PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :
VOLUME : 1.00
SUMBERDANA : ……………………………….2016
VOLUME
No. URAIAN PEKERJAAN
SATUAN
B. PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali btkl 1 5.40
2 Urugan Pasir Bawah Pondasi 0.60
3 Urugan Kembali 1.80 M3
4 Pas. Pondasi Batu Kosong 1.80
5 Pas. Pondasi Batu Kali 1 : 4 4.80
6 Urugan Pasir Bawah Lantai 0.60
7 Urugan Sirtu Bawah Lantai 3.60
VOLUME : 1.00
SUMBERDANA : ……………………………….2016
VOLUME
No. URAIAN PEKERJAAN
SATUAN
VOLUME : 1.00
SUMBERDANA : ……………………………….2016
VOLUME
No. URAIAN PEKERJAAN
SATUAN
VOLUME : 1.00
SUMBERDANA : ……………………………….2016
VOLUME
No. URAIAN PEKERJAAN
SATUAN
E. PEKERJAAN ATAP
1 pasang kuda-kuda baja ringan M2
2 Pasang Atap Seng Gelombang M2
4 Pasang Nok Seng M2
5 Papan Listplank 3/30 cm M2
F. PEKERJAAN PLAFON
1 Pek. Rangka Plafon dalam M2
luar M2
sisi 1 M2
sisi 2 M2
total M2
2 Pek. Plafon Tripleks 3,4 mm M2
3 Pek. List Plafon
BACK UP DATA QUANTITY
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
PROYEK :
VOLUME : 1.00
SUMBERDANA : ……………………………….2016
VOLUME
No. URAIAN PEKERJAAN
SATUAN
VOLUME : 1.00
SUMBERDANA : ……………………………….2016
VOLUME
No. URAIAN PEKERJAAN
SATUAN
H. PEKERJAAN PENGECATAN
jalusi j2 M2
jalusi j1 M2
jalusi P1 M2
Daun Pintu 6.43 M2
Total 9.98 M2
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA
RUMUS URAIAN
(4) (5)
panjang*lebar*tinggi
panjang*lebar*tebal
1/3 galian tanah
panjang*lebar*tinggi
panjang*lebar*tinggi
panjang*lebar*tebal
panjang*lebar*tebal
0.22200
0.61667
0.88800
(h1+h2)*P.slof*jumlah sloef
(h1+h2)*P.slof*jumlah sloef
p sloof*jumlah tulangan
p total besi*berat besi
p sloofl/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA
RUMUS URAIAN
(4) (5)
p sloof*jumlah tulangan
p total besi*berat besi
p sloofl/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi
dimensi sloof*panjang
(s1+s2+s3+s4)*h*jumlah kolom
(s1+s2)*h*jumlah kolom
RUMUS URAIAN
(4) (5)
h tot.kolom utama/jarak begel
jumlah begel*panjang perbegel
pjg total begel*berat besi
(h1+h2)*P.slof*jumlah ringbalk
(h1+h2)*P.slof*jumlah ringbalk
Panjang p = 29 m
dimensi sloof*panjang
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA
RUMUS URAIAN
(4) (5)
p*l*jumlah kusen
p*l*jumlah kusen
p*l*jumlah kusen
(panjang1*lebar1)+(panjang2*lebar2)
(panjang1*lebar1)+(panjang2*lebar2)
panjang*lebar
panjang*lebar
p*l*jumlah panel
p*l*jumlah panel
p*l*jumlah panel
p*l*jumlah panel
RUMUS URAIAN
(4) (5)
Tinggi*Panjang*jumlah
BACK UP DATA QUANTITY
AMPUS UNIVERSITAS ANDI DJEMMA
RUMUS URAIAN
(4) (5)
P*lebar*jumlah jalusi
P*lebar*jumlah jalusi
P*lebar*jumlah jalusi
P*lebar*jumlah sisi*jumlah pintu
PEMBANGUNAN / REHABILITASI GEDUNG SMK TAHUN ANGGARAN 2015
KEGIATAN :
PEKERJAAN : PEMBANGUNAN WC
DIKETAHUI OLEH :
KEPALA DINAS
PENDIDIKAN PEMUDA DAN OLAHRAGA
KABUPATEN LUWU
kantor
kantor 70.15 1
Pek. Kusen Pintu dan Jendela (Kayu Kls II) baru kelas A KJ 10.1 0.15 0.06 13
baru kelas A KP 12.9 0.15 0.06 3
baru kantor KJ 4.4 0.15 0.06 1
Pasang MCB
Instalasi Titik Nyala - Kabel NYY 2 x 1.5 mm
Fitting Tunggal (Broco)
Lampu SL 23 Watt (Philips)
Sakelar Ganda (Broco)
Sakelar tunggal (Broco)
Stop Kontak
0.35
1.155
1.155
0.0105
0.0105
30.14
60.28
60.28
16.61093
1.94
0.6
19.15093
2.5506
0.338
0.234
0.06696
3.18956
0.245
dinding klas A 693013.338 1.73253335
0.245 dinding klas B 1598158.18 3.99539544
0.061056 dinding klas A 8 4
0.04896 dinding klas B 16 4
0.110016
3
0.315 213750 2 427500
0.10375
3.41875 355526.301 1 355526.301
0.48
m3
0.48
451.935 m2
61.305 m2
13.695 m2
526.935
14.94 m2
m2
14.94
21.7 m2
4.9625 m2
1.9875
28.65
410.688
66.2739
476.9619
410.688
755.9975
157.5
913.4975
410.688
66.2739
476.9619
61.5125
1.425
1.1
21
1.5
54.096
5.328
21.7
6.95
174.6115
1
40
40
40
11
0
9
3.400269
3.400269
0.3493
0.056
0.056
0.0315
0.4928
42.75
35.55263
78.30263
cat
dinding
kayu
m3
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBANGUNAN KAMPUS UNIVERSITAS ANDI DJEMMA
KEGIATAN :
PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA
VOLUME : 1
SUMBER DANA : ……………………………….2016
TERBILANG :
SERATUS TIGA PULUH SEMBILAN JUTA LIMA RATUS ENAM PULUH TUJUH RIBU RUPIAH
Palopo, 2016
DIKETAHUI OLEH DIBUAT OLEH :
REKTOR II Panitian Pembangunan Kampus
UNIV. ANDI DJEMMA PALOPO UNIV. ANDI DJEMMA PALOPO
DIKETAHUI OLEH :
REKTOR
UNIV. ANDI DJEMMA PALOPO
