REKAPITULASI
PEKERJAAN : PEMBANGUNAN GUANG LPG DUSUN KUMU BARU RT 03 RW 02 DESA RAMBAH KECAMATAN RAMBAH
HILIR KABUPATEN ROKAN HULU
LOKASI : KEC. RAMBAH HILIR, KAB. ROKAN HILIR
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
A B C
JUMLAH Rp 195,901,152.29
SERATUS SEMBILAN PULUH LIMA JUTA SEMBILAN RATUS SATU RIBU SERATUS LIMA PULUH DUA RUPIAH
Terbilang : KOMA DUA PULUH SEMBILAN SEN
A PEKERJAAN PAGAR
I PEKERJAAN PERSIAPAN
1 Pek. Pas. Bouwplank dan Pengukuran 10.00 m' 69,782.00 697,820.00
TOTAL PEKERJAAN PERSIAPAN 697,820.00
II PEKERJAAN TANAH DAN PONDASI
A PEKERJAAN TANAH
1 Pek. Galian Tanah 3.94 m3 90,275.00 355,864.05
2 Pek. Urugan Pasir 0.20 m3 187,910.00 37,206.18
3 Pek. Cor Lantai Kerja 0.20 m3 968,283.39 191,720.11
4 Pek. Urugan Kembali Galian 1.31 m3 65,550.00 86,132.70
SUB TOTAL A 670,923.04
B PEKERJAAN PONDASI
1 Pek. Tapak (P1) 0.59 m3 1,182,921.31 702,655.26
- Pembesian Tapak (P1) 76.01 kg 16,679.00 1,267,844.18
2 Pek. Kolom Pedestal Atas Pondasi P1, 0.06 m3 1,182,921.31 73,193.26
- Pembesian 25.03 Kg 16,679.00 417,557.10
- Bekisting 1.65 m2 344,816.00 568,946.40
3 Pek. Pondasi Bata 1 Bata (Rolag) 7.09 M2 165,867.26 1,175,584.21
4 Pek. Raben Pondasi 14.18 M2 45,185.52 640,504.80
SUB TOTAL B 4,846,285.19
B PEKERJAAN BALOK
1 Pek. Balok 20/15, 0.90 m3 1,182,921.31 1,064,629.18
- Pembesian 67.37 Kg 16,679.00 1,123,680.91
- Bekisting 12.00 m2 353,441.00 4,241,292.00
SUB TOTAL B 6,429,602.08
TOTAL PEKERJAAN STRUKTUR 13,296,082.15
D PEKERJAAN PENGECATAN
1 Pek. Cat Air Dinding /Tembok / Struktur 152.71 m2 53,350.80 8,147,414.07
SUB TOTAL D 8,147,414.07
TOTAL PEKERJAAN ARSITEKTUR 72,873,120.49
TOTAL PEKERJAAN PAGAR 98,556,630.84
PEKERJAAN : PEMBANGUNAN GUANG LPG DUSUN KUMU BARU RT 03 RW 02 DESA RAMBAH KECAMATAN RAMBAH HILIR
KABUPATEN ROKAN HULU
Analisa Page 4
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.5 100,000.00 50,000.00
Mandor L.04 OH 0.05 140,000.00 7,000.00
JUMLAH TENAGA KERJA 57,000.00
B BAHAN
A. A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 140,000.00 3,920.00
Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 213,540.00
B BAHAN
Semen Portland kg 247.0000 1,640.00 405,080.00
Pasir Beton kg 869.0000 111.11 96,555.56
Kerikil (Maks 30mm) kg 999.0000 125.00 124,875.00
Air Liter 215.0000 9.00 1,935.00
JUMLAH HARGA BAHAN 628,445.56
C PERALATAN
A. A.4.1.1.7 Membuat 1 m3 beton mutu (K 200) slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 120,000.00 33,000.00
Kepala Tukang L.03 OH 0.0280 140,000.00 3,920.00
Mandor L.04 OH 0.0830 140,000.00 11,620.00
JUMLAH TENAGA KERJA 213,540.00
B BAHAN
Semen Portland kg 352.0000 1,640.00 577,280.00
