BESI MENJANG 15
0.006165
BESI MELINTANG 36
0.006165
500000 : 34.755804
44091.711
14386.086
BESI MENJANG 15
0.006165
BESI MELINTANG 36
0.006165
500000 : 27.119182
44091.711
18437.135
X 5.4 = 11.34
X 5.4 = 81
X 6X 6X 81 = 17.97714
X 2.1 = 75.6
X 6X 6X 75.6 = 16.778664
= 34.755804 KG/LBR
= 3.0648857 M2
= 14386.086
X 5.4 = 11.34
X 5.4 = 81
X 5.3 X 5.3 X 81 = 14.027163
X 2.1 = 75.6
X 5.3 X 5.3 X 75.6 = 13.092019
= 27.119182 KG/LBR
= 2.3914622 M2
= 18437.135
27.119182 1
0 0
lbr
57 #REF! #REF!
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
B.16.a
JENIS PEKERJAAN : Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) (2 Kali Pakai)
SATUAN : M2
LOKASI : Jalan Gg Merak Perum Lobam Mas Asri 2 Rt.006/Rw.001 Kec. Seri Kuala Lobam
HARGA JUMLAH
SATUAN HARGA
NO KOMPONEN SATUAN KOEFISIEN
A TENAGA
1 Pekerja Org/Hr 0.2 Rp. 110000 Rp. 22000
2 Tukang Kayu Org/Hr 0.1 Rp. 130000 Rp. 13000
3 Kepala Tukang Org/Hr 0.01 Rp. 150000 Rp. 1500
4 Mandor Org/Hr 0.02 Rp. 150000 Rp. 3000
JUMLAH HARGA TENAGA (A) Rp 39500
B BAHAN
1 Multiflex 12 mm Lembar 0.203 Rp. 215000 Rp. 43645
2 Kayu kelas III M3 0.016 Rp. 3500000 Rp. 56000
3 Paku Kg 0.25 Rp. 22000 Rp. 5500
4 Minyak bekisting Liter 0.2 Rp. 5000 Rp. 1000
Rp.
JUMLAH HARGA BAHAN (B) Rp. 106145
C. ALAT
A.4.1.1.17.
JENIS PEKERJAAN : Pemasangan 1 kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6-M8
SATUAN : Kg
LOKASI : Jalan Gg Merak Perum Lobam Mas Asri 2 Rt.006/Rw.001 Kec. Seri Kuala Lobam
HARGA JUMLAH
SATUAN HARGA
NO KOMPONEN SATUAN KOEFISIEN
A TENAGA
1 Pekerja Org/Hr 0.0025 Rp. 110000 Rp. 275
2 Tukang Besi Org/Hr 0.0025 Rp. 130000 Rp. 325
3 Kepala Tukang Org/Hr 0.0025 Rp. 150000 Rp. 375
4 Mandor Org/Hr 0.0001 Rp. 150000 Rp. 15
JUMLAH HARGA TENAGA (A) Rp 990
B BAHAN
1 Wiremesh M6 Kg 1.02 Rp. 14362.1207682011 Rp. 14649.3631835651
2 Kawat Beton Kg 0.005 Rp. 25000 Rp. 125
2.2.3.a.(a)
JENIS PEKERJAAN : Beton menggunakan Ready Mixed
SATUAN : M3
LOKASI : Jalan Gg Merak Perum Lobam Mas Asri 2 Rt.006/Rw.001 Kec. Seri Kuala Lobam
HARGA JUMLAH
SATUAN HARGA
NO KOMPONEN SATUAN KOEFISIEN
A TENAGA
1 Pekerja Org/Hr 0.4 Rp. 110000 Rp. 44000
2 Tukang Batu Org/Hr 0.1 Rp. 130000 Rp. 13000
3 Kepala Tukang Org/Hr 0.01 Rp. 150000 Rp. 1500
4 Mandor Org/Hr 0.04 Rp. 150000 Rp. 6000
JUMLAH HARGA TENAGA (A) Rp 64500
B BAHAN
1 Beton K-250 Readymix M3 1.02 Rp. 1193250 Rp. 1217115
HARGA JUMLAH
SATUAN HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME (Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PENDAHULUAN
1.1 Pek Pasang Papan Nama Proyek Unit 1 Rp. 500000 Rp. 500000
1.2 Pek. Pembersihan dan Pemerataan Lokasi Ls 1 Rp. 1300000 Rp. 1300000
Rp. 1800000
Rp. 99614618.4082
RENCANA ANGGARAN BIAYA ( PRASARANA )
DESA SEBONG PEREH KECAMATAN TELUK SEBONG
TAHUN ANGGARAN 2022
Pajak (Rp)
No Kode Rekening Uraian Volume Satuan Harga Satuan (Rp.Jumlah PPN (11%) PPH (1.5%) Harga Satuan DeJumlah Total
1 2 3 4 5 6=4x5 7 8 9 = 10/4 10 = 6+7+8
I Belanja Barang dan jasa
184319870
JUMLAH TOTAL ( Rp.) 172574200 16810112 2079558 191463870
Cara pengisian :
