BACK UP DATA QUANTITY
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI

VOLUME : 1.00

SUMBERDANA : ……………………………….2016

LOKASI : KOTA PALOPO

VOLUME
No. URAIAN PEKERJAAN
SATUAN

(1) (2) (3)


A. PEKERJAAN PENDAHULUAN
1 Papan Proyek 1.00 Ls
2 Pengukuran dan Pemasangan Bouwplank 1.00 Ls

B. PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali btkl 1 5.40
2 Urugan Pasir Bawah Pondasi 0.60
3 Urugan Kembali 1.80 M3
4 Pas. Pondasi Batu Kosong 1.80
5 Pas. Pondasi Batu Kali 1 : 4 4.80
6 Urugan Pasir Bawah Lantai 0.60
7 Urugan Sirtu Bawah Lantai 3.60

C. PEKERJAAN BETON / STRUKTUR


besi polos 6
besi polos 10
besi polos 12
1 Sloof Beton Bertulang
- Pasang Bekesting untuk Sloof 15/20 6.40 M2
- Pasang Bekesting untuk Sloof 15/15 - M2
Total 6.40

- Pembesian dengan Besi Polos


Tulangan d 12 = 6 btg 64.00 M
Total 56.83 Kg
Begel d 6 80.00
46.40
Total 10.30 Kg
Jumlah Total 67.13 Kg

- Pembesian dengan Besi Polos


BACK UP DATA QUANTITY
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI

VOLUME : 1.00

SUMBERDANA : ……………………………….2016

LOKASI : KOTA PALOPO

VOLUME
No. URAIAN PEKERJAAN
SATUAN

(1) (2) (3)


Tulangan d 12 = 6 btg -
Total - Kg
Begel d 6 -
-
Total - Kg
Jumlah Total - Kg

Jumlah Total 67.13 Kg


- Membuat Beton Bertulang (K-225) 0.48 m3

2 Kolom Beton Bertulang


- Bekesting untuk Utama 20/20 (3.15 m) 2bh 5.04 M2
- Bekesting untuk Utama 15/15 (3.15 m) 4 bh 3.78 M2
- Bekesting untuk Utama ……………… M2
Total 8.82

- Pembesian dengan Besi Polos


Kolom Utama 20/20 (3.15 m) 2bh 28.00
Total 24.86 Kg
Begel d 6 35.00
23.20
Total 5.15 Kg

Kolom Utama 15/15 (3.15 m) 4 bh 56.00


Total 49.73 Kg
Begel d 6 70.00
33.60
Total 7.46 Kg

Kolom Utama ………………


Total - Kg
BACK UP DATA QUANTITY
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI

VOLUME : 1.00

SUMBERDANA : ……………………………….2016

LOKASI : KOTA PALOPO

VOLUME
No. URAIAN PEKERJAAN
SATUAN

(1) (2) (3)


Begel d 6
-
Total - Kg

Jumlah Total 87.20 Kg

- Membuat Beton Bertulang (K-225) 0.60 M3

3 Ringbalk Beton Bertulang


- Bekesting untuk Ringbalk 15/15 tegak 4.80 M2
- Bekesting untuk Ringbalk 15/15 miring M2
Total 4.80 M3

- Pembesian dengan Besi Polos


Ring balok 15/15 tegak 64.00
Total 56.83 Kg
Begel d 6 80.00
38.40
Total 8.52 Kg

Ring balok 15/15 miring


Total - Kg
Begel d 6
-
Total - Kg

Jumlah Total 65.36 Kg

- Membuat Beton Bertulang (K-225) 0.36 M3


BACK UP DATA QUANTITY
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI

VOLUME : 1.00

SUMBERDANA : ……………………………….2016

LOKASI : KOTA PALOPO

VOLUME
No. URAIAN PEKERJAAN
SATUAN

(1) (2) (3)


D. PEKERJAAN DINDING DAN LANTAI
1 Pasangan Dinding Tembok 1 : 4 long 25.20
trans 25.20

2 bh luas kusen p3 3.28


4 bh luas kusen L 0.30
… ….
luas tot kusen pintu dan jendela 3.58
luas tot kusen lubang angin kuda-kuda -
Total pasangan dinding tembok 46.82

Jumlah Total 46.82 M2


2 Plesteran Dinding 1 : 4 dikurangi dinding tegel kerami 71.32 M2
3 Lantai Floor (K-100) 0.84 M3
4 Lantai Keramik 20 x 20 cm (warna/kasar) 12.00 M3
5 Dinding keramik luar 20 x 20 (warna/kasar) 22.32

total dinding keramik 22.32

E. PEKERJAAN ATAP
1 pasang kuda-kuda baja ringan M2
2 Pasang Atap Seng Gelombang M2
4 Pasang Nok Seng M2
5 Papan Listplank 3/30 cm M2
F. PEKERJAAN PLAFON
1 Pek. Rangka Plafon dalam M2
luar M2
sisi 1 M2
sisi 2 M2
total M2
2 Pek. Plafon Tripleks 3,4 mm M2
3 Pek. List Plafon
BACK UP DATA QUANTITY
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI

VOLUME : 1.00

SUMBERDANA : ……………………………….2016

LOKASI : KOTA PALOPO

VOLUME
No. URAIAN PEKERJAAN
SATUAN

(1) (2) (3)

G. PEKERJAAN KUSEN PINTU, JENDELA DAN PENGGANTUNG


1 Pek. Kusen

Kusen pintu 3 2 buah


P Horisontal 4.10 M1
P Vertikal 0.80 M1
Panjang Kayu Kusen 4.90 M1
Total 0.07 M3
Kusen loster 4 buah
P Horisontal 0.50 M1
P Vertikal 0.60 M1
Panjang Kayu Kusen 1.10 M1
Total 0.03 M3

total pekerjaan kusen 0.11 m3

2 Pek. Daun Pintu 2 dan Pintu 3 3.22 M2


BACK UP DATA QUANTITY
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI

VOLUME : 1.00

SUMBERDANA : ……………………………….2016

LOKASI : KOTA PALOPO

VOLUME
No. URAIAN PEKERJAAN
SATUAN

(1) (2) (3)

4 Pas. Kunci Pintu 2 Slag 2.00 BH


5 Pas. Engsel Pintu 6.00 BH
6 Pas. Terali Besi Pengaman Jendela

H. PEKERJAAN PENGECATAN

1 Pengecatan dinding 71.32 M2


2 Pengecatan Plafon M2
3 Pengecatan Kayu Listplank M2
kusen P2 - M2
kusen P3 2.45 M2
kusen Loster 1.10 M2

jalusi j2 M2
jalusi j1 M2
jalusi P1 M2
Daun Pintu 6.43 M2
Total 9.98 M2
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA

ANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

RUMUS URAIAN

(4) (5)

panjang*lebar*tinggi
panjang*lebar*tebal
1/3 galian tanah
panjang*lebar*tinggi
panjang*lebar*tinggi
panjang*lebar*tebal
panjang*lebar*tebal

0.22200
0.61667
0.88800

(h1+h2)*P.slof*jumlah sloef
(h1+h2)*P.slof*jumlah sloef

p sloof*jumlah tulangan
p total besi*berat besi
p sloofl/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA

ANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

RUMUS URAIAN

(4) (5)
p sloof*jumlah tulangan
p total besi*berat besi
p sloofl/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi

dimensi sloof*panjang

(s1+s2+s3+s4)*h*jumlah kolom
(s1+s2)*h*jumlah kolom

h kolom*jumlah tulangan*jumlah kolom


h total besi*berat besi
h tot.kolom utama/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi

h kolom*jumlah tulangan*jumlah kolom


h total besi*berat besi
h tot.kolom utama/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi

h kolom*jumlah tulangan*jumlah kolom


h total besi*berat besi
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA

ANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

RUMUS URAIAN

(4) (5)
h tot.kolom utama/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi

dimensi kolom*tinggi total kolom

(h1+h2)*P.slof*jumlah ringbalk
(h1+h2)*P.slof*jumlah ringbalk
Panjang p = 29 m

p ring balok*jumlah tulangan


p total besi*beart besi
p begel/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi

p ring bal0k*jumlah tulangan


p total besi*beart besi
p begel/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi

dimensi sloof*panjang
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA

ANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

RUMUS URAIAN

(4) (5)

p*l*jumlah kusen
p*l*jumlah kusen
p*l*jumlah kusen

long + trans - luas lubang kusen

(A pasangan batu * 2)-(luas tegel keramik)

panjang x lebar x tebal


panjang x lebar
panjang x lebar

(panjang1*lebar1)+(panjang2*lebar2)
(panjang1*lebar1)+(panjang2*lebar2)
panjang*lebar
panjang*lebar

p*l*jumlah panel
p*l*jumlah panel
p*l*jumlah panel
p*l*jumlah panel

luas rangka plafond


BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA

ANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

RUMUS URAIAN

(4) (5)

dimensi kayu 5/15


panjang * luas kayu * jumlah

dimensi kayu 5/15


panjang * luas kayu * jumlah

Tinggi*Panjang*jumlah
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA

ANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

RUMUS URAIAN

(4) (5)

(A pasangan batu * 2)-(luas kuda-kuda batu tanpa plaster)

luas pekerjaan plafond


panjang*lebar
P*lebar*jumlah kusen
P*lebar*jumlah kusen
P*lebar*jumlah kusen

P*lebar*jumlah jalusi
P*lebar*jumlah jalusi
P*lebar*jumlah jalusi
P*lebar*jumlah sisi*jumlah pintu
PEMBANGUNAN / REHABILITASI GEDUNG SMK TAHUN ANGGARAN 2015
KEGIATAN :
PEKERJAAN : PEMBANGUNAN WC

NO JENIS PEKERJAAN JUMLAH HARGA

A PEKERJAAN TANAH Rp 4,355,712.72


B PEKERJAAN BETON / STRUKTUR Rp 15,561,465.65
C PEKERJAAN DINDING DAN LANTAI Rp 17,394,781.89
D PEKERJAAN KUSEN PINTU, JENDELA DAN PENGGANTUNG Rp 2,538,383.23
E PEKERJAAN PENGECATAN / FINISHING Rp 1,691,045.95
F PEKERJAAN INSTALASI LISTRIK Rp 582,376.50
F PEKERJAAN SANITASI Rp 4,762,309.20
[1] REAL COST (RC) Rp 46,886,075.15
RENCANA ANGGARAN BIAYA
PEMBANGUNAN / REHABILITASI GEDUNG SMK TAHUN ANGGARAN 2015
KEGIATAN :
PEKERJAAN ### PEMBANGUNAN WC

VOLUME BIAYA JUMLAH


No. URAIAN PEKERJAAN
SATUAN KONSTRUKSI HARGA

(1) (2) (3) (4) (5)


A PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali 5.40 M3 Rp 51,250.00 Rp 276,750.00
2 Urugan Pasir Bawah Pondasi 0.60 M3 Rp 158,140.00 Rp 94,884.00
3 Urugan Kembali 1.80 M3 Rp 14,380.00 Rp 25,884.00
4 Pas. Pondasi Batu Kosong 1.80 M3 Rp 304,250.40 Rp 547,650.72
5 Pas. Pondasi Batu Kali 1 : 4 4.80 M3 Rp 620,900.00 Rp 2,980,320.00
6 Urugan Pasir Bawah Lantai 0.60 M3 Rp 158,140.00 Rp 94,884.00
7 Urugan Sirtu Bawah Lantai 3.60 M3 Rp 93,150.00 Rp 335,340.00
Sub Jumlah (B) Rp 4,355,712.72
B PEKERJAAN BETON / STRUKTUR
1 Sloof Beton Bertulang 1 : 2 : 3
- Pasang Bekesting untuk Sloof 6.40 M2 Rp 126,050.00 Rp 806,720.00
- Pembesian dengan Besi Polos 67.13 Kg Rp 12,890.00 Rp 865,341.79
- Membuat Beton Bertulang (K-175) 0.48 M3 Rp 808,147.02 Rp 387,910.57
2 Kolom Beton Bertulang 1 : 2 : 3
- Pasang Bekesting untuk Kolom 8.82 M2 Rp 146,250.00 Rp 1,289,925.00
- Pembesian dengan Besi Polos 87.20 Kg Rp 12,890.00 Rp 1,124,023.68
- Membuat Beton Bertulang (K-175) 0.60 M3 Rp 808,147.02 Rp 480,847.48
3 Ring Balok Beton Bertulang 1 : 2 : 3
- Pasang Bekesting untuk Ring Balok include bekisting lantai
- Pembesian dengan Besi Polos 65.36 Kg Rp 12,890.00 Rp 842,449.15
- Membuat Beton Bertulang (K-175) 0.36 M3 Rp 808,147.02 Rp 290,932.93
4 Lantai / dack Beton Bertulang 1 : 2 : 3
- Pas. Bekesting untuk dack 5.15*3.65 18.80 M2 Rp 265,550.00 Rp 4,991,676.13
- Pembesian dengan Besi Polos 252.40 Kg Rp 12,890.00 Rp 3,253,457.48
- Membuat Beton Bertulang (K-175) 1.52 M3 Rp 808,147.02 Rp 1,228,181.44
Sub Jumlah (C) Rp 15,561,465.65
C PEKERJAAN DINDING DAN LANTAI
1 Pasangan Dinding Tembok 1 : 4 46.82 M2 Rp 99,862.50 Rp 4,675,562.25
2 Plesteran Dinding Tembok 1 : 4 includ acian 71.32 M2 Rp 45,912.00 Rp 3,274,443.84
3 Lantai Floor (K-100) tebal 7 cm 0.84 M3 Rp 633,860.71 Rp 532,443.00
4 Lantai Keramik 20 x 20 cm (warna/motif) 12.00 M2 Rp 243,907.50 Rp 2,926,890.00
5 Dinding keramik 20 x 20 (warna/motif) 22.32 M2 Rp 268,165.00 Rp 5,985,442.80
Sub Jumlah (D) Rp 17,394,781.89
D PEKERJAAN KUSEN PINTU, JENDELA DAN PENGGANTUNG
1 Pek. Kusen Pintu dan Jendela (Kayu Kls II) 0.11 M3 Rp 5,660,500.00 Rp 602,843.25
2 Pek. Daun Pintu 3.22 M2 Rp 483,750.00 Rp 1,555,740.00
6 Pas. Kunci Pintu 2 Slag 2.00 Bh Rp 107,150.00 Rp 214,300.00
7 Pas. Engsel Pintu 6.00 Bh Rp 27,583.33 Rp 165,499.98
Sub Jumlah (G) Rp 2,538,383.23
E PEKERJAAN PENGECATAN / FINISHING
1 Pengecatan Tembok 71.32 M2 Rp 17,306.50 Rp 1,234,299.58
3 Pengecatan Kayu 9.98 M2 Rp 45,757.00 Rp 456,746.37
Sub Jumlah (H) Rp 1,691,045.95
F PEKERJAAN INSTALASI LISTRIK
1 Instalasi Titik Nyala - Kabel NYY 2 x 1.5 mm 3.00 titik Rp 131,200.00 Rp 393,600.00
2 Fitting Tunggal (Broco) 3.00 Bh Rp 14,063.00 Rp 42,189.00
3 Lampu Sumpit 23 Watt (Philips) 3.00 Bh Rp 36,500.00 Rp 109,500.00
4 Sakelar Tunggal (Broco) 3.00 Bh Rp 12,362.50 Rp 37,087.50
Sub Jumlah (I) Rp 582,376.50
G PEKERJAAN SANITASI
1 Pas. Pipa PVC 3" Saluran Air Kotor 10.00 M1 Rp 71,470.00 Rp 714,700.00
2 Pas. Pipa PVC 3/4" Saluran Air Bersih 10.00 M1 Rp 17,865.83 Rp 178,658.33
3 Pas. Kran air 3/4" 2.00 Bh Rp 37,775.00 Rp 75,550.00
4 Kloset Jongkok 2.00 Bh Rp 435,575.00 Rp 871,150.00
5 Floor Drain 2.00 Bh Rp 37,650.00 Rp 75,300.00
Pekerjaan septick tank
6 Galian Tanah 3.60 M3 Rp 51,250.00 Rp 184,500.00
7 Pasangan Dinding Tembok 1 : 4 11.40 M2 Rp 99,862.50 Rp 1,138,432.50
8 Plesteran Dinding Tembok 1 : 4 includ acian 13.20 M2 Rp 45,912.00 Rp 606,038.40
9 Lantai Floor (K-100) tebal 7 cm 0.17 M3 Rp 633,860.71 Rp 106,488.60
10 Lantai / dack Beton Bertulang 1 : 2 : 3
- Pas. Bekesting (kayu bekas) 2.40 M2 Rp 133,900.00 Rp 321,360.00
- Pembesian dengan Besi Polos 19.73 kg Rp 12,890.00 Rp 254,362.67
- Membuat Beton Bertulang (K-175) 0.17 M3 Rp 808,147.02 Rp 135,768.70
11 Pipa ventilasi 2.00 Bh Rp 50,000.00 Rp 100,000.00
Sub Jumlah (H) Rp 4,762,309.20
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBANGUNAN / REHABILITASI GEDUNG SMK TAHUN ANGGARAN 2015
KEGIATAN :

PEKERJAAN : PENGADAAN MEUBELER SMK NEGERI 1 BUA

VOLUME : 2 (DUA) RUANG KELAS

SUMBER DANA : ……………………………………………………………………….


……………………………………………………………………….

LOKASI : KECAMATAN BELOPA KABUPATEN LUWU

NO JENIS PEKERJAAN JUMLAH HARGA

A PEKERJAAN MEUBELER (KAYU KLAS II) Rp 40,040,339.04


[1] REAL COST (RC) Rp 40,040,339.04

Belopa, Oktober 2015


DISETUJUI OLEH : DIBUAT OLEH :
KONSULTAN PERENCANA KEPALA SEKOLAH
CV. ERA DESIGN SMK NEGERI 1 BUA

JUSMIDAH, ST., MT. ……………………………………


…………………………………….

DIKETAHUI OLEH :
KEPALA DINAS
PENDIDIKAN PEMUDA DAN OLAHRAGA
KABUPATEN LUWU

Drs. H. ANDI PAHRI, MM


NIP. 19561231 198303 1 191
RENCANA ANGGARAN BIAYA
PEMBANGUNAN / REHABILITASI GEDUNG SMK TAHUN ANGGARAN 2015
KEGIATAN :
PEKERJAAN : PENGADAAN MEUBELER SMK NEGERI 1 BUA
VOLUME : 2 (DUA) RUANG KELAS
SUMBER DANA : ……………………………………………………………………….
……………………………………………………………………….
LOKASI : KECAMATAN BELOPA KABUPATEN LUWU

VOLUME BIAYA JUMLAH


No. URAIAN PEKERJAAN
SATUAN KONSTRUKSI HARGA

(1) (2) (3) (4) (5)


A PEKERJAAN MEUBELER (KAYU KLAS II)
1 Meja ganda siswa 32.00 BH Rp 500,000.00 Rp 16,000,000.00
2 Meja guru 1/2 biro 2.00 BH Rp 650,000.00 Rp 1,300,000.00
3 Kursi siswa tunggal 64.00 BH Rp 296,255.30 Rp 18,960,339.04
4 Kursi guru 2.00 BH Rp 350,000.00 Rp 700,000.00
5 Papan tulis 2.00 BH Rp 240,000.00 Rp 480,000.00
6 Lemari buku 2.00 BH Rp 1,300,000.00 Rp 2,600,000.00

Sub Jumlah (A) Rp 40,040,339.04


panjang lebar tinggi jumlah
- Pasang Bekesting untuk hak kolom typeA 0.25 0.2 7

- Pembesian dengan Besi Polos typeA 0.25 7

- Membuat Beton Bertulang (K-175) typeA 0.1 0.1 0.15 7

dinding pembatas batu bata kantor 6.85 1.1 4


plasteran kantor
Acian Dinding kantor
lantai rabat kelas A 36.15 9.19 0.05

kantor 8 4.85 0.05


12 1 0.05

Pek. Kuda-kuda Kayu Kls III typeA 27.25 0.06 0.12 13


1.3 0.05 0.1 52
6.5 0.06 0.12 5
3.1 0.06 0.12 3

Kolom tiang typeA 0.1 0.1 3.5 7

ikatan angin kolom typeA trans 1.06 0.06 0.12 8


typeA long 0.68 0.06 0.12 10

Pek. Gording Kayu Kls III typeA 37.5 0.05 0.1 16


kantor 9 0.05 0.1 7
WC 4.15 0.05 0.1 5

ikatan angin kuda2 typeA 4 0.05 0.1 24

Pas. Atap Seng Gelombang Besar typeA 37.35 12.1 1


kantor 9.15 6.7 1
WC 4.15 3.3 1

Pas. Nok Seng typeA 37.35 0.4 1

Pek. Listplank Kayu Klas II typeA 86.8 0.25 1


kantor 19.85 0.25 1
WC 7.95 0.25 1

Pek. Rangka Plafon kelas A 37.2 11.04


kantor 9.15 6.5

Pek. Plafon Tripleks 5 mm kelas A

kantor

Pek. List Plafon kelas A 361.6 1

kantor 70.15 1

Pek. Kusen Pintu dan Jendela (Kayu Kls II) baru kelas A KJ 10.1 0.15 0.06 13
baru kelas A KP 12.9 0.15 0.06 3
baru kantor KJ 4.4 0.15 0.06 1

Pek. Daun Pintu kelas A 0.92 2.1 6


kantor 0.92 2.1 1
wc 0.72 1.85 2

Pek. Daun Jendela kantor 0.66 1.27 2

Pek. Jalusi Kusen (Kayu Kls II) kelas A KJ 2.85 0.45 20


kelas A KP 2.85 0.45 4

Pas. Kunci Pintu 2 Slag kelas A


wc
kantor

Pas. Engsel Pintu kelas A


wc
kantor

Pas. Engsel Jendela kantor


Pas. Kait Angin kantor
pasang kawat harmonika kelas A

Pengecatan Tembok kelas A

kantor dan wc 63 2.5

Pengecatan Plafon kelas A


kantor

Pengecatan Kayu kelas A KJ 12.95 0.15 0.05 19

kantor KJ2 5.7 0.15 0.05 1


kantor KJ3 4.4 0.15 0.05 1
kelas A KP 14 0.15 0.05 6
kantor KP 6 0.15 0.05 1
daun pintu A 0.92 2.1 14
daun pintu wc 0.72 1.85 2
listplangk A 86.8 0.25
listplangk kantor 27.8 0.25

Pasang MCB
Instalasi Titik Nyala - Kabel NYY 2 x 1.5 mm
Fitting Tunggal (Broco)
Lampu SL 23 Watt (Philips)
Sakelar Ganda (Broco)
Sakelar tunggal (Broco)
Stop Kontak

Dinding kayu kelas A

Rangka dinding pembatas 24.95 0.05 0.07 4


dinding samping 4 0.05 0.07 4
dinding samping kiri 4 0.05 0.07 4
dinding belakang 4.5 0.05 0.07 2
vol
0.35

0.35
1.155

1.155
0.0105

0.0105

30.14
60.28
60.28
16.61093

1.94
0.6
19.15093
2.5506
0.338
0.234
0.06696
3.18956
0.245
dinding klas A 693013.338 1.73253335
0.245 dinding klas B 1598158.18 3.99539544
0.061056 dinding klas A 8 4
0.04896 dinding klas B 16 4

0.110016
3
0.315 213750 2 427500
0.10375
3.41875 355526.301 1 355526.301
0.48
m3
0.48
451.935 m2
61.305 m2
13.695 m2
526.935
14.94 m2
m2
14.94
21.7 m2
4.9625 m2
1.9875
28.65
410.688
66.2739
476.9619
410.688

66.2739 1096455 997492.5 226050 329740.005


476.9619 2 2 12 2
361.6 2192910 1994985 2712600 659480.01
7559975.01
755.997501
70.15 220852.5 206715 329740.005 150700
431.75 1 1 1 4
1.1817 220,852.50 206,715.00 329,740.00 602,800.00
0.3483 1360107.5
0.0396 136.01075
3.40026876
1.5696
11.592
1.932
2.664
16.188
1.6764 136.01075 lembar
0.025 m3
25.65 2700000 3.40026876
5.13 9,180,725.66
67,500.00
6.5
2.2
4
30.78 40 57.2
6
2
1 40
9 67500
18 2700000
6
3
27
4
4

755.9975

157.5
913.4975
410.688
66.2739
476.9619
61.5125

1.425
1.1
21
1.5
54.096
5.328
21.7
6.95
174.6115

1
40
40
40
11
0
9

3.400269
3.400269
0.3493
0.056
0.056
0.0315

0.4928
42.75

35.55263
78.30263
cat

dinding
kayu

m3
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
KEGIATAN :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

VOLUME : 1
SUMBER DANA : ……………………………….2016

LOKASI : KOTA PALOPO

NO JENIS PEKERJAAN JUMLAH HARGA

A PEKERJAAN PENDAHULUAN Rp 300,000.00


B PEKERJAAN BETON / STRUKTUR Rp 67,490.99
C PEKERJAAN DINDING DAN LANTAI Rp 35,061,437.71
D PEKERJAAN KUDA-KUDA DAN ATAP Rp 56,675,316.09
E PEKERJAAN KUSEN PINTU, JENDELA DAN PENGGANTUNG Rp 23,875,904.07
F PEKERJAAN PENGECATAN / FINISHING Rp 15,809,444.50
G PEKERJAAN INSTALASI LISTRIK Rp 7,777,870.00
[1] BIAYA KONSTRUKSI Rp 139,567,463.37

[2] DIBULATKAN Rp 139,567,000.00

TERBILANG :

SERATUS TIGA PULUH SEMBILAN JUTA LIMA RATUS ENAM PULUH TUJUH RIBU RUPIAH

Palopo, 2016
DIKETAHUI OLEH DIBUAT OLEH :
REKTOR II Panitian Pembangunan Kampus
UNIV. ANDI DJEMMA PALOPO UNIV. ANDI DJEMMA PALOPO

Zulkifli Darwis, S.Sos., M.Si.


Asnadi A. Machmud, ST.,MT.

DIKETAHUI OLEH :
REKTOR
UNIV. ANDI DJEMMA PALOPO

Dr. Marsus Suti, M.Kes.


