Dibuat Diperiksa
M. Alimin Husairi
QS WG QS DBG
PERHITUNGAN VOLUME PLAT KONVENSIONAL LANTAI BASEMENT GEDUNG PARKIR UTARA
DIMENSI (m2) TOTAL
VOLUME TOTAL VOLUME
TYPE PEKERJAAN BETON h X Y VOLUME BETON RASIO VOLUME BESI LT 1 SAT
BETON LT 1
(m) (m) (m)
(a) (b) (axb)
TOTAL
URUGAN PASIR 609.44 m3 TOTAL RASIO RATA- VOLUME TOTAL VOLUME
TOTAL BERAT SAT VOLUME SAT SAT SAT SAT
RATA BETON LT BESI LT BASEMENT
LANTAI KERJA 435.31 m3 BETON
BASEMENT
(a) (b) (c = a / b) (d) (e = c x d)
TOTAL
TOTAL RASIO RATA- VOLUME TOTAL VOLUME
TOTAL BERAT SAT VOLUME SAT SAT SAT SAT
BETON RATA BETON LT BESI LT BASEMENT
BASEMENT
(a) (b) (c = a / b) (d) (e = c x d)
TOTAL TOTAL
RASIO RATA- VOLUME TOTAL VOLUME
TOTAL BERAT SAT VOLUME SAT RATA SAT BETON LT SAT BESI LT BASEMENT SAT
BETON
BASEMENT
(a) (b) (c = a / b) (d) (e = c x d)
17,076.88
SELISIH AKIBAT KONVERSI
BERAT SEBELUM KONVERSI 198,866.76 Kg
SELISIH (17,076.88) Kg
PERHITUNGAN VOLUME PLAT KONVENSIONAL LANTAI 1 GEDUNG PARKIR UTARA
RASIO RATA-
SAT TOTAL VOLUME BETON LT 2 VOLUME BESI SAT
RATA
(m3)
Di Buat Oleh :
PERHITUNGAN VOLUME PLAT KONVENSIONAL LANTAI 3 GEDUNG PARKIR UTARA
Konvensional 7,018.75 m2
(m3)
(m3)
(c = a / b) (d) (e = c x d)
43.54
16.88 Di Buat Oleh :
27.80