VOLUME KUSEN JENDELA

JUMLAH KUSEN TOTAL LEBAR TEBAL


JENIS KUSEN
KUSEN
LANTAI 1 LANTAI 2 LANTAI 3 (m) (m)
JENDELA TYPE 1 1 4 0 5 0.15 0.05
KUSEN JENDELA

JENDELA TYPE 2 1 2 0 3 0.15 0.05

JENDELA TYPE 3 2 0 0 2 0.15 0.05

JENDELA TYPE 4 1 0 0 1 0.15 0.05

PINTU TYPE 1 6 5 1 12 0.15 0.05


KUSEN PINTU

PINTU TYPE 2 2 2 0 4 0.15 0.05

PINTU TYPE 3 1 0 0 1 0.15 0.05

VOLUME TOTAL KESELURUHAN KUSEN JENDELA

𝐾𝐸𝐿𝐼𝐿𝐼𝑁𝐺=𝑇𝐼𝑁𝐺𝐺𝐼+𝑃𝐴𝑁𝐽𝐴𝑁𝐺
𝐿𝑈𝐴𝑆 𝑃𝐸𝑁𝐴𝑀𝑃𝐴𝑁𝐺 𝐾𝐴𝑌𝑈=𝐿𝐸𝐵𝐴𝑅 𝐾𝐴𝑌𝑈 𝑋 𝑇𝐸𝐵𝐴𝐿 𝐾𝐴𝑌𝑈
𝑉𝑂𝐿𝑈𝑀𝐸 𝑆𝐴𝑇𝑈𝐴𝑁=𝐾𝐸𝐿𝐼𝐿𝐼𝑁𝐺 𝑋 𝐿𝑈𝐴𝑆 𝑃𝐸𝑁𝐴𝑀𝑃𝐴𝑁𝐺 𝐾𝐴𝑌𝑈
KUSEN JENDELA DAN PINTU

LUAS VOLUME
VOLUME VOLUME
TINGGI PANJANG KELILING PENAMPANG SATUAN X TOTAL
KAYU TOTAL KUSEN
(m) (m) (m) (m²) (m³) (m³) (m³)
1.4 1.05 6.3 0.0075 0.04725 0.23625

1.4 2.1 11.2 0.0075 0.08400 0.252


0.66
1.4 1.25 6.7 0.0075 0.05025 0.1005

1.4 2.65 9.5 0.0075 0.07125 0.07125

2.12 0.9 5.14 0.0075 0.03855 0.4626

2.12 0.9 5.14 0.0075 0.03855 0.1542


0.689475
2.12 2.65
9.69 0.0075 0.07268 0.072675
1.4 1.4

URUHAN KUSEN JENDELA DAN PINTU 1.349475


VOLUME DINDING YANG LUAS PENGECETAN KAYU LUAS PENGECETAN DI
DIPAKAI OLEH KUSEN (m²) YANG DI PAKAI KUSEN

(m³) lantai 1 lantai 2 lantai 3 lantai 1


1.1025 1.89 7.56 0 2.94

1.323 3.36 6.72 0 5.88

0.525 4.02 0 0 7

0.5565 2.85 0 0 7.42

3.4344 9.252 7.71 1.542 22.896

1.1448 3.084 3.084 0 7.632

2.1384 2.907 0 0 11.236

10.2246 27.363 25.074 1.542 65.004


LUAS PENGECETAN DINDING
YANG DI PAKAI KUSEN (m²)

lantai 2 lantai 3
11.76 0

11.76 0

0 0

0 0

19.08 3.816

7.632 0

0 0

50.232 3.816
VOLUME DINDING

LEBAR TINGGI PANJANG


DINDING

(m) (m) (m)

LANTAI 1 0.15 3 81.63

LANTAI 2 0.15 3 90

LANTAI 3 0.15

POS SATPAM 0.15 2.5 7

PAGAR 0.15 2 36

*ket: volume kotor yaitu volume dinding tanpa mengurangi volume dinding yang di pakai oleh k

*ket: volume bersih yaitu volume kotor dikurangi volume dinding yang dipakai oleh kusen
INDING