PEKERJAAN : REHABILITASI RUANG KELAS BARU FAKULTAS PERTANIAN UNIV. ANDI DJEMMA
VOLUME ###
:
SUMBER DANA : ……………………………….2016
A BAHAN DASAR
B BAHAN KAYU
1 Kayu Klas II
Papan M3 Rp 3,250,000.00
Balok M3 Rp 3,250,000.00
2 Kayu Klas III
Papan M3 Rp 2,640,000.00
Balok M3 Rp 2,640,000.00
3 Kayu Mal / Bakesting
Papan M3 Rp 1,980,000.00
Balok M3 Rp 1,980,000.00
4 Dolken Kayu Batang Rp 8,050.00
5 Bambu Panjang Batang Rp 20,000.00
C BAHAN TEGEL
1 Tegel Keramik
- Putih 20 x 20 cm Dos Rp 92,400.00 3,696.00
- Putih 50 x 50 cm Dos Rp - -
- Warna 50 x 50 cm Dos Rp - -
Dinding Keramik
- Putih 20 x 20 cm Dos Rp - -
- Warna 20 x 20 cm Dos Rp - -
- Putih 20 x 25 cm Dos Rp - -
- Warna 20 x 25 cm Dos Rp - -
D BAHAN KACA
1 Kaca
- kaca 3 mm Lembar Rp 171,600.00 78,142.08
HARGA BAHAN DAN UPAH KERJA
KABUPATEN LUWU T.A. 2016
D BAHAN BESI
1 Besi beton polos Kg Rp 10,900.00
- Besi beton dia 12 mm batang Rp 104,500.00
- Besi beton dia 10 mm batang Rp 66,000.00
- Besi beton dia 06 mm batang Rp 30,800.00
2 Paku
Paku Biasa 5, 6, 7 dan 10 Cm Kg Rp 20,000.00
Paku Skrup 4 inc Dos Rp 48,100.00
Paku Skrup 3.5 inc Dos Rp 22,100.00
Paku Tripleks Kg Rp 25,350.00
Paku Kalsiboard 1" x 24 BWG Kg Rp 30,000.00
Paku seng Kg Rp 27,500.00
3 Kawat
- Beton Kg Rp 22,000.00
4 Besi Strep
30.3 mm Batang Rp 36,250.00
5 Mur/Baut 20 Cm Buah Rp 6,600.00
6 Kawat harmonika 2.1mm (BWG 14) 40*40 M2 Rp 30,000.00
E BAHAN LANGIT-LANGIT
F BAHAN ATAP
G BAHAN KUNCI
1 Cat tembok
- Cat Dasar 5 Kg Rp 110,000.00
- Cat Akhir/Finishing 5 Kg Rp 179,800.00
2 Cat kayu
- Meni Kayu Kg Rp 21,131.25 84,525.00
/Kg
/Kg
/Kg
/Kg
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
/Bh
m2
KET.
5
m2
4 meter
53900
KET.
5
4 kg
KET.
5
ANALISA BIAYA KONSTRUKSI (SNI 2007)
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6
9 1 M2 PLESTERAN 1 : 4 T 15 MM
- Semen portland 6.2400 kg Rp 1,300.00 Rp 8,112.00
- Pasir Pasangan 0.0240 m3 Rp 137,500.00 Rp 3,300.00
- Pekerja 0.3000 oh Rp 65,000.00 Rp 19,500.00
- Tukang Batu 0.1500 oh Rp 80,000.00 Rp 12,000.00
- Kepala tukang 0.0150 oh Rp 100,000.00 Rp 1,500.00
- Mandor 0.0150 oh Rp 100,000.00 Rp 1,500.00
Rp 45,912.00
10 1 M2 PLESTERAN 1 : 4 T 20 MM
- Semen Portland 8.320 kg Rp 1,300.00 Rp 10,816.00
- Pasir Pasangan 0.032 m3 Rp 137,500.00 Rp 4,400.00
- Pekerja 0.400 oh Rp 65,000.00 Rp 26,000.00
- Tukang Batu 0.200 oh Rp 80,000.00 Rp 16,000.00
- Kepala tukang 0.020 oh Rp 100,000.00 Rp 2,000.00
- mandor 0.022 oh Rp 100,000.00 Rp 2,200.00
Rp 61,416.00
11 10 M2 Acian
- Semen Portland 3.250 kg Rp 1,300.00 Rp 4,225.00
- Pekerja 0.200 oh Rp 65,000.00 Rp 13,000.00
- Tukang Batu 0.100 oh Rp 80,000.00 Rp 8,000.00
- Kepala tukang 0.010 oh Rp 100,000.00 Rp 1,000.00
- mandor 0.010 oh Rp 100,000.00 Rp 1,000.00
Rp 27,225.00
12 1 M2 PAS. RANGKA ATAP BAJA RINGAN
- Main Truss C.75 2.8000 m Rp 13,333.33 Rp 37,333.33
- Roof Bottom/Reng R.33.0,45 5.1000 m Rp 9,833.33 Rp 50,150.00
- Screw Dia 6x20 mm 25.0000 bh Rp 350.00 Rp 8,750.00
- Screw Dia 4x20 mm 35.0000 bh Rp 300.00 Rp 10,500.00
Dynabolt M10*100mm
- 1.0000 bh Rp 1,500.00 Rp 1,500.00
- Peralatan 1.0000 ls Rp 3,000.00 Rp 3,000.00
- Pekerja 0.2470 oh Rp 65,000.00 Rp 16,055.00
- Tukang 0.1740 oh Rp 80,000.00 Rp 13,920.00
- Kepala Tukang 0.1170 oh Rp 100,000.00 Rp 11,700.00
- mandor 0.0590 oh Rp 100,000.00 Rp 5,900.00
Rp 158,808.33
13 1 M PAS. LISTPLANK ASBES PLAT RAM KAYU
- Kayu Kelas II 0.0070 m3 Rp 3,250,000.00 Rp 22,750.00
- Asbes Plat 1.0000 m2 Rp 15,000.00 tidak
- Screw Dia 6x50 mm 7.0000 bh Rp 500.00 Rp 3,500.00
- Pekerja 0.6000 oh Rp 65,000.00 Rp 39,000.00
- Tukang Kayu 1.8000 oh Rp 80,000.00 Rp 144,000.00
- Kepala Tukang 0.1800 oh Rp 100,000.00 Rp 18,000.00
- mandor 0.0300 oh Rp 100,000.00 Rp 3,000.00
Rp 230,250.00
14 1M2 PAS. RANGKA LANGIT-LANGIT 60x120
- Kayu Kelas III Balok 5/5 0.0069 m3 Rp 2,640,000.00 Rp 18,150.00
- Paku Biasa 0.1000 Kg Rp 20,000.00 Rp 2,000.00
- Pekerja 0.1500 oh Rp 65,000.00 Rp 9,750.00
- Tukang Kayu 0.2500 oh Rp 80,000.00 Rp 20,000.00
- Kepala Tukang 0.0250 oh Rp 100,000.00 Rp 2,500.00
- Mandor 0.0750 oh Rp 100,000.00 Rp 7,500.00
Rp 59,900.00
15 1M PAS. LIST PROFIL
- List Profil 4 x 4 cm 1.0500 m Rp 3,750.00 Rp 3,937.50
- Paku Tripleks 0.0100 Kg Rp 25,350.00 Rp 253.50
- Pekerja 0.0500 oh Rp 65,000.00 Rp 3,250.00
- Tukang Kayu 0.0500 oh Rp 80,000.00 Rp 4,000.00
