JADWAL PELAKSANAAN PEKERJAAN

Nama Paket : Relokasi Gunung Pasir Periode Laporan : -


Prop / Kab / Kodya : Papua Barat / Kabupaten Tambrauw Minggu Ke : - LOGO LOGO
Tahun : 2023 & 2024 Bulan Ke : -
Waktu Pelaksanaan : 420 Hari Kalender Progress Realisasi : -
KONTRAKTOR KONSULTAN
Deviasi : -

TAHUN ANGGARAN 2023 - 2024

Harga Bobot MASA PELAKSANAAN TAHUN 2023 SELAMA 308 (TIGA RATUS DELAPAN) HARI KALENDER MASA PELAKSANAAN TAHUN 2024 SELAMA 112 (SERATUS DUA BELAS) HARI KALENDER
No. Mata Perkiraan Jumlah Harga
Uraian Sat. Satuan Total Ket
Pembay. Kuantitas (Rupiah) MARET 2023 APRIL 2023 MEI 2023 JUNI 2023 JULI 2023 AGUSTUS 2023 SEPTEMBER 2023 OKTOBER 2023 NOVEMBER 2023 DESEMBER 2023 JANUARI 2024 FEBRUARI 2024 MARET 2024 APRIL 2024
(Rupiah) (%)
20-Feb 27-Feb 06-Mar 13-Mar 20-Mar 27-Mar 03-Apr 10-Apr 17-Apr 24-Apr 01-Mei 08-Mei 15-Mei 22-Mei 29-Mei 05-Jun 12-Jun 19-Jun 26-Jun 03-Jul 10-Jul 17-Jul 24-Jul 31-Jul 07-Agu 14-Agu 21-Agu 28-Agu 04-Sep 11-Sep 18-Sep 25-Sep 02-Okt 09-Okt 16-Okt 23-Okt 30-Okt 06-Nov 13-Nov 20-Nov 27-Nov 04-Des 11-Des 18-Des 25-Des 01-Jan 08-Jan 15-Jan 22-Jan 29-Jan 05-Feb 12-Feb 19-Feb 26-Feb 04-Mar 11-Mar 18-Mar 25-Mar 01-Apr 08-Apr
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
26-Feb 05-Mar 12-Mar 19-Mar 26-Mar 02-Apr 09-Apr 16-Apr 23-Apr 30-Apr 07-Mei 14-Mei 21-Mei 28-Mei 04-Jun 11-Jun 18-Jun 25-Jun 02-Jul 09-Jul 16-Jul 23-Jul 30-Jul 06-Agu 13-Agu 20-Agu 27-Agu 03-Sep 10-Sep 17-Sep 24-Sep 01-Okt 08-Okt 15-Okt 22-Okt 29-Okt 05-Nov 12-Nov 19-Nov 26-Nov 03-Des 10-Des 17-Des 24-Des 31-Des 07-Jan 14-Jan 21-Jan 28-Jan 04-Feb 11-Feb 18-Feb 25-Feb 03-Mar 10-Mar 17-Mar 24-Mar 31-Mar 07-Apr 14-Apr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60

