HARGA SATUAN
NO. JENIS PEKERJAAN KODE SATUAN KETERANGAN
(Rp.)
1 2 3 4 5
1 2 3 4 5
1 2 3 4 5
31 Batu Alam - Palimanan (RTM/Polos) 15/30 m 2
Rp 95,000.00
32 Batu Alam - Palimanan (RTM/Polos) 20/40 m 2
Rp 115,000.00
33 Batu Alam - Siolit (RTM/Polos) 15/30 m2 Rp 124,950.00
34 Batu Alam - Siolit (RTM/Polos) 20/40 m 2
Rp 151,250.00
35 Batu Alam (Andesit) - Polos 10/20 m 2
Rp 125,000.00
36 Batu Alam (Andesit) - Polos 15/30 m 2
Rp 125,000.00
37 Batu Alam (Andesit) - Polos 20/40 m 2
Rp 130,000.00
38 Batu Alam (Andesit) - Bakar Bintik 10/20 RTM m 2
Rp 135,000.00
39 Batu Alam (Andesit) - Bakar Bintik 15/30 RTM m2 Rp 140,000.00
40 Batu Alam (Andesit) - Bakar Bintik 20/40 RTM m 2
Rp 150,000.00
41 Batu Alam (Andesit) - Susun Sirih Bintik 3/30 m 2
Rp 164,450.00
42 Batu Alam (Andesit) - Susun Sirih Bintik 3/40 m 2
Rp 171,000.00
43 Batu Alam (Andesit) - Susun Sirih Polos 3/30 m 2
Rp 151,250.00
44 Batu Alam (Andesit) - Susun Sirih Polos 5/30 m 2
Rp 157,850.00
45 Batu Alam (Andesit) - Susun Sirih Polos 3/40 m2 Rp 164,450.00
46 Batu Alam (Candi) - Alur Lurus 10/20 m 2
Rp 124,950.00
47 Batu Alam (Candi) - Alur Lurus 15/30 m 2
Rp 134,800.00
48 Batu Alam (Candi) - Alur Lurus 20/40 m 2
Rp 144,700.00
49 Batu Alam (Candi) - Alur Patah 10/20 m 2
Rp 131,550.00
50 Batu Alam (Candi) - Alur Patah 15/30 m 2
Rp 144,700.00
51 Batu Alam (Candi) - Alur Patah 20/40 m2 Rp 157,850.00
52 Batu Alam (Candi) - RTM / Polos 10/20 m2 Rp 80,000.00
53 Batu Alam (Candi) - RTM / Polos 15/30 m 2
Rp 95,000.00
54 Batu Alam (Candi) - RTM / Polos 20/40 m 2
Rp 105,000.00
55 Batu Alam (Candi) - RTM / Polos 30/60 m 2
Rp 160,000.00
56 Batu Alam (Candi) - RTM / Polos 15/15 m 2
Rp 95,000.00
57 Batu Alam (Candi) - RTM / Polos 20/20 m 2
Rp 105,000.00
58 Batu Alam (Candi) - RTM / Polos 30/30 m2 Rp 125,000.00
59 Batu Alam (Lempeng) - Acak Hitam m 2
Rp 80,000.00
60 Batu Alam (Lempeng) - Acak Abu-abu m 2
Rp 75,000.00
61 Batu Alam (Lempeng) - Berdimensi m 2
Rp 120,000.00
62 Batu Alam (Lempeng) - Berdimensi 10/20 m 2
Rp 1,300,000.00
63 Batu Alam (Lempeng) - Berdimensi 20/40 m 2
Rp 120,000.00
64 Batu Alam (Marmo) - Bakar 10/20 m2 Rp 144,700.00
65 Batu Alam (Marmo) - Bakar 20/40 m 2
Rp 171,000.00
66 Batu Alam (Marmo) - Krem m 2
Rp 164,450.00
67 Batu Belah m 3
Rp 245,700.00
68 Batu Belah 15/20 m 3
Rp 427,550.00
69 Batu Bolder m 3
Rp 240,750.00
70 Batu Grosok (pudel) m3 Rp 263,100.00
71 Batu Gunung/quarry m3 Rp 115,100.00
72 Batu Kali Bulat m 3
Rp 263,100.00
NO. NAMA BAHAN / MATERIAL MEREK SATUAN HARGA
1 2 3 4 5
73 Batu Pecah 0,5/1 m 3
Rp 157,000.00
74 Batu Pecah 1/1 m 3
Rp 299,150.00
75 Batu Pecah 1/2 m3 Rp 322,990.00
76 Batu Pecah 2/3 m 3
Rp 287,700.00
77 Batu Pecah 3/5 m 3
Rp 370,950.00
78 Batu Pecah 5/7 m 3
Rp 394,650.00
79 Besi Beton Polos kg Rp 12,900.00
80 Besi Beton Ulir kg Rp 13,100.00
81 Besi Hollow Galvanis 4x4 mm x 0,4 mm m' Rp 10,500.00
82 Besi Plat Baja kg Rp 29,600.00
83 Besi Strip kg Rp 19,700.00
84 Buis Beton ø 15 cm - 100 cm bh Rp 62,750.00
85 Buis Beton ø 20 cm - 100 cm bh Rp 47,000.00
86 Buis Beton ø 25 cm - 100 cm bh Rp 84,550.00
87 Buis Beton ø 30 cm - 100 cm bh Rp 60,000.00
88 Buis Beton ø 40 cm - 100 cm bh Rp 126,000.00
89 Buis Beton ø 50 cm - 100 cm bh Rp 164,950.00
90 Buis Beton ø 60 cm - 100 cm bh Rp 210,450.00
91 Buis Beton ø 70 cm - 100 cm bh Rp 269,650.00
92 Buis Beton ø 80 cm - 100 cm bh Rp 240,000.00
93 Buis Beton ø 90 cm - 100 cm bh Rp 487,500.00
94 Buis Beton ø 100 cm - 100 cm bh Rp 545,950.00
95 Buis Beton U 15 cm - 100 cm bh Rp 65,100.00
96 Buis Beton U 20 cm - 100 cm bh Rp 30,000.00
97 Buis Beton U 25 cm - 100 cm bh Rp 80,250.00
98 Buis Beton U 30 cm - 100 cm bh Rp 40,000.00
99 Cat Batu Alam kg Rp 80,000.00
100 Cat Besi (baik) kg Rp 71,900.00
101 Cat Besi (cukup) kg Rp 61,800.00
102 Cat Foxi kg Rp 98,650.00
103 Cat Kayu (baik) kg Rp 73,500.00
104 Cat Kayu (cukup) kg Rp 70,000.00
105 Cat Tembok Dalam (baik) kg Rp 43,100.00
106 Cat Tembok Dalam (cukup) kg Rp 28,600.00
107 Cat Tembok Dalam dulux kg Rp 108,650.00
108 Cat Tembok Dalam mowilex/jotun kg Rp 86,700.00
109 Cat Tembok Luar (baik) kg Rp 47,000.00
110 Cat Tembok Luar (cukup) kg Rp 47,000.00
111 Cat Tembok Luar dulux kg Rp 138,100.00
112 Cat Tembok Luar (mowilex,jotun,nippon paint) kg Rp 106,700.00
113 Cat Anti Bocor kg Rp 52,100.00
114 Closet Duduk Porselin (manual) sekelas Ina/setara bh Rp 650,000.00
115 Closet Duduk Porselin (otomatis) sekelas Ina/setara bh Rp 1,525,000.00
116 Closet Jongkok Porselin bh Rp 277,500.00
117 Dempul kg Rp 35,650.00
118 Engsel H bh Rp 15,350.00
119 Engsel Kupu-kupu bh Rp 26,300.00
120 Engsel Pintu bh Rp 47,050.00
121 Eternit 4 mm (100 x 100) m2 Rp 22,350.00
NO. NAMA BAHAN / MATERIAL MEREK SATUAN HARGA
1 2 3 4 5
122 Floordrain (Plastik) bh Rp 18,800.00
123 Floordrain (Stainlessteel) bh Rp 54,700.00
124 Folding gate; tb. 0,4 mm m2 Rp 657,800.00
125 Folding gate; tb. 0,5 mm m 2
Rp 723,550.00
126 Folding gate; tb. 0,8 mm m 2
Rp 855,100.00
127 Formika lbr Rp 131,550.00
128 Galfalum (lebar 0,7 m) m' Rp 32,000.00
129 Genteng Beton bh Rp 6,400.00
130 Genteng Jatiwangi (Glazur) -Natural bh Rp 4,200.00
131 Genteng Jatiwangi (Non Glazur) - Natural bh Rp 3,200.00
132 Genteng Keramik M-CLASS bh Rp 9,700.00
133 Genteng Keramik KANMURI bh Rp 12,000.00
134 Genteng Kerpus Beton bh Rp 20,000.00
135 Genteng Kerpus Jatiwangi (Non glazur) Natural bh Rp 10,000.00
136 Genteng Kerpus Jatiwangi (Glazur) Natural bh Rp 11,000.00
137 Genteng Kerpus Keramik KIA bh Rp 25,000.00
138 Genteng Kerpus Kodok bh Rp 5,000.00
139 Genteng Kerpus M-CLASS bh Rp 25,000.00
140 Genteng Kerpus KANMURI bh Rp 25,000.00
141 Genteng Kerpus Mantili Besar/Kecil bh Rp 5,300.00
142 Genteng Mantili Besar bh Rp 2,100.00
143 Genteng Mantili Kecil bh Rp 1,500.00
144 Genteng Pres Kodok bh Rp 1,600.00
145 Genteng Kerpus Pres Kodok bh Rp 5,000.00
146 Granit Lokal 60x60 warna cerah m2 Rp 105,000.00
147 Granit Lokal 60x60 warna galap m 2
Rp 145,000.00
148 Granit 30x60 Roman m 2
Rp 232,500.00
149 Granit Stepnoasing 10x60 cm bh Rp 25,000.00
150 Grendel bh Rp 10,100.00
151 Gypsum 9 mm (Jaya board) lbr Rp 49,000.00
152 Hak Angin bh Rp 19,200.00
153 Harplek 30 x 200 lbr Rp 26,300.00
154 Harplek 40 x 200 lbr Rp 26,300.00
155 Harplek 50 x 200 lbr Rp 26,300.00
156 Harplek 60 x 200 lbr Rp 13,150.00
157 Isolatip bh Rp 10,500.00
158 Jendela nako lengkap daun Rp 109,150.00
159 Kaca bening 3 mm m2 Rp 100,000.00
160 Kaca bening 5 mm m 2
Rp 105,200.00
161 Kaca buram 12 mm m2 Rp 460,450.00
162 Kaca Rayband 3 mm m 2
Rp 98,650.00
163 Kaca Rayband 5 mm m 2
Rp 128,250.00
164 Kalsiboard 3.5 m 2
Rp 65,750.00
165 Kapur Pasang (padam) m 3
Rp 493,350.00
166 Kapur sirih kg Rp 1,300.00
167 Kawat berduri m' Rp 7,600.00
168 Kawat Ikat Beton/bendrat kg Rp 21,300.00
169 Kawat Las Listrik kg Rp 42,000.00
NO. NAMA BAHAN / MATERIAL MEREK SATUAN HARGA
1 2 3 4 5
170 Kayu Bakar m 3
