t (tebal pelat) = 10 cm f'c = 30 Mpa

WF 16 x 50 16 0.729713 Wc = 24 kN/m3
As = 14.7 in2 fy = 240 Mpa
= 94.8444 cm2 0.009484 m2
d = 16.3 in
AsFy = 2.2762656 0.41402 m
0,85fc'Ac = 61.2 ry = 3.79 in
96.266 mm
a = 5.7 m
b = 5.7 m
c = 3.9 m
H = 3.7 m

Loads applied before the concrete cures


BEBAN MATI
Slab weight 2.4 kN/m2

W 13.68 kN/m 22.09166


beam weight 0.72971283 kN/m
Total 14.40971283 kN/m

Loads applied after the concrete cures


BEBAN MATI
Wd 14.40971283 kN/m

BEBAN HIDUP
Wl 3 kN/m

n xx

BEFF 0.178125
lebar efektif 1.425 m memanjang beam spacing
0.975 m melintang
Btr 0.121875 yang baru ikut perhitungan komposit component
a 0.0915541719 m Beff komposit concrete
y 0.261232914 m Ec 25742.96 WF 16 x 50
n 7.769114 8
Mn 0.5946354958 kN.m

BEFORE CURES AFTER CURES


Wu 20.173597962 kN/m Wu 22.091655396
M 81.930024723 kN.m Mu 89.719735477
Mn 0.5946354958 kN.m 0.535172
0.5351719462 From the Zx table
467.757 >

Check Shear
62.9612178786

From the Zx table


186 kN >

DIMENSI WF DAPAT DIGUNAKAN

KOLOM
Beban lantai 56.197880 kN
pelat 53.352 kN
balok 2.845880037 kN kontrol
56.197880 kN OKE

Beban Kolom
Asumsi dimensi kolom HP 16.141
A 41.7 in2 6.4516 6.463513 cm2
d 16 in 2.54 6.299213 cm
tw 0.875 in 0.344488 cm
bf 16 in 6.299213 cm
tf 0.875 in 0.344488 cm
Ix 1870 in4 77835.28 cm4
convert sendiri
Iy 599 in4 23267.34 cm4
W 141 lb/ft 209.8311 kg/m
Beban sendiri 2.098311155 kN/m 2.098311 kN/m
Beban Hidup 3 kN/m

Kombinasi Pembebanan
Pu= 1,2DL + 1,6LL 83.331341647 kN

Kolom tekan termasuk elemen nonlangsing karena profil baja H-shape


KL/r 38.435169219 cm Ag 269.0317 cm2
4,71(E/Fy)^1/2 1272.972973 PAKE R1

Fy/Fe 0.6486486486 R1 Fy/Fe 0.648649 R2


2.25
Fcr 0.7622412919 OKE Fcr 324.49 TIDAK OKE
Pn 205.06707057 Digunakan yang oke 87298.1
184.56036351 OKE, PROFIL DAPAT DIGUNAKAN

DARI TABEL 1630 kips


7250.60 kN convert sendiri
(baja)
fe E
370 200000

113.3333333 4.205
148.2516221 21.695

component A (cm2) y (cm) Ay (cm) I (cm4) d I + Ad2


concrete 121.875 5 609.375 1015.625 9.059204 11017.81
WF 16 x 50 94.8385 25.701 2437.444289 27429.6509 11.6418 40283.25
216.7135 3046.819289 51301.05

y bar 14.0592 cm Menghitung momen inersia penampang baru


140.592 mm yt 4.059203919 cm

Komponen A y Ay
Concrete 12.1875 y y/2 6.09375 y2
WF 16 x 50 94.8385 25.701 2437.444
89.71974 kN.m OKE
Total A 12.1875 y + 94.8385
Ay 6.09375 y2 + 2437.444

