PEKERJAAN : 0
VOLUME : -
LOKASI : 0
VOLUME
No. URAIAN PEKERJAAN RUMUS
SATUAN
B. PEKERJAAN TANAH
1 Galian Tanah u/ Pondasi Poer 4.40 M3 h*p*l*n
Tinggi h = 1.10 m
Panjang p = 1 m
Lebar b = 1 m
Jumlah Titik n = 4 titik
2 Galian Tanah Pas. Batu Kali btkl 1 30.88 h*p*l
kekurangan 0.29 M3
0.43 M3
H. PEKERJAAN PENGECATAN
2 Pengecatan Dinding -
Cat Kusen 32.96 M2 Panjang*Lebar
Cat Konsol 25.77 Panjang*Lebar
58.73
I. PEKERJAAN AKHIR
1 Gambar As Build Drawing 1.00 Ls
2 Pembersihan sisa pekerjaan 1.00 Ls
URAIAN
(5)
1.10*1*1*4
0.65*0.95*50
0.05*0.95*50
0.95*0.20*50
(0.30+0.80)/2*0.80*50
15*10*0.05
15*10*0.62
0.3*5*4*6
(6*6)*6
223.20*0.887
(6*8)/0.15
240*0.95
228*0.222
50*6
300*0.887
50/0.15
333.33*0.95
316.67*0.222
0.25*0.30*50
0.60*5*9
0.30*5*2
(5*9)*6
270*0.887
(5*8)/0.15
300*0.75
225*0.222
(5*2)*4
40*0.887
(5*8)/0.15
66.67*0.45
30*0.222
(0.045*5*9)+(0.0225*5*2)
0.40*50
0.30*50
50*4
200*0.887
50/0.15
333.33*0.55
183.33*0.222
70*4
40*0.887
70/0.15
1.50*0.45
30*0.222
0.25*0.30*50
(6.18*4)*4
98.88*0.887
(6.18*4)/0.15
123.60*0.45
55.62*0.222
(0.15*0.15)*(6.18*4)
0.06*0.12*38.14
0.06*0.12*55.16
0.06*0.12*2.79
0.06*0.12*5.16
((17.16*0.06*0.12*12)+
(9.65*0.06*0.12)*8
(4.95*0.06*0.12)*8
(4.95*0.06*0.12)*12
0.06*0.12*1.92
0.05*0.10*55.16
0.05*0.10*8.18
0.05*0.10*9.08
3.53*9.65*2+5.03*17.16*2
1.37*4.54+1.37*4.09*2
0.05*0.14*10.40
0.05*0.14*9.40
3.40*4+4.70*4
17.16*2+9.65*2
1.11*2*3
4.54+4.09*2
3.70*3.00
(0.73*0.60+5)+(0.80*0.60+32)
0.20*0.55*64.14
0.65*64.14*2
0.30*64.14*0.05
1.24*64.14
64.14*1*0.05
(10.40+9.40)*2.4
25.77*1.6
BACK UP DATA QUANTITY
PROYEK : PENINGKATAN SARANA DAN PRASARANA KELAUTAN
PEKERJAAN :
VOLUME :
LOKASI :
VOLUME
No. URAIAN PEKERJAAN RUMUS URAIAN
SATUAN
B. PEKERJAAN TANAH
1 Galian Tanah Pas. Batu Kali btkl 1 28.08 m3 h*p*l 0.65*0.80*54
2 Urugan Pasir Bawah Pondasi 2.16 m3 0.05*0.8*54
3 Urugan Kembali 9.36 m3 1/3 galian tanah
4 Pasangan Batu Kosong 8.64 m3 b* h* p 0.8*0.20*54
5 Pasangan Pondasi Batu Kali 1 : 4 17.01 m3 b * h* p (0.25+0.65)/2*0.7*54
6 Peninggian dengan Sirtu 15.75 m3 p*b*h 8*6*0.3
3*1.5*0.3
7 Urugan Pasir Bawah Lantai 13.13 m3 p*b*h 8*6*0.25
3*1.5*0.25
gording melintang
Balok Gording 5/10 a 0.92 0.00 M3 A*P*jumlah 0.05*0.10*0.92
Balok Gording 5/10 b 4.64 0.02 M3 A*P*jumlah 0.05*0.10*4.64
