JUMLAH 360,376,457
PPN 11 % 39,641,410
JUMLAH 400,017,867
DIBULATKAN 400,010,000
I PEKERJAAN PENDAHULUAN
1 Pekerjaan Pembersihan Lapangan 11 x 10 110.00
110.00 m2
42.00 m
II PEKERJAAN PONDASI
1 Pekerjaan Galian Biasa 1 x 1 x 1.1 x 17 18.70
18.70 m3
0.85 m3
0.85 m3
4.25 m3
0.51 m3
4.68 m3
III PEKERJAAN STRUKTUR
1 Pekerjaan Balok Sloof 20/25 0.20 x 0.25 x 65 3.25
3.25 m3
0.15 m3
2.04 m3
0.29 m3
2.42 m3
2.75 m3
1.04 m3
IV PEKERJAAN DINDING
1 Pekerjaan Dinding Tastram 1:2
Luas Bersih 0.40 x 60 = 24.00
0.80 x 10.77 = 8.62
32.62
30.82 m2
Luas Kozen
P 0.90 x 2.15 x 5.00 = 9.675
J2 1.35 x 1.55 x 3.00 = 6.2775
J1 0.70 X 1.55 X 3.00 = 3.255
V 0.50 X 0.7 x 1.00 = 0.35
19.5575
157.88 m2
61.63 m2
312.00 m2
373.63 m2
V PEKERJAAN ATAP
1 Pekerjaan Kuda-kuda
Kuda-kuda 1
Balok Tarik 6/12 6.15 x 0.06 x 0.12 x 1 x 2 0.09
Kaki Kuda-kuda 6/12 4.74 x 0.06 x 0.12 x 2 x 2 0.14
Tiang Makelar 6/12 2.24 x 0.06 x 0.12 x 1 x 2 0.03
Balok Apit 2x 4/12 3.72 x 0.04 x 0.12 x 2 x 2 0.07
No Uraian Pekerjaan Perhitungan Volume Satuan
Kuda-kuda 2
Balok Tarik 6/12 5.66 x 0.06 x 0.12 x 1 x 4 0.16
Kaki Kuda-kuda 6/12 4.89 x 0.06 x 0.12 x 1 x 4 0.14
Tiang Makelar 6/12 2.05 x 0.06 x 0.12 x 1 x 4 0.06
Balok Apit 2x 4/12 1.89 x 0.04 x 0.12 x 2 x 4 0.07
Skor Miring 4/12 1.54 x 0.04 x 0.12 x 1 x 4 0.03
Skor Tegak 4/12 0.86 x 0.04 x 0.12 x 1 x 4 0.02
0.90 m3
0.88 m3
23.64 m
89.61 m2
10.20 m2
VI PEKERJAAN LANTAI
1 Pekerjaan Timbunan Biasa
Ruang Tengah 2.85 x 6.85 x 0.09 1.76
Ruang Lapor 2.85 x 2.85 x 0.09 0.73
Ruang Menyusui 2.85 x 2.85 x 0.09 0.73
Ruang Pimpinan 2.85 x 2.85 x 0.09 0.73
WC/KM 1.85 x 1.85 x 0.04 0.14
Pos Luar 1.85 x 6.85 x 0.04 0.51
1.85 x 2.85 x 0.04 0.21
4.80 m3
3.26 m3
6.53 m3
61.84 m2
3.42 m2
9.83 m2
93.53 m2
93.53 m2
3 Pekerjaan Listprofil
Ruang Tengah 5.7 + 13.7 19.40
Ruang Lapor 11.4 11.40
Ruang Menyusui 11.4 11.40
Ruang Pimpinan 11.4 11.40
WC/KM 7.4 7.40
Pos Luar 23.1 23.10
Overstek 34 + 26 60.00
144.10 m
0.61 m3
9.08 m2
3.12 m2
4.00 Bh
12.00 Bh
8.00 Bh
18.00 Bh
9.00 Bh
18.00 Bh
J1 2 x 3 6.00
J2 4 x 3 12.00
18.00 Bh
