PAS KECIL
CERTIFICATE OF NATIONAUTY
Yang bertanda tangan di bawah ini (The Undersigned):KEPALA KANTOR UPP KELAS II TANJUNG
SELOR
PENGGERAK UTAMA UKURAN (P x L x D (Meter)) MEREK DAN DAYA BAHAN UTAMA KAPAL
MAIN PROPULSION (DIMENSION (L x B x D ENGINE MAKER AND SHIPS MATERIAL
(meters) POWER
MESIN 17,00 X 1,60 X 1,30 YAMAHA 5 X 40 KAYU
TANGGAL PEMBANGUNAN
(DATE OF BUILD)
KONTRAK * PELETAKAN LUNAS SERAH TERIMA * PERUBAHAN
(CONTRACT) KEEL LAID DELIVERY CONVERSION
- 2021 2021 -
No.Urut :1077
Senal Number
No Halaman :29
Page NO