Balok Gording 5/10 c 8.34 0.04 M3 A*P*jumlah 0.05*0.10*8.34
Balok Gording 5/10 d 12.04 0.06 M3 A*P*jumlah 0.05*0.10*12.04
Balok Gording 5/10 e 15.76 0.08 M3 A*P*jumlah 0.05*0.10*15.76
jumlah 0.21 A = dimensi Balok
Total 1 0.21 M3
F. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond 5/5 80.00 M2 Lebar* Panjang*2.sisi 10*8
2 Pek. Rangka Plafond 5/5 80.00 M2 Lebar* Panjang*2.sisi 10*8
3 Pek.List plank 3 x 3 cm 144.00 M1 sepanjang sudut
H. PEKERJAAN SANITASI
1 Pas. Pipa PVC 3" Saluran Air Kotor 20.00 M1
2 Pas. Pipa PVC 3/4" Saluran Air Bersih 20.00 M1
3 Pas. Kran air 3/4" 1.00 Bh
4 Kloset Jongkok 1.00 Bh
5 Floor Drain 1.00 Bh
J. PEKERJAAN PENGECATAN
1 Pegecatan Kayu -
Cat Kusen 25.80 M2 Panjang*Lebar 103.2*(0.05+0.05+0.15)
Cat Daun Pintu 18.50 M2 Luas*2 sisi 9.25*2
Cat List plank 10.80 M2 Panjang*Lebar ((15.64*4)+(6.64*4))*0.3
Jumlah Total 55.10 M2
2 Pengecatan Dinding 320.53 M2 Luasan Plaster
3 Pengecatan Plafond 80.00 M2 Luas Plafond
K. PEKERJAAN LISTRIK
1 Instalasi Titik Nyala 8.00 bh
2 Fitting lampu 8.00 bh
3 KWH -
4 MCB 1.00 bh
5 Lampu Sumpit 25 watt 5.00 bh
6 Lampu Sumpit 15 watt 3.00 bh
7 Saklar Ganda 1.00 bh
8 Saklar Tunggal 4.00 bh
9 Stop Kontak 4.00 bh
L. PEKERJAAN AKHIR
1 Gambar As Build Drawing 1.00 Ls
2 Pembersihan sisa pekerjaan 1.00 Ls
REKAPITULASI
PROYEK : PENINGKATAN SARANA DAN PRASARANA KELAUTAN
PEKERJAAN :
VOLUME :
SUMBERDANA : DANA ALOKASI KHUSUS (DAK)
DINAS KELAUTAN DAN PERIKANAN KOTA PALOPO T.A. 2012
LOKASI :
NO JENIS PEKERJAAN
A PEKERJAAN PENDAHULUAN
B PEKERJAAN TANAH DAN BATU
C PEKERJAAN BETON / STRUKTUR
D PEKERJAAN DINDING DAN LANTAI
E PEKRJAAN ATAP
F PEKERJAAN PLAFOND
G PEKERJAAN PINTU DAN VENTILASI
H PEKERJAAN SANITASI
I PEKERJAAN RABAT KELILING BANGUNAN
J PEKERJAAN PENGECATAN / FINISHING
K PEKERJAAN LISTRIK
L PEKERJAAN AKHIR
REAL COST (RC)
PPN 10 %
JUMLAH TOTAL
DIBULATKAN
TERBILANG :
MENGETAHUI : MENYETUJUI :
KEPALA DINAS KELAUTAN DAN PERIKANAN PEJABAT PEMBUAT KOMITMEN
KOTA PALOPO
VOLUME BIAYA
No. URAIAN PEKERJAAN
SATUAN KONSTRUKSI
JUMLAH HARGA
Rp 2,700,000.00
Rp 17,421,851.25
Rp 23,143,519.29
Rp 36,503,970.09
#REF!
Rp 8,354,192.00
Rp 12,526,096.21
Rp 2,415,727.50
Rp 1,999,894.34
Rp 15,862,908.94
Rp 1,867,516.60
Rp 1,126,500.00
#REF!
#REF!
#REF!
#REF!