VOLUME VOLUME
VOLUME KOTOR BERSIH LUAS PLESTER
DINDING DINDING

(m³) (m³) (m³) m2

36.73 489.78

40.50 540

0.00 90.66 80.43 0

2.63 35

10.80 144

volume dinding yang di pakai oleh kusen

nding yang dipakai oleh kusen


LUAS PERMUKAAN CAT

LANTAI 1 490 M²

LANTAI 2 540 M²

LANTAI 3 0 M²

POS SATPAM 35 M²

PAGAR 144 M²

LUAS TOTAL 1209 M²


MENGHITUNG LUAS DAN VOLUME

DIMENSI
NO URAIAN PEKERJAAN
P L t

GEDUNG LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site 20 14.5
2 Direksi keet 5 5
3 Pek Pemasangan Bouwplank 20 14.5
II PEKERJAAN TANAH DAN PONDASI
1 Pek.Galian Tanah type P1 6.5 2.19 0.72
2 Pek.Galian Tanah type P2 36.1 1.56 0.8
3 Pek.Galian Tanah type F1 1.25 1.25 1.7
4 Pek.Galian Tanah type F2 1.25 1.25 1.7
5 Pek.Galian Tanah type F3 1.25 1.25 1.7
Jumlah Pek.Galian Tanah
1 Pek. Aanstamping t 15 cm type P1 6.5 0.75 0.15
2 Pek. Aanstamping t 15 cm type P2 36.1 0.6 0.15
Jumlah Pek.Aanstamping
1 Pek. Pasangan Batu belah type P1 6.5 0.8 0.5
2 Pek. Pasangan Batu belah type P2 36.1 0.75 0.55
Jumlah Pek. Pasangan Batu Kali
1 Pek. Urugan Pasir pondasi t 7 cm type P1 6.5 0.96 0.07
2 Pek. Urugan Pasir pondasi t 7 cm type P2 36.1 0.7 0.07
3 Pek. Urugan Pasir pondasi t 5 cm type F1 1.25 1.25 0.05
4 Pek. Urugan Pasir pondasi t 5 cm type F2 1.25 1.25 0.05
5 Pek. Urugan Pasir pondasi t 5 cm type F3 1.25 1.25 0.05
Jumlah Pek. Urugan Pasir Pondasi
1 Pek. Urugan kembali pondasi type P1 6.5
2 Pek. Urugan kembali pondasi type P2 36.1
3 Pek. Urugan kembali pondasi type F1 1.25 1.25 1.37
4 Pek. Urugan kembali pondasi type F2 1.25 1.25 1.37
5 Pek. Urugan kembali pondasi type F3 1.25 1.25 1.37
Jumlah Pek. Urugan Kembali
6 Pek. Urugan Peninggian lantai t 15 cm 20 0.15
7 Pek. Urugan Pasir bawah lantai t 10 cm 20 0.1
Jumlah Pek. Pasir bawah lantai
8 Pek. Lantai kerja t 8 cm F1 1.25 0.08
9 Pek. Lantai kerja t 8 cm F2 1.25 0.08
10 Pek. Lantai kerja t 8 cm F3 1.25 0.08
Jumlah Pek. Pasir bawah lantai
III PEKERJAAN BETON
1 Pondasi Plat Setempat Type F1
- Pek. Pembesian tul dia.13
- Pek. Pembesian sengkang dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting 1.25 1.25 0.38
- Pek. Cor Beton
2 Pondasi Plat Setempat Type F2
- Pek. Pembesian tul dia.13
- Pek. Pembesian sengkang dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting 1.25 1.25 0.38
- Pek. Cor Beton
2 Pondasi Plat Setempat Type F3
- Pek. Pembesian tul dia.13
- Pek. Pembesian sengkang dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting 1.25 1.25 0.38
- Pek. Cor Beton
3 Pek. Bor pile dia.15
- Pek. Pembesian dia.8
- Pek. Pembesian dia.13
- Pek. Bekisting 6
- Pek. Cor Beton 6
4 Pek. Sloof 25/40
- Pek. Pembesian sengkang dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.25 0.4
4 Pek. Sloof 15/20
- Pek. Pembesian sengkang dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.2
1 Pek. Balok Induk B1 25/40
- Pek. Pembesian dia.8
- Pek. Pembesian dia.13
- Pek. Bekisting
- Pek. Cor Beton 0.25 0.4
2 Pek. Balok Anak BA 15/25 Melintang
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.25
3 Pek. Balok Anak BA 15/25 Memanjang
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.25
5 Pek. Kolom K1 30/30 +3.40 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia.13
- Pek. Bekisting
- Pek. Cor Beton 0.3 0.3 3.5
6 Pek. Kolom K2 15/40 +3.40 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 13
- Pek. Bekisting 0.15 0.4 3.5
- Pek. Cor Beton 0.15 0.4 3.5
6 Pek. Kolom Kp 15/15 +3.40 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 12
- Pek. Bekisting 0.15 0.15 3.5
- Pek. Cor Beton 0.15 0.4 3.5
6 Pek. Kolom K4 15/15 +2.00 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 12
- Pek. Bekisting 0.15 0.15 3.5
- Pek. Cor Beton 0.15 0.4 3.5
7 Pek. Anak Tangga
- Pek. Pembesian dia.12
- Pek. Pembesian Tul. dia 10
- Pek. Bekisting
- Pek. Cor Beton
8 Pek. Bordes Tangga T= 12 cm
- Pek. Pembesian tul. dia.12
- Pek. Pembesian dia 10
- Pek. Bekisting
- Pek. Cor Beton
9 Pek.Pelat Tangga T= 12 cm
- Pek. Pembesian tul. dia.10
- Pek. Pembesian dia 12
- Pek. Bekisting
- Pek. Cor Beton
10 Pek. Beton Plat Topi TYPE 1
- Pek. Pembesian dia.8
- Pek. Bekisting
- Pek. Cor Beton
11 Pek. Beton Plat Topi TYPE 2
- Pek. Pembesian dia.8
- Pek. Bekisting
- Pek. Cor Beton
12 Pek. Beton Plat Topi TYPE 3
- Pek. Pembesian dia.8
- Pek. Bekisting
- Pek. Cor Beton
13 Pek. Beton Plat Topi TYPE 4
- Pek. Pembesian dia.8
- Pek. Bekisting
- Pek. Cor Beton
1 - Pekerjaan dinding 1 Pc : 5 Ps +3.40m 81.63 0.15 3
3 Pek. Acian / Plesteran 81.63 3
V PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
1 JENDELA TYPE 1 1.05 0.15 1.4
JENDELA TYPE 2 2.1 0.15 1.4
JENDELA TYPE 3 1.25 0.15 1.4
JENDELA TYPE 4 2.65 0.15 1.4
PINTU TYPE 1 0.9 0.15 2.12
PINTU TYPE 2 0.9 0.15 2.12
2.65 2.12
PINTU TYPE 3 0.15
1.4 1.4
2 DAUN PINTU DAN JENDELA
JENDELA TYPE 1 0.48 0.05 1.32
JENDELA TYPE 2 0.48 0.05 0.04
JENDELA TYPE 3 0.48 0.05 0.04
JENDELA TYPE 4 0 0 0
PINTU TYPE 1 0.8 0.15 2.07
PINTU TYPE 2 0.8 0.15 2.07
PINTU TYPE 3 0 0 0