Rp 230,200.00
171 Kayu Bengkirai (balok/pesagen) m 3
Rp 10,500,000.00
172 Kayu Bengkirai (papan) m3 Rp 11,000,000.00
173 Kayu Dolken Sengon ø 8-10 cm, 4 m btg Rp 55,000.00
174 Kayu Hutan (Rimba Campur) m3 Rp 9,209,200.00
175 Kayu Kruing (balok/pesagen) m 3
Rp 8,000,000.00
176 Kayu Kruing (papan) m 3
Rp 8,500,000.00
177 Kayu Perancah m 3
Rp 3,000,000.00
178 Kayu Randu (papan 1,5 x 20 x 200) lbr Rp 8,500.00
179 Keramik 10 x 25 cm (Lis) bh Rp 13,250.00
180 Keramik 7,5 x 20 cm (Lis) bh Rp 7,950.00
181 Keramik 20 x 20 cm doos Rp 64,200.00
182 Keramik 20 x 25 cm doos Rp 87,500.00
183 Keramik 30 x 30 cm doos Rp 52,050.00
184 Keramik 40 x 40 cm polished - putih doos Rp 48,000.00
185 Keramik 40 x 40 cm polised - warna doos Rp 64,300.00
186 Keramik 40 x 40 cm Unpolished doos Rp 64,300.00
187 Keramik 60 x 60 cm doos Rp 105,200.00
188 Keramik 50 x 50 cm warna doos Rp 76,500.00
189 Kerb Standard 10 x 20 x 50 bh Rp 26,000.00
190 Kerb Standard 12 x 30 x 50 bh Rp 39,000.00
191 Kran Air bh Rp 41,550.00
192 Kunci Lemari bh Rp 24,950.00
193 Kunci Silinder bh Rp 64,200.00
194 Kunci Tanam Besar bh Rp 172,700.00
195 Kunci Tanam Kecil bh Rp 98,650.00
196 Kuwas 3" bh Rp 8,500.00
197 Lapisan Kedap Air kg Rp 85,500.00
198 Lem Kayu (fox) kg Rp 15,000.00
199 Lem Kuning (aica aibon) kg Rp 99,300.00
200 Lis Gypsum m' Rp 9,000.00
201 Lis Kayu 2/3 m' Rp 10,500.00
202 Lis Kayu Profil m' Rp 10,130.00
203 Marmer Lampung, 100 m x 100 m bh Rp 1,710,250.00
204 Marmer Tulungagung, 100 m x 100 m bh Rp 1,118,250.00
205 Material Pilihan (tras) m3 Rp 300,000.00
206 Melamin kg Rp 109,850.00
207 Menie kg Rp 74,550.00
208 Minyak Beton & bekisting ltr Rp 45,000.00
209 Minyak Tanah ltr Rp 15,750.00
210 Mortar Bata Ringan. 40kg Sak Rp 113,300.00
kg Rp 2,800.00
211 Multipleks 120 x 240 tb. 8 mm lbr Rp 111,800.00
212 Multipleks 120 x 240 tb. 9 mm lbr Rp 101,500.00
213 Multipleks 120 x 240 tb. 12 mm lbr Rp 143,000.00
214 Mur Baut 3-8" bh Rp 3,900.00
215 Mur Baut 9" bh Rp 5,250.00
216 Nok Asbes bh Rp 37,500.00
217 Nok Galfalum m' Rp 92,050.00
NO. NAMA BAHAN / MATERIAL MEREK SATUAN HARGA
1 2 3 4 5
218 Nok Seng Gelombang m' Rp 29,600.00
219 Oker Putih kg Rp 55,900.00
220 Oker Warna kg Rp 32,850.00
221 Olie / Minyak pelumas (SAE 140) ltr Rp 49,300.00
222 Olie / Minyak pelumas (SAE 40) ltr Rp 52,600.00
223 Olie / Minyak pelumas (SAE 50) ltr Rp 49,950.00
224 Pagar BRC 90 lbr Rp 177,600.00
225 Pagar BRC 120 lbr Rp 217,050.00
226 Paku - payung kg Rp 40,300.00
227 Paku - sekrup kg Rp 75,600.00
228 Paku - ukuran 1" s/d 4" kg Rp 22,200.00
229 Paku - ukuran 1/4" s/d 1" kg Rp 24,400.00
230 Pasir Beton (Cepu) m3 Rp 324,100.00
231 Pasir Beton ( Muntilan) m 3
Rp 549,300.00
232 Pasir Kwarsa m 3
Rp 460,450.00
233 Pasir Pasang (Cepu) m 3
Rp 281,800.00
234 Pasir Lumajang m 3
Rp 425,000.00
235 Paving Block Holland tb. 6 cm K.225 m 2
Rp 66,000.00
236 Paving Block Holland tb. 6 cm K.300 m2 Rp 100,000.00
237 Paving Block Holland tb. 10 cm K.400 m2 Rp 125,000.00
238 Paving Block Holland tb. 10 cm K.400 m 2
Rp 160,000.00
Pertamina Dex ltr Rp 16,850.00
239 Pipa Galvanis ø 1/2" m' Rp 27,500.00
240 Pipa Galvanis ø 3/4" m' Rp 37,850.00
241 Pipa Galvanis ø 1" m' Rp 41,150.00
242 Pipa Galvanis ø 1 1/2" m' Rp 67,500.00
243 Pipa Galvanis ø 2" m' Rp 82,200.00
244 Pipa PVC Maspion tipe AW ø 1/2" m' Rp 8,800.00
245 Pipa PVC Maspion tipe AW ø 3/4" m' Rp 11,300.00
246 Pipa PVC Maspion tipe AW ø 1" m' Rp 14,300.00
247 Pipa PVC Maspion tipe AW ø 1 1/4" m' Rp 19,600.00
248 Pipa PVC Maspion tipe AW ø 1 1/2" m' Rp 25,000.00
249 Pipa PVC Maspion tipe AW ø 2" m' Rp 36,300.00
250 Pipa PVC Maspion tipe AW ø 2 1/2" m' Rp 37,500.00
251 Pipa PVC Maspion tipe AW ø 3" m' Rp 69,000.00
252 Pipa PVC Maspion tipe AW ø 4" m' Rp 87,500.00
253 Pipa PVC Maspion tipe AW ø 5" m' Rp 246,650.00
254 Pipa PVC Maspion tipe AW ø 6" m' Rp 324,250.00
255 Pipa Tiang BRC 90 - 2" unit Rp 328,900.00
256 Pipa Tiang BRC 120 - 2" unit Rp 328,900.00
257 Plafond PVC m2 Rp 16,400.00
258 Plamur Kayu kg Rp 36,800.00
259 Plamur Tembok kg Rp 55,750.00
260 Plinkut kg Rp 31,700.00
261 Portland Cement / PC (40 kg) Gersik zak Rp 57,000.00
262 Semen portland Gersik kg Rp 1,430.00
263 Portland Cement / PC (40 kg) Non Gersik zak Rp 51,000.00
264 Semen portland non Gersik kg Rp 1,275.00
NO. NAMA BAHAN / MATERIAL MEREK SATUAN HARGA
1 2 3 4 5
265 Semen Warna kg Rp 26,300.00
266 Profil Allumunium (kaca mati + tutup) Silver m' Rp 101,950.00
1 2 3 4 5
305 Sewa Alat jam Rp 46,000.00
306 Sewa Mesin Stamper hr Rp 500,000.00
Sewa Walls hr Rp 282,500.00
Pemeliharaan Alat (Walls) hr Rp 88,140.00
307 Shear Connector kg Rp 16,400.00
308 Sirtu (tak ayak) m3 Rp 197,300.00
309 Sirtu Royalty m 3
Rp 85,500.00
310 Soda Api kg Rp 35,500.00
311 Solar (minyak diesel) ltr Rp 9,800.00
312 Spiritus ltr Rp 15,000.00
313 Stempet kg Rp 32,850.00
314 Sunscreen Allumunium m2 Rp 19,700.00
315 Tali Ijuk kg Rp 27,350.00
316 Tanah Biasa m3 Rp 62,450.00
317 Tanah Liat m 3
Rp 92,050.00
318 Tanah Padas m 3
Rp 65,750.00
319 Teak Wood 120 x 240 tb. 4 mm lbr Rp 85,500.00
320 Thinner A ltr Rp 43,000.00
321 Thinner Super Daimaru ltr Rp 42,500.00
322 Tanag Timbunan m3 Rp 50,000.00
323 Tras m3 Rp 263,100.00
324 Tripleks 120 x 240 tb. 3 mm lbr Rp 48,000.00
325 Tripleks 120 x 240 tb. 4 mm lbr Rp 58,000.00
326 Tripleks 120 x 240 tb. 6 mm lbr Rp 92,050.00
327 Urinoir bh Rp 1,315,600.00
328 Usuk Kayu Bengkirai (3x5x400) btg Rp 49,000.00
329 Usuk Kayu Bengkirai (4x6x400) btg Rp 85,000.00
330 Usuk Kayu Bengkirai (5x7x400) btg Rp 135,000.00
331 Usuk Kayu Kruing (3x5x400) btg Rp 40,000.00
332 Usuk Kayu Kruing (4x6x400) btg Rp 60,000.00
333 Usuk Kayu Kruing (5x7x400) btg Rp 100,000.00
334 Wastafel Besar bh Rp 425,000.00
335 Wastafel Kecil bh Rp 225,000.00
336 Waterdrain bh Rp 13,150.00
337 Wiremesh 6' m2 Rp 49,600.00
338 Wiremesh 8' m 2
Rp 94,100.00
339 Wood filer (INFRA) kg Rp 66,400.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
1.1.e.(c) Pembuatan 1 m2 kantor sementara / Rumah Jaga / Gudan Semen dan Peralatan, lantai plesteran
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.0000 100,000.00 200,000.00
Tukang Kayu L.02 OH 2.0000 110,000.00 220,000.00
Tukang Batu L.02 OH 1.0000 110,000.00 110,000.00
Kepala Tukang L.03 OH 0.3000 120,000.00 36,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 571,000.00
B. BAHAN
Kayu Dolken Sengon ø 8-10 cm, 4 m btg 1.2500 55,000.00 68,750.00
Kayu Kruing (balok/pesagen) m3 0.1800 8,000,000.00 1,440,000.00
Paku biasa 2 " - 5" kg 0.0800 22,200.00 1,776.00
Besi Strip kg 1.1000 19,700.00 21,670.00
Semen portland Gersik kg 35.0000 1,430.00 50,050.00
Pasir Pasang (Cepu) m3 0.1500 281,800.00 42,270.00
Pasir Beton (Cepu) m3 0.1000 324,100.00 32,410.00
Batu Pecah 1/2 m3 0.1500 322,990.00 48,448.50
Bata merah lokal bh 30.0000 600.00 18,000.00
Seng Talang BJLS 26 lebar 1,20 m' 0.2500 65,750.00 16,437.50
