Anda di halaman 1dari 3

Perhitungan Struktur Jembatan Pipa Ø6"

Data Perencanaan:
L= 15 m
Mutu Baja = BJ 37
Fy = 240 MPa
Fu = 370 MPa
BJ Besi = 7850 kg/m3
BJ Kayu = 1200 kg/m3
BJ Air = 1000 kg/m3
Ø pipa dalam = 155 mm
= 0.155 m
Ø pipa luar = 160 mm
= 0.16 m
Tebal Pipa = 5 mm
= 0.005 m
Plat Pengaku (Stiffner) = 0.184 × 0.0445 × 0.0055 m
Profil Baja Kanal U = 100.50.6.8,5

Profil WF = 250.125.6.9
Berat = 29.6 kg/m
H= 250 mm
B= 125 mm
tw = 6 mm
tf = 9 mm
r= 12 mm
A= 37.66 cm2
lx = 4050 cm4
ly = 294 cm4
ix = 10.4 cm
iy = 2.79 cm
Zx = 324 cm3
Zy = 47 cm3

momen = 117.34 kgm


= 11734.000 kg cm
Tegangan Lentur momen / zx
= 36.22 kg cm2
Kontrol Tegangan lentur = momen = < Tegangan Lentur Ijin = OK
36.216 < 1400 = OK
Maka profil bisa dipakai
DAYA DUKUNG PONDASI

Beban Dl Beban Pada 2 Pondasi


13394.92 Kg 13896.51 Kg

Beban LL Beban Pada 1 Pondasi


501.59 Kg 6948.26 Kg

qu = 1,3.c.Nc + q.Nq+0,4 ꙋ.B.Nꙋ


qu 89917.97 Kg/cm2

q ijin= qu/fs
qijin 22479.49 Kg/cm2

Q = q ijin x B²
Q 71821.98 Kg

Q > P = ok
71821.9785375 > 6948.26 = ok

q: 1530
BEBAN MATI

no nama p l t jumlah berat jenis hasil SATUAN

1 Pipa Gi Ø 6" 15 0.50 0.005 1 7850 295.79 Kg


2 Flange 6 5.18 31.08 Kg
3 Bend All Flange 4 10 40.00 Kg
4 IWF 250.125Single 15 29.6 444.00 Kg
5 Unp 100.50.5 0.35 10 9.37 32.78 Kg
6 Klos Kayu 0.35 0.1 0.12 10 900 37.8 Kg
7 U bolt 10 2 20 Kg
8 Air Valve 2" 1 32 32 Kg
9 Stifener 0.22 0.55 0.01 20 7850 189.97 Kg
10 pondasi beton 11696.4 Kg
2.13 1.5 1.3 2400 9968.4 Kg
1.5 0.8 0.6 2400 1728 Kg
11 lantai kerja 2.13 1.5 0.1 1800 575.1 Kg
13394.92 Kg

BEBAN HIDUP

no nama p l t jumlah berat jenis hasil Satuan

1 Air dalam pipa 15 0.02 1000 301.59 Kg


2 orang 2 100 200.00 Kg
501.59 Kg

BEBAN AKSIAL
Beban Total
LL+DL
13394.92 + 501.59 = 13896.51 Kg

Beban Aksial 1 Pondasi


13896.51 : 2 = 6948.257 Kg