.00 Rp. 8,307.00
0.0630 oh Tukang cat Rp. 80,000.00 Rp. 5,040.00
0.0063 oh Kepala tukang Rp. 85,000.00 Rp. 535.50
0.0025 oh Mandor Rp. 90,000.00 Rp. 225.00 Rp. 5,800.50
Jumlah Rp. 14,107.50
Jasa 10% Rp. 1,410.75
Jumlah Rp. 15,518.25
Dibulatkan Rp. 15,518.00
375
51
19.73684
52
-
-
-
46### Kayu Bengkirai Papan M3 6,612,000.00
47### Kayu Keruing Balok M3 4,312,000.00
48### Kayu Keruing Papan M3 5,175,000.00
49### Kayu Kruing 1/3 M' 1,700.00
50### Kayu Meranti Balok m3 3,737,500.00
51### Kayu Meranti Papan m3 4,312,500.00
52### Kasau 5/7 bengkirai m' 26,450.00
53### Kasau 5/7 kruing m' 17,829.82
54### Reng jati 2/3 m' 4,000.00
55### Papan cor m3 1,800,000.00
56### Dolken m3 760,000.00
57### Genteng Kaca 5mm bj 9,200.00
58### Genteng Pres bh 750.00
59### Kerpus bh 800.00
60### Genteng Beton Besar bh 3,050.00
61### Kerpus Genteng Beton Bh 4,600.00
62### Genteng Fiber semen 1150x850x4mm Lbr 26,100.00
63### Seng Gelombang Bjls 20 90x180 cm Lbr 44,600.00
64### Seng Gelombang 2" -5" Bjls 24 Lbr 52,800.00
65### Asbes Gelombang Kecil 3000x1050x4mm Lbr 75,300.00
66### Asbes Gelombang Besarl 3000x1100x5mm Lbr 103,500.00
67### Keramik 30 x 30 M2 42,350.00
68### Keramik 30 x 30 Putih Polos M2 30,650.00
69### Keramik 20 x 25 Polos M2 40,000.00
70### Keramik 20/ 25 motif M2 43,750.00
71### Keramik 20x 20cm M2 44,000.00
72### Keramik 40 x 40 bh 50,000.00
73### Reng 2/3 cm Bengkirai M' 4,000.00
74### Reng 2/3 cm Kamper M' 2,800.00
75### Reng 2/3 cm Jati M' 4,000.00
76### Kayu jati Papan Klas III M3 8,625,000.00
77### Plywood 1,2 x 2,4 m tbl 4mm Lbr 104,900.00
78### Takwood 90 x 120 cm Lbr 60,500.00
79### Triplek 3mm Lbr 42,000.00
80### Multiplek 9 mm Lbr 122,650.00
81### Air Ltr 250.00
HITUNGAN VOLUME
A R. KELAS
PANJANG PONDASI INDUK 48.25
a Galia tanah Pondasi induk 0.90 X 1.10 X 48.25 = 47.77
47.77
1 Urugan kembali 15.92
b Luas lantai
Luas total 3.00 x 5.50 16.50
6.50 x 3.00 19.50
3.00 x 5.75 17.25
Pengurangan 31.00 x 0.08 2.33
17.25 x 0.15 2.59
Luas lantai 48.34
4.83
19.30
Cat kayu
Daun Pintu 16.00
Kosen PJ #REF! X 0.36 X 4.00 #REF!
7.88 X 0.24 X 4.00 7.56
Kosen Jendela #REF! X 0.36 X 4.00 #REF!
7.64 X 0.24 X 4.00 7.33
#REF!
Penutup Atap
Luas Atap 1.15 X 9.50 X 13.50 147.49
Kerpusan 13.5
Lisplang
Datar 13.50 X 2.00 27
Miring 1.15 9.50 10.93
37.93
PENATAAN HALAMAN
Talud Pas. Batu Kali 0.40 X 0.40 X 19.00 3.04
0.50 X 0.30 X 19.00 2.85
Talud Pas. Batu Kali 5.89
Galian tanah Talud 0.30 x 0.50 19.00 2.85
Urugan Kembali 0.95
Pemotongan tanah 0.60 x 19.00 x 15.00 x 0.50 85.50
M'
M3
m3
M3
M2
M2
M2
M2
M2
M2
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M3
M2
M2
M2
M2
M2
M2
m2
M2
M2
M2
M2
M2
m2
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M'
M'
M'
M'
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M2
M2
M3
M2
M2
M2
M2
M2
M2
M2
M'
M'
M'
M'
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M'
M'
M'
M2
M2
M2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
Pjg Diameter Koefisien Harga/Kg Harga / Btg
No
M mm Rp Rp
a b c d e bxc²xdxe
1 12 6 0.006165 7,000.00 18,642.96
2 12 8 0.006165 7,000.00 33,143.04
3 12 10 0.006165 7,000.00 51,786.00
4 12 12 0.006165 7,000.00 74,571.84
5 12 16 0.006165 7,000.00 132,572.16
6 12 19 0.006165 7,000.00 186,947.46
7 12 22 0.006165 7,000.00 250,644.24
8 12 25 0.006165 7,000.00 323,662.50 ²