PROJECT PT.

AIDA RATTAN INDUSTR


( JATIBARANG - TUGUREJO )

NO SITE PROJECT NAME


FACTORY

1 JB sun light

2 JB Lab QA

3 JB Mixing room

4 JB Area Makan
5 JB Loker Karywn
6 JB Cat Dinding
7 TR Lampu
8 TR Pos security - pos 2
9 TR Killn Dry
10 TR Sun Dry
11 TR Plester Dinding luar

12 TR Bak Control

13 TR Mushola, kantin karuun

14 TR Toilet Pos 1 security


15 TR Paving depan gerbang karuun

16 TR Toilet Office
17 TR Pengaspalan
18 TR Atap Fiber
19 TR Cat dinding meeting room
20 TR Talang belakang Karuun
21 TR Atap bocor
22 TR Bongkar lantai marmer
23 TR TPS
24 TR Toilet karyawan
25 TR Talut selokan Karuun
25 TR Alas tandon Karuun
26 TR MMT SHE
27 TR Kanopi parkir motor
28 TR Instalasi air bersih
29 TR Instalasi air utk HF
30 TR Talang air depan Karuun
31 TR Ipal
PROJECT PT. AIDA RATTAN INDUSTRY
( JATIBARANG - TUGUREJO )

NOTED DUE DATE

pemasangan & penggantian atap fiber, spy sinar matahari masuk dan meminimalisir jamur
di material mdf & saving energy listrik.
renovasi ruangan utk digunakan lab. QA, testing busa dan kayu.
sekat penutup area mixing masih menggunakan terpal, akan di ganti menggunakan
galvalum baja ringan utk rangkanya
pembuatan area tempat untuk makan karyawan (kanopi, kursi & meja)
actual menggunakan full material mdf, akan di ganti rangka besi & multiplex
cek dan cat ulang dinding di semua area JB
penambahan 11 titik lampu penerangan di area TR
Pembuatan pos security (pos 2) di Karuun
Pembuatan ruangan pengering venner di Karuun
area di depan samping luar gerbang P.6 dgn dimensi bangunan uk. 12 x 6 x 4 mtr
penanggulangan banjir yg actual masuk dari celah pori2 dinding belakang area mesin

pembuatan bak control tampungan air hujan, lokasi di belakang pojok mesin Karuun, dgn
dimensi 50x50x50 cm

pembuatan sarana umum : area tempat makan karyawan yg bawa bekal dan mushola

belum ada sarana toilet di pos security site TR furniture


area paving akses forklift dari karuun ke furniture, paving bergelombang, tidak level

pembuatan toilet office karuun


pengaspalan di karuun - area mesin dan boiler
pemasangan fiber untuk kanopi spray finishing
cat ulang dinding bawah unit Ac ruang meeting (noda bekas bocor air Ac)
penggantian talang rusak uk. 84 mtr, belakang dinding Karuun
beberapa banyak titik atap Karuun, bocor ketika hujan
pembongkaran lantai marmer depan office karuun
pembuatan tempat TPS tugurejo (Limbah B3, Limbah kering, Limbah sebet)
Renovasi toilet karyawan (toilet mess, toilet tengah, toilet finishing, toilet Karuun)
perbaikan talut saluran air depan pagar Karuun (ambrol)
plester / cor, bawah tandon air yg baru di pasang, karena bawahnya berongga
pemasangan kotak p3k dan MMT penandaan area
perbaikan dan penggantian atap parkiran motor site furniture.
perbaikan dan perubahan instalasi air bersih area Karuun dan furniture
pemasangan instalasi air bersih, untuk supplay air ke unit mesin HF furniture
penggantian talang rusak uk. 84 mtr, sisi atas depan gerbang P.5 - P6 Karuun
pembersihan bak ipal bawah, karena ada pengendapan
START FINISH STATUS PELAKSANA

1/12/2023 13/1/2023 closed vendor

open GA

open GA

open vendor
open GA
open GA
24/12/2022 progress GA
1/2/2023 1/14/2023 closed vendor
1/13/2023 progress vendor
1/18/2023 progress vendor

1/9/2023 13/1/2023 closed vendor

open vendor

open vendor

open vendor

open vendor

1/17/2023 progress vendor


open vendor
1/19/2023 1/19/2023 closed GA
1/19/2023 1/19/2023 closed GA
open vendor
open vendor
open GA
open GA
open GA
open GA
open GA
open GA
open GA
open GA
open GA
open vendor
open GA

General Affair Dept.


