SUB TOTAL 2 -
3 UPAH / BIAYA
1 Pekerja 45.60 oh 120,000.00 5,472,371.52
2 Tukang 72.13 oh 150,000.00 10,819,159.80
3 Pemasangan Krawangan tempel 10.00 m² 250,000.00 2,500,000.00
SUB TOTAL 3 18,791,531.32
4 BIAYA PERENCANAAN
SUB TOTAL 4 -
JUMLAH 40,611,245.43
PEMBULATAN 40,611,000.00
I PEKERJAAN BETON
1 Membuat beton mutu f'c = 14,5 Mpa slump (120 +/- 20) mm
Upah
Pekerja 1.650 oh 5.43 8.96
Tukang 0.275 oh 5.43 1.49
Bahan
Semen portland 326.00 kg 5.43 1770.83
Pasir beton 760.00 kg 5.43 4128.32
Kerikil (maks 30 mm) 1029.00 kg 5.43 5589.53
Air 215.00 ltr 5.43 1167.88
II PEKERJAAN PEMBESIAN BESI POLOS ATAU BESI ULIR / 10 kg
1 Pembesian dengan besi polos atau besi ulir
Upah
Pekerja 0.070 oh 760.02
Tukang 0.070 oh 760.02 53.20
Bahan
Besi beton (polos/ulir) 10.500 kg 760.02 7980.22
Kawat beton 0.015 kg 760.02 11.40