Analisa PDF
Analisa PDF
BOW N.01
XXVI.003
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
A. TENAGA
1. Pekerja / knek LII.52.1.1 org/hr 0,0200 169.000,00 3.380,00
2. Mandor / pengawas LII.52.1.12 org/hr 0,0020 296.000,00 592,00
3.
4.
5.
B. BAHAN
1. Bayam Merah (Alteanthera ficoidea), rumpun, tinggi 20-25 cm, 1 btg/rpn M 0 9 3 .5 8 9
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 -
JUMLAH HARGA UPAH -
A. TENAGA
1. Pekerja / knek LII.52.1.1 org/hr 0,0200 169.000,00 3.380,00
2. Mandor / pengawas LII.52.1.12 org/hr 0,0020 296.000,00 592,00
3.
4.
5.
B. BAHAN
1. Brokoli Kuning T.20 - 40 cm M 0 9 3 .5 8 9
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 -
JUMLAH HARGA UPAH -
A. TENAGA
1. @ Pekerja / knek LII.52.1.1.aorg/jam 1,0000 24.000,00 24.000,00
2. @ Tukang LII.52.1.2.aorg/jam 0,7000 30.000,00 21.000,00
3. @ Mandor / pengawas LII.52.1.12.aorg/jam 0,1400 42.000,00 5.880,00
4.
5.
B. BAHAN
1. Teh-tehan tinggi (Durantha repens), tinggi 75 cm, BENTUKAN BULAT M093.150 Polybag 1,0000 350.000,00 350.000,00
2. Pupuk Kandang isi 5 kg/karung matang M093.589 Buah 0,5000 33.000,00 16.500,00
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 -
JUMLAH HARGA UPAH -
SATUAN PEMBAYARAN m²
A. TENAGA
1. Pekerja / knek LII.52.1.1 org/hr 0,1000 169.000,00 16.900,00
2. Mandor / pengawas LII.52.1.12 org/hr 0,0500 296.000,00 14.800,00
3.
4.
5.
B. BAHAN
1.
2.
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 -
JUMLAH HARGA UPAH -
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 31.700,00
E. Keuntungan +OVERHEAD 11% 3.487,00
F. HARGA SATUAN PEKERJAAN ( D + E ) XXVI.003 35.187,00
G. DIBULATKAN 35.200,00
Mata Pembayaran :
SNI N.02
XVIII.002
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
SATUAN PEMBAYARAN m²
A. TENAGA
1. Pekerja / knek LII.5 2 .1 .1
B. BAHAN
1. sabun colek Ekonomi 500 g M 0 7 5 .0 0 5
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 -
JUMLAH HARGA UPAH -
A. TENAGA
1. Pekerja / knek LII.5 2 .1 .1
B. BAHAN
1. Cat Dinding Exterior M 0 3 5 .0 3 9
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 -
JUMLAH HARGA UPAH -
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 79.994,00
E. Keuntungan +OVERHEAD 11% 8.799,34
F. HARGA SATUAN PEKERJAAN ( D + E ) XXVI.003 88.793,34
G. DIBULATKAN 88.800,00
Mata Pembayaran :
BOW O.07 e
XXV.031
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
SATUAN PEMBAYARAN m¹
A. TENAGA
1. @ Pekerja / knek LI I . 52. 1. 1. a
B. BAHAN
1. kanstin uk. 40×28×12×16 M 0 3 0 .2 5 5
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 1.000 1.000
JUMLAH HARGA UPAH 1.000,00
A. TENAGA
1. Pekerja / knek LII.52.1.1.a org/hr 0,2500 169.000,00 42.250,00
2. tukang batu LII.52.1.5.a org/hr 0,5000 212.000,00 106.000,00
3. Kepala Tukang Batu LII.52.1.4.a org/hr 0,0500 250.000,00 12.500,00
4. Mandor / pengawas LII.52.1.12.aorg/hr 0,0013 296.000,00 384,80
5.
B. BAHAN
1. Paving Block K-350 Tebal 6 cm. m² 1,0100 99.000,00 99.990,00
2. Rp0,0 #N/A 0,0500 - -
3.
4.
5.
6.
7.
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Mata Pembayaran :
Analisa LI-831a
XXVI.005
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
SATUAN PEMBAYARAN m²
A. TENAGA
1. @ Pekerja / knek LII.52.1.1.aorg/jam 0,2800 24.000,00 6.720,00
2. @ Tukang LII.52.1.2.aorg/jam 0,1400 30.000,00 4.200,00
3. @ Mandor / pengawas LII.52.1.12.aorg/jam 0,1400 42.000,00 5.880,00
4.
5.
B. BAHAN
1. Rumput Gajah mini Per M2 m2
M 0 9 3 .0 9 1
C. PERALATAN
1.
2.
3.
4.
5.
6.
7.
8.
Alat bantu Ls 1,0000 1.000,00 1.000,00
JUMLAH HARGA UPAH 1.000,00