1. Bidang diisi dengan kode rekening berdasarkan klasifikasi kelompok belanja desa.
2. Kegiatan diisi dengan kode rekening sesuai dengan urutan kegiatan dalam APBDesa.
3. kolom 1 diisi dengan nomor urut
4. kolom 2 diisi dengan uraian berupa rincian kebutuhan dalam kegiatan.
5. kolom 3 diisi dengan volume dapat berupa jumlah orang/barang.
6. kolom 4 diisi dengan harga satuan yang merupakan besaran untuk membayar orang/barang
7. kolom 5 diisi dengan jumlah perkalian antara kolom 3 dengan kolom 4.
8 Diisi yang warna kuning saja, rumus kolom yang lainya jangan di ubah
Kabupaten : Bintan Jenis Prasarana : Rehab Gdung Serba Guna
Kecamatan : Teluk Sebong Take Of Sheet Lokasi : Perumahan 10
Desa : Sebong Pereh Volume : 6 x 15
I PEKERJAAN STRUKTUR
1 Pek. Galian Tanah Panjang x Lebar x Tinggi Jumlah
a. Galian pondasi 0.6 x 0.6 x 0.7 x 5= 1.26 M3
b. Galian Parit 65 x 0.4 x 0.2 = 5.2 M3
Area x Tinggi
c. Galian septictank 0.785 x 1.7 = 1.3345 M3
= 7.7945 M3
3.15155 x 5 = 15.75774 Kg
= 6 Btg
f. Bekesting 0.15 x 3x 2x 5 = 4.5 M2
0.25 x 3x 2x 5 = 7.5 M2
12 M2
f. Bekesting 0.2 x 15 x 2 = 6 M2
0.15 x 15 x 1 = 2.25 M2
8.25 M2
b. Keramik teras 30 cm x 30 cm 4x 2 = 8 M2
8 M2
c. Prabung = 21.7 M1
21.7 M1
d. Listplank = 56.42 M1
56.42 M1
18 Pek. Pengecatan
a. Dinding baru = 181.58 M2
181.58 M2
Panjang x Tinggi Bidang
b. Dinding lama 12 x 0.8 x 2 = 19.2 M2
12 x 0.8 x 2 = 19.2 M2
6 x 0.8 x 2 = 9.6 M2
6 x 3x 2 = 36 M2
84 M2
Total = 265.58 M2
19 Pek. Elektrik
a. Instalasi Listrik = 19 Titik
b. Stop Kontak Mata 1 = 3 Bh
c. Stop Kontak Mata 3 = 2 Bh
d. Saklar = 5 Bh
e. Lampu Philips = 9 Bh
f. MCB = 3 Glg
g. Kabel NYA 2.5 mm = 12 Btg
h. Pipa hitam
20 Pek. Sanitasi
a. Cincin Septictank dia. 1 m = 6 bh
b. Tutup Septictank = 1 bh
c. Closed Jongkok Keramik = 1 bh
d. Kran Air = 1 bh
e. Floor drain = 1 bh
f. Pipa PVC 1/2 in = 2 M
f. Pipa PVC 2 in = 2 M
f. Pipa PVC 4 in = 3 M
TABEL KEBUTUHAN BESI
NO. Keterangan Panjang Besi Banyak BeBanyak GaTotal PanjaKebutuhan Besi (Btg/Kebutuhan Besi (
a b c d e Ø8 Ø10 Ø12 Ø8 Ø10 Ø12
1 Pondasi Tapak Type P1
Kolom
e
b
e
a
No Uraian Pekerjaan Volume Satuan Faktor Pengg Jumlah Bahan / HOK Harga Sat. (Rp) Jumlah (Rp) Total Keterangan
PEKERJAAN TANAH
1 Pek. Penggalian tanah biasa /M3 7.7945
Upah :
Pekerja HOK 0.75 5.845875 110000 643046.25
643046.25 643046.25
Alat :
Upah :
Pekerja HOK 0.5 0.9743125 110000 107174.375
107174.375 107174.375
Upah :
Pekerja HOK 0.3 0.1962 110000 21582
21582 52974
Upah :
Pekerja HOK 0.3 0.027 110000 2970
2970 25650
No Uraian Pekerjaan Volume Satuan Faktor Pengg Jumlah Bahan / HOK Harga Sat. (Rp) Jumlah (Rp) Total Keterangan
PEKERJAAN STRUKTUR
Upah :
Pekerja HOK 0.66 8.6328 110000 949608
Tukang Kayu HOK 0.33 4.3164 130000 561132