Pasir Beton kg 731.0000 111.11 81,222.22
Batu Split 1/2 kg 1,031.0000 150.00 154,650.00
Air Liter 215.0000 9.00 1,935.00
JUMLAH HARGA BAHAN 815,087.22
C PERALATAN
Analisa Page 5
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 120,000.00 8,400.00
Kepala Tukang L.03 OH 0.0070 140,000.00 980.00
Mandor L.04 OH 0.0040 140,000.00 560.00
JUMLAH TENAGA KERJA 16,940.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 14,000.00 147,000.00
Kawat beton kg 0.1500 19,000.00 2,850.00
JUMLAH HARGA BAHAN 149,850.00
C PERALATAN
Analisa Page 6
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 120,000.00 39,600.00
Kepala Tukang L.03 OH 0.0330 140,000.00 4,620.00
Mandor L.04 OH 0.0330 140,000.00 4,620.00
JUMLAH TENAGA 114,840.00
B BAHAN
Kayu kelas III m3 0.0400 1,900,000.00 76,000.00
Paku 5 cm – 12 cm kg 0.4000 24,000.00 9,600.00
Minyak bekisting Liter 0.2000 2,000.00 400.00
Balok kayu kelas II m3 0.0180 2,500,000.00 45,000.00
Plywood tebal 9 mm Lbr 0.3500 130,000.00 45,500.00
Dolken kayu Ø 8-10cm - panjang 4 m Batang 2.0000 8,000.00 16,000.00
JUMLAH BAHAN 192,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 307,340.00
E Overhead & Profit 15% x D 46,101.00
F Harga Satuan Pekerjaan (D+E) 353,441.00
Analisa Page 7
A.4.4.1.10 Pemasangan 1 m2 dinding batako tebal 1 batu campuran 1SP:4PP
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.03 OH 0.1000 120,000.00 12,000.00
Kepala Tukang L.03 OH 0.0100 140,000.00 1,400.00
Mandor L.04 OH 0.0150 140,000.00 2,100.00
JUMLAH TENAGA KERJA 45,500.00
B BAHAN
Batako Bh 25.0000 2,700.00 67,500.00
Semen Portland Kg 15.1600 1,640.00 24,862.40
Pasir Pasang m3 0.0364 175,000.00 6,370.00
JUMLAH HARGA BAHAN 98,732.40
C PERALATAN
Analisa Page 8
E Overhead & Profit 15% x D 5,893.76
F Harga Satuan Pekerjaan (D+E) 45,185.52
Analisa Page 9
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PEKERJAAN : PEMBANGUNAN GUANG LPG DUSUN KUMU BARU RT 03 RW 02 DESA RAMBAH KECAMATAN RAMBAH
HILIR KABUPATEN ROKAN HULU
LOKASI : KEC. RAMBAH HILIR, KAB. ROKAN HILIR
HARGA SATUAN
No. UPAH SATUAN KET
(Rp)
1 2 3 4 5
UPAH
1 Pekerja OH 100,000.00
2 Tukang Batu/Kayu/Besi/Cat/Pipa/Las OH 120,000.00
3 Kepala Tukang OH 140,000.00
4 Mandor OH 140,000.00
BAHAN LANTAI
1 Granite Lantai 60x60 Bh 136,000.00
2 Keramik Lantai 40x40 Bh 18,400.00
3 Keramik Lantai 30x30 Bh 10,350.00
4 Keramik Lantai 25x25 Bh 7,200.00
5 Keramik Dinding 30x60 Bh 7,200.00
6 Plint Keramik 10x60 Bh 2,400.00
BAHAN KAYU
1 Plywood, T = 9 mm Lbr 130,000.00
2 Plywood, T = 4 mm Lbr 65,000.00
3 Teakwood, T = 4 mm Lbr 90,000.00
4 Kayu Kls I M3 3,500,000.00
5 Kayu Kls II M3 2,500,000.00 ex. Meranti
6 Kayu Kls III M3 1,900,000.00
