STRUKTUR ORGANISASI PELAKSANA

PEKERJAAN : PEMBANGUNAN JALAN

KONTRAKTOR PELAKSANA
NAMA PERUSAHAAN

DIREKTUR
DAFTAR PERSONIL KONTRAKTOR
LAPORAN NO. :
BULAN :
NO. PAKET : KONSULTAN :
NAMA PAKET : KONTRAKTOR :

JUMLAH TGL. MOBILISASI TGL. DEMOBILISASI


NAMA POSISI / JABATAN KETERANGAN
PERSONIL DI LAPANGAN DARI LAPANGAN
STAF AHLI
Project Manager General Superintendent
Site Manager Highway Engineer
Site Engineer Material Engineer
Material Engineer Quality Engineer
Highway Engineer Bridge Engineer
TOTAL

Dibuat Oleh,
Kontraktor Pelaksana
( Nama Perusahaan )

NAMA
Director
DATA PROYEK

Nama Paket :

No./Kode Package :

Lokasi :

Panjang :

Sumber Dana :

Tahun Anggaran :

Kontraktor :

Consultant :

Nilai Kontrak Awal ( Termasuk PPN ) :

Nilai Kontrak Addendum ( Termasuk PPN ) :

Tanggal Kontrak :

Tanggal Kontrak Addendum 01 :

Nomor Kontrak :

Nomor Kontrak Addendum 01 :

Surat Penunjukan Penyedia Jasa ( SPPJ ) :

Surat Serah Terima Lapangan :

Surat Perintah Mulai Kerja ( SPMK ) :

Awal Masa Pelaksanaan Konstruksi :

Akhir Masa Pelaksanaan Konstruksi :

Akhir Masa Pelaksanaan Konstruksi ( Add. ) :

Masa Pelaksanaan Konstruksi : hari kalender

Masa Pemeliharaan : hari kalender

Waktu Terpakai : hari kalender


Prosen Waktu Terpakai : %

Sisa Waktu Pelaksanaan : hari kalender

Progres Fisik ( Dilaporkan setiap Akhir Bulan )

- Rencana : %

- Realisasi : % ( Tgl/ Bln/ Thn )

- Deviasi : %
NAMA PAKET :
NO./KODE PAKET :
KONTRAKTOR :
LOKASI :
KONSULTAN :

ITEM URAIAN

A. PEKERJAAN JALAN
I DIVISI 1. U M U M

1.2 Mobilisasi

II DIVISI 3. PEKERJAAN TANAH

3.1 (1) Galian Biasa

3.2 (1) Timbunan Biasa

3.2 (2) Timbunan Pilihan

3.3 Penyiapan Badan Jalan

III DIVISI 5. PERKERASAN BERBUTIR

5.1 (1) Lapis Pondasi Agregat Kelas A

5.1 (2) Lapis Pondasi Agregat Kelas B

IV DIVISI 6. PERKERASAN ASPAL


6.1 (1) Lapis Resap Pengikat

6.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm


6.3 (6) Laston-Lapis Pengikat Aspal beton (AC BC) tebal = 5 cm

6.6 Lapis Penetrasi Macadam ( Permukaan )

V DIVISI 7. STRUKTUR

7.9 Pasangan Batu

VI DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

8.4 (1) Marka Jalan Bukan Thermoplastic

B. PEKERJAAN DRAINASE
1 Galian Tanah

2 Urugan Pasir

3 Pekerjaan Saluran Batu Belah

4 Plesteran

5 Pekerjaan Saluran Beton

6 Acian

7 Kerb

8 Paving Block

9 Suling-suling

10 Beton Penutup Saluran

11 Begisting Tutup Saluran

C. PEKERJAAN AIR BERSIH


I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi

2 Pengukuran dan Pematokan

II PEMASANGAN PIPA DAN ACCESSORIES


1 ND. 100 MM

2 ND. 75 MM

3 ND. 50 MM
3 ND. 50 MM

4 ND. 40 MM

III PENGETESAN PIPA


1 ND. 100 MM

2 ND. 75 MM

3 ND. 50 MM

4 ND. 40 MM

IV DESINFEKSI PIPA
1 ND. 100 MM

2 ND. 75 MM

3 ND. 50 MM

4 ND. 40 MM

V PEMASANGAN SAMBUNGAN RUMAH


1 PEMASANGAN SAMBUNGAN RUMAH

VI PEKERJAAN LAIN-LAIN

1 AS BUILT DRAWING

D. PEKERJAAN AIR KOTOR


1 JUMLAH TOTAL PEKERJAAN AIR KOTOR

E. PEKERJAAN PERSAMPAHAN
1 JUMLAH TOTAL PEKERJAAN PERSAMPAHAN

F. PEKERJAAN LAND SCAPE


1 JUMLAH TOTAL PEKERJAAN LAND SCAPE

(A)
(B)
(C)
(D)
RENCANA PEKERJAAN PERMINGGU
RENCANA PEKERJAAN KOMULATIF ( PERMINGGU )
RENCANA PEKERJAAN PERMINGGU ( C.C.O )
RENCANA PEKERJAAN KOMULATIF ( C.C.O )
REALISASI KEMAJUAN KERJA PERMINGGU
REALISASI KEMAJUAN KERJA KOMULATIF ( PER MINGGU )
DEVIASI

Mengetahui
Kepala Satuan Kerja Sementara
BRR - Infrastruktur Kawasan dan Permukiman NAD

