Date :
Supervisi by :
B
1
C
1
D
1
2
3
4
5
6
1
2
3
4
5
PHOTO's
Penggantian material lumpur di STA 1+600-1+800
Penimbunan, Dozing dan Pemadatan badan jalan dengan material OB di sta 1+600-1+
PT BERAU COAL
CHID Dept. - Site SMO
Budi
Saturday, May 06, 2017
Budi
Constraint
Lokasi quarry scorea cukup jauh ( 14 km)
Doosan unit loading MIJ produktivity rendah(Low power dan sering B/D, Air radiator setiap hari haru
Unit Dozer pengganti untuk grader belum ready ( masih di blok 8,penggantian tracklink )
Issue Safety
Debu saat panas
Equipment
1 PC 400 (Doosan) --> beroperasi 8:00-17:00
3 unit DT 20 T --> beroperasi 8:00-17:00
1 unit Bomag --> beroperasi 13:00-17:00 ( Kondisi hujan semalaman )
2 PC 200 (Mining) --> beroperasi = 2 unit
1 unit Dozer D85 (Mining) --> beroperasi
4 Unit DT 20 T (Mining) --> beroperasi
Others
Man Power MIJ
Operator/Driver (MIJ) = 13 Orang
Foreman (MIJ) = 1 Orang
Mekanik ( MIJ ) = 2 Orang
Crew Leader CHID = 1 orang
Pengawas CHID = 1 orang
B
1
C
1
2
D
1
2
3
1
2
PHOTO's
Cut & Fill area latihan menembak (kontinyu)
PEKERJAAN PERBAIKAN JEMBATAN DAN JALAN AKSES DI AREA ex. BBE
Activity Description
Cut & Fill area latihan menembak (kontinyu)
Slooping Area Latihan Menembak
Constraint
Lokasi pekerjaan cukup jauh ( 23 km dari office SMO)
Issue Safety
Equipment
1 PC 200 --> beroperasi 8:00-17:00
1 unit Dozer D85 --> Break Down ( Waterpump bocor )
1 Unit DT 20 T -->
Others
Man Power MIJ
Operator/Driver (MIJ) = 3 Orang
Crew Leader CHID = 1 orang
B
1
C
1
2
D
1
1
2
3
PHOTO's
Melanjutkan pemasangan pagar BRC
PEMASANGAN PAGAR BRC DI GUDANG HANDAK
Activity Description
Melanjutkan pemasangan pagar BRC
Constraint
Issue Safety
Equipment
Alat-Alat pertukangan /sipil
Others
Man Power Kop. Bintang Harapan
Tukang = 1 orang
Helper = 3 Orang
Crew Leader CHID = 0 orang
PT.BC
1 LV 209 Budi 7:30 18:00 0.0 Liter Monitoring pekerjaan dan mobilisasi personil