IX PEKERJAAN TERAS
1 Pasangan Bata 1:2 Tastram 41 x 0.3 12.30
12.30 m2
6.15 m2
6.15 m2
1.51 m3
3.02 m3
30.24 m2
22.00 Titik
7.00 Buah
10.00 Buah
1.00 Buah
5.00 Buah
No Uraian Pekerjaan Perhitungan Volume Satuan
5.00 Buah
1.00 Buah
1.00 Buah
1.00 Buah
1.00 Buah
12.50 m
4.70 m
3.00 m
7 Septicktank 1 1.00
1.00 Unit
37.86 m2
2 Pengecatan Dinding
373.63 373.63
No Uraian Pekerjaan Perhitungan Volume Satuan
373.63 m2
93.53 m2
49.93 m2
2.00 Unit
2 Pengadaan Lemari
3 3.00
3.00 Unit
10.00 Unit
1.00 Unit
-
-
-
No Uraian Pekerjaan Perhitungan Volume Satuan
-
-
RINCIAN PENGGUNAAN UANG MUKA
KEGIATAN : Pengelolaan Kawasan Strategis Pariwisata Kabupaten Kota
PEKERJAAN : Pembangunan Jalur Pejalan Kaki Pedestrian
LOKASI : Desa Tuapejat, Kecamatan Sipora Utara
TAHUN : 2022
BANYAKNYA
NO URAIAN BAHAN HARGA SATUAN JUMLAH HARGA
JUMLAH SATUAN
TOTAL Rp 80,004,784.80
APRIANUS HURA
Kuasa Direktur
DAFTAR HARGA SATUAN DASAR
UPAH, BAHAN DAN PERALATAN
HARGA TOTAL
No URAIAN SATUAN SATUAN MOBILISASI HARGA KETERANGAN
Rp. Rp Rp.
I BAHAN PASANGAN
IV BAHAN KAYU
VI BAHAN KACA
1 Kaca Bening Tebal 5 mm M2 91,476.00 91,476.00
3 Kaca Bening Tebal 8 mm M2 177,463.44 177,463.44
4 Kaca Reiben Tebal 3 mm M2 68,800.00 86,000.00
5 Kaca Reiben Tebal 5 mm M2 83,200.00 104,000.00
6 Kaca Es Tebal 3 mm M2 68,000.00 85,000.00
2 Kaca Es Tebal 5 mm M2 126,880.00 158,600.00
8 Kaca Grafir M2 600,000.00 750,000.00
9 Kaca Naco M2 100,000.00 125,000.00
X BAHAN SANITAIR
XI BAHAN LISTRIK
1 Pemasangan Instalasi Listrik ( Standar PLN dan SNI ) Titik 142,931.25 142,931.25
2 Stop Kontak Setara Broco Buah 20,250.00 20,250.00
3 Stop Kontak AC Buah 33,750.00 33,750.00
3 Saklar Tunggal Setara Broco Buah 12,150.00 12,150.00
4 Saklar Ganda Setara Broco Buah 16,200.00 16,200.00
5 Saklar Tiga Buah 16,875.00 16,875.00
5 Fitting Lampu Biasa Setara Broco Buah 16,200.00 16,200.00
6 Fitting Lampu Tanam 4" (Downlight ) Buah 27,000.00 27,000.00
6 Lampu XL 20 Watt Setara Philips Buah 30,375.00 30,375.00
7 Lampu Pijar 25 Watt Buah 6,750.00 6,750.00
7 Box Panel Unit 202,500.00 202,500.00
