Anda di halaman 1dari 4

BENDUNGAN BATU NAMPAR

Papan Tempel Rangka Hollow 40x40 mm Huruf dari stainlesstell warna merah Huruf dari stainlesstell warna putih

1.20
1.50

BENDUNGAN Cor Beton K.225


1.00 Angkur Besi ∅12

6.44 6.36 6.36 6.44

TAMPAK MUKA

0 1.0 2.0 3.0 4.0 5.0 m

SKALA 1 : 50

HURUF/TULISAN
1.20

1.50

HOLLOW 40x40 mm

Cor Beton K.225


1.00 Angkur Besi ∅12

0.30

TAMPAK SAMPING
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI :
D I R E K T O R A T J E N D E R A L S U M B E R D A Y A A I R NUSA TENGGARA BARAT
B A L A I W I L A Y A H S U N G A I N U S A T E N G G A R A I PEKERJAAN :
SATUAN KERJA OPERASI DAN PEMELIHARAAN SDA NUSA TENGGARA I
S A T U A N P E L A K S A N A A N K E G I A T A N O & P S U M B E R D A Y A A I R I
Jln. Gajah Mada No. 105 Praya-Lombok Tengah Kode Pos 83500 Telp./Fax. (0370) 654137
REMEDIAL DAN PENANGANAN SEDIMENTASI
0 0.5 1.0 1.5 2.0 2.5 m NAMA GAMBAR : SHOP DRAWING BENDUNGAN DI PULAU LOMBOK II
NOMENKLATUR
PROJECT
HIDUP-JAYA,KSO MANAGER
NONO DARYONO, ST.
LOKASI :
KONSULTAN SUPERVISI BENDUNGAN BATU NAMPAR
KABUPATEN LOMBOK TIMUR
DIPERIKSA PT. INDRA KARYA (PERSERO) AGUNG NUR FAUZI, ST.
PT. CIRIAJASA E.C.
PT. TUAH AGUNG ANUGRAH
SAHNAL, ST.
DIPERIKSA PELAKSANA TEKNIK TANGGAL
NIP. 19651231 200701 1 026
SUPARDI, ST.,MT.
NO TANGGAL YANG DIREVISI DIGAMBAR DIPERIKSA DISETUJUI DISETUJUI PPK O&P SUMBER DAYA AIR I NO LEMBAR : JUMLAH LEMBAR :
NIP. 19681231 200701 1 025
II III BENDUNGAN BATU NAMPAR
0.85 1.20 0.80

0.80
0.80
BORDES BORDES
± 1.95 ± 0.90
Ring Balok 20/25 Atap plat beton t= 10 cm
Roof Drain Roof Drain
0.50 3.20 0.50
3.00

Atap plat beton t= 10 cm Elv. ± 5.50

0.50
Roof Drain Roof Drain

I R. Peralatan
Naik
I Kolom beton 20/20

± 0.00

1.05
Talang Tegak Talang Tegak
Pipa PVC 3" Pipa PVC 3"
0.65

Talang Tegak Talang Tegak


3.00 Pipa PVC 3" Pipa PVC 3"

Dinding Ornament Batu Alam


II III

0.90
BALOK 20/25
Elv. ± 3.00

Pipa dia. 2"


DENAH LANTAI 1
skala 1 : 50 Pipa dia. 1,5"

BALOK LATEI 12/15 PAS. BATU BATA

0.15
PLASTER+ACI

II III
0.85
Elv. ± 0.90
0.80

BORDES BORDES
± 1.95 ± 0.90
Lantai Beton Rabat
Beton Sloof 15/20
Elv. ± 0.00
3.00

Gardu Pandang
Lantai kerja 5 cm
+ 3.00
I I Pasir urug 5 cm
Elv. - 1.25
1.00 1.00
Turun
TAMPAK DEPAN
0.65

skala 1 : 50 POTONGAN I - I
skala 1 : 50

II 3.00
III

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI :


DENAH LANTAI 2 D I R E K T O R A T J E N D E R A L S U M B E R D A Y A A I R
B A L A I W I L A Y A H S U N G A I N U S A T E N G G A R A I
NUSA TENGGARA BARAT
PEKERJAAN :
skala 1 : 50 SATUAN KERJA OPERASI DAN PEMELIHARAAN SDA NUSA TENGGARA I
S A T U A N P E L A K S A N A A N K E G I A T A N O & P S U M B E R D A Y A A I R I
Jln. Gajah Mada No. 105 Praya-Lombok Tengah Kode Pos 83500 Telp./Fax. (0370) 654137
REMEDIAL DAN PENANGANAN SEDIMENTASI
NAMA GAMBAR : SHOP DRAWING BENDUNGAN DI PULAU LOMBOK II
DENAH DAN POTONGAN GARDU PANDANG
PROJECT
HIDUP-JAYA,KSO MANAGER
NONO DARYONO, ST.
LOKASI :
0 1.0 2.0 3.0 4.0 5.0 m KONSULTAN SUPERVISI BENDUNGAN BATU NAMPAR
KABUPATEN LOMBOK TIMUR
DIPERIKSA PT. INDRA KARYA (PERSERO) AGUNG NUR FAUZI, ST.
PT. CIRIAJASA E.C.
SKALA 1 : 50 PT. TUAH AGUNG ANUGRAH
SAHNAL, ST.
DIPERIKSA PELAKSANA TEKNIK TANGGAL
NIP. 19651231 200701 1 026
SUPARDI, ST.,MT.
NO TANGGAL YANG DIREVISI DIGAMBAR DIPERIKSA DISETUJUI DISETUJUI PPK O&P SUMBER DAYA AIR I NO LEMBAR : JUMLAH LEMBAR :
NIP. 19681231 200701 1 025
BENDUNGAN BATU NAMPAR

0.05
KUSEN KAYU

DAUN PINTU

Atap plat beton t= 10 cm


Ring Balok 20/25 Atap plat beton t= 10 cm
0.50 3.20 0.50
0.50 3.20 0.50
Elv. ± 5.50
Elv. ± 5.50
0.50

0.50
Kolom beton 20/20
Kolom beton 20/20

1.90KUNCI TANAM

Dinding Ornament Batu Alam

0.90

0.90
PELAT LANTAI t 12 cm
Elv. ± 3.00 BALOK 20/25
Elv. ± 3.00 0.15

PAS. BATU BATA

BORDES BALOK LATEI 12/15


± 1.95

0.90
0.05 0.05

PAS. BATU BATA BALOK LATEI 12/15 BORDES


± 0.90 0.20

0.15
Beton Sloof 15/20
Elv. ± 0.00 Beton Sloof 15/20
Elv. ± 0.00

Lantai kerja 5 cm
Lantai kerja 5 cm
Elv. - 1.25
Elv. - 1.25
Pasir urug 5 cm
1.00 1.00 Pasir urug 5 cm
1.00 1.00

POTONGAN II - II
skala 1 : 50 POTONGAN III - III
skala 1 : 50

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI :


D I R E K T O R A T J E N D E R A L S U M B E R D A Y A A I R NUSA TENGGARA BARAT
B A L A I W I L A Y A H S U N G A I N U S A T E N G G A R A I PEKERJAAN :
SATUAN KERJA OPERASI DAN PEMELIHARAAN SDA NUSA TENGGARA I
S A T U A N P E L A K S A N A A N K E G I A T A N O & P S U M B E R D A Y A A I R I
Jln. Gajah Mada No. 105 Praya-Lombok Tengah Kode Pos 83500 Telp./Fax. (0370) 654137
REMEDIAL DAN PENANGANAN SEDIMENTASI
NAMA GAMBAR : SHOP DRAWING BENDUNGAN DI PULAU LOMBOK II
DENAH DAN POTONGAN GARDU PANDANG
PROJECT
HIDUP-JAYA,KSO MANAGER
NONO DARYONO, ST.
LOKASI :
0 1.0 2.0 3.0 4.0 5.0 m KONSULTAN SUPERVISI BENDUNGAN BATU NAMPAR
KABUPATEN LOMBOK TIMUR
DIPERIKSA PT. INDRA KARYA (PERSERO) AGUNG NUR FAUZI, ST.
PT. CIRIAJASA E.C.
SKALA 1 : 50 PT. TUAH AGUNG ANUGRAH
SAHNAL, ST.
DIPERIKSA PELAKSANA TEKNIK TANGGAL
NIP. 19651231 200701 1 026
SUPARDI, ST.,MT.
NO TANGGAL YANG DIREVISI DIGAMBAR DIPERIKSA DISETUJUI DISETUJUI PPK O&P SUMBER DAYA AIR I NO LEMBAR : JUMLAH LEMBAR :
NIP. 19681231 200701 1 025
Roof Drain
4.15
Roof Drain
BENDUNGAN BATU NAMPAR
0.50 3.15 0.50
3.00