y bar 6.09375 y2 13.67868


94.8385 y -29.24192
62.96122 kN OKE -2437.444289

y bar baru 13.67867947 cm


I baru 51534.67375 cm4
Profil Baja WF16.50 Profil Beton
A= 14.7 in^2 = 94.8444 cm^2 f`c = 30 Mpa
d= 16.3 in = 41.402 cm ybeton = 24 kN/m^3
tw= 0.38 in = 0.9652 cm t= 10 cm
bf= 7.07 in = 17.9578 cm Dimensi Balok
tf = 0.63 in = 1.6002 cm Balok Memanjang =
k= 1.03 in = 2.6162 cm =
I= 659 in^4 = 27429.6509 cm^4 Balom Melintang =
ho = 15.7 in = 39.878 cm =
E= 200000 Mpa
Fy = 240 kn/m
Lebar Efektif Balok Memanjang Lebar Efektif Balok Melintang
Beff = 142.5 cm 1.425 Beff = 97.5
Jadi Jadi
Beff = 0.178125 cm 178.125 Beff = 0.121875
= 1.78125 mm = 1.21875

Menentukan Titik Berat/Garis Normal Menentukan Titik Berat/Garis Norm

Komponen A(cm^2) y(cm) Ay(cm) KomponenA(cm^2) y(cm)


Beton eq 1425 5 7125 Beton eq 975 5
Baja WF 94.8444 30.701 2911.8179 Baja WF 94.8444 30.701

ybar = 6.6038457124 = 6.6 cm ybar = 7.278458 =

Momen Inersia Penampang (Teori Axis Paralel) 1519.844


Komponen I(cm^4) d I+Ad^2
Beton eq 11875 1.6 15523
Baja WF 27429.6509 24.101 82520.79846
Jumlah 98043.79846

Letak Garis Netral dari atas serat Beton


Komponen A y Ay
Beton eq 14,25y y/2 7125y^2
Baja WF 94.8444 30.701 2911.8179
a= 71.25
ybar = Ay/A = 71,25y^2 + 2911,8179 b= 94.8444
142,5y + 94,8444 c= -2911.818

y(142,5y+94,8444) = 71,25y^2 +2911,8179 71.25 71,25y^2+94,8444y-291


142,5y^2+94,8444y = 71,25y^2 +2911,8179
71,25y^2+94,8444y-2911,8179= 0

ybar = 1995.923 19.95922949 = 20

Itr = 165896.6 cm^4


Profil Beton Mencari nilai n
25742.9602027428 n = 7.769114 = 8

Dimensi Balok
5.7 m Beff = 142.5
570 cm Bo = 570 (jarak antar bentang baja)
3.9 m Beff = 97.5
390 cm Bo = 390

r Efektif Balok Melintang


cm 0.975
7.95
mm 12.95
cm

ukan Titik Berat/Garis Normal


12.95
Ay(cm)
4875
2911.8179244

7.3 cm

915.894951242423

71,25y^2+94,8444y-2911,8179 = 0
PERHITUNGAN BALOK

A BALOK MEMANJANG
DIMENSI PADA BALOK MEMANJANG
Direncanakan :
fc' = 30 MPa
fy = 240 MPa
DIGUNAKAN PROFIL BAJA WF
WF 16 x 50
A = 14.7 in2 9483.85
d = 16.3 in 414.02
tw = 0.38 in 9.652
bf = 7.07 in 179.578
tf = 0.63 in 16.002
Wu = 14.40971 kN/m2
L = 5.7 m
= 5700 mm

Menghitung beban - beban yang bekerja pada balok


Beban Pelat
q1 = 28.099 kN/m (Trapesium) t=
q2 = 28.099 kN/m (Trapesium) t=

Beban akibat balok


q3 = 0.047 kN/m 56.245
Momen Primer

MP1 = 61.316 kN.m (Trapesium)


MP2 = 61.316 kN.m (Trapesium)

MP3 = 0.060 kN.m

Momen primer total 122.692 kN.m


Momen kekakuan balok dan Kolom
Kam.Kbn.Kco (Kolom)
= 168292489918.27 EI
Kab.Kbc (balok) = 9309860038.2521 EI

DF = 9.0384006433391

Menghitung Faktor Distorsi


Titik A Kontrol
AM = 0.9476 1.0000 Joint
AB = 0.0524 Batang
DK
Titik B FEM
BA = 0.0498 Kontrol DIST
BC = 0.0498 1.0000 INDUKSI
BN = 0.9004 DIST
CO
Titik C Total
CB = 0.0524 Kontrol Kontrol
CO = 0.9476 1.0000