3 pek.pintu pvc toilet Pt


4 pek. Kaca 5 mm JENDELA TYPE 1 1.56 4.92 0.005
pek. Kaca 5 mm JENDELA TYPE 2 3.12 4.92 0.005
pek. Kaca 5 mm JENDELA TYPE 3 2.14 5.7 0.005
pek. kaca 5 mm JENDELA TYPE 4 5.04 5.24 0.005
jumlah pek.kaca 5 mm
5 pek.engsel uk 3" dekson
6 pek.engsel uk 5" dekson
7 pek.kunci 2 slaagh ex dekson
8 pek.kunci km/wc (toilet) ex alfa
9 pek.slot pintu ex dekson
10 pek.handle alumnium rambuncis ex dekson
VI PEKERJAAN PLAFOND
1 pek.rangka plafond + penutup gypsum 9mm
2 pek.rangka plafond + penutup Grc 6mm km/wc
3 pek.list kayu 3/3
4 pek.list gypsum 10 cm
VII PEKERJAAN LANTAI + TANGGA
1 pek.pasangan keramik 20x20 km/wc+t.cuci/jemuran
2 pek.pasangan keramik lantai 30x30 ex roman putih
VIII PEKERJAAN SANITAIRE DAN PLUMBING
1 pek.inst air bersih pipa pvc wavin aw.uk 1/2"
2 pek.inst setengah air kotor pipa pvc wavin aw.uk 2"
3 pek.inst air kotor pipa pvc wavin D uk 3"
4 pek.pas closed duduk toto
5 pek.floor drain uk.3"
6 pek.tangki air fiber uk 1100 liter+radar
7 pek.pompa air ex wester 250 watt
8 pek.pompa pendorong ex zimitsu 125 watt
9 pek.kran dinding
10 pek.bak kontrol uk.40x40
11 pek.septictank
12 pek.sumur resapan
13 Pek .Kitchen sink
14 pek. Wastafel
IX PEKERJAAN PENGECATAN
1 pek.pengecatan dinding 81.63 0.15 3
2 pek.pengecatan plafond
3 pek.pengecatan kayu 12.9 0.15 13.36
X PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu
2 pek.titik stop kontak
3 pek.saklar tunggal
4 pek.saklar ganda
5 pek.lampu downlight
6 pek.lampu TL 20 watt
7 pek.lampu SL 15 watt
8 pek.pasang listrik baru daya 1300 watt
DIMENSI
NO URAIAN PEKERJAAN
P L t