0.50
0.20 0.20 0.20
4Ø12
Ø8-150
0.20
Beton K-225

Galian
4Ø12
0.65 Timbunan tanah kembali
4.15

3.15

3.00
Ø8-150

Ø12-150

0.05
Lantai kerja
0.20
Pasir urug
0.05

1.00
0.05
1.00
0.50

Ø12-150

3.00 1.00 DETAIL PONDASI


skala 1 : 10
DENAH DAK ATAP DENAH PONDASI
skala 1 : 50 skala 1 : 50

0.20 tul: 4 Ø 12 0.20


Besi beton Ø 8-200
4 Ø 12
tul: 4 Ø 12
Talang tegak
pipa PVC 3" ring : Ø8-150 Ø8 - 150

0.20
0.25

0.12
Besi beton Ø 8-150

0.25
Ring Balok 20/25 ring : Ø8-150
KOLOM
RING BALOK skala 1 : 10 0.20
0.10

skala 1 : 10
0.50

tul: 4 Ø 12 PELAT LANTAI


tul: 4 Ø 12 skala 1 : 10
tul: 4 Ø 12
0.08 ring : Ø8-150
ring : Ø8-150 ring : Ø8-150
0.50
0.20

0.15

0.12
0.15
0.20
BALOK SLOOF BALOK LATEI KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT PROVINSI :
DETAIL ROOF DRAIN D I R E K T O R A T J E N D E R A L S U M B E R D A Y A A I R NUSA TENGGARA BARAT
skala 1 : 10 B A L A I W I L A Y A H S U N G A I N U S A T E N G G A R A I PEKERJAAN :
skala 1 : 20 skala 1 : 10
SATUAN KERJA OPERASI DAN PEMELIHARAAN SDA NUSA TENGGARA I
S A T U A N P E L A K S A N A A N K E G I A T A N O & P S U M B E R D A Y A A I R I
0.15

Jln. Gajah Mada No. 105 Praya-Lombok Tengah Kode Pos 83500 Telp./Fax. (0370) 654137
REMEDIAL DAN PENANGANAN SEDIMENTASI
NAMA GAMBAR : SHOP DRAWING BENDUNGAN DI PULAU LOMBOK II
DENAH DAN POTONGAN GARDU PANDANG
PROJECT
HIDUP-JAYA,KSO MANAGER
NONO DARYONO, ST.
LOKASI :
0 1.0 2.0 3.0 4.0 5.0 m KONSULTAN SUPERVISI BENDUNGAN BATU NAMPAR
KABUPATEN LOMBOK TIMUR
DIPERIKSA PT. INDRA KARYA (PERSERO) AGUNG NUR FAUZI, ST.
PT. CIRIAJASA E.C.
SKALA 1 : 50 PT. TUAH AGUNG ANUGRAH
SAHNAL, ST.
DIPERIKSA PELAKSANA TEKNIK TANGGAL
NIP. 19651231 200701 1 026
SUPARDI, ST.,MT.
NO TANGGAL YANG DIREVISI DIGAMBAR DIPERIKSA DISETUJUI DISETUJUI PPK O&P SUMBER DAYA AIR I NO LEMBAR : JUMLAH LEMBAR :
NIP. 19681231 200701 1 025