- Kepala Tukang 0.0050 oh Rp 100,000.00 Rp 500.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6
32 1 M2 PENGECATAN ATAP
- Cat 0.3000 kg Rp 65,000.00 Rp 19,500.00
- Pekerja 0.0060 oh Rp 65,000.00 Rp 390.00
- Tukang Cat 0.0600 oh Rp 80,000.00 Rp 4,800.00
- Kepala Tukang 0.0120 oh Rp 100,000.00 Rp 1,200.00
- Mandor 0.0060 oh Rp 100,000.00 Rp 600.00
Jumlah Rp 26,490.00
33 1 M2 PEK. PINTU PANIL KAYU KLS II (Bitti)
- Papan kayu 0.040 m3 Rp 3,250,000.00 Rp 130,000.00
- Lem kayu 0.500 kg Rp 27,500.00 Rp 13,750.00
- Pekerja 1.000 OH Rp 65,000.00 Rp 65,000.00
- Tukang kayu 3.000 OH Rp 80,000.00 Rp 240,000.00
- Kepala tukang 0.300 OH Rp 100,000.00 Rp 30,000.00
- Mandor 0.050 OH Rp 100,000.00 Rp 5,000.00
Jumlah Rp 483,750.00
34 1 M3 PEK. KUSEN PINTU KAYU KLS II (Bitti)
1.2 - Kayu KLS II 1.1000 m3 Rp 3,250,000.00 Rp 3,575,000.00
- Paku 10 cm 1.25 kg Rp 20,000.00 Rp 25,000.00
- Lem kayu 1 kg Rp 27,500.00 Rp 27,500.00
- Pekerja 6.0000 oh Rp 65,000.00 Rp 390,000.00
- Tukang Kayu 18.0000 oh Rp 80,000.00 Rp 1,440,000.00
- Kepala Tukang 2.0000 oh Rp 100,000.00 Rp 200,000.00
- Mandor 0.0300 oh Rp 100,000.00 Rp 3,000.00
Jumlah Rp 5,660,500.00
35 1 M2 PEK. JALUSI KUSEN KAYU KLS II
- Papan KLS II 0.0330 m3 Rp 3,250,000.00 Rp 107,250.00
- Paku 1 cm - 2.5 cm 0.1500 kg Rp 20,000.00 Rp 3,000.00
- Pekerja 0.6700 oh Rp 65,000.00 Rp 43,550.00
- Tukang Kayu 2.0000 oh Rp 80,000.00 Rp 160,000.00
- Kepala Tukang 0.2000 oh Rp 100,000.00 Rp 20,000.00
- Mandor 0.0335 oh Rp 100,000.00 Rp 3,350.00
Jumlah Rp 337,150.00
36 1 M2 MEMBUAT DAN MEMASANG 1 M2 JENDELA KACA, KAYU KELAS II
- Papan kayu klas II 0.024 m3 Rp 3,250,000.00 Rp 78,000.00
- Kaca Polos 5 mm 1.1 m2 Rp 214,500.00 Rp 235,950.00
- Lem kayu 0.3 kg Rp 27,500.00 Rp 8,250.00
- Pekerja 0.8 OH Rp 65,000.00 Rp 52,000.00
- Tukang kayu 2.4 OH Rp 80,000.00 Rp 192,000.00
- Kepala tukang 0.24 OH Rp 100,000.00 Rp 24,000.00
- Mandor 0.04 OH Rp 100,000.00 Rp 4,000.00
Jumlah Rp 594,200.00
37 1 M2 PAS. KACA POLOS TEBAL 5 MM
- Kaca Polos 1.100 m2 Rp 214,500.00 Rp 235,950.00
- Pekerja 0.015 Oh Rp 65,000.00 Rp 975.00
- Tukang kayu 0.150 Oh Rp 80,000.00 Rp 12,000.00
- Kepala tukang 0.015 Oh Rp 100,000.00 Rp 1,500.00
- Mandor 0.001 Oh Rp 100,000.00 Rp 75.00
Jumlah Rp 250,500.00
38 1 M2 PAS. KUNCI TANAM 2 SLAG
- Kunci Tanam Biasa 1.0000 bh Rp 65,000.00 Rp 65,000.00
- Pekerja 0.0100 oh Rp 65,000.00 Rp 650.00
- Tukang Kayu 0.5000 oh Rp 80,000.00 Rp 40,000.00
- Kepala Tukang 0.0100 oh Rp 100,000.00 Rp 1,000.00
- Mandor 0.0050 oh Rp 100,000.00 Rp 500.00
Jumlah Rp 107,150.00
Koefisien
No Uraian Satuan Harga Satuan Jumlah
Analisa
1 2 3 4 5 6
1. Bahan
▪ BESI dia 12 1.10 m' x Rp. 8,708.33 = Rp. 9,579.17
▪ Besi strip 3/20 6m (2.4 kg) 1.10 m' x Rp. 7,920.00 = Rp. 8,712.00
▪ Biaya Las 5.00 ttk x Rp. 500.00 = Rp. 2,500.00
Jumlah Ia = Rp. 12,079.17
Jumlah Ib = Rp. 8,712.00
2. Tenaga
▪ Pekerja 0.030 Oh x Rp. 65,000.00 = Rp. 1,950.00
▪ Tukang Besi 0.060 Oh x Rp. 80,000.00 = Rp. 4,800.00
▪ Kepala Tukang 0.006 Oh x Rp. 100,000.00 = Rp. 600.00
▪ Mandor 0.0003 Oh x Rp. 100,000.00 = Rp. 30.00
Jumlah II = Rp. 7,380.00
Jumlah Ia + Jumlah II = Rp. 19,459.17
Jumlah Ib + Jumlah II 16,092.00
A Analisa pekerjaan terali type J2
▪ besi polos dia 12 11.44 19,459.17 222,612.87
▪ Besi strip 3.34 16,092.00 53,747.28
▪ Skrup 0.05 48,100.00 2,405.00
jumlah/unit 278,765.15
B Analisa pekerjaan terali type J1
▪ besi polos dia 12 6.28 19,459.17 122,203.57
▪ Besi strip 2.34 16,092.00 37,655.28
▪ Skrup 0.025 48,100.00 1,202.50
jumlah/unit 161,061.35
ANALISA BIAYA PEKERJAAN MEUBELER
Harga Satuan
No. Kode Keterangan Sat Indek Alat (Rp) Upah (Rp) Bahan (Rp) Jumlah
(Rp)
a b c d e f = (d x e) g = (d x e) h = (d x e) i = (f + g + h)
M. 02 1 UNIT MEJA SISWA GANDA
a Kayu Klas II m³ 0.013 3,250,000.00 41,538.45 41,538.45
b Papan Klas II m³ 0.035 3,250,000.00 112,214.70 112,214.70
c Paku Ulir bh 24.000 2,405.00 57,720.00 57,720.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.200 40,000.00 8,000.00 8,000.00
f Lem Kayu kg 0.100 27,500.00 2,750.00 2,750.00
g Politur kg 0.750 84,525.00 63,393.75 63,393.75
h Upah ls 1.000 98,100.00 98,100.00 98,100.00
Total Rp 0.00 98,100.00 292,216.90 390,316.90
Total harga Rp 390,300.00
M. 08 1 UNIT MEJA GURU
a Kayu Klas II m³ 0.0095 3,250,000.00 30,946.50 30,946.50