RENCANA ANGGARAN BIAYA
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
KEGIATAN :

PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA

VOLUME ###
:
SUMBER DANA : ……………………………….2016

LOKASI : KOTA PALOPO

VOLUME BIAYA JUMLAH


No. URAIAN PEKERJAAN
SATUAN KONSTRUKSI HARGA

(1) (2) (3) (4) (5)


A PEKERJAAN PENDAHULUAN
1 Pembongkaran bangunan lama 1.00 M' Rp 300,000.00 Rp 300,000.00
Sub Jumlah (A) Rp 300,000.00
B PEKERJAAN BETON / STRUKTUR
1 Sloof Beton Bertulang 1 : 2 : 3
- Pasang Bekesting untuk Sloof 0.35 M2 Rp 126,050.00 Rp 44,117.50
- Pembesian dengan Besi Polos 1.16 Kg Rp 12,890.00 Rp 14,887.95
- Membuat Beton Bertulang (K-175) 0.01 M3 Rp 808,147.02 Rp 8,485.54
Sub Jumlah (C) Rp 67,490.99
C PEKERJAAN DINDING DAN LANTAI
1 Pasangan Dinding Tembok 1 : 4 30.14 M2 Rp 99,862.50 Rp 3,009,855.75
2 Plesteran Dinding Tembok 1 : 4 includ acian 60.28 M2 Rp 45,912.00 Rp 2,767,575.36
3 Acian Dinding 60.28 M2 Rp 2,722.50 Rp 164,112.30
4 Lantai Floor (K-100) tebal 5 cm 19.15 M3 Rp 633,860.71 Rp 12,139,019.00
5 Konstruksi kayu konvensional / Rangka dinding 0.49 M3 Rp 4,264,000.00 Rp 2,101,299.20
6 Dinding papan 3.40 M3 Rp 4,376,000.00 Rp 14,879,576.10
Sub Jumlah (D) Rp 35,061,437.71
D PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Kuda-kuda Kayu Kls III 3.19 M3 Rp 4,347,968.75 Rp 13,868,107.21
Pek. Kolom tiang 0.25 M3 Rp 4,347,968.75 Rp 1,065,252.34
Pek. ikatan angin kolom 0.11 M3 Rp 4,347,968.75 Rp 478,346.13
2 Pek. Gording Kayu Kls III 3.42 M3 Rp 3,847,968.75 Rp 13,155,243.16
Pek. ikatan angin kuda-kuda 0.48 M3 Rp 3,847,968.75 Rp 1,847,025.00
3 Pas. Atap Seng Gelombang Besar 526.94 M2 Rp 46,690.00 Rp 24,602,595.15
4 Pas. Nok Seng 14.94 M2 Rp 25,875.00 Rp 386,572.50
5 Pek. Listplank Kayu Klas II 28.65 M2 Rp 44,404.00 Rp 1,272,174.60
Sub Jumlah (E) Rp 56,675,316.09
E PEKERJAAN PLAFON
1 Pek. Rangka Plafon 476.96 M2 Rp 59,900.00 Rp 28,570,017.81
2 Pek. Plafon Tripleks 5 mm 476.96 M2 Rp 39,035.50 Rp 18,618,446.25
3 Pek. List Plafon 431.75 M' Rp 14,941.00 Rp 6,450,776.75
Sub Jumlah (F)
E PEKERJAAN KUSEN PINTU, JENDELA DAN PENGGANTUNG
1 Pergantian Kusen Pintu dan Jendela (Kayu Kls II) 1.57 M3 Rp 5,660,500.00 Rp 8,884,720.80
2 Pek. Daun Pintu 16.19 M2 Rp 483,750.00 Rp 7,830,945.00
3 Pek. Daun Jendela 1.68 M2 Rp 594,200.00 Rp 996,116.88
4 Pek. Kaca Mati 0.65 M2 Rp 250,500.00 Rp 162,825.00
5 Pek. Pemasangan kawat harmonika 75.24 M2 Rp 54,152.00 Rp 4,074,396.48
6 Pas. Kunci Pintu 2 Slag 9.00 Bh Rp 107,150.00 Rp 964,350.00
7 Pas. Engsel Pintu 27.00 Bh Rp 27,583.33 Rp 744,749.91
8 Pas. Engsel Jendela 4.00 Bh Rp 21,200.00 Rp 84,800.00
9 Pas. Kait Angin 4.00 Bh Rp 33,250.00 Rp 133,000.00
Sub Jumlah (G) Rp 23,875,904.07
F PEKERJAAN PENGECATAN / FINISHING
1 Pengecatan Dinding 913.50 M2 Rp 17,306.50 Rp 15,809,444.50
Sub Jumlah (H) Rp 15,809,444.50
G PEKERJAAN INSTALASI LISTRIK
1 Pasang MCB 1.00 titik Rp 132,250.00 Rp 132,250.00
2 Instalasi Titik Nyala - Kabel NYY 2 x 1.5 mm 40.00 titik Rp 131,200.00 Rp 5,248,000.00
3 Fitting Tunggal (Broco) 40.00 Bh Rp 14,063.00 Rp 562,520.00
4 Lampu Sumpit 23 Watt (Philips) 40.00 Bh Rp 36,500.00 Rp 1,460,000.00
5 Sakelar Ganda (Broco) 11.00 Bh Rp 16,100.00 Rp 177,100.00
6 Sakelar Tunggal (Broco) - Bh Rp 12,362.50 Rp -
7 Stop Kontak 9.00 Bh Rp 22,000.00 Rp 198,000.00
Sub Jumlah (I) Rp 7,777,870.00
HARGA BAHAN DAN UPAH KERJA
KABUPATEN LUWU T.A. 2016

NO JENIS BAHAN SATUAN HARGA BAHAN KET.


1 2 3 4 5

A BAHAN DASAR

1 Batu Pecah (Spilt 2 - 3 Cm) M3 Rp 346,500.00 256.67


2 Batu kali M3 Rp 137,500.00
3 Batu merah Buah Rp 700.00
4 Pasir Beton M3 Rp 137,500.00 98.21
5 Pasir Pasang M3 Rp 137,500.00
6 Pasir Urug M3 Rp 114,700.00
7 Kerikil Saring (ayak) tanpa pasir M3 Rp 137,500.00 76.39
8 Sirtu M3 Rp 62,000.00
9 Semen (Portland Cement) Tonasa Zak Rp 65,000.00 1,300.00
10 Semen Warna Kg Rp 20,000.00
11 Air Liter Rp 50.00

B BAHAN KAYU

1 Kayu Klas II
Papan M3 Rp 3,250,000.00
Balok M3 Rp 3,250,000.00
2 Kayu Klas III
Papan M3 Rp 2,640,000.00
Balok M3 Rp 2,640,000.00
3 Kayu Mal / Bakesting
Papan M3 Rp 1,980,000.00
Balok M3 Rp 1,980,000.00
4 Dolken Kayu Batang Rp 8,050.00
5 Bambu Panjang Batang Rp 20,000.00

C BAHAN TEGEL
1 Tegel Keramik
- Putih 20 x 20 cm Dos Rp 92,400.00 3,696.00

- Warna 20 x 20 cm Dos Rp 105,000.00 4,200.00

- Putih 30 x 30 cm Dos Rp 77,800.00 7,002.00

- Warna 30 x 30 cm Dos Rp 79,750.00 7,177.50

- Putih 40 x 40 cm Dos Rp 85,500.00 13,680.00

- Warna 40 x 40 cm Dos Rp 87,700.00 14,032.00

- Putih 50 x 50 cm Dos Rp - -

- Warna 50 x 50 cm Dos Rp - -

Dinding Keramik
- Putih 20 x 20 cm Dos Rp - -

- Warna 20 x 20 cm Dos Rp - -

- Putih 20 x 25 cm Dos Rp - -

- Warna 20 x 25 cm Dos Rp - -

D BAHAN KACA

1 Kaca
- kaca 3 mm Lembar Rp 171,600.00 78,142.08
HARGA BAHAN DAN UPAH KERJA
KABUPATEN LUWU T.A. 2016

NO JENIS BAHAN SATUAN HARGA BAHAN KET.


1 2 3 4 5
- kaca 5 mm Lembar Rp 214,500.00 97,677.60

D BAHAN BESI
1 Besi beton polos Kg Rp 10,900.00
- Besi beton dia 12 mm batang Rp 104,500.00
- Besi beton dia 10 mm batang Rp 66,000.00
- Besi beton dia 06 mm batang Rp 30,800.00
2 Paku
Paku Biasa 5, 6, 7 dan 10 Cm Kg Rp 20,000.00
Paku Skrup 4 inc Dos Rp 48,100.00
Paku Skrup 3.5 inc Dos Rp 22,100.00
Paku Tripleks Kg Rp 25,350.00
Paku Kalsiboard 1" x 24 BWG Kg Rp 30,000.00
Paku seng Kg Rp 27,500.00
3 Kawat
- Beton Kg Rp 22,000.00
4 Besi Strep
30.3 mm Batang Rp 36,250.00
5 Mur/Baut 20 Cm Buah Rp 6,600.00
6 Kawat harmonika 2.1mm (BWG 14) 40*40 M2 Rp 30,000.00

E BAHAN LANGIT-LANGIT

1 Multipleks 9 mm 122 x 244 Lembar Rp 121,800.00


2 Tripleks 3 mm Lembar Rp 65,000.00
3 Tripleks 5 mm Lembar Rp -
4 Asbes Plat M2 Rp 15,000.00
5 List Profil 3 x 3 cm M1 Rp 3,750.00 15,000.00

F BAHAN ATAP

1 Genteng Metal Surya Roof 0.3 mm (2x4) Lembar Rp 60,000.00


2 Nok/Bubungan Surya Roof 0.3 mm Lembar Rp 40,000.00
3 Seng Spandec 0.3 silver M1 Rp 60,000.00
4 Rabung/nok Spandek M1 Rp 30,000.00
5 Main Truss C.75.0,75 M Rp 80,000.00
6 Roof Bottom/Reng R.33.0,45 M Rp 59,000.00
7 Screw Dia 6x50 mm Bh Rp 500.00
8 Screw Dia 6x20 mm Bh Rp 350.00
9 Screw Dia 4x20 mm Bh Rp 300.00
dyna bolt M10*100mm
10 Bh Rp 1,500.00
11 Seng gelombang besar Lbr Rp 46,200.00
12 Seng Plat BWG BJLS 0,30 mm Lbr Rp 56,000.00

G BAHAN KUNCI

1 Kunci Tanam Union 2x Slag Buah Rp 75,000.00


2 Kait Angin Buah Rp 18,700.00
3 Grendel Sedang Buah Rp 12,000.00
HARGA BAHAN DAN UPAH KERJA
KABUPATEN LUWU T.A. 2016

NO JENIS BAHAN SATUAN HARGA BAHAN KET.


1 2 3 4 5
4 Engsel Pintu Buah Rp 13,033.33
5 Engsel Jendela Buah Rp 11,500.00
H BAHAN FHINISING/CAT

1 Cat tembok
- Cat Dasar 5 Kg Rp 110,000.00
- Cat Akhir/Finishing 5 Kg Rp 179,800.00
2 Cat kayu
- Meni Kayu Kg Rp 21,131.25 84,525.00

- Cat Finishing KG Rp 76,500.00


3 Cat anti bocor
- Nodrop 4 Kg Rp 190,900.00
4 Cat atap
- Meni besi kg Rp -
- NIPPON kg Rp 65,000.00
- YOKO kg Rp 105,000.00
5 Plamur 5 Kg Rp 38,525.00
6 Minyak Cat (Tinner Biasa) Ltr Rp 7,475.00
7 Pengelasan Cm Rp 500.00
8 Bahan Residu Ltr Rp 27,500.00
9 Minyak Solar (Industri) Ltr Rp 8,500.00
10 Amplas lembar Rp 8,000.00
11 Dempul Kayu kg Rp 40,000.00
12 Lem Kayu kg Rp 27,500.00
13 Politur kg Rp 84,525.00

I BAHAN INSTALASI LISTRIK

1 Pipa Union untuk Kabel 5/8" - 4 m Batang Rp 20,000.00


2 Kabel Eterna NYY 2×1.5 Roll 50 m Rp 350,000.00
3 Lampu TL (Philips) 1x20 Watt Buah Rp 38,500.00
4 Lampu Sumpit (Philips)
23 Watt Buah Rp 36,500.00
18 Watt Buah Rp 33,000.00
14 Watt Buah Rp 30,000.00
5 Saklar Phase
Tunggal Putih IB Broco Buah Rp 12,362.50
Double Putih CH Broco Buah Rp 16,100.00
6 Stop Kontak Putih IB Broco Buah Rp 22,000.00
7 Fitting Buah Rp 14,063.00
8 Box Sekring Buah Rp 85,575.00
9 MCB Buah Rp 132,250.00
J BAHAN SANITASI
1 Pipa PVC 3" paralon Class D 4 M Batang Rp 164,000.00
2 Pipa PVC 1" paralon Class D 4 M Batang Rp 41,000.00
HARGA BAHAN DAN UPAH KERJA
KABUPATEN LUWU T.A. 2016

NO JENIS BAHAN SATUAN HARGA BAHAN KET.


