SUB TOTAL 2 -
3 UPAH / BIAYA
1 Upah Borongan Tukang (35% x Sub Total 1) 35.00 % 21,819,714.11 7,636,899.94
2 Pemasangan Krawangan tempel 10.00 m² 250,000.00 2,500,000.00
SUB TOTAL 3 10,136,899.94
4 BIAYA PERENCANAAN
SUB TOTAL 4 -
JUMLAH 31,956,614.05
PEMBULATAN 31,956,000.00
Terbilang : Tiga Puluh Satu Juta Sembilan Ratus Lima Puluh Enam Ribu Rupiah,-