RUPIAH
FATSAR KILALI, ST
Team Leader
MENYETUJUI :
PEJABAT PEMBUAT KOMITMEN
ANSHARI MAS'UD, ST
NIP. 19620627 198903 1 006
RAB)
RAB (hal-2)
JUMLAH
HARGA
(5)
Rp 350,000.00
Rp 550,000.00
Rp 1,800,000.00
Rp 2,700,000.00
Rp 1,000,350.00
Rp 160,380.00
Rp 94,208.40
Rp 2,913,278.40
Rp 9,685,579.05
Rp 974,531.25
Rp 2,593,524.15
Rp 17,421,851.25
Rp 1,488,348.00
Rp 4,033,022.40
Rp 1,534,069.44
Rp 1,703,866.50
Rp 5,621,921.28
Rp 1,469,676.40
Rp 2,603,846.25
Rp 3,768,327.36
Rp 920,441.66
Rp -
Rp -
Rp -
Rp 23,143,519.29
RAB (hal-3)
JUMLAH
HARGA
(5)
Rp 12,985,096.98
Rp 426,323.97
Rp 11,304,734.84
Rp 479,044.26
Rp 677,141.79
Rp 1,635,951.90
Rp 529,012.00
Rp 6,419,964.40
Rp 2,046,699.95
Rp 36,503,970.09
Rp 3,217,817.13
Rp 3,411,265.64
Rp 20,610,379.13
#REF!
#REF!
Rp 5,143,534.07
Rp 55,200.00
Rp 1,795,500.00
#REF!
Rp 3,988,400.00
Rp 2,874,960.00
Rp 1,490,832.00
Rp 8,354,192.00
Rp 4,303,745.61
Rp 5,024,406.86
Rp 388,100.00
Rp 965,750.00
Rp 107,812.50
Rp 516,468.75
Rp 575,750.00
Rp 94,437.50
Rp 119,875.00
Rp 429,750.00
Rp 12,526,096.21
Rp 1,169,662.50
Rp 396,850.00
Rp 74,250.00
Rp 478,640.00
Rp 296,325.00
Rp 2,415,727.50
Rp 11,613.75
Rp 606,645.05
Rp 248,181.45
Rp 1,133,454.08
Rp 1,999,894.34
Rp 2,350,015.00
Rp 10,100,893.94
Rp 3,412,000.00
Rp 15,862,908.94
Rp 657,741.60
Rp 273,600.00
Rp -
Rp 72,800.00
Rp 349,750.00
Rp 168,225.00
Rp 43,000.00
Rp 154,000.00
Rp 148,400.00
Rp 1,867,516.60
Rp 800,000.00
Rp 326,500.00
Rp 1,126,500.00
PEMERINTAH KABUPATEN LUWU
BADAN PEMBANGUNAN DAERAH
(BAPPEDA)
REKAPITULASI
RENCANA ANGGARAN BIAYA
KOTA PALOPO
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6
1 1M3 GALIAN TANAH BIASA
- Pekerja 0.7500 oh Rp 45,000.00 Rp 33,750.00
- Mandor 0.0250 oh Rp 75,000.00 Rp 1,875.00
Rp 35,625.00
2 1M3 URUGAN TANAH/PASIR URUG
- Tanah berpasir 1.2000 m3 Rp 50,000.00 Rp 60,000.00
- Pekerja 0.3000 oh Rp 45,000.00 Rp 13,500.00
- Mandor 0.0100 oh Rp 75,000.00 Rp 750.00
Rp 74,250.00
3 1M2 PAS.BATU BATA 1/2 BATU 1 : 5
- Bata merah 5x11x22 cm 70.0000 bh Rp 650.00 Rp 45,500.00
- Semen portland 9.6800 kg Rp 1,140.00 Rp 11,035.20
- Pasir pasang 0.045 m3 Rp 125,000.00 Rp 5,625.00
- Pekerja 0.300 oh Rp 45,000.00 Rp 13,500.00
- Tukang batu 0.100 oh Rp 70,000.00 Rp 7,000.00
- Kepala tukang 0.010 oh Rp 80,000.00 Rp 800.00
- Mandor 0.015 oh Rp 75,000.00 Rp 1,125.00
Rp 84,585.20
5 1M3 LANTAI FLOOR f'c=7,4 MPa (K100)
- Semen Portland 247.0000 kg Rp 1,140.00 Rp 281,580.00
- Pasir Pasangan 869.0000 Kg Rp 76.10 Rp 66,133.38
- Kerikil beton 999.0000 Kg Rp 65.77 Rp 65,702.01
- Air 215.0000 Ltr Rp 50.00 Rp 10,750.00
- Pekerja 1.6500 oh Rp 45,000.00 Rp 74,250.00
- Tukang Batu 0.2750 oh Rp 70,000.00 Rp 19,250.00
- Kepala Tukang 0.0280 oh Rp 80,000.00 Rp 2,240.00