GEDUNG LANTAI 2
I PEKERJAAN BETON
1 Pek. Balok Induk B1 25/40
- Pek. Pembesian dia.8
- Pek. Pembesian dia.13
- Pek. Bekisting
- Pek. Cor Beton 0.25 0.4
2 Pek. Balok Anak BA 15/25 Melintang
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.25
3 Pek. Balok Anak BA 15/25 Memanjang
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.25
4 Pek. Kolom K1 30/30 +3.40 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia.13
- Pek. Bekisting
- Pek. Cor Beton 0.3 0.3 3.4
5 Pek. Kolom K2 15/40 +3.40 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 13
- Pek. Bekisting 0.15 0.4 3.4
- Pek. Cor Beton 0.15 0.4 3.4
6 Pek. Kolom Kp 15/15 +3.40 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 12
- Pek. Bekisting 0.15 0.15 3.4
- Pek. Cor Beton 0.15 0.4 3.4
7 Pek. Anak Tangga
- Pek. Pembesian dia.12
- Pek. Pembesian Tul. dia 10
- Pek. Bekisting
- Pek. Cor Beton
8 Pek. Bordes Tangga T= 12 cm
- Pek. Pembesian tul. dia.12
- Pek. Pembesian dia 10
- Pek. Bekisting
- Pek. Cor Beton
9 Pek.Pelat Tangga T= 12 cm
- Pek. Pembesian tul. dia.10
- Pek. Pembesian dia 12
- Pek. Bekisting
- Pek. Cor Beton
10 Pek.Pelat lantai
- Pek. Pembesian tul. dia.10
- Pek. Pembesian dia 12
- Pek. Bekisting
- Pek. Cor Beton
11 Pek. Beton Plat Topi TYPE 1
- Pek. Pembesian dia.8
- Pek. Bekisting
- Pek. Cor Beton
12 Pek. Beton Plat Topi TYPE 2
- Pek. Pembesian dia.8
- Pek. Bekisting
- Pek. Cor Beton
II PEKERJAAN DINDING
1 - Pekerjaan dinding 1 Pc : 5 Ps +3.40m 90 0.15 3
3 Pek. Acian / Plesteran 90 3
III PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
1 JENDELA TYPE 1 1.05 0.15 1.4
JENDELA TYPE 2 2.1 0.15 1.4
JENDELA TYPE 3 1.25 0.15 1.4
JENDELA TYPE 4 2.65 0.15 1.4
PINTU TYPE 1 0.9 0.15 2.12
PINTU TYPE 2 0.9 0.15 2.12
2.65 2.12
PINTU TYPE 3 0.15
1.4 1.4
2 DAUN PINTU DAN JENDELA
JENDELA TYPE 1 0.48 0.05 1.32
JENDELA TYPE 2 0.48 0.05 0.04
JENDELA TYPE 3 0.48 0.05 0.04
JENDELA TYPE 4 0 0 0
PINTU TYPE 1 0.8 0.15 2.07
PINTU TYPE 2 0.8 0.15 2.07
PINTU TYPE 3 0 0 0
7 pek.engsel uk 4" dekson
8 pek.kunci 2 slaagh ex dekson
9 pek.kunci km/wc (toilet) ex alfa
10 pek.slot pintu ex dekson
11 pek.handle alumnium ex dekson
IVPEKERJAAN KACA
1 pek. Kaca 5 mm JENDELA TYPE 1 1.56 4.92 0.005
pek. Kaca 5 mm JENDELA TYPE 2 3.12 4.92 0.005
pek. Kaca 5 mm JENDELA TYPE 3 2.14 5.7 0.005
pek. kaca 5 mm JENDELA TYPE 4 5.04 5.24 0.005
jumlah pek.kaca 5 mm

VI PEKERJAAN PLAFOND
1 pek.rangka plafond + penutup gypsum 9mm
2 pek.rangka plafond + penutup Grc 6mm km/wc
3 pek.list kayu 3/3
4 pek.list gypsum 10 cm
V PEKERJAAN LANTAI
1 pek.pasangan keramik 20x20 km/wc
2 pek.pasangan keramik lantai 30x30 ex roman putih
VI PEKERJAAN SANITAIRE DAN PLUMBING
1 pek.inst air bersih pipa pvc wavin aw.uk 1/2"
2 pek.inst setengah air kotor pipa pvc wavin aw.uk 2"
3 pek.inst air kotor pipa pvc wavin D uk 3"
4 pek.pas closed duduk toto
5 pek.floor drain uk.3"
6 pek. Bathub
7 pek. Wastafel
8 pek.kitchen sink
9 pek.SHOWER
VII PEKERJAAN PENGECATAN
1 pek.pengecatan dinding 90 0.15 3
2 pek.pengecatan plafond
3 pek.pengecatan kayu 12.9 13.36
VIII PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu
2 pek.titik stop kontak
3 pek.saklar tunggal
4 pek.saklar ganda
5 pek.lampu downlight
6 pek.lampu TL 20 watt
7 pek.lampu SL 15 watt