Menghitung Momen Lapangan Maksimal


RA = 106.9291759874 210.4734
RB = 103.5441825043 207.088365 459.8717
Kontrol = 0 0.340567

Mx = 188.1586429863
x = 5.693850416845
turunan
Ma = -116.26 0
R1.x = 106.92917598741 x 106.9292 -18.77977
= -9.3663133395 x2 -18.73263 x
= -0.0235694427264 x2 -0.047139 x
UNGAN BALOK MEMANJANG

E 200000 Mpa
Ic 659 in4
27429.65094704 cm4
mm2
mm
mm
mm
mm

1.95 (dari gambar) AM = 3.9 a


1.95 AB = 5.7 b
BN = 3.7
BC = 5.5
CO = 3.7
H = 3.7

TABEL MEMANJANG
A B C M
AM AB BA BN BC CB CO MA
0.9476 0.0524 0.0498 0.9004 0.0498 0.0524 0.9476 0
0 122.692 -122.692 0 122.692 -122.692 0 0
-116.261 -6.43149 0 0.0000 0 6.43148762 116.2607 0
0 0 -3.21574380899371 0 3.215744 0 0 -58.1304
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
-116.2607 116.26 -125.91 0 125.908 -116.261 116.26 -58.1304
0 0.00 0.000 0.00

x + 106.92917598741
5.69385042
1.8
1.95
N O
NB OC
0 0
0 0
0 0
0 58.13036
0 0
0 0
0 58.13
PERHITUNGAN BALOK

A BALOK MELINTANG
DIMENSI PADA BALOK MELINTANG
Direncanakan :
fc' = 30 MPa
fy = 240 MPa
DIGUNAKAN PROFIL BAJA WF
WF 16 x 50
A = 14.7 in2 9483.85
d = 16.3 in 414.02
tw = 0.38 in 9.652
bf = 7.07 in 179.578
tf = 0.63 in 16.002
Wu = 14.40971 kN/m2
L = 5.7 m
= 5700 mm

Menghitung beban - beban yang bekerja pada balok


Beban Pelat
q1 = 28.099 kN/m (Segitiga) t=
q2 = 28.099 kN/m (Segitiga) t=

Beban akibat balok


q3 = 0.04714 kN/m 56.245
Momen Primer

MP1 = 22.260 kN.m (Segitiga)


MP2 = 22.260 kN.m (Segitiga)

MP3 = 0.060 kN.m

Momen primer total 44.579 kN.m


Momen kekakuan balok
Kam.Kbn.Kco = 16829248991.83 EI
Kab.Kbc = 13606718517.45 EI

DF = 0.618416886123

Menghitung Faktor Distorsi


Titik D Kontrol
DP = 0.5529 1.0000 Joint
DE = 0.4471 Batang
DK
Titik E FEM
ED = 0.3089 Kontrol DIST
EF = 0.3089 1.0000 INDUKSI
EQ = 0.3821 DIST
CO
Titik F Total
FR = 0.4471 Kontrol Kontrol
FE = 0.5529 1.0000

Menghitung Momen Lapangan Maksimal


RD = 87.6552553423 159.9801
RE = 72.3248611099 144.6497222 126.8799
Kontrol = 0 0.340567

Mx = 179.917590663
x = 4.66753725127
turunan
Ma = -24.65 0
R1.x = 87.65525534229 x 87.65526 -18.77977
= -9.3663133395 x2 -18.73263 x
= -0.02356944273 x2 -0.047139 x
NGAN BALOK MELINTANG