- Mandor 0.0830 oh Rp 75,000.00 Rp 6,225.00
Rp 526,130.39
25 1 KG PEMBESIAN DENGAN BESI POLOS
- Besi beton 1.0500 kg Rp 14,600.00 Rp 15,330.00
- Kawat Beton 0.0150 m3 Rp 23,100.00 Rp 346.50
- Pekerja 0.0070 Oh Rp 45,000.00 Rp 315.00
- Tukang Besi 0.0070 Oh Rp 70,000.00 Rp 490.00
- Kepala tukang 0.0007 Oh Rp 80,000.00 Rp 56.00
- Mandor 0.0003 Oh Rp 75,000.00 Rp 22.50
Rp 16,560.00
26 1 M2 BEKISTING PONDASI POER
- Kayu Mall 0.0400 m3 Rp 1,955,000.00 Rp 78,200.00
- Paku 5 cm – 10 cm 0.3000 kg Rp 19,800.00 Rp 5,940.00
- Minyak bekisting 0.1000 Liter Rp 10,250.00 Rp 1,025.00
- Pekerja 0.5200 OH Rp 45,000.00 Rp 23,400.00
- Tukang kayu 0.2600 OH Rp 70,000.00 Rp 18,200.00
- Kepala tukang 0.0260 OH Rp 80,000.00 Rp 2,080.00
- Mandor 0.0260 OH Rp 75,000.00 Rp 1,950.00
JUMLAH UPAH= Rp 45,630.00
2 X PAKAI = Rp 42,582.50
JUMLAH = Rp 88,212.50
27 1 M2 BEKISTING SLOOF
- Kayu Mall 0.0450 m3 Rp 1,955,000.00 Rp 87,975.00
- Paku 5 cm – 10 cm 0.3000 kg Rp 19,800.00 Rp 5,940.00
- Minyak bekisting 0.1000 Liter Rp 10,250.00 Rp 1,025.00
- Pekerja 0.5200 OH Rp 45,000.00 Rp 23,400.00
- Tukang kayu 0.2600 OH Rp 70,000.00 Rp 18,200.00
- Kepala tukang 0.0260 OH Rp 80,000.00 Rp 2,080.00
- Mandor 0.0260 OH Rp 75,000.00 Rp 1,950.00
JUMLAH UPAH= Rp 45,630.00
10 X PAKAI = Rp 9,494.00
JUMLAH = Rp 55,124.00
28 1 M2 BEKISTING KOLOM
- Kayu Mall 0.0400 m3 Rp 1,955,000.00 Rp 78,200.00
- Paku 5 cm – 12 cm 0.4000 kg Rp 19,800.00 Rp 7,920.00
- Minyak bekisting 0.2000 Liter Rp 10,250.00 Rp 2,050.00
- Balok kayu Mall 0.0150 m 3
Rp 1,955,000.00 Rp 29,325.00
- Plywood tebal 9 mm 0.3500 Lbr Rp 124,200.00
- Dolken kayu galam, 2.0000 btg Rp 34,500.00
- Pekerja 0.6600 OH Rp 45,000.00 Rp 29,700.00
- Tukang kayu 0.3300 OH Rp 70,000.00 Rp 23,100.00
- Kepala tukang 0.0330 OH Rp 80,000.00 Rp 2,640.00
- Mandor 0.0330 OH Rp 75,000.00 Rp 2,475.00
JUMLAH UPAH= Rp 57,915.00
40 X PAKAI = Rp 2,937.38
JUMLAH = Rp 60,852.38
29 1 M2 BEKISTING BALOK
- Kayu Mall 0.0400 m3 Rp 1,955,000.00 Rp 78,200.00
- Paku 5 cm – 12 cm 0.4000 kg Rp 19,800.00 Rp 7,920.00
- Minyak bekisting 0.2000 Liter Rp 10,250.00 Rp 2,050.00
- Balok kayu Mall 0.0180 m3 Rp 1,955,000.00 Rp 35,190.00
- Plywood tebal 9 mm 0.3500 Lbr Rp 124,200.00
- Dolken kayu galam, 2.0000 btg Rp 34,500.00 Rp 69,000.00
- Pekerja 0.6600 OH Rp 45,000.00 Rp 29,700.00
- Tukang kayu 0.3300 OH Rp 70,000.00 Rp 23,100.00
- Kepala tukang 0.0330 OH Rp 80,000.00 Rp 2,640.00
- Mandor 0.0330 OH Rp 75,000.00 Rp 2,475.00
JUMLAH UPAH= Rp 57,915.00
10 X PAKAI = Rp 19,236.00
JUMLAH = Rp 77,151.00
29 1 M2 BEKISTING LANTAI
- Kayu Mall 0.04 m3 Rp 1,955,000.00 Rp 78,200.00
- Paku 5 cm – 12 cm 0.4 kg Rp 19,800.00 Rp 7,920.00
- Minyak bekisting 0.2 Liter Rp 10,250.00 Rp 2,050.00