b Papan Klas II m³ 0.039 3,250,000.00 127,535.46 127,535.46
c Paku Ulir bh 12.000 2,405.00 28,860.00 28,860.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
f Lem Kayu kg 0.050 27,500.00 1,375.00 1,375.00
g Politur kg 0.750 84,525.00 63,393.75 63,393.75
h Upah ls 1.000 107,900.00 107,900.00 107,900.00
Total Rp 0.00 107,900.00 262,710.71 370,610.71
Total harga Rp 370,600.00
K. 01 1 UNIT KURSI SISWA
a Kayu Klas II m³ 0.010 3,250,000.00 32,179.88 32,179.88
b Papan Klas II m³ 0.006 3,250,000.00 19,734.00 19,734.00
c Paku Ulir bh 25.000 2,405.00 60,125.00 60,125.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
f Lem Kayu kg 0.030 27,500.00 825.00 825.00
g Politur kg 0.500 84,525.00 42,262.50 42,262.50
h Upah ls 1.000 66,500.00 66,500.00 66,500.00
Total Rp 0.00 0.00 232,226.38 232,226.38
Total harga Rp 232,200.00
K. 05 1 UNIT KURSI KERJA/ GURU
a Kayu Klas II m³ 0.0105 3,250,000.00 34,086.00 34,086.00
b Papan Klas II m³ 0.002 3,250,000.00 5,045.63 5,045.63
c Paku Ulir bh 20.00 2,405.00 48,100.00 48,100.00
d Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
e Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
f Lem Kayu kg 0.030 27,500.00 825.00 825.00
g Politur kg 0.250 84,525.00 21,131.25 21,131.25
h Multipleks 9 mm lbr 0.103 121,800.00 12,560.63 12,560.63
i Karet Busa ls 1.000 10,000.00 10,000.00 10,000.00
j Imitatie Lear ls 1.000 7,500.00 7,500.00 7,500.00
k Upah ls 1.000 103,700.00 103,700.00 103,700.00
Total Rp 0.00 0.00 132,348.50 253,548.50
Total harga Rp 253,500.00
P. 04 1 UNIT WHITE BOARD GANTUNG / STANDAR
a Kayu Klas II m³ 0.012 3,250,000.00 40,365.00 40,365.00
b Paku Biasa kg 0.250 20,000.00 5,000.00 5,000.00
c Amplas lbr 2.000 3,300.00 6,600.00 6,600.00
d Dempul Kayu kg 0.100 40,000.00 4,000.00 4,000.00
e Lem Kayu kg 0.100 27,500.00 2,750.00 2,750.00
f Cat Minyak kg 1.000 21,131.25 21,131.25 21,131.25
g Jabarwood 5 mm bh 1.000 100,000.00 100,000.00 100,000.00
h Besi penggantung ls 1.000 5,000.00 5,000.00 5,000.00
i Aluminium m 2.400 5,500.00 13,200.00 13,200.00
j Upah ls 1.000 53,300.00 53,300.00 53,300.00
Total Rp 0.00 0.00 58,715.00 251,346.25
Total harga Rp 251,300.00
ANALISA BIAYA PEKERJAAN MEUBELER
Harga Satuan
No. Kode Keterangan Sat Indek Alat (Rp) Upah (Rp) Bahan (Rp) Jumlah
(Rp)
a b c d e f = (d x e) g = (d x e) h = (d x e) i = (f + g + h)
R. 02 1 UNIT RAK BUKU SATU MUKA
a Kayu Klas II m³ 0.116 3,250,000.00 376,740.00 376,740.00
b Paku Ulir bh 48.000 2,405.00 115,440.00 115,440.00
c Sekrup 5 cm bh 24.000 500.00 12,000.00 12,000.00
d Triplek 4mm lbr 0.726 65,000.00 47,164.74 47,164.74
e Amplas lbr 3.000 3,300.00 9,900.00 9,900.00
f Dempul Kayu kg 0.300 40,000.00 12,000.00 12,000.00
g Lem Kayu kg 0.300 27,500.00 8,250.00 8,250.00
h Politur kg 1.500 84,525.00 126,787.50 126,787.50
i Upah ls 1.000 175,600.00 175,600.00 175,600.00
Total Rp 0.00 0.00 581,494.74 883,882.24
Total harga Rp 883,800.00
RENCANA ANGGARAN BIAYA
(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :1
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Pengukuran Pemasangan bouplank
Ukuran/Dimensi 1.00
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall 0.01 0.01 m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall 0.01 0.01 m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa 0.02 0.02 kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.10 0.10 hok 65,000.00
2 Tukang kayu 0.10 0.10 hok 80,000.00
3 Kepala tukang 0.01 0.01 hok 100,000.00
4 Mandor 0.01 0.01 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.75 0.75 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Disetujui Oleh Diketahui Oleh Dibuat Oleh:
Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.19 0.19 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.02 0.02 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Satuan
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug 1.20 1.20 m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.30 0.30 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.01 0.01 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu 1.20 1.20 m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.25 0.25 hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
RENCANA ANGGARAN BIAYA
(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB :6
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Pasang pondasi batu kosong
