1 Pemasangan balok WF 200 x 100 x 5.5 x 8 Kg 579.33 2,127.70

2 Pemasangan balok WF 300 x 150 x6.5 x 9 Kg - 1,849.30 2,272.08 2,668.33

3 Pemasangan balok WF 400 x 200 x 8 x 13 Kg 2,765.53 1,019.58

Perkuatan Balok WF metode Box menggunakan


4
Plat Elv +5.00 dan Elv +9.00 Kg 2,725.50

Pengelasan Full Cover Plat Balok WF Elv +5.00


5
dan Elv +9.00 Cm 50,320.00

6 Modifikasi Joint Plate +5.00


1.Pengelasan keliling pada EndPlate Cm 25,160.00
2.Penambahan Stefner Kg

7 Pengerokan Karat pada Permukaan Baja secara Manual


- Lantai 1 M2
- Lantai 2 M2
ME STRUKTUR PERKUATAN BAJA

Evl.+5 Evl.+3
JUMLAH
RAB.BARU RAB.LAMA RAB.BARU
9 10 11 12

2,021.97 2,614.31 7,343.31

1160.96 1251.55 9,202.23

3,785.10

18,416.93 21,142.43

107,816.00 158,136.00

114.52 25,274.52
114.52

2,057.15
1,522.90
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
A ELEVASI + 9,00
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +9.00) 145 kg
WF 200 Grid 7 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg
145 kg
WF 200 Grid 8 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg
145 kg
WF 200 Grid 14 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg
145 kg
WF 200 Grid 15 21.33 2.10 2.00 89.60 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 24.00 4.08 kg

TOTAL Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +9.00) 579 Kg
PERHITUNGAN VOLUME

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
A ELEVASI + 8,200
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +8.20) 252 kg
WF 200 Grid 1-1 21.33 5.50 2.00 234.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 - - kg
98 kg
WF 200 Grid 2 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 16.00 2.72 kg
98 kg
WF 200 Grid 2-1 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
72 kg
WF 200 Grid 9-1 21.33 3.00 1.00 64.00 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg 1
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
83 kg
WF 200 Grid 10 - 1 21.33 3.50 1.00 74.67 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
72 kg
WF 200 Grid 10 - 2 21.33 3.00 1.00 64.00 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
83 kg
WF 200 Grid 11 - 1 21.33 3.50 1.00 74.67 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.23 - - kg
72 kg
WF 200 Grid 11 - 2 21.33 3.00 1.00 64.00 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.23 - - kg
83 kg
WF 200 Grid 12 - 1 21.33 3.50 1.00 74.67 kg
End Plate 10mm 80.90 0.40 0.1 2.00 6.47 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Baut M 16 0.17 - - kg
98 kg
WF 200 Grid 19 - 1 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98 kg
WF 200 Grid 20 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
252 kg
WF 200 Grid 20 - 1 21.33 5.50 2.00 234.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 8.00 1.36 kg
188 kg
WF 200 Grid C-1 21.33 4.00 2.00 170.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 - - kg
98 kg
WF 200 Grid D 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98 kg
WF 200 Grid D-1 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98
PERHITUNGAN VOLUME

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

WF 200 Grid I-1 21.33 1.00 2.00 42.67 kg kg


End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
98 kg
WF 200 Grid J 21.33 1.00 2.00 42.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
Baut M 16 0.17 8.00 1.36 kg
188 kg
WF 200 Grid J-1 21.33 4.00 2.00 170.67 kg
End Plate 10mm 80.90 0.40 0.1 4.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M 16 0.17 8.00 1.36 kg

2 Pemasangan balok WF 300 x 150 x6.5 x 9 (Elv. +8,20) 150.21 kg


WF 300 Grid 7 36.67 2.50 1.00 92 kg
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
150.21 kg
WF 300 Grid 8 36.67 2.50 1.00 92 kg
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
150.21 kg
WF 300 Grid 14 36.67 2.50 1.00 92 kg
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
150.21 kg
WF 300 Grid 15 36.67 2.50 1.00 92 kg
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Bracing WF 300 36.67 0.50 2.00 36.666667 kg
Baut M 19 0.23 12.00 2.76 kg
557.08 kg
WF 300 Grid D 36.67 6.00 2.00 440 kg
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M 19 0.23 24.00 5.52 kg
557.08 kg
WF 300 Grid E 36.67 6.00 2.00 440 kg
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M 19 0.23 24.00 5.52 kg

557.08 kg
WF 300 Grid F 36.67 6.00 2.00 440 kg
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M 19 0.23 24.00 5.52 kg

2 Pemasangan balok WF 400 x 200 x 8 x 13 (Elv. +8,20) 691.38 kg


WF 400 Grid 7 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Baut M 16 WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg
691.38 kg
WF 400 Grid 8 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Bracing WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg
691.38 kg
WF 400 Grid 14 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Bracing WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg
691.38 kg
WF 400 Grid 15 66.00 8.60 1.00 568 kg
End Plate 16mm 97.22 0.60 0.15 2.00 17.5 kg
Rip 10mm 80.90 0.30 0.075 4.00 7.28125 kg
Bracing WF 400 66.00 0.75 2.00 99 kg
Baut M19 0.17 24.00 4.08 kg
PERHITUNGAN VOLUME

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

TOTAL Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Elv +8.20) 2,128 Kg
TOTAL Pemasangan balok WF 300 x 150 x6.5 x 9 (Elv. +8,20) 2,272 Kg
TOTAL Pemasangan balok WF 400 x 200 x 8 x 13 (Elv. +8,20) 2,766 Kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
BJ P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
E Kuda-Kuda
1 Pemasangan besi siku 5x5 (untuk tumpuan) 571.16 kg S-103
- Potongan Memanjang S-606
Grid D 3.77 1.50 19.00 107.45 kg S-607
Grid E 3.77 1.50 6.00 33.93 kg S-608
Grid F 3.77 1.50 10.00 56.55 kg
Grid G 3.77 1.50 6.00 33.93 kg
Grid H 3.77 1.50 10.00 56.55 kg
Grid I 3.77 1.50 6.00 33.93 kg
Grid J 3.77 1.50 19.00 107.45 kg

- Potongan Melintang
Grid 2 3.77 1.50 8.00 45.24 kg
Grid 7 3.77 1.50 3.00 16.97 kg
Grid 9 3.77 1.50 3.00 16.97 kg
Grid 13 3.77 1.50 3.00 16.97 kg
Grid 20 3.77 1.50 8.00 45.24 kg

2 Sepatu Kuda-Kuda 223.94 kg


- Potongan Memanjang
Grid D 3.77 0.15 68.00 38.45 kg
Grid E 3.77 0.15 22.00 12.44 kg
Grid F 3.77 0.15 40.00 22.62 kg
Grid H 3.77 0.15 40.00 22.62 kg
Grid I 3.77 0.15 22.00 12.44 kg
Grid J 3.77 0.15 68.00 38.45 kg