- Balok kayu Mall 0.015 m3 Rp 1,955,000.00 Rp 29,325.00
- Plywood tebal 9 mm 0.35 Lbr Rp 124,200.00
- Dolken kayu galam, 6 btg Rp 34,500.00 Rp 207,000.00
- Pekerja 0.66 OH Rp 45,000.00 Rp 29,700.00
- Tukang kayu 0.33 OH Rp 70,000.00 Rp 23,100.00
- Kepala tukang 0.033 OH Rp 80,000.00 Rp 2,640.00
- Mandor 0.033 OH Rp 75,000.00 Rp 2,475.00
JUMLAH UPAH= Rp 57,915.00
2 X PAKAI = Rp 162,247.50
JUMLAH = Rp 220,162.50
REKAPITULASI
RENCANA ANGGARAN BIAYA
KOTA PALOPO
A BAHAN DASAR
1 Batu Pecah (Spilt 2 - 3 Cm) M3 Rp 371,190.00 161.21 /Kg
2 Batu kali M3 Rp 178,950.00
3 Batu merah Buah Rp 650.00
4 Pasir Beton M2 Rp 87,500.00 76.10 /Kg
5 Pasir Pasang Halus M3 Rp 125,000.00
6 Kerikil Saring (ayak) tanpa pasir M3 Rp 144,900.00 65.77 /Kg
7 Sirtu M3 Rp 126,286.00
8 Semen (Portland Cement) Kg Rp 1,140.00
9 Air Liter Rp 50.00
10 Kayu Klas II (Uru, Bitti)
Papan M3 Rp 4,255,000.00
Balok M3 Rp 4,082,500.00
Kayu Klas III (Nato, betao, kendonio dan sejenis)
Papan M3 Rp 3,795,000.00
Balok M3 Rp 3,680,000.00
11 Kayu Mal / Bakesting (mangga)
Papan M3 Rp 1,955,000.00
Balok M3 Rp 1,955,000.00
12 Dolken Kayu Batang Rp 34,500.00
13 Besi beton polos Kg Rp 14,600.00
14 Paku
Paku Biasa 5, 6, 7 dan 10 Cm Kg Rp 19,800.00
Paku Seng ( Payung ) RRT Kg Rp 36,500.00
Paku Tripleks Kg Rp 20,400.00
15 Kawat
- Beton Kg Rp 23,100.00
16 Besi Strep
- 3 Cm Batang Rp 69,850.00
17 Mur/Baut 20 Cm Buah Rp 4,600.00
18 Multipleks 9 mm 122 x 224 Lembar Rp 124,200.00
19 -Genteng
BWG 32" Metal
BJLSSakura
0,30 mmRoof
(Sermani)
0.2 mm Lembar Rp 38,600.00
20 Nok/Bubungan Sakura Roof 0.2 mm Lembar Rp 35,800.00
21 Cat tembok
- Avitex 5 Kg Rp 115,000.00
- Aries 5 Kg Rp 56,685.00
22 Cat kayu
- Avian Kg Rp 62,700.00
- Yoko Kg Rp 40,800.00
23 Cat anti bocor
- Nodrop 4 Kg Rp 240,100.00
24 Plamur 5 Kg Rp 51,050.00
25 Minyak Cat (Tinner Biasa) Ltr Rp 10,200.00
26 Minyak Solar (Industri) Ltr Rp 10,250.00
27 Tegel keramik 20 x 20 warna Dos Rp 66,900.00 2,676.00
28 Tegel keramik 20 x 25 warna Dos Rp 73,000.00 3,650.00
29 Tegel keramik 40 x 40 warna Dos Rp 74,300.00 11,888.00
Tegel keramik 40 x 40 putih Dos Rp 73,000.00 11,680.00
30 Semen Warna kg Rp 12,400.00
31 Lem Kayu (0.7 x 1.43) kg Rp 25,142.86
32 Kaca Polos 5 mm m2 Rp 117,600.00
33 Kunci Tanam Biasa belucci Buah Rp 60,400.00
34 Tarikan Pintu Minimalis Buah Rp 200,000.00
35 Kunci Tanam kamar mandi (selinder) Buah Rp 72,000.00
36 Engsel Pintu Buah Rp 22,000.00
37 Engsel Jendela Buah Rp 20,500.00
38 Grendel Pintu (besar) Buah Rp 10,600.00
39 Grendel Jendela (kecil) Buah Rp 3,700.00
40 Kait Angin ATC (kecil) Buah Rp 13,200.00
41 Pipa PVC 3" paralon Class D 4 M Batang Rp 113,550.00
Pipa PVC 2.5" paralon Class D 4 M Batang Rp 91,450.00
42 Pipa PVC 3/4" paralon SNI Class AW 4 M Batang Rp 34,600.00