Jendela nako lengkap bh 0.2000 109,150.00 21,830.00
Kaca Rayband 5 mm m2 0.0800 128,250.00 10,260.00
Kunci Tanam Besar bh 0.1500 172,700.00 25,905.00
Teak Wood 120 x 240 tb. 4 mm lbr 0.0600 85,500.00 5,130.00
JUMLAH HARGA BAHAN 1,802,937.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 2,373,937.00
E. Overhead & profit 15.00% x D 356,090.55
F. Harga satuan pekerjaan (D+E) 2,730,027.55
B. BAHAN
Kayu Dolken Sengon ø 8-10 cm, 4 m btg 1.7000 55,000.00 93,500.00
Kayu Kruing (balok/pesagen) m3 0.2100 8,000,000.00 1,680,000.00
Paku biasa 2 " - 5" kg 0.3000 22,200.00 6,660.00
Semen portland Gersik kg 10.5000 1,430.00 15,015.00
Pasir Beton (Cepu) m3 0.0300 324,100.00 9,723.00
Batu Pecah 1/2 m3 0.0500 322,990.00 16,149.50
Seng Gelb. Kecil 0,70 x 1,80 m lbr 1.5000 85,500.00 128,250.00
Seng Talang BJLS 26 lebar 1,20 lbr 0.2500 65,750.00 16,437.50
JUMLAH HARGA BAHAN 1,965,735.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 2,314,735.00
E. Overhead & profit 15.00% x D 347,210.25
F. Harga satuan pekerjaan (D+E) 2,661,945.25
1.7.7.1.1.e (a) Penggalian 1 m3 Tanah Biasa sedalam lebih dari 1 m s.d 2 m untuk volume s.d 200 m3
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.9000 100,000.00 90,000.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 94,500.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 94,500.00
E. Overhead & profit 15.00% x D 14,175.00
F. Harga satuan pekerjaan (D+E) 108,675.00
1.7.7.1.1.g (a) Penggalian 1 m3 Tanah Biasa sedalam lebih dari 2 m s.d 3 m untuk volume s.d 200 m3
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0500 100,000.00 105,000.00
Mandor L.04 OH 0.0670 100,000.00 6,700.00
JUMLAH TENAGA KERJA 111,700.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 111,700.00
E. Overhead & profit 15.00% x D 16,755.00
F. Harga satuan pekerjaan (D+E) 128,455.00
1.7.7.1.1.h (a) Penggalian 1 m3 Tanah Biasa > 3 m, setiap tambah kedalaman 1 m'
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0075 100,000.00 750.00
JUMLAH TENAGA KERJA 8,250.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 8,250.00
E. Overhead & profit 15.00% x D 1,237.50
F. Harga satuan pekerjaan (D+E) 9,487.50
1.7.9.1.b (a) Penggalian 1 m3 Tanah Cadas sedalam s.d. 1 m untuk volume s.d 200 m3
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 156,000.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 156,000.00
E. Overhead & profit 15.00% x D 23,400.00
F. Harga satuan pekerjaan (D+E) 179,400.00
1.7.9.1.c (a) Penggalian 1 m3 Tanah Cadas / Tanah Keras sedalam lebih dari 1 m s.d 2 m untuk volume s.d 200 m3
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.3920 100,000.00 139,200.00
Mandor L.04 OH 0.1392 100,000.00 13,920.00
JUMLAH TENAGA KERJA 153,120.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 153,120.00
E. Overhead & profit 15.00% x D 22,968.00
F. Harga satuan pekerjaan (D+E) 176,088.00
1.7.9.1.d (a) Penggalian 1 m3 Tanah Cadas / Tanah Keras sedalam lebih dari 2 m s.d 3 m untuk volume s.d 200 m3
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Mandor L.04 OH 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA 165,000.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 165,000.00
E. Overhead & profit 15.00% x D 24,750.00
F. Harga satuan pekerjaan (D+E) 189,750.00
1.7.10.1.b (c) Penggalian 1 m3 Tanah Lumpur sedalam s.d 1 m untuk volume s.d 200 m3
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 124,500.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 124,500.00
E. Overhead & profit 15.00% x D 18,675.00
F. Harga satuan pekerjaan (D+E) 143,175.00
1.7.3.1.a (a) 1 m2 Pembersihan dan Pengupasan Permukaan tanah (striping) s.d. tanaman ø 2 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 5,500.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 5,500.00
E. Overhead & profit 15.00% x D 825.00
F. Harga satuan pekerjaan (D+E) 6,325.00
A.1.5.1.13 Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan tangki septik
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 16,500.00
B. BAHAN
Tali Ijuk kg 6.0000 27,350.00 164,100.00
JUMLAH HARGA BAHAN 164,100.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 180,600.00
E. Overhead & profit 15.00% x D 27,090.00
F. Harga satuan pekerjaan (D+E) 207,690.00
2.1.1.b.(a) Pemasangan 1 m3 Pondasi batu belah mortar tipe N (5,2 Mpa), campuran 1 SP : 4 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 110,000.00 82,500.00
Kepala Tukang L.03 OH 0.0750 120,000.00 9,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 249,000.00
B. BAHAN
Batu Belah m3 1.2000 245,700.00 294,840.00
Semen portland Gersik kg 163.0000 1,430.00 233,090.00
Pasir Pasang (Cepu) m3 0.5200 281,800.00 146,536.00
JUMLAH HARGA BAHAN 674,466.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 923,466.00
E. Overhead & profit 15.00% x D 138,519.90
F. Harga satuan pekerjaan (D+E) 1,061,985.90
2.1.1.c.(a) Pemasangan 1 m3 Pondasi batu belah mortar tipe O (2,4 Mpa), campuran 1 SP : 5 PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 110,000.00 82,500.00
Kepala Tukang L.03 OH 0.0750 120,000.00 9,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 249,000.00
B. BAHAN
Batu Belah m3 1.2000 245,700.00 294,840.00
Semen portland Gersik kg 136.0000 1,430.00 194,480.00
Pasir Pasang (Cepu) m3 0.5440 281,800.00 153,299.20
JUMLAH HARGA BAHAN 642,619.20
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 891,619.20
E. Overhead & profit 15.00% x D 133,742.88
F. Harga satuan pekerjaan (D+E) 1,025,362.08
2.2.12.b.(c) Pemasangan 1 m3 Pondasi siklop (60% beton dgn camp. 1 SP : 2PB : 3Kr dan 40% Batu belah)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.4000 100,000.00 340,000.00
Tukang Batu L.02 OH 0.8500 110,000.00 93,500.00
Kepala Tukang L.03 OH 0.0850 120,000.00 10,200.00
Mandor L.04 OH 0.1700 100,000.00 17,000.00
JUMLAH TENAGA KERJA 460,700.00
B. BAHAN
Batu Belah m3 0.4800 245,700.00 117,936.00
Semen portland Gersik kg 194.0000 1,430.00 277,420.00
Pasir Beton (Cepu) m3 0.3120 324,100.00 101,119.20
Batu Pecah 1/2 m3 0.4680 322,990.00 151,159.32
Besi Beton Polos kg 126.0000 12,900.00 1,625,400.00
Kawat Ikat Beton/bendrat kg 1.8000 21,300.00 38,340.00
JUMLAH HARGA BAHAN 2,311,374.52
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 2,772,074.52
E. Overhead & profit 15.00% x D 415,811.18
F. Harga satuan pekerjaan (D+E) 3,187,885.70
A.4.1.1.4 Pemasangan 1 m3 Lantai Kerja Beton mutu fc = 7,4 Mpa (K.100), slump (3-6), w/c = 0,87
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
Tukang Batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 150,400.00
B. BAHAN
Semen portland Gersik kg 230.0000 1,430.00 328,900.00
Pasir Beton (Cepu) kg 893.0000 231.50 206,729.50
Batu Pecah 1/2 kg 1027.0000 239.25 245,711.65
Air bersih ltr 200.0000 39.00 7,800.00
JUMLAH HARGA BAHAN 789,141.15