DIVISI 1. UMUM 1.89 100%


1.2 Mobilisasi 1.04
1.2 Mobilisasi LS 1.00 938,323,760.00 938,323,760.00 1.04 0.15 0.45 0.02 0.42

1.17 Pengamanan Lingkungan Hidup 0.02


1.17.(1a) Pengujian pH Buah 5.00 220,000.00 1,100,000.00 0.001 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 5.00 220,000.00 1,100,000.00 0.001 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 5.00 242,000.00 1,210,000.00 0.001 0.0003 0.0003 0.0003 0.0003 0.0003
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 1.00 220,000.00 220,000.00 0.000 0.0002
1.17.(1g) Pengujian Coliform Buah 5.00 495,000.00 2,475,000.00 0.003 0.001 0.0005 0.0005 0.0005 0.0005
1.17.(1h) Pengujian E. Coli Buah 5.00 275,000.00 1,375,000.00 0.002 0.0003 0.0003 0.0003 0.0003 0.0003
1.17.(1j) Pengujian Temperatur (Suhu) Buah 5.00 220,000.00 1,100,000.00 0.001 0.0002 0.0002 0.0002 0.0002 0.0002
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 5.00 770,000.00 3,850,000.00 0.004 0.001 0.0009 0.0009 0.0009 0.0009
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 1.00 1,100,000.00 1,100,000.00 0.001 0.001
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 5.00 539,000.00 2,695,000.00 0.003 0.001 0.0006 0.0006 0.0006 0.0006
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 5.00 583,000.00 2,915,000.00 0.003 0.001 0.0006 0.0006 0.0006 0.0006
-
1.19 Keselamatan dan Kesehatan Kerja 0.53
SKh-1.1.22.(1a) Pembuatan dokumen RKK, RMPK, RKPPL, dan RMLLP Set 1.00 800,000.00 800,000.00 0.001 0.0009
SKh-1.1.22.(1b) Pembuatan prosedur dan instruksi kerja Set 1.00 800,000.00 800,000.00 0.001 0.001
SKh-1.1.22.(1c) Penyusunan pelaporan penerapan SMKK Set 1.00 800,000.00 800,000.00 0.001 0.0009
SKh-1.1.22.(2c) Pertemuan keselamatan (Safety Talk dan/atauTool Box Meeting) Orang 40.00 800,000.00 32,000,000.00 0.04 0.04
SKh-1.1.22.(2d) Pelatihan Keselamatan Konstruksi, antara lain: Orang 6.00 2,500,000.00 15,000,000.00 0.02 0.02
1) Bekerja di ketinggian
2) Penggunaan bahan kimia (MSDS)
3) Analisis keselamatan pekerjaan
4) Perilaku berbasis keselamatan ( Budaya berkeselamatan konstruksi ) 75%
5) PK3
SKh-1.1.22.(2f) Simulasi Keselamatan Konstruksi LS 1.00 15,000,000.00 15,000,000.00 0.02 0.02
SKh-1.1.22.(2g) Spanduk (Banner) Buah 5.00 700,000.00 3,500,000.00 0.004 0.004
SKh-1.1.22.(2i) Papan Informasi Keselamatan Konstruksi Lembar 2.00 250,000.00 500,000.00 0.001 0.00
SKh-1.1.22.(3a1) Jaring pengaman (Safety Net) M' 1,480.00 10,000.00 14,800,000.00 0.02 0.02
SKh-1.1.22.(3a2) Tali keselamatan (Life Line) M' 1,480.00 5,000.00 7,400,000.00 0.01 0.01
SKh-1.1.22.(3a3) Penahan jatuh (Safety Deck) Unit 5.00 1,000,000.00 5,000,000.00 0.01 0.01
SKh-1.1.22.(3a4) Pagar pengaman (Guard Railling) M' 1,480.00 5,000.00 7,400,000.00 0.01 0.01
SKh-1.1.22.(3a5) Pembatas area (Restricted Area) Rol 5.00 750,000.00 3,750,000.00 0.004 0.004
SKh-1.1.22.(3a6) Perlengkapan keselamatan bencana (Disaster Safety Equipment) Set 2.00 20,000,000.00 40,000,000.00 0.04 0.04
SKh-1.1.22.(3b1) Topi pelindung (Safety Helmet) Buah 40.00 100,000.00 4,000,000.00 0.004 0.004
SKh-1.1.22.(3b2) Pelindung mata (Goggles, Spectacles) Buah 40.00 80,000.00 3,200,000.00 0.004 0.004
SKh-1.1.22.(3b6) Pelindung pernafasan dan mulut (masker, masker respirator) Buah 10.00 30,000.00 300,000.00 0.0003 0.0003
SKh-1.1.22.(3b7) Sarung tangan (Safety Gloves) Pasang 40.00 50,000.00 2,000,000.00 0.002 0.002
SKh-1.1.22.(3b8)
SKh-1.1.22.(3b11)
SKh-1.1.22.(4a)
Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap)
Rompi keselamatan (Safety Vest)
Asuransi (Construction All Risk/CAR)
Pasang
Buah
LS
40.00
40.00
1.00
175,000.00
90,000.00
80,000,000.00
7,000,000.00
3,600,000.00
80,000,000.00
0.01
0.004
0.09
0.01
0.004
0.09
GARIS RENCANA
SKh-1.1.22.(5a) Ahli K3 konstruksi/ahli keselamatan konstruksi Orang 1.00 50,000,000.00 50,000,000.00 0.06 0.06
SKh-1.1.22.(5d) Petugas Pengelolaan Lingkungan Orang 1.00 35,000,000.00 35,000,000.00 0.04 0.04
SKh-1.1.22.(5f) Petugas P3K Orang 1.00 25,000,000.00 25,000,000.00 0.03 0.03
SKh-1.1.22.(5g) Tenaga medis dan/atau kesehatan (Dokter atau paramedis) Orang 1.00 17,000,000.00 17,000,000.00 0.02 0.02
SKh-1.1.22.(5h) Petugas pengatur lalu lintas Orang 4.00 7,000,000.00 28,000,000.00 0.03 0.03
SKh-1.1.22.(5e) Koordinator Manajemen dan Keselamatan LaluLintas (KMKL) Orang 1.00 25,000,000.00 25,000,000.00 0.03 0.03
SKh-1.1.22.(6a) Peralatan P3K Set 1.00 1,000,000.00 1,000,000.00 0.001 0.00
SKh-1.1.22.(6b) Ruang P3K Set 1.00 3,000,000.00 3,000,000.00 0.003 0.00
50%
SKh-1.1.22.(6f) Perlengkapan Isolasi mandiri Set 1.00 8,000,000.00 8,000,000.00 0.01 0.01
SKh-1.1.22.(7b) Rambu larangan Buah 10.00 500,000.00 5,000,000.00 0.01 0.01
SKh-1.1.22.(7c) Rambu peringatan Buah 10.00 500,000.00 5,000,000.00 0.01 0.01
SKh-1.1.22.(7h) Kerucut lalu lintas (traffic cone) Buah 40.00 150,000.00 6,000,000.00 0.01 0.01
SKh-1.1.22.(7i) Tongkat pengatur lalu lintas (Warning LightsStick) Buah 4.00 150,000.00 600,000.00 0.001 0.001
SKh-1.1.22.(7n) Lampu darurat (Emergency Lamp) Buah 2.00 450,000.00 900,000.00 0.001 0.001
SKh-1.1.22.(9a1) Alat Pemadam Api Ringan (APAR) Buah 2.00 500,000.00 1,000,000.00 0.001 0.001
SKh-1.1.22.(9a4) Bendera K3 Buah 2.00 1,000,000.00 2,000,000.00 0.002 0.002
SKh-1.1.22.(9a7) Audit internal Kegiatan 2.00 11,000,000.00 22,000,000.00 0.02 0.01 0.01