Ukuran/Dimensi 1.00
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali 1.20 1.20 m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug 0.43 0.43 m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.78 0.78 hok 65,000.00
2 Tukang kayu 0.39 0.39 hok 80,000.00
3 Kepala tukang 0.04 0.04 hok 100,000.00
4 Mandor 0.04 0.04 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali 1.20 1.20 m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan 0.52 0.52 m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 163.00 163.00 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 1.50 1.50 hok 65,000.00
2 Tukang kayu 0.75 0.75 hok 80,000.00
3 Kepala tukang 0.08 0.08 hok 100,000.00
4 Mandor 0.08 0.08 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Disetujui Oleh Diketahui Oleh Dibuat Oleh:
Rektor Univ. Andi Djemma Wakil Rektor II Univ. Andi Djemma Panitia Rehab Gedung
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah 70.00 70.00 buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan 0.04 0.04 m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 11.50 11.50 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.30 0.30 hok 65,000.00
2 Tukang kayu 0.10 0.10 hok 80,000.00
3 Kepala tukang 0.01 0.01 hok 100,000.00
4 Mandor 0.02 0.02 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan 0.03 0.03 m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 8.32 8.32 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.40 0.40 hok 65,000.00
2 Tukang kayu 0.20 0.20 hok 80,000.00
3 Kepala tukang 0.02 0.02 hok 100,000.00
4 Mandor 0.02 0.02 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
RENCANA ANGGARAN BIAYA
(Format 5.2)
Propinsi : Sulawesi Selatan No.RAB : 11
Kota : Palopo Program : Pembangunan Kampus Univ. Andi Djemma
Jenis Kegiatan : Acian
Ukuran/Dimensi 1.00
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 80,000.00
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 59,000.00
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 0.33 0.33 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1
2
Sub Total 2)
UPAH
1 Pekerja 0.02 0.02 hok 65,000.00
2 Tukang kayu 0.01 0.01 hok 80,000.00
3 Kepala tukang 0.00 0.00 hok 100,000.00
4 Mandor 0.00 0.00 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 1.00 1.00 buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 2.80 2.80 m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 5.10 5.10 m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm 35.00 35.00 buah 300.00
76 Screw Dia 6x20 mm 25.00 25.00 buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor 1.00 1.00 3000
2
Sub Total 2)
UPAH
1 Pekerja 0.25 0.25 hok 65,000.00
2 Tukang kayu 0.17 0.17 hok 80,000.00
3 Kepala tukang 0.12 0.12 hok 100,000.00
4 Mandor 0.06 0.06 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat 1.00 1.00 m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II 0.01 0.01 m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm 7.00 7.00 buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 0.60 0.60 hok 65,000.00
2 Tukang kayu 1.80 1.80 hok 80,000.00
3 Kepala tukang 0.18 0.18 hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil 1.05 1.05 m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks 0.01 0.01 kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 - -
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 0.05 0.05 hok 65,000.00
2 Tukang kayu 0.05 0.05 hok 80,000.00
3 Kepala tukang 0.01 0.01 hok 100,000.00
4 Mandor 0.03 0.03 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring 999.00 999.00 kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton 869.00 869.00 kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland 247.00 247.00 kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 Air 215.00 215.00 liter 50.00
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 1.65 1.65 hok 65,000.00
2 Tukang kayu 0.28 0.28 hok 80,000.00
3 Kepala tukang 0.03 0.03 hok 100,000.00
4 Mandor 0.08 0.08 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir 1.05 1.05 kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton 0.02 0.02 kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 Air - - liter 50.00
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja 0.01 0.01 hok 65,000.00
