ANALISA HARGA LUMPSUM UNTUK MOBILISASI

NO MATA PEMBAYARAN : 1.2


JENIS PEKERJAAN : MOBILISASI
SATUAN PEMBAYARAN : Lump Sum

Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2 -

B. PERALATAN
Periksa lembar 1.2-2

C. MOBILISASI FASILITAS KONTRAKTOR Set -


1 Base Camp
a) Kantor Direksi Lapangan M2
b) Fasilitas Akomudasi untuk Staff Pengawas M2
c) Fasilitas Akomudasi untuk Staff Pengawas (Barak) M2
d) Pagar Base Camp dan lain - lain Ls
2 Kantor
3 Barak
4 Bengkel
5 Gudang, dan lain-lain

D. MOBILISASI FASILITAS LABORATORIUM Set


1 Ruang Laboratorium (sesuai Gambar) M2
2 Soil & Aggregate Testing
Compaction Test Set
CBR Test Set
Specific Gravity Set
Atterberg Limits Set
Grain Size Analysis Set
Field Density Test by Sand Cone Methode Set 1,00
Moisture Content Set
Abrasion of Aggregate by Los Angeles Machine Bln

3 Bituminous Testing
Marshall Asphalt Test Set
Extraction Test, Centrifuge/Refflux Method Set
Specific Gravity for Coarse Aggregate Set
Specific Gravity for Fine Aggregate Set
Mix Air Viod Content (Accurate Method) Set
Core Drill Set
Metal Thermometer Set
Accessories and Tolls Set
Penetration Test Bln
Softening Point Set
Refusal Density Compactor Set

4 Concrete Testing
Slump Cone Set 1,00
Cylinder/Cube Mould for Compressive Strength Set 1,00
Beam Mould for Flexural Strength (RIGID) Set
Crushing Machine Set
5 Pendukung (Periksa Fasilitas Laboratorium)
6 Operasional (Periksa Fasilitas Laboratorium)

E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT LS 1,00
1 Perkuatan Jembatan Lama
2 Pemeliharaan Jalan Kerja / Samping

E.II. LAIN-LAIN Set


1 Pengukuran LS 1,00
2 Papan Nama Proyek Bh 2,00

F. Manajemen dan Keselamatan lalu lintas LS

G. DEMOBILISASI LS 1,00

Total Biaya Mobilisasi


ANALISA HARGA LUMPSUM UNTUK MOBILISASI

NO MATA PEMBAYARAN : 1.2


JENIS PEKERJAAN : MOBILISASI
SATUAN PEMBAYARAN : Lump Sum

Lembar 1.2-2
HARGA JUMLAH
No. JENIS ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT FINISHER Unit 1,00


2 ASPHALT SPRAYER Unit 1,00
3 DUMP TRUCK 3.5 TON Unit 5,00
4 GENERATOR SET Unit 1,00
5 MOTOR GRADER >100 HP Unit 1,00
6 TANDEM ROLLER 6-8 T. Unit 1,00
7 VIBRATORY ROLLER 5-8 T. Unit 1,00
8 WATER TANKER 3000-4500 L. Unit 1,00

Total untuk Item B pada Lembar 1