DIMENSI
NO URAIAN PEKERJAAN
P L t
GEDUNG LANTAI 3
I PEKERJAAN BETON
1 Pek. Balok Induk B1 25/40
- Pek. Pembesian dia.8
- Pek. Pembesian dia.13
- Pek. Bekisting
- Pek. Cor Beton 0.25 0.4
2 Pek. Ring Balok 15/25 Melintang
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.25
3 Pek. Balok Ring Balok 15/25 Memanjang
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.25
4 Pek. Kolom K3 20/20 +2.60 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia.13
- Pek. Bekisting
- Pek. Cor Beton 0.3 0.3 2.6
5 Pek. Kolom K2 15/40 +2.60 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 13
- Pek. Bekisting 0.15 0.4 3.4
- Pek. Cor Beton 0.15 0.4 3.4
6 Pek. Kolom Kp 15/15 +2.60 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 12
- Pek. Bekisting 0.15 0.15 2.6
- Pek. Cor Beton 0.15 0.4 2.6
7 Pek.Pelat lantai
- Pek. Pembesian tul. dia.10
- Pek. Pembesian dia 12
- Pek. Bekisting
- Pek. Cor Beton
8 Pek.Pelat Atap Dak
- Pek. Pembesian tul. dia.10
- Pek. Pembesian dia 12
- Pek. Bekisting
- Pek. Cor Beton
II PEKERJAAN DINDING
1 Pekerjaan dinding 38.3 0.15 2.6
jumlah pekerjaan dinding
4 Pek. Acian / Plesteran 38.3 2.6
5 pek.pelapis dinding roaster 19.5 0.13 2
V PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
1 Kusen PINTU TYPE 1 0.9 0.15 2.12
jumlah pek.kusen
2 Daun PINTU TYPE 1 0.8 0.15 2.07
jumlah daun kusen
pek.engsel uk 3" dekson
pek.engsel uk 5" dekson
pek.kunci 2 slaagh ex dekson
pek.kunci km/wc (toilet) ex alfa
6 pek.slot pintu ex dekson
7 pek.handel alumnium ex dekson
8 PEKERJAAN PLAFOND
9 pek.rangka plafond + penutup gypsum 9mm
10 pek.rangka plafond + penutup Grc 6mm km/wc
11 pek.list kayu 3/3
12 pek.list gypsum 10 cm
IV PEKERJAAN LANTAI
1 pek.pasangan keramik lantai 30x30 ex roman putih
V PEKERJAAN SANITAIRE DAN PLUMBING
1 pek.inst air bersih pipa pvc wavin aw.uk 1/2"
2 pek.inst setengah air kotor pipa pvc wavin aw.uk 2"
3 pek.inst air kotor pipa pvc wavin D uk 3"
4 pek.pas closed duduk toto
5 pek.floor drain uk.3"
6 pek. Wastafel
7 pek.kran dinding
8 pek.SHOWER
VI PEKERJAAN PENGECATAN
1 pek.pengecatan dinding 38.31 0.15 2.6
2 pek.pengecatan plafond
3 pek.pengecatan kayu 0.9 2.12
VII PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu
3 pek.titik stop kontak
4 pek.saklar tunggal
5 pek.lampu TL 20 watt
6 pek.lampu SL 15 watt
DIMENSI
NO URAIAN PEKERJAAN
P L t