2 Tukang kayu 0.01 0.01 hok 80,000.00
3 Kepala tukang 0.00 0.00 hok 100,000.00
4 Mandor 0.00 0.00 hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
VOLUME HARGA
URAIAN Total Dari Dari Satuan SATUAN
Swadaya Dana (Rp)
BAHAN
1 Amplas - - lembar 8,000.00
2 Asbes Plat - - m2 15,000.00
3 Bambu - - batang 20,000.00
4 Batu Kali - - m3 137,500.00
5 Batu Merah - - buah 700.00
6 Besi beton polos/ ulir - - kg 10,900.00
7 Besi strip - - batang 36,250.00
8 Box Sekring - - buah 85,575.00
9 cat besi - - kg 65,000.00
10 Cat kayu - - kg 76,500.00
11 Cat tembok - - kg 22,000.00
12 Dempul Kayu - - kg 40,000.00
13 Dinding keramik 20/20 polos - - buah -
14 Dinding keramik 20/20 warna - - buah -
15 Dinding keramik 20/25 polos - - buah -
16 Dinding keramik 20/25 warna - - buah -
17 Dolken kayu galam - - batang 8,050.00
18 - - buah 1,500.00
19 Engsel Jendela - - buah 11,500.00
20 Engsel Pintu - - buah 13,033.33
21 Fitting Tunggal (Broco) - - buah 14,063.00
22 Floor Drain TX1C - - buah 27,500.00
23 Genteng Metal Surya Roof 0.3 m - - lembar 60,000.00
24 Grendel Sedang - - buah 12,000.00
25 Kabel Eterna NYY 2×1.5 - - m 7,000.00
26 Kaca polos 3 cm - - m2 78,142.08
27 Kaca polos 5 cm - - m2 97,677.60
28 Kait Angin - - buah 18,700.00
29 Kawat beton - - kg 22,000.00
30 Kayu Balok Kelas II 5/15 - - m3 3,250,000.00
31 Kayu Balok Kelas III 1.5/5 - - m3 2,640,000.00
32 Kayu Balok Kelas III 3/5 - - m3 2,640,000.00
33 Kayu Balok Kelas III 5/10 - - m3 2,640,000.00
34 Kayu Balok Kelas III 5/5 - - m3 2,640,000.00
35 Kayu Balok Kelas III 5/7 - - m3 2,640,000.00
36 Kayu Balok Kelas III 6/12 - - m3 2,640,000.00
37 Kayu Balok Mall - - m3 1,980,000.00
38 Kayu Papan Kelas II - - m3 3,250,000.00
39 Kayu Papan Kelas III 2.2/25 - - m3 2,640,000.00
40 Kayu Papan Mall - - m3 1,980,000.00
41 Kerikil / Split 2 - 3 - - kg 256.67
42 Kerikil saring - - kg 76.39
43 Kloset Jongkok - - buah 195,500.00
44 Kran air 3/4" besi - - buah 27,500.00
45 Kunci Tanam Union 2x Slag - - buah 75,000.00
46 Lampu Sumpit 23 Watt (Philips) - - buah 36,500.00
47 Lem kayu - - kg 27,500.00
48 List profil - - m1 3,750.00
49 Main Truss C.75 - - m1 13,333.33
50 MCB - - buah 132,250.00
51 Meni besi - - kg -
52 Meni kayu - - kg 21,131.25
53 Minyak Bekisting (solar) - - liter 8,500.00
54 Minyak Cat (tinner) - - liter 7,475.00
55 Minyak Solar (Industri) - - liter 8,500.00
56 Nok/Bubungan Surya Roof 0.3 m - - lembar 40,000.00
57 Paku biasa - - kg 20,000.00
58 Paku Sekrup 4 inc - - dos 48,100.00
59 Paku seng - - kg 27,500.00
60 Paku tripleks - - kg 25,350.00
61 Paku kalsiboard 1" x 24 bwg - - kg 30,000.00
62 Pasir beton - - kg 98.21
63 Pasir pasangan - - m3 137,500.00
64 Pasir urug - - m3 114,700.00
65 Pipa PVC 1" paralon Class D 4 M - - m1 10,250.00
66 Pipa PVC 3" paralon Class D 4 M - - m1 41,000.00
67 Pipa PVC 3/4" paralon SNI 6 M - - m1 6,416.67
68 Pipa Union untuk Kabel 5/8" - 4 m - - m1 5,000.00
69 Plamour - - kg 7,705.00
70 Politur - - kg 84,525.00
71 Rabung/nok Spandek - - m1 30,000.00
72 Roof Bottom/Reng R.33.0,45 - - m1 9,833.33
73 Sakelar Ganda (Broco) - - buah 16,100.00
74 Sakelar Tunggal (Broco) - - buah 12,362.50
75 Screw Dia 4x20 mm - - buah 300.00
76 Screw Dia 6x20 mm - - buah 350.00
77 Screw Dia 6x50 mm - - buah 500.00
78 Semen portland - - kg 1,300.00
79 Semen warna - - kg 20,000.00
80 Seng gelombang besar - - lembar 46,200.00
81 Seng plat - - lembar 56,000.00
82 Seng Spandec 0.35 - - m1 60,000.00
83 Sirtu - - m3 62,000.00
84 Stop Kontak - - buah 22,000.00
85 Tegel keramik 20/20 polos - - buah 3,696.00
86 Tegel keramik 20/20 warna - - buah 4,200.00
87 Tegel keramik 30/30 polos - - buah 7,002.00
88 Tegel keramik 30/30 warna - - buah 7,177.50
89 Tegel keramik 40/40 polos - - buah 13,680.00
90 Tegel keramik 40/40 warna - - buah 14,032.00
91 Tegel keramik 50/50 polos - - buah -
92 Tegel keramik 50/50 warna - - buah -
93 Tripleks 3 mm - - lembar 65,000.00
94 Tripleks 5 mm - - lembar -
95 Air - - liter 50.00
96 - -
97 - -
98 - -
99 - -
Sub Total 1)
ALAT
1 sewa bor - -
2
Sub Total 2)
UPAH
1 Pekerja - - hok 65,000.00
2 Tukang kayu - - hok 80,000.00
3 Kepala tukang - - hok 100,000.00
4 Mandor - - hok 100,000.00
Sub Total 3)
TOTAL BIAYA
Dana Bantuan Sosial:
Sumber Dana
Swadaya :
Dr. MARSUS SUTI, M.Kes. ZULKIFLI DARWIS, S.Sos., M.Si. ASNADI A. MACHMUD, ST. MT.