JOBLIST GENERAL AFFAIR PT. AIDA RATTA
( JATIBARANG - TUGUREJO )

SITE
NO PROJECT NAME
FACTORY
1 JB Lab QA/PD

2 JB Pemberian sekat plastik area penumpukan kayu &


finishgood
3 JB Perbaikan pintu ruang top coat
4 JB Perbaikan atap dryroom
5 JB Pemasangan blower di area amplas mentah
6 JB Perbaikan jalan area produksi
Bocor area :
7 JB sanding, gdg acc, assembil internal, komponen,
pembahanan, office

8 JB Mixing room

9 JB Pintu Sofa
10 JB Depan Area silow dan B3
11 JB
12 JB
13 JB
14 JB Cat Dinding

1 TR Atap Fiber
2 TR Cat dinding meeting room
3 TR Tps b3
4 TR Atap bocor
5 TR Atap bocor
6 Talang Karuun
7 TR Tandon karuun
8 TR Paving depan gerbang karuun
9 TR Lampu
10 TR MMT SHE
11 TR Storage Venner
12 TR Toilet office Karuun
13 TR Toilet karyawan karuun
14 TR Talut selokan Karuun
15 TR Kanopi Solar
16 TR secondary contaiment Solar Karuun
17 TR Ipal
18 TR Troli limbah sampah
19 TR Bongkar lantai marmer
20 TR TPS
21 TR Toilet karyawan
22 TR Kanopi parkir motor
23 TR Instalasi air utk HF
24 TR Yellow Line
JOBLIST GENERAL AFFAIR PT. AIDA RATTAN INDUSTRY
( JATIBARANG - TUGUREJO )

NOTED DUE DATE START

renovasi ruangan utk digunakan lab. QA, testing busa dan kayu. 2/20/2023

pasang certain, meminimalisir debu masuk di arwa subcont 2/5/2023 2/10/2023

2/20/2023 2/11/2023
2/20/2023 2/11/2023
2/20/2023
2/20/2023

no drop di area titik bocor (partial & kondisional) 2/20/2023 2/4/2023

sekat penutup area mixing masih menggunakan terpal, akan di ganti menggunakan 3/10/2023
galvalum baja ringan utk rangkanya
pasang pintu geser di area sofa, utk meminimalisir kucing masuk.
plester area jalan yg becek karena genangan air 2/4/2023
Penutupan dan perapian gudang GA di bawah tangga office...
Perbaikan dinding2 partisi di area dustcolector central.
Pembuatan area makan (istitahat karyawan di samping deket parkiran motor)
cek dan cat ulang dinding di semua area JB

pemasangan fiber untuk kanopi spray finishing 1/19/2023


cat ulang dinding bawah unit Ac ruang meeting (noda bekas bocor air Ac) 1/19/2023
bongkar area tps b3, untuk kondisikan silow 1/25/2023
beberapa banyak titik atap Karuun, bocor ketika hujan 1/26/2023
atap atas mesin HF furniture, 3 titik bocor ketika hujan 1/25/2023
penggantian dan pemasangan paralon talang
penyambungan paralon 2 tandon jadi 1 jalur out 2/1/2023
area paving akses forklift dari karuun ke furniture, paving bergelombang, tidak level 1/31/2023
penambahan 11 titik lampu penerangan di area TR furniture 24/12/2022
pemasangan kotak p3k dan MMT penandaan area 1/24/2023
penambalan dgn semend dan atau no drop, dinding dalam sisi bawah gudang venner 2/8/2023
pemasangan instalasi tandon dan pompa 2/6/2023
renovasi toilet karyawan karuun - pasang keramik
perbaikan talut saluran air depan pagar Karuun (ambrol)
perbaikan kanopi solar
pasang dinding sekitar solar, dgn ketinggian 1.5 mtr
pembersihan bak ipal bawah, karena ada pengendapan 2/8/2023
pembuatan troli utk limbah/sampah produksi & sampah kering
pembongkaran lantai marmer depan office karuun
pembuatan tempat TPS tugurejo (Limbah B3, Limbah kering, Limbah sebet)
Renovasi toilet karyawan toilet mess dan toilet TR furniture
perbaikan dan penggantian atap parkiran motor site furniture.
pemasangan instalasi air bersih, untuk supplay air ke unit mesin HF furniture
peremajaan (cat ulang yellow line) area Karuun dan TR
FINISH STATUS PELAKSANA

open GA

progress GA kurang 7 lembar potongan certain


2/11/2023 closed GA
2/11/2023 closed GA
open GA
open GA

progress GA partial titik area

open GA

progress GA kelanjutan utk plester titik kran air wastafelnya


open GA
open GA
open GA
open GA

1/19/2023 closed GA
1/19/2023 closed GA
1/25/2023 closed GA
progress GA kolaborasi dgn vendor
progress GA kolaborasi dgn vendor
open vendor/GA kolaborasi dgn vendor
2/1/2023 closed GA
2/3/2023 closed GA
1/28/2023 closed GA terpasang 5 titik, dan dilanjutkan pic. Elektrik
progress GA
2/9/2023 closed GA
2/10/2023 closed GA
open GA
open GA
open GA
open GA
progress GA partial
open GA
open GA batal
open GA
open GA
open GA
open GA
open GA

General Affair Dept. 2023


LIST ALAT KERJA GENERAL AFFAIR PT. AIDA
RATTAN INDUSTRY
( JATIBARANG - TUGUREJO )
NO ITEM ALAT QTY SATUAN LOKASI NOTED
1 Gerinda tangan 1 unit TR
2 Bor tangan 1 unit TR
3 Palu amric 1 unit TR
4 Arit 1 unit TR
5 Bendo 1 unit TR
6 Gunting kodok 1 unit TR
7 Tang kombinasi 1 unit
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22