K O N T R A K I N V O I C E SISA
No. U R A I A N RINCIAN JUMLAH YANG LALU SAAT INI S/D SEKARANG KONTRAK
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7 8
I. BIAYA LANGSUNG PERSONIL (BLP/REMUNERATION) 29.131.339 0 29.131.339 29.131.339 0
1 Tenaga Ahli 21.360.201 0 21.360.201 21.360.201 0
2 Tenaga Pendukung 7.771.137 0 7.771.137 7.771.137 0
Terbilang: Tiga puluh lima juta sembilan ratus tujuh puluh delapan ribu enam ratus tujuh puluh delapan koma tujuh puluh lima rupiah
I N V O I C E
K O N T R A K SISA KONTRAK
YANG LALU SAAT INI S/D SEKARANG
No. TENAGA AHLI N A M A
Unit / Volume Harga Satuan Jumlah Biaya Volume Jumlah Biaya Volume Jumlah Biaya Volume Jumlah Biaya Volume Jumlah Biaya
Satuan (MM) ( Rp. ) ( Rp. ) (MM) ( Rp. ) (MM) ( Rp. ) (MM) ( Rp. ) (MM) ( Rp. )
A. TENAGA AHLI
B. TENAGA PENDUKUNG
1 Juru Survei/Surveyor-1 Marnasip P. Siregar OH 3 10.194.694 1.529.204 - - 3 1.529.204 3 1.529.204 0 0
I N V O I C E
K O N T R A K SISA KONTRAK
YANG LALU S A A T I N I S/D SEKARANG
No. U R A I A N
Unit / Biaya Satuan Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
Volume Volume Volume Volume Volume
Satuan ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
II.1 BIAYA PERALATAN & ALAT TULIS KERJA 4.316.048 4.316.048 4.316.048
1 Biaya Alat Ukur Surveyor Unit 1 343.680 378.048 0 0 1 378.048 1 378.048 0 0
2 Laporan Awal Rangkap 5 200.480 1.102.640 0 0 5 1.102.640 5 1.102.640 0 0
3 Laporan Antara Rangkap 5 229.120 1.260.160 0 0 5 1.260.160 5 1.260.160 0 0
4 Laporan Akhir Rangkap 5 286.400 1.575.200 0 0 5 1.575.200 5 1.575.200 0 0
II.3 BIAYA SEWA KOMUNIKASI KANTOR DAN KOMUNIKASI PERSONIL 1.031.040 1.031.040 1.031.040
1 Tenaga Ahli Bangunan 1 Orang 1 114.560 114.560 0 0 1 114.560 1 114.560 0 0
2 Tenaga Ahli Estimator 1 Orang 1 114.560 114.560 0 0 1 114.560 1 114.560 0 0
3 Operator CAD 1 Orang 1 114.560 114.560 0 0 1 114.560 1 114.560 0 0
4 Administrator 2 Orang 1 114.560 229.120 0 0 1 229.120 1 229.120 0 0
5 Surveyor 2 Orang 2 114.560 458.240 0 0 2 458.240 2 458.240 0 0