1 2 3 4 5
3 Pipa PVC 3/4" paralon SNI 6 M Batang Rp 38,500.00
4 Kran air 3/4" besi Buah Rp 27,500.00
5 Kloset Jongkok Buah Rp 195,500.00
6 Floor Drain TX1C Buah Rp 27,500.00
K UPAH
1 Pekerja oh Rp 65,000.00
2 Tukang oh Rp 80,000.00
3 Kepala Tukang oh Rp 100,000.00
4 Mandor oh Rp 100,000.00
KET.
5

/Kg

/Kg

/Kg

/Kg

/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh

/Bh
/Bh
/Bh
/Bh

m2
KET.
5
m2

4 meter

53900
KET.
5

4 kg
KET.
5
ANALISA BIAYA KONSTRUKSI (SNI 2007)

Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

1 1M PENGUKURAN DAN PEMASANGAN BOUPLANK


- Kayu Balok 0.0120 m3 Rp 1,980,000.00 Rp 23,760.00
- Paku Biasa 0.0200 Kg Rp 20,000.00 Rp 400.00
- Kayu Papan 0.0070 m3 Rp 1,980,000.00 Rp 13,860.00
- Pekerja 0.1000 oh Rp 65,000.00 Rp 6,500.00
- Tukang Batu 0.1000 oh Rp 80,000.00 Rp 8,000.00
- Kepala Tukang 0.0100 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.0050 oh Rp 100,000.00 Rp 500.00
Rp 54,020.00
2 1 M3 GALIAN TANAH BIASA
- Pekerja 0.7500 oh Rp 65,000.00 Rp 48,750.00
- Mandor 0.0250 oh Rp 100,000.00 Rp 2,500.00
Rp 51,250.00
3 1 M3 URUGAN KEMBALI
- Pekerja 0.1920 oh Rp 65,000.00 Rp 12,480.00
- Mandor 0.0190 oh Rp 100,000.00 Rp 1,900.00
Rp 14,380.00
4 1 M3 URUGAN PASIR
- Pasir Urug 1.2000 m3 Rp 114,700.00 Rp 137,640.00
- Pekerja 0.3000 oh Rp 65,000.00 Rp 19,500.00
- Mandor 0.0100 oh Rp 100,000.00 Rp 1,000.00
Rp 158,140.00
5 1 M3 URUGAN SIRTU
- Sirtu 1.2000 m3 Rp 62,000.00 Rp 74,400.00
- Pekerja 0.2500 oh Rp 65,000.00 Rp 16,250.00
- Mandor 0.0250 oh Rp 100,000.00 Rp 2,500.00
Rp 93,150.00
6 1 M3 PAS.PONDASI BATU KOSONG
- Batu Kali 1.2000 m3 Rp 137,500.00 Rp 165,000.00
- Pasir Urug 0.4320 m3 Rp 114,700.00 Rp 49,550.40
- Pekerja 0.7800 oh Rp 65,000.00 Rp 50,700.00
- Tukang Batu 0.3900 oh Rp 80,000.00 Rp 31,200.00
- Kepala tukang 0.0390 oh Rp 100,000.00 Rp 3,900.00
- mandor 0.0390 oh Rp 100,000.00 Rp 3,900.00
Rp 304,250.40
7 1 M3 PAS.PONDASI BATU KALI 1 : 4
- Batu Kali 1.2000 m3 Rp 137,500.00 Rp 165,000.00
- Semen Portland 163.0000 kg Rp 1,300.00 Rp 211,900.00
- Pasir Pasangan 0.5200 m3 Rp 137,500.00 Rp 71,500.00
- Pekerja 1.5000 oh Rp 65,000.00 Rp 97,500.00
- Tukang Batu 0.7500 oh Rp 80,000.00 Rp 60,000.00
- Kepala tukang 0.0750 oh Rp 100,000.00 Rp 7,500.00
- mandor 0.0750 oh Rp 100,000.00 Rp 7,500.00
Rp 620,900.00
8 1 M2 PAS.BATU BATA 1/2 BATU 1 : 4
- Bata merah 5x11x22 cm 70.000 bh Rp 700.00 Rp 49,000.00
- Semen portland 11.500 kg Rp 1,300.00 Rp 14,950.00
- Pasir pasang 0.043 m3 Rp 137,500.00 Rp 5,912.50
- Pekerja 0.300 oh Rp 65,000.00 Rp 19,500.00
- Tukang batu 0.100 oh Rp 80,000.00 Rp 8,000.00
- Kepala tukang 0.010 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.015 oh Rp 100,000.00 Rp 1,500.00
Rp 99,862.50
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

9 1 M2 PLESTERAN 1 : 4 T 15 MM
- Semen portland 6.2400 kg Rp 1,300.00 Rp 8,112.00
- Pasir Pasangan 0.0240 m3 Rp 137,500.00 Rp 3,300.00
- Pekerja 0.3000 oh Rp 65,000.00 Rp 19,500.00
- Tukang Batu 0.1500 oh Rp 80,000.00 Rp 12,000.00
- Kepala tukang 0.0150 oh Rp 100,000.00 Rp 1,500.00
- Mandor 0.0150 oh Rp 100,000.00 Rp 1,500.00
Rp 45,912.00
10 1 M2 PLESTERAN 1 : 4 T 20 MM
- Semen Portland 8.320 kg Rp 1,300.00 Rp 10,816.00
- Pasir Pasangan 0.032 m3 Rp 137,500.00 Rp 4,400.00
- Pekerja 0.400 oh Rp 65,000.00 Rp 26,000.00
- Tukang Batu 0.200 oh Rp 80,000.00 Rp 16,000.00
- Kepala tukang 0.020 oh Rp 100,000.00 Rp 2,000.00
- mandor 0.022 oh Rp 100,000.00 Rp 2,200.00
Rp 61,416.00
11 10 M2 Acian
- Semen Portland 3.250 kg Rp 1,300.00 Rp 4,225.00
- Pekerja 0.200 oh Rp 65,000.00 Rp 13,000.00
- Tukang Batu 0.100 oh Rp 80,000.00 Rp 8,000.00
- Kepala tukang 0.010 oh Rp 100,000.00 Rp 1,000.00
- mandor 0.010 oh Rp 100,000.00 Rp 1,000.00
Rp 27,225.00
12 1 M2 PAS. RANGKA ATAP BAJA RINGAN
- Main Truss C.75 2.8000 m Rp 13,333.33 Rp 37,333.33
- Roof Bottom/Reng R.33.0,45 5.1000 m Rp 9,833.33 Rp 50,150.00
- Screw Dia 6x20 mm 25.0000 bh Rp 350.00 Rp 8,750.00
- Screw Dia 4x20 mm 35.0000 bh Rp 300.00 Rp 10,500.00
Dynabolt M10*100mm
- 1.0000 bh Rp 1,500.00 Rp 1,500.00
- Peralatan 1.0000 ls Rp 3,000.00 Rp 3,000.00
- Pekerja 0.2470 oh Rp 65,000.00 Rp 16,055.00
- Tukang 0.1740 oh Rp 80,000.00 Rp 13,920.00
- Kepala Tukang 0.1170 oh Rp 100,000.00 Rp 11,700.00
- mandor 0.0590 oh Rp 100,000.00 Rp 5,900.00
Rp 158,808.33
13 1 M PAS. LISTPLANK ASBES PLAT RAM KAYU
- Kayu Kelas II 0.0070 m3 Rp 3,250,000.00 Rp 22,750.00
- Asbes Plat 1.0000 m2 Rp 15,000.00 tidak
- Screw Dia 6x50 mm 7.0000 bh Rp 500.00 Rp 3,500.00
- Pekerja 0.6000 oh Rp 65,000.00 Rp 39,000.00
- Tukang Kayu 1.8000 oh Rp 80,000.00 Rp 144,000.00
- Kepala Tukang 0.1800 oh Rp 100,000.00 Rp 18,000.00
- mandor 0.0300 oh Rp 100,000.00 Rp 3,000.00
Rp 230,250.00
14 1M2 PAS. RANGKA LANGIT-LANGIT 60x120
- Kayu Kelas III Balok 5/5 0.0069 m3 Rp 2,640,000.00 Rp 18,150.00
- Paku Biasa 0.1000 Kg Rp 20,000.00 Rp 2,000.00
- Pekerja 0.1500 oh Rp 65,000.00 Rp 9,750.00
- Tukang Kayu 0.2500 oh Rp 80,000.00 Rp 20,000.00
- Kepala Tukang 0.0250 oh Rp 100,000.00 Rp 2,500.00
- Mandor 0.0750 oh Rp 100,000.00 Rp 7,500.00
Rp 59,900.00
15 1M PAS. LIST PROFIL
- List Profil 4 x 4 cm 1.0500 m Rp 3,750.00 Rp 3,937.50
- Paku Tripleks 0.0100 Kg Rp 25,350.00 Rp 253.50
- Pekerja 0.0500 oh Rp 65,000.00 Rp 3,250.00
- Tukang Kayu 0.0500 oh Rp 80,000.00 Rp 4,000.00
- Kepala Tukang 0.0050 oh Rp 100,000.00 Rp 500.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

- Mandor 0.0300 oh Rp 100,000.00 Rp 3,000.00


Rp 14,941.00
16 1 M3 LANTAI FLOOR f'c=7,4 MPa (K100)
- Semen Portland 247.0000 kg Rp 1,300.00 Rp 321,100.00
- Pasir Beton 869.0000 kg Rp 98.21 Rp 85,348.21
- Kerikil beton 999.0000 kg Rp 76.39 Rp 76,312.50
- Air 215.0000 Ltr Rp 50.00 Rp 10,750.00
- Pekerja 1.6500 oh Rp 65,000.00 Rp 107,250.00
- Tukang Batu 0.2750 oh Rp 80,000.00 Rp 22,000.00
- Kepala Tukang 0.0280 oh Rp 100,000.00 Rp 2,800.00
- Mandor 0.0830 oh Rp 100,000.00 Rp 8,300.00
Rp 633,860.71
17 1 KG PEMBESIAN DENGAN BESI POLOS
- Besi beton 1.0500 kg Rp 10,900.00 Rp 11,445.00
- Kawat Beton 0.0150 kg Rp 22,000.00 Rp 330.00
- Pekerja 0.0070 Oh Rp 65,000.00 Rp 455.00
- Tukang Besi 0.0070 Oh Rp 80,000.00 Rp 560.00
- Kepala tukang 0.0007 Oh Rp 100,000.00 Rp 70.00
- Mandor 0.0003 Oh Rp 100,000.00 Rp 30.00
Rp 12,890.00
18 1 M2 BEKISTING PONDASI POER
- Kayu mall 0.0400 m3 Rp 1,980,000.00 Rp 79,200.00
- Paku 5 cm – 10 cm 0.3000 kg Rp 20,000.00 Rp 6,000.00
- Minyak bekisting 0.1000 Liter Rp 8,500.00 Rp 850.00
- Pekerja 0.5200 OH Rp 65,000.00 Rp 33,800.00
- Tukang kayu 0.2600 OH Rp 80,000.00 Rp 20,800.00
- Kepala tukang 0.0260 OH Rp 100,000.00 Rp 2,600.00
- Mandor 0.0260 OH Rp 100,000.00 Rp 2,600.00
JUMLAH UPAH= Rp 59,800.00
KAYU FULL = Rp 79,200.00
JUMLAH = Rp 145,850.00
19 1 M2 BEKISTING SLOOF
- Kayu mall 0.0300 m3 Rp 1,980,000.00 Rp 59,400.00
- Paku 5 cm – 10 cm 0.3000 kg Rp 20,000.00 Rp 6,000.00
- Minyak bekisting 0.1000 Liter Rp 8,500.00 Rp 850.00
- Pekerja 0.5200 OH Rp 65,000.00 Rp 33,800.00
- Tukang kayu 0.2600 OH Rp 80,000.00 Rp 20,800.00
- Kepala tukang 0.0260 OH Rp 100,000.00 Rp 2,600.00
- Mandor 0.0260 OH Rp 100,000.00 Rp 2,600.00
JUMLAH UPAH= Rp 59,800.00
KAYU FULL = Rp 59,400.00
JUMLAH = Rp 126,050.00
20 1 M2 BEKISTING KOLOM
- Kayu mall 0.0300 m3 Rp 1,980,000.00 Rp 59,400.00
- Paku 5 cm – 12 cm 0.4000 kg Rp 20,000.00 Rp 8,000.00
- Minyak bekisting 0.2000 Liter Rp 8,500.00 Rp 1,700.00
- Balok kayu mall 0.0150 m3 Rp 1,980,000.00 Rp 29,700.00
- Tripleks tebal 3 mm 0.3500 Lbr Rp 65,000.00 tidak
- Dolken kayu galam, 2.0000 btg Rp 8,050.00 Rp 16,100.00
- Pekerja 0.6600 OH Rp 65,000.00 Rp 42,900.00
- Tukang kayu 0.3300 OH Rp 80,000.00 Rp 26,400.00
- Kepala tukang 0.0330 OH Rp 100,000.00 Rp 3,300.00
- Mandor 0.0330 OH Rp 100,000.00 Rp 3,300.00
JUMLAH UPAH= Rp 75,900.00
KAYU 2 KALI PAKAI = Rp 44,550.00
JUMLAH = Rp 146,250.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

21 1 M2 BEKISTING RING BALK


- Kayu mall 0.0300 m3 Rp 1,980,000.00 Rp 59,400.00
- Paku 5 cm – 12 cm 0.4000 kg Rp 20,000.00 Rp 8,000.00
- Minyak bekisting 0.2000 Liter Rp 8,500.00 Rp 1,700.00
- Balok kayu mall 0.0180 m3 Rp 1,980,000.00 Rp 35,640.00
- Plywood tebal 9 mm 0.3500 Lbr Rp 121,800.00 tidak
- Dolken kayu galam, 2.0000 btg Rp 8,050.00 Rp 16,100.00
- Pekerja 0.6600 OH Rp 65,000.00 Rp 42,900.00
- Tukang kayu 0.3300 OH Rp 80,000.00 Rp 26,400.00
- Kepala tukang 0.0330 OH Rp 100,000.00 Rp 3,300.00
- Mandor 0.0330 OH Rp 100,000.00 Rp 3,300.00
JUMLAH UPAH= Rp 75,900.00
KAYU 2 KALI PAKAI = Rp 47,520.00
JUMLAH = Rp 149,220.00
22 1 M2 BEKISTING LANTAI
- Kayu Mall 0.0400 m3 Rp 1,980,000.00 Rp 79,200.00
- Paku 5 cm – 12 cm 0.4000 kg Rp 20,000.00 Rp 8,000.00
- Minyak bekisting 0.2000 Liter Rp 8,500.00 Rp 1,700.00
- Balok kayu Mall 0.0150 m3 Rp 1,980,000.00 Rp 29,700.00
- Tripleks tebal 3 mm 0.3500 Lbr Rp 65,000.00 Rp 22,750.00
- Dolken kayu galam, 6.0000 btg Rp 8,050.00 Rp 48,300.00
- Pekerja 0.6600 OH Rp 65,000.00 Rp 42,900.00
- Tukang kayu 0.3300 OH Rp 80,000.00 Rp 26,400.00
- Kepala tukang 0.0330 OH Rp 100,000.00 Rp 3,300.00
- Mandor 0.0330 OH Rp 100,000.00 Rp 3,300.00
JUMLAH UPAH= Rp 75,900.00
KAYU FULL = Rp 108,900.00
JUMLAH = Rp 265,550.00
23 1 M3 MEMBUAT BETON MUTU K 175
- Semen portland 326.0000 kg Rp 1,300.00 Rp 423,800.00
- Pasir beton 760.0000 m3 Rp 98.21 Rp 74,642.86
- Split 1,029.0000 m3 Rp 76.39 Rp 78,604.17
- Air 215.0000 Ltr Rp 50.00 Rp 10,750.00
- Pekerja 1.6500 OH Rp 65,000.00 Rp 107,250.00
- Tukang batu 1.2750 OH Rp 80,000.00 Rp 102,000.00
- Kepala tukang 0.0280 OH Rp 100,000.00 Rp 2,800.00
- Mandor 0.0830 OH Rp 100,000.00 Rp 8,300.00
Rp 808,147.02
24 1 M2 PAS. ATAP SPANDEC
- Seng Spandec 0.35 0.7000 m Rp 60,000.00 Rp 42,000.00
- Paku Sekrup 4 inc 0.0200 kg Rp 48,100.00 Rp 962.00
- Pekerja 0.1200 oh Rp 65,000.00 Rp 7,800.00
- Tukang Kayu 0.0600 oh Rp 80,000.00 Rp 4,800.00
- Kepala Tukang 0.0060 oh Rp 100,000.00 Rp 600.00
- Mandor 0.0060 oh Rp 100,000.00 Rp 600.00
Jumlah Rp 56,762.00
25 1 M2 PAS. NOK SENG
- Seng Plat 0.3000 lbr Rp 30,000.00 Rp 9,000.00
- Paku Biasa 0.0400 kg Rp 20,000.00 Rp 800.00
- Pekerja 0.1500 oh Rp 65,000.00 Rp 9,750.00
- Tukang Kayu 0.0700 oh Rp 80,000.00 Rp 5,600.00
- Kepala Tukang 0.0080 oh Rp 100,000.00 Rp 800.00
- Mandor 0.0060 oh Rp 100,000.00 Rp 600.00
Rp 26,550.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