Kepala Tukang HOK 0.033 0.43164 150000 64746
1575486 4944240
2xPakai 2472120
Upah :
Pekerja HOK 0.52 3.9 110000 429000
Tukang Kayu HOK 0.26 1.95 130000 253500
Kepala Tukang HOK 0.026 0.195 150000 29250
711750 1183125
2xPakai 591562.5
3 Pek. Pemasangan bekisting untuk Balok/M2 16.104
Bahan :
Kayu kelas III m3 0.04 0.64416 2500000 1610400
Paku 5 cm – 12 cm kg 0.4 6.4416 27000 173923.2
Minyak bekisting Liter 0.2 3.2208 5000 16104
Balok kayu kelas III m3 0.018 0.289872 2500000 724680
Plywood tebal 9 mm Lbr 0.35 5.6364 155000 873642
Dolken kayu 8-10cm –panj 4 m Btg 2 32.208 27000 869616
4268365.2
Upah :
Pekerja HOK 0.66 10.62864 110000 1169150.4
Tukang Kayu HOK 0.33 5.31432 130000 690861.6
Kepala Tukang HOK 0.033 0.531432 150000 79714.8
1939726.8 6208092
2xPakai 3104046
Upah :
Pekerja HOK 1.65 0.1485 110000 16335
Tukang Kayu HOK 0.25 0.0225 130000 2925
Kepala Tukang HOK 0.025 0.00225 150000 337.5
19597.5 96349.5
Upah :
Pekerja HOK 1.65 3.1515 110000 346665
Tukang Kayu HOK 0.25 0.4775 130000 62075
Kepala Tukang HOK 0.025 0.04775 150000 7162.5
415902.5 2050289.5
Upah :
Pekerja HOK 2 3.79125 110000 417037.5
Tukang Kayu HOK 0.35 0.66346875 130000 86250.9375
Kepala Tukang HOK 0.035 0.066346875 150000 9952.03125
513240.46875 2468956.78125
Upah :
Pekerja HOK 0.07 18.506900916 110000 2035759.10076
Tukang Kayu HOK 0.07 18.506900916 130000 2405897.11908
Kepala Tukang HOK 0.007 1.8506900916 150000 277603.51374
4719259.73358 46161498.57048
Per Kilo 4616149.857048
No Uraian Pekerjaan Volume Satuan Faktor Pengg Jumlah Bahan / HOK Harga Sat. (Rp) Jumlah (Rp) Total Keterangan
PEKERJAAN PASANGAN
1 Pek. Pemasangan bata semen (Batako) campuran 1 : 4/M2 121.454
Bahan :
Bata Semen Bh 16 1943.264 2300 4469507.2
Semen Portland Zak 0.25 30.3635 80000 2429080
Pasir pasang M3 0.04 4.85816 210000 1020213.6
7918800.8
Upah :
Pekerja HOK 0.3 36.4362 110000 4007982
Tukang Kayu HOK 0.1 12.1454 130000 1578902
Kepala Tukang HOK 0.01 1.21454 150000 182181
5769065 13687865.8
Upah :
Pekerja HOK 0.3 54.474 110000 5992140
Tukang Kayu HOK 0.15 27.237 130000 3540810
Kepala Tukang HOK 0.015 2.7237 150000 408555
9941505 12669562.92
3 Pek. Acian/M2 181.58
Bahan :
Semen Portland Zak 0.065 11.8027 80000 944216
944216
Upah :
Pekerja HOK 0.1 18.158 110000 1997380
Tukang Kayu HOK 0.1 18.158 130000 2360540
Kepala Tukang HOK 0.01 1.8158 150000 272370
4630290 5574506
No Uraian Pekerjaan Volume Satuan Faktor Pengg Jumlah Bahan / HOK Harga Sat. (Rp) Jumlah (Rp) Total Keterangan
PEKERJAANKERAMIK
1 Pek. Pemasangan lantai keramik ukuran 30 cm x 30 cm/M2 8
Bahan :
Keramik M2 1 8 70000 560000
Semen Portlan Zak 0.2 1.6 80000 128000
Pasir pasang M3 0.045 0.36 210000 75600
Semen warna Kg 0.6 4.8 20000 96000
859600
Upah :
Pekerja HOK 0.26 2.08 110000 228800