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 939,541.15
E. Overhead & profit 15.00% x D 140,931.17
F. Harga satuan pekerjaan (D+E) 1,080,472.32
A.4.1.1.6 Pemasangan 1 m3 Beton mutu fc = 16,9 Mpa (K.200)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 110,000.00 30,250.00
Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 206,910.00
B. BAHAN
Semen portland Gersik kg 352.0000 1,430.00 503,360.00
Pasir Beton (Cepu) kg 731.0000 231.50 169,226.50
Batu Pecah 1/2 kg 1031.0000 239.25 246,668.66
Air bersih ltr 215.0000 39.00 8,385.00
JUMLAH HARGA BAHAN 927,640.16
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 1,134,550.16
E. Overhead & profit 15.00% x D 170,182.52
F. Harga satuan pekerjaan (D+E) 1,304,732.68
A.4.1.1.11 Pemasangan 1 m3 Beton mutu fc = 28,8 Mpa (K.325), slump (12+2), w/c = 0,49
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 100,000.00 210,000.00
Tukang Batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.1050 100,000.00 10,500.00
JUMLAH TENAGA KERJA 263,200.00
B. BAHAN
Semen portland Gersik kg 439.0000 1,430.00 627,770.00
Pasir Beton ( Muntilan) kg 670.0000 392.36 262,879.29
Batu Pecah 1/2 kg 1006.0000 239.25 240,687.36
Air bersih ltr 215.0000 39.00 8,385.00
JUMLAH HARGA BAHAN 1,139,721.65
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 1,402,921.65
E. Overhead & profit 15.00% x D 210,438.25
F. Harga satuan pekerjaan (D+E) 1,613,359.90
A.4.1.1.12 Pemasangan 1 m3 Beton mutu fc = 31,1 Mpa (K.350), slump (12+2), w/c = 0,48
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1000 100,000.00 210,000.00
Tukang Batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala Tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.1050 100,000.00 10,500.00
JUMLAH TENAGA KERJA 263,200.00
B. BAHAN
Semen portland Gersik kg 448.0000 1,430.00 640,640.00
Pasir Beton ( Muntilan) kg 667.0000 392.36 261,702.21
Batu Pecah 1/2 kg 1000.0000 239.25 239,251.85
Air bersih ltr 215.0000 39.00 8,385.00
JUMLAH HARGA BAHAN 1,149,979.07
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 1,413,179.07
E. Overhead & profit 15.00% x D 211,976.86
F. Harga satuan pekerjaan (D+E) 1,625,155.93
2.2.7.a.(a) Pemasangan 100 kg jaring kawat (wiremesh M6) untuk plat atau dinding atau Ferrocement
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Besi/Besi Beton L.02 OH 0.2500 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.0250 120,000.00 3,000.00
Mandor L.04 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 58,000.00
B. BAHAN
Wiremash M6 ø 5,7 mm kg 102.0000 -
Kawat Ikat Beton/bendrat kg 0.5000 21,300.00 10,650.00
JUMLAH HARGA BAHAN 10,650.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 68,650.00
E. Overhead & profit 15.00% x D 10,297.50
F. Harga satuan pekerjaan (D+E) 78,947.50
2.2.7.a.a.(a) Pemasangan 1 kg jaring kawat (wiremesh M6) untuk plat atau dinding atau Ferrocement
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0025 100,000.00 250.00
Tukang Besi/Besi Beton L.02 OH 0.0025 110,000.00 275.00
Kepala Tukang L.03 OH 0.0000 120,000.00 -
Mandor L.04 OH 0.0003 100,000.00 30.00
JUMLAH TENAGA KERJA 555.00
B. BAHAN
Wiremash M6 ø 5,7 mm kg 1.0200 -
Kawat Ikat Beton/bendrat kg 0.0050 21,300.00 106.50
JUMLAH HARGA BAHAN 106.50
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 661.50
E. Overhead & profit 15.00% x D 99.23
F. Harga satuan pekerjaan (D+E) 760.73
A.4.1.1.22.a Pemasangan 1 m2 bekisting untuk Plat lantai Beton Bangunan Gedung (4 x pakai)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Batu L.02 OH 0.3300 110,000.00 36,300.00
Kepala Tukang L.03 OH 0.0330 120,000.00 3,960.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 109,560.00
B. BAHAN
Kayu Perancah m3 0.0100 3,000,000.00 30,000.00
Paku - ukuran 1" s/d 4" kg 0.4000 22,200.00 8,880.00
Minyak Beton & bekisting bh 0.2000 45,000.00 9,000.00
Kayu Kruing (balok/pesagen) m3 0.0038 8,000,000.00 30,400.00
Multipleks 120 x 240 tb. 9 mm lbr 0.0875 101,500.00 8,881.25
Kayu Dolken Sengon ø 8-10 cm, 4 m btg 1.5000 55,000.00 82,500.00
JUMLAH HARGA BAHAN 169,661.25
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 279,221.25
E. Overhead & profit 15.00% x D 41,883.19
F. Harga satuan pekerjaan (D+E) 321,104.44
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 40.40.0,4 mm, modul 60 x 120 cm (dinding partisi)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Besi/Besi Beton L.02 OH 0.2500 110,000.00 27,500.00
Kepala Tukang L.03 OH 0.0250 120,000.00 3,000.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 56,800.00
B. BAHAN
Rangka Metal (Hollow 40.40.0,4 mm) m' 3.5000 7,800.00 27,300.00
Assesoris (perkuatan, dll) ls 100% x rangka 27,300.00
JUMLAH HARGA BAHAN 54,600.00
C. PERALATAN
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 111,400.00
E. Overhead & profit 15.00% x D 16,710.00
F. Harga satuan pekerjaan (D+E) 128,110.00
B. BAHAN
Profil Allumunium (kaca mati + tutup) Silver m' 1.1000 101,950.00 112,145.00
Sekrup Fixer (Allumunium) bh 2.0000 1,050.00 2,100.00
Sealant (Dokorning) tube 0.0600 45,250.00 2,715.00
JUMLAH HARGA BAHAN 116,960.00
C. PERALATAN
A.4.4.1.2 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1 batu dgn mortar tipe S, fc' 12,5 Mpa (setara campuran 1SP : 3PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 87,400.00
B. BAHAN
Bata merah lokal bh 140.0000 600.00 84,000.00
Semen portland Gersik kg 32.9500 1,430.00 47,118.50
Pasir Pasang (Cepu) m3 0.0910 281,800.00 25,643.80
JUMLAH HARGA BAHAN 156,762.30
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 244,162.30
E. Overhead & profit 15.00% x D 36,624.34
F. Harga satuan pekerjaan (D+E) 280,786.64
A.4.4.1.3 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1 batu dgn mortar tipe N, fc' 5,2 Mpa (setara campuran 1SP : 4PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 87,400.00
B. BAHAN
Bata merah lokal bh 140.0000 600.00 84,000.00
Semen portland Gersik kg 26.5500 1,430.00 37,966.50
Pasir Pasang (Cepu) m3 0.0930 281,800.00 26,207.40
JUMLAH HARGA BAHAN 148,173.90
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 235,573.90
E. Overhead & profit 15.00% x D 35,336.09
F. Harga satuan pekerjaan (D+E) 270,909.99
A.4.4.1.4 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1 batu dgn mortar tipe O, fc' 2,4 Mpa (setara campuran 1SP : 5PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 87,400.00
B. BAHAN
Bata merah lokal bh 140.0000 600.00 84,000.00
Semen portland Gersik kg 22.2000 1,430.00 31,746.00
Pasir Pasang (Cepu) m3 0.1020 281,800.00 28,743.60
JUMLAH HARGA BAHAN 144,489.60
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 231,889.60
E. Overhead & profit 15.00% x D 34,783.44
F. Harga satuan pekerjaan (D+E) 266,673.04
A.4.4.1.5 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1 batu dgn campuran 1SP : 6PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 87,400.00