26 1 M2 PASANG 1 M2 LANGIT-LANGIT (120 x 240) CM, TEBAL 3 MM


- Tripleks 3 mm 0.3750 lbr Rp 65,000.00 Rp 24,375.00
- Paku Tripleks 0.0300 kg Rp 25,350.00 Rp 760.50
- Pekerja 0.0700 oh Rp 65,000.00 Rp 4,550.00
- Tukang Kayu 0.1000 oh Rp 80,000.00 Rp 8,000.00
- Kepala Tukang 0.0100 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.0035 oh Rp 100,000.00 Rp 350.00
Jumlah Rp 39,035.50
27 1 M2 PAS. LANTAI KERAMIK
- Tegel Keramik 30 x 30 cm (Putih) 11.870 bh Rp 7,002.00 Rp 83,113.75
- Semen Portland 10.000 kg Rp 1,300.00 Rp 13,000.00
- Pasir Pasang 0.045 m3 Rp 137,500.00 Rp 6,187.50
- Semen Warna 1.500 kg Rp 20,000.00 Rp 30,000.00
- Pekerja 0.260 oh Rp 65,000.00 Rp 16,900.00
- Tukang Batu 0.130 oh Rp 80,000.00 Rp 10,400.00
- Kepala Tukang 0.013 oh Rp 100,000.00 Rp 1,300.00
- Mandor 0.013 oh Rp 100,000.00 Rp 1,300.00
Tegel Keramik 30 x 30 cm Rp 162,201.25
28 1 M2 PAS. DINDING KERAMIK
- Tegel Keramik 30 x 30 cm (Putih) 11.870 bh Rp 7,002.00 Rp 83,113.75
- Semen Portland 9.300 kg Rp 1,300.00 Rp 12,090.00
- Pasir Pasang 0.018 m3 Rp 137,500.00 Rp 2,475.00
- Semen Warna 1.940 kg Rp 20,000.00 Rp 38,800.00
- Pekerja 0.900 oh Rp 65,000.00 Rp 58,500.00
- Tukang Batu 0.450 oh Rp 80,000.00 Rp 36,000.00
- Kepala Tukang 0.045 oh Rp 100,000.00 Rp 4,500.00
- Mandor 0.045 oh Rp -
Tegel Keramik 30 x 30 cm Rp 235,478.75
29 1 M2 PENGECATAN DINDING
- Plamour 0.1000 kg Rp 7,705.00 Rp 770.50
- Cat Dasar 0.1000 kg Rp 35,960.00 Rp 3,596.00
- Cat Penutup 2 x 0.2600 kg Rp 22,000.00 Rp 5,720.00
- Pekerja 0.0200 oh Rp 65,000.00 Rp 1,300.00
- Tukang Cat 0.0630 oh Rp 80,000.00 Rp 5,040.00
- Kepala Tukang 0.0063 oh Rp 100,000.00 Rp 630.00
- Mandor 0.0025 oh Rp 100,000.00 Rp 250.00
Jumlah Rp 17,306.50
30 1 M2 PENGECATAN PLAFON
- Cat Dasar 0.1200 kg Rp 22,000.00 Rp 2,640.00
- Cat Penutup 3 x 0.1800 kg Rp 35,960.00 Rp 6,472.80
- Pekerja 0.0280 oh Rp 65,000.00 Rp 1,820.00
- Tukang Cat 0.0420 oh Rp 80,000.00 Rp 3,360.00
- Kepala Tukang 0.0042 oh Rp 100,000.00 Rp 420.00
- Mandor 0.0025 oh Rp 100,000.00 Rp 250.00
Jumlah Rp 14,962.80
31 1 M2 PENGECATAN KAYU
- Cat Meni 0.2000 kg Rp 21,131.25 Rp 4,226.25
- Plamour 0.1500 kg Rp 7,705.00 Rp 1,155.75
- Cat Penutup 3 x 0.3500 kg Rp 76,500.00 Rp 26,775.00
- Pekerja 0.0700 oh Rp 65,000.00 Rp 4,550.00
- Tukang Cat 0.1050 oh Rp 80,000.00 Rp 8,400.00
- Kepala Tukang 0.0040 oh Rp 100,000.00 Rp 400.00
- Mandor 0.0025 oh Rp 100,000.00 Rp 250.00
Jumlah Rp 45,757.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

32 1 M2 PENGECATAN ATAP
- Cat 0.3000 kg Rp 65,000.00 Rp 19,500.00
- Pekerja 0.0060 oh Rp 65,000.00 Rp 390.00
- Tukang Cat 0.0600 oh Rp 80,000.00 Rp 4,800.00
- Kepala Tukang 0.0120 oh Rp 100,000.00 Rp 1,200.00
- Mandor 0.0060 oh Rp 100,000.00 Rp 600.00
Jumlah Rp 26,490.00
33 1 M2 PEK. PINTU PANIL KAYU KLS II (Bitti)
- Papan kayu 0.040 m3 Rp 3,250,000.00 Rp 130,000.00
- Lem kayu 0.500 kg Rp 27,500.00 Rp 13,750.00
- Pekerja 1.000 OH Rp 65,000.00 Rp 65,000.00
- Tukang kayu 3.000 OH Rp 80,000.00 Rp 240,000.00
- Kepala tukang 0.300 OH Rp 100,000.00 Rp 30,000.00
- Mandor 0.050 OH Rp 100,000.00 Rp 5,000.00
Jumlah Rp 483,750.00
34 1 M3 PEK. KUSEN PINTU KAYU KLS II (Bitti)
1.2 - Kayu KLS II 1.1000 m3 Rp 3,250,000.00 Rp 3,575,000.00
- Paku 10 cm 1.25 kg Rp 20,000.00 Rp 25,000.00
- Lem kayu 1 kg Rp 27,500.00 Rp 27,500.00
- Pekerja 6.0000 oh Rp 65,000.00 Rp 390,000.00
- Tukang Kayu 18.0000 oh Rp 80,000.00 Rp 1,440,000.00
- Kepala Tukang 2.0000 oh Rp 100,000.00 Rp 200,000.00
- Mandor 0.0300 oh Rp 100,000.00 Rp 3,000.00
Jumlah Rp 5,660,500.00
35 1 M2 PEK. JALUSI KUSEN KAYU KLS II
- Papan KLS II 0.0330 m3 Rp 3,250,000.00 Rp 107,250.00
- Paku 1 cm - 2.5 cm 0.1500 kg Rp 20,000.00 Rp 3,000.00
- Pekerja 0.6700 oh Rp 65,000.00 Rp 43,550.00
- Tukang Kayu 2.0000 oh Rp 80,000.00 Rp 160,000.00
- Kepala Tukang 0.2000 oh Rp 100,000.00 Rp 20,000.00
- Mandor 0.0335 oh Rp 100,000.00 Rp 3,350.00
Jumlah Rp 337,150.00
36 1 M2 MEMBUAT DAN MEMASANG 1 M2 JENDELA KACA, KAYU KELAS II
- Papan kayu klas II 0.024 m3 Rp 3,250,000.00 Rp 78,000.00
- Kaca Polos 5 mm 1.1 m2 Rp 214,500.00 Rp 235,950.00
- Lem kayu 0.3 kg Rp 27,500.00 Rp 8,250.00
- Pekerja 0.8 OH Rp 65,000.00 Rp 52,000.00
- Tukang kayu 2.4 OH Rp 80,000.00 Rp 192,000.00
- Kepala tukang 0.24 OH Rp 100,000.00 Rp 24,000.00
- Mandor 0.04 OH Rp 100,000.00 Rp 4,000.00
Jumlah Rp 594,200.00
37 1 M2 PAS. KACA POLOS TEBAL 5 MM
- Kaca Polos 1.100 m2 Rp 214,500.00 Rp 235,950.00
- Pekerja 0.015 Oh Rp 65,000.00 Rp 975.00
- Tukang kayu 0.150 Oh Rp 80,000.00 Rp 12,000.00
- Kepala tukang 0.015 Oh Rp 100,000.00 Rp 1,500.00
- Mandor 0.001 Oh Rp 100,000.00 Rp 75.00
Jumlah Rp 250,500.00
38 1 M2 PAS. KUNCI TANAM 2 SLAG
- Kunci Tanam Biasa 1.0000 bh Rp 65,000.00 Rp 65,000.00
- Pekerja 0.0100 oh Rp 65,000.00 Rp 650.00
- Tukang Kayu 0.5000 oh Rp 80,000.00 Rp 40,000.00
- Kepala Tukang 0.0100 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.0050 oh Rp 100,000.00 Rp 500.00
Jumlah Rp 107,150.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

39 1 M2 PAS. ENGSEL PINTU


- Engsel Pintu 1.0000 bh Rp 13,033.33 Rp 13,033.33
- Pekerja 0.0150 oh Rp 65,000.00 Rp 975.00
- Tukang Kayu 0.1500 oh Rp 80,000.00 Rp 12,000.00
- Kepala Tukang 0.0150 oh Rp 100,000.00 Rp 1,500.00
- Mandor 0.0008 oh Rp 100,000.00 Rp 75.00
Jumlah Rp 27,583.33
40 1 M2 PAS. ENGSEL JENDELA
- Engsel Jendela 1.000 bh Rp 11,500.00 Rp 11,500.00
- Pekerja 0.010 oh Rp 65,000.00 Rp 650.00
- Tukang Kayu 0.100 oh Rp 80,000.00 Rp 8,000.00
- Kepala Tukang 0.010 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.001 oh Rp 100,000.00 Rp 50.00
Jumlah Rp 21,200.00
41 1 M2 PAS. Pasang Kait angin
- Kait Angin 1.000 bh Rp 18,700.00 Rp 18,700.00
- Pekerja 0.015 oh Rp 65,000.00 Rp 975.00
- Tukang Kayu 0.150 oh Rp 80,000.00 Rp 12,000.00
- Kepala Tukang 0.015 oh Rp 100,000.00 Rp 1,500.00
- Mandor 0.001 oh Rp 100,000.00 Rp 75.00
Jumlah Rp 33,250.00
42 1 M2 PEK. ANTI RAYAP
- Bahan Anti Rayap + Peralatan 1.0000 m2 Rp 27,500.00 Rp 27,500.00
- Pekerja 0.1000 oh Rp 65,000.00 Rp 6,500.00
- Tukang 0.0500 oh Rp 80,000.00 Rp 4,000.00
- Kepala Tukang 0.0100 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.0250 oh Rp 100,000.00 Rp 2,500.00
Jumlah Rp 20,750.00
43 1ttk Titik Nyala Pek. Listrik
- Kabel Ganda NYM 2*1.5 mm 10 m Rp 7,000.00 Rp 70,000.00
- Pipa PVC E 5/8 " (Union ) 2 Btg
- Alat Bantu 10 % dari Jumlah Harga 0.1 % Rp 700.00 Rp 700.00
- Pekerja 0.5 Oh Rp 65,000.00 Rp 32,500.00
- Tukang batu 0.2 Oh Rp 80,000.00 Rp 16,000.00
- Kepala tukang 0.1 Oh Rp 100,000.00 Rp 10,000.00
- Mandor 0.02 Oh Rp 100,000.00 Rp 2,000.00
Rp 131,200.00
44 1bh Titik Nyala Pek. Listrik
- Saklar Tunggal 1 buah Rp 12,362.50 Rp 12,362.50
- Saklar Ganda 1 buah Rp 16,100.00 Rp 16,100.00
- Stop Kontak 1 buah Rp 22,000.00 Rp 22,000.00
- Fitting Lampu 1 buah Rp 14,063.00 Rp 14,063.00
- MCB 1 buah Rp 132,250.00 Rp 132,250.00
- Tukang Listrik 0.3 Oh Rp 80,000.00 Rp 24,000.00
Saklar Tunggal Rp 12,362.50
Saklar Ganda Rp 16,100.00
Stop Kontak Rp 22,000.00
Fitting Lampu Rp 14,063.00
MCB Rp 132,250.00
45 1bh BUAH MEMASANG LAMPU
- Lampu Sumpit 23 watt 1 buah Rp 36,500.00 Rp 36,500.00
- Lampu Sumpit 18 watt 1 buah Rp 33,000.00 Rp 33,000.00
- Pekerja 0.2 Oh Rp 65,000.00 Rp 13,000.00
Lampu Sumpit 23 watt Rp 36,500.00
Lampu Sumpit 18 watt Rp 33,000.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

46 1M1 Memasang 1 m' Pipa PVC tipe AW Ø 3"