43 Kran air 3/4" besi Buah Rp 65,500.00
44 Kloset Jongkok Buah Rp 283,750.00
45 Floor Drain TX1C Buah Rp 287,700.00
46 Pipa C untuk instalasi listrik 4 m Batang Rp 8,700.00
47 Kabel Tunggal NYA 1.5 mm mastelindo 50 m roll Rp 177,700.00 Rp 1,777.00
48 Kabel NYM 2x1.5 mm eterna 100 m roll Rp 989,200.00 Rp 9,892.00
49 Fitting lampu broco (hias) Buah Rp 13,200.00
50 KWH Buah
51 MCB Buah Rp 51,800.00
52 Lampu Sumpit 23 watt Buah Rp 48,950.00
53 Lampu Sumpit 8 watt Buah Rp 35,075.00
54 Saklar Ganda broco hitam Buah Rp 22,000.00
55 Saklar Tunggal broco hitam Buah Rp 17,500.00
56 Stop Kontak broco Buah Rp 16,100.00
57 Tripleks 3 mm Lembar Rp 60,400.00
58 Seng gelombang kecil BWG 32" BJLS 0,30 mm kaki Rp 8,900.00 sermani
59 Seng Polos Sermani lembar Rp 66,000.00 sermani
60 Cat atap NIPPON POINT 5 ltr. Rp 535,300.00 Rp 107,060.00
61
B UPAH
1 Tukang oh Rp 70,000.00
2 Kepala Tukang oh Rp 80,000.00
3 Pekerja oh Rp 45,000.00
4 Mandor oh Rp 75,000.00
C TANAMAN
1 Perdu Binahong btg Rp 55,000.00
2 Pohon Luohansung btg Rp 250,000.00
3 Pohon Airis btg Rp 7,500.00
4 Pohon Palm Kol btg Rp 85,000.00
5. Pohon Tabebuya Rosea btg Rp 75,000.00
6. Pohon Liliy Brazil btg Rp 7,500.00
7. Pohon Palm Sikas btg Rp 650,000.00
8. Rumput Gajah Mini m2 Rp 25,000.00
9. Rumput Swiss m2 Rp 45,000.00
10. Pupuk Kandang kg Rp 1,750.00
DAFTAR HARGA SATUAN UPAH
1 Pekerja OH 45,000.00
2 Tukang Kayu OH 70,000.00
Tukang Batu OH 70,000.00
Tukang Cat OH 70,000.00
Tukang Listrik OH 70,000.00
Tukang Pipa OH 70,000.00
Tukang Besi OH 70,000.00
3 Kepala Tukang Kayu OH 80,000.00
Kepala Tukang Batu OH 80,000.00
KepalaTukang Cat OH 80,000.00
Kepala Tukang Listrik OH 80,000.00
Kepala Pipa OH 80,000.00
Kepala Tukang Besi OH 80,000.00
4 Mandor Lapangan OH 75,000.00
PEMERINTAH K OTA PALOPO
DINAS PERTANIAN DAN PETERNAKAN
JALAN VETERAN NO. 39 P ALO PO TELP. (0 471 ) 21 019
P ek er ja a n :
P e m b a n gu n a n BP P K
Ke lu r a h a n : T A K K A LA L A
Ke c a m a t a n : W AR A S EL A TA N
CV.
CV. ASSIST
ASSIST MEDIA
MEDIA CONSULTAN
CONSULTAN
Consu ltan Engineering & Supervisi
Jl. D r. Ratu la ngi N O. 8 9 Km 06 Tlp. (0471) 3312177 Kot a Palopo
CV.
CV. ASSIST
ASSIST MEDIA
MEDIA CONSULTAN
CONSULTAN
Consu ltan Engineering & Supervisi
Jl. D r. Ratu la ngi N O. 8 9 Km 06 Tlp. (0471) 3312177 Kot a Palopo
PEME RIN TAH K OTA PALOPO
DINAS PERTANIAN DAN PETERNAKAN
JALAN VETERAN NO. 39 P ALO PO TELP. (0 471 ) 21 019
R E NCANA A NGGA R A N B I A YA (R A B)
Ke g i a t a n :
P e n y e d i a a n Sa r a n a P r o d u k s i
P e r t a n i a n / P e r k e b u n a n T a h u n An gga r a n 2 0 1 3
P ek er ja a n :
P e m b a n g u n a n BP P K
Ke l u r a h a n : TA K K A LA LA
Ke c a m a t a n : W AR A S E LA T A N
CV.
