Barang
I. Material Langsung 614.845.589,84 - 614.845.589,84 52,50% 52,50% 52,50%
( Bahan baku )
II. Peralatan ( Barang 204.948.529,95 - 204.948.529,95 17,50% 17,50% 17,50%
jadi )
A. Sub Total Barang 819.794.119,78 - 819.794.119,78 70,00% 70,00% 70,00%
Jasa
III. Manajemen Proyek 52.701.050,56 - 52.701.050,56 4,50% 4,50% 4,50%
dan Perekayasaan
IV. Alat Kerja / Fasilitas 87.835.084,26 - 87.835.084,26 7,50% 7,50% 7,50%
Kerja
V. Konstruksi dan 175.670.168,52 - 175.670.168,52 15,00% 15,00% 15,00%
Fabrikasi
VI. Jasa Umum 35.134.033,70 - 35.134.033,70 3,00% 3,00% 3,00%
B. Sub Total Jasa 351.340.337,05 - 351.340.337,05 30,00% 30,00% 30,00%
Rp819.794.119,78 - Rp0,00
Rp1.171.134.456,83
Rp351.340.337,05 - Rp0,00
Rp1.171.134.456,83
= 100,00%
#REF!
#REF!
#REF!
#REF!
#REF!