E 20000 Mpa
Ic 659 in4
27429.65094704 cm4
mm2
mm
mm
mm
mm

1.95 (dari gambar) AM = 3.9 a 1.8


1.95 AB = 5.7 b 1.95
BN = 3.9
BC = 5.7
CO = 3.9
H = 3.7

TABEL MEMANJANG
D E F M N
DP DE ED EF EQ FR FE MA NB
0.5529 0.4471 0.3089 0.3821 0.3089 0.4471 0.5529 0 0
0 44.579 -44.579 0 44.579 -44.579 0 0 0
-24.649 -19.9295 0 0.0000 0 19.92951 24.64949 0 0
0 0 -9.96475625105406 0 9.964756 0 0 -12.3247 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
-24.6495 24.65 -54.54 0 54.544 -24.649 24.65 -12.3247 0
0 0.00 0.000 0.00

x + 87.6552553422875
4.667537
O
OC
0
0
0
12.32475
0
0
12.32
oMn>Mu Zx WF16.50 = 92 in^3
0,9*(Zx*Fy) > Mu 1507.609 cm^3
325.643544 188.1586429863 (balok kuat)

lamda f = 8.9125 lamdapf = 10.3923


lamda w = 35.85474513054 lamdapw = 108.5419

Vu = 8.008197905273 89.0625 Cc
oVn = 13657.5936 Cs
13.6575936

1. Cek Momen Tumpuan


Balok Memanjang Balok Melintang
o.Mn > Mu 0,9*Zx*Fy > Mu
0,9*Zx*Fy > Mu 325.643544 > 54.54376
325.643544 > 125.9079550751

2. Cek Momen Lapangan


Cek Kompak
lamda f < lamda p
8.90625 < 10.9696551146
Sehingga Mp = Mn
Balok Memanjang Balok Melintang
Mp > Mx Mp > Mx
325.643544 > 188.1586429863 325.643544 > 179.9176

3. Cek Kuat Geser


Menentukan Cv
h/tw < 2,24*sqrt(E/Fy)
35.8547451305 < 64.66323014924
Cv = 1
Balok Memanjang Balok Melintang
oVn > Vu oVn > Vu
0,6*Fy*Aw*Cv > Vu 1365.75936 > 87.65526
1365759.36
1365.75936 > 103.5441825043
Fy = 240
h= 34.607 cm

0.00948444

2907000
2276265.6

lintang

ng
Analisa Gaya Aksial
Pu = 27.0765 ASD LRFD
omega*Pn = 8277.399 0 1250 0 1880
H = 3.7 3.7 1238.5 3.7 1860.833
Mu = 6.769125 6 1220 6 1830
oMu = 6.092213 P/omega 0mega*P

Pu/omPu + Mu/omMu < 1


0.0201694051393536 < 1
Pwd 2006.14795

8277.399 Mn 445.09 (AISC 15)


Shear Connector Memanjang

Digunakan
Diameter (D) = 10 L = 5700
Fc = 30 Mpa 2*tf = 32.004
Fu = 370 Mpa Asc = 7853.982
Rg = 1 (SNI - 1729- 2015)
Rp = 0.75
Fy = 240 MPa
Ec = 25742.960202743
As = 9484.44 mm2
Qn = 1035311.4340833 N

Qn' = 2179479.9034279 N

MIN (Qn;Qn') = 1035311.4340833 N

Vn = 2276265.6 N

Jumlah Shear Connector untuk 1/2 bentang


n = 2.1986288618704 2

Jumlah Shear Connector untuk 1 bentang


n = 4.3972577237407 4

Jarak antar Shear Connector


s = 1425 mm

Jarak Transversal = 40 mm

Jarak max longitudinal = 800 mm

Jarak min longitudinal = 60 mm

S > Jarak minimum longitudinal, maka ditetapkan sebesar 400 mm atau


4 cm. Dengan jumlah shear connector sebanyak 4 buah.
Shear Connector Melinta

Digunakan
Diameter (D) =
Fc =
Fu =
Rg =
Rp =
Fy =
Ec =
As =
Qn =

Qn' =

MIN (Qn;Qn') =

Vn =

Jumlah Shear Connector untuk 1/2 bentang


n =

Jumlah Shear Connector untuk 1 bentang


n =

Jarak antar Shear Connector


s =

Jarak Transversal =

Jarak max longitudinal =

Jarak min longitudinal =

S > Jarak minimum longitudinal, maka ditetapkan sebesar 4


4 cm. Dengan jumlah shear connector sebanyak 4 b
Shear Connector Melintang

10 L = 3900
30 Mpa 2*tf = 32.004
370 Mpa Asc = 7853.982
1 (SNI - 1729- 2015)
0.75
240 MPa
25742.960202743
9484.44 mm2
1035311.4340833 N