B. BAHAN
Bata merah lokal bh 140.0000 600.00 84,000.00
Semen portland Gersik kg 18.5000 1,430.00 26,455.00
Pasir Pasang (Cepu) m3 0.1220 281,800.00 34,379.60
JUMLAH HARGA BAHAN 144,834.60
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 232,234.60
E. Overhead & profit 15.00% x D 34,835.19
F. Harga satuan pekerjaan (D+E) 267,069.79
A.4.4.1.6 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1 batu dgn campuran 1SP : 3KP : 10PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 87,400.00
B. BAHAN
Bata merah lokal bh 140.0000 600.00 84,000.00
Semen portland Gersik kg 10.0800 1,430.00 14,414.40
Kapur Pasang (padam) m3 0.0275 493,350.00 13,567.13
Pasir Pasang (Cepu) m3 0.0925 281,800.00 26,066.50
JUMLAH HARGA BAHAN 138,048.03
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 225,448.03
E. Overhead & profit 15.00% x D 33,817.20
F. Harga satuan pekerjaan (D+E) 259,265.23
A.4.4.1.7 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1/2 batu dgn mortar tipe M, fc' 17,2 Mpa (setara campuran 1SP : 2PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 18.9500 1,430.00 27,098.50
Pasir Pasang (Cepu) m3 0.0380 281,800.00 10,708.40
JUMLAH HARGA BAHAN 79,806.90
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 123,506.90
E. Overhead & profit 15.00% x D 18,526.04
F. Harga satuan pekerjaan (D+E) 142,032.94
A.4.4.1.8 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1/2 batu dgn mortar tipe S, fc' 12,5 Mpa (setara campuran 1SP : 3PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 14.3700 1,430.00 20,549.10
Pasir Pasang (Cepu) m3 0.0400 281,800.00 11,272.00
JUMLAH HARGA BAHAN 73,821.10
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 117,521.10
E. Overhead & profit 15.00% x D 17,628.17
F. Harga satuan pekerjaan (D+E) 135,149.27
A.4.4.1.9 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1/2 batu dgn mortar tipe N, fc' 5,2 Mpa (setara campuran 1SP : 4PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 11.5000 1,430.00 16,445.00
Pasir Pasang (Cepu) m3 0.0430 281,800.00 12,117.40
JUMLAH HARGA BAHAN 70,562.40
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 114,262.40
E. Overhead & profit 15.00% x D 17,139.36
F. Harga satuan pekerjaan (D+E) 131,401.76
A.4.4.1.10 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1/2 batu dgn mortar tipe O, fc' 2,4 Mpa (setara campuran 1SP : 5PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 9.6800 1,430.00 13,842.40
Pasir Pasang (Cepu) m3 0.0450 281,800.00 12,681.00
JUMLAH HARGA BAHAN 68,523.40
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 112,223.40
E. Overhead & profit 15.00% x D 16,833.51
F. Harga satuan pekerjaan (D+E) 129,056.91
A.4.4.1.11 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1/2 batu dgn campuran 1SP : 6PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 8.3200 1,430.00 11,897.60
Pasir Pasang (Cepu) m3 0.0490 281,800.00 13,808.20
JUMLAH HARGA BAHAN 67,705.80
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 111,405.80
E. Overhead & profit 15.00% x D 16,710.87
F. Harga satuan pekerjaan (D+E) 128,116.67
A.4.4.1.12 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1/2 batu dgn campuran 1SP : 8PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 6.5000 1,430.00 9,295.00
Pasir Pasang (Cepu) m3 0.0500 281,800.00 14,090.00
JUMLAH HARGA BAHAN 65,385.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 109,085.00
E. Overhead & profit 15.00% x D 16,362.75
F. Harga satuan pekerjaan (D+E) 125,447.75
A.4.4.1.13 Pemasangan 1 m2 Dinding bata merah (5x11x22) cm tebal 1/2 batu dgn campuran 1PPC : 3KP : 10PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 4.5000 1,430.00 6,435.00
Kapur Pasang (padam) m3 0.0150 493,350.00 7,400.25
Pasir Pasang (Cepu) m3 0.0500 281,800.00 14,090.00
JUMLAH HARGA BAHAN 69,925.25
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 113,625.25
E. Overhead & profit 15.00% x D 17,043.79
F. Harga satuan pekerjaan (D+E) 130,669.04
A.4.4.1.16 Pemasangan 1 m2 Dinding Conblock HB.20 dgn mortar tipe S, fc' 12,5 Mpa (setara campuran 1SP : 3PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang Batu L.02 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 55,100.00
B. BAHAN
Bataco Besar (9/19/39) HB.20 bh 12.5000 16,400.00 205,000.00
Semen portland Gersik kg 30.3200 1,430.00 43,357.60
Pasir Pasang (Cepu) m3 0.7280 281,800.00 205,150.40
Besi Beton Polos kg 0.2800 12,900.00 3,612.00
JUMLAH HARGA BAHAN 457,120.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 512,220.00
E. Overhead & profit 15.00% x D 76,833.00
F. Harga satuan pekerjaan (D+E) 589,053.00
A.4.4.1.17 Pemasangan 1 m2 Dinding Conblock HB.20 dgn mortar tipe N, fc' 5,2 Mpa (setara campuran 1PPC : 4PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang Batu L.02 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 55,100.00
B. BAHAN
Bataco Besar (9/19/39) HB.20 bh 12.5000 16,400.00 205,000.00
Semen portland Gersik kg 24.2600 1,430.00 34,691.80
Pasir Pasang (Cepu) m3 0.7720 281,800.00 217,549.60
Besi Beton Polos kg 0.2800 12,900.00 3,612.00
JUMLAH HARGA BAHAN 460,853.40
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 515,953.40
E. Overhead & profit 15.00% x D 77,393.01
F. Harga satuan pekerjaan (D+E) 593,346.41
A.4.4.1.18 Pemasangan 1 m2 Dinding Conblock HB.15 dgn mortar tipe S, fc' 12,5 Mpa (setara campuran 1PPC : 3PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3200 100,000.00 32,000.00
Tukang Batu L.02 OH 0.1200 110,000.00 13,200.00
Kepala Tukang L.03 OH 0.0120 120,000.00 1,440.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 48,240.00
B. BAHAN
Bataco Sedang (10/15/40) HB.15 bh 12.5000 5,250.00 65,625.00
Semen portland Gersik kg 22.7400 1,430.00 32,518.20
Pasir Pasang (Cepu) m3 0.5500 281,800.00 154,990.00
Besi Beton Polos kg 0.2800 12,900.00 3,612.00
JUMLAH HARGA BAHAN 256,745.20
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 304,985.20
E. Overhead & profit 15.00% x D 45,747.78
F. Harga satuan pekerjaan (D+E) 350,732.98
A.4.4.1.19 Pemasangan 1 m2 Dinding Conblock HB.15 dgn mortar tipe N, fc' 5,2 Mpa (setara campuran 1PPC : 4PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3200 100,000.00 32,000.00
Tukang Batu L.02 OH 0.1200 110,000.00 13,200.00
Kepala Tukang L.03 OH 0.0120 120,000.00 1,440.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 48,240.00
B. BAHAN
Bataco Sedang (10/15/40) HB.15 bh 12.5000 5,250.00 65,625.00
Semen portland Gersik kg 18.2000 1,430.00 26,026.00
Pasir Pasang (Cepu) m3 0.5820 281,800.00 164,007.60
Besi Beton Polos kg 0.2800 12,900.00 3,612.00
JUMLAH HARGA BAHAN 259,270.60
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 307,510.60
E. Overhead & profit 15.00% x D 46,126.59
F. Harga satuan pekerjaan (D+E) 353,637.19
