Anda di halaman 1dari 3

KEGIATAN : Penyediaan Infrastruktur dan Seluruh Pendukung Kemandirian Pangan Sesuai Kewenangan Sub Kegiatan Penyediaan Infrastruktur Lumbung

ediaan Infrastruktur Lumbung Pangan


PEKERJAAN : Belanja Jasa Konsultan Perencanaan Pembangunan Lantai Jemur
NO,KONTRAK : 500.1.3/585-DCP Tanggal 21 Maret 2023
THN ANGGARAN : TA 2023
KONSULTAN : PT. INDIKA REKAYASA PERKASA
PERIODE INVOICE : 21 Maret 2023 s/d 05 April 2023

REKAPITULASI INVOICE PEKERJAAN

K O N T R A K I N V O I C E SISA
No. U R A I A N RINCIAN JUMLAH YANG LALU SAAT INI S/D SEKARANG KONTRAK
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7 8
I. BIAYA LANGSUNG PERSONIL (BLP/REMUNERATION) 29.131.339 0 29.131.339 29.131.339 0
1 Tenaga Ahli 21.360.201 0 21.360.201 21.360.201 0
2 Tenaga Pendukung 7.771.137 0 7.771.137 7.771.137 0

II. BIAYA LANGSUNG NON PERSONIL (BLNP) 6.847.340 0 6.847.340 6.847.340 0


II.1 BIAYA PERALATAN & ALAT TULIS KERJA 4.316.048 0 4.316.048 4.316.048 0
II.2 BIAYA SEWA TRANSPORTASI & PENUNJANG 1.500.252 0 1.500.252 1.500.252 0
II.3 BIAYA SEWA KOMUNIKASI KANTOR DAN KOMUNIKASI PERSONIL 1.031.040 0 1.031.040 1.031.040 0

JUMLAH ( I + II ) 35.978.195 - 35.978.679 35.978.679 0


JUMLAH YANG DIBAYARKAN INVOICE SAAT INI (PEMBULATAN) 35.978.679 35.978.679

Terbilang: Tiga puluh lima juta sembilan ratus tujuh puluh delapan ribu enam ratus tujuh puluh delapan koma tujuh puluh lima rupiah

*) Biaya diatas sudah termasuk Perhitungan Pajak Bogor, 05 April 2023


Mengetahui / Menyetujui : PT. INDIKA REKAYASA PERKASA

(Dr. Malikusworo Hutomo, APU) Rony Rickriana, ST., MT.


Team Leader Direktur Teknik
RINCIAN BIAYA INVOICE

I. BIAYA LANGSUNG PERSONIL (BLP/REMUNERATION)

I N V O I C E
K O N T R A K SISA KONTRAK
YANG LALU SAAT INI S/D SEKARANG
No. TENAGA AHLI N A M A
Unit / Volume Harga Satuan Jumlah Biaya Volume Jumlah Biaya Volume Jumlah Biaya Volume Jumlah Biaya Volume Jumlah Biaya
Satuan (MM) ( Rp. ) ( Rp. ) (MM) ( Rp. ) (MM) ( Rp. ) (MM) ( Rp. ) (MM) ( Rp. )

A. TENAGA AHLI

1 Team Leader/Ahli Teknik Bangunan Baharudin, ST OH 16 20.343.049 16.274.439 - - 16 16.274.439 16 16.274.439 0 0

2 Tenaga Ahli Sipil/Estimator Sugeng Raharjo, ST OH 5 20.343.049 5.085.762 - - 5 5.085.762 5 5.085.762 0 0

SUB TOTAL ( 1 ) 21.360.201 - 21.360.201 21.360.201 -

B. TENAGA PENDUKUNG
1 Juru Survei/Surveyor-1 Marnasip P. Siregar OH 3 10.194.694 1.529.204 - - 3 1.529.204 3 1.529.204 0 0

2 Juru Survei/Surveyor-2 Wisnu Wijayanto OH 3 10.194.694 1.529.204 - - 3 1.529.204 3 1.529.204 0 0


3 Operator CAD Gunawan P.Siagian OH 6 10.797.108 3.239.132 - - 6 3.239.132 6 3.239.132 0 0

4 Administrator Ersa Marpaung OH 3 9.823.978 1.473.597 - - 3 1.473.597 3 1.473.597 0 0

SUB TOTAL ( 2 ) 7.771.137 - 7.771.137 7.771.137 -


II. BIAYA LANGSUNG NON PERSONIL (BLNP)

I N V O I C E
K O N T R A K SISA KONTRAK
YANG LALU S A A T I N I S/D SEKARANG
No. U R A I A N
Unit / Biaya Satuan Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya Jumlah Biaya
Volume Volume Volume Volume Volume
Satuan ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
II.1 BIAYA PERALATAN & ALAT TULIS KERJA 4.316.048 4.316.048 4.316.048
1 Biaya Alat Ukur Surveyor Unit 1 343.680 378.048 0 0 1 378.048 1 378.048 0 0
2 Laporan Awal Rangkap 5 200.480 1.102.640 0 0 5 1.102.640 5 1.102.640 0 0
3 Laporan Antara Rangkap 5 229.120 1.260.160 0 0 5 1.260.160 5 1.260.160 0 0
4 Laporan Akhir Rangkap 5 286.400 1.575.200 0 0 5 1.575.200 5 1.575.200 0 0

II.2 BIAYA SEWA TRANSPORTASI & PENUNJANG 1.500.252 1.500.252 1.500.252


1 Sewa Kendaraan Roda 2 2 Unit 3 206.208 1.236.764 0 0 3 1.236.764 3 1.236.764 0 0
2 Tenaga Ahli Bangunan 1 Orang 1 131.744 131.744 0 0 1 131.744 1 131.744 0 0
3 Tenaga Ahli Estimator 1 Orang 1 131.744 131.744 0 0 1 131.744 1 131.744 0 0

II.3 BIAYA SEWA KOMUNIKASI KANTOR DAN KOMUNIKASI PERSONIL 1.031.040 1.031.040 1.031.040
1 Tenaga Ahli Bangunan 1 Orang 1 114.560 114.560 0 0 1 114.560 1 114.560 0 0
2 Tenaga Ahli Estimator 1 Orang 1 114.560 114.560 0 0 1 114.560 1 114.560 0 0
3 Operator CAD 1 Orang 1 114.560 114.560 0 0 1 114.560 1 114.560 0 0
4 Administrator 2 Orang 1 114.560 229.120 0 0 1 229.120 1 229.120 0 0
5 Surveyor 2 Orang 2 114.560 458.240 0 0 2 458.240 2 458.240 0 0

JUMLAH ( I+II+III) = 6.847.340 - 6.847.340 6.847.340 -