Tukang Kayu HOK 0.13 1.04 130000 135200
Kepala Tukang HOK 0.013 0.104 150000 15600
379600 1239200
No Uraian Pekerjaan Volume Satuan Faktor Pengg Jumlah Bahan / HOK Harga Sat. (Rp) Jumlah (Rp) Total Keterangan
PEKERJAAN ATAP
1 Pek. Pemasangan Listplank GRC/M1 56.42
Bahan :
Fiber Semen 08/20 M1 1.1 62.062 20000 1241240
Skrup Bh 1 56.42 72 4062.24
1245302.24
Upah :
Pekerja HOK 0.11 6.2062 110000 682682
Tukang Kayu HOK 0.22 12.4124 130000 1613612
Kepala Tukang HOK 0.022 1.24124 150000 186186
2482480 3727782.24
No Uraian Pekerjaan Volume Satuan Faktor Pengg Jumlah Bahan / HOK Harga Sat. (Rp) Jumlah (Rp) Total Keterangan
PEKERJAAN PELAPON
1 Pek. Plapon PVC rangka hollow baja ringan/M2 136.416
Bahan :
Hollow baja ringan 20x40 M1 4 545.664 9000 4910976
Hollow baja ringan 40x40 M1 2.5 341.04 10000 3410400
Plapon PVC 10 mm M2 1 136.416 127000 17324832
Skrup Bh 21 2864.736 72 206260.992
25852468.992
Upah :
Pekerja HOK 0.3 40.9248 110000 4501728
Tukang Kayu HOK 0.35 47.7456 130000 6206928
Kepala Tukang HOK 0.035 4.77456 150000 716184
11424840 37277308.992
No Uraian Pekerjaan Volume Satuan Faktor Pengg Jumlah Bahan / HOK Harga Sat. (Rp) Jumlah (Rp) Total Keterangan
PEKERJAAN PENGECATAN
1 Pek. Pengecatan tembok baru ( 3 x Sapu )/M2 265.58
Bahan :
Cat dasar Kg 0.1 26.558 32500 863135
Cat penutup Kg 0.26 69.0508 32500 2244151
3107286
Upah :
Pekerja HOK 0.02 5.3116 110000 584276
Tukang Kayu HOK 0.063 16.73154 130000 2175100.2
Kepala Tukang HOK 0.0063 1.673154 150000 250973.1
3010349.3 6117635.3
No Uraian Pekerjaan Volume Satuan Faktor Jumlah BahaHarga Sat. Jumlah (Rp)Total Keterangan
1 Pembongkaran Atap #REF!
Upah :
Pekerja HOK 0.24 #REF! #REF! Swadaya
Mandor HOK 0.024 #REF! #REF!
#REF! #REF!
II ALAT
1 Gerobak sorong (arco) Bh 1 1
2 Sendok semen Bh 2 2
3 Ember cor Bh 4 4
4 Cangkul Bh 2 2
5 Sekop Bh 2 2
6 Raskam Bh 2 2
7 Kuas Roll Bh 2 2
8 Kuas Bh 2 2
9 Palu Bh 1 1
10 Selang timbangan air m 6 6
11 Gergaji kayu Bh 1 1
12 Papan Proyek Ls 1 1
III. UPAH
1 Pekerja HOK 295.687134916 296
2 Tukang HOK 283.548921666 284
3 Kepala Tukang HOK 22.7735309666 23
SATUAN HARGA BAHAN DAN UPAH PEKERJA
B ALAT
1 Gerobak sorong (arco) Bh 600000
2 Sendok semen Bh 20000
3 Ember cor Bh 20000
4 Cangkul Bh 60000
5 Sekop Bh 65000
6 Raskam Bh 25000
7 Kuas Roll Bh 15000
8 Kuas Bh 5000
9 Palu Bh 40000
10 Selang timbangan air m 4000
11 Gergaji kayu Bh 120000
12 Papan Proyek Ls 300000
C UPAH
1 Pekerja HOK 110000
1 Tukang HOK 130000
1 Kepala Tukang HOK 150000
3in
PJG = 50 MM
LBR = 50 MM
TEBAL = 2 MM
PANJANG = 6000 MM
100
200
18840000
18.84 Kg
40000 keramik 50000 109.4 5470000
35000 plapon 60000 136.416 8184960
atap+rangka 70000 170.2312 11916184
dinding +plasteran+acian 70000 121.454 8501780
34072924