A.4.4.1.20 Pemasangan 1 m2 Dinding Conblock HB.10 dgn mortar tipe S, fc' 12,5 Mpa (setara campuran 1SP : 3PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bataco Kecil (7/11/25) HB.10 bh 12.5000 3,000.00 37,500.00
Semen portland Gersik kg 15.1600 1,430.00 21,678.80
Pasir Pasang (Cepu) m3 0.3640 281,800.00 102,575.20
Besi Beton Polos kg 0.2800 12,900.00 3,612.00
JUMLAH HARGA BAHAN 165,366.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 209,066.00
E. Overhead & profit 15.00% x D 31,359.90
F. Harga satuan pekerjaan (D+E) 240,425.90
A.4.4.1.21 Pemasangan 1 m2 Dinding Conblock HB.10 dgn mortar tipe N, fc' 5,2 Mpa (setara campuran 1PPC : 4PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bataco Kecil (7/11/25) HB.10 bh 12.5000 3,000.00 37,500.00
Semen portland Gersik kg 12.1300 1,430.00 17,345.90
Pasir Pasang (Cepu) m3 0.3880 281,800.00 109,338.40
Besi Beton Polos kg 0.2800 12,900.00 3,612.00
JUMLAH HARGA BAHAN 167,796.30
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 211,496.30
E. Overhead & profit 15.00% x D 31,724.45
F. Harga satuan pekerjaan (D+E) 243,220.75
A.4.4.1.22 Pemasangan 1 m2 Dinding Rooster 12x11x24 dgn mortar tipe S, fc' 12,5 Mpa (setara campuran 1PPC : 3PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata Rooster 12x11x24 bh 30.0000 - -
Semen portland Gersik kg 11.0000 1,430.00 15,730.00
Pasir Pasang (Cepu) m3 0.0350 281,800.00 9,863.00
JUMLAH HARGA BAHAN 25,593.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 69,293.00
E. Overhead & profit 15.00% x D 10,393.95
F. Harga satuan pekerjaan (D+E) 79,686.95
A.4.4.1.23 Pemasangan 1 m2 Dinding Rooster 12x11x24 dgn mortar tipe N, fc' 5,2 Mpa (setara campuran 1PPC : 4PP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 43,700.00
B. BAHAN
Bata Rooster 12x11x24 bh 30.0000 -
Semen portland Gersik kg 11.0000 1,430.00 15,730.00
Pasir Pasang (Cepu) m3 0.0350 281,800.00 9,863.00
JUMLAH HARGA BAHAN 25,593.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 69,293.00
E. Overhead & profit 15.00% x D 10,393.95
F. Harga satuan pekerjaan (D+E) 79,686.95
A.4.4.1.25 Pemasangan 1 m2 Dinding Bata Ringan tebal 7,5 cm dgn mortar siap pakai
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6700 100,000.00 67,000.00
Tukang Batu L.02 OH 0.1300 110,000.00 14,300.00
Kepala Tukang L.03 OH 0.0130 120,000.00 1,560.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 83,160.00
B. BAHAN
Bata Ringan (Habel) tebal 7,5 cm bh 8.4000 6,100.00 51,240.00
Mortar Bata Ringan. 40kg kg 0.4730 2,832.50 1,339.77
JUMLAH HARGA BAHAN 52,579.77
C. PERALATAN
Peralatan ls 10% x bahan 5,257.98
JUMLAH HARGA PERALATAN 5,257.98
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 140,997.75
E. Overhead & profit 15.00% x D 21,149.66
F. Harga satuan pekerjaan (D+E) 162,147.41
A.4.4.1.26 Pemasangan 1 m2 Dinding Bata Ringan tebal 10 cm dgn mortar siap pakai
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.6710 100,000.00 67,100.00
Tukang Batu L.02 OH 0.1300 110,000.00 14,300.00
Kepala Tukang L.03 OH 0.0130 120,000.00 1,560.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 83,260.00
B. BAHAN
Bata Ringan (Habel) tebal 10 cm bh 8.4000 8,300.00 69,720.00
Mortar Bata Ringan. 40kg kg 0.6300 2,832.50 1,784.48
JUMLAH HARGA BAHAN 71,504.48
C. PERALATAN
Peralatan ls 10% x bahan 7,150.45
JUMLAH HARGA PERALATAN 7,150.45
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 161,914.92
E. Overhead & profit 15.00% x D 24,287.24
F. Harga satuan pekerjaan (D+E) 186,202.16
3.2.2.1.(a) HARGA SATUAN PEKERJAAN PLESTERAN
3.2.1.(c) Pemasangan 1 m2 Plesteran dgn campuran 1SP : 1PP tebal 15 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 49,800.00
B. BAHAN
Semen portland Gersik kg 15.5040 1,430.00 22,170.72
Pasir Pasang (Cepu) m3 0.0160 281,800.00 4,508.80
JUMLAH HARGA BAHAN 26,679.52
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 76,479.52
E. Overhead & profit 15.00% x D 11,471.93
F. Harga satuan pekerjaan (D+E) 87,951.45
A.4.4.2.26 Pemasangan 1 m2 Finishing siar pasangan batu kali dgn campuran 1SP : 2PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 110,000.00 16,500.00
Kepala Tukang L.03 OH 0.0150 120,000.00 1,800.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 49,800.00
B. BAHAN
Semen portland Gersik kg 6.3400 1,430.00 9,066.20
Pasir Pasang (Cepu) m3 0.0120 281,800.00 3,381.60
JUMLAH HARGA BAHAN 12,447.80
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 62,247.80
E. Overhead & profit 15.00% x D 9,337.17
F. Harga satuan pekerjaan (D+E) 71,584.97
3.2.2.2.36.(c) Pemasangan 1 m2 Acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 33,200.00
B. BAHAN
Semen portland Gersik kg 3.2500 1,430.00 4,647.50
JUMLAH HARGA BAHAN 4,647.50
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 37,847.50
E. Overhead & profit 15.00% x D 5,677.13
F. Harga satuan pekerjaan (D+E) 43,524.63
A.4.5.1.5 Pemasangan 1 m2 Langit-Langit Tripleks 120 cm x 240 cm (tebal 3 mm, 4 mm, 6 mm)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 22,700.00
B. BAHAN
Tripleks 120 x 240 tb. 3 mm lbr 0.3750 48,000.00 18,000.00
Paku - ukuran 1/4" s/d 1" kg 0.0300 24,400.00 732.00
JUMLAH HARGA BAHAN 18,732.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 41,432.00
E. Overhead & profit 15.00% x D 6,214.80
F. Harga satuan pekerjaan (D+E) 47,646.80
B. BAHAN
Genteng Jatiwangi (Glazur) -Natural bh 20.0000 4,200.00 84,000.00
JUMLAH HARGA BAHAN 84,000.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 109,010.00
E. Overhead & profit 15.00% x D 16,351.50
F. Harga satuan pekerjaan (D+E) 125,361.50
A.4.6.1.2 Pembuatan dan Pemasangan 1 m2 Kusen Pintu dan Kusen Jendela (Kayu Klas II dan Klas III)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 6.0000 100,000.00 600,000.00
Tukang Kayu L.02 OH 18.0000 110,000.00 1,980,000.00
Kepala Tukang L.03 OH 1.8000 120,000.00 216,000.00
Mandor L.04 OH 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA 2,826,000.00
B. BAHAN
Kayu Kruing (balok/pesagen) m3 1.2000 8,000,000.00 9,600,000.00
Paku - ukuran 1" s/d 4" kg 1.2500 22,200.00 27,750.00
Lem Kayu (fox) kg 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 9,642,750.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 12,468,750.00
E. Overhead & profit 15.00% x D 1,870,312.50
F. Harga satuan pekerjaan (D+E) 14,339,062.50
A.4.6.1.3 Pembuatan dan Pemasangan 1 m2 Pintu Klamp Standar (Kayu Klas II)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang Kayu L.02 OH 1.0500 110,000.00 115,500.00
Kepala Tukang L.03 OH 0.1050 120,000.00 12,600.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 164,900.00
B. BAHAN
Kayu Kruing (balok/pesagen) m3 0.0400 8,000,000.00 320,000.00
Paku - ukuran 1" s/d 4" kg 0.0500 22,200.00 1,110.00
JUMLAH HARGA BAHAN 321,110.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 486,010.00
E. Overhead & profit 15.00% x D 72,901.50
