PERBAIKAN KONSTRUKSI
BAJA
KONTRAKTOR PELAKSANA
REKAPAN VOLUME STRUKTUR PERKUATAN BAJA
Evl.+5 Evl.+3
JUMLAH
RAB.BARU RAB.LAMA RAB.BARU
9 10 11 12
3,785.10
18,416.93 21,142.43
107,816.00 158,136.00
114.52 25,274.52
114.52
2,057.15
1,522.90
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR
TOTAL Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +9.00) 579 Kg
PERHITUNGAN VOLUME
557.08 kg
WF 300 Grid F 36.67 6.00 2.00 440 kg
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M 19 0.23 24.00 5.52 kg
TOTAL Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +8.20) 2,128 Kg
TOTAL Pemasangan balok WF 300 x 150 x6.5 x 9 (Elv. +8,20) 2,272 Kg
TOTAL Pemasangan balok WF 400 x 200 x 8 x 13 (Elv. +8,20) 2,766 Kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN
- Potongan Melintang
Grid 2 3.77 1.50 8.00 45.24 kg
Grid 7 3.77 1.50 3.00 16.97 kg
Grid 9 3.77 1.50 3.00 16.97 kg
Grid 13 3.77 1.50 3.00 16.97 kg
Grid 20 3.77 1.50 8.00 45.24 kg
- Potongan Melintang
Grid 2 3.77 0.15 35.00 19.79 kg
Grid 5 3.77 0.15 11.00 6.22 kg
Grid 7 3.77 0.15 11.00 6.22 kg
Grid 10 3.77 0.15 11.00 6.22 kg
Grid 12 3.77 0.15 11.00 6.22 kg
Grid 13 3.77 0.15 11.00 6.22 kg
Grid 17 3.77 0.15 11.00 6.22 kg
Grid 20 3.77 0.15 35.00 19.79 kg
TOTAL PERKUATAN Pemasangan besi siku 5x5 (untuk tumpuan & sepatu kuda-kuda) ELV +9.00 795.09 KG
Grid 4
Cover Plate 8 mm 2 Line 8.6 4 34.4 M
Grid 18
Cover Plate 8 mm 2 Line 8.6 4 34.4 M
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR
Grid 20
Cover Plate 6 mm 2 Line 8.6 4 34.4 M
8 mm 2 Line 2.1 4 8.4 M
6 mm 2 Line 6.15 4 24.6 M
Grid D
Cover Plate 6 mm 2 Line 6 4 24 M
Grid J
Cover Plate 6 mm 2 Line 6 4 24 M
- Potongan Melintang
Grid A D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid B D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid C D - 16 jarak 0.2 1.57824 24.00 0.300 120.00 36.00 kg
Grid C-1 D - 16 jarak 0.2 1.57824 8.00 0.300 40.00 12.00 kg
Grid D D - 16 jarak 0.2 1.57824 86.00 0.300 430.00 129.00 kg
Grid D-1 D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid D-2 D - 16 jarak 0.2 1.57824 74.00 0.300 370.00 111.00 kg
Grid D-3 D - 16 jarak 0.2 1.57824 4.00 0.300 20.00 6.00 kg
Grid E D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid F D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid F-1 D - 16 jarak 0.2 1.57824 41.00 0.300 205.00 61.50 kg
Grid G D - 16 jarak 0.2 1.57824 41.00 0.300 205.00 61.50 kg
Grid G-1 D - 16 jarak 0.2 1.57824 41.00 0.300 205.00 61.50 kg
Grid H D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid I D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid I-1 D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid I-2 D - 16 jarak 0.2 1.57824 74.00 0.300 370.00 111.00 kg
Grid I-3 D - 16 jarak 0.2 1.57824 4.00 0.300 20.00 6.00 kg
Grid J D - 16 jarak 0.2 1.57824 86.00 0.300 430.00 129.00 kg
Grid J-1 D - 16 jarak 0.2 1.57824 8.00 0.300 40.00 12.00 kg
Grid K D - 16 jarak 0.2 1.57824 24.00 0.300 120.00 36.00 kg
5 TULANGAN KEBAKARAN
- Potongan Memanjang Panjang Dg Overlab 8,219.79 8,219.79 kg S-R- 007-A1
84 D - 10 jarak 0.2 0.6165 36.00 3.00 0.8 38.400 420.00 9,942.91 kg
Dikurangi Void
43 D - 10 jarak 0.2 0.6165 13.00 -1 215.00 (1,723.12) kg
WF 200 Grid 10-2 21.33 3.25 1.00 69.33 kg 90.07 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19
WF 200 Grid 10-3 21.33 4.50 2.00 192.00 kg 233.48 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.18 4.00 14.93 kg
Baut M19
WF 200 Grid 10-4 21.33 3.00 1.00 64.00 kg 84.74 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19
WF 200 Grid 11-1 21.33 3.25 2.00 138.67 kg 165.21 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200
Baut M19
WF 200 Grid 11-2 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg
WF 200 Grid 11-3 21.33 3.25 2.00 138.67 kg 165.21 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg
WF 200 Grid 11-4 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
WF 200 Grid 11-5 21.33 3.00 1.00 64.00 kg 77.27 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
WF 200 Grid G-1 21.33 1.50 1.00 32.00 kg 44.62 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 4.00 10.68 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
WF 200 Grid I-1 21.33 2.00 7.00 298.67 kg 380.24 kg S-R- 003-E3
Rip 10mm 80.90 0.30 0.1 28.00 67.96 kg
Rip 6mm 48.61 0.20 0.05 28.00 13.61 kg
Bracing WF 200 0.00 kg
Baut M19 - kg