0
0
0
0
DAFTAR ANALISA BIAYA KONSTRUKSI (ABK)
KELOMPOK PEKERJAAN LANTAI DAN DINDING ( MERUJUK PADA SNI - 7395 - 2008 )
2 1 M1 Pemasangan Bowplank
Upah :
0.100 Oh Tukang kayu 100,000.00 10,000.00
0.010 Oh Kepala tukang 150,000.00 1,500.00
0.100 Oh Pekerja 80,000.00 8,000.00
0.005 Oh Mandor 100,000.00 500.00 20,000.00
Bahan :
0.007 M3 Kayu papan 2,000,000.00 14,000.00
0.012 M3 Kayu 5 x 7 cm 2,000,000.00 24,000.00
0.020 Kg Besi paku biasa 21,000.00 420.00 38,420.00
Jumlah 58,420.00
10% Keuntungan dan Over head max 10% 5,842.00
Total 64,262.00
3 1 M3 Urugan Pasir
Upah :
0.300 Oh Pekerja 80,000.00 24,000.00
0.010 Oh Mandor 100,000.00 1,000.00 25,000.00
Bahan :
1.200 M3 Pasir Urug 177,416.25 212,899.50 212,899.50
Jumlah 237,899.50
10% Keuntungan dan Over head max 10% 23,789.95
Total 261,689.45
1 1 M3 Urugan Kerikil
Upah :
0.300 Oh Pekerja 80,000.00 24,000.00
0.010 Oh Mandor 100,000.00 1,000.00 25,000.00
Bahan :
1.200 M3 Tanah Urug 422,250.00 506,700.00 506,700.00
Jumlah 531,700.00
10% Keuntungan dan Over head max 10% 53,170.00
Total 584,870.00
KELOMPOK PEKERJAAN PONDASI, SNI 2836 - 2008
HRG . SATUAN SUB JUMLAH JUMLAH
NO. URAIAN KET
Rp. Rp. Rp.
Bahan :
326.000 Kg Semen portland ( 50 Kg) 1,600.00 521,600.00
0.540 M3 Pasir beton 412,500.00 222,750.00
0.760 M3 Kerikil 422,250.00 320,910.00
215.000 Ltr Air 30.00 6,450.00 1,071,710.00
Jumlah 1,243,710.00
10% Keuntungan dan Over head max 10% 124,371.00
Total 1,368,081.00
4 1 M2 Pasang Bekisting
Upah :
0.520 Oh Pekerja 80,000.00 41,600.00
0.260 Oh Tukang kayu 100,000.00 26,000.00
0.026 Oh Kepala tukang 150,000.00 3,900.00
0.026 Oh Mandor 100,000.00 2,600.00 74,100.00
Bahan :
0.045 M3 Kayu terentang/Perancah 2,000,000.00 90,000.00
0.300 Kg Paku Biasa 21,000.00 6,300.00
0.100 Lt Minyak bekisting 10,000.00 1,000.00 97,300.00
Jumlah 171,400.00
10% Keuntungan dan Over head max 10% 17,140.00
Total 188,540.00
dua kali pakai 94,270.00
KELOMPOK PEKERJAAN LANTAI DAN DINDING ( MERUJUK PADA SNI - 7395 - 2008 )
HRG . SATUAN SUB JUMLAH JUMLAH
NO. URAIAN KET
Rp. Rp. Rp.