F. Harga satuan pekerjaan (D+E) 558,911.50
A.4.6.1.5 Pembuatan dan Pemasangan 1 m2 Daun Pintu Panel (Kayu Klas I atau Klas II)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 3.0000 110,000.00 330,000.00
Kepala Tukang L.03 OH 0.3000 120,000.00 36,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 471,000.00
B. BAHAN
Kayu Bengkirai (papan) m3 0.0400 11,000,000.00 440,000.00
Lem Kayu (fox) kg 0.5000 15,000.00 7,500.00
JUMLAH HARGA BAHAN 447,500.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 918,500.00
E. Overhead & profit 15.00% x D 137,775.00
F. Harga satuan pekerjaan (D+E) 1,056,275.00
A.4.6.1.6 Pembuatan dan Pemasangan 1 m2 Daun Pintu Kaca atau Jendela Kaca (Kayu Klas I atau Klas II)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 100,000.00 80,000.00
Tukang Kayu L.02 OH 2.4000 110,000.00 264,000.00
Kepala Tukang L.03 OH 0.2400 120,000.00 28,800.00
Mandor L.04 OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 376,800.00
B. BAHAN
Kayu Bengkirai (papan) m3 0.0240 11,000,000.00 264,000.00
Lem Kayu (fox) kg 0.3000 15,000.00 4,500.00
JUMLAH HARGA BAHAN 268,500.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 645,300.00
E. Overhead & profit 15.00% x D 96,795.00
F. Harga satuan pekerjaan (D+E) 742,095.00
A.4.6.1.7 Pembuatan dan Pemasangan 1 m2 Daun Pintu Jalusi atau Jendela Jalusi (Kayu Klas I atau Klas II)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 3.0000 110,000.00 330,000.00
Kepala Tukang L.03 OH 0.3000 120,000.00 36,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 471,000.00
B. BAHAN
Kayu Bengkirai (papan) m3 0.0640 11,000,000.00 704,000.00
Lem Kayu (fox) kg 0.5000 15,000.00 7,500.00
JUMLAH HARGA BAHAN 711,500.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 1,182,500.00
E. Overhead & profit 15.00% x D 177,375.00
F. Harga satuan pekerjaan (D+E) 1,359,875.00
A.4.6.1.11 Pembuatan dan Pemasangan 1 m2 Daun Pintu Teakwood Rangkap, rangka ekspose(Kayu Klas I)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8000 100,000.00 80,000.00
Tukang Kayu L.02 OH 2.4000 110,000.00 264,000.00
Kepala Tukang L.03 OH 0.2400 120,000.00 28,800.00
Mandor L.04 OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 376,800.00
B. BAHAN
Kayu Bengkirai (papan) m3 0.0250 11,000,000.00 275,000.00
Paku - ukuran 1/4" s/d 1" kg 0.0300 24,400.00 732.00
Lem Kayu (fox) kg 0.3000 15,000.00 4,500.00
Teak Wood 120 x 240 tb. 4 mm lbr 1.0000 85,500.00 85,500.00
JUMLAH HARGA BAHAN 365,732.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 742,532.00
E. Overhead & profit 15.00% x D 111,379.80
F. Harga satuan pekerjaan (D+E) 853,911.80
A.4.6.1.12 Pembuatan dan Pemasangan 1 m2 Daun Pintu Teakwood Rangkap Lapis Formika, rangka ekspose(Kayu Klas II)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.8500 100,000.00 85,000.00
Tukang Kayu L.02 OH 2.5500 110,000.00 280,500.00
Kepala Tukang L.03 OH 0.2550 120,000.00 30,600.00
Mandor L.04 OH 0.0430 100,000.00 4,300.00
JUMLAH TENAGA KERJA 400,400.00
B. BAHAN
Kayu Bengkirai (papan) m3 0.0250 11,000,000.00 275,000.00
Paku - ukuran 1/4" s/d 1" kg 0.0300 24,400.00 732.00
Lem Kayu (fox) kg 0.8000 15,000.00 12,000.00
Teak Wood 120 x 240 tb. 4 mm lbr 1.0000 85,500.00 85,500.00
Formika lbr 0.5000 131,550.00 65,775.00
JUMLAH HARGA BAHAN 439,007.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 839,407.00
E. Overhead & profit 15.00% x D 125,911.05
F. Harga satuan pekerjaan (D+E) 965,318.05
A.4.6.1.13 Pembuatan dan Pemasangan 1 m3 Konstruksi Kuda-Kuda Konvensional, Kayu kelas I bentang s/d 6 m'
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 4.0000 100,000.00 400,000.00
Tukang Kayu L.02 OH 12.0000 110,000.00 1,320,000.00
Kepala Tukang L.03 OH 1.2000 120,000.00 144,000.00
Mandor L.04 OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,884,000.00
B. BAHAN
Kayu Bengkirai (balok/pesagen) m3 1.1000 10,500,000.00 11,550,000.00
Besi Strip kg 15.0000 19,700.00 295,500.00
Paku - ukuran 1" s/d 4" kg 5.6000 22,200.00 124,320.00
JUMLAH HARGA BAHAN 11,969,820.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 13,853,820.00
E. Overhead & profit 15.00% x D 2,078,073.00
F. Harga satuan pekerjaan (D+E) 15,931,893.00
A.4.6.1.16.a Pemasangan 1 m2 Rangka Atap Genteng (Usuk 5/7/jarak 50 cm) Kayu Kruing
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 22,700.00
B. BAHAN
Usuk Kayu Kruing (5x7x400) m3 0.0088 100,000.00 880.00
Reng Kayu Kruing (2x3x400) m3 0.0024 8,952,571.62 21,486.17
Paku - ukuran 1" s/d 4" kg 0.2500 22,200.00 5,550.00
JUMLAH HARGA BAHAN 27,916.17
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 50,616.17
E. Overhead & profit 15.00% x D 7,592.43
F. Harga satuan pekerjaan (D+E) 58,208.60
A.4.6.1.16 Pemasangan 1 m2 Rangka Atap Genteng (Usuk 5/7/jarak 50 cm) Kayu Bengkirai
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 22,700.00
B. BAHAN
Usuk Kayu Bengkirai (5x7x400) m3 0.0088 9,643,050.00 84,858.84
Reng Kayu Bengkirai (2x3x400) m3 0.0024 10,506,750.72 25,216.20
Paku - ukuran 1" s/d 4" kg 0.2500 22,200.00 5,550.00
JUMLAH HARGA BAHAN 115,625.04
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 138,325.04
E. Overhead & profit 15.00% x D 20,748.76
F. Harga satuan pekerjaan (D+E) 159,073.80
A.4.6.1.16.a Pemasangan 1 m2 Rangka Atap Genteng (Usuk 5/7/jarak 50 cm) Kayu Kruing
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 22,700.00
B. BAHAN
Usuk Kayu Kruing (5x7x400) m3 0.0088 7,143,000.00 62,858.40
Reng Kayu Kruing (2x3x400) m3 0.0024 8,952,571.62 21,486.17
Paku - ukuran 1" s/d 4" kg 0.2500 22,200.00 5,550.00
JUMLAH HARGA BAHAN 89,894.57
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 112,594.57
E. Overhead & profit 15.00% x D 16,889.19
F. Harga satuan pekerjaan (D+E) 129,483.76
3.3.4.(c) Pengecatan 1 m2 Bidang Kayu Baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Cat/Pelitur L.02 OH 0.0090 110,000.00 990.00
Kepala Tukang L.03 OH 0.0060 120,000.00 720.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,010.00
B. BAHAN
Menie kg 0.2000 74,550.00 14,910.00
Plamur Kayu kg 0.1500 36,800.00 5,520.00
Cat Kayu (cukup) kg 0.1700 70,000.00 11,900.00
Cat Kayu (baik) kg 0.2600 73,500.00 19,110.00
Kuwas 3" bh 0.0100 8,500.00 85.00
Thinner A ltr 0.0300 43,000.00 1,290.00
Ampelas / Ambril lbr 0.2000 8,650.00 1,730.00
JUMLAH HARGA BAHAN 54,545.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 63,555.00
E. Overhead & profit 15.00% x D 9,533.25
F. Harga satuan pekerjaan (D+E) 73,088.25
3.3.5.(c) Pengecatan 1 m2 Bidang Kayu Baru (1 lapis plamur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Cat/Pelitur L.02 OH 0.1050 110,000.00 11,550.00
Kepala Tukang L.03 OH 0.0040 120,000.00 480.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 19,330.00
B. BAHAN
Menie kg 0.2000 74,550.00 14,910.00
Plamur Kayu kg 0.1500 36,800.00 5,520.00
Cat Kayu (cukup) kg 0.1700 70,000.00 11,900.00