WF 200 Grid J-1 21.33 2.00 2.00 85.33 kg 110.58 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 8.00 21.36 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg
Pengecatan 86.75 1 86.75 m2 86.75 m2 S-R- 003-B
Baut 50.00 50.00 titik 50.00 titik
1 Pemasangan balok WF 300 x 150 x 6,5 x 9 (Elv. +5.00) 1,161 kg S-R- 003-B
WF 300 Grid 9-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR
X
WF 300 Grid 9-2 36.67 3.00 1.00 110.00 kg 114.18 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
WF 300 Grid 12-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
WF 300 Grid I-1 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
WF 300 Grid I-2 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
Pengecatan 26.00 1.2 31.20 m2 31.20 m2 S-R- 003-B
Baut 14.00 14.00 titik 14.00 titik
2 Perkuatan Balok WF metode Box menggunakan Plat
2.1 R1 (WF 300 x 150 x 6,5 x 9) 1,231.36 kg S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Grid i-1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Pengecatan 18.96 m2 S-R- 003-E
Grid D-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
Grid i-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
2.2 R2 (WF 300 x 150 x 6,5 x 9) 101.40 kg S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid G - 1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid I-2
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 1 15.58 Kg
Rip 8 mm 2 Line 64.93 0.072 0.28 0.02 2.6 1 2.61 Kg
Pengecatan 1.56 m2 S-R- 003-E
Grid F-1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid G - 1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid I-2
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 1 0.24 m2
Rip 8 mm 2 Line 1.00 0.072 0.28 0.02 0.0 1 0.04 m2
2.3 R3 (WF 300 x 150 x 6,5 x 9) 566.00 kg S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 80.90 5.83 0.30 1.75 283.0 2 566.00 Kg
Rip 8 mm - Line 64.93 0.072 0.28 0.02 - - - Kg
Pengecatan 7.00 m2 S-R- 003-E
Grid I - 1
Cover Plate 10 mm 2 Line 1.00 5.83 0.30 1.75 3.5 2 7.00 m2
Rip 8 mm - Line 1.00 0.072 0.28 0.02 - - - m2
2.4 R4 (350 x 175 x 7 x 11) 488.83 kg S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Grid 11
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 1 90.61 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Grid 18
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Pengecatan 5.93 m2 S-R- 003-E
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR
X
Grid 4
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 - 0.084 0.33 0.03 - 4 - m2
Grid 11
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 1 1.12 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
Grid 18
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 4 0.22 m2
2.5 R5 (350 x 175 x 7 x 11) 184.10 kg S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 97.22 2.6 0.35 0.91 176.9 1 176.94 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Pengecatan 1.93 m2 S-R- 003-E
Grid 11
Cover Plate 12 mm 2 1.00 2.6 0.35 0.91 1.8 1 1.82 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
2.6 R6 (350 x 175 x 7 x 11) 323.11 kg S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 80.90 2.6 0.35 0.91 147.2 2 294.49 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 8 28.62 Kg
Pengecatan 4.08 m2 S-R- 003-E
Grid
Cover Plate 10 mm 2 1.00 2.6 0.35 0.91 1.8 2 3.64 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 8 0.44 m2
2.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 3,052.30 kg S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 10-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Pengecatan 37.73 m2 S-R- 003-C4
Grid 10-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 10-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 10,774.66 kg S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 4 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 6 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 7 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 9 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 10 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 11 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 12 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 13 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 15 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 16 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 18 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR
X
