HARGA JUMLAH
NO ITEM PEKERJAAN SAT. VOL.
SATUAN ( Rp ) ( Rp )
A PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran / Pak.Pembersihan Lapang M' 32.00 10,000 320,000
Volume = (PxLxT)
=
Volume = (( a + b )/2 x P x T ))
=
Volume = (( a + b )/2 x P x T ))
=
5 Kolom K1 (10/12)
Tinggi = 2.80 m
Lebar = 0.10 m
Panjang = 0.12 m
Jumlah = 14 Unit
Volume = ( P x L x T ) x Unit
=
6 Sloof (12/12)
Tinggi = 0.12 m
Lebar = 0.12 m
Panjang = 40.00 m
Volume = (PxLxT)
=
5.31 M³
3.15 M³
2.61 M³
0.47 M³
0.58 M³
ANALISA PEKERJAAN RUMAH TAL
PEKERJAN PELESTERAN
Kebutuhan
No Nama Barang Untuk 1 unit Satuan Harga Satuan Total Keterangan
1 Kayu Kaso 8 Bh Rp 50,000 Rp 400,000
2 Kayu Papan 10 Bh Rp 80,000 Rp 800,000
3 Kayu III #NAME? m3 Rp 3,250,000 #NAME?
4 Batu Belah 6.912 m3 Rp 190,000 Rp 1,313,280
5 Semen Portand #NAME? Kg Rp 1,000 #NAME? #NAME? Zak
6 Pasir #NAME? m3 Rp 190,000 #NAME?
7 Batu Krikil #NAME? Kg Rp 190 #NAME? #NAME? m3
8 Besi d.10 48 Bh Rp 60,000 Rp 2,880,000
9 Besi d.6 25 Bh Rp 30,000 Rp 750,000
10 Keramik 40x40 36 Dus Rp 45,000 Rp 1,620,000
11 Keramik 20x20 3 Dus Rp 90,000 Rp 270,000
12 Kawat 3.15 Kg Rp 25,000 Rp 78,750
13 Paku 3" ( 5-10 cm ) #NAME? Kg Rp 20,000 #NAME?
14 Minyak Bekisting #NAME? Liter Rp 20,000 #NAME?
15 Glass wall 3 Bh Rp 20,000 Rp 60,000
16 Roster 2 Bh Rp 25,000 Rp 50,000
17 Kabel NYM 3x2.5mm 1.06 Roll Rp 350,000 Rp 371,000
18 Kabel Tunggal buat Massa 4 m Rp 15,000 Rp 60,000
19 Saklar Tunggal 2 Bh Rp 15,000 Rp 30,000
20 Saklar Ganda 2 Bh Rp 25,000 Rp 50,000
21 Stop Kontak 4 Bh Rp 17,000 Rp 68,000
22 Dudukan Lamp 9 Bh Rp 10,000 Rp 90,000
23 Inbow dus 6 Bh Rp 5,000 Rp 30,000
24 MCB Bok 1 Bh Rp 60,000 Rp 60,000
25 seal tipe listrik hitam 2 Bh Rp 15,000 Rp 30,000
26 Pipa Kabel 4 Bh Rp 12,500 Rp 50,000
27 Pipa PVC 0.5" 3 Bh Rp 23,000 Rp 69,000
28 Pipa PVC 2.5" 2 Bh Rp 128,000 Rp 256,000
29 Pipa PVC 3" 2 Bh Rp 180,000 Rp 360,000
30 Tee 0.5" 2 Bh Rp 5,000 Rp 10,000
31 Knee Drat 0.5" 3 Bh Rp 5,000 Rp 15,000
32 Knee 2.5" 2 Bh Rp 25,000 Rp 50,000
33 tee 2.5" 2 Bh Rp 25,000 Rp 50,000
34 Knee 3" 1 Bh Rp 8,000 Rp 8,000
35 Kran Air 0.5" 3 Bh Rp 40,000 Rp 120,000
36 Lem Pipa 4 Bh Rp 10,000 Rp 40,000
37 Kloset jongkok 1 Bh Rp 120,000 Rp 120,000
38 seal tipe 1 Bh Rp 5,000 Rp 5,000
39 Cat dasar #NAME? Kg Rp 100,000 #NAME?
40 Cat Putih #NAME? Kg Rp 100,000 #NAME?
41 Plamir #NAME? Kg Rp 60,000 #NAME?
42 Batu bata #NAME? Bh Rp 600 #NAME?
43 Kusen Almunium 48 m Rp 75,000 Rp 3,600,000
Pek. Atap Baja Ringan 57 m2 Rp 180,000 Rp 10,260,000
Pek. Plafon 36.5 m3 Rp 70,000 Rp 2,555,000
Pek.Pintu dan jendela 1 Set Rp 680,000 Rp 680,000
depan
1 Kayu kaso 8 Bh
2 Kayu papan 10 Bh
3 Paku 3" 0.6 Kg
Sub total Rp -
Sub total Rp -
Sub total Rp -
PEKERJAN PEK.BEKISTINGAN SLOOF
Sub total Rp -
Sub total Rp -
Sub total Rp -
PEKERJAN PEK.PENGECORAN BALOK
Sub total Rp -
Sub total Rp -
Sub total Rp -
PEKERJAN PELESTERAN
Sub total Rp -
PEKERJAN PEMASANGAN DINDING SEPTICKTANK
Sub total Rp -
Sub total Rp -
Sub total Rp -
Sub total Rp -
PEKERJAN PEMASANGAN DINDING ATAP
Sub total Rp -
Sub total Rp -
Sub total Rp -
Sub total Rp -
Sub total Rp -
Sub total Rp -
Sub total Rp -
Sub total Rp -
Sub total Rp -
PEKERJAN PELESTERAN
Sub total Rp -