TAHUN
NO CODE UNIT JENIS UNIT UMUR UNIT
PEROLEHAN
PT BBP
HM / KM BD TANGGAL BD BD ( HARI )
139160 3/1/2023 31
207921 3/1/2023 31
16423 3/14/2023 18
PRIORITAS
P1 = 1 - 6 HARI
P2 = 7 - 12 HARI
P3 = 13 - 18 HARI
DESCRIPTION
ban aus
10000km
P3 1652001239, '10/1/2023
1652001289, , 02/24/2023
1652001317 3/19/2023
1652001297 3/8/2023
P2
PR to Askep #DIV/0!
PROSES PURCHASING REQUEST
RPH LT MGR TEK LT BUDGET LT DIR.OPS
proses
3/23/2023
full release
PO
dari FR to PO ( Hari )
PURCHASING ORDER PARTS TERSUPPLY
ESTIMASI PLAN
TANGGAL PO LT dari FR TERSUPPLY TANGGAL LT dari PO RFU
3/2/2023
M Ke II april
3/6/2023
injektor cyl 1 open circuit, dan diakukan perbaikan selesai (03/15/2023) CA 322
error NE sensor, selesai, 03/15/2023
error prerseure oil (03/15/2023)
unit can't run, (starter bisa mutar, tp mesin tidak hidup karena tidak ada pembakaran)
selesai, unit beroperasi normal setelah ganti injektor bekas dar GKAE
22
akaran)
PR PART UNIT YG BEROPERASI
PT BBP
OPERASI
TRACKLINK ASSEMBLY
HOSE TURBO AIR CLEANER
OPERASI
SPROCKET
SHAFT IDLER
MOTOR STARTING
WIRING HARNESS INJECTOR
LOWER ARM
UPPER ARM
SHCOKABSORBER ASSY
OPERASI
DRIVE SHAFT
BALLJOINT
STABLIZER LINK
CUP RADIATOR
OPERASI CUP HIDROLIK TANK
KUKU BUCKET
OPERASI ADAPTOR
PEN KUKU BUCKET
Blade bucket
Operasi Ban loader
Oring kit
PRIORITAS
P1 = 1 - 6 HARI
P2 = 7 - 12 HARI
P3 = 13 - 18 HARI
P/N PERBAIKAN DAN KEBUTUHAN PARTS
1418-49005-0
1418-49005-0
PPBP
Order Part
Order Part
Order Part
PSA
Order Part
CREATE MATERIAL
CREATE MATERIAL
Order part
Order part
Order part
Order part
Order part
Order part
Order part
Order part
Order part
Order Part
Order part
Order part
Order part
Order part
Order part
Order part
Order part
Order part
Order part
Order part
Orderpart
Orderpart
Creater Material
NORMA LIFE TIME STATUS PRIORITAS
BD NO PR TGL PR
1652001256 24.01.2023
1652001256 24.01.2023
1652001205 25.10.2022
1652001270 03.02.2023
1652001268 03.02.2023
1652001267 30.01.2023
1652001253 23.01.2023
1652001252 21.01.2023
1652001257 25.01.2023
1652001203 22.10.2022
1652001203 22.10.2022
1652001283 2/17/2023
1652001323 4/3/2023
1652001298 3/9/2023
1652001323 4/3/2023
1652001323 4/3/2023
1652001298 3/9/2023
1652001327 3/6/2023
1652001323 4/3/2023
1652001328 4/6/2023
1652001328 3/6/2023
1652001323 4/3/2023
165200298 3/9/2023
1652001328 4/3/2023
1652001323 4/3/2023
1652001298 3/9/2023
1652001323 4/3/2023
1652001328 4/6/2023
1652001323 4/3/2023
1652001298 3/9/2023
10000Hm
1652001254 1/23/2023
1652001299 3/9/2023
PROSES PURCHASING REQUEST
ASKEP TEK LT RPH LT MGR TEK LT
25.01.2023 Proses
25.01.2023 Proses
27.12.2022 29.12.2022
03.02.2023
Proses BA
25.01.2023 25.01.2023
25.01.2023 25.01.2023
28.01.2023 31.01.2023
27.10.2022 29.10.2022
27.10.2022
4/3/2023
4/3/2023
belum release
4/3/2023
4/3/2023
4/3/2023
4/3/2023
4/3/2023
4/3/2023
4/3/2023
07.11.2022 10.11.2022
MT to BD #DIV/0!
PURCHASING ORDER
STATUS PR TGL FR
NO PO TANGGAL PO
1672001525
1672002490
1672001438 30.01.2023
full relase 1672001438 30.01.2023
1672001517 28.11.2022
fullrelease 3/28/2023 Belum PO
dari FR to PO ( Hari )
RDER PARTS TERSUPPLY PLAN
ESTIMASI TERSUPPLY
LT dari FR TANGGAL LT dari PO RFU
3/6/2023 M ke II
3/1/2023
3/7/2023
3/23/2023
3/23/2023
3/6/2023
3/6/2023
3/6/2023
Belum PO, Proses penawaran vendor sesuai arahan P.budi menggunakan merek UNO KOERA,
Part tersuply
Proses BA
Part tersuply sebagai cadangan stock
CREATE MATERIAL
CREATE MATERIAL
di gudang BPP