PEKERJAAN POS SATPAM


1 PEKERJAAN KOLAM RENANG
I Pek. Beton
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton
II PEKERJAAN DINDING
1 Pekerjaan dinding 6.9 0.15 2
2 Pek. Acian / Plesteran
III PEKERJAAN LANTAI
1 pek.pasangan keramik lantai 30x30 ex roman putih 2.4 4.5 2
2 PEKERJAAN POS SATPAM
I Pek. Beton
1 Pek. Sloof 15/20
- Pek. Pembesian sengkang dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.2
2 Pek. Kolom Kp 15/15 +3.50 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 12
- Pek. Bekisting 0.15 0.15 3.5
- Pek. Cor Beton 0.15 0.15 3.5
3 Pek. Ring Balok 15/20
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.2
4 Pek.Pelat Atap Dak
- Pek. Pembesian tul. dia.10
- Pek. Pembesian dia 12
- Pek. Bekisting
- Pek. Cor Beton
II PEKERJAAN DINDING
1 Pekerjaan dinding 7 0.15 3.5
2 Pek. Acian / Plesteran
III PEKERJAAN PLAFOND
1 pek.rangka plafond + penutup gypsum 9mm 2 1.5
2 pek.list gypsum 10 cm 7
IV PEKERJAAN LANTAI
1 pek.pasangan keramik lantai 30x30 ex roman putih
V PEKERJAAN PENGECATAN
1 pek.pengecatan dinding 7 0.15 3.5
2 pek.pengecatan plafond 2 1.5
3 pek.pengecatan kayu 0.9 2.12
VI PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
1 Kusen PINTU TYPE 1 0.9 0.15 2.12
jumlah pek.kusen
2 Daun PINTU TYPE 1 0.8 0.15 2.07
jumlah daun kusen
pek.engsel uk 5" dekson
3 pek.handel alumnium ex dekson
VII PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu
2 pek.titik stop kontak
3 pek.saklar tunggal
4 pek.lampu SL 15 watt
3 PEKERJAAN PERKERASAN JALAN
1 Pek.Galian perkerasan jalan 0.6
2 Pek.lapisan pondasi bawah 0.3
3 pek lapisan pondasi 0.2
4 pek.lapisan permukaan aspal 0.1
4 PEKERJAAN PAGAR BANGUNAN
1 Pek. Sloof 15/20
- Pek. Pembesian sengkang dia.8
- Pek. Pembesian dia.10
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.2
2 Pek. Kolom Kp 15/15 +3.50 m
- Pek. Pembesian dia.8
- Pek. Pembesian dia 12
- Pek. Bekisting 0.15 0.15 2
- Pek. Cor Beton 0.15 0.15 2
3 Pek. Ring Balok 15/20
- Pek. Pembesian dia.8
- Pek. Pembesian dia.12
- Pek. Bekisting
- Pek. Cor Beton 0.15 0.2
4 PEKERJAAN DINDING
1 Pekerjaan dinding 37 0.15 2
2 Pek. Acian / Plesteran
V PEKERJAAN PENGECATAN
1 pek.pengecatan dinding 37 0.15 2
Jumlah LUAS (m2) VOL (m3) Keliling(m1) Satuan

290 M2
25 M2
69 M2

0.7884 5.1246 M3
0.624 22.5264 M3
8 2.125 21.25 M3
6 2.125 15.9375 M3
9 2.125 23.90625 M3
88.74475
0.1125 0.73125 M3
0.09 3.249 M3
3.98025
0.2 1.3 M3
0.20625 7.445625 M3

8.745625 M3
0.0672 0.4368 M3
0.049 1.7689 M3
8 0.0625 0.625 M3
6 0.0625 0.46875 M3
9 0.0625 0.703125 M3
4.7057 M3
0.4087 2.65655 M3
0.27875 10.062875 M3
6 1.1567 8.67525 M3
6 1.1567 8.67525 M3
9 1.3015 14.641875 M3
57.6238 M3
14.5 290 43.5 M3
14.5 290 29 M3
29 M3
8 0.125 1.25 M3
6 0.125 0.9375 M3
9 0.125 1.40625 M3
3.59375 M3

8 1.76 108.1344 Kg 865.0752


8 1.56 24.73536 Kg
8 2.67 2121.98784 Kg
8 3.1 24.8 M2
8 1.290625 10.325 M3

6 1.76 648.8064 Kg
6 1.96 31.07776 Kg
6 2.67 198.93636 Kg
6 3.5 21 M2
6 0.450625 2.70375 M3

9 1.76 973.2096 Kg
9 1.96 31.07776 Kg
9 2.67 298.40454 Kg
9 3.1 27.9 M2
9 0.450625 4.055625 M3

0.4082 20.6479236605 Kg
46.08 Kg
1 0.01767857 0.01767857143 M2
0.01767857 0.10607142857 M3

0.408 440.56 Kg
9.6 988.8 Kg
92 2.6 239.2 M2
92 9.2 M3

0.208 8.8608 Kg
42.6 3.84 163.584 Kg
42.6 0.12 5.112 M2
42.6 0.03 1.278 M3

0.408 440.56 Kg
8.9 916.7 Kg
2.6 239.2 92 M2
9.2 92 M3
19.84 99.200 0.62 Kg
5.34 106.8 Kg
4 17.6 70.4 M2
4 1.65 11 M3

19.84 39.680 0.62 Kg


5.34 21.36 Kg
4 19.2 76.8 M2
4 1.8 12 M3

14 9.61333333 134.5866666667 Kg
14 26.88 376.32 Kg
14 4.2 58.8 M2
14 0.315 4.41 M3

10 8.58666667 85.86666666667 Kg
10 26.88 268.8 Kg
10 3.85 38.5 M2
10 0.21 2.1 M3

7 4.48 31.36 Kg
7 24.92 174.44 Kg
7 2.1 14.7 M2
7 0.21 1.47 M3

10 2.56 25.6 Kg
10 24.92 249.2 Kg
10 2.1 21 M2
10 0.21 2.1 M3

16 3.204 51.264 Kg
16 0.712 11.392 Kg
16 0.02 0.32 M2
16 0.02 0.32 M3

16 0.712 11.392 Kg
16 0.488 7.808 Kg 73.333333
1 0.13432 0.13432 M2
1 0.13432 0.13432 M3