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 19 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Pengecatan 133.18 m2 S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 4 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 6 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 7 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 9 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 10 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 11 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 12 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 13 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 15 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 16 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 18 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 19 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 1,695.17 kg S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 8 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 14 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 20 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Pengecatan 20.95 m2 S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 8 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 14 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 20 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
3 Pengelasan Full Cover Plat Balok WF Elv +5.00
3.1 R1 (WF 300 x 150 x 6,5 x 9) 120.00 m S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
Grid i-1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
3.2 R2 (WF 300 x 150 x 6,5 x 9) 9.60 m S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR
X
Grid G - 1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid I-2
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
3.3 R3 (WF 300 x 150 x 6,5 x 9) 46.64 m S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 5.83 - 4 46.64 m
3.4 R4 (350 x 175 x 7 x 11) 38.40 m S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 11
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 18
Cover Plate 10 mm 2 1.6 - 4 12.80 m
3.5 R5 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 2.6 - 4 20.80 m
3.6 R6 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 2.6 - 4 20.80 m
3.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 154.88 m S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 10-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 570.40 m S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 4 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 6 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 7 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 9 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 10 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 11 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 12 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 13 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 15 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 16 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 18 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 19 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 96.64 m S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 8 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 14 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 20 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
LANTAI 1 2057.15 m2
KOLOM
K1 : WF 400X400X13X21 0.4 x 0.4 0.5 2.4 68 81.6 m2
K2 : WF 300X150X6,5X9 0.3 x 0.15 0.5 2.4 41 49.2 m2
LANTAI 2 1522.9 m2
KOLOM
K1 : WF 400X400X13X21 0.4 x 0.4 4 2.4 68 652.8 m2
K2 : WF 300X150X6,5X9 0.3 x 0.15 4 1.2 42 201.6 m2
2 Pemasangan balok WF 300 x 150 x6.5 x 9 (Area Selasar Samping Elv. +3.00) 1,868.74 kg
WF 300 Grid 2 36.67 2.50 6.00 550 kg
End Plate 12mm 97.22 0.60 0.15 12.00 105 kg
Rip 6mm 48.61 0.30 0.075 24.00 26.25 kg
Bracing WF 300 36.67 0.50 12.00 220 kg
Baut M19 0.23 144.00 33.12 kg
3 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00) 1,875 kg
WF 200 Grid 1 21.33 2.50 6.00 320.00 kg
End Plate 10mm 80.90 0.40 0.1 12.00 38.83 kg
Rip 6mm 48.61 0.20 0.05 24.00 11.67 kg
Bracing WF 200 21.33 0.45 12.00 115.20 kg
B LANTAI II
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 8 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 14 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 20 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg