h 0.594 m L 50 m
bf 0.302 m E 200000000
tw 0.014 m ΔBADAN 1
tf 0.023 m
Ag 0.02224 m2
W 175 kg/m
r 0.028 mm
Ix 0.00137 M4 ix 1370000000
Iy 0.000106 M4
Sx
Sy
h' 0.548 m
ix 24.9 cm
iy 6.9 cm
zx 4620 cm3
zy 701 cm3
fu 410000 Kn/m2
fy 250000 Kn/m2
lamda 5m
b 1m
Momen MD
MD 6544.0625 kg.m
Gaya Perletakan
VD
VD 5235.25 kg
PKEL
PKEL 123.48 kN
Tu 263.25 kN
MT 329.0625 kN.m
ambil yg besar antara kel udl dan T
digunakan 329.0625 kN.m
B. KONTROL GESER
KONTROL PROFIL 42.428571429 <= 69.570108524 OK
BANDINGKAN DENGAN
VA 157.381
VA 167.191 PILIH YG BESAR 167.191
VN 1150.8 OK 0 FALSE = GA GANTI PROFIL
C. SAMBUNGAN
σMAKS 167.191
σIZIN 156250 OKE
LP 0.1668643368
SX 4612794612.8
G 76923076.923
J 2.9929347E-06
x1 178460812.01
X2 3940866483.9
Fl
qkayu ringan 800 kg/m3
ɣaspal (berat jenis aspal) 2240 kg/m3
γb (berat jenis beton) 2400 kg/m3
panjang bentang 5m
KALI B1 20.941 kN
1a Profil Balok Memanjang
h 0.692 m L 50 m
bf 0.3 m E 200000000
tw 0.013 m ΔBADAN 0.0450697674
tf 0.02 m fc' 30000 Kn/m2
Ag 0.02115 m2 Ac 0.108
W 166 kg/m
r 0.028 mm fc'= 30 mpa
Ix 0.00172 M4
Iy 9.02E-05 M4 fy= 250 mpa
Sx 4980 cm3 fu= 410 Mpa
Sy 602 cm3
h' 0.652 m
ix 28.6 cm
iy 6.53 cm 65.3 mm
zx 4980 cm3 4980000 mm3
zy 602 cm3 124500000 1245000 Nm
fu 410000 Kn/m2
fy 250000 Kn/m2
lamda 8m
b 5m
Momen MD
MD 84524.8 kg.m
Gaya Perletakan
VD
VD 41824.9 kg
PKEL
PKEL 617.4 kN
Tu 263.25 kN
KONTROL GESER
53.230769231 <= 69.570108524 OK
VA 677.08 709.53
VA 709.53
VN 1144.26 OK
SAMBUNGAN
σMAX 15742.925697
σIZIN 156250 OK
menetnukan nilai C
As beton= 0.108
C1= 5287.5 kN
C2= 2754 kN
pilih yg trkecil 2754 kN
hitung a
a= 0.15
d1= 0.075 m
d2= 0m
d3= 0.346 m
n= 0.128714801
A total= 0.12915 m2
Shear Connnnector
Asumsi
tinggi stud 100 mm
diameter 25 mm
beratstud
Asc 490.625 mm2
KALI B1 484.53 kN
MT 526.5 PAKE 526.5
kNm
1
DIKETAHUI
V0 19.3 km/jam KOTA
V10 120 km/jam
VB 100 km/jam
Z 10500 MM
Z0 2500 mm KOTA
WB 7740 N
RC 77400 N
jalan
LAMDA
KONTROL PUTUS
FAKTOR RE 0.75
FY 250 mPA
AN 3315.85 MM2
621721.875 N
KONTROL PROFIL
Ip 16.666666667 MM
Ir 14.230249471 ok
Vdz 18 km/jam
tinggi jemb 8m
Vb 120 km/jam
V10 120 km/jam
Z0 7E-05 km
angin tekan
Tekanan ang 0.0024 mpa
1. Pb= 5.4E-05 mpa
Perhitunga Ag
fy 250 MPa
reduksi c 0.85
N
mm2 ok
5 m/s asumsi
70 mm lahan terbuka