7 Kayu Cerocok (Ubar) Ø 10-12 cm Btg 75,000.00
8 Dolken Kayu Ø 8-10 cm Btg 8,000.00
8 Kusen P1 fin cat Unit 500,000.00
8 Kusen J1 fin cat Unit 500,000.00
8 Daun Pintu P1 fin cat Unit 750,000.00
8 Daun Jendela J1 fin cat Unit 450,000.00
Page 10 U&B
HARGA SATUAN
No. UPAH SATUAN KET
(Rp)
1 2 3 4 5
4 Kalsi Board 6 mm Lbr 100,000.00
BAHAN BESI
1 Besi Beton Kg 14,000.00
2 Railing Besi Hollow M' 450,000.00
3 Railing Besi Stainless M' 700,000.00
4 Pagar Besi (Hollow 1,3mm) M2 450,000.00
5 Wire Mesh M - 8 (Uk. 5.4 x 2.1 m) Lbr 911,736.00
6 Wire Mesh M - 8 (Uk. 5.4 x 2.1 m) Kg 14,755.40
7 Kawat Beton Kg 19,000.00
BAHAN PAKU
1 Paku Biasa Kg 24,000.00
2 Paku Seng Kg 30,500.00
3 Paku Triplek Kg 22,500.00
4 Paku Sekrup ktk 75,000.00
BAHAN ATAP
1 Atap Seng gelombang Lbr 45,000.00
2 Atap Genteng Metal Fancy Lbr 55,000.00
3 Nok Metal M' 65,000.00
4 Atap Spandek M2 65,000.00
5 Singap Ukir/Ornamen Kayu M2 750,000.00
6 Selembayung psg 500,000.00
14 Lisplank GRC M' 40,000.00
15 Main truss Kanal C.75,75 AZ 100 Resin Merah M' 16,200.00
16 Reng 30,40 AZ 100 Resin Merah M' 7,500.00
17 Dynabolt bh 2,000.00
18 Piri-piri GRC woodplank 8mm bh 120,000.00
19 Atap Spandek Bluescope Zacs Natural Hitam 0,35mm m2 70,000.00
BAHAN PLUMBING
1 Pipa PVC Ø 4" (100 mm) M' 156,000.00
2 Pipa PVC Ø 3" (100 mm) M' 132,000.00
3 Pipa PVC Ø 2" ( 50 mm) M' 72,000.00
4 Pipa PVC Ø 1" (25 mm) M' 36,000.00
5 Pipa PVC Ø 3/4" M' 35,000.00
6 Pipa PVC Ø 1/2" M' 20,000.00
7 Tower Tangki Air 5 meter unit 10,000,000.00
8 Tangki Air 1000L Penguin Unit 2,000,000.00
9 Mesin Air Jet Pump Unit 1,000,000.00
10 Roof Drain Allumunium bh 350,000.00
11 Pelampung Otomatis bh 200,000.00
BAHAN FINISHING
1 Cat Minyak Kg 60,000.00 ex. Avian
2 Plamir Kayu Kg 45,000.00
3 Cat Meni Kg 20,000.00
4 Cat Dasar Minyak Kg 60,000.00
5 Cat Dasar Kg 45,000.00
6 Cat Tembok Luar Jotun Kg 110,000.00
7 Cat Tembok Dalam Jotun Kg 90,000.00
8 Plamir Kg 25,000.00
9 Lem Kayu Kg 12,000.00
10 Kuas Gulung Bh 35,000.00
11 Kuas 4" Buah 15,000.00
12 Thinner Ltr 25,000.00
13 Ampelas Bh 3,000.00
15 Water Profing Kg 75,000.00
16 Minyak Bekesting Ltr 2,000.00
Page 11 U&B
HARGA SATUAN
No. UPAH SATUAN KET
(Rp)
1 2 3 4 5
2 Kunci Tanam Antik Unit 250,000.00
3 Pintu Plastik Kamar Mandi Unit 350,000.00
4 Engsel Pintu 4" Bh 10,000.00
5 Engsel Jendela 3" Bh 8,000.00
6 Hak Angin Bh 15,000.00
7 Kaca Polos 3mm M2 87,000.00
8 Kaca Polos 5mm M2 107,000.00
9 Kaca Polos 8mm M2 240,000.00
10 Kaca Tempred 10mm M2 800,000.00
11 Kaca Tempred 12mm M2 1,100,000.00
12 Sealent Kg 62,500.00
13 Frame Kusen Allumunium 4" m' 80,000.00
14 Frame Pintu / Jendela Allumunium 3" m' 35,000.00
