RERUBLHK INSONESIA
REPUBLIC.OF HEDONESIA
MEGA DAYA 55
BATAM 07-11-2018
Tanggal peletakan lunas atau pada tahap pembangunan serupa itu (Pasal 2(6), atau tanggal saat/dimana kapal mengatain
Perubahan atau perombakan besar (Pasal 3(2) (6) ).
Date on which the keel was laid or the ship was at a similar stage of construction (Article 2 (6), or date on which the ship
underwent alterations or modifications of major character (Article 3
(2)(6), as
appropriale
UKURAN-UKURAN POKOK
MAIN DIMENSIONS
133 -
TONASE KOTOR ***aa*****yan*s*era*s************
GROSS TONNASE
41
TONASEBERSIH
NET TONNAGE
Amne
Captr RRYTk.EAR, MM
AL
(IV/b)
Pembina I
NIP.19690207 200312 1 001
DKP II-22