- Pipa PVC tipe AW Ø 3" 1.2 m1 Rp 41,000.00 Rp 49,200.00
- Perlengkapan 35% 0.35 ls Rp 14,350.00 Rp 14,350.00
- Pekerja 0.036 OH Rp 65,000.00 Rp 2,340.00
- Tukang batu 0.060 OH Rp 80,000.00 Rp 4,800.00
- Kepala tukang 0.006 OH Rp 100,000.00 Rp 600.00
- Mandor 0.002 OH Rp 100,000.00 Rp 180.00
Rp 71,470.00
47 1M1 Memasang 1 m' Pipa PVC tipe AW Ø 3/4"
- Pipa PVC tipe AW Ø ¾" 1.200 m1 Rp 6,416.67 Rp 7,700.00
- Perlengkapan 0.350 ls Rp 2,245.83 Rp 2,245.83
- Pekerja 0.036 OH Rp 65,000.00 Rp 2,340.00
- Tukang batu 0.060 OH Rp 80,000.00 Rp 4,800.00
- Kepala tukang 0.006 OH Rp 100,000.00 Rp 600.00
- Mandor 0.002 OH Rp 100,000.00 Rp 180.00
Rp 17,865.83
48 1bh Memasang 1 bh Kran Ø ¾"
- Kran Air 3/4" 1 bh Rp 27,500.00 Rp 27,500.00
- Seal tape 0.025 bh Rp 5,000.00 Rp 125.00
- Pekerja 0.01 Oh Rp 65,000.00 Rp 650.00
- Tukang batu 0.1 Oh Rp 80,000.00 Rp 8,000.00
- Kepala tukang 0.01 Oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.005 Oh Rp 100,000.00 Rp 500.00
Rp 37,775.00
49 1bh Memasang 1 buah Kloset Jongkok Teraso
- Kloset Jongkok Teraso 1 bh Rp 195,500.00 Rp 195,500.00
- Bata merah 7 bh Rp 700.00 Rp 4,900.00
- Semen Portland 6 Kg Rp 1,300.00 Rp 7,800.00
- Pasir Pasang 0.01 m3 Rp 137,500.00 Rp 1,375.00
- Pekerja 1 Oh Rp 65,000.00 Rp 65,000.00
- Tukang batu 1.5 Oh Rp 80,000.00 Rp 120,000.00
- Kepala tukang 0.3 Oh Rp 100,000.00 Rp 30,000.00
- Mandor 0.11 Oh Rp 100,000.00 Rp 11,000.00
Rp 435,575.00
50 1bh Memasang 1 bh Floor Drain
- Floor Drain 1 bh Rp 27,500.00 Rp 27,500.00
- Pekerja 0.01 Oh Rp 65,000.00 Rp 650.00
- Tukang batu 0.1 Oh Rp 80,000.00 Rp 8,000.00
- Kepala tukang 0.01 Oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.005 Oh Rp 100,000.00 Rp 500.00
Rp 37,650.00
51 1 M2 PAS. LANTAI KERAMIK
- Tegel Keramik 20 x 20 cm (warna kasar) 26.500 bh Rp 4,200.00 Rp 111,300.00
- Semen Portland 10.400 kg Rp 1,300.00 Rp 13,520.00
- Pasir Pasang 0.045 m3 Rp 137,500.00 Rp 6,187.50
- Semen Warna 1.620 kg Rp 20,000.00 Rp 32,400.00
- Pekerja 0.700 oh Rp 65,000.00 Rp 45,500.00
- Tukang Batu 0.350 oh Rp 80,000.00 Rp 28,000.00
- Kepala Tukang 0.035 oh Rp 100,000.00 Rp 3,500.00
- Mandor 0.035 oh Rp 100,000.00 Rp 3,500.00
Tegel Keramik 20 x 20 cm Rp 243,907.50
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

52 1 M2 PAS. DINDING KERAMIK


- Tegel Keramik 20 x 20 cm (Warna/kasar 26.500 bh Rp 4,200.00 Rp 111,300.00
- Semen Portland 9.300 kg Rp 1,300.00 Rp 12,090.00
- Pasir Pasang 0.018 m3 Rp 137,500.00 Rp 2,475.00
- Semen Warna 1.940 kg Rp 20,000.00 Rp 38,800.00
- Pekerja 0.900 oh Rp 65,000.00 Rp 58,500.00
- Tukang Batu 0.450 oh Rp 80,000.00 Rp 36,000.00
- Kepala Tukang 0.045 oh Rp 100,000.00 Rp 4,500.00
- Mandor 0.045 oh Rp 100,000.00 Rp 4,500.00
Tegel Keramik 20 x 20 cm Rp 268,165.00
53 1M2 PAS. ATAP GENTENG METAL
- Atap Genteng Metal 0.3 mm (2x4) 1.6300 lbr Rp 60,000.00 Rp 97,800.00
- Paku Sekrup 0.2000 dos Rp 22,100.00 Rp 4,420.00
- Pekerja 0.2000 oh Rp 65,000.00 Rp 13,000.00
- Tukang Kayu 0.1000 oh Rp 80,000.00 Rp 8,000.00
- Kepala Tukang 0.0100 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.0010 oh Rp 100,000.00 Rp 100.00
Rp 124,320.00
54 1 M2 PAS. NOK GENTENG METAL
- Nok Genteng Metal 1.1000 lbr Rp 40,000.00 Rp 44,000.00
- Paku Sekrup 0.0500 dos Rp 22,100.00 Rp 1,105.00
- Pekerja 0.2500 oh Rp 65,000.00 Rp 16,250.00
- Tukang Kayu 0.1500 oh Rp 80,000.00 Rp 12,000.00
- Kepala Tukang 0.0150 oh Rp 100,000.00 Rp 1,500.00
- Mandor 0.0130 oh Rp 100,000.00 Rp 1,300.00
Rp 76,155.00
55 1 M2 PAS. Kawat Harmonika
- Kawat harmonika 2.1mm (BWG 14) 40* 1.1000 M2 Rp 30,000.00 Rp 33,000.00
- Paku biasa ½" - 1" 0.0200 kg Rp 20,000.00 Rp 400.00
- Papan kayu kamper 0.0018 M3 Rp 2,640,000.00 Rp 4,752.00
- Pekerja 0.1000 Oh Rp 65,000.00 Rp 6,500.00
- Tukang kayu 0.1000 Oh Rp 80,000.00 Rp 8,000.00
- Kepala tukang 0.0100 Oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.0050 Oh Rp 100,000.00 Rp 500.00
Tegel Keramik 20 x 20 cm Rp 54,152.00
56 1M3 PAS.KUDA-KUDA KAYU
- Kayu Kelas III 1.1000 kg Rp 2,640,000.00 Rp 2,904,000.00
- Paku Biasa 0.8000 bh Rp 20,000.00 Rp 16,000.00
- Basi Strip 15.0000 bh Rp 4,531.25 Rp 67,968.75
- Pekerja 4.0000 kg Rp 65,000.00 Rp 260,000.00
- Tukang Kayu 12.0000 kg Rp 80,000.00 Rp 960,000.00
- Kepala Tukang 1.2000 kg Rp 100,000.00 Rp 120,000.00
- mandor 0.2000 kg Rp 100,000.00 Rp 20,000.00
Rp 4,347,968.75
57 1M3 PAS. GORDING KAYU KLS III
- Kayu Kelas III 1.1000 m3 Rp 2,640,000.00 Rp 2,904,000.00
- Paku Biasa 3.0000 bh Rp 20,000.00 Rp 60,000.00
- Basi Strip 15.0000 m3 Rp 4,531.25 Rp 67,968.75
- Pekerja 2.4000 kg Rp 65,000.00 Rp 156,000.00
- Tukang Kayu 7.2000 kg Rp 80,000.00 Rp 576,000.00
- Kepala Tukang 0.7200 kg Rp 100,000.00 Rp 72,000.00
- mandor 0.1200 kg Rp 100,000.00 Rp 12,000.00
Rp 3,847,968.75
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6

58 1M3 PAS. KASO DAN RENG KAYU KLS III


- Kaso-kaso (5 x 7) Kelas III 0.0140 m3 Rp 2,640,000.00 Rp 36,960.00
Reng (2 x 3) cm 0.0360 m3 Rp 2,640,000.00 Rp 95,040.00
- Paku Biasa 0.2500 kg Rp 20,000.00 Rp 5,000.00
- Pekerja 0.1000 kg Rp 65,000.00 Rp 6,500.00
- Tukang Kayu 0.1000 kg Rp 80,000.00 Rp 8,000.00
- Kepala Tukang 0.0100 kg Rp 100,000.00 Rp 1,000.00
- mandor 0.0050 kg Rp 100,000.00 Rp 500.00
Rp 153,000.00
59 1M PAS. LISPLANK KAYU KLS III
- Kayu Kelas III 0.0086 m3 Rp 2,640,000.00 Rp 22,704.00
- Paku Biasa 0.0600 kg Rp 20,000.00 Rp 1,200.00
- Pekerja 0.1000 oh Rp 65,000.00 Rp 6,500.00
- Tukang Kayu 0.1000 oh Rp 80,000.00 Rp 8,000.00
- Kepala Tukang 0.0100 oh Rp 100,000.00 Rp 1,000.00
- mandor 0.0500 oh Rp 100,000.00 Rp 5,000.00
Rp 44,404.00
60 1M2 PAS. ATAP SENG GELOMBANG BESAR
- Seng Gelombang 3" x 6" BJLS 28 0.700 Lbr Rp 46,200.00 Rp 32,340.00
- Paku Seng 0.020 Kg Rp 27,500.00 Rp 550.00
- Pekerja 0.120 Oh Rp 65,000.00 Rp 7,800.00
- Tukang kayu 0.060 Oh Rp 80,000.00 Rp 4,800.00
- Kepala tukang 0.006 Oh Rp 100,000.00 Rp 600.00
- Mandor 0.006 Oh Rp 100,000.00 Rp 600.00
Jumlah Rp 46,690.00
61 1 M2 PAS. ATAP NOK SENG
- Seng Plat 3" x 6" BJLS 28 0.300 Lbr Rp 56,000.00 Rp 16,800.00
- Paku Seng 0.040 Kg Rp 27,500.00 Rp 1,100.00
- Pekerja 0.015 Oh Rp 65,000.00 Rp 975.00
- Tukang kayu 0.070 Oh Rp 80,000.00 Rp 5,600.00
- Kepala tukang 0.008 Oh Rp 100,000.00 Rp 800.00
- Mandor 0.006 Oh Rp 100,000.00 Rp 600.00
Rp 25,875.00
62 1M2 Memasang 1 m3 konstruksi kayu konvensional
- Balok kayu kelas III 1.10 m3 Rp 2,640,000.00 Rp 2,904,000.00
- Pekerja 4.00 OH Rp 65,000.00 Rp 260,000.00
- Tukang kayu 12.00 OH Rp 80,000.00 Rp 960,000.00
- Kepala tukang 1.20 OH Rp 100,000.00 Rp 120,000.00
- Mandor 0.20 OH Rp 100,000.00 Rp 20,000.00
Jumlah Rp 4,264,000.00
63 1 M2 Memasang 1 m3 lantai papan ukuran (3 x 20) cm, kayu kelas II
- Papan Kayu kls. III 1.10 m3 Rp 2,640,000.00 Rp 2,904,000.00
- Paku 7 cm 5.60 kg Rp 20,000.00 Rp 112,000.00
- Pekerja 4.00 OH Rp 65,000.00 Rp 260,000.00
- Tukang kayu 12.00 OH Rp 80,000.00 Rp 960,000.00
- Kepala tukang 1.20 OH Rp 100,000.00 Rp 120,000.00
- Mandor 0.20 OH Rp 100,000.00 Rp 20,000.00
Rp 4,376,000.00
64 1 M2 Memasang 1 m2 dinding bilik, rangka kayu kelas III
- Papan Kayu kls. III 0.03 m3 Rp 2,640,000.00 Rp 72,600.00
- Kaso-kaso (5 x 7) cm 0.007 m3 Rp 2,640,000.00 Rp 18,480.00
- Paku 7 cm 0.012 kg Rp 20,000.00 Rp 240.00
- Pekerja 0.100 OH Rp 65,000.00 Rp 6,500.00
- Tukang kayu 0.050 OH Rp 80,000.00 Rp 4,000.00
- Kepala tukang 0.005 OH Rp 100,000.00 Rp 500.00
- Mandor 0.005 OH Rp 100,000.00 Rp 500.00
Rp 102,820.00
ANALISA BIAYA PEKERJAAN BESI TERALI JENDELA
1M1 PEKERJAAN BESI PENGAMAN