1.21 Manajemen Mutu 0.30


1.21 Manajemen Mutu LS 1.00 266,548,333.33 266,548,333.33 0.30 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

DIVISI 2. DRAINASE 10.2


2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 17,824.57 95,675.87 1,705,381,242.13 1.89 0.66 0.94 0.29
2.2.(1) Pasangan Batu dengan Mortar M3 2,047.40 1,852,824.73 3,793,473,352.20 4.21 0.03 0.10 0.24 0.26 0.17 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.01
2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 96.00 9,129,433.70 876,425,635.20 0.97 0.36 0.61
2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1 12.00 21,290,220.93 255,482,651.16 0.28 0.04 0.04 0.04 0.04 0.04 0.04 0.04
2.3.(22) Saluran berbentuk U Tipe DS 1 M1 2,960.00 859,096.27 2,542,924,959.20 2.82 0.03 0.15 1.00 0.95 0.69

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 33.85


3.1.(1) Galian Biasa M3 231,333.83 65,803.85 15,222,656,649.25 16.90 0.25 0.33 0.31 0.30 0.34 0.30 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48 0.48
3.2.(2b) Timbunan Pilihan dari galian M3 11,648.09 54,921.29 639,728,128.84 0.71 0.24 0.47
Skh-1.3.17 (1c) Matras Perkuatan Tipe III M2 35,219.00 293,550.18 10,338,543,789.42 11.48 0.82 0.82 0.82 0.82 0.41 0.41 0.41 0.41 0.05 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46 0.46
Skh-1.3.17 (2b) Penanaman BIII Vegetasi dengan Teknik Mulsa ( mulching) M2 35,219.00 121,864.60 4,291,949,347.40 4.77 0.51 0.38 0.38 0.38 0.38 1.10 0.68 0.57 0.37 25%

DIVISI 5. PERKERASAN BERBUTIR 5.14


5.1.(1) Lapis Pondasi Agregat Kelas A M3 2,277.00 1,113,119.53 2,534,573,169.81 2.81 0.48 0.27 0.30 0.30 0.30 0.30 0.30 0.30 0.30
5.1.(2) Lapis Pondasi Agregat Kelas B M3 2,277.00 918,388.83 2,091,171,365.91 2.32 0.11 0.50 0.34 0.34 0.34 0.34 0.34

