NO URAIAN PEKERJAAN
( Rp.) (%
TOTAL 14,415,535.76
NILAI TOTAL + PPN 15% 16,577,866
EMPAT BELAS JUTA EMPAT RATUS LIMA BEL
TERBILANG RATUS TIGA PULUH LIMA KOMA TUJUH PULU
RUPIAH
BOBOT
(%)
100.00
100
C
Tulangan Balok Sloof k 4 Ø12
a = 3964.40 4 15857.6
a
D B
A
D = 10.00
D B 49.60 20 992
C
Tulangan Balok Sloof k 4 Ø12
a = 314.40 4 1257.6
a
C
Tulangan Balok Sloof k 4 Ø12
a = 4364.40 4 17457.6
a
Total Panjang (m) 0.0000
Berat Besi Tulangan (kg/m) 0.0022
Berat Total (kg) 0.0000
Volume Beton (m³) 1.305
Berat Besi / m³ Beton (kg) 0.77
Begisting (m²) 23.33
KTUR LANTAI I
Diameter (cm)
Total Berat
0.8 1 1.2 (kg)
15694.66667
15857.6
Diameter (cm)
Total Berat
0.8 1 1.2 (kg)
992
1257.6
Diameter (cm)
Total Berat
0.8 1 1.2 (kg)
17284
17457.6
172.8400 0.0000 174.5760
0.0039 0.0062 0.0089
0.6820 0.0000 1.5498 2.232
1.305
1.710
23.33
3950
300
4350
VOLUME
A PEKERJAAN STRUKTUR BETON DAN PASANGAN
1. Pek. Balok Sloof Ukuran 15 x 20 cm fc' 24 Mpa L
0.15
2. Pek. Kolom Praktis Ukuran 15 x 15 cm fc' 24 Mpa P L
0.15 0.15
3. Pek. Reng Balok Ukuran 15 x 20 fc' 24 Mpa L
0.15
T P VOLUME SATUAN
0.2 39.50 1.185 M3
T JUMLAH VOLUME SATUAN
3 4 0.27 M3
T P VOLUME SATUAN
0.2 43.5 1.305 M3
DAFTAR UPAH DAN BAHAN KOTA PEKANBARU TAHUN 2018
NO JENIS BAHAN VOLUME SAT
JUMLAH
1 2 3 4
A UPAH
B BAHAN PASANGAN
1 Pasir Cor (Beton) 1 Kg Rp.
2 Semen PC Type I @50kg 1 Kg Rp.
3 Kerikil Cor (Beton) 1 Kg Rp.
4 BesI Beton Polos 1 Kg Rp.
5 Kawat Beton 1 Kg Rp.
6 Air 1 L Rp.
7 Kayu Klas III 1 Kg Rp.
8 Paku 5-10 cm 1 Kg Rp.
9 Minyak Bekisting 1 L Rp.
10 Balok kayu kelas II 1 M3 Rp.
11 Plywood tebal 9 mm 1 Lbr Rp.
12 Dolken kayu Ø 8-10 panjang 400 cm 1 Btg Rp.
11
ANBARU TAHUN 2018
KET
JUMLAH
6
120,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
120,000.00
80,000.00
100.93
1,160.00
92.64
12,000.00
16,000.00
4.50
2,100,000.00
16,000.00
12,000.00
4,100,000.00
36,800.00
12,000.00
A.4.1.1.9. Membuat 1 m3 beton mutu f'c = 24 MPa
Harga Satuan
No Uraian Kode Satuan Koef.
Rp
A TENAGA
Pekerja L.01 OH 1.650 80,000.00
Tukang batu L.02 OH 0.275 100,000.00
Kepala tukang L.03 OH 0.028 120,000.00
Mandor L.04 OH 0.083 120,000.00
TOTAL UPAH TENAGA
B BAHAN
Semen portland Kg 406.000 1,160.00
Pasir beton Kg 684.000 100.93
Kerikil (Maks 30 mm) Kg 1026.000 92.64
Air Liter 215.000 4.50
TOTAL BIAYA BAHAN
C PERALATAN
132,000.00
27,500.00
3,360.00
9,960.00
172,820.00
470,960.00
69,035.14
95,047.50
967.50
636,010.14
0.00
0.00
0.00
808,830.14
121,324.52
930,154.66
Jumlah Harga
Rp
41,600.00
26,000.00
3,120.00
3,120.00
73,840.00
94,500.00
4,800.00
1,200.00
100,500.00
0.00
0.00
0.00
174,340.00
26,151.00
200,491.00
Jumlah Harga
Rp
5,600.00
7,000.00
840.00
480.00
13,920.00
126,000.00
2,400.00
128,400.00
0.00
0.00
0.00
142,320.00
21,348.00
163,668.00
Jumlah Harga
Rp
52,800.00
33,000.00
3,960.00
3,960.00
93,720.00
84,000.00
6,400.00
2,400.00
61,500.00
12,880.00
24,000.00
191,180.00
0.00
0.00
0.00
284,900.00
42,735.00
327,635.00
Jumlah Harga
Rp
52,800.00
33,000.00
3,960.00
3,960.00
93,720.00
84,000.00
6,400.00
2,400.00
73,800.00
12,880.00
24,000.00
203,480.00
0.00
0.00
0.00
297,200.00
44,580.00
341,780.00
N0 JENIS PEKERJAAN VOLUME SATUAN
1 2 3 4
I. Pekerjaan Struktur
1 Pek. Balok Sloof 15 x 20 cm, fc' 24 Mpa 1.185 m2
2 Pek. Kolom 15 x 15 cm, fc' 24 Mpa 0.27 m3
3 Pek. Reng Balok 15 x 20 cm, fc' 24 Mpa 1.31 m3
HARGA JUMLAH
SATUAN
(Rp) (Rp)
5 6
5813532.4916 6,889,036.00
8,802,186.64 2,376,590.39
9,225,245.49 12,038,945.37
14,415,535.76