1. Bahan
▪ BESI dia 12 1.10 m' x Rp. 8,708.33 = Rp. 9,579.17
▪ Besi strip 3/20 6m (2.4 kg) 1.10 m' x Rp. 7,920.00 = Rp. 8,712.00
▪ Biaya Las 5.00 ttk x Rp. 500.00 = Rp. 2,500.00
Jumlah Ia = Rp. 12,079.17
Jumlah Ib = Rp. 8,712.00
2. Tenaga
▪ Pekerja 0.030 Oh x Rp. 65,000.00 = Rp. 1,950.00
▪ Tukang Besi 0.060 Oh x Rp. 80,000.00 = Rp. 4,800.00
▪ Kepala Tukang 0.006 Oh x Rp. 100,000.00 = Rp. 600.00
▪ Mandor 0.0003 Oh x Rp. 100,000.00 = Rp. 30.00
Jumlah II = Rp. 7,380.00
Jumlah Ia + Jumlah II = Rp. 19,459.17
Jumlah Ib + Jumlah II 16,092.00
A Analisa pekerjaan terali type J2
▪ besi polos dia 12 11.44 19,459.17 222,612.87
▪ Besi strip 3.34 16,092.00 53,747.28
▪ Skrup 0.05 48,100.00 2,405.00
jumlah/unit 278,765.15
B Analisa pekerjaan terali type J1
▪ besi polos dia 12 6.28 19,459.17 122,203.57
▪ Besi strip 2.34 16,092.00 37,655.28
▪ Skrup 0.025 48,100.00 1,202.50
jumlah/unit 161,061.35
ANALISA BIAYA PEKERJAAN MEUBELER
Harga Satuan
No. Kode Keterangan Sat Indek Alat (Rp) Upah (Rp) Bahan (Rp) Jumlah
(Rp)
a b c d e f = (d x e) g = (d x e) h = (d x e) i = (f + g + h)
M. 02 1 UNIT MEJA SISWA GANDA
a Kayu Klas II m³ 0.013 3,250,000.00 41,538.45 41,538.45
b Papan Klas II m³ 0.035 3,250,000.00 112,214.70 112,214.70
c Paku Ulir bh 24.000 2,405.00 57,720.00 57,720.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.200 40,000.00 8,000.00 8,000.00
f Lem Kayu kg 0.100 27,500.00 2,750.00 2,750.00
g Politur kg 0.750 84,525.00 63,393.75 63,393.75
h Upah ls 1.000 98,100.00 98,100.00 98,100.00
Total Rp 0.00 98,100.00 292,216.90 390,316.90
Total harga Rp 390,300.00
M. 08 1 UNIT MEJA GURU
a Kayu Klas II m³ 0.0095 3,250,000.00 30,946.50 30,946.50
b Papan Klas II m³ 0.039 3,250,000.00 127,535.46 127,535.46
c Paku Ulir bh 12.000 2,405.00 28,860.00 28,860.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
f Lem Kayu kg 0.050 27,500.00 1,375.00 1,375.00
g Politur kg 0.750 84,525.00 63,393.75 63,393.75
h Upah ls 1.000 107,900.00 107,900.00 107,900.00
Total Rp 0.00 107,900.00 262,710.71 370,610.71
Total harga Rp 370,600.00
K. 01 1 UNIT KURSI SISWA
a Kayu Klas II m³ 0.010 3,250,000.00 32,179.88 32,179.88
b Papan Klas II m³ 0.006 3,250,000.00 19,734.00 19,734.00
c Paku Ulir bh 25.000 2,405.00 60,125.00 60,125.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
f Lem Kayu kg 0.030 27,500.00 825.00 825.00
g Politur kg 0.500 84,525.00 42,262.50 42,262.50
h Upah ls 1.000 66,500.00 66,500.00 66,500.00
Total Rp 0.00 0.00 232,226.38 232,226.38
Total harga Rp 232,200.00
K. 05 1 UNIT KURSI KERJA/ GURU
a Kayu Klas II m³ 0.0105 3,250,000.00 34,086.00 34,086.00
b Papan Klas II m³ 0.002 3,250,000.00 5,045.63 5,045.63
c Paku Ulir bh 20.00 2,405.00 48,100.00 48,100.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
f Lem Kayu kg 0.030 27,500.00 825.00 825.00
g Politur kg 0.250 84,525.00 21,131.25 21,131.25
h Multipleks 9 mm lbr 0.103 121,800.00 12,560.63 12,560.63
i Karet Busa ls 1.000 10,000.00 10,000.00 10,000.00
j Imitatie Lear ls 1.000 7,500.00 7,500.00 7,500.00
k Upah ls 1.000 103,700.00 103,700.00 103,700.00
Total Rp 0.00 0.00 132,348.50 253,548.50
Total harga Rp 253,500.00
P. 04 1 UNIT WHITE BOARD GANTUNG / STANDAR
a Kayu Klas II m³ 0.012 3,250,000.00 40,365.00 40,365.00
b Paku Biasa kg 0.250 20,000.00 5,000.00 5,000.00
c Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
d Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
e Lem Kayu kg 0.100 27,500.00 2,750.00 2,750.00
f Cat Minyak kg 1.000 21,131.25 21,131.25 21,131.25
g Jabarwood 5 mm bh 1.000 100,000.00 100,000.00 100,000.00
h Besi penggantung ls 1.000 5,000.00 5,000.00 5,000.00
i Aluminium m 2.400 5,500.00 13,200.00 13,200.00
j Upah ls 1.000 53,300.00 53,300.00 53,300.00
Total Rp 0.00 0.00 58,715.00 251,346.25
Total harga Rp 251,300.00
ANALISA BIAYA PEKERJAAN MEUBELER
Harga Satuan
No. Kode Keterangan Sat Indek Alat (Rp) Upah (Rp) Bahan (Rp) Jumlah
(Rp)
a b c d e f = (d x e) g = (d x e) h = (d x e) i = (f + g + h)
R. 02 1 UNIT RAK BUKU SATU MUKA
a Kayu Klas II m³ 0.116 3,250,000.00 376,740.00 376,740.00
b Paku Ulir bh 48.000 2,405.00 115,440.00 115,440.00
c Sekrup 5 cm bh 24.000 500.00 12,000.00 12,000.00
d Triplek 4mm lbr 0.726 65,000.00 47,164.74 47,164.74
e Amplas lbr 3.000 3,300.00 9,900.00 9,900.00
f Dempul Kayu kg 0.300 40,000.00 12,000.00 12,000.00
g Lem Kayu kg 0.300 27,500.00 8,250.00 8,250.00
h Politur kg 1.500 84,525.00 126,787.50 126,787.50
i Upah ls 1.000 175,600.00 175,600.00 175,600.00
Total Rp 0.00 0.00 581,494.74 883,882.24
Total harga Rp 883,800.00
RENCANA ANGGARAN BIAYA
(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :1
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Pengukuran Pemasangan bouplank
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall 0.01 0.01 m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall 0.01 0.01 m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa 0.02 0.02 kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.10 0.10 hok 65,000.00
2 Tukang kayu 0.10 0.10 hok 80,000.00
3 Kepala tukang 0.01 0.01 hok 100,000.00
4 Mandor 0.01 0.01 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :2
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Galian tanah biasa
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.75 0.75 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Disetujui Oleh Diketahui Oleh Dibuat Oleh:
Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :3
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : urugan kembali
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.19 0.19 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.02 0.02 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :4
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Urugan pasir
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Satuan
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug 1.20 1.20 m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.30 0.30 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.01 0.01 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :5
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Urugan sirtu
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu 1.20 1.20 m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.25 0.25 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
RENCANA ANGGARAN BIAYA
(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :6
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Pasang pondasi batu kosong
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali 1.20 1.20 m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug 0.43 0.43 m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.78 0.78 hok 65,000.00
2 Tukang kayu 0.39 0.39 hok 80,000.00
3 Kepala tukang 0.04 0.04 hok 100,000.00
4 Mandor 0.04 0.04 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :7
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Pasang pondasi batu kali
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali 1.20 1.20 m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan 0.52 0.52 m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 163.00 163.00 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 1.50 1.50 hok 65,000.00
2 Tukang kayu 0.75 0.75 hok 80,000.00
3 Kepala tukang 0.08 0.08 hok 100,000.00
4 Mandor 0.08 0.08 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Disetujui Oleh Diketahui Oleh Dibuat Oleh:
Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :8
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Pasang batu bata 1/2 batu 1 : 4
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah 70.00 70.00 buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan 0.04 0.04 m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 11.50 11.50 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.30 0.30 hok 65,000.00
2 Tukang kayu 0.10 0.10 hok 80,000.00
3 Kepala tukang 0.01 0.01 hok 100,000.00
4 Mandor 0.02 0.02 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :9
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Plasteran 1 : 4 tebal 15 mm
Ukuran/Dimensi 1.00
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan 0.02 0.02 m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 6.24 6.24 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.30 0.30 hok 65,000.00
2 Tukang kayu 0.15 0.15 hok 80,000.00
3 Kepala tukang 0.02 0.02 hok 100,000.00
4 Mandor 0.02 0.02 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 10
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Plasteran 1 : 4 tebal 20 mm
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan 0.03 0.03 m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 8.32 8.32 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.40 0.40 hok 65,000.00
2 Tukang kayu 0.20 0.20 hok 80,000.00
3 Kepala tukang 0.02 0.02 hok 100,000.00
4 Mandor 0.02 0.02 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
RENCANA ANGGARAN BIAYA
(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 11
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Acian
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 0.33 0.33 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.02 0.02 hok 65,000.00
2 Tukang kayu 0.01 0.01 hok 80,000.00
3 Kepala tukang 0.00 0.00 hok 100,000.00
4 Mandor 0.00 0.00 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 12
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Pasang atap rangka baja ringan
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 1.00 1.00 buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 2.80 2.80 m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 5.10 5.10 m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm 35.00 35.00 buah 300.00
76 Screw Dia 6x20 mm 25.00 25.00 buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor 1.00 1.00 3000
2
Sub Total 2)
UPAH
1 Pekerja 0.25 0.25 hok 65,000.00
2 Tukang kayu 0.17 0.17 hok 80,000.00
3 Kepala tukang 0.12 0.12 hok 100,000.00
4 Mandor 0.06 0.06 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 13
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : LISTPLANK ASBES PLAT RAM KAYU
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat 1.00 1.00 m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II 0.01 0.01 m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm 7.00 7.00 buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 0.60 0.60 hok 65,000.00
2 Tukang kayu 1.80 1.80 hok 80,000.00
3 Kepala tukang 0.18 0.18 hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 14
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : PAS. RANGKA LANGIT-LANGIT 60x120
Ukuran/Dimensi 1.00
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 0.01 0.01 m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa 0.10 0.10 kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 0.15 0.15 hok 65,000.00
2 Tukang kayu 0.25 0.25 hok 80,000.00
3 Kepala tukang 0.03 0.03 hok 100,000.00
4 Mandor 0.08 0.08 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 15
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : PAS. LIST PROFIL
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil 1.05 1.05 m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks 0.01 0.01 kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 0.05 0.05 hok 65,000.00
2 Tukang kayu 0.05 0.05 hok 80,000.00
3 Kepala tukang 0.01 0.01 hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 16
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : LANTAI FLOOR f'c=7,4 MPa (K100)
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring 999.00 999.00 kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton 869.00 869.00 kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 247.00 247.00 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 Air 215.00 215.00 liter 50.00
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 1.65 1.65 hok 65,000.00
2 Tukang kayu 0.28 0.28 hok 80,000.00
3 Kepala tukang 0.03 0.03 hok 100,000.00
4 Mandor 0.08 0.08 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 17
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : PEMBESIAN DENGAN BESI POLOS
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir 1.05 1.05 kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton 0.02 0.02 kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 Air - - liter 50.00
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 0.01 0.01 hok 65,000.00
2 Tukang kayu 0.01 0.01 hok 80,000.00
3 Kepala tukang 0.00 0.00 hok 100,000.00
4 Mandor 0.00 0.00 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.

RENCANA ANGGARAN BIAYA


(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 18
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : BEKISTING PONDASI POER
Ukuran/Dimensi 1.00

VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 Air - - liter 50.00
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2

Sub Total 2)
UPAH
1 Pekerja - - hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor - - hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :

Disetujui Oleh Diketahui Oleh Dibuat Oleh:


Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung

Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
hapus koef. Setiap
analisa detail baru
angunan Kampus Univ. Andi Djemma
ukuran Pemasangan bouplank
m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
23,760.00 0.012
-
-
13,860.00 0.007
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
400.00 0.02
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
38,020.00
1 M PENGUKURAN DAN PEMASANGAN BOUPLANK
- Kayu Balok 0.012 m3
- Paku Biasa 0.02 Kg
- - Kayu Papan 0.007 m3
- Pekerja 0.1 oh
6,500.00 0.1 - Tukang Batu 0.1 oh
8,000.00 0.1 - Kepala Tukang 0.01 oh
1,000.00 0.01 - Mandor 0.005 oh
500.00 0.005
16,000.00

54,020.00 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma

m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 M3 GALIAN TANAH BIASA
- Pekerja 0.75 oh
- Mandor 0.025 oh
-

48,750.00 0.75
-
-
2,500.00 0.025
51,250.00

51,250.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma

m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 M3 URUGAN KEMBALI
- Peker 0 0 0.192 oh
- Mand 0 0 0.019 oh
-

12,480.00 0.192
-
-
1,900.00 0.019
14,380.00

14,380.00 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma

m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
137,640.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
137,640.00
1 M3 URUGAN PASIR
- Pasir Urug 1.2 m3
- Pekerja 0.3 oh
- - Mandor 0.01 oh

19,500.00 0.3
-
-
1,000.00 0.01
20,500.00

158,140.00 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma

m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
74,400.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
74,400.00
1 M3 URUGAN SIRTU
- Sirtu 1.2 m3
- Pekerja 0.25 oh
- - Mandor 0.025 oh

16,250.00 0.25
-
-
2,500.00 0.025
18,750.00

93,150.00 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru
angunan Kampus Univ. Andi Djemma
ng pondasi batu kosong
m2

JUMLAH
TOTAL
(Rp)

-
-
-
165,000.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
49,550.40 0.432
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
214,550.40
1 M3 PAS.PONDASI BATU KOSONG
- Batu Kali 1.2 m3
- Pasir Urug 0.432 m3
- - Pekerja 0.78 oh
- Tukang Batu 0.39 oh
50,700.00 0.78 - Kepala tukang 0.039 oh
31,200.00 0.39 - mandor 0.039 oh
3,900.00 0.039
3,900.00 0.039
89,700.00

304,250.40 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


ng pondasi batu kali
m2

JUMLAH
TOTAL
(Rp)

-
-
-
165,000.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
71,500.00 0.52
-
-
-
-
-
-
-
-
-
-
-
-
-
-
211,900.00 163
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
448,400.00
1 M3 PAS.PONDASI BATU KALI 1 : 4
- Batu Kali 1.2 m3
- Semen Portland 163 kg
- - Pasir Pasangan 0.52 m3
- Pekerja 1.5 oh
97,500.00 1.5 - Tukang Batu 0.75 oh
60,000.00 0.75 - Kepala tukang 0.075 oh
7,500.00 0.075 - mandor 0.075 oh
7,500.00 0.075
172,500.00