DIVISI 6. PERKERASAN ASPAL 4.63


6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 18,216.00 19,119.48 348,280,447.68 0.39 0.01 0.05 0.11 0.11 0.09 0.02
6.3(3) Lataston Lapis Aus (HRS-WC) Ton 1,692.57 2,230,895.41 3,775,946,644.10 4.19 0.14 0.50 1.16 1.16 1.00 0.24
6.3.(8) Bahan anti pengelupasan Kg 330.05 134,640.00 44,437,932.00 0.05 0.00 0.01 0.01 0.01 0.01 0.00

DIVISI 7. STRUKTUR 42.15


7.1 (5a) Beton struktur, fc’30 MPa M 3 1,666.00 3,537,958.36 5,894,238,627.76 6.54 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.47 0.47 0.47 0.47 0.47 0.47 0.47
7.1 (7a) Beton strukur, fc’20 MPa M3 6,031.33 2,912,257.44 17,564,785,665.60 19.50 0.05 0.16 0.18 0.18 0.28 0.17 0.11 0.14 0.57 0.71 0.93 0.95 1.14 1.36 1.57 1.54 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
7.1 (8) Beton , fc’15 Mpa M3 1,265.00 2,427,942.79 3,071,347,629.35 3.41 0.62 0.62 0.62 0.62 0.62 0.33
7.1 (10) Beton, fc’10 Mpa M3 190.40 2,269,876.38 432,184,462.75 0.48 0.24 0.24
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 144,194.22 29,390.26 4,237,905,616.30 4.71 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
7.6.(19a) Tiang Bor Beton, diameter 300 mm (Strauss Pile) M 1 1,376.00 2,100,794.18 2,890,692,791.68 3.21 0.32 0.32 0.32 0.32 0.32 0.53 0.53 0.53
7.9.(1) Pasangan Batu M3 1,977.50 1,960,527.02 3,876,942,182.05 4.30 0.51 0.37 0.36 0.36 0.19 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31

DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 2.15


9.2.(1) Marka Jalan Termoplastik M 2 854.04 341,914.01 292,008,241.10 0.32 0.32
9.2.(7) Rel Pengaman M1 890.00 1,554,452.72 1,383,462,920.80 1.54 0.16 0.36 0.41 0.002 0.10 0.08 0.03 0.30 0.09
9.2.(9c) Paku Jalan Memantul Bulat Buah 852.00 307,834.40 262,274,908.80 0.29 0.29

0%

JUMLAH TOTAL HARGA PEKERJAAN 90,072,180,453.81 100.00

RENCANA PEKERJAAN MINGGUAN 0.15 0.58 0.34 0.31 0.34 0.32 0.31 0.35 0.31 1.12 1.23 1.25 1.25 1.35 1.37 1.39 1.42 1.58 1.72 1.94 1.96 2.15 2.37 2.58 2.68 2.73 2.83 2.93 2.92 3.05 3.07 3.09 3.05 3.04 2.93 2.91 2.77 2.67 2.56 2.40 2.21 2.19 2.15 2.07 2.02 2.01 1.95 1.95 1.77 1.55 1.29 1.29 1.71 1.09 0.63 0.01 0.33 0.01 0.01 0.44
KOMULATIF PEKERJAAN MINGGUAN 0.15 0.73 1.08 1.39 1.73 2.04 2.35 2.69 3.00 4.12 5.36 6.61 7.87 9.22 10.59 11.99 13.41 14.99 16.72 18.66 20.63 22.78 25.16 27.74 30.42 33.15 35.97 38.91 41.82 44.88 47.94 51.04 54.09 57.13 60.06 62.97 65.74 68.41 70.96 73.36 75.57 77.76 79.91 81.98 84.00 86.02 87.96 89.91 91.67 93.23 94.51 95.80 97.50 98.59 99.21 99.22 99.55 99.55 99.56 100.00
REALISASI PEKERJAAN MINGGUAN
KOMULATIF PEKERJAAN MINGGUAN
DEVIASI

DISETUJUI OLEH : DIPERIKSA OLEH : DIAJUKAN OLEH :


An. KEPALA SATUAN KERJA KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
PJN WIL. I PROP. PAPUA BARAT (MANOKWARI) PT. ……………………….. PT. BULI BANGUN
PEJABAT PEMBUAT KOMITMEN 1.2

ANGGIAT ADI GUNAWAN NAPITULU S.,ST ……………………………………….. …………………………………….


Nip. 19890110 201012 1 002 Supervision Engineer Direktur