2179479.9034279 N

1035311.4340833 N

1989000 N

or untuk 1/2 bentang


1.9211610482802 2

or untuk 1 bentang
3.8423220965604 4

975 mm

40 mm

800 mm

60 mm

ngitudinal, maka ditetapkan sebesar 400 mm atau


jumlah shear connector sebanyak 4 buah.
DESAIN TULANGAN BALOK MEMANJANG

Penulangan Utama Plat Lapangan


Tebal Plat (t) = 100 mm
Selimut Beton (p) = 40 mm
Diameter Tulangan Utama (Ø) = 16 mm
Tinggu Efektif (deff) = 52 mm
Lebar Tinjauan Plat (b) = 1425 mm
fc' = 30 Mpa
fy = 240 MPa
Mu (diambil yang terbesar) = 188.158643 kN.m
β1 = 0.85 mm
ρmin = 0.00583333
ρb = 0.06450893
ρmax = 0.004375
Mu = 188.158643 N.mm
Mn = 235.198304
M = 9.41176471
Rn = 6.10397E-05
ρperlu = 2.54333E-07
Maka,
As perlu
A tulangan
Jarak
Penulangan Utama Plat Lapangan Penulanga

Tebal Pelat (t) = 100 mm Tebal Pelat (t)


Selimut Beton (p) = 40 mm Selimut Beton (p)
Diameter Tulangan Utama (Ø) = 14 mm Diameter Tulangan Utama
Tinggi Efektif (deff) = t-p-(D/2) = 53 mm Tinggi Efektif (deff) = t-p
Lebar Tinjauan Plat (b) = 5500 mm Lebar Tinjauan Plat (b)
fc' = 30 Mpa fc'
fy = 240 Mpa fy
Mu (diambil yang terbesar) = 188.159 kN.m Mu (diambil yang terbesar
β1 = 0.850 β1
ρmin = 0.006 ρmin
ρb = 0.065 ρb
ρmax = 0.048 ρmax
Mu = 1.9.E+08 N.mm Mu
Mn = 2.352.E+08 Mn
M = 9.412 M
Rn = 15.224 Rn
ρperlu = 0.006 karena terlalu kecil pake p min ρperlu
Maka, ρ = 0.006 Maka,

As perlu = 1700.417 mm2 As perlu


A tulangan = 153.938 mm2 A tulangan
Jarak St = 497.913 490 Jarak
Jumlah tulangan = 11.04611093 11
DIGUNAKAN TULANGAN D14-490 DIGUNAKAN TULANG

Kontrol Kontrol
As pakai ≥ As perlu As pakai
1727.876 ≥ 1700.4167 OK 398.9324
Bulatkan ke bawa

Penulangan Bagi Lapangan Penulan


As' = 850.2083 mm2 d = 12 As' =
S = 731.627 mm s = 30 S =
dipasang tulangan D24-250 dipasang tulangan D14-150
As pakai = 20734.51 mm2 As pakai =
kontrol = As pakai ≥ As perlu kontrol =
20734.51 ≥ 850.2083 mm2
OK
Penulangan Utama Plat Tumpuan

Tebal Pelat (t) = 100 mm


Selimut Beton (p) = 30 mm
Diameter Tulangan Utama (Ø) = 8 mm
Tinggi Efektif (deff) = t-p-(D/2) = 66 mm
Lebar Tinjauan Plat (b) = 1000 mm
= 30 Mpa
= 240 Mpa
Mu (diambil yang terbesar) = 179.918 kN.m
= 0.850
= 0.006
= 0.065
= 0.048
= 1.799.E+08 N.mm
= 2.249.E+08
= 9.412
= 51.629
= 0.006
ρ = 0.006

= 396.000
A tulangan = 50.265
= 126.933 126

DIGUNAKAN TULANGAN D8-126

≥ As perlu
≥ 396.0000 OK
Bulatkan ke bawa 25 x 5

Penulangan Bagi Lapangan


198 mm2 d = 24
2284.795 mm s = 200
tulangan D14-150
2261.947 mm2
As pakai ≥ As perlu
2261.947 ≥ 198.0000 mm2