620,900.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT. hapus koef. Setiap


analisa detail baru

angunan Kampus Univ. Andi Djemma


ng batu bata 1/2 batu 1 : 4
m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
49,000.00 70
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5,912.50 0.043
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14,950.00 11.5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
69,862.50
1 M3 PAS.BATU BATA 1/2 BATU 1 : 4
- Bata merah 5x11 70 bh
- Semen portland 11.5 kg
- - Pasir pasang 0.043 m3
- Pekerja 0.3 oh
19,500.00 0.3 - Tukang batu 0.1 oh
8,000.00 0.1 - Kepala tukang 0.01 oh
1,000.00 0.01 - Mandor 0.015 oh
1,500.00 0.015
30,000.00

99,862.50 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


eran 1 : 4 tebal 15 mm
m2
JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,300.00 0.024
-
-
-
-
-
-
-
-
-
-
-
-
-
-
8,112.00 6.24
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11,412.00
1 M3 PLESTERAN 1 : 4 T 15 MM
- Semen portland 6.24 kg
- Pasir Pasangan 0.024 m3
- - Pekerja 0.3 oh
- Tukang Batu 0.15 oh
19,500.00 0.3 - Kepala tukang 0.015 oh
12,000.00 0.15 - Mandor 0.015 oh
1,500.00 0.015
1,500.00 0.015
34,500.00

45,912.00 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


eran 1 : 4 tebal 20 mm
m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,400.00 0.032
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10,816.00 8.32
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
15,216.00
1 M3 PLESTERAN 1 : 4 T 20 MM
- Semen Portland 8.32 kg
- Pasir Pasangan 0.032 m3
- - Pekerja 0.4 oh
- Tukang Batu 0.2 oh
26,000.00 0.4 - Kepala tukang 0.02 oh
16,000.00 0.2 - mandor 0.022 oh
2,000.00 0.02
2,200.00 0.022
46,200.00

61,416.00 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru
angunan Kampus Univ. Andi Djemma

m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
422.50 0.325
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
422.50
1 M3 Acian
- Semen Portland 3.25 kg
- Pekerja 0.2 oh
- - Tukang Batu 0.1 oh
- Kepala tukang 0.01 oh
1,300.00 0.02 - mandor 0.01 oh
800.00 0.01
100.00 0.001
100.00 0.001
2,300.00

2,722.50 31,551,575.19

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


ng atap rangka baja ringan
m2

JUMLAH
TOTAL
(Rp)

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,500.00 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
37,333.33 2.8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
50,150.00 5.1
-
-
10,500.00 35
8,750.00 25
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
108,233.33
1 M3 PAS. RANGKA ATAP BAJA RINGAN
3,000.00 1 - Main Truss C.75 2.8 m
- Roof Bottom/Ren 5.1 m
3,000.00 - Screw Dia 6x20 25 bh
- Screw Dia 4x20 35 bh
16,055.00 0.247 - 1 bh
13,920.00 0.174 - Peralatan 1 ls
11,700.00 0.117 - Pekerja 0.247 oh
5,900.00 0.059 - Tukang 0.174 oh
47,575.00 - Kepala Tukang 0.117 oh
- mandor 0.059 oh
158,808.33 31,435,741.86
Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


PLANK ASBES PLAT RAM KAYU
m2

JUMLAH
TOTAL
(Rp)

-
tidak 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
22,750.00 0.007
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,500.00 7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
26,250.00
1 M3 PAS. LISTPLANK ASBES PLAT RAM KAYU
- - Kayu Kelas II 0.007 m3
- Asbes Plat 1 m2
- - Screw Dia 6x50 7 bh
- Pekerja 0.6 oh
39,000.00 0.6 - Tukang Kayu 1.8 oh
144,000.00 1.8 - Kepala Tukang 0.18 oh
18,000.00 0.18 - mandor 0.03 oh
3,000.00 0.03
204,000.00

230,250.00 31,435,741.86

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


RANGKA LANGIT-LANGIT 60x120
m2
hapus koef
analisa det
JUMLAH
TOTAL
(Rp)

-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
18,150.00 0.006875
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2,000.00 0.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
20,150.00
1 M3 PAS. RANGKA LANGIT-LANGIT 60x120
- - Kayu Kelas III Ba 0.006875 m3
- Paku Biasa 0.1 Kg
- - Pekerja 0.15 oh
- Tukang Kayu 0.25 oh
9,750.00 0.15 - Kepala Tukang 0.025 oh
20,000.00 0.25 - Mandor 0.075 oh
2,500.00 0.025
7,500.00 0.075
39,750.00

59,900.00 31,435,741.86

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma

m2

JUMLAH
TOTAL
(Rp)

-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,937.50 1.05
-
-
-
-
-
-
-
-
-
-
-
253.50 0.01
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,191.00
1 M3 PAS. LIST PROFIL
- - List Profil 4 x 4 c 1.05 m
- Paku Tripleks 0.01 Kg
- - Pekerja 0.05 oh
- Tukang Kayu 0.05 oh
3,250.00 0.05 - Kepala Tukang 0.005 oh
4,000.00 0.05 - Mandor 0.03 oh
500.00 0.005
3,000.00 0.03
10,750.00

14,941.00 31,435,741.86

Dibuat Oleh:
Panitia Rehab Gedung
SNADI A. MACHMUD, ST. MT.

hapus koef. Setiap


analisa detail baru
angunan Kampus Univ. Andi Djemma
AI FLOOR f'c=7,4 MPa (K100)
m2

JUMLAH
TOTAL
(Rp)

-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
76,312.50 999
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
85,348.21 869
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
321,100.00 247
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10,750.00 215
-
-
-
-
493,510.71
1 M3 LANTAI FLOOR f'c=7,4 MPa (K100)
- - Semen Portland 247 kg
- Pasir Beton 869 kg
- - Kerikil beton 999 kg
- Air 215 Ltr
107,250.00 1.65 - Pekerja 1.65 oh
22,000.00 0.275 - Tukang Batu 0.275 oh
2,800.00 0.028 - Kepala Tukang 0.028 oh
8,300.00 0.083 - Mandor 0.083 oh
140,350.00

633,860.71 31,435,791.86

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


BESIAN DENGAN BESI POLOS
m2

JUMLAH
TOTAL
(Rp)

-
tidak
-
-
-
11,445.00 1.05
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
330.00 0.015
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11,775.00
1 M3 PEMBESIAN DENGAN BESI POLOS
- - Besi beton 1.05 kg
- Kawat Beton 0.015 kg
- - Pekerja 0.007 Oh
- Tukang Besi 0.007 Oh
455.00 0.007 - Kepala tukang 0.0007 Oh
560.00 0.007 - Mandor 0.0003 Oh
70.00 0.0007
30.00 0.0003
1,115.00
12,890.00 31,435,791.86

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


hapus koef. Setiap
analisa detail baru

angunan Kampus Univ. Andi Djemma


STING PONDASI POER
m2

JUMLAH
TOTAL
(Rp)

-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 M3 BEKISTING PONDASI POER
- - Kayu 0 0 0.04 m3
- Paku 0 0 0.3 kg

- - Minya 0 0 0.1 Liter


- Peker 0 0 0.52 OH
- - Tukan 0 0 0.26 OH
- - Kepal 0 0 0.026 OH
- - Mand 0 0 0.026 OH
-
-

- 31,435,791.86

Dibuat Oleh:
Panitia Rehab Gedung

SNADI A. MACHMUD, ST. MT.


SANGAN BOUPLANK
1,980,000.00 23,760.00
20,000.00 400.00
1,980,000.00 13,860.00
65,000.00 6,500.00
80,000.00 8,000.00
100,000.00 1,000.00
100,000.00 500.00
54,020.00
65,000.00 48,750.00
100,000.00 2,500.00
-
-
-
-
-
51,250.00
65,000.00 12,480.00
100,000.00 1,900.00
-
-
-
-
-
14,380.00
114,700.00 137,640.00
65,000.00 19,500.00
100,000.00 1,000.00
-
-
-
-
158,140.00
62,000.00 74,400.00
65,000.00 16,250.00
100,000.00 2,500.00
-
-
-
-
93,150.00
137,500.00 165,000.00
114,700.00 49,550.40
65,000.00 50,700.00
80,000.00 31,200.00
100,000.00 3,900.00
100,000.00 3,900.00
-
304,250.40
137,500.00 165,000.00
1,300.00 211,900.00
137,500.00 71,500.00
65,000.00 97,500.00
80,000.00 60,000.00
100,000.00 7,500.00
100,000.00 7,500.00
620,900.00
700.00 49,000.00
1,300.00 14,950.00
137,500.00 5,912.50
65,000.00 19,500.00
80,000.00 8,000.00
100,000.00 1,000.00
100,000.00 1,500.00
99,862.50
1,300.00 8,112.00
137,500.00 3,300.00
65,000.00 19,500.00
80,000.00 12,000.00
100,000.00 1,500.00
100,000.00 1,500.00

45,912.00
1,300.00 10,816.00
137,500.00 4,400.00
65,000.00 26,000.00
80,000.00 16,000.00
100,000.00 2,000.00
100,000.00 2,200.00

61,416.00
1,300.00 4,225.00
65,000.00 13,000.00
80,000.00 8,000.00
100,000.00 1,000.00
100,000.00 1,000.00
-

27,225.00
13,333.33 37,333.33
9,833.33 50,150.00
350.00 8,750.00
300.00 10,500.00
1,500.00 1,500.00
3,000.00 3,000.00
65,000.00 16,055.00
80,000.00 13,920.00
100,000.00 11,700.00
100,000.00 5,900.00
158,808.33
LAT RAM KAYU
3,250,000.00 22,750.00
15,000.00
500.00 3,500.00
65,000.00 39,000.00
80,000.00 144,000.00
100,000.00 18,000.00
100,000.00 3,000.00
-
-
-
230,250.00
NGIT 60x120
2,640,000.00 18,150.00
20,000.00 2,000.00
65,000.00 9,750.00
80,000.00 20,000.00
100,000.00 2,500.00
100,000.00 7,500.00
-
-
-
-
59,900.00
3,750.00 3,937.50
25,350.00 253.50
65,000.00 3,250.00
80,000.00 4,000.00
100,000.00 500.00
100,000.00 3,000.00
-
-
-
-
14,941.00
1,300.00 321,100.00
98.21 85,348.21
76.39 76,312.50
50.00 10,750.00
65,000.00 107,250.00
80,000.00 22,000.00
100,000.00 2,800.00
100,000.00 8,300.00
-
-
633,860.71
10,900.00 11,445.00
22,000.00 330.00
65,000.00 455.00
80,000.00 560.00
100,000.00 70.00
100,000.00 30.00
-
-
-
-
12,890.00
1,980,000.00 79,200.00
20,000.00 6,000.00

8,500.00 850.00
65,000.00 33,800.00
80,000.00 20,800.00
100,000.00 2,600.00
100,000.00 2,600.00
-
-
-
145,850.00
1 Amplas
2 Asbes Plat
3 Bambu
4 Batu Kali
5 Batu Merah
6 Besi beton polos/ ulir
7 Besi strip
8 Box Sekring
9 cat besi
10 Cat kayu
11 Cat tembok
12 Dempul Kayu
13 Dinding keramik 20/20
14 Dinding keramik 20/25
15 Dolken kayu galam
16
17 Engsel Jendela
18 Engsel Pintu
19 Fitting Tunggal (Broco)
20 Floor Drain TX1C
21 Genteng Metal Surya Roof 0.3 mm (2x4)
22 Grendel Sedang
23 Kabel Eterna NYY 2×1.5
24 Kaca polos 3 cm
25 Kaca polos 5 cm
26 Kait Angin
27 Kawat beton
28 Kayu Balok Kelas II 5/15
29 Kayu Balok Kelas III 1.5/5
30 Kayu Balok Kelas III 3/5
31 Kayu Balok Kelas III 5/10
32 Kayu Balok Kelas III 5/5
33 Kayu Balok Kelas III 5/7
34 Kayu Balok Kelas III 6/12
35 Kayu Balok Mall
36 Kayu Papan Kelas II
37 Kayu Papan Kelas III 2.2/25
38 Kayu Papan Mall
39 Kerikil / Split 2 - 3
40 Kerikil saring
41 Kloset Jongkok
42 Kran air 3/4" besi
43 Kunci Tanam Union 2x Slag
44 Lampu Sumpit 23 Watt (Philips)
45 Lem kayu
46 List profil
47 Main Truss C.75
48 MCB
49 Meni besi
50 Meni kayu
51 Minyak Bekisting
52 Minyak Cat (tinner)
53 Minyak Solar (Industri)
54 Nok/Bubungan Surya Roof 0.3 mm
55 Paku biasa
56 Paku Sekrup 4 inc
57 Paku seng
58 Paku tripleks
59 Pasir kalsiboard 1" x 24 bwg
60 Pasir pasangan
61 Pipa PVC 1" paralon Class D 4 M
62 Pipa PVC 3" paralon Class D 4 M
63 Pipa PVC 3/4" paralon SNI 6 M
64 Pipa Union untuk Kabel 5/8" - 4 m
65 Plamour
66 Politur
67 Rabung/nok Spandek
68 Roof Bottom/Reng R.33.0,45
69 Sakelar Ganda (Broco)
70 Sakelar Tunggal (Broco)
71 Screw Dia 4x20 mm
72 Screw Dia 6x20 mm
73 Screw Dia 6x50 mm
74 Semen portland
75 Semen warna
76 Seng gelombang besar
77 Seng plat
78 Seng Spandec 0.35
79 Sirtu
80 Stop Kontak
81 Tegel keramik 20/20
82 Tegel keramik 30/30
83 Tegel keramik 40/40
84 Tegel keramik 50/50
85 Tripleks 3 mm