-
-
-
-
DAFTAR ANALISA BIAYA KONSTRUKSI (ABK)
BOB0T MINGGU KE
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PERSENTASE
No. URAIAN PEKERJAAN
DARI TGL dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy (%)
s/d TGL dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
100
I PEKERJAAN PENDAHULUAN 3.432
1.716 1.716
75
25
III PEKERJAAN PEDESTRIAN 29.937
7.484 7.484 7.484 7.484
0
KOMULATIF BOBOT RENCANA 100.000 1.72 5.64 3.92 11.40 11.40 11.40 11.40 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92 3.92
BOBOT RENCANA 1.72 7.35 11.27 22.67 34.08 45.48 56.89 60.81 64.72 68.64 72.56 76.48 80.40 84.32 88.24 92.16 96.08 100.00
KOMULATIF REALISASI
BOBOT REALISASI 0
DEVIASI CEPAT (+) / LAMBAT (-)
HARDANA MENDOZA, ST
Direktur
ACTUAL CHECK
Kegiatan : Pengelolaan Kawasan Strategis Pariwisata Kabupaten Kota
Pekerjaan : Pembangunan Jalur Pejalan Kaki Pedestrian
Lokasi : Desa Gooisoinan, Kec. Sipora Utara
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan 176.00 x 1.00 = 176.00
29.02 x 2.00 = 58.03
6 Timbunan Kerikil
1.98 x 0.1 x 83.6 = 16.55
A PEKERJAAN PONDASI
b. Bekisting
= 0.20 x 1.00 x 4.00 = 0.80 M2
b. Bekisting
= 0.20 x 0.70 x 4.00 = 0.56 M2
B PEKERJAAN SLOOF
b. Bekisting
= 0.70 x 1.00 = 0.70 M2
b. Bekisting
= 0.55 x 1.00 = 0.55 M2
1 KOLOM 20/20
P = 1.00 M Jarak Sengkang
L = 0.20 M Lapangan = 0.15
T = 0.20 M Tumpuan = 0.10
a. Berat Besi
- Tulangan Pokok 12 0.8878 1.0000 8.000 7.1021
- Tulangan Sengkang 8 0.3946 0.8000 9.000 2.8408
Total 9.9429
Volume Beton = 1.00 x 0.20 x 0.20 = 0.04 M3
Untuk 1 M3 Beton = 1.00 / 0.04 x 9.94 = 248.57 Kg/M3
b. Bekisting
= 0.20 x 1.00 x 4.00 = 0.80 M2
b. Bekisting
= 0.15 x 1.00 x 4.00 = 0.60 M2
C PEKERJAAN BALOK
1 BALOK 15/15
P = 1.00 M Jarak Sengkang
L = 0.15 M Lapangan = 0.15
T = 0.15 M Tumpuan = 0.10
a. Berat Besi
- Tulangan Pokok 12 0.8878 1.0000 4.000 3.5510
- Tulangan Sengkang 8 0.3946 0.6000 9.000 2.1306
Total 5.6817
Volume Beton = 1.00 x 0.15 x 0.15 = 0.02 M3
Untuk 1 M3 Beton = 1.00 / 0.02 x 5.68 = 252.52 Kg/M3
b. Bekisting
= 0.15 x 1.00 x 2.00 = 0.30 M2
2 BALOK 13/13
P = 1.00 M Jarak Sengkang
L = 0.13 M Lapangan = 0.20
T = 0.13 M Tumpuan = 0.15
a. Berat Besi
- Tulangan Pokok 10 0.6165 1.0000 4.000 2.4660
- Tulangan Sengkang 8 0.3946 0.5200 7.000 1.4362
Total 3.9022
Volume Beton = 1.00 x 0.13 x 0.13 = 0.02 M3
Untuk 1 M3 Beton = 1.00 / 0.02 x 3.90 = 230.90 Kg/M3
b. Bekisting
= 0.13 x 1.00 x 2.00 = 0.26 M2
b. Bekisting
= 0.20 x 1.00 x 2.00 = 0.40 M2
D PEKERJAAN PLAT
b. Bekisting
= 1.00 x 1.00 x 1.00 = 1.00 M2
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan 176.00 x 1.00 = 176.00
29.02 x 2.00 = 58.03
6 Acian 95.88
6 Timbunan Kerikil
1.98 x 0.1 x 69.2 = 13.70
11 Acian 40.26
Tuapejat, 2022
Diperiksa Oleh Dibuat Oleh
Konsultan Pengawas Kontraktor Pelaksana