6 2.04 Kg
57 0.712 40.584 Kg
1 4.6464 4.6464 M2
1 4.6464 4.6464 M3

2.56 Kg
0.4 M2
0.096 M3

4.69333333333 Kg
0.6 M2
0.096 M3

12.16 Kg
1.3 M2
0.456 M3

21.3333333333 Kg
2.16 M2
0.8 M3
244.89 36.7335 M2
489.78 0 M2

1 0.0075 0.04725 6.3


1 0.0075 0.084 11.2
2 0.0075 0.1005 6.7
1 0.0075 0.07125 9.5 1.47
6 0.0075 0.2313 5.14 2.94
2 0.0075 0.0771 5.14 1.75
3.71
1 0.0075 0.072675 9.69
1.908
1.908
2 0.00125 0.0078 6.24 5.618
8 0.00125 0.002 1.6
2 0.00125 0.0014 1.12
0 0 0 0
6 0.12 2.9808
2 0.192 0.79488
1 0 0

2
1 7.6752 0.038376
1 15.3504 0.076752
2 12.198 0.12198
1 26.4096 0.132048
0.369156
16
21
6
2
0
16

126.1824 M2
126.1824 M2
101.5 M1
101.5 M1

6 M2
120.1824 M2

23.09 M1
22.37 M1
19.32 M1
2
2
1
1
1
2
1
1
1
1
2

21 424.776
126.1824
14 27.363

105.58 M1
11
4
8
5
8
11
1
Jumlah LUAS (m2) VOL (m3) Keliling Satuan

0.408 440.56 Kg
8.9 916.7 Kg
2.6 239.2 92 M2
9.2 92 M3

19.84 99.200 0.62 Kg


5.34 106.8 Kg
4 17.6 70.4 M2
4 1.65 11 M3

19.84 39.680 0.62 Kg


5.34 21.36 Kg
4 19.2 76.8 M2
4 1.8 12 M3

14 9.33866667 130.741 Kg
14 26.112 365.568 Kg
14 4.08 57.12 M2
14 0.306 4.284 M3

9 8.34133333 75.072 Kg
9 26.112 235.008 Kg
9 3.74 33.66 M2
9 0.204 1.836 M3

5 4.352 21.76 Kg
5 24.208 121.04 Kg
5 2.04 10.2 M2
5 0.204 1.02 M3

16 3.204 51.264 Kg
16 0.712 11.392 Kg
16 0.02 0.32 M2
16 0.02 0.32 M3

16 0.712 11.392 Kg
16 0.488 7.808 Kg
1 0.13432 0.13432 M2
1 0.13432 0.13432 M3

6 2.04 Kg
57 0.712 40.584 Kg
1 4.6464 4.6464 M2
1 4.6464 4.6464 M3

536.8 Kg
363.12 Kg
269.52 M2
15.84 M3

3 7.680 Kg
3 1.2 M2
3 0.288 M3

2 9.387 Kg
2 1.2 M2
2 0.352 M3

270 40.5 M2
540 0 M2

4 0.0075 0.189 6.3


2 0.0075 0.168 11.2
0 0.0075 0 6.7
0 0.0075 0 9.5
5 0.0075 0.19275 5.14
2 0.0075 0.0771 5.14
0 0.0075 0 9.69

8 0.00125 0.0276 22.08


8 0.00125 0.002 1.6
0 0.00125 0.0012 0.96
0 0 0 0
5 0.12 2.484
2 0.192 0.79488
0 0 0
12
4
2
4
21