- Potongan Melintang
Grid 2 3.77 0.15 35.00 19.79 kg
Grid 5 3.77 0.15 11.00 6.22 kg
Grid 7 3.77 0.15 11.00 6.22 kg
Grid 10 3.77 0.15 11.00 6.22 kg
Grid 12 3.77 0.15 11.00 6.22 kg
Grid 13 3.77 0.15 11.00 6.22 kg
Grid 17 3.77 0.15 11.00 6.22 kg
Grid 20 3.77 0.15 35.00 19.79 kg

TOTAL PERKUATAN Pemasangan besi siku 5x5 (untuk tumpuan & sepatu kuda-kuda) ELV +9.00 795.09 KG

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Direksi Pekerjaan Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang PT.KONINDO PANORAMA KONSULTAN PT. TANJONG HARAPAN

KEVIN ESTON FUNAY, A.Md MESAKH PENLAANA, ST HILMANTO, ST


Nip 19810830 201101 1 010 Inspector Pelaksana
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
D ELEVASI +9.00 (ATAP)
1 Pemasangan balok WF 300 x 150 x6.5 x 9 1,849.30 kg
WF 300 Grid 7 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1
End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg

WF 300 Grid 9 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1


End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg

WF 300 Grid 13 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1


End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg

WF 300 Grid 15 36.67 9.00 1.00 330 kg 462.33 kg S-R- 005-A1


End Plate 12mm 97.22 0.60 0.15 2.00 17.5 kg S-R- 004-A1
Rip 6mm 48.61 0.30 0.075 4.00 4.375 kg
Rip 10mm 80.90 0.38 0.2 12.00 73.783 kg
Bracing WF 300 36.67 0.50 2.00 36.67 kg
Baut M19 0.23 24.00 5.52 kg
Baut 8.00 8.00 titik 8.00 titik
Pengecatan 36.00 1.20 43.20 m2 43.20 m2 S-R- 005-A1
2 Pemasangan balok WF 200 x 100 x5.5 x 8 - kg S-R- 005-A1
WF 200 Grid 7 & 15 21.33 2.50 2.00 kg - kg S-R- 004-A1
End Plate 10mm 80.90 0.60 0.1 4.00 kg
Rip 10mm 80.90 0.38 0.2 12.00 kg
Rip 6mm 48.61 0.20 0.05 8.00 kg
Bracing WF 200 21.33 0.30 4.00 kg
Baut M16 0.17 40.00 kg
Baut 4.00 titik 0.00 titik
Pengecatan 5.00 1.00 m2 0.00 m2
3 Perkuatan Ring Balok Elv +9.00 (Atap) 2,725.50 kg S-R- 005-A
Grid 2 S-R- 005-A1
Cover Plate 6 mm 2 Line 48.61 8.6 0.20 1.72 167.2 2 334.44 Kg
8 mm 2 Line 64.93 2.1 0.20 0.42 54.5 2 109.08 Kg
6 mm 2 Line 48.61 6.15 0.20 1.23 119.6 2 239.17 Kg
Grid 4
Cover Plate 8 mm 2 Line 64.93 8.6 0.20 1.72 223.4 2 446.72 Kg
Grid 18
Cover Plate 8 mm 2 Line 64.93 8.6 0.20 1.72 223.4 2 446.72 Kg
Grid 20
Cover Plate 6 mm 2 Line 48.61 8.6 0.20 1.72 167.2 2 334.44 Kg
8 mm 2 Line 64.93 2.1 0.20 0.42 54.5 2 109.08 Kg
6 mm 2 Line 48.61 6.15 0.20 1.23 119.6 2 239.17 Kg
Grid D
Cover Plate 6 mm 2 Line 48.61 6 0.20 1.20 116.7 2 233.33 Kg
Grid J
Cover Plate 6 mm 2 Line 48.61 6 0.20 1.20 116.7 2 233.33 Kg

Pengelasan Full Cover Plat Balok WF Elv +9.00 (Atap)


Las Kelliling 8mm
Grid 2 251.6 M
Cover Plate 6 mm 2 Line 8.6 4 34.4 M
8 mm 2 Line 2.1 4 8.4 M
6 mm 2 Line 6.15 4 24.6 M

Grid 4
Cover Plate 8 mm 2 Line 8.6 4 34.4 M

Grid 18
Cover Plate 8 mm 2 Line 8.6 4 34.4 M
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

Grid 20
Cover Plate 6 mm 2 Line 8.6 4 34.4 M
8 mm 2 Line 2.1 4 8.4 M
6 mm 2 Line 6.15 4 24.6 M

Grid D
Cover Plate 6 mm 2 Line 6 4 24 M

Grid J
Cover Plate 6 mm 2 Line 6 4 24 M

TOTAL PENAMBAHAN BALOK WF 300 ELV +9.00 1,849.30 KG


TOTAL PENAMBAHAN BALOK WF 200 ELV +9.00 - KG
TOTAL PERKUATAN Balok WF metode Box menggunakan Plat ELV +9.00 2,725.50 KG
TOTAL PENAMBAHAN BAUT M.19 ELV +9.00 8 Titik
TOTAL PENGECATAN ELV +9.00 43 M2
TOTAL Pengelasan Full Cover Plat Balok WF Elv +9.00 (Atap) 25,160 cm
PERHITUNGAN VOLUME

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
C ELEVASI + 8.20
1 Pemasangan balok WF 300 x 150 x 6.5 x 9 2,668.33 kg
WF 300 Grid 2 36.67 9.00 2.00 660 kg 777.08 kg S-R- 004
End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid 20 36.67 9.00 2.00 660 kg 777.08 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid B 36.67 6.00 2.00 kg 0.00 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 kg
Rip 6mm 48.61 0.30 0.075 8.00 kg
Bracing WF 300 36.67 0.50 4.00 kg

WF 300 Grid C 36.67 6.00 2.00 kg 0.00 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 kg
Rip 6mm 48.61 0.30 0.075 8.00 kg
Bracing WF 300 36.67 0.50 4.00 kg

WF 300 Grid D 36.67 6.00 2.00 440 kg 557.08 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 35 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid J 36.67 6.00 2.00 440 kg 557.08 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 4.00 35.00 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.33 kg
Baut M19 0.23 56.00 12.88 kg

WF 300 Grid K 36.67 6.00 4.00 kg 0.00 kg S-R- 004


End Plate 12mm 97.22 0.60 0.15 8.00 kg
Rip 6mm 48.61 0.30 0.075 16.00 kg
Bracing WF 300 36.67 0.50 8.00 kg
Baut M19 0.23 112.00 kg
Baut 18.00 18.00 titik 18.00 titik
Pengecatan 108.00 1.20 129.60 m2 129.60 m2
2 Pemasangan balok WF 400 x 200 x 8 x 13 1,020 kg S-R- 004
WF 400 Grid D - 1 66.00 5.40 2.00 712.80 kg 1019.58 kg S-R- 004-A1
End Plate 16mm 129.51 0.80 0.2 4.00 82.89 kg
Rip 10mm 80.90 0.40 0.1 8.00 25.89 kg
Bracing WF 400 66.00 0.75 4.00 198.00 kg
Baut M22 0.33 56.00 18.48 kg
Baut 4.00 4.00 titik 4.00 titik
Pengecatan 10.80 1.20 12.96 m2 12.96 m2
3 Pemasangan angkur M 19 - 75cm
3.1 Pemasangan balok WF 300 x 150 x 6.5 x 9 - BH
Grid B 56.00 bh
Grid C 56.00 bh

