PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : BETON FOOTPLAT (DUDUKAN WF)

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

1 PEMBESIAN FOOTPLAT 0.90 x 0.90 x 0.30

- Tulangan Atas
D 13 0.15 1.04 0.80 0.10 0.10 1.00 22.00 5 117.33 122.19
c D 13 0.15 1.04 0.80 0.10 0.10 1.00 22.00 5 117.33 122.19
b
a
- Tulangan Bawah
D 13 0.15 1.04 0.80 0.10 0.10 1.00 22.00 5 117.33 122.19
D 13 0.15 1.04 0.80 0.10 0.10 1.00 22.00 5 117.33 122.19
a
b c

TOTAL BESI D 13 469.33 488.77

Panjang Lebar Tinggi Jumlah Volume


No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING BATAKO 1.80 1.80 0.30 22.00 83.16

TOTAL BEGESTING 83.16


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON FOOTPLAT 0.90 0.90 0.30 22.00 5.35

TOTAL BETON 5.35


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA
REQUEST
TAHUN ANGGARAN : 2021
ITEM PEKERJAAN : BETON KOLOM PRAKTIS 10x10

Panjang (m) Panjang


Jarak Berat per
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c d e f potongan
(m)

PEMBESIAN KOLOM
1 0.10 x 0.10
PRAKTIS 10/10
- Tulangan Pokok
a
D 12 - 0.89 5.00 0.48 0.48 - - - 5.96

- Tulangan Sengkang
a e D 8 0.20 0.39 0.05 0.05 0.05 0.05 0.10 0.10 0.39
f

d c

TOTAL B
TOTAL
Panjang
No. Uraian Pekerjaan Sketsa
(m)

2 BEGESTING TRIPLEK
KOLOM PRAKTIS 5.96

Panjang
No. Uraian Pekerjaan Sketsa
(m)

3
BETON KOLOM PRAKTIS 5.96
BACKUP DATA

= 96.00 KOLOM

Kebutuhan Total
Jumlah
Per titik Panjang
titik (bh) Berat (kg)
(bh) (m)

83.00 4.00 1978.7 1,755.84

83.00 25.00 813.40 320.79

TOTAL BESI D 10 1,978.72 1,755.84


TOTAL BESI D 8 813.40 320.79
Lebar Tinggi Jumlah Volume
(m) (m) (m) (m2)

0.10 0.10 83.00 197.87

TOTAL BEGESTING 197.87


Lebar Tinggi Jumlah Volume
(m) (m) (m) (m3)

0.10 0.10 83.00 4.95

TOTAL BETON 4.95


BACKUP DATA

PEKERJAAN : PEMBANGUNAN GEDUNG DPR


LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : BETON BALOK LATEI 10x20 LANTAI-1

Panjang (m) Panjang


Jarak Berat per
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) potongan
a b c d e f (m)

PEMBESIAN BALOK
1 0.10 x 0.20
LATEI 10/20
- Tulangan Pokok
a
D 10 - 0.62 353.03 0.40 - - - - 353.43

- Tulangan Sengkang
a e D 8 0.20 0.39 0.05 0.05 0.15 0.15 0.10 0.10 0.59
f

d c

TOTAL
TOTA

Panjang
No. Uraian Pekerjaan Sketsa

(m)

BEGESTING BALOK LATEI


2
TRIPLEX 353.43

Panjang
No. Uraian Pekerjaan Sketsa
(m)

3 BETON BALOK LATEI


353.43
BACKUP DATA

Total
Kebutuhan
Jumlah
Per titik
titik (bh) Panjang
(bh) Berat (kg)
(m)

1.00 4.00 1413.7 871.16

1.00 1,765.13 1,044.95 412.11

TOTAL BESI D 10 1,413.70 871.16


TOTAL BESI D 8 1,044.95 412.11

Lebar Tinggi Jumlah Volume

(m) (m) (m) (m3)

0.10 0.40 1.00 318.08

TOTAL BEGESTING 318.08


Lebar Tinggi Jumlah Volume
(m) (m) (m) (m3)

0.10 0.20 1.00 7.07

TOTAL BETON 7.07


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA REQUEST = 8.00 BH
SUDUT =
TAHUN ANGGARAN : 2021
ITEM PEKERJAAN : BETON KOLOM PRAKTIS KP1 10x10

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

PEMBESIAN KOLOM
1 0.10 x 0.10
PRAKTIS 10/10
- Tulangan Pokok
a
D 10 - 0.62 5.20 - - - - - 5.20 5.00 4.00 104.0 64.09

- Tulangan Sengkang
a e D 8 0.20 0.39 0.05 0.05 0.05 0.05 0.05 0.05 0.30 1.00 26.00 7.70 3.04
f

d c

TOTAL BESI D 10 104.00 64.09


TOTAL BESI D 8 7.70 3.04
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING KOLOM
PRAKTIS 5.20 0.10 0.20 1.00 1.56

TOTAL BEGESTING 1.56


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

3
BETON KOLOM PRAKTIS 5.20 0.10 0.10 1.00 0.05

TOTAL BETON 7.70 0.05


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA REQUEST = 16.00 BH
TINGGI = 1.00 M 16 BH
TAHUN ANGGARAN : 2021 TINGGI 2.00 1.90 M 2.00
ITEM PEKERJAAN : BETON KOLOM PRAKTIS KP2 10x10

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

PEMBESIAN KOLOM
1 0.10 x 0.10
PRAKTIS KP2 10/10

- Tulangan Pokok
a
D 10 - 0.62 1.00 - - - - - 1.00 16.00 4.00 64.0 39.44

- Tulangan Sengkang
a e D 8 0.20 0.39 0.05 0.05 0.05 0.05 0.05 0.05 0.30 16.00 5.00 23.68 9.34
f

d c

TOTAL BESI D 10 64.00 39.44


TOTAL BESI D 8 23.68 9.34
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING KOLOM
PRAKTIS 1.00 0.10 0.10 16.00 3.20

TOTAL BEGESTING 3.20


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

3
BETON KOLOM PRAKTIS 1.00 0.10 0.10 16.00 0.16

TOTAL BETON 23.68 0.16


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA TINGGI = 1.80 M 2 BH
TINGGI = 0.20 M 12 BH
TAHUN ANGGARAN : 2021
ITEM PEKERJAAN : BETON KOLOM PRAKTIS KP2A 10x10

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

PEMBESIAN KOLOM
1 0.10 x 0.10
PRAKTIS 10/10

- Tulangan Pokok
a
D 10 - 0.62 5.20 - - - - - 5.20 2.00 4.00 41.6 25.63

- Tulangan Sengkang
a e D 8 0.20 0.39 0.05 0.05 0.05 0.05 0.05 0.05 0.30 2.00 26.00 15.39 6.07
f

d c

TOTAL BESI D 10 41.60 25.63


TOTAL BESI D 8 15.39 6.07
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING KOLOM
PRAKTIS 5.20 0.10 0.20 1.00 1.56

TOTAL BEGESTING 1.56


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

3
BETON KOLOM PRAKTIS 5.20 0.10 0.10 1.00 0.05

TOTAL BETON 15.39 0.05


BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG DPR
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : BETON GAWANGAN KUSEN 10x10 LANTAI-1

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

PEMBESIAN GAWANG
1 0.10 x 0.20
KUSEN 10/10
- Tulangan Pokok
a
D 10 - 0.62 353.03 0.40 - - - - 353.43 1.00 4.00 1413.7 871.16

- Tulangan Sengkang
a e D 8 0.20 0.39 0.05 0.05 0.15 0.15 0.10 0.10 0.59 1.00 1,765.13 1,044.95 412.11
f

d c

TOTAL BESI D 10 1,413.70 871.16


TOTAL BESI D 8 1,044.95 412.11
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

BEGESTING GAWANGAN
2
KUSEN 353.43 0.10 0.40 1.00 318.08

TOTAL BEGESTING 318.08


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

BETON GAWANG KUSEN


3 TYPE LEBAR TINGGI JUMLAH

PJ1 - 0.10 0.10 2.00 -


P1 2.50 1.68 19.00 31.92 0.10 0.10 2.00 0.64
PJ2 3.00 2.14 2.00 4.28 0.10 0.10 2.00 0.09
P2 1.68 2.50 4.00 10.00 0.10 0.10 2.00 0.20
PJ3
P3 0.98 2.46 4.00 9.84 0.10 0.10 2.00 0.20
P4 0.88 2.50 13.00 32.50 0.10 0.10 2.00 0.65
P5

J1
J2
J3
J4
J5
J6
J7
J8
J9
J10
J11
J12
J13

BETON 1.77
BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG DPRD
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : BETON KOLOM K3 20x20 LANTAI-1

Panjang (m) Total


Jarak Berat Panjang per Jumlah titik Kebutuhan Per
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c d e f potongan (m) (bh) titik (bh) Panjang (m) Berat (kg)

PEMBESIAN KOLOM
1 0.20 x 0.20
20/20

- Tulangan Pokok
a
D 10 - 0.62 5.00 - - - - - 5.00 16.00 12.00 960.0 591.58

- Tulangan Sengkang
a e D 8 0.15 0.39 0.15 0.15 0.12 0.12 0.10 0.10 0.73 16.00 33.33 390.40 153.97
f

d c

TOTAL BESI D 10 960.00 591.58


TOTAL BESI D 8 390.40 153.97
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING KOLOM 20x20


TRIPLEX 5.00 0.20 0.20 16.00 64.00

TOTAL BEGESTING 64.00


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON KOLOM 20x20 5.00 0.20 0.20 16.00 3.20

TOTAL BETON 3.20


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BUIS BETON

Panjang (m)
Jarak Berat
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c d

1 Pembesian
- Tulangan
b D 13 0.15 1.04 1.20 0.16 0.16 0.08

d
c

No. Uraian Pekerjaan Sketsa

2 Begesting

No. Uraian Pekerjaan Sketsa

3 Beton
HITUNGAN VOLUME

Panjang (m) Panjang Kebutuhan Total


per Jumlah Per titik
potongan titik (bh) Panjang
e f (bh) Berat (kg)
(m) (m)

0.08 1.67 28.00 16 747.26 778.22

Total Besi D 13 747.26 778.22


Panjang Lebar Tinggi Jumlah Volume
(m) (m) (m) (m) (m2)

- - - - -

Total Begesting -
Dia.Luar Dia.Dalam Luas Tinggi Tebal Jumlah Volume
(m) (m) (m2) (m) (m) (m) (m3)

1.00 0.80 0.79 1.00 0.10 28.00 2.20

Total Beton 2.20


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON FOOTPLAT 120x120x35

Panjang (m)
Jarak Berat
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c

1 Pembesian 1.20 x 1.20 x 0.35


- Tulangan Atas
D 13 0.15 1.04 1.12 1.12 0.27
a
f D 13 0.15 1.04 1.12 1.12 0.27
d e c