CV. ASSIST
ASSIST MEDIA
MEDIA CONSULTAN
CONSULTAN
Consul tan Engin eering & Su pervisi
J l. Dr. Ra tulangi NO. 89 Km 06 Tlp. (0 471) 331 2177 Kot a Pa lopo
CV.
CV. ASSIST
ASSIST MEDIA
MEDIA CONSULTAN
CONSULTAN
Consul tan Engin eering & Su pervisi
J l. Dr. Ra tulangi NO. 89 Km 06 Tlp. (0 471) 331 2177 Kot a Pa lopo
BACK UP DATA QUANTITY
PROYEK : PENYEDIAAN SARANA PRODUKSI PERTANIAN DAN PERKEBUNAN TAHUN ANGGARAN 2013
PEMBANGUNAN BPPK
PEKERJAAN :
VOLUME : 1 Paket
VOLUME
No. URAIAN PEKERJAAN RUMUS URAIAN
SATUAN
B. PEKERJAAN TANAH
1 Galian Tanah Pas. Batu Kali btkl 1 53.87 m3 h*p*l 0.65*0.65*127.5
2 Urugan Pasir Bawah Pondasi 5.10 m3 0.05*0.8*127.5
3 Urugan Kembali 17.96 m3 1/3 galian tanah
4 Pasangan Batu Kosong 15.42 m3 b* h* p 0.8*0.15*127.5
5 Pasangan Pondasi Batu Kali 1 : 4 34.43 m3 b * h* p (0.25+0.65)/2*0.6*127.4
6 Urugan Tanah Bawah Lantai 59.10 m3 p*b*h 14*13*0.3
3*3*0.3
2*3*0.3
7 Urugan Sirtu Bawah Lantai 49.25 M3 p*b*h 14*13*0.25
3*3*0.25
2*3*0.25
C. PEKERJAAN BETON
1 Sloof Beton Bertulang 15/25
- Pasang Bekesting untuk Sloof 68.00 M2 b*p*n
Lebar b= 0.25*2
Panjang p = 136 m
- Pembesian dengan Besi Polos sloef gantung 8.50
Tulangan d 10 = 4 btg 544.00 p sloof*jumlah tulangan 136*4
Total 335.47 Kg p total besi*beart besi 544*0.617
Begel d 4 906.67 p sloofl/jarak begel 136/0.15
589.33 jumlah begel*panjang perbegel 850*0.65
Total 58.15 Kg pjg total begel*berat besi 552.5*0.099
Jumlah Total 393.61 Kg
- Membuat Beton Bertulang (K-175) 5.10 M3 dimensi sloof*panjang 0.15*0.25*136
E. PEKERJAAN ATAP
Pek. List Plank 89.12 M1 (15.64*4)+(6.64*4)
1 Pek kuda-kuda kayu klas II
Balok tekan 6/12 9.62 0.07 M3 p=(4.81*2) 0.06*0.12*9.62
Balok Sokong 6/12 2.98 0.02 M3 p=(1.49*2) 0.06*0.12*2.98
Balok Tarik 6/12 5.65 0.04 M3 p=5.65 0.06*0.12*5.65
Tuang Raja 6/12 2.61 0.02 M3 p=2.61 0.06*0.12*2.61
Balok Sokong Tidur 5.26 0.04 M3 p=2.63*2 0.06*0.12*5.26
Balok gapit 2.78 0.02 M3 p=1.39*2 0.06*0.12*2.78
jumlah 0.21 (2*1/2 kuda-kuda+4)*2=10
Total 10 2.08 M3
2 gording memanjang
Balok Gording 5/10 a 17.00 0.09 M3 A*P*jumlah 0.05*0.10*17
Balok Gording 5/10 b 19.06 0.10 M3 A*P*jumlah 0.05*0.10*19.06
Balok Gording 5/10 c 22.12 0.11 M3 A*P*jumlah 0.05*0.10*22.12
Balok Gording 5/10 d 25.16 0.13 M3 A*P*jumlah 0.05*0.10*25.16
Balok Gording 5/10 e 28.22 0.14 M3 A*P*jumlah 0.05*0.10*28.22
Balok Gording 5/10 f 31.28 0.16 M3 A*P*jumlah 0.05*0.10*31.28
5 Pas. Nok Genteng Metal Surya Roof 0.3 mm 66.60 M' p (miring + lurus) (8.5*2)+(8*6.2)
F. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond 5/5 195.58 M2 Lebar* Panjang*2.sisi 15.4*6.35*2
2 Pekerjaan Plafond Tripleks 3 mm 195.58 M2 Lebar* Panjang*2.sisi 15.4*6.35*2
3 Pek.List plafond 3 x 3 cm 347.80 M1 sepanjang sudut
J. PEKERJAAN PENGECATAN
1 Pengecatan Atap Seng 305.34 M2 Luasan Atap
2 Pegecatan Kayu -
Cat Kusen 52.80 M2 Panjang*Lebar 211.2*(0.05+0.05+0.15)
Cat Daun Pintu 81.44 M2 Luas*2 sisi pintu + luas cat jendela (31.82*2)+(17.8)
Cat List plank 26.736 M2 Panjang*Lebar ((15.64*4)+(6.64*4))*0.3
Jumlah Total 160.98 M2
3 Pengecatan Dinding 805.53 M2 Luasan Plaster
4 Pengecatan Plafond 195.58 M2 Luas Plafond
K. PEKERJAAN LISTRIK
1 Instalasi Titik Nyala 19.00 bh
2 Fitting lampu 19.00 bh
3 KWH - bh
4 MCB 1.00 bh
5 Lampu Sumpit 25 watt 15.00 bh
6 Lampu Sumpit 15 watt 4.00 bh
7 Saklar Ganda 3.00 bh
8 Saklar Tunggal 8.00 bh
9 Stop Kontak 9.00 bh
L PEKERJAAN AKHIR
1 Gambar As Build Drawing 1.00 Ls
2 Pembersihan sisa pekerjaan 1.00 Ls
ABDUL AZIS
Team Leader
Multi Value Conversion
By iZaL
No NILAI
1 Rp 102,500,000.00
2
3
4
5 Rp -
nversion
TERBILANG
SERATUS DUA JUTA LIMA RATUS RIBU RUPIAH 9
RUPIAH 0
RUPIAH 0
RUPIAH 0
RUPIAH 1
102 SERATUS DUA 500 LIMA RAT
000 SERATUS SERATUS
0
LIMA RATULIMA RATU
1 1M1 PEKERJAAN BESI PENGAIT KAWAT
1. Bahan
▪ BESI Siku 40.40.4 1.100 m' x Rp. 21,000.00 = Rp.
▪ BESI polos D.12 mm 0.350 m' x Rp. 9,047.22 = Rp.
▪ Biaya Las 3.000 ttk x Rp. 4,000.00 = Rp.
Jumlah I = Rp.
2. Tenaga
▪ Pekerja 0.006 Oh x Rp. 45,000.00 = Rp.
▪ Tukang Besi 0.060 Oh x Rp. 70,000.00 = Rp.
▪ Kepala Tukang 0.006 Oh x Rp. 80,000.00 = Rp.
▪ Mandor 0.0003 Oh x Rp. 75,000.00 = Rp.
Jumlah II = Rp.
Jumlah I + Jumlah II = Rp.
1. Bahan
▪ Kawat Duri 1.100 m' x Rp. 4,000.00 = Rp.
Jumlah I = Rp.
2. Tenaga
▪ Pekerja 0.020 Oh x Rp. 45,000.00 = Rp.
▪ Mandor 0.010 Oh x Rp. 75,000.00 = Rp.
Jumlah II = Rp.
Jumlah I + Jumlah II = Rp.
sloef 161 m
besi utama 10 0.616667 397.1333333
23,100.00 besi begel 6 0.222 151.9035
3,166.53 549.0368333 kg
12,000.00
38,266.53 kolom 126.5 m
besi utama 10 0.616667 312.0333333
270.00 besi begel 6 0.222 175.1025
4,200.00 487.1358333 kg
480.00
22.50 ringbalk 161 m
4,972.50 besi utama 10 0.616667 397.1333333
43,239.03 besi begel 6 0.222 98.2905
495.4238333 kg
28,105.37
28,105.37
4,400.00
4,400.00 Pekerja Oh 0.300
Kepala tuk Oh 0.020
900.00 Mandor Oh 0.020
750.00
1,650.00
6,050.00
2,922,150.00 434,700.00
81
2,276,534.81
3750