Anda di halaman 1dari 8

JAWABAN :

1 Volume Pekerjaan Jalan


Pekerjaan mulai STA 112+572 sd 112+685
Panjang Jalan = 113.00 m

a Subbase Course = 305.10 m³


b Base Course = 76.28 m³
c Primecoat = 406.80 Liter
d Tack Coat = 177.98 Liter
e AC- Base T=85 mm = 99.41 ton
f AC - BC t=75 mm = 87.72 ton
g AC - WC t=50 mm = 58.48 ton

2 Bakup Volume Pekerjaan Balok Beton dan Plat

a Balok
- Beton = 1.86 m³
- Bekisting = 20.15 m²
- Besi = 301.09 kg ( Rincian terlapir pada sheet Balok BBS )

b Plat
- Beton = 28.13 m³
- Bekisting = 31.78 m²
- Besi = 752.11 kg ( Rincian terlapir pada sheet BBS PLAT )
1.86

heet Balok BBS )

5.81

heet BBS PLAT )


BAR BENDING SCHEDULE

Dimensi Balok (m) Uraian Besi Tulangan


Panjang
No. Sketch Tulangan sb (m)
b h Dia (mm) balok (m)
kg/m' kg/12m'
1 Balok 200 x 300
(200x300) = 15.5 m'
Utama 12.00 0.887 10.64 15.50

Tumpuan 15.50

Lapangan 6.00

Tumpuan 26.70 6.00

Lapangan 26.70 6.50

Tumpuan 26.70 6.50


D.10-202
D.10-202 0.2 0.3 0.025 Sengkang 8.00 0.395 4.740 15.50
BAR BENDING SCHEDULE

D.12

D.8
DING SCHEDULE

Pjg Tul (m) Berat


Jml Balok Qty pot Pjg Total Jml Pot
Keterangan
(bh) (bh) Kait Ovlp ki ka Ext Besi (m) Btg (kg)

1 16 0.14 0.48 11.86 4.27 16.27 16 230.88

1 2 - - 12.00 3.50 15.50 2 - Besi D. 12 :


Berat Total = 230.88 kg
1 3 - 3.00 3.00 3 - Jumlah Besi = 24 btg

1 3 - 3.13 3.13 3 -
Besi D. 8 :
1 3 - 3.25 3.25 3 - Berat Total = 70.22 kg
Jumlah Besi = 15 btg
1 3 - - 1.63 1.63 3 -

1 202 0.08 0.88 202 70.22


DING SCHEDULE

D.12 Berat Total (kg) 230.88


Jumlah Besi (btg) 24
btg 22
5% 2
D.8 Berat Total (kg) 70.22
Jumlah Besi (btg) 16
btg 15
5% 1
Tabel Berat Besi
Besi
kg/m' kg/12m'

D.8 0.395 4.74


D.12 0.887 10.644
D.13 1.041 12.492
D.16 1.578 18.936
D.19 2.225 26.70
D.22 2.983 35.796
D.25 3.853 46.236
Jumlah Jumlah
Sisa
Kebutuhan Panj. Panj. Panj. Panj. Panj. Kg Kg Kg Kg Kg
No Lokasi Item Pek. Gambar Potongan Keterangan
12 M 12 M 12 M 12 M 12 M
Panj. jml Ǿ8 D 12 D 16 D 22 D 25 Panj Jml
Ǿ8 D 12 D 16 D 22 D 25
1.01
1 Plat TULANGAN ATAS AXIX X
1 Besi Ø 12 0.149 1.34 202 23 241.02 - 1.28 23.00

TULANGAN ATAS & BAWAH 15.45


2 Besi Ø 12 15.75 24 31 335.53 - 1.50 8.00
86 0.149 0.149

TULANGAN BAWAH AXIZ X


3 Besi Ø 12 87 1.96 101 16 175.56 - 0.24 16

`
1.67
71 - 752 -

Page 8 of 8