hapus koef. Setiap
analisa detail baru
angunan Kampus Univ. Andi Djemma
ukuran Pemasangan bouplank
m2
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
23,760.00 0.012
-
-
13,860.00 0.007
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
400.00 0.02
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
38,020.00
1 M PENGUKURAN DAN PEMASANGAN BOUPLANK
- Kayu Balok 0.012 m3
- Paku Biasa 0.02 Kg
- - Kayu Papan 0.007 m3
- Pekerja 0.1 oh
6,500.00 0.1 - Tukang Batu 0.1 oh
8,000.00 0.1 - Kepala Tukang 0.01 oh
1,000.00 0.01 - Mandor 0.005 oh
500.00 0.005
16,000.00
54,020.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
m2
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 M3 GALIAN TANAH BIASA
- Pekerja 0.75 oh
- Mandor 0.025 oh
-
48,750.00 0.75
-
-
2,500.00 0.025
51,250.00
51,250.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
m2
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 M3 URUGAN KEMBALI
- Peker 0 0 0.192 oh
- Mand 0 0 0.019 oh
-
12,480.00 0.192
-
-
1,900.00 0.019
14,380.00
14,380.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
m2
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
137,640.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
137,640.00
1 M3 URUGAN PASIR
- Pasir Urug 1.2 m3
- Pekerja 0.3 oh
- - Mandor 0.01 oh
19,500.00 0.3
-
-
1,000.00 0.01
20,500.00
158,140.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
m2
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
74,400.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
74,400.00
1 M3 URUGAN SIRTU
- Sirtu 1.2 m3
- Pekerja 0.25 oh
- - Mandor 0.025 oh
16,250.00 0.25
-
-
2,500.00 0.025
18,750.00
93,150.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
-
-
165,000.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
49,550.40 0.432
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
214,550.40
1 M3 PAS.PONDASI BATU KOSONG
- Batu Kali 1.2 m3
- Pasir Urug 0.432 m3
- - Pekerja 0.78 oh
- Tukang Batu 0.39 oh
50,700.00 0.78 - Kepala tukang 0.039 oh
31,200.00 0.39 - mandor 0.039 oh
3,900.00 0.039
3,900.00 0.039
89,700.00
304,250.40 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
-
-
165,000.00 1.2
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
71,500.00 0.52
-
-
-
-
-
-
-
-
-
-
-
-
-
-
211,900.00 163
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
448,400.00
1 M3 PAS.PONDASI BATU KALI 1 : 4
- Batu Kali 1.2 m3
- Semen Portland 163 kg
- - Pasir Pasangan 0.52 m3
- Pekerja 1.5 oh
97,500.00 1.5 - Tukang Batu 0.75 oh
60,000.00 0.75 - Kepala tukang 0.075 oh
7,500.00 0.075 - mandor 0.075 oh
7,500.00 0.075
172,500.00
620,900.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
-
-
-
49,000.00 70
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5,912.50 0.043
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14,950.00 11.5
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
69,862.50
1 M3 PAS.BATU BATA 1/2 BATU 1 : 4
- Bata merah 5x11 70 bh
- Semen portland 11.5 kg
- - Pasir pasang 0.043 m3
- Pekerja 0.3 oh
19,500.00 0.3 - Tukang batu 0.1 oh
8,000.00 0.1 - Kepala tukang 0.01 oh
1,000.00 0.01 - Mandor 0.015 oh
1,500.00 0.015
30,000.00
99,862.50 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,300.00 0.024
-
-
-
-
-
-
-
-
-
-
-
-
-
-
8,112.00 6.24
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11,412.00
1 M3 PLESTERAN 1 : 4 T 15 MM
- Semen portland 6.24 kg
- Pasir Pasangan 0.024 m3
- - Pekerja 0.3 oh
- Tukang Batu 0.15 oh
19,500.00 0.3 - Kepala tukang 0.015 oh
12,000.00 0.15 - Mandor 0.015 oh
1,500.00 0.015
1,500.00 0.015
34,500.00
45,912.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,400.00 0.032
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10,816.00 8.32
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
15,216.00
1 M3 PLESTERAN 1 : 4 T 20 MM
- Semen Portland 8.32 kg
- Pasir Pasangan 0.032 m3
- - Pekerja 0.4 oh
- Tukang Batu 0.2 oh
26,000.00 0.4 - Kepala tukang 0.02 oh
16,000.00 0.2 - mandor 0.022 oh
2,000.00 0.02
2,200.00 0.022
46,200.00
61,416.00 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
m2
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
422.50 0.325
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
422.50
1 M3 Acian
- Semen Portland 3.25 kg
- Pekerja 0.2 oh
- - Tukang Batu 0.1 oh
- Kepala tukang 0.01 oh
1,300.00 0.02 - mandor 0.01 oh
800.00 0.01
100.00 0.001
100.00 0.001
2,300.00
2,722.50 31,551,575.19
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1,500.00 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
37,333.33 2.8
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
50,150.00 5.1
-
-
10,500.00 35
8,750.00 25
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
108,233.33
1 M3 PAS. RANGKA ATAP BAJA RINGAN
3,000.00 1 - Main Truss C.75 2.8 m
- Roof Bottom/Ren 5.1 m
3,000.00 - Screw Dia 6x20 25 bh
- Screw Dia 4x20 35 bh
16,055.00 0.247 - 1 bh
13,920.00 0.174 - Peralatan 1 ls
11,700.00 0.117 - Pekerja 0.247 oh
5,900.00 0.059 - Tukang 0.174 oh
47,575.00 - Kepala Tukang 0.117 oh
- mandor 0.059 oh
158,808.33 31,435,741.86
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
tidak 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
22,750.00 0.007
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,500.00 7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
26,250.00
1 M3 PAS. LISTPLANK ASBES PLAT RAM KAYU
- - Kayu Kelas II 0.007 m3
- Asbes Plat 1 m2
- - Screw Dia 6x50 7 bh
- Pekerja 0.6 oh
39,000.00 0.6 - Tukang Kayu 1.8 oh
144,000.00 1.8 - Kepala Tukang 0.18 oh
18,000.00 0.18 - mandor 0.03 oh
3,000.00 0.03
204,000.00
230,250.00 31,435,741.86
Dibuat Oleh:
Panitia Rehab Gedung
-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
18,150.00 0.006875
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2,000.00 0.1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
20,150.00
1 M3 PAS. RANGKA LANGIT-LANGIT 60x120
- - Kayu Kelas III Ba 0.006875 m3
- Paku Biasa 0.1 Kg
- - Pekerja 0.15 oh
- Tukang Kayu 0.25 oh
9,750.00 0.15 - Kepala Tukang 0.025 oh
20,000.00 0.25 - Mandor 0.075 oh
2,500.00 0.025
7,500.00 0.075
39,750.00
59,900.00 31,435,741.86
Dibuat Oleh:
Panitia Rehab Gedung
m2
JUMLAH
TOTAL
(Rp)
-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,937.50 1.05
-
-
-
-
-
-
-
-
-
-
-
253.50 0.01
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,191.00
1 M3 PAS. LIST PROFIL
- - List Profil 4 x 4 c 1.05 m
- Paku Tripleks 0.01 Kg
- - Pekerja 0.05 oh
- Tukang Kayu 0.05 oh
3,250.00 0.05 - Kepala Tukang 0.005 oh
4,000.00 0.05 - Mandor 0.03 oh
500.00 0.005
3,000.00 0.03
10,750.00
14,941.00 31,435,741.86
Dibuat Oleh:
Panitia Rehab Gedung
SNADI A. MACHMUD, ST. MT.