16 Besi Grill Penutup Drainase m' 250,000.00
17 Grendel Pintu Bh 15,000.00
18 Handel Pintu Bh 120,000.00
19 Grendel Jendela Bh 18,000.00
20 Handel Jendela Bh 10,000.00
23 Kait Angin Jendela Bh 15,000.00
24 Pintu KM Alluminium (Komplit) Unit 1,000,000.00
25 Pintu Gerbang Besi Plat + Fin Cat m2 2,000,000.00
36 Ventilasi Besi Fin Cat m2 450,000.00
37 Teralis Besi Fin. Cat m2 650,000.00
BAHAN SANITAIR
1 Kloset Jongkok Bh 400,000.00
2 Kloset Duduk Bh 2,100,000.00
8 Floor Drain Bh 230,000.00
9 Kran Air Bh 250,000.00
BAHAN ELEKTRIKAL
1 Intalasi Titik Lampu/Stop Kontak Ttk 250,000.00
8 Lampu LED 18 W Bh 150,000.00 phillips
12 Stop Kontak Bh 16,000.00 ex. Panasonic
13 Stop Kontak AC Bh 80,000.00 ex. Panasonic
16 Sakelar Ganda Bh 18,000.00 ex. Panasonic
17 Sakelar Tunggal Bh 14,000.00 ex. Panasonic
18 Sakelar Tripel Bh 22,000.00 ex. Panasonic
21 Panel Box Utama / Main Power Unit 1,000,000.00
BAHAN LAIN-LAIN
1 Alluminium Composite Panel (ACP) + Rangka M2 850,000.00
2 APAR 9 KG Unit 1,250,000.00
Page 12 U&B
BACKUP DATA
KEGIATAN : PEMBANGUNAN PAGAR SMK
PEKERJAAN : PEMBUATAN PAGAR SMKN 1 DESA NGASO UJUNG BATU
LOKASI : DESA NGASO UJUNG BATU
A PEKERJAAN PENDAHULIAN
B PEKERJAAN PONDASI
dikuran tapak 11 Bh
0.6 x
6.6 M'
Lebar 0.25 M
Tinggi 0.2 M
1.17 M3
Jumlah pondasi 11 Bh
Panjang 0.6
Lebar 0.6
Tinggi 0.15
0.594 M3
Pembesian 76.014 Kg
Besi Dia 10
Panjang 0.55
Tinggi 0.1
Keliling 1.3
Hak 0.1
Jumlah 8
Jumlah Tapak 11
Berat Jenis Besi 10 0.617
Panjang 30
30 M'
Lebar 0.2
Tinggi 0.25
Volume 1.5 M3
C PEKERJAAN STRUKTUR
Panjang 2.3 M
2.3 M'
Lebar 0.15 M
Tebal 0.15 M
0.569 M3
Pembesian 57.485 Kg
Besi Pokok Dia. 8
Panjang 2.5 M
Jumlah 4 Bh
Jumlah Kolom 11 BH
Berat Jenis Besi 8 0.395 Kg/m
Jumlah Volume Besi pokok 43.45 Kg
Panjang 30
30 M'
NO. URAIAN PEKERJAAN, GAMBAR KERJA/SKETSA VOLUME SATUAN Perhitungan Volume
Lebar 0.15 M
Tinggi 0.2 M
0.9 M3
Pembesian 67.371 Kg
Besi Pokok Dia. 8
Panjang 30
Jumlah 4 Bh
Berat Jenis Besi 8 0.395 Kg/m
Jumlah Volume Besi pokok 47.4 Kg
Tinggi 2.3 M
Pas bata kolom
Panjang 28.5
Tinggi 2.3
F PEKERJAAN TERALI
Panjang 4.5
1 +
5.5
G PEKERJAAN PENGECATAN
Plesteran 131.100 M2
Balok 12.000 M2
Dibuat Oleh,
NO. URAIAN PEKERJAAN, GAMBAR KERJA/SKETSA VOLUME SATUAN Perhitungan Volume
CV. ALTHIS KONSULTAN
ARDIANTO, ST.MT
Direktur
PERHITUNGAN BEKISTING
Pedestal
Panjang 0.15 M
Lebar 0.15 M
Tingi 0.25 M
Jumlah 11 Bh
Volume 1 Pedestal 0.15 M2
Volume Total 1.65 M2
Sloof
Panjang 30.000 M
Tinggi 0.25 M
Jumlah 2 Bh
Beton dalam 1M' 15 M2
Kolom
Panjang 0.15 M
Lebar 0.15 M
Tingi 2.3 M
Jumlah 11 Bh
Volume 1 Pedestal 1.38 M2
Volume Total 15.18 M2
Ring Balok
Panjang 30.000 M
Tinggi 0.2 M
Jumlah 2 Bh
Beton dalam 1M' 12 M2