N A M A
NIP.
KONTRAK AWAL

SAT. HARGA
SATUAN VOLUME JUMLAH HARGA BOBOT %

Ls 86,930,000.00 1.00 86,930,000.00 1.118

M3 36,754.55 608.12 22,351,176.95 0.287

M3 113,362.83 2,871.50 325,521,366.35 4.185

M3 52,228.29 9,080.50 474,258,987.35 6.097

M2 2,838.48 19,250.00 54,640,740.00 0.703

M3 335,288.11 2,100.00 704,105,031.00 9.053

M3 276,079.11 2,800.00 773,021,508.00 9.939

Ltr 8,160.54 21,175.00 172,799,434.50 2.222

M3 1,665,208.06 700.00 1,165,645,642.00 14.986


M3 1,105,898.34 367.50 406,417,639.95 5.225

M3 525,804.16 661.00 347,556,549.76 4.468

M1 118,629.50 313.63 37,205,770.09 0.478

M3 24,237.50 9,329.71 226,128,846.13 2.907

M3 93,695.00 1,320.44 123,718,625.80 1.591

M3 510,346.00 1,225.44 625,398,402.24 8.041

M2 24,583.80 2,376.55 58,424,629.89 0.751

M3 649,447.98 573.25 372,296,054.54 4.787

M2 7,524.00 11,105.71 83,559,362.04 1.074

M1 101,816.50 1,057.50 107,670,948.75 1.384

M2 79,913.40 1,109.00 88,623,960.60 1.139

M1 5,134.25 1,959.00 10,057,995.75 0.129

M3 2,450,230.00 184.50 452,067,435.00 5.812

M2 69,657.50 36.37 2,533,443.28 0.033

Ls 2,000,000.00 2.00 4,000,000.00 0.051

Ls 1,000,000.00 2.00 2,000,000.00 0.026

M 17,174.65 780.00 13,396,227.00 0.172

M 14,347.24 546.00 7,833,593.04 0.101

M 13,717.06 2,950.00 40,465,327.00 0.520


M 11,435.06 4,929.00 56,363,410.74 0.725

M 1,255.00 780.00 978,900.00 0.013

M 1,013.00 546.00 553,098.00 0.007

M 784.00 2,950.00 2,312,800.00 0.030

M 784.00 4,929.00 3,864,336.00 0.050

M 694.00 780.00 541,320.00 0.007

M 545.00 546.00 297,570.00 0.004

M 409.00 2,950.00 1,206,550.00 0.016

M 409.00 4,929.00 2,015,961.00 0.026

M 230,000.00 125.00 28,750,000.00 0.370

Ls 200,000.00 2.00 400,000.00 0.005

Ls 87,369,122.71 1.00 87,369,122.71 1.123

Ls 97,881,664.87 1.00 97,881,664.87 1.258

Ls 706,853,127.36 1.00 706,853,127.36 9.088

JUMLAH 7,778,016,557.66 100.00


PPN 10 % (A x 10 %) 777,801,655.77
JUMLAH TOTAL (A + B) 8,555,818,213.42
DIBULATKAN 8,555,816,000.00
JADWAL PELAK
SATUAN KERJA SEMENTARA BRR-IN

,NOVEMBER 2006
1 2 3
8 15 24
5 9 16
Diperiksa Oleh
Konsultan Pengawas
NAMA PERUSAHAAN

NAMA
Team Leader / Co Team Leader
JADWAL PELAKSANAAN PEKERJAAN
KERJA SEMENTARA BRR-INFRASTRUKTUR KAWASAN DAN PERMUKIMAN

JADWAL KEG
TAHUN

DESEMBER 2006
4 5 6
29 6 13
25 31 7
Diperiksa Oleh
Konsultan Pengawas
NAMA PERUSAHAAN

NAMA
Team Leader / Co Team Leader

0.000 0.000

JANGAN DIHAPUS : INPUT DATA GRAFIK REALISASI CCO


ERJAAN
ASAN DAN PERMUKIMAN

JADWAL KEGIATAN PEKERJAAN


TAHUN 2006 / 2007

R 2006 JANUARI 2007


7 8 9
20 24 3
14 21 25

`
0.000 0.000 0.000
JANUARI 2007
10 11 12
10 17 24
4 11 18
Dibuat Oleh
Kontraktor Pelaksa
NAMA PERUSAHA

NAMA
Direktur Utama/General Sup

0.000 0.000 0.000


FEBRUARI 2007
KET.
13 14 18
1 8 13
25 2 9
Dibuat Oleh
Kontraktor Pelaksana
NAMA PERUSAHAAN

NAMA
Direktur Utama/General Superintendent

0.000 0.000
KET.

sisa
awal Check CCO Check terlaksana

0.000 1.118 #REF! 0.559 #REF!


0.000

0.000 0.287

0.000 4.185

0.000 6.097

0.000 0.703

0.000 9.053

0.000 9.939 #REF! 0.000 #REF!


0.000

0.000 2.222 #REF! 0.000 #REF!


0.000
0.000 14.986
0.000 5.225 #REF! 0.000 #REF!
0.000
0.000 53.814 0.000 #REF! 0.559 #REF!
0.559

Rencana Awal

Rencana CCO I
Rencana Awal

Rencana CCO I

Rencana
Awal

Rencana
Awal

585
58.5
0.000