Anda di halaman 1dari 1

PENGELUARAN PEMBELIAN SBW / SBS

MAS NUR ANGGI

DESCRIPTION UANG KELUAR UANG MASUK

√ PEMBELIAN SBW BEKASI TGL 03-04-2023 6,650,000.00


√ PEMBELIAN SBW CENGKARENG 08-04-2023 3,300,000.00
√ SISAH UANG PEMBELIAN SBW CKR 200,000.00
√ SISAH UANG PEMBELIAN SBW CKR 150,000.00
√ PEMBELIAN SARANG SRITI BEKASI 09-04-2023 170,000.00
√ PENJUALAN SBW KASURAN 10-04-2023 1,200,000.00
√ ONGKIR KIRIMAN 09-04-2023 110,000.00
√ PEMBELIAN SBW JONGGOL 16-04-2023 2,650,000.00
√ ONGKOS KIRIM 17-04-2023 66,000.00

JUMALH 13,296,000.00 1,200,000.00

PENGELUARAN DAN FEE SAYA

DESCRIPTION UANG MASUK UANG KELUAR


KOMISI SBW TGL 03-04-2023 √ 150,000.00
BELANJA KEPERLUAN PEEKING SBW √ 100,000.00
PEMBELIAN BENSIN SAYA √ 50,000.00
PEMBELIAN KARDUS PEEKING 2 PCS √ 40,000.00
PEMBELIAN BENSIN 16-04-2023 √ 50,000.00

JUMLAH 150,000.00 240,000.00

Anda mungkin juga menyukai