CV. KEMBAR ARSITEKTUR CV. H A L I M A
KONTRAK ADENDUM-1
No. URAIAN PEKERJAAN SATUAN KET
VOLUME HRG SATUAN JML SATUAN BOBOT VOLUME HRG SATUAN JML SATUAN BOBOT
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan M2 234.03 14,300.00 3,346,629.00 92.86% 234.03 14,300.00 3,346,629.00 92.86%
2 Pelaksanaan SMK3 -
a. Pengadaan Peralatan K3 Bh 2.00 95,000.00 190,000.00 5.27% 2.00 95,000.00 190,000.00 5.27%
b. Pengadaan Helmet Safety Bh 7.00 45,000.00 315,000.00 8.74% 7.00 45,000.00 315,000.00 8.74%
c. Pengadaan Sarung Tangan Psg 7.00 30,000.00 210,000.00 5.83% 7.00 30,000.00 210,000.00 5.83%
d. Pengadaan Sepatu Boot Psg 7.00 100,000.00 700,000.00 19.42% 7.00 100,000.00 700,000.00 19.42%
e. Pengadaan Rompi Bh 7.00 25,000.00 175,000.00 4.86% 7.00 25,000.00 175,000.00 4.86%
f. Pengadaan Masker Bh 75.00 15,000.00 1,125,000.00 31.22% 75.00 15,000.00 1,125,000.00 31.22%
g. Pengadaan Banner/Spanduk K3 Bh 1.00 350,000.00 350,000.00 9.71% 1.00 350,000.00 350,000.00 9.71%
3 Pengadaan Plang Proyek Bh 1.00 300,000.00 300,000.00 8.32% 1.00 300,000.00 300,000.00 8.32%
4 Pemasangan Bouplank Ls 88.00 64,262.00 5,655,056.00 156.92% 88.00 64,262.00 5,655,056.00 156.92%
Tuapejat, 2022
Diperiksa Oleh Dibuat Oleh
Mengetahui dan Menyetujui, Dikperiksa Oleh, Konsultan Pengawas Kontraktor Pelaksana
PEJABAT PELAKSANA TEKNIS
PEJABAT PEMBUAT KOMITMEN CV. KEMBAR ARSITEKTUR CV. H A L I M A
KEGIATAN
Bobot
No. Uraian Pekerjaan Kontrak Tingkat Tertim-
Penyelesaian bang
% % %
Demikianlah Laporan Kemajuan Pekerjaan ini dibuat dalam rangkap 5 (Lima) untuk dapat dipergunakan sesuai
menurut keperluannya.
BOB0T MINGGU KE
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13
No. URAIAN PEKERJAAN
DARI TGL 20 Juli 2022 27 Juli 2022 03 Agustus 2022 10 Agustus 2022 17 Agustus 2022 24 Agustus 2022 31 Agustus 2022 07 September 2022 14 September 2022 21 September 2022 28 September 2022 05 Oktober 2022 12 Oktober 2022
s/d TGL 26 Juli 2022 02 Agustus 2022 09 Agustus 2022 16 Agustus 2022 23 Agustus 2022 30 Agustus 2022 06 September 2022 13 September 2022 20 September 2022 27 September 2022 04 Oktober 2022 11 Oktober 2022 18 Oktober 2022
KOMULATIF BOBOT RENCANA 100.000 1.72 5.64 3.92 11.40 11.40 11.40 11.40 3.92 3.92 3.92 3.92 3.92 3.92
BOBOT RENCANA 1.72 7.35 11.27 22.67 34.08 45.48 56.89 60.81 64.72 68.64 72.56 76.48 80.40
KOMULATIF REALISASI
BOBOT REALISASI 0
DEVIASI CEPAT (+) / LAMBAT (-)
26 Juli 2022
CV. H A L I M A
Aprianus Hura
Kuasa Direktur
E SCHEDULLE
MINGGU KE
14 15 16 17 18 PERSENTASE
19 Oktober 2022 26 Oktober 2022 02 November 2022 09 November 2022 16 November 2022 (%)
25 Oktober 2022 01 November 2022 08 November 2022 15 November 2022 22 November 2022
100
75
25
0
3.92 3.92 3.92 3.92 3.92
84.32 88.24 92.16 96.08 100.00
26 Juli 2022
CV. H A L I M A
Aprianus Hura
Kuasa Direktur