TOTAL PENAMBAHAN BALOK WF 300 ELV +8.20 2,668 KG


TOTAL PENAMBAHAN BALOK WF 400 ELV +8.20 1,020 KG
TOTAL Pemasangan angkur M 19 - 75cm ELV +8.20 - BH
TOTAL PENAMBAHAN BAUT M.19 ELV +8.20 22 Titik
TOTAL PENGECATAN ELV +8.20 143 M2
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN P (m) Panjang Shear Jml / Unit Volume Σ Volume
Ø (mm) L (m) T (m) kg GAMBAR
Penampang Connector

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
B LANTAI II
4 SHEAR CONNECTOR
- Potongan Memanjang 2,325.00 kg S-R- 003-E4
Grid 1-1 D - 16 jarak 0.2 1.57824 11.00 0.300 55.00 16.50 kg
Grid 2 D - 16 jarak 0.2 1.57824 36.00 0.300 180.00 54.00 kg
Grid 2-1 D - 16 jarak 0.2 1.57824 2.00 0.300 10.00 3.00 kg
Grid 3 D - 16 jarak 0.2 1.57824 36.00 0.300 180.00 54.00 kg
Grid 4 D - 16 jarak 0.2 1.57824 36.00 0.300 180.00 54.00 kg
Grid 5 D - 16 jarak 0.2 1.57824 13.00 0.300 65.00 19.50 kg
Grid 6 D - 16 jarak 0.2 1.57824 23.00 0.300 115.00 34.50 kg
Grid 7 D - 16 jarak 0.2 1.57824 23.00 0.300 115.00 34.50 kg
Grid 8 D - 16 jarak 0.2 1.57824 23.00 0.300 115.00 34.50 kg
Grid 9 D - 16 jarak 0.2 1.57824 26.00 0.300 130.00 39.00 kg
Grid 9-1 D - 16 jarak 0.2 1.57824 3.00 0.300 15.00 4.50 kg
Grid 9-2 D - 16 jarak 0.2 1.57824 14.00 0.300 70.00 21.00 kg
Grid 10 D - 16 jarak 0.2 1.57824 51.00 0.300 255.00 76.50 kg
Grid 10-1 D - 16 jarak 0.2 1.57824 3.00 0.300 15.00 4.50 kg
Grid 11 D - 16 jarak 0.2 1.57824 51.00 0.300 255.00 76.50 kg
Grid 11-1 D - 16 jarak 0.2 1.57824 3.00 0.300 15.00 4.50 kg
Grid 12 D - 16 jarak 0.2 1.57824 51.00 0.300 255.00 76.50 kg
Grid 12-1 D - 16 jarak 0.2 1.57824 14.00 0.300 70.00 21.00 kg
Grid 12-1 D - 16 jarak 0.2 1.57824 3.00 0.300 15.00 4.50 kg
Grid 13 D - 16 jarak 0.2 1.57824 26.00 0.300 130.00 39.00 kg
Grid 14 D - 16 jarak 0.2 1.57824 23.00 0.300 115.00 34.50 kg
Grid 15 D - 16 jarak 0.2 1.57824 23.00 0.300 115.00 34.50 kg
Grid 16 D - 16 jarak 0.2 1.57824 23.00 0.300 115.00 34.50 kg
Grid 17 D - 16 jarak 0.2 1.57824 13.00 0.300 65.00 19.50 kg
Grid 18 D - 16 jarak 0.2 1.57824 36.00 0.300 180.00 54.00 kg
Grid 19 D - 16 jarak 0.2 1.57824 36.00 0.300 180.00 54.00 kg
Grid 19-1 D - 16 jarak 0.2 1.57824 2.00 0.300 10.00 3.00 kg
Grid 20 D - 16 jarak 0.2 1.57824 36.00 0.300 180.00 54.00 kg
Grid 20-1 D - 16 jarak 0.2 1.57824 11.00 0.300 55.00 16.50 kg

- Potongan Melintang
Grid A D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid B D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid C D - 16 jarak 0.2 1.57824 24.00 0.300 120.00 36.00 kg
Grid C-1 D - 16 jarak 0.2 1.57824 8.00 0.300 40.00 12.00 kg
Grid D D - 16 jarak 0.2 1.57824 86.00 0.300 430.00 129.00 kg
Grid D-1 D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid D-2 D - 16 jarak 0.2 1.57824 74.00 0.300 370.00 111.00 kg
Grid D-3 D - 16 jarak 0.2 1.57824 4.00 0.300 20.00 6.00 kg
Grid E D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid F D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid F-1 D - 16 jarak 0.2 1.57824 41.00 0.300 205.00 61.50 kg
Grid G D - 16 jarak 0.2 1.57824 41.00 0.300 205.00 61.50 kg
Grid G-1 D - 16 jarak 0.2 1.57824 41.00 0.300 205.00 61.50 kg
Grid H D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid I D - 16 jarak 0.2 1.57824 84.00 0.300 420.00 126.00 kg
Grid I-1 D - 16 jarak 0.2 1.57824 12.00 0.300 60.00 18.00 kg
Grid I-2 D - 16 jarak 0.2 1.57824 74.00 0.300 370.00 111.00 kg
Grid I-3 D - 16 jarak 0.2 1.57824 4.00 0.300 20.00 6.00 kg
Grid J D - 16 jarak 0.2 1.57824 86.00 0.300 430.00 129.00 kg
Grid J-1 D - 16 jarak 0.2 1.57824 8.00 0.300 40.00 12.00 kg
Grid K D - 16 jarak 0.2 1.57824 24.00 0.300 120.00 36.00 kg

5 TULANGAN KEBAKARAN
- Potongan Memanjang Panjang Dg Overlab 8,219.79 8,219.79 kg S-R- 007-A1
84 D - 10 jarak 0.2 0.6165 36.00 3.00 0.8 38.400 420.00 9,942.91 kg

Dikurangi Void
43 D - 10 jarak 0.2 0.6165 13.00 -1 215.00 (1,723.12) kg

TOTAL Shear Connector LANTAI 2 2,325 KG


TOTAL Tulangan Kebakaran LANTAI 2 8,220 KG
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
B LANTAI II
3 MODIFIKASI JOINT BASE PLATE
Tipe 1 S-R- 003-E1
Las Keliling 10mm 1.41 4.00 0 M - M
Rip 8 mm 64.93 0.10 0.08 0.004 0.26 16.00 4.16 kg 4.16 kg
Tipe 2
Las Keliling 8mm 1.24 4.00 0 M - M
Rip 6 mm 48.61 0.10 0.07 0.004 0.17 16.00 2.72 kg 2.72 kg
Tipe 3 S-R- 003-E1
Las Keliling 10mm 1.00 12.00 0 M - M
Rip 6 mm 48.61 0.10 0.07 0.004 0.17 48.00 8.17 kg 8.17 kg
Tipe 4 S-R- 003-E1
Las Keliling 8mm 1.24 46.00 0 M - M
Rip 6 mm 48.61 0.10 0.07 0.004 0.17 184.00 31.31 kg 31.31 kg
Tipe 5 S-R- 003-E2
Las Keliling 10mm 1.82 28.00 0 M - M
Rip 8 mm 64.93 0.10 0.08 0.004 0.26 168.00 43.63 kg 43.63 kg
Tipe 6 S-R- 003-E2
Las Keliling 6mm 0.90 4.00 0 M - M
Rip 6 mm 48.61 0.10 0.07 0.004 0.17 16.00 2.72 kg 2.72 kg
Tipe 7 S-R- 003-E2
Las Keliling 10mm 1.41 21.00 0 M - M
Rip 8 mm 64.93 0.10 0.08 0.004 0.26 84.00 21.82 kg 21.82 kg

TOTAL Panjang Las Keliling Balok WF Existing LANTAI 2 - CM


TOTAL MODIFIKASI JOINT BASE PLATE LANTAI 2 115 KG
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
B LANTAI II
1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Elv. +5.00) 2,022 kg S-R- 003-B
WF 200 Grid 10-1 21.33 4.50 2.00 192.00 kg 233.48 kg S-R- 003-E3
End Plate 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.18 4.00 14.93 kg
Baut M19

WF 200 Grid 10-2 21.33 3.25 1.00 69.33 kg 90.07 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 10-3 21.33 4.50 2.00 192.00 kg 233.48 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.18 4.00 14.93 kg
Baut M19

WF 200 Grid 10-4 21.33 3.00 1.00 64.00 kg 84.74 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg
Bracing WF 200 21.33 0.18 2.00 7.47 kg
Baut M19

WF 200 Grid 11-1 21.33 3.25 2.00 138.67 kg 165.21 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200
Baut M19

WF 200 Grid 11-2 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-3 21.33 3.25 2.00 138.67 kg 165.21 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid 11-4 21.33 4.50 2.00 192.00 kg 218.54 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 8.00 22.65 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg

WF 200 Grid 11-5 21.33 3.00 1.00 64.00 kg 77.27 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.1 4.00 11.33 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg

WF 200 Grid G-1 21.33 1.50 1.00 32.00 kg 44.62 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 4.00 10.68 kg
Rip 6mm 48.61 0.20 0.05 4.00 1.94 kg

WF 200 Grid I-1 21.33 2.00 7.00 298.67 kg 380.24 kg S-R- 003-E3
Rip 10mm 80.90 0.30 0.1 28.00 67.96 kg
Rip 6mm 48.61 0.20 0.05 28.00 13.61 kg
Bracing WF 200 0.00 kg
Baut M19 - kg

WF 200 Grid J-1 21.33 2.00 2.00 85.33 kg 110.58 kg S-R- 003-E3
Rip 10mm 80.90 0.33 0.1 8.00 21.36 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 0.00 kg
Baut M19 - kg
Pengecatan 86.75 1 86.75 m2 86.75 m2 S-R- 003-B
Baut 50.00 50.00 titik 50.00 titik
1 Pemasangan balok WF 300 x 150 x 6,5 x 9 (Elv. +5.00) 1,161 kg S-R- 003-B
WF 300 Grid 9-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
WF 300 Grid 9-2 36.67 3.00 1.00 110.00 kg 114.18 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid 12-1 36.67 2.00 1.00 73.33 kg 77.51 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 4.00 1.70 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-1 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg

WF 300 Grid I-2 36.67 6.00 2.00 440.00 kg 445.88 kg S-R- 003-E3
Rip 10mm 80.90 0.35 0.0875 1.00 2.48 kg
Rip 6mm 48.61 0.20 0.04375 8.00 3.40 kg
Bracing WF 300 0.00 kg
Baut M19 - kg
Pengecatan 26.00 1.2 31.20 m2 31.20 m2 S-R- 003-B
Baut 14.00 14.00 titik 14.00 titik
2 Perkuatan Balok WF metode Box menggunakan Plat
2.1 R1 (WF 300 x 150 x 6,5 x 9) 1,231.36 kg S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Grid i-1
Cover Plate 8 mm 6 Line 64.93 2.5 0.30 0.75 292.2 2 584.38 Kg
Rip 8 mm 6 Line 64.93 0.072 0.28 0.02 7.8 4 31.31 Kg
Pengecatan 18.96 m2 S-R- 003-E
Grid D-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
Grid i-1
Cover Plate 8 mm 6 Line 1.00 2.5 0.30 0.75 4.5 2 9.00 m2
Rip 8 mm 6 Line 1.00 0.072 0.28 0.02 0.1 4 0.48 m2
2.2 R2 (WF 300 x 150 x 6,5 x 9) 101.40 kg S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid G - 1
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 2 31.17 Kg
Rip 8 mm 4 Line 64.93 0.072 0.28 0.02 5.2 2 10.44 Kg
Grid I-2
Cover Plate 8 mm 2 Line 64.93 0.4 0.30 0.12 15.6 1 15.58 Kg
Rip 8 mm 2 Line 64.93 0.072 0.28 0.02 2.6 1 2.61 Kg
Pengecatan 1.56 m2 S-R- 003-E
Grid F-1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid G - 1
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 2 0.48 m2
Rip 8 mm 4 Line 1.00 0.072 0.28 0.02 0.1 2 0.16 m2
Grid I-2
Cover Plate 8 mm 2 Line 1.00 0.4 0.30 0.12 0.2 1 0.24 m2
Rip 8 mm 2 Line 1.00 0.072 0.28 0.02 0.0 1 0.04 m2
2.3 R3 (WF 300 x 150 x 6,5 x 9) 566.00 kg S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 80.90 5.83 0.30 1.75 283.0 2 566.00 Kg
Rip 8 mm - Line 64.93 0.072 0.28 0.02 - - - Kg
Pengecatan 7.00 m2 S-R- 003-E
Grid I - 1
Cover Plate 10 mm 2 Line 1.00 5.83 0.30 1.75 3.5 2 7.00 m2
Rip 8 mm - Line 1.00 0.072 0.28 0.02 - - - m2
2.4 R4 (350 x 175 x 7 x 11) 488.83 kg S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Grid 11
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 1 90.61 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Grid 18
Cover Plate 10 mm 2 80.90 1.6 0.35 0.56 90.6 2 181.22 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 4 14.31 Kg
Pengecatan 5.93 m2 S-R- 003-E
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
Grid 4
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 - 0.084 0.33 0.03 - 4 - m2
Grid 11
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 1 1.12 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
Grid 18
Cover Plate 10 mm 2 1.00 1.6 0.35 0.56 1.1 2 2.24 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 4 0.22 m2
2.5 R5 (350 x 175 x 7 x 11) 184.10 kg S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 97.22 2.6 0.35 0.91 176.9 1 176.94 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 2 7.16 Kg
Pengecatan 1.93 m2 S-R- 003-E
Grid 11
Cover Plate 12 mm 2 1.00 2.6 0.35 0.91 1.8 1 1.82 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 2 0.11 m2
2.6 R6 (350 x 175 x 7 x 11) 323.11 kg S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 80.90 2.6 0.35 0.91 147.2 2 294.49 Kg
Rip 8 mm 2 64.93 0.084 0.33 0.03 3.6 8 28.62 Kg
Pengecatan 4.08 m2 S-R- 003-E
Grid
Cover Plate 10 mm 2 1.00 2.6 0.35 0.91 1.8 2 3.64 m2
Rip 8 mm 2 1.00 0.084 0.33 0.03 0.1 8 0.44 m2
2.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 3,052.30 kg S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 10-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Pengecatan 37.73 m2 S-R- 003-C4
Grid 10-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 10-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-1 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
Grid 11-2 Cover Plate 10mm 1 line 1.00 9.00 0.509 4.58 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 2.00 0.27 m2
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 10,774.66 kg S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 4 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 6 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 7 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 9 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 10 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 11 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 12 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 13 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 15 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 16 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 18 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 19 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Pengecatan 133.18 m2 S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 4 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 6 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 7 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 9 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 10 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 11 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 12 Cover Plate 10mm 1 line 1.00 4.50 0.509 2.29 2.29 2.00 4.58 m2
Tutup Lubang Cast 10mm 1 line 1.00 0.14 0.14 5.00 0.68 m2
Rip 10mm 1 line 1.00 0.0875 0.509 0.04 0.04 12.00 0.53 m2
Grid 13 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 15 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 16 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 18 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
Grid 19 Cover Plate 10mm 2 line 1.00 4.50 0.509 2.29 4.58 2.00 9.16 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 5.00 1.35 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 12.00 1.07 m2
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 1,695.17 kg S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 8 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 14 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 20 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Pengecatan 20.95 m2 S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 8 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 14 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
Grid 20 Cover Plate 10mm 2 line 1.00 2.00 0.509 1.02 2.04 2.00 4.07 m2
Tutup Lubang Cast 10mm 2 line 1.00 0.14 0.27 3.00 0.81 m2
Rip 10mm 2 line 1.00 0.0875 0.509 0.04 0.09 4.00 0.36 m2
3 Pengelasan Full Cover Plat Balok WF Elv +5.00
3.1 R1 (WF 300 x 150 x 6,5 x 9) 120.00 m S-R- 003-E
Grid D-1 S-R- 003-C1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
Grid i-1
Cover Plate 8 mm 6 Line 2.5 - 4 60.00 m
3.2 R2 (WF 300 x 150 x 6,5 x 9) 9.60 m S-R- 003-E
Grid F-1 S-R- 003-C1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

X
Grid G - 1
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
Grid I-2
Cover Plate 8 mm 2 Line 0.4 - 4 3.20 m
3.3 R3 (WF 300 x 150 x 6,5 x 9) 46.64 m S-R- 003-E
Grid I - 1 S-R- 003-C2
Cover Plate 10 mm 2 Line 5.83 - 4 46.64 m
3.4 R4 (350 x 175 x 7 x 11) 38.40 m S-R- 003-E
Grid 4 S-R- 003-C2
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 11
Cover Plate 10 mm 2 1.6 - 4 12.80 m
Grid 18
Cover Plate 10 mm 2 1.6 - 4 12.80 m
3.5 R5 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid 11 S-R- 003-C3
Cover Plate 12 mm 2 2.6 - 4 20.80 m
3.6 R6 (350 x 175 x 7 x 11) 20.80 m S-R- 003-E
Grid S-R- 003-C3
Cover Plate 10 mm 2 2.6 - 4 20.80 m
3.7 R.7 (Cast WF 509.175.7.11) Elv. +5.00 154.88 m S-R- 003-E
Grid 10-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 10-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-1 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
Grid 11-2 Cover Plate 10mm 1 line 9.00 - 4.00 36.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 2.00 2.72 m
2.8 R.8 (Cast WF 509.175.7.11) Elv. +5.00 570.40 m S-R- 003-E
Grid 3 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 4 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 6 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 7 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 9 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 10 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 11 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 12 Cover Plate 10mm 1 line 4.50 - 4.00 18.00 m
Tutup Lubang Cast 10mm 1 line 1.36 - 5.00 6.80 m
Grid 13 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 15 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 16 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 18 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
Grid 19 Cover Plate 10mm 2 line 4.50 - 4.00 36.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 5.00 13.60 m
2.9 R.9 (Cast WF 509.175.7.11) Elv. +5.00 96.64 m S-R- 003-E
Grid 2 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m S-R- 003-C4
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 8 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 14 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m
Grid 20 Cover Plate 10mm 2 line 2.00 - 4.00 16.00 m
Tutup Lubang Cast 10mm 2 line 1.36 - 3.00 8.16 m

TOTAL PENAMBAHAN BALOK WF 200 LANTAI 2 2,022 Kg


TOTAL PENAMBAHAN BALOK WF 300 LANTAI 2 1,161 Kg
TOTAL PERKUATAN Balok WF metode Box menggunakan Plat LANTAI 2 18,417 Kg
TOTAL PENAMBAHAN BAUT M.19 LANTAI 2 64 Titik
TOTAL PENGECATAN LANTAI 2 349 M2
TOTAL Pengelasan Full Cover Plat Balok WF Elv +5.00 107,816 cm
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
A LANTAI I
1 Kolom K.22 Elv. +3.00 S-R- 001
1.1 Cor beton site mix, K-250 1.68 m3 S-R- 006
Grid 1 7 bh 0.2 0.2 3 7 0.84 m3
Grid 21 7 bh 0.2 0.2 3 7 0.84 m3
1.2 Besi beton ulir D 13 mm = 121.50 Kg/M3 1.68 204.12 Kg/M3 204.12 Kg/M3
1.3 Besi beton ulir D 10 mm = 98.60 Kg/M3 1.68 165.64 Kg/M3 165.64 Kg/M3
1.4 Bekisting kolom = 20.00 M2/M3 1.68 33.60 M2/M3 33.60 M2/M3

2 Kolom KJ.88-1 t.5m (80x80)


2.1 Cor beton site mix, K-250 1.6 0.1 5 11 8.8 m3 8.8 m3 S-R- 001
2.2 Besi beton ulir 12-D 22 mm = 267.65 Kg/M3 8.8 2,355.34 Kg/M3 2,355.34 Kg/M3 S-R- 006
22 5.98 2.98386 132 2355.34 kg
2.3 Besi beton ulir 8- D 16 mm = 90.59 Kg/M3 8.8 797.20 Kg/M3 797.20 Kg/M3 S-R- 006
16 5.74 1.57824 88 797.20 kg
2.4 Besi beton ulir D13-100 = 436.29 Kg/M3 8.8 3,839.35 Kg/M3 3,839.35 Kg/M3 S-R- 006
sengkang 13 3.1 1.041885 550 1776.41 kg
kait 13 0.9 1.041885 2200 2062.93 kg
2.5 Bekisting kolom 21.25 m2 8.8 187.00 m2 187.00 m2 S-R- 006
1.6 0.1 5 3.4 11 187 m2
2.6 CHEMICAL ANCHOR Besi beton ulir D13-100 4,136.00 titik S-R- 006
sengkang 4136 4136.00 titik
3 Kolom KJ.88-2 t.4m (80x80)
2.1 Cor beton site mix, K-250 1.6 0.1 4 5 3.2 m3 5.0336 m3 S-R- 001
1.6 0.1 3.82 3 1.8336 m3
2.2 Besi beton ulir 12-D 22 mm = 216.25 Kg/M3 5.03 1,088.51 Kg/M3 1,088.51 Kg/M3 S-R- 006
22 4.1 2.98 60 734.03 kg
22 3.3 2.98 36 354.48 kg
2.3 Besi beton ulir 8- D 16 mm = 76.25 Kg/M3 5.03 383.83 Kg/M3 383.83 Kg/M3 S-R- 006
16 4.1 1.58 40 258.83 kg
16 3.3 1.58 24 125.00 kg
2.4 Besi beton ulir D13-100 = 398.24 Kg/M3 5.03 2,004.59 Kg/M3 2,004.59 Kg/M3 S-R- 006
sengkang 13 3.1 1.04 200 645.97 kg
kait 13 0.85 1.04 800 708.48 kg
sengkang 13 3.1 1.04 96 310.06 kg
kait 13 0.85 1.04 384 340.07 kg
2.5 Bekisting kolom 19.99 m2 5.03 100.64 m2 100.64 m2 S-R- 006
1.6 0.1 4 3.4 5 68 m2 100.64 m2
1.6 0.1 3.2 3.4 3 32.64 m2
2 Pemasangan balok WF 300 x 150 x6.5 x 9 (Area Selasar Samping Elv. +3.00) 622.80 kg S-R- 002
WF 300 Grid 2 36.67 6.50 2.00 477 kg S-R- 001
End Plate 12mm 97.22 0.60 0.15 8.00 70 kg
Rip 6mm 15.56 0.30 0.075 8.00 2.8 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M19 0.23 48.00 11.04 kg
Baut 4.00 4.00 titik 4.00 titik
628.75 kg
WF 300 Grid 20 36.67 6.50 2.00 477 kg
End Plate 12mm 97.22 0.60 0.15 8.00 70 kg
Rip 6mm 48.61 0.30 0.075 8.00 8.75 kg
Bracing WF 300 36.67 0.50 4.00 73.333333 kg
Baut M19 0.23 48.00 11.04 kg
Baut 8.00 8.00 titik 8.00 titik
Pengecatan 26.00 1.2 31.20 m2 31.20 m2
3 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00) 1,307 kg S-R- 001
WF 200 Grid 1 21.33 2.50 2.00 106.67 kg S-R- 002
End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg S-R- 004 -A
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid 1-1 21.33 6.50 2.00 277.33 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid 2 21.33 2.50 2.00 106.67 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid Melintang (e,f,g,h,i) 21.33 2.50 7.00 373.33 kg


End Plate 10mm 80.90 0.40 0.1 28.00 90.61 kg
Rip 6mm 48.61 0.20 0.05 28.00 13.61 kg
Bracing WF 200 21.33 0.45 14.00 134.40 kg
Baut M19 0.23 48.00 11.04 kg
Baut 26.00 26.00 titik 26.00 titik S-R- 001
Pengecatan 40.50 1.2 48.60 m2 48.60 m2 S-R- 002
1,307 kg
WF 200 Grid 20 21.33 2.50 2.00 106.67 kg
End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid 21 21.33 2.50 2.00 106.67 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

WF 200 Grid 21-1 21.33 6.50 2.00 277.33 kg


End Plate 10mm 80.90 0.40 0.1 8.00 25.89 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Bracing WF 200 21.33 0.45 4.00 38.40 kg

WF 200 Grid Melintang (e,f,g,h,i) 21.33 2.50 7.00 373.33 kg


End Plate 10mm 80.90 0.40 0.1 28.00 90.61 kg
Rip 6mm 48.61 0.20 0.05 28.00 13.61 kg
Bracing WF 200 21.33 0.45 14.00 134.40 kg
Baut M19 0.23 48.00 11.04 kg
Baut 26.00 26.00 titik 26.00 titik S-R- 001
Pengecatan 40.50 1 40.50 m2 40.50 m2 S-R- 002
4 Pemasangan angkur M 16 - 32cm
4.1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00) 156.00 bh S-R- 004 -A
Grid 1 78.00 78.00 bh
4.2 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00)
Grid 21 78.00 78.00 bh

TOTAL PENAMBAHAN besi D.10 LANTAI 1 165.6 KG


TOTAL PENAMBAHAN besi D.13 LANTAI 1 6,048.1 KG
TOTAL PENAMBAHAN besi D.16 LANTAI 1 1,181.0 KG
TOTAL PENAMBAHAN besi D.22 LANTAI 1 3,443.9 KG
TOTAL Chemical Anchor D.13 LANTAI 1 4,136.0 KG
TOTAL PENAMBAHAN WF 300 LANTAI 1 1,251.6 KG
TOTAL PENAMBAHAN WF 200 LANTAI 1 2,614.3 KG
TOTAL Pemasangan angkur M 16 - 32cm LANTAI 1 156.00 BH
TOTAL PENAMBAHAN BAUT M.19 LANTAI 1 64.00 titik
TOTAL PENGECATAN LANTAI 1 120 M2
PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume GAMBAR
Ø (mm) P (m) L (m) T (m) Luas (m2) kg

Pengerokan Karat pada Permukaan Baja secara Manual


K1 : WF 400X400X13X21 0.4 x 0.4 2.4
K2 : WF 300X150X6,5X9 0.3 x 0.15 1.2
G1 : HC 509X175X7X11 0.5 x 0.175 1.7
G2 : WF 350X150X6,5X9 0.35 x 0.15 1.3
B1 : WF 300X150X6,5X9 0.3 x 0.15 1.2
B2 : WF 200X150X6X9 0.2 x 0.15 1

LANTAI 1 2057.15 m2
KOLOM
K1 : WF 400X400X13X21 0.4 x 0.4 0.5 2.4 68 81.6 m2
K2 : WF 300X150X6,5X9 0.3 x 0.15 0.5 2.4 41 49.2 m2

BALOK Section Memanjang


As 1 G2 : WF 350X150X6,5X9 0.35 x 0.15 24 1.3 31.2 31.2 m2
As 2 G2 : WF 350X150X6,5X9 0.35 x 0.15 84 1.3 109.2 109.2 m2
As 2-1 B1 : WF 300X150X6,5X9 0.3 x 0.15 4 1.2 4.8 4.8 m2
As 2-2 B1 : WF 300X150X6,5X9 0.3 x 0.15 76 1.2 91.2 91.2 m2
As 2-3 B1 : WF 300X150X6,5X9 0.3 x 0.15 16 1.2 19.2 19.2 m2
As 3 G2 : WF 350X150X6,5X9 0.35 x 0.15 84 1.3 109.2 109.2 m2
As 4 G2 : WF 350X150X6,5X9 0.35 x 0.15 36 1.3 46.8 46.8 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 48 1.2 57.6 57.6 m2
As 4-1 B1 : WF 300X150X6,5X9 0.3 x 0.15 36 1.2 43.2 43.2 m2
As 5 G2 : WF 350X150X6,5X9 0.35 x 0.15 36 1.3 46.8 46.8 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 5 1.2 6 6 m2
As 5-1 B1 : WF 300X150X6,5X9 0.3 x 0.15 41 1.2 49.2 49.2 m2
As 6 G2 : WF 350X150X6,5X9 0.35 x 0.15 36 1.3 46.8 46.8 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 48 1.2 57.6 57.6 m2
As 7 G2 : WF 350X150X6,5X9 0.35 x 0.15 84 1.3 109.2 109.2 m2
As 7-1 B1 : WF 300X150X6,5X9 0.3 x 0.15 4 1.2 4.8 4.8 m2
As 7-2 B1 : WF 300X150X6,5X9 0.3 x 0.15 76 1.2 91.2 91.2 m2
As 8 G2 : WF 350X150X6,5X9 0.35 x 0.15 84 1.3 109.2 109.2 m2
As 9 B1 : WF 300X150X6,5X9 0.3 x 0.15 24 1.2 28.8 28.8 m2
As 10 G2 : WF 350X150X6,5X9 0.35 x 0.15 12 1.3 15.6 15.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 12 1.2 14.4 14.4 m2
As 11 G2 : WF 350X150X6,5X9 0.35 x 0.15 12 1.3 15.6 15.6 m2

BALOK Section Melintang


As B G1 : HC 509X175X7X11 0.5 x 0.175 23 1.7 39.1 39.1 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 13 1.3 16.9 16.9 m2
As C G1 : HC 509X175X7X11 0.5 x 0.175 23 1.7 39.1 39.1 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 13 1.3 16.9 16.9 m2
As D G1 : HC 509X175X7X11 0.5 x 0.175 23 1.7 39.1 39.1 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 13 1.3 16.9 16.9 m2
As D-1 B1 : WF 300X150X6,5X9 0.3 x 0.15 13 1.2 15.6 15.6 m2
As E G1 : HC 509X175X7X11 0.5 x 0.175 18 1.7 30.6 30.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 5 1.2 6 6 m2
As F G1 : HC 509X175X7X11 0.5 x 0.175 18 1.7 30.6 30.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 5 1.2 6 6 m2
As G G1 : HC 509X175X7X11 0.5 x 0.175 36 1.7 61.2 61.2 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 12.5 1.2 15 15 m2
B2 : WF 200X150X6X9 0.2 x 0.15 2.5 1 2.5 2.5 m2
As H G1 : HC 509X175X7X11 0.5 x 0.175 18 1.7 30.6 30.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 7.5 1.2 9 9 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 9.5 1.3 12.35 12.35 m2
B2 : WF 200X150X6X9 0.2 x 0.15 2.5 1 2.5 2.5 m2
As I G1 : HC 509X175X7X11 0.5 x 0.175 18 1.7 30.6 30.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 7.5 1.2 9 9 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 9.5 1.3 12.35 12.35 m2
B2 : WF 200X150X6X9 0.2 x 0.15 2.5 1 2.5 2.5 m2
As J G1 : HC 509X175X7X11 0.5 x 0.175 18 1.7 30.6 30.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 7.5 1.2 9 9 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 9.5 1.3 12.35 12.35 m2
B2 : WF 200X150X6X9 0.2 x 0.15 2.5 1 2.5 2.5 m2
As K G1 : HC 509X175X7X11 0.5 x 0.175 36 1.7 61.2 61.2 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 12.5 1.2 15 15 m2
B2 : WF 200X150X6X9 0.2 x 0.15 2.5 1 2.5 2.5 m2
As L G1 : HC 509X175X7X11 0.5 x 0.175 18 1.7 30.6 30.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 5 1.2 6 6 m2
As M G1 : HC 509X175X7X11 0.5 x 0.175 18 1.7 30.6 30.6 m2
B1 : WF 300X150X6,5X9 0.3 x 0.15 5 1.2 6 6 m2
As N G1 : HC 509X175X7X11 0.5 x 0.175 23 1.7 39.1 39.1 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 13 1.3 16.9 16.9 m2
As O G1 : HC 509X175X7X11 0.5 x 0.175 23 1.7 39.1 39.1 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 13 1.3 16.9 16.9 m2
As P G1 : HC 509X175X7X11 0.5 x 0.175 23 1.7 39.1 39.1 m2
G2 : WF 350X150X6,5X9 0.35 x 0.15 13 1.3 16.9 16.9 m2

TOTAL KUPAS CAT LAMA & PENGECATAN BARU (LANTAI 1) 2057.15 M2


PERHITUNGAN VOLUME
PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)
TAHUN ANGGARAN : 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume GAMBAR
Ø (mm) P (m) L (m) T (m) Luas (m2) kg

Pengerokan Karat pada Permukaan Baja secara Manual


K1 : WF 400X400X13X21 0.4 x 0.4 2.4
K2 : WF 300X150X6,5X9 0.3 x 0.15 1.2
B2 : WF 200X150X6X9 0.2 x 0.15 1

LANTAI 2 1522.9 m2
KOLOM
K1 : WF 400X400X13X21 0.4 x 0.4 4 2.4 68 652.8 m2
K2 : WF 300X150X6,5X9 0.3 x 0.15 4 1.2 42 201.6 m2

BALOK Section Memanjang


As 1 B2 : WF 200X150X6X9 0.2 x 0.15 16 1 16 16 m2
As 2 B2 : WF 200X150X6X9 0.2 x 0.15 84 1 84 84 m2
As 3 B2 : WF 200X150X6X9 0.2 x 0.15 84 1 84 84 m2
As 4 B2 : WF 200X150X6X9 0.2 x 0.15 55 1 55 55 m2
As 5 B2 : WF 200X150X6X9 0.2 x 0.15 24 1 24 24 m2
As 6 B2 : WF 200X150X6X9 0.2 x 0.15 55 1 55 55 m2
As 7 B2 : WF 200X150X6X9 0.2 x 0.15 60 1 60 60 m2
As 8 B2 : WF 200X150X6X9 0.2 x 0.15 60 1 60 60 m2
As 9 B2 : WF 200X150X6X9 0.2 x 0.15 24 1 24 24 m2
As 10 B2 : WF 200X150X6X9 0.2 x 0.15 12 1 12 12 m2

BALOK Section Melintang


As B B2 : WF 200X150X6X9 0.2 x 0.15 36 1 36 36 m2
As D B2 : WF 200X150X6X9 0.2 x 0.15 18 1 18 18 m2
As D-1 B2 : WF 200X150X6X9 0.2 x 0.15 13 1 13 13 m2
As G B2 : WF 200X150X6X9 0.2 x 0.15 5 1 5 5 m2
As H B2 : WF 200X150X6X9 0.2 x 0.15 22 1 22 22 m2
As I B2 : WF 200X150X6X9 0.2 x 0.15 6.5 1 6.5 6.5 m2
As J B2 : WF 200X150X6X9 0.2 x 0.15 22 1 22 22 m2
As K B2 : WF 200X150X6X9 0.2 x 0.15 5 1 5 5 m2
As M-1 B2 : WF 200X150X6X9 0.2 x 0.15 13 1 13 13 m2
As N B2 : WF 200X150X6X9 0.2 x 0.15 18 1 18 18 m2
As P B2 : WF 200X150X6X9 0.2 x 0.15 36 1 36 36 m2

TOTAL KUPAS CAT LAMA & PENGECATAN BARU (LANTAI 2) 1,522.90 M2


CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

I PENAMBAHAN STRUKTUR PERKUATAN


1 PERKUATAN STRUKTUR
A LANTAI I
1 Kolom K.22 Elv. +3.00
1.1 Cor beton site mix, K-250 1.68 m3
Grid 1 7 bh 0.2 0.2 3 7 0.84 m3
Grid 21 7 bh 0.2 0.2 3 7 0.84 m3
1.2 Besi beton polos D 13 mm = 121.50 Kg/M3 1.68 204.12 Kg/M3 204.12 Kg/M3
1.3 Besi beton polos D 10 mm = 98.60 Kg/M3 1.68 165.64 Kg/M3 165.64 Kg/M3
1.4 Bekisting kolom = 20.00 M2/M3 1.68 33.60 M2/M3 33.60 M2/M3

2 Pemasangan balok WF 300 x 150 x6.5 x 9 (Area Selasar Samping Elv. +3.00) 1,868.74 kg
WF 300 Grid 2 36.67 2.50 6.00 550 kg
End Plate 12mm 97.22 0.60 0.15 12.00 105 kg
Rip 6mm 48.61 0.30 0.075 24.00 26.25 kg
Bracing WF 300 36.67 0.50 12.00 220 kg
Baut M19 0.23 144.00 33.12 kg

WF 300 Grid 20 36.67 2.50 6.00 550 kg


End Plate 12mm 97.22 0.60 0.15 12.00 105 kg
Rip 6mm 48.61 0.30 0.075 24.00 26.25 kg
Bracing WF 300 36.67 0.50 12.00 220 kg
Baut M19 0.23 144.00 33.12 kg

3 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00) 1,875 kg
WF 200 Grid 1 21.33 2.50 6.00 320.00 kg
End Plate 10mm 80.90 0.40 0.1 12.00 38.83 kg
Rip 6mm 48.61 0.20 0.05 24.00 11.67 kg
Bracing WF 200 21.33 0.45 12.00 115.20 kg

WF 200 Grid 21 21.33 2.50 6.00 320.00 kg


End Plate 10mm 80.90 0.40 0.1 12.00 38.83 kg
Rip 6mm 48.61 0.20 0.05 24.00 11.67 kg
Bracing WF 200 21.33 0.45 12.00 115.20 kg

WF 200 Grid Melintang (e,f,g,h,i) 21.33 2.50 14.00 746.67 kg


End Plate 10mm 80.90 0.40 0.1 28.00 90.61 kg
Rip 6mm 48.61 0.20 0.05 56.00 27.22 kg
Baut M19 0.23 168.00 38.64 kg

4 Pemasangan angkur M 16 - 32cm


4.1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Area Selasar Samping Elv +3.00) 84.00 84.00 bh

B LANTAI II

1 Pemasangan balok WF 200 x 100 x 5.5 x 8 (Elv. +5.00) 643 kg


WF 200 Grid 10-1 21.33 4.50 2.00 192.00 kg
End Plate 10mm 80.90 0.20 0.1 8.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M19 0.23 24.00 5.52 kg

WF 200 Grid 10-2 21.33 4.50 2.00 192.00 kg


End Plate 10mm 80.90 0.20 0.1 8.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M19 0.23 24.00 5.52 kg

WF 200 Grid 11-1 21.33 4.50 2.00 192.00 kg


End Plate 10mm 80.90 0.20 0.1 8.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M19 0.23 24.00 5.52 kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

WF 200 Grid 11-2 21.33 4.50 2.00 192.00 kg


End Plate 10mm 80.90 0.20 0.1 8.00 12.94 kg
Rip 6mm 48.61 0.20 0.05 8.00 3.89 kg
Baut M19 0.23 24.00 5.52 kg

2 Perkuatan R.7 (Cast WF 509.175.7.11) Elv. +5.00 3,052.30 kg


Grid 10-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 10-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-1 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg
Grid 11-2 Cover Plate 10mm 1 line 80.90 9.00 0.509 4.58 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 2.00 21.84 kg

Perkuatan R.8 (Cast WF 509.175.7.11) Elv. +5.00 10,774.66 kg


Grid 3 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 4 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 6 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 7 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 9 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 10 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 11 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 12 Cover Plate 10mm 1 line 80.90 4.50 0.509 2.29 185.31 2.00 370.62 kg
Tutup Lubang Cast 10mm 1 line 80.90 0.14 10.92 5.00 54.61 kg
Rip 10mm 1 line 80.90 0.0875 0.509 0.04 3.60 12.00 43.24 kg
Grid 13 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 15 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 16 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 18 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg
Grid 19 Cover Plate 10mm 2 line 80.90 4.50 0.509 2.29 370.62 2.00 741.23 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 5.00 109.22 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 12.00 86.48 kg

Perkuatan R.9 (Cast WF 509.175.7.11) Elv. +5.00 1,271.38 kg


Grid 2 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
CALCULATION SHEET
PERHITUNGAN DATA REKAYASA LAPANGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN FISIK GEDUNG KANTOR DPRD (MULTIYEARS TAHAP 1)


TAHUN ANGGARAN : 2021
NOMOR KONTRAK : PU.620/KONTRAK.DPRD/01/VII/2021 - Tanggal 21 Juli 2021
KONSULTAN PENGAWAS : PT.KONINDO PANORAMA KONSULTAN
PELAKSANA : PT. TANJONG HARAPAN
Ukuran Berat
KODE
NO JENIS PEKERJAAN Jml / Unit Volume Σ Volume
Ø (mm) P (m) L (m) T (m) Luas (m2) kg GAMBAR

Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 8 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 14 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg
Grid 20 Cover Plate 10mm 2 line 80.90 2.00 0.509 1.02 164.72 2.00 329.44 kg
Tutup Lubang Cast 10mm 2 line 80.90 0.14 21.84 3.00 65.53 kg
Rip 10mm 2 line 80.90 0.0875 0.509 0.04 7.21 4.00 28.83 kg

TOTAL KUPAS CAT LAMA & PENGECATAN BARU (LANTAI 1) 0 M2

Disetujui Oleh, Diperiksa Oleh, Dibuat Oleh,


Direksi Pekerjaan Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang PT.KONINDO PANORAMA KONSULTAN PT. TANJONG HARAPAN

KEVIN ESTON FUNAY, A.Md MESAKH PENLAANA, ST HILMANTO, ST


Nip 19810830 201101 1 010 Inspector Pelaksana

Anda mungkin juga menyukai