No. Uraian Pekerjaan Sketsa

2 Begesting

No. Uraian Pekerjaan Sketsa

3 Beton
HITUNGAN VOLUME

Panjang (m) Panjang Kebutuhan Total


per Jumlah Per titik
potongan titik (bh) Panjang
d e f (bh) Berat (kg)
(m) (m)

0.27 0.08 0.08 2.94 56.00 7.00 1150.9 1,198.58


0.27 0.08 0.08 2.94 56.00 7.00 1150.9 1,198.58

Total Besi D 13 2,301.82 2,397.17


Panjang Lebar Tinggi Jumlah Volume
sa
(m) (m) (m) (m) (m2)

1.20 1.20 0.35 28.00 47.04

Total Begesting 47.04


Panjang Lebar Tinggi Jumlah Volume
sa
(m) (m) (m) (m) (m3)

1.20 1.20 0.35 28.00 14.11

Total Beton 14.11


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : BETON SLOOF SL1 (20x30)

Panjang (m)
Jarak Berat
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m)
a b c d

1 Pembesian 0.30 x 0.20 x 109.00


- Tulangan Pokok

e
D 13 - 1.04 0.05 0.05 0.22 0.22

c d
a b
f

- Tulangan Sengkang
D 10 0.10 0.62 0.22 0.22 0.12 0.12
a
e
c f d

No. Uraian Pekerjaan Sketsa

2 Begesting

No. Uraian Pekerjaan Sketsa

3 Beton
HITUNGAN VOLUME

Panjang (m) Panjang per Kebutuhan Total


Jumlah
potongan Per titik
titik (bh) Panjang
e f (m) (batang) Berat (kg)
(m)

109.00 4.72 114.27 1.00 9.00 1028.4 1,071.00

0.06 0.06 0.80 1.00 1,090.00 872.00 537.35

Total Besi D 13 1,028.41 1,071.00


Total Besi 10 872.00 537.35
Panjang Tinggi Lebar Jumlah Volume
(m) (m) (m) (m) (m2)

109.00 0.30 0.20 1.00 65.40

Total Begesting 65.40


Panjang Lebar Tinggi Jumlah Volume
(m) (m) (m) (m) (m3)

109.00 0.30 0.20 1.00 6.54

Total Beton 6.54


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : BETON SLOOF SL2 (25x15)

Panjang (m)
Jarak Berat
No. Uraian Pekerjaan Sketsa Ø Dia (mm) a b c d
(m) (kg/m)

1 Sloof 25/15 0.25 x 0.15 x 39.50


- Tulangan Pokok
e
D 13 - 1.04 0.05 0.05 0.17 0.17

c d
a b
f

- Tulangan Sengkang
D 10 0.10 0.62 0.17 0.17 0.07 0.07
a
e
c f d

No. Uraian Pekerjaan Sketsa

2 Begesting

No. Uraian Pekerjaan Sketsa

3 Beton
HITUNGAN VOLUME

Panjang (m) Panjang per Kebutuhan Total


Jumlah
potongan Per titik Panjang
e f titik (bh) Berat (kg)
(m) (batang) (m)

39.50 1.71 41.66 1.00 8.00 333.2 347.05

0.06 0.06 0.60 1.00 395.00 237.00 146.05

Total Besi D 13 333.25 347.05


Total Besi 10 237.00 146.05
Panjang Tinggi Lebar Jumlah Volume
(m) (m) (m) (m) (m2)

39.50 0.25 0.15 1.00 19.75

Total Begesting 19.75


Panjang Lebar Tinggi Jumlah Volume
(m) (m) (m) (m) (m3)

39.50 0.25 0.15 1.00 1.48

Total Beton 1.48


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON KOLOM PEDESTAIL K1 (35X35)

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

1 Pembesian 0.35 x 0.35 x 1.20

- Tulangan Pokok
D 16 - 1.58 0.10 0.19 1.40 0.64 - - 2.33 21.00 16.00 782.2 1,233.96
b

a
b

- Tulangan Sengkang
a e D 10 0.125 0.62 0.27 0.27 0.27 0.27 0.06 0.06 1.20 21.00 9.60 241.92 149.08
f
a b

d c c D 10 0.125 0.62 0.06 0.06 0.27 0.39 21.00 9.60 78.62 48.45
D 10 0.125 0.62 0.06 0.06 0.27 0.39 21.00 9.60 78.62 48.45
b

Total Besi 16 D16 782.21 1,233.96


Total Besi D10 399.17 245.98
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 1.20 0.35 0.35 21.00 35.28

Total Begesting 35.28


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 1.20 0.35 0.35 21.00 3.09

Total Beton 3.09


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON KOLOM K1 (35X35)

Panjang (m)
Jarak Berat
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c d e f

1 Pembesian 0.35 x 0.35 x 5.00

- Tulangan Pokok
D 16 - 1.58 5.00 0.64 - - - -

- Tulangan Sengkang
a e D 10 0.125 0.62 0.27 0.27 0.27 0.27 0.06 0.06
f
a b

d c c D 10 0.125 0.62 0.06 0.06 0.27


D 10 0.125 0.62 0.06 0.06 0.27
b

No. Uraian Pekerjaan Sketsa

2 Begesting

No. Uraian Pekerjaan Sketsa

3 Beton
RHITUNGAN VOLUME

Panjang Total
Kebutuhan
per Jumlah
Per titik Panjang
potongan titik (bh) Berat (kg)
(bh) (m)
(m)

5.64 21.00 16.00 1895.0 2,989.49

1.20 21.00 40.00 1,008.00 621.15

0.39 21.00 40.00 327.60 201.88


0.39 21.00 40.00 327.60 201.88

Total Besi 16 D16 1,895.04 2,989.49


Total Besi D10 1,663.20 1,024.91
Panjang Lebar Tinggi Jumlah Volume
(m) (m) (m) (m) (m2)

5.00 0.35 0.35 21.00 147.00

Total Begesting 147.00


Panjang Lebar Tinggi Jumlah Volume
(m) (m) (m) (m) (m3)

5.00 0.35 0.35 21.00 12.86

Total Beton 12.86


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON KOLOM PEDESTAIL K2 (35x15)

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

1 Pembesian 0.35 x 0.15 x 1.20

- Tulangan Pokok
D 16 - 1.58 0.10 0.19 1.40 0.64 - - 2.33 10.00 10.00 232.8 367.25
b

a
b

- Tulangan Sengkang
a e D 10 0.125 0.62 0.27 0.27 0.07 0.07 0.06 0.06 0.80 10.00 9.60 76.80 47.33
f
a b

d c c D 10 0.125 0.62 0.06 0.06 0.27 0.39 10.00 9.60 37.44 23.07
D 10 0.125 0.62 0.06 0.06 0.07 0.19 10.00 9.60 18.24 11.24
b

Total Besi 10 D16 232.80 367.25


Total Besi D10 132.48 81.64
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 1.20 0.15 0.35 10.00 12.00

Total Begesting 12.00


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 1.20 0.15 0.35 10.00 0.63

Total Beton 0.63


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON KOLOM K2 (35x15)

Panjang (m) Panjang


Jarak Berat per
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c d e f potongan
(m)

1 Pembesian 0.35 x 0.15 x 92.60 D 16 - 1.58 92.60 0.64 - - - - 93.24


- Tulangan Pokok

- Tulangan Sengkang
D 10 0.125 0.62 0.27 0.27 0.07 0.07 0.06 0.06 0.80
c

e
f
a b

d
Total Bes

Panjang
No. Uraian Pekerjaan Sketsa
(m)

2 Begesting 92.60

Panjang
No. Uraian Pekerjaan Sketsa
(m)

3 Beton 92.60
HITUNGAN VOLUME

Kebutuhan Total
Jumlah
Per titik Panjang
titik (bh) Berat (kg)
(bh) (m)

1.00 10.00 932.4 1,470.89

1.00 740.80 592.64 365.20

Total Besi 10 D16 932.40 1,470.89


Total Besi D10 592.64 365.20
Lebar Tinggi Jumlah Volume
(m) (m) (m) (m2)

0.15 0.35 1.00 92.60

Total Begesting 92.60


Lebar Tinggi Jumlah Volume
(m) (m) (m) (m3)

0.15 0.35 1.00 4.86

Total Beton 4.86


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON KOLOM PEDESTAIL KL (70x15)

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

1 Pembesian 0.70 x 0.15 x 1.20

- Tulangan Pokok
D 16 - 1.58 0.10 0.19 1.40 0.64 - - 2.33 1.00 10.00 23.3 36.73
b

a
b

- Tulangan Sengkang
a e D 10 0.125 0.62 0.27 0.27 0.07 0.07 0.06 0.06 0.80 2.00 9.60 15.36 9.47
f
a b

d c c

Total Besi 10 D16 23.28 36.73


Total Besi D10 15.36 9.47
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 1.20 0.15 0.70 1.00 1.44

Total Begesting 1.44


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 1.20 0.15 0.70 1.00 0.13

Total Beton 0.13


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON KOLOM KL/K2b (35x35x15)

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

1 Pembesian 0.70 x 0.15 x 21.70

- Tulangan Pokok
D 16 - 1.58 21.70 0.64 - - - - 22.34 1.00 10.00 223.4 352.42

- Tulangan Sengkang
a e D 10 0.125 0.62 0.27 0.27 0.07 0.07 0.06 0.06 0.80 2.00 173.60 277.76 171.16
f

d c

Total Besi 10 D16 223.40 352.42


Total Besi D10 277.76 171.16
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 21.70 0.15 0.35 2.00 43.40

Total Begesting 43.40


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 21.70 0.15 0.35 2.00 2.28

Total Beton 2.28


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021-2022


ITEM PEKERJAAN : BETON KOLOM 60x60 LANTAI-2

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

PEMBESIAN KOLOM
1 0.60 x 0.60
60/60
- Tulangan Pokok
a
D 16 - 1.58 3.60 - - - - - 3.60 8.00 8.00 230.4 363.46

- Tulangan Sengkang
a e D 10 0.10 0.62 0.52 0.52 0.52 0.52 0.12 0.12 2.31 8.00 36.00 665.28 409.96
f

d c

TOTAL BESI D 16 230.40 363.46


TOTAL BESI D 10 665.28 409.96
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING KOLOM 3.60 0.60 0.60 8.00 69.12

TOTAL BEGESTING 69.12


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON KOLOM 3.60 0.60 0.60 8.00 10.37

TOTAL BETON 10.37


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON BALOK B1 (30x40) ELEVASI 5.20

Panjang (m) Panjang per Kebutuhan Total


Jarak Berat Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Per titik Panjang
(m) (kg/m) a b c d e f titik (bh) Berat (kg)
(m) (bh) (m)

1 Pembesian 0.30 x 0.40 x 109.00


- Tulangan Pokok Menerus
e D 13 - 1.04 0.08 0.08 0.32 0.32 109.00 4.72 114.52 1.00 11.00 1259.7 1,311.89
c d
a b
f

- Tulangan Sengkang

a D 10 0.09 0.62 0.22 0.22 0.32 0.32 0.06 0.06 1.20 1.00 1,245.00 1,494.00 920.64

e
c f d

Total Besi D13 1,259.71 1,311.89


Total Besi D10 1,494.00 920.64
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 109.00 0.30 0.40 1.00 119.90

Total Begesting 119.90


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 109.00 0.30 0.40 1.00 13.08

Total Beton 13.08


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON BALOK B1 (25x35) ELVASI 5.20

Panjang (m) Panjang per Kebutuhan Total


Jarak Berat Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Per titik Panjang
(m) (kg/m) a b c d e f titik (bh) Berat (kg)
(m) (bh) (m)

1 Pembesian 0.25 x 0.35 x 56.00


- Tulangan Pokok Menerus
e D 13 - 1.04 0.08 0.08 0.27 0.27 56.00 2.43 59.12 1.00 9.00 532.1 554.14
c d
a b
f

- Tulangan Sengkang

a D 10 0.11 0.62 0.17 0.17 0.27 0.27 0.06 0.06 1.00 1.00 497.00 497.00 306.26

e
c f d

Total Besi D13 532.10 554.14


Total Besi D10 497.00 306.26
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 56.00 0.25 0.35 1.00 53.20

Total Begesting 53.20


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 56.00 0.25 0.35 1.00 4.90

Total Beton 4.90


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON BALOK B3 (15x30) ELEVASI +6.10

Panjang (m) Panjang per Kebutuhan Total


Jarak Berat Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Per titik Panjang
(m) (kg/m) a b c d e f titik (bh) Berat (kg)
(m) (bh) (m)

1 Pembesian 0.15 x 0.30 x 13.60

- Tulangan Pokok Menerus


e
D 13 - 1.04 0.08 0.08 0.22 0.22 13.60 0.59 14.79 1.00 9.00 133.1 138.58
c d
a b
f

- Tulangan Sengkang

a D 10 0.11 0.62 0.07 0.07 0.22 0.22 0.06 0.06 0.70 1.00 120.00 84.00 51.76

e
c f d

Total Besi D13 133.07 138.58


Total Besi D10 84.00 51.76
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 13.60 0.15 0.30 1.00 10.20

Total Begesting 10.20


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 13.60 0.15 0.30 1.00 0.61

Total Beton 0.61


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON BALOK B4 (15x25) ELEVASI +6.10

Panjang (m) Panjang per Kebutuhan Total


Jarak Berat Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Per titik Panjang
(m) (kg/m) a b c d e f titik (bh) Berat (kg)
(m) (bh) (m)

1 Pembesian 0.15 x 0.25 x 4.00

- Tulangan Pokok Menerus


e
D 13 - 1.04 0.08 0.08 0.17 0.17 4.00 0.17 4.67 1.00 8.00 37.4 38.90
c d
a b
f

- Tulangan Sengkang

a D 10 0.11 0.62 0.07 0.07 0.17 0.17 0.06 0.06 0.60 1.00 35.00 21.00 12.94

e
c f d

Total Besi D13 37.35 38.90


Total Besi D10 21.00 12.94
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 4.00 0.15 0.25 1.00 2.60

Total Begesting 2.60


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 4.00 0.15 0.25 1.00 0.15

Total Beton 0.15


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON PLAT LANTAI TEBAL 12 CM (ELEVASI +5.20)

Panjang (m) Total


Jarak Berat Panjang per Jumlah titik Kebutuhan Per
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c d e f potongan (m) (bh) titik (bh) Panjang (m) Berat (kg)

1 Werimessh M-8 Tebal = 0.12 m


= 6.00 x 2.00
= 7.00 x 4.00

Total Plat - -
Panjang Lebar Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m2)

2 Begesting Wiremessh dan Bondek 6.00 2.00 1.00 12.00


7.00 4.00 1.00 28.00

Total Begesting 40.00


Luasan Tebal Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m3)

3 Beton 40.00 0.12 1.00 4.80

Total Beton 4.80


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON BALOK B3 (15x30) ELEVASI +8.00

Panjang (m) Panjang per Kebutuhan Total


Jarak Berat Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Per titik Panjang
(m) (kg/m) a b c d e f titik (bh) Berat (kg)
(m) (bh) (m)

1 Pembesian 0.15 x 0.30 x 31.00

- Tulangan Pokok Menerus


e
D 13 - 1.04 0.08 0.08 0.22 0.22 31.00 1.34 32.94 1.00 9.00 296.5 308.73
c d
a b
f

- Tulangan Sengkang

a D 10 0.11 0.62 0.07 0.07 0.22 0.22 0.06 0.06 0.70 1.00 275.00 192.50 118.62

e
c f d

Total Besi D13 296.45 308.73


Total Besi D10 192.50 118.62
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 31.00 0.15 0.30 1.00 23.25

Total Begesting 23.25


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 31.00 0.15 0.30 1.00 1.40

Total Beton 1.40


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON BALOK B4 (15x25) ELEVASI +6.10

Panjang (m) Panjang per Kebutuhan Total


Jarak Berat Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Per titik Panjang
(m) (kg/m) a b c d e f titik (bh) Berat (kg)
(m) (bh) (m)

1 Pembesian 0.15 x 0.25 x 6.00

- Tulangan Pokok Menerus


e
D 13 - 1.04 0.08 0.08 0.17 0.17 6.00 0.26 6.76 1.00 8.00 54.0 56.29
c d
a b
f

- Tulangan Sengkang

a D 10 0.11 0.62 0.07 0.07 0.17 0.17 0.06 0.06 0.60 1.00 53.00 31.80 19.60

e
c f d

Total Besi D13 54.05 56.29


Total Besi D10 31.80 19.60
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 6.00 0.15 0.25 1.00 3.90

Total Begesting 3.90


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 6.00 0.15 0.25 1.00 0.23

Total Beton 0.23


PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON PLAT DAK TEBAL 12 CM (ELEVASI +2.40)

Panjang (m)
Jarak Berat Panjang per
No. Uraian Pekerjaan Sketsa Ø Dia (mm)
(m) (kg/m) a b c d e f potongan (m)

1 Werimessh M-8 Tebal = 0.12 m


= 2.00 x 2.00
= 2.50 x 7.50

No. Uraian Pekerjaan Sketsa

2 Begesting Wiremessh dan Bondek

No. Uraian Pekerjaan Sketsa

3 Beton
PERHITUNGAN VOLUME

Total
Jumlah titik Kebutuhan Per
(bh) titik (bh) Panjang (m) Berat (kg)

Total Plat - -
Panjang Lebar Jumlah Volume
(m) (m) (m) (m2)

2.00 2.00 1.00 4.00


2.50 7.50 1.00 18.75

Total Begesting 22.75


Luasan Tebal Jumlah Volume
(m) (m) (m) (m3)

22.75 0.12 1.00 2.73

Total Beton 2.73


BACKUP DATA
PEKERJAAN : PEMBANGUNAN GEDUNG DPR
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : BETON BALOK LATEI 10x20 LANTAI-2

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik Panjang
(m) (kg/m) a b c d e f potongan titik (bh) Berat (kg)
(bh) (m)
(m)

PEMBESIAN BALOK
1 0.10 x 0.20
LATEI 10/20
- Tulangan Pokok
a
D 10 - 0.62 488.22 0.40 - - - - 488.62 1.00 4.00 1954.5 1,204.40

- Tulangan Sengkang
a e D 8 0.20 0.39 0.05 0.05 0.15 0.15 0.10 0.10 0.59 1.00 2,441.10 1,445.13 569.94
f

d c

TOTAL BESI D 10 1,954.48 1,204.40


TOTAL BESI D 8 1,445.13 569.94
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

BEGESTING BALOK LATEI


2
TRIPLEX 488.62 0.10 0.40 1.00 439.76

TOTAL BEGESTING 439.76


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON BALOK LATEI


ARAH HORISONTAL
AS B 10.80 0.10 0.20 1.00 0.22
AS C 5.40 0.10 0.20 2.00 0.22
AS D 23.60 0.10 0.20 2.00 0.94
D1 1.85 0.10 0.20 2.00 0.07
D2 3.85 0.10 0.20 2.00 0.15
AS E 23.60 0.10 0.20 2.00 0.94
AS G1 4.20 0.10 0.20 1.00 0.08
H 4.20 0.10 0.20 1.00 0.08

AS I 85.16 0.10 0.20 1.00 1.70


10.30 0.10 0.20 1.00 0.21

AS J 23.60 0.10 0.20 2.00 0.94


AS K 14.35 0.10 0.20 1.00 0.29

TOILET 16.65 0.10 0.20 1.00 0.33


3.85 0.10 0.20 1.00 0.08
ARAH VERTIKAL

AS 2 18.30 0.10 0.20 1.00 0.37


AS 4 16.20 0.10 0.20 1.00 0.32
AS 6 8.40 0.10 0.20 1.00 0.17
AS 9 18.70 0.10 0.20 2.00 0.75
9' 13.70 0.10 0.20 2.00 0.55

AS 10 5.03 0.10 0.20 2.00 0.20


AS 10' 3.10 0.10 0.20 2.00 0.12
AS 12 2.90 0.10 0.20 1.00 0.06
AS 18 16.20 0.10 0.20 1.00 0.32
AS 20 18.30 0.10 0.20 1.00 0.37

TOILET 13.55 0.10 0.20 1.00 0.27

TOTAL BETON 9.76


PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021-2022


ITEM PEKERJAAN : PLAT LISTPLANK EVL.5.00

Panjang (m) Panjang per Total


Jarak Lebar Berat Jumlah Kebutuhan
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Panjang
(m) (m) (kg/m) a b c d e f g titik (bh) Per titik (Btg) Berat (kg)
(m) (m)

1 TULANGAN LISTPLANK
- Tulangan Plat Lantai Memanjang
D 10 0.15 28.29 0.62 0.85 0.22 0.60 - - - - 1.67 1.00 188.60 315.0 194.09
D 10 0.15 28.29 0.62 0.85 0.22 0.60 - - - - 1.67 1.00 188.60 315.0 194.09
c

b a

- Tulangan Plat Lantai Melintang D 10 0.15 1.67 0.62 - 28.29 0.80 - - - - 29.09 1.00 11.13 323.9 199.58
D 10 0.15 1.67 0.62 - 28.29 0.80 - - - - 29.09 1.00 11.13 323.9 199.58
b

TOTAL BESI D 10 1,277.66 787.33


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING TRIPLEK 28.29 - 3.34 1.00 94.49

TOTAL BEGESTING 94.49


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON PLAT AREA TANGGA 28.29 1.67 0.10 1.00 4.72

TOTAL BETON LIS PLANK 4.72


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021-2022


ITEM PEKERJAAN : PLAT LISTPLANK EVL.8.20

Panjang (m) Panjang per Total


Jarak Lebar Berat Jumlah Kebutuhan
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Panjang
(m) (m) (kg/m) a b c d e f g titik (bh) Per titik (Btg) Berat (kg)
(m) (m)

1 TULANGAN LISTPLANK
- Tulangan Plat Lantai Memanjang
D 10 0.15 23.91 0.62 0.85 0.22 0.60 - - - - 1.67 1.00 159.40 266.2 164.04
D 10 0.15 23.91 0.62 0.85 0.22 0.60 - - - - 1.67 1.00 159.40 266.2 164.04
c

b a

- Tulangan Plat Lantai Melintang D 10 0.15 1.67 0.62 - 23.91 0.80 - - - - 24.71 1.00 11.13 275.1 169.53
D 10 0.15 1.67 0.62 - 23.91 0.80 - - - - 24.71 1.00 11.13 275.1 169.53
b

TOTAL BESI D 10 1,082.61 667.13


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING TRIPLEK 23.91 - 3.34 1.00 79.86

TOTAL BEGESTING 79.86


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON PLAT AREA TANGGA 23.91 1.67 0.10 1.00 3.99

TOTAL BETON PLAT LANTAI 3.99


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021-2022


ITEM PEKERJAAN : PLAT DAK TEBAL 10 CM EVL.8.20

Panjang (m) Panjang per Total


Jarak Lebar Berat Jumlah Kebutuhan
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Panjang
(m) (m) (kg/m) a b c d e f g titik (bh) Per titik (Btg) Berat (kg)
(m) (m)

1 TULANGAN PLAT DAK


SUDUT - Tulangan Plat Lantai Memanjang
D 10 0.15 5.50 0.62 1.00 0.12 0.12 - - - - 1.24 8.00 36.67 363.7 224.14
D 10 0.15 1.00 0.62 5.50 0.12 0.12 - - - - 5.74 8.00 6.67 306.1 188.65
c b

- Tulangan Plat Lantai Melintang D 10 0.15 4.00 0.62 1.00 0.12 0.12 - - - - 1.24 8.00 26.67 264.5 163.01
D 10 0.15 1.00 0.62 4.00 0.12 0.12 - - - - 4.24 8.00 6.67 226.1 139.35

c b

TOTAL BESI D 10 1,160.53 715.15


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING TRIPLEK 11.50 1.00 - 4.00 46

TOTAL BEGESTING 46.00


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON PLAT SUDUT 9.50 1.00 0.10 4.00 3.80

TOTAL BETON PLAT DAK 3.80


BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021-2022


ITEM PEKERJAAN : PLAT DAK TEBAL 12 CM EVL.8.20

Panjang (m) Panjang per Total


Jarak Lebar Berat Jumlah Kebutuhan
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Panjang
(m) (m) (kg/m) a b c d e f g titik (bh) Per titik (Btg) Berat (kg)
(m) (m)

1 TULANGAN PLAT DAK


TERAS DEPAN - Tulangan Plat Lantai Memanjang
D 10 0.15 12.00 0.62 3.50 0.12 0.12 - - - - 3.74 1.00 80.00 299.2 184.37
D 10 0.15 12.00 0.62 3.50 0.12 0.12 - - - - 3.74 1.00 80.00 299.2 184.37
c b

- Tulangan Plat Lantai Melintang D 10 0.15 3.50 0.62 12.00 0.12 0.12 - - - - 12.24 1.00 23.33 285.6 175.99
D 10 0.15 3.50 0.62 12.00 0.12 0.12 - - - - 12.24 1.00 23.33 285.6 175.99

c b

VOID TANGGA D 10 0.15 11.50 0.62 6.00 0.12 0.12 - - - - 6.24 4.00 76.67 1913.6 1,179.21
D 10 0.15 6.00 0.62 11.50 0.12 0.12 - - - - 11.74 4.00 40.00 1878.4 1,157.52

AREA TOILET D 10 0.15 24.00 0.62 3.00 0.12 0.12 - - - - 3.24 2.00 160.00 1036.8 638.90
D 10 0.15 3.00 0.62 24.00 0.12 0.12 - - - - 24.24 2.00 20.00 969.6 597.49

TOTAL BESI D 10 1,169.60 4,293.86


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 FLOORDECK TERAS DEPAN 12.15 3.65 - 1.00 44.3475


VOID TANGGA 11.65 5.50 - 2.00 128.15
AREA TOILET 24.15 3.15 - 1.00 76.0725

TOTAL BEGESTING 248.57


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON TERAS DEPAN 43.34 5.20 12.00 3.50 0.12 1.00 5.04
VOID TANGGA 63.78 15.31 11.50 6.00 0.12 2.00 16.56
AREA TOILET 74.64 8.96 24.00 3.00 0.12 1.00 8.64
29.46
TOTAL BETON PLAT DAK 30.24
PERHITUNGAN VOLUME
PEKERJAAN :
LOKASI :

TAHUN ANGGARAN : 2023


ITEM PEKERJAAN : BETON BALOK RB2 (15x30) ELEVASI +8.5

Panjang (m) Panjang per Kebutuhan Total


Jarak Berat Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) potongan Per titik Panjang
(m) (kg/m) a b c d e f titik (bh) Berat (kg)
(m) (bh) (m)

1 Pembesian 0.15 x 0.30 x 51.00


- Tulangan Pokok Menerus
e D 13 - 1.04 0.08 0.08 0.22 0.22 51.00 2.21 53.81 1.00 4.00 215.2 224.14
c d
a b
f

- Tulangan Sengkang

a D 10 0.10 0.62 0.07 0.07 0.22 0.22 0.06 0.06 0.70 1.00 510.00 357.00 219.99

e
c f d

Total Besi D13 215.22 224.14


Total Besi D10 357.00 219.99
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 Begesting 51.00 0.15 0.30 1.00 38.25

Total Begesting 38.25


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 Beton 51.00 0.15 0.30 1.00 2.30

Total Beton 2.30


PENGAJUAN TERMIN 30 % KONTRAKTOR GEDUNG DPRD

TERMIN-2 REALISASI SAMPE MINGGU INI RENCANA TERMIN-3 (CCO)


NO URAIAN SAT KETERANGAN
BOBOT JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT JUMLAH HARGA

A PEKERJAAN PLAT LANTAI-2

1 Cor beton site mix K-250 M3 3.82% 3.82% RENCANA COR PLAT LANTAI-2, TGL 19
Rp 18,774,444.51 Rp 18,774,444.51 100.00% Rp 610,744,742.42 DESEMBER 2021

2 Pekerjaan pemasangan floor deck tebal 0.75 mm M2 100.00% 100.00%


Rp 663,200,661.20 Rp 663,200,661.20 100.00% Rp 613,319,763.80 SELESAI

3 Pekerjaan pemasangan wiremesh M10 M2 97.62% 100.00%


Rp 268,811,514.31 Rp 275,357,836.60 100.00% Rp 254,647,519.50 SELESAI

4 Pemasangan shear conektor besi Ǿ 12 mm Kg 38.13% 38.13%


Rp 40,798,518.75 Rp 40,798,518.75 100.00% Rp 40,798,518.75 SEMENTARA DIKERJAKAN

B PEKERJAAN ATAP

1 Pasang rangka atap baja ringan M2 88.96% Rp 995,746,290.00 72.72% Rp 813,990,226.92 SEMENTARA DIKERJAKAN

2 Pasang atap onduvilla termasuk bubungan dan jurai M2 60.00% Rp 762,983,760.00 41.71% Rp 530,429,053.88 SEMENTARA DIKERJAKAN

3 Pasang multipleks tebal 15 mm pelapis atap M2 60.00% Rp 393,424,257.60 41.71% Rp 273,509,958.76 SEMENTARA DIKERJAKAN

4 Pasang list plank wood plank lebar 30 cm M2 60.00% Rp 14,779,314.00 0.00% Rp -


C PEKERJAAN PERBAIKAN KONSTRUSI BAJA

Penambahan baut Ø 19 mm pada balok ekssisting (by aplikator) Titik 61.86% Rp 60,000,000.00 SEMENTARA DIKERJAKAN

Pemasangan balok WF 200 x 100 x 5.5 x 8 Kg 29.67% Rp 75,256,582.52 SEMENTARA DIKERJAKAN

Pemasangan balok WF 300 x 150 x6.5 x 9 Kg 83.47% Rp 265,318,233.45 SEMENTARA DIKERJAKAN

Pemasangan balok WF 400 x 200 x 8 x 13 Kg 54.80% Rp 71,640,925.13 SEMENTARA DIKERJAKAN

Cat zincromate baja Kg 84.96% Rp 368,834,608.83 SEMENTARA DIKERJAKAN

Perkuatan Balok WF metode Box menggunakan Plat Elv +5.00 dan Elv +9.00
UNTUK ELV.+9 SUDAH SELESAI DAN ELV.5
Kg 80.00% Rp 697,607,283.49 SEMENTARA DIKERJA KAN

UNTUK ELV.+9 SUDAH SELESAI DAN ELV.5


Pengelasan Full Cover Plat Balok WF Elv +5.00 dan Elv +9.00 Cm 81.82% Rp 385,705,628.00 SEMENTARA DIKERJA KAN

Modifikasi Joint Plate +5.00

12.1. Pengelasan keliling pada EndPlate Cm 50.00% Rp 13,247,564.00 SEMENTARA DIKERJAKAN

12.2. Penambahan Stefner Kg 50.00% Rp 2,083,190.95 SEMENTARA DIKERJAKAN

Pengerokan Karat pada Permukaan Baja secara Manual

13.1. - Lantai 1 m2 90.00% Rp 57,859,195.19 SEMENTARA DIKERJAKAN

13.2. - Lantai 2 m2 30.00% Rp 14,277,644.37 SEMENTARA DIKERJAKAN

Rp 3,531,341,400.39
PENGAJUAN TERMIN 30 % KONTRAKTOR GEDUNG DPRD

TERMIN-2 REALISASI SAMPE MINGGU INI RENCANA TERMIN-3 (CCO)


NO URAIAN SAT
BOBOT JUMLAH HARGA BOBOT JUMLAH HARGA BOBOT JUMLAH HARGA

A PEKERJAAN PLAT LANTAI-2


1 Cor beton site mix K-250 M3 3.82% Rp 18,774,444.51 3.82% Rp 18,774,444.51 100.00% Rp 610,744,742.42
2 Pekerjaan pemasangan floor deck tebal 0.75 mm M2 100.00% Rp 663,200,661.20 100.00% Rp 663,200,661.20 100.00% Rp 613,319,763.80
3 Pekerjaan pemasangan wiremesh M10 M2 97.62% Rp 268,811,514.31 100.00% Rp 275,357,836.60 100.00% Rp 254,647,519.50
4 Pemasangan shear conektor besi Ǿ 12 mm Kg 38.13% Rp 40,798,518.75 38.13% Rp 40,798,518.75 100.00% Rp 40,798,518.75
B PEKERJAAN ATAP
1 Pasang rangka atap baja ringan M2 88.96% Rp 995,746,290.00 72.72% Rp 813,990,226.92
2 Pasang atap onduvilla termasuk bubungan dan jurai M2 60.00% Rp 762,983,760.00 41.71% Rp 530,429,053.88
3 Pasang multipleks tebal 15 mm pelapis atap M2 60.00% Rp 393,424,257.60 41.71% Rp 273,509,958.76
4 Pasang list plank wood plank lebar 30 cm M2 60.00% Rp 14,779,314.00 0.00% Rp -
C PEKERJAAN PERBAIKAN KONSTRUSI BAJA
Penambahan baut Ø 19 mm pada balok ekssisting (by aplikator) Titik 61.86% Rp 60,000,000.00
Pemasangan balok WF 200 x 100 x 5.5 x 8 Kg 29.67% Rp 75,256,582.52
Pemasangan balok WF 300 x 150 x6.5 x 9 Kg 83.47% Rp 265,318,233.45
Pemasangan balok WF 400 x 200 x 8 x 13 Kg 54.80% Rp 71,640,925.13
Cat zincromate baja Kg 84.96% Rp 368,834,608.83
Perkuatan Balok WF metode Box menggunakan Plat Elv +5.00 dan Elv +9.00 Kg 80.00% Rp 697,607,283.49
Pengelasan Full Cover Plat Balok WF Elv +5.00 dan Elv +9.00 Cm 81.82% Rp 385,705,628.00
Modifikasi Joint Plate +5.00
12.1. Pengelasan keliling pada EndPlate Cm 50.00% Rp 13,247,564.00
12.2. Penambahan Stefner Kg 50.00% Rp 2,083,190.95
Pengerokan Karat pada Permukaan Baja secara Manual
13.1. - Lantai 1 m2 90.00% Rp 57,859,195.19
13.2. - Lantai 2 m2 30.00% Rp 14,277,644.37

Rp 3,531,341,400.39
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
A ELEVASI + 9,00
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +9.00) 145 kg
WF 200 Grid 7 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg
145 kg
WF 200 Grid 8 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg
145 kg
WF 200 Grid 14 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg
145 kg
WF 200 Grid 15 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg

TOTAL Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +9.00) 579 Kg

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Direksi Pekerjaan Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang PT.KONINDO PANORAMA KONSULTAN PT. TANJONG HARAPAN

KEVIN ESTON FUNAY, A.Md JIMI ANTONIUS HURU


Nip 19810830 201101 1 010 Team Leader Kepala Cabang
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
A ELEVASI + 8,200
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +8.20) 252 kg
WF 200 Grid 1-1 21.33 5.50 2.00 234.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 - - kg
98 kg
WF 200 Grid 2 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 16.00 2.72 kg
98 kg
WF 200 Grid 2-1 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
72 kg
WF 200 Grid 9-1 21.33 3.00 1.00 64.00 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg 1
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
83 kg
WF 200 Grid 10 - 1 21.33 3.50 1.00 74.67 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
72 kg
WF 200 Grid 10 - 2 21.33 3.00 1.00 64.00 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
83 kg
WF 200 Grid 11 - 1 21.33 3.50 1.00 74.67 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.23 - - kg
72 kg
WF 200 Grid 11 - 2 21.33 3.00 1.00 64.00 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.23 - - kg
83 kg
WF 200 Grid 12 - 1 21.33 3.50 1.00 74.67 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
98 kg
WF 200 Grid 19 - 1 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98 kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

WF 200 Grid 20 21.33 1.00 2.00 42.67 kg


End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
252 kg
WF 200 Grid 20 - 1 21.33 5.50 2.00 234.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 8.00 1.36 kg
188 kg
WF 200 Grid C-1 21.33 4.00 2.00 170.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 - - kg
98 kg
WF 200 Grid D 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98 kg
WF 200 Grid D-1 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98
WF 200 Grid I-1 21.33 1.00 2.00 42.67 kg kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98 kg
WF 200 Grid J 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
188 kg
WF 200 Grid J-1 21.33 4.00 2.00 170.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 8.00 1.36 kg
2,272.08
2 Pemasangan balok WF 300 x 150 x6.5 x 9 (Elv. +8,20) 150.21 kg
WF 300 Grid 7 36.67 2.50 1.00 92 kg
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
150.21 kg
WF 300 Grid 8 36.67 2.50 1.00 92 kg
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
150.21 kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

WF 300 Grid 14 36.67 2.50 1.00 92 kg


End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
150.21 kg
WF 300 Grid 15 36.67 2.50 1.00 92 kg
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
557.08 kg
WF 300 Grid D 36.67 6.00 2.00 440 kg
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M 19 0.23 24.00 5.52 kg
557.08 kg
WF 300 Grid E 36.67 6.00 2.00 440 kg
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M 19 0.23 24.00 5.52 kg

557.08 kg
WF 300 Grid F 36.67 6.00 2.00 440 kg
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M 19 0.23 24.00 5.52 kg

2 Pemasangan balok WF 400 x 200 x 8 x 13 (Elv. +8,20) 691.38 kg


WF 400 Grid 7 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Baut M 16 WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg
691.38 kg 2,765.53
WF 400 Grid 8 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Bracing WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg
691.38 kg
WF 400 Grid 14 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Bracing WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg
691.38 kg
WF 400 Grid 15 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Bracing WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg

TOTAL Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +8.20) 2,128 Kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

TOTAL Pemasangan balok WF 300 x 150 x6.5 x 9 (Elv. +8,20) 2,272 Kg


TOTAL Pemasangan balok WF 400 x 200 x 8 x 13 (Elv. +8,20) 2,766 Kg

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Direksi Pekerjaan Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang PT.KONINDO PANORAMA KONSULTAN PT. TANJONG HARAPAN

KEVIN ESTON FUNAY, A.Md JIMI ANTONIUS HURU


Nip 19810830 201101 1 010 Team Leader Kepala Cabang
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat

KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
B LANTAI II
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Elv. +5.00) 1,925.41 kg S-R- 003-B
WF 200 Grid 10-1 21.33 5.00 1.00 106.67 kg 117.45 kg S-R- 003-E3
End Plate 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 10-2 21.33 3.25 1.00 69.33 kg 80.12 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 10-3 21.33 0.00 2.00 - kg 0.00 kg S-R- 003-E3


Rip 10mm 80.90 0.35 0.1 8.00 - kg
Rip 6mm 48.61 0.20 0.05 8.00 - kg
Bracing WF 200 21.33 0.18 4.00 0.00 kg
Baut M19

WF 200 Grid 10-4 21.33 3.00 2.00 128.00 kg 146.25 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 8.00 0.49 kg
Bracing WF 200 21.33 0.18 4.00 14.93 kg
Baut M19

WF 200 Grid 11-1 21.33 3.25 2.00 138.67 kg 141.98 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 8.00 0.49 kg
Bracing WF 200
Baut M19

WF 200 Grid 11-2 21.33 5.00 1.00 106.67 kg 109.98 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-3 21.33 3.00 1.00 64.00 kg 67.32 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-4 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg

WF 200 Grid 11-5 21.33 3.00 1.00 64.00 kg 77.27 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg

WF 200 Grid G-1 21.33 1.50 1.00 32.00 kg 44.62 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 4.00 10.68 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
WF 200 Grid I-1 21.33 2.00 6.00 256.00 kg 325.92 kg S-R- 003-E3
Rip 10mm 80.90 0.30 0.1 24.00 58.25 kg
Rip 6mm 48.61 0.20 0.05 24.00 11.67 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid J-1 21.33 2.00 2.00 85.33 kg 0.00 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 8.00 21.36 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

Pengecatan 42.25 1 42.25 m2 42.25 m2 S-R- 003-B


Baut 36.00 36.00 titik 36.00 titik
1 Pemasangan balok WF 300 x 150 x 6,5 x 9 (Elv. +5.00) 892 kg S-R- 003-B
WF 300 Grid 9-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid 9-2 36.67 3.00 1.00 110.00 kg 114.18 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid 12-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-1 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-2 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
Pengecatan 24.00 1.2 28.80 m2 28.80 m2 S-R- 003-B
Baut 8.00 8.00 titik 8.00 titik
2 Perkuatan Balok WF metode Box menggunakan Plat
2.1 R1 (WF 300 x 150 x 6,5 x 9) 1,231.36 kg S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Grid i-1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Pengecatan 18.96 m2 S-R- 003-E
Grid D-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
Grid i-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
2.2 R2 (WF 300 x 150 x 6,5 x 9) 101.40 kg S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid G - 1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid I-2
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 1 15.58 Kg
Rip 8 mm 2 Line 64.93 0.072 0.28 0.02 2.6 1 2.61 Kg
Pengecatan 1.56 m2 S-R- 003-E
Grid F-1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid G - 1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid I-2
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 1 0.24 m2
Rip 8 mm 2 Line 1.00 0.072 0.28 0.02 0.0 1 0.04 m2
2.3 R3 (WF 300 x 150 x 6,5 x 9) 566.00 kg S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 80.90 5.83 0.30 1.75 283.0 2 566.00 Kg
Rip 8 mm - Line 64.93 0.072 0.28 0.02 - - - Kg
Pengecatan 7.00 m2 S-R- 003-E
Grid I - 1
Cover Plate 10 mm 2 Line 1.00 5.83 0.30 1.75 3.5 2 7.00 m2
Rip 8 mm - Line 1.00 0.072 0.28 0.02 - - - m2
2.4 R4 (350 x 175 x 7 x 11) 488.83 kg S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Grid 11
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 1 90.61 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Grid 18
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Pengecatan 5.93 m2 S-R- 003-E
Grid 4
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 - 0.084 0.33 0.03 - 4 - m2
Grid 11
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 1 1.12 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
Grid 18
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 4 0.22 m2
2.5 R5 (350 x 175 x 7 x 11) 184.10 kg S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 97.22 2.6 0.35 0.91 176.9 1 176.94 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Pengecatan 1.93 m2 S-R- 003-E
Grid 11
Cover Plate 12 mm 2 1.00 2.6 0.35 0.91 1.8 1 1.82 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
2.6 R6 (350 x 175 x 7 x 11) 323.11 kg S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 80.90 2.6 0.35 0.91 147.2 2 294.49 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 8 28.62 Kg
Pengecatan 4.08 m2 S-R- 003-E
Grid
Cover Plate 10 mm 2 1.00 2.6 0.35 0.91 1.8 2 3.64 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 8 0.44 m2
2.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 2,289.23 kg S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 10-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Pengecatan 18.86 m2 S-R- 003-C4
Grid 10-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 10-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 10,774.66 kg S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 4 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 6 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 7 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 9 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 10 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 11 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 12 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 13 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 15 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 16 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 18 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 19 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Pengecatan 133.18 m2 S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 4 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 6 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 7 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 9 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 10 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 11 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 12 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 13 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 15 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 16 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 18 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 19 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 1,695.17 kg S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 8 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 14 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 20 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Pengecatan 20.95 m2 S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 8 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 14 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 20 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
3 Pengelasan Full Cover Plat Balok WF Elv +5.00
3.1 R1 (WF 300 x 150 x 6,5 x 9) 120.00 m S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
Grid i-1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
3.2 R2 (WF 300 x 150 x 6,5 x 9) 9.60 m S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid G - 1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid I-2
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
3.3 R3 (WF 300 x 150 x 6,5 x 9) 46.64 m S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 5.83 - 4 46.64 m
3.4 R4 (350 x 175 x 7 x 11) 38.40 m S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 11
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 18
Cover Plate 10 mm 2 1.6 - 4 12.80 m
3.5 R5 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 2.6 - 4 20.80 m
3.6 R6 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 2.6 - 4 20.80 m
3.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 154.88 m S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 10-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 570.40 m S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 4 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 6 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 7 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 9 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 10 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 11 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 12 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 13 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 15 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 16 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 18 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 19 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 96.64 m S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 8 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 14 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 20 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m

TOTAL PENAMBAHAN BALOK WF 200 LANTAI 2 1,925 Kg


TOTAL PENAMBAHAN BALOK WF 300 LANTAI 2 892 Kg
TOTAL PERKUATAN Balok WF metode Box menggunakan Plat LANTAI 2 17,654 Kg
TOTAL PENAMBAHAN BAUT M.19 LANTAI 2 44 Titik
TOTAL PENGECATAN LANTAI 2 302 M2
TOTAL Pengelasan Full Cover Plat Balok WF Elv +5.00 107,816 cm
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat

KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
B LANTAI II
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Elv. +5.00) 1,878.38 kg S-R- 003-B
WF 200 Grid 9-1 21.33 3.00 1.00 64.00 kg 74.78 kg S-R- 003-E3
End Plate 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 10-1 21.33 5.00 1.00 106.67 kg 117.45 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 10-2 21.33 3.25 1.00 69.33 kg 76.38 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 21.33 0.18 2.00 3.73 kg
Baut M19

WF 200 Grid 10-3 21.33 3.00 1.00 64.00 kg 74.78 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 11-1 21.33 3.25 2.00 138.67 kg 141.98 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 8.00 0.49 kg
Bracing WF 200
Baut M19

WF 200 Grid 11-2 21.33 5.00 1.00 106.67 kg 109.98 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-3 21.33 3.00 1.00 64.00 kg 67.32 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 2.83 kg
Rip 6mm 48.61 0.20 0.05 4.00 0.49 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-4 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg

WF 200 Grid 11-5 21.33 3.00 1.00 64.00 kg 77.27 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg

WF 200 Grid G-1 21.33 1.50 1.00 32.00 kg 44.62 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 4.00 10.68 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
WF 200 Grid I-1 21.33 6.00 2.00 256.00 kg 279.31 kg S-R- 003-E3
Rip 10mm 80.90 0.30 0.1 8.00 19.42 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid J-1 21.33 2.00 2.00 85.33 kg 0.00 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 8.00 21.36 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

Pengecatan 61.50 1 61.50 m2 61.50 m2 S-R- 003-B


Baut 32.00 32.00 titik 32.00 titik
1 Pemasangan balok WF 300 x 150 x 6,5 x 9 (Elv. +5.00) 1,161 kg S-R- 003-B
WF 300 Grid 9-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid 9-2 36.67 3.00 1.00 110.00 kg 114.18 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid 12-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-1 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-2 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
Pengecatan 26.00 1.2 31.20 m2 31.20 m2 S-R- 003-B
Baut 14.00 14.00 titik 14.00 titik
2 Perkuatan Balok WF metode Box menggunakan Plat
2.1 R1 (WF 300 x 150 x 6,5 x 9) 1,231.36 kg S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Grid i-1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Pengecatan 18.96 m2 S-R- 003-E
Grid D-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
Grid i-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
2.2 R2 (WF 300 x 150 x 6,5 x 9) 101.40 kg S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg 601.85
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid G - 1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid I-2
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 1 15.58 Kg
Rip 8 mm 2 Line 64.93 0.072 0.28 0.02 2.6 1 2.61 Kg
Pengecatan 1.56 m2 S-R- 003-E
Grid F-1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid G - 1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid I-2
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 1 0.24 m2
Rip 8 mm 2 Line 1.00 0.072 0.28 0.02 0.0 1 0.04 m2
2.3 R3 (WF 300 x 150 x 6,5 x 9) 566.00 kg S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 80.90 5.83 0.30 1.75 283.0 2 566.00 Kg
Rip 8 mm - Line 64.93 0.072 0.28 0.02 - - - Kg
Pengecatan 7.00 m2 S-R- 003-E
Grid I - 1
Cover Plate 10 mm 2 Line 1.00 5.83 0.30 1.75 3.5 2 7.00 m2
Rip 8 mm - Line 1.00 0.072 0.28 0.02 - - - m2
2.4 R4 (350 x 175 x 7 x 11) 488.83 kg S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Grid 11
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 1 90.61 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Grid 18
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Pengecatan 5.93 m2 S-R- 003-E
Grid 4
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 - 0.084 0.33 0.03 - 4 - m2
Grid 11
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 1 1.12 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
Grid 18
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 4 0.22 m2
2.5 R5 (350 x 175 x 7 x 11) 184.10 kg S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 97.22 2.6 0.35 0.91 176.9 1 176.94 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Pengecatan 1.93 m2 S-R- 003-E
Grid 11
Cover Plate 12 mm 2 1.00 2.6 0.35 0.91 1.8 1 1.82 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
2.6 R6 (350 x 175 x 7 x 11) 323.11 kg S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 80.90 2.6 0.35 0.91 147.2 2 294.49 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 8 28.62 Kg
Pengecatan 4.08 m2 S-R- 003-E
Grid
Cover Plate 10 mm 2 1.00 2.6 0.35 0.91 1.8 2 3.64 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 8 0.44 m2
2.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 3,052.30 kg S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 10-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Pengecatan 37.73 m2 S-R- 003-C4
Grid 10-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 10-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 10,774.66 kg S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 4 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 6 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 7 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 9 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg 3747.71
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 10 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 11 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 12 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 13 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 15 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 16 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 18 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 19 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg 3747.71
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Pengecatan 133.18 m2 S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 4 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 6 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 7 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 9 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 10 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 11 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 12 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 13 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 15 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 16 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 18 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 19 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 1,695.17 kg S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 8 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 14 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 20 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Pengecatan 20.95 m2 S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 8 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 14 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 20 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
3 Pengelasan Full Cover Plat Balok WF Elv +5.00
3.1 R1 (WF 300 x 150 x 6,5 x 9) 120.00 m S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
Grid i-1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
3.2 R2 (WF 300 x 150 x 6,5 x 9) 9.60 m S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid G - 1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid I-2
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
3.3 R3 (WF 300 x 150 x 6,5 x 9) 46.64 m S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 5.83 - 4 46.64 m
3.4 R4 (350 x 175 x 7 x 11) 38.40 m S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 11
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 18
Cover Plate 10 mm 2 1.6 - 4 12.80 m
3.5 R5 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 2.6 - 4 20.80 m
3.6 R6 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 2.6 - 4 20.80 m
3.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 154.88 m S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 10-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 570.40 m S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 4 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 6 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 7 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 9 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 10 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 11 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 12 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 13 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 15 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 16 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 18 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 19 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 96.64 m S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 8 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 14 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 20 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m

TOTAL PENAMBAHAN BALOK WF 200 LANTAI 2 1,878 Kg


TOTAL PENAMBAHAN BALOK WF 300 LANTAI 2 1,161 Kg
TOTAL PERKUATAN Balok WF metode Box menggunakan Plat LANTAI 2 18,417 Kg
TOTAL PENAMBAHAN BAUT M.19 LANTAI 2 46 Titik
TOTAL PENGECATAN LANTAI 2 324 M2
TOTAL Pengelasan Full Cover Plat Balok WF Elv +5.00 107,816 cm
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
B LANTAI II
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Elv. +5.00) 2,022 kg S-R- 003-B
WF 200 Grid 10-1 21.33 4.50 2.00 192.00 kg 233.48 kg S-R- 003-E3
End Plate 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.18 4.00 14.93 kg
Baut M19

WF 200 Grid 10-2 21.33 3.25 1.00 69.33 kg 90.07 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 10-3 21.33 4.50 2.00 192.00 kg 233.48 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.18 4.00 14.93 kg
Baut M19

WF 200 Grid 10-4 21.33 3.00 1.00 64.00 kg 84.74 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 11-1 21.33 3.25 2.00 138.67 kg 165.21 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200
Baut M19

WF 200 Grid 11-2 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-3 21.33 3.25 2.00 138.67 kg 165.21 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-4 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg

WF 200 Grid 11-5 21.33 3.00 1.00 64.00 kg 77.27 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg

WF 200 Grid G-1 21.33 1.50 1.00 32.00 kg 44.62 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 4.00 10.68 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg

WF 200 Grid I-1 21.33 2.00 7.00 298.67 kg 380.24 kg S-R- 003-E3
Rip 10mm 80.90 0.30 0.1 28.00 67.96 kg
Rip 6mm 48.61 0.20 0.05 28.00 13.61 kg
Bracing WF 200 0.00 kg
Baut M19 - kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

WF 200 Grid J-1 21.33 2.00 2.00 85.33 kg 110.58 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 8.00 21.36 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg
Pengecatan 86.75 1 86.75 m2 86.75 m2 S-R- 003-B
Baut 50.00 50.00 titik 50.00 titik
1 Pemasangan balok WF 300 x 150 x 6,5 x 9 (Elv. +5.00) 1,161 kg S-R- 003-B
WF 300 Grid 9-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid 9-2 36.67 3.00 1.00 110.00 kg 114.18 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid 12-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-1 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-2 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
Pengecatan 26.00 1.2 31.20 m2 31.20 m2 S-R- 003-B
Baut 14.00 14.00 titik 14.00 titik
2 Perkuatan Balok WF metode Box menggunakan Plat
2.1 R1 (WF 300 x 150 x 6,5 x 9) 1,231.36 kg S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Grid i-1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Pengecatan 18.96 m2 S-R- 003-E
Grid D-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
Grid i-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
2.2 R2 (WF 300 x 150 x 6,5 x 9) 101.40 kg S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid G - 1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid I-2
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 1 15.58 Kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
Rip 8 mm 2 Line 64.93 0.072 0.28 0.02 2.6 1 2.61 Kg
Pengecatan 1.56 m2 S-R- 003-E
Grid F-1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid G - 1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid I-2
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 1 0.24 m2
Rip 8 mm 2 Line 1.00 0.072 0.28 0.02 0.0 1 0.04 m2
2.3 R3 (WF 300 x 150 x 6,5 x 9) 566.00 kg S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 80.90 5.83 0.30 1.75 283.0 2 566.00 Kg
Rip 8 mm - Line 64.93 0.072 0.28 0.02 - - - Kg
Pengecatan 7.00 m2 S-R- 003-E
Grid I - 1
Cover Plate 10 mm 2 Line 1.00 5.83 0.30 1.75 3.5 2 7.00 m2
Rip 8 mm - Line 1.00 0.072 0.28 0.02 - - - m2
2.4 R4 (350 x 175 x 7 x 11) 488.83 kg S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Grid 11
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 1 90.61 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Grid 18
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Pengecatan 5.93 m2 S-R- 003-E
Grid 4
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 - 0.084 0.33 0.03 - 4 - m2
Grid 11
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 1 1.12 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
Grid 18
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 4 0.22 m2
2.5 R5 (350 x 175 x 7 x 11) 184.10 kg S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 97.22 2.6 0.35 0.91 176.9 1 176.94 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Pengecatan 1.93 m2 S-R- 003-E
Grid 11
Cover Plate 12 mm 2 1.00 2.6 0.35 0.91 1.8 1 1.82 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
2.6 R6 (350 x 175 x 7 x 11) 323.11 kg S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 80.90 2.6 0.35 0.91 147.2 2 294.49 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 8 28.62 Kg
Pengecatan 4.08 m2 S-R- 003-E
Grid
Cover Plate 10 mm 2 1.00 2.6 0.35 0.91 1.8 2 3.64 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 8 0.44 m2
2.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 3,052.30 kg S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 10-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
Pengecatan 37.73 m2 S-R- 003-C4
Grid 10-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 10-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 10,774.66 kg S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 4 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 6 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 7 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 9 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 10 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 11 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 12 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 13 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 15 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 16 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 18 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 19 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Pengecatan 133.18 m2 S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 4 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 6 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 7 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 9 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 10 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 11 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 12 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 13 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 15 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 16 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 18 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 19 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 1,695.17 kg S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 8 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 14 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 20 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Pengecatan 20.95 m2 S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 8 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 14 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 20 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
3 Pengelasan Full Cover Plat Balok WF Elv +5.00
3.1 R1 (WF 300 x 150 x 6,5 x 9) 120.00 m S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
Grid i-1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
3.2 R2 (WF 300 x 150 x 6,5 x 9) 9.60 m S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid G - 1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid I-2
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
3.3 R3 (WF 300 x 150 x 6,5 x 9) 46.64 m S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 5.83 - 4 46.64 m
3.4 R4 (350 x 175 x 7 x 11) 38.40 m S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 11
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 18
Cover Plate 10 mm 2 1.6 - 4 12.80 m
3.5 R5 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 2.6 - 4 20.80 m
3.6 R6 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 2.6 - 4 20.80 m
3.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 154.88 m S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 10-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 570.40 m S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 4 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 6 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 7 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 9 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 10 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 11 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 12 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 13 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 15 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 16 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 18 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 19 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 96.64 m S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 8 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 14 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 20 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m

TOTAL PENAMBAHAN BALOK WF 200 LANTAI 2 2,022 Kg


TOTAL PENAMBAHAN BALOK WF 300 LANTAI 2 1,161 Kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
TOTAL PERKUATAN Balok WF metode Box menggunakan Plat LANTAI 2 18,417 Kg
TOTAL PENAMBAHAN BAUT M.19 LANTAI 2 64 Titik
TOTAL PENGECATAN LANTAI 2 349 M2
TOTAL Pengelasan Full Cover Plat Balok WF Elv +5.00 107,816 cm
Disetujui Oleh, Diperiksa Oleh,
Direksi Pekerjaan Konsultan Pengawas Dibuat Oleh,
Dinas Pekerjaan Umum Dan Penataan Ruang
18,416.93 PT.KONINDO PANORAMA KONSULTAN Kontraktor Pelaksana
2,725.50 PT. TANJONG HARAPAN
21,142.43

KEVIN ESTON FUNAY, A.Md MESAKH PENLAANA, ST


Nip 19810830 201101 1 010 Inspector HILMANTO, ST
Pelaksana
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
A LANTAI I
1 Kolom K.22 Elv. +3.00 S-R- 001
1.1 Cor beton site mix, K-250 1.68 m3 S-R- 006
Grid 1 7 bh 0.2 0.2 3 7 0.84 m3
Grid 21 7 bh 0.2 0.2 3 7 0.84 m3
1.2 Besi beton ulir D 13 mm = 121.50 Kg/M3 1.68 204.12 Kg/M3 204.12 Kg/M3
1.3 Besi beton ulir D 10 mm = 98.60 Kg/M3 1.68 165.64 Kg/M3 165.64 Kg/M3
1.4 Bekisting kolom = 20.00 M2/M3 1.68 33.60 M2/M3 33.60 M2/M3

2 Kolom KJ.88-1 t.5m (80x80)


2.1 Cor beton site mix, K-250 1.6 0.1 5 11 8.8 m3 8.8 m3 S-R- 001
2.2 Besi beton ulir 12-D 22 mm = 267.65 Kg/M3 8.8 2,355.34 Kg/M3 2,355.34 Kg/M3 S-R- 006
22 5.98 2.98386 132 2355.34 kg
2.3 Besi beton ulir 8- D 16 mm = 90.59 Kg/M3 8.8 797.20 Kg/M3 797.20 Kg/M3 S-R- 006
16 5.74 1.57824 88 797.20 kg
2.4 Besi beton ulir D13-100 = 436.29 Kg/M3 8.8 3,839.35 Kg/M3 3,839.35 Kg/M3 S-R- 006
sengkang 13 3.1 1.041885 550 1776.41 kg
kait 13 0.9 1.041885 2200 2062.93 kg
2.5 Bekisting kolom 21.25 m2 8.8 187.00 m2 187.00 m2 S-R- 006
1.6 0.1 5 3.4 11 187 m2
2.6 CHEMICAL ANCHOR Besi beton ulir D13-100 4,136.00 titik S-R- 006
sengkang 4136 4136.00 titik
3 Kolom KJ.88-2 t.4m (80x80)
2.1 Cor beton site mix, K-250 1.6 0.1 4 5 3.2 m3 5.0336 m3 S-R- 001
1.6 0.1 3.82 3 1.8336 m3
2.2 Besi beton ulir 12-D 22 mm = 216.25 Kg/M3 5.03 1,088.51 Kg/M3 1,088.51 Kg/M3 S-R- 006
22 4.1 2.98 60 734.03 kg
22 3.3 2.98 36 354.48 kg
2.3 Besi beton ulir 8- D 16 mm = 76.25 Kg/M3 5.03 383.83 Kg/M3 383.83 Kg/M3 S-R- 006
16 4.1 1.58 40 258.83 kg
16 3.3 1.58 24 125.00 kg
2.4 Besi beton ulir D13-100 = 398.24 Kg/M3 5.03 2,004.59 Kg/M3 2,004.59 Kg/M3 S-R- 006
sengkang 13 3.1 1.04 200 645.97 kg
kait 13 0.85 1.04 800 708.48 kg
sengkang 13 3.1 1.04 96 310.06 kg
kait 13 0.85 1.04 384 340.07 kg
2.5 Bekisting kolom 19.99 m2 5.03 100.64 m2 100.64 m2 S-R- 006
1.6 0.1 4 3.4 5 68 m2 100.64 m2
1.6 0.1 3.2 3.4 3 32.64 m2
2 Pemasangan balok WF 300 x 150 x6.5 x 9 (Area Selasar Samping Elv. +3.00) 622.80 kg S-R- 002
WF 300 Grid 2 36.67 6.50 2.00 477 kg S-R- 001
End Plate 12mm 97.22 0.60 0.15 8.00 70 kg
Rip 6mm 15.56 0.30 0.075 8.00 2.8 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M19 0.23 48.00 11.04 kg
Baut 4.00 4.00 titik 4.00 titik
628.75 kg
WF 300 Grid 20 36.67 6.50 2.00 477 kg
End Plate 12mm 97.22 0.60 0.15 8.00 70 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M19 0.23 48.00 11.04 kg
Baut 8.00 8.00 titik 8.00 titik
Pengecatan 26.00 1.2 31.20 m2 31.20 m2
3 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00) 1,307 kg S-R- 001
WF 200 Grid 1 21.33 2.50 2.00 106.67 kg S-R- 002
End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg S-R- 004 -A
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid 1-1 21.33 6.50 2.00 277.33 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg


Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid 2 21.33 2.50 2.00 106.67 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid Melintang (e,f,g,h,i) 21.33 2.50 7.00 373.33 kg


End Plate 10mm 80.90 0.40 0.1 28.00 90.61 kg
Rip 6mm 48.61 0.20 0.05 28.00 13.61 kg
Bracing WF 200 21.33 0.45 14.00 134.40 kg
Baut M19 0.23 48.00 11.04 kg
Baut 26.00 26.00 titik 26.00 titik S-R- 001
Pengecatan 40.50 1.2 48.60 m2 48.60 m2 S-R- 002
1,307 kg
WF 200 Grid 20 21.33 2.50 2.00 106.67 kg
End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid 21 21.33 2.50 2.00 106.67 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid 21-1 21.33 6.50 2.00 277.33 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid Melintang (e,f,g,h,i) 21.33 2.50 7.00 373.33 kg


End Plate 10mm 80.90 0.40 0.1 28.00 90.61 kg
Rip 6mm 48.61 0.20 0.05 28.00 13.61 kg
Bracing WF 200 21.33 0.45 14.00 134.40 kg
Baut M19 0.23 48.00 11.04 kg
Baut 26.00 26.00 titik 26.00 titik S-R- 001
Pengecatan 40.50 1 40.50 m2 40.50 m2 S-R- 002
4 Pemasangan angkur M 16 - 32cm
4.1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00) 156.00 bh S-R- 004 -A
Grid 1 78.00 78.00 bh
4.2 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00)
Grid 21 78.00 78.00 bh

TOTAL PENAMBAHAN besi D.10 LANTAI 1 165.6 KG


TOTAL PENAMBAHAN besi D.13 LANTAI 1 6,048.1 KG
TOTAL PENAMBAHAN besi D.16 LANTAI 1 1,181.0 KG
TOTAL PENAMBAHAN besi D.22 LANTAI 1 3,443.9 KG
TOTAL Chemical Anchor D.13 LANTAI 1 4,136.0 KG
TOTAL PENAMBAHAN WF 300 LANTAI 1 1,251.6 KG
TOTAL PENAMBAHAN WF 200 LANTAI 1 2,614.3 KG
TOTAL Pemasangan angkur M 16 - 32cm LANTAI 1 156.00 BH
TOTAL PENAMBAHAN BAUT M.19 LANTAI 1 64.00 titik
TOTAL PENGECATAN LANTAI 1 120 M2
Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,
Direksi Pekerjaan Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang PT.KONINDO PANORAMA KONSULTAN PT. TANJONG HARAPAN

KEVIN ESTON FUNAY, A.Md MESAKH PENLAANA, ST HILMANTO, ST


Nip 19810830 201101 1 010 Inspector Pelaksana
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
D ELEVASI +9.00 (ATAP)
1 Pemasangan balok WF 300 x 150 x6.5 x 9 1,849.30 kg
WF 300 Grid 7 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg

WF 300 Grid 9 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1


End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg

WF 300 Grid 13 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1


End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg

WF 300 Grid 15 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1


End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg
Baut 8.00 8.00 titik 8.00 titik
Pengecatan 36.00 1.20 43.20 m2 43.20 m2 S-R- 005-A1
2 Pemasangan balok WF 200 x 100 x5.5 x 8 - kg S-R- 005-A1
WF 200 Grid 7 & 15 21.33 2.50 2.00 - kg - kg S-R- 004-A1
End Plate 10mm 80.90 0.60 0.1 4.00 - kg
Rip 10mm 80.90 0.38 0.2 12.00 - kg
Rip 6mm 48.61 0.20 0.05 8.00 - kg
Bracing WF 200 21.33 0.30 4.00 - kg
Baut M16 0.17 40.00 - kg
Baut 4.00 - titik 0.00 titik
Pengecatan 5.00 1.00 5.00 m2 5.00 m2
3 Perkuatan Ring Balok Elv +9.00 (Atap) 2,725.50 kg S-R- 005-A
Grid 2 S-R- 005-A1
Cover Plate 6 mm 2 Line 48.61 8.6 0.20 1.72 167.2 2 334.44 Kg
8 mm 2 Line 64.93 2.1 0.20 0.42 54.5 2 109.08 Kg
6 mm 2 Line 48.61 6.15 0.20 1.23 119.6 2 239.17 Kg
Grid 4
Cover Plate 8 mm 2 Line 64.93 8.6 0.20 1.72 223.4 2 446.72 Kg
Grid 18
Cover Plate 8 mm 2 Line 64.93 8.6 0.20 1.72 223.4 2 446.72 Kg
Grid 20
Cover Plate 6 mm 2 Line 48.61 8.6 0.20 1.72 167.2 2 334.44 Kg
8 mm 2 Line 64.93 2.1 0.20 0.42 54.5 2 109.08 Kg
6 mm 2 Line 48.61 6.15 0.20 1.23 119.6 2 239.17 Kg
Grid D
Cover Plate 6 mm 2 Line 48.61 6 0.20 1.20 116.7 2 233.33 Kg
Grid J
Cover Plate 6 mm 2 Line 48.61 6 0.20 1.20 116.7 2 233.33 Kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

Pengelasan Full Cover Plat Balok WF Elv +9.00 (Atap)


Las Kelliling 8mm
Grid 2 251.6 M
Cover Plate 6 mm 2 Line 8.6 4 34.4 M
8 mm 2 Line 2.1 4 8.4 M
6 mm 2 Line 6.15 4 24.6 M

Grid 4
Cover Plate 8 mm 2 Line 8.6 4 34.4 M

Grid 18
Cover Plate 8 mm 2 Line 8.6 4 34.4 M

Grid 20
Cover Plate 6 mm 2 Line 8.6 4 34.4 M
8 mm 2 Line 2.1 4 8.4 M
6 mm 2 Line 6.15 4 24.6 M

Grid D
Cover Plate 6 mm 2 Line 6 4 24 M

Grid J
Cover Plate 6 mm 2 Line 6 4 24 M

TOTAL PENAMBAHAN BALOK WF 300 ELV +9.00 1,849.30 KG


TOTAL PENAMBAHAN BALOK WF 200 ELV +9.00 - KG
TOTAL PERKUATAN Balok WF metode Box menggunakan Plat ELV +9.00 2,725.50 KG
TOTAL PENAMBAHAN BAUT M.19 ELV +9.00 8 Titik
TOTAL PENGECATAN ELV +9.00 48 M2
TOTAL Pengelasan Full Cover Plat Balok WF Elv +9.00 (Atap) 25,160 cm

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Direksi Pekerjaan Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang PT.KONINDO PANORAMA KONSULTAN PT. TANJONG HARAPAN

KEVIN ESTON FUNAY, A.Md MESAKH PENLAANA, ST HILMANTO, ST


Nip 19810830 201101 1 010 Inspector Pelaksana
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
C ELEVASI + 8.20
1 Pemasangan balok WF 300 x 150 x 6.5 x 9 2,668.33 kg
WF 300 Grid 2 36.67 9.00 2.00 660 kg 777.08 kg S-R- 004
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid 20 36.67 9.00 2.00 660 kg 777.08 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid B 36.67 6.00 2.00 kg 0.00 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 kg
Rip 6mm 48.61 0.30 0.075 8.00 kg
Bracing WF 300 36.67 0.50 4.00 kg

WF 300 Grid C 36.67 6.00 2.00 kg 0.00 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 kg
Rip 6mm 48.61 0.30 0.075 8.00 kg
Bracing WF 300 36.67 0.50 4.00 kg

WF 300 Grid D 36.67 6.00 2.00 440 kg 557.08 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid J 36.67 6.00 2.00 440 kg 557.08 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 35.00 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid K 36.67 6.00 4.00 kg 0.00 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 8.00 kg
Rip 6mm 48.61 0.30 0.075 16.00 kg
Bracing WF 300 36.67 0.50 8.00 kg
Baut M19 0.23 112.00 kg
Baut 18.00 18.00 titik 18.00 titik
Pengecatan 108.00 1.20 129.60 m2 129.60 m2
2 Pemasangan balok WF 400 x 200 x 8 x 13 1,020 kg S-R- 004
WF 400 Grid D - 1 66.00 5.40 2.00 712.80 kg 1019.58 kg S-R- 004-A1
End Plate 16mm 129.51 0.80 0.2 4.00 82.89 kg
Rip 10mm 80.90 0.40 0.1 8.00 25.89 kg
Bracing WF 400 66.00 0.75 4.00 198.00 kg
Baut M22 0.33 56.00 18.48 kg
Baut 4.00 4.00 titik 4.00 titik
Pengecatan 10.80 1.20 12.96 m2 12.96 m2
3 Pemasangan angkur M 19 - 75cm
3.1 Pemasangan balok WF 300 x 150 x 6.5 x 9 - BH
Grid B 56.00 bh
Grid C 56.00 bh
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

TOTAL PENAMBAHAN BALOK WF 300 ELV +8.20 2,668 KG


TOTAL PENAMBAHAN BALOK WF 400 ELV +8.20 1,020 KG
TOTAL Pemasangan angkur M 19 - 75cm ELV +8.20 - BH
TOTAL PENAMBAHAN BAUT M.19 ELV +8.20 22 Titik
TOTAL PENGECATAN ELV +8.20 143 M2

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Direksi Pekerjaan Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang PT.KONINDO PANORAMA KONSULTAN PT. TANJONG HARAPAN

KEVIN ESTON FUNAY, A.Md MESAKH PENLAANA, ST HILMANTO, ST


Nip 19810830 201101 1 010 Inspector Pelaksana
REKAPAN VOLUME BAJA

Elv.+9.00 Elv.+8.20 Evl.+5 Evl.+3


NO URAIAN PEKERJAAN Jumlah
RAB.LAMA RAB.BARU RAB.LAMA RAB.BARU RAB.LAMA RAB.BARU RAB.LAMA RAB.BARU

1 2 3 4 5 6 7 8 7 8

1 Pemasangan balok WF 200 x 100 x 5.5 x 8 579.33 2,127.70 1,925.41 2,614.31 7,246.75
2,128.00

2 Pemasangan balok WF 300 x 150 x6.5 x 9 - 1,849.30 2,272.08 2,668.33 891.76 1,251.55 8,933.03

3 Pemasangan balok WF 400 x 200 x 8 x 13 2,765.53 1,019.58 3,785.10

Perkuatan Balok WF metode Box menggunakan


4
Plat Elv +5.00 dan Elv +9.00 2,725.50 17,653.86 20,379.36

Pengelasan Full Cover Plat Balok WF Elv +5.00


5
dan Elv +9.00 50,320.00 107,816.00 158,136.00

6 Modifikasi Joint Plate +5.00


Pengelasan keliling pada EndPlate
Penambahan Stefner
BACKUP DATA
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
LOKASI : KABUPATEN SABU RAIJUA

TAHUN ANGGARAN : 2021


ITEM PEKERJAAN : CAT ZINCROMATE BAJA

Panjang (m) Panjang Total


Kebutuhan
Jarak Berat per Jumlah
No. Uraian Pekerjaan Sketsa Ø Dia (mm) Per titik
(m) (kg/m) a b c d e f potongan titik (bh) Panjang (m) Berat (kg)
(bh)
(m)

PEMBESIAN KOLOM
1 0.40 x 0.40
40/40
- Tulangan Pokok
a User: User:
D 6 - 0.22 5.00 - - - - - 5.00 50.00 8.00
JUMLAH GAMBAR2000.0
DI GAMBAR DETAIL 443.68
PEMBESIAN

- Tulangan Sengkang
a e D 6 0.10 0.22 0.34 0.34 0.34 0.34 0.07 0.07 1.50 50.00 50.00 3,760.00 834.12
f

d c

TOTAL BESI D 6 2,000.00 443.68


TOTAL BESI D 6 3,760.00 834.12
Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m2)

2 BEGESTING KOLOM 5.00 0.40 0.40 50.00 400.00

TOTAL BEGESTING 400.00


Panjang Lebar Tinggi Jumlah Volume
No. Uraian Pekerjaan Sketsa
(m) (m) (m) (m) (m3)

3 BETON KOLOM 5.00 0.40 0.40 50.00 40.00

TOTAL BETON 40.00

Anda mungkin juga menyukai