JUMLAH
TOTAL
(Rp)
-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
76,312.50 999
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
85,348.21 869
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
321,100.00 247
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
10,750.00 215
-
-
-
-
493,510.71
1 M3 LANTAI FLOOR f'c=7,4 MPa (K100)
- - Semen Portland 247 kg
- Pasir Beton 869 kg
- - Kerikil beton 999 kg
- Air 215 Ltr
107,250.00 1.65 - Pekerja 1.65 oh
22,000.00 0.275 - Tukang Batu 0.275 oh
2,800.00 0.028 - Kepala Tukang 0.028 oh
8,300.00 0.083 - Mandor 0.083 oh
140,350.00
633,860.71 31,435,791.86
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
tidak
-
-
-
11,445.00 1.05
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
330.00 0.015
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11,775.00
1 M3 PEMBESIAN DENGAN BESI POLOS
- - Besi beton 1.05 kg
- Kawat Beton 0.015 kg
- - Pekerja 0.007 Oh
- Tukang Besi 0.007 Oh
455.00 0.007 - Kepala tukang 0.0007 Oh
560.00 0.007 - Mandor 0.0003 Oh
70.00 0.0007
30.00 0.0003
1,115.00
12,890.00 31,435,791.86
Dibuat Oleh:
Panitia Rehab Gedung
JUMLAH
TOTAL
(Rp)
-
tidak
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1 M3 BEKISTING PONDASI POER
- - Kayu 0 0 0.04 m3
- Paku 0 0 0.3 kg
- 31,435,791.86
Dibuat Oleh:
Panitia Rehab Gedung
45,912.00
1,300.00 10,816.00
137,500.00 4,400.00
65,000.00 26,000.00
80,000.00 16,000.00
100,000.00 2,000.00
100,000.00 2,200.00
61,416.00
1,300.00 4,225.00
65,000.00 13,000.00
80,000.00 8,000.00
100,000.00 1,000.00
100,000.00 1,000.00
-
27,225.00
13,333.33 37,333.33
9,833.33 50,150.00
350.00 8,750.00
300.00 10,500.00
1,500.00 1,500.00
3,000.00 3,000.00
65,000.00 16,055.00
80,000.00 13,920.00
100,000.00 11,700.00
100,000.00 5,900.00
158,808.33
LAT RAM KAYU
3,250,000.00 22,750.00
15,000.00
500.00 3,500.00
65,000.00 39,000.00
80,000.00 144,000.00
100,000.00 18,000.00
100,000.00 3,000.00
-
-
-
230,250.00
NGIT 60x120
2,640,000.00 18,150.00
20,000.00 2,000.00
65,000.00 9,750.00
80,000.00 20,000.00
100,000.00 2,500.00
100,000.00 7,500.00
-
-
-
-
59,900.00
3,750.00 3,937.50
25,350.00 253.50
65,000.00 3,250.00
80,000.00 4,000.00
100,000.00 500.00
100,000.00 3,000.00
-
-
-
-
14,941.00
1,300.00 321,100.00
98.21 85,348.21
76.39 76,312.50
50.00 10,750.00
65,000.00 107,250.00
80,000.00 22,000.00
100,000.00 2,800.00
100,000.00 8,300.00
-
-
633,860.71
10,900.00 11,445.00
22,000.00 330.00
65,000.00 455.00
80,000.00 560.00
100,000.00 70.00
100,000.00 30.00
-
-
-
-
12,890.00
1,980,000.00 79,200.00
20,000.00 6,000.00
8,500.00 850.00
65,000.00 33,800.00
80,000.00 20,800.00
100,000.00 2,600.00
100,000.00 2,600.00
-
-
-
145,850.00
1 Amplas
2 Asbes Plat
3 Bambu
4 Batu Kali
5 Batu Merah
6 Besi beton polos/ ulir
7 Besi strip
8 Box Sekring
9 cat besi
10 Cat kayu
11 Cat tembok
12 Dempul Kayu
13 Dinding keramik 20/20
14 Dinding keramik 20/25
15 Dolken kayu galam
16
17 Engsel Jendela
18 Engsel Pintu
19 Fitting Tunggal (Broco)
20 Floor Drain TX1C
21 Genteng Metal Surya Roof 0.3 mm (2x4)
22 Grendel Sedang
23 Kabel Eterna NYY 2×1.5
24 Kaca polos 3 cm
25 Kaca polos 5 cm
26 Kait Angin
27 Kawat beton
28 Kayu Balok Kelas II 5/15
29 Kayu Balok Kelas III 1.5/5
30 Kayu Balok Kelas III 3/5
31 Kayu Balok Kelas III 5/10
32 Kayu Balok Kelas III 5/5
33 Kayu Balok Kelas III 5/7
34 Kayu Balok Kelas III 6/12
35 Kayu Balok Mall
36 Kayu Papan Kelas II
37 Kayu Papan Kelas III 2.2/25
38 Kayu Papan Mall
39 Kerikil / Split 2 - 3
40 Kerikil saring
41 Kloset Jongkok
42 Kran air 3/4" besi
43 Kunci Tanam Union 2x Slag
44 Lampu Sumpit 23 Watt (Philips)
45 Lem kayu
46 List profil
47 Main Truss C.75
48 MCB
49 Meni besi
50 Meni kayu
51 Minyak Bekisting
52 Minyak Cat (tinner)
53 Minyak Solar (Industri)
54 Nok/Bubungan Surya Roof 0.3 mm
55 Paku biasa
56 Paku Sekrup 4 inc
57 Paku seng
58 Paku tripleks
59 Pasir kalsiboard 1" x 24 bwg
60 Pasir pasangan
61 Pipa PVC 1" paralon Class D 4 M
62 Pipa PVC 3" paralon Class D 4 M
63 Pipa PVC 3/4" paralon SNI 6 M
64 Pipa Union untuk Kabel 5/8" - 4 m
65 Plamour
66 Politur
67 Rabung/nok Spandek
68 Roof Bottom/Reng R.33.0,45
69 Sakelar Ganda (Broco)
70 Sakelar Tunggal (Broco)
71 Screw Dia 4x20 mm
72 Screw Dia 6x20 mm
73 Screw Dia 6x50 mm
74 Semen portland
75 Semen warna
76 Seng gelombang besar
77 Seng plat
78 Seng Spandec 0.35
79 Sirtu
80 Stop Kontak
81 Tegel keramik 20/20
82 Tegel keramik 30/30
83 Tegel keramik 40/40
84 Tegel keramik 50/50
85 Tripleks 3 mm