Cat Kayu (baik) kg 0.3500 73,500.00 25,725.00
Kuwas 3" bh 0.0100 8,500.00 85.00
Thinner A kg 0.0300 43,000.00 1,290.00
Ampelas / Ambril lbr 0.2000 8,650.00 1,730.00
JUMLAH HARGA BAHAN 61,160.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 80,490.00
E. Overhead & profit 15.00% x D 12,073.50
F. Harga satuan pekerjaan (D+E) 92,563.50
3.3.10.(c) Pengecatan 1 m2 Tembok Baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat/Pelitur L.02 OH 0.0630 110,000.00 6,930.00
Kepala Tukang L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,986.00
B. BAHAN
Plamur Tembok kg 0.1000 55,750.00 5,575.00
Cat Tembok Dalam (cukup) kg 0.1000 28,600.00 2,860.00
Cat Tembok Dalam (baik) kg 0.2600 43,100.00 11,206.00
JUMLAH HARGA BAHAN 19,641.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 29,627.00
E. Overhead & profit 15.00% x D 4,444.05
F. Harga satuan pekerjaan (D+E) 34,071.05
3.3.11.(c) Pengecatan 1 m2 Tembok Lama dengan (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0280 100,000.00 2,800.00
Tukang Cat/Pelitur L.02 OH 0.0420 110,000.00 4,620.00
Kepala Tukang L.03 OH 0.0042 120,000.00 504.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,224.00
B. BAHAN
Cat Tembok Dalam (cukup) kg 0.1200 28,600.00 3,432.00
Cat Tembok Dalam (baik) kg 0.1800 43,100.00 7,758.00
JUMLAH HARGA BAHAN 11,190.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 19,414.00
E. Overhead & profit 15.00% x D 2,912.10
F. Harga satuan pekerjaan (D+E) 22,326.10
3.3.15.(c) Pengecatan 1 m2 Permukaan Baja dengan Menie Besi (Zinc Chromatic) dengan Perancah
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Cat/Pelitur L.02 OH 0.2250 110,000.00 24,750.00
Kepala Tukang L.03 OH 0.0225 120,000.00 2,700.00
Mandor L.04 OH 0.0075 100,000.00 750.00
JUMLAH TENAGA KERJA 53,200.00
B. BAHAN
Menie kg 0.1000 74,550.00 7,455.00
Kuwas 3" bh 0.0100 8,500.00 85.00
Thinner A ltr 0.0100 43,000.00 430.00
Kayu Perancah m3 0.0020 3,000,000.00 6,000.00
JUMLAH HARGA BAHAN 13,970.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 67,170.00
E. Overhead & profit 15.00% x D 10,075.50
F. Harga satuan pekerjaan (D+E) 77,245.50
3.3.17.(c) Pengecatan 1 m2 Permukaan Baja Galvanis secara Manual sistem 1 lapis Cat Penutup
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Cat/Pelitur L.02 OH 0.0600 110,000.00 6,600.00
Kepala Tukang L.03 OH 0.0120 120,000.00 1,440.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 14,340.00
B. BAHAN
Cat Kayu (cukup) kg 0.3000 70,000.00 21,000.00
Kuwas 3" bh 0.0100 8,500.00 85.00
Thinner A ltr 0.0100 43,000.00 430.00
JUMLAH HARGA BAHAN 21,515.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 35,855.00
E. Overhead & profit 15.00% x D 5,378.25
F. Harga satuan pekerjaan (D+E) 41,233.25
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1 Pemasangan 1 buah Closet Duduk
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.5000 100,000.00 50,000.00
Tukang Batu L.02 OH 1.1000 110,000.00 121,000.00
Kepala Tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.1600 100,000.00 16,000.00
JUMLAH TENAGA KERJA 188,200.00
B. BAHAN
Closet Duduk Porselin (manual) sekelas Ina/setara bh 1.0000 650,000.00 650,000.00
Perlengkapan ls 6% x closet 39,000.00
JUMLAH HARGA BAHAN 689,000.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 877,200.00
E. Overhead & profit 15.00% x D 131,580.00
F. Harga satuan pekerjaan (D+E) 1,008,780.00
B. BAHAN
Closet Jongkok Porselin unit 1.0000 277,500.00 277,500.00
Semen portland Gersik kg 6.0000 1,430.00 8,580.00
Pasir Pasang (Cepu) m3 0.0100 281,800.00 2,818.00
JUMLAH HARGA BAHAN 288,898.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 587,898.00
E. Overhead & profit 15.00% x D 88,184.70
F. Harga satuan pekerjaan (D+E) 676,082.70
B. BAHAN
Closet Jongkok Porselin unit 1.0000 277,500.00 277,500.00
Pasangan Bata 1 PC : 3 Ps m2 0.0360 73,821.10 2,657.56
JUMLAH HARGA BAHAN 280,157.56
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 579,157.56
E. Overhead & profit 15.00% x D 86,873.63
F. Harga satuan pekerjaan (D+E) 666,031.19
A.5.1.1.16 Pemasangan 1 buah Bak Kontrol Pasangan Bata 30 x 30 cm tinggi 35 cm dngan tutup beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 2.1600 100,000.00 216,000.00
Tukang Batu L.02 OH 0.7200 110,000.00 79,200.00
Kepala Tukang L.03 OH 0.0720 120,000.00 8,640.00
Mandor L.04 OH 0.0110 100,000.00 1,100.00
JUMLAH TENAGA KERJA 304,940.00
B. BAHAN
Bata merah lokal bh 40.0000 600.00 24,000.00
Semen portland Gersik kg 44.0000 1,430.00 62,920.00
Pasir Pasang (Cepu) m3 0.0700 281,800.00 19,726.00
Pasir Beton (Cepu) m3 0.0600 324,100.00 19,446.00
Batu Pecah 1/2 m3 0.0700 322,990.00 22,609.30
Besi Beton Polos kg 1.6000 12,900.00 20,640.00
JUMLAH HARGA BAHAN 169,341.30
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 474,281.30
E. Overhead & profit 15.00% x D 71,142.19
F. Harga satuan pekerjaan (D+E) 545,423.50
A.5.1.1.17 Pemasangan 1 buah Bak Kontrol Pasangan Bata 45 x 45 cm tinggi 50 cm dengan tutup beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.2000 100,000.00 320,000.00
Tukang Batu L.02 OH 1.1500 110,000.00 126,500.00
Kepala Tukang L.03 OH 0.0110 120,000.00 1,320.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 449,420.00
B. BAHAN
Bata merah lokal bh 70.0000 600.00 42,000.00
Semen portland Gersik kg 77.0000 1,430.00 110,110.00
Pasir Pasang (Cepu) m3 0.1300 281,800.00 36,634.00
Pasir Beton (Cepu) m3 0.0900 324,100.00 29,169.00
Batu Pecah 1/2 m3 0.0200 322,990.00 6,459.80
Besi Beton Polos kg 2.6000 12,900.00 33,540.00
JUMLAH HARGA BAHAN 257,912.80
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 707,332.80
E. Overhead & profit 15.00% x D 106,099.92
F. Harga satuan pekerjaan (D+E) 813,432.72
A.5.1.1.18 Pemasangan 1 buah Bak Kontrol Pasangan Bata 60 x 60 cm tinggi 65 cm dengan tutup beton
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 3.2000 100,000.00 320,000.00
Tukang Batu L.02 OH 1.1500 110,000.00 126,500.00
Kepala Tukang L.03 OH 0.0110 120,000.00 1,320.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 449,420.00
B. BAHAN
Bata merah lokal bh 123.0000 600.00 73,800.00
Semen portland Gersik kg 114.0000 1,430.00 163,020.00
Pasir Pasang (Cepu) m3 0.1840 281,800.00 51,851.20
Pasir Beton (Cepu) m3 0.1200 324,100.00 38,892.00
Batu Pecah 1/2 m3 0.0330 322,990.00 10,658.67
Besi Beton Polos kg 4.8500 12,900.00 62,565.00
JUMLAH HARGA BAHAN 400,786.87
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 850,206.87
E. Overhead & profit 15.00% x D 127,531.03
F. Harga satuan pekerjaan (D+E) 977,737.90
B. BAHAN
Pipa PVC Maspion tipe AW ø 3" m' 1.2000 69,000.00 82,800.00
Perlengkapan ls 35% x pipa 28,980.00
JUMLAH HARGA BAHAN 111,780.00
C. PERALATAN
-
JUMLAH HARGA PERALATAN -
D. Jumlah harga tenaga, bahan dan peralatan (A+B+C) 136,750.00
E. Overhead & profit 15.00% x D 20,512.50