4 7.6752 0.153504
2 15.3504 0.153504
0 12.198 0
0 26.4096 0
0.307008

126.1824 M2
126.1824 M2
101.5 M1
101.5 101.5 M1

7.5
108.93

19.56
3.69
6.65
2
2
1
2
1
1

21 489.768
126.1824
13 25.074

44.53
7
6
6
10
2
12

Jumlah LUAS (m2) VOL (m3) Keliling Satuan


0.408 440.56 Kg
8.9 916.7 Kg
2.6 239.2 92 M2
9.2 92 M3

9.920 79.360 0.62 Kg


2.67 96.12 Kg
4 12.8 51.2 M2
4 1.2 8 M3

4.960 44.640 0.62 Kg


2.67 96.12 Kg
4 14.4 57.6 M2
4 1.35 9 M3

14 7.14133333 99.979 Kg
14 9.984 139.776 Kg
14 2.08 29.12 M2
14 0.234 3.276 M3

3 6.37866667 19.136 Kg
3 9.984 29.952 Kg
3 2.86 8.58 M2
3 0.204 0.612 M3

10 3.328 33.28 Kg
10 9.256 92.56 Kg
10 1.56 15.6 M2
10 0.156 1.56 M3

536.8 Kg
363.12 Kg
269.52 M2
15.84 M3

87.149 Kg
180.67 Kg
83.3 M2
4.71 M3
99.58 14.937
99.58
2 199.16
39

1 0.0075 0.0453 6.04


0.0453
1 0.12 0.4968
0.4968
-
2
-
-
-
1

39.25
39.25
101.5
101.5

4.25

20.88
3.4
3.4
-
2
-
2
-

199.212
39.25
1 1.542

16.05
5
1
2
5
Jumlah LUAS (m2) VOL (m3) Keliling Satuan

2.56 57.6 Kg
4.005 136.17 Kg
34.5 M2
8.82 M3

13.8 2.07
13.8

34.5

35 0.208 7.28 Kg
7 3.84 26.88 Kg
7 0.12 0.84 M2
7 0.03 0.21 M3

4 4.48 17.92 Kg
4 24.92 99.68 Kg
4 2.1 8.4 M2
4 0.07875 0.315 M3

5.547 44.373 0.52 Kg


2.67 96.12 Kg
4 0 0 M2
4 0.24 M3

16.358 Kg
49.84 Kg
6.96 M2
0.36 M3

24.5 3.675
2 49

3
7
3

49
3
1 1.542

1 0.0075 0.0453 6.04


0.0453
1 0.12 0.4968
0.4968
2
1

0.75
1
1
1

117 70.2
117 35.1
117 23.4
117 11.7

185 0.208 38.48 Kg


7 3.84 26.88 Kg
7 0.12 0.84 M2
7 0.03 0.21 M3

4 2.56 10.24 Kg
4 1.78 7.12 Kg
10 1.2 12 M2
10 0.045 0.45 M3

51.307 51.307 0.52 Kg


32.93 131.72 Kg
37 0.95 35.15 M2
37 2.22 M3

74 11.1
2 148
148
#REF!

0.3125
0.1
0.12
0.072
MENGHITUNG RENCANA ANGGARAN BIAYA

NO JENIS PEKERJAAN SATUAN VOLUME

I PEKERJAAN PERSIAPAN
1 Pengukuran kembali site m2 290.00
2 Mobilisasi dan demobilisasi ls 1.00
3 Papan Nama Proyek ls 1.00
4 Biaya uji material ls 1.00
5 Direksi keet m2 25.00
6 Administrasi dan Dokumentasi ls 1.00
7 Pek. Bongkaran bekas pasangan ls 1.00
8 Air kerja ls 1.00
9 Keamanan ls 1.00
10 Perijinan IMB ls 1.00
11 Perencanaan Gambar ls 1.00
12 penyediaan tenaga listrik ls 1.00
13 Pek Pemasangan Bauwplank m' 69.00
sub jumlah
II PEKERJAAN TANAH & PONDASI
1 pek.galian tanah m3 88.74
2 pek.anstamping batu belah m3 3.98
3 pek.pasangan batu belah m3 8.75
4 pek.urugan pasir pondasi m3 4.71
5 pek.urugan tanah kembali m3 57.62
6 pek.urugan peninggian lantai m3 43.50
7 pek.urugan pasir bawah lantai m3 29.00
8 pek.lantai kerja pondasi foot plat 8 cm m3 3.59
sub jumlah
III PEKERJAAN STRUKTUR BETON
1 pek.pondasi foot plat (p1)
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 2.70
pek.besi beton Dia.12 mm kg 2,121.99
pek.besi beton dia.13 mm kg 108.13
pek.besi beton dia.8 mm kg 24.74
pek.bekisting m2 3.10
sub jumlah
2 pek.pondasi foot plat (p2)
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 2.70
pek.besi beton Dia.12 mm kg 198.94
pek.besi beton dia.13 mm kg 648.81
pek.besi beton dia.8 mm kg 31.08
pek.bekisting m2 3.50
sub jumlah
3 pek.pondasi foot plat (p3)
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 4.06
pek.besi beton Dia.12 mm kg 298.40
pek.besi beton dia.13 mm kg 973.21
pek.besi beton dia.8 mm kg 31.08
pek.bekisting m2 27.90
sub jumlah
4 Pek. Bor pile dia.15
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.11
pek.besi beton dia.13 mm kg 46.08
pek.besi beton dia.8 mm kg 20.65
pek.bekisting m2 0.02
sub jumlah
5 Pek. Sloof 25/40
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 9.20
pek.besi beton Dia.13 mm kg 988.80
pek.besi beton dia.8 mm kg 440.56
pek.bekisting m2 239.20
sub jumlah
6 Pek. Kolom K1 30/30 +3.4 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 4.41
pek.besi beton Dia.13mm kg 376.32
pek.besi beton dia.8 mm kg 134.59
pek.bekisting m2 4.20
sub jumlah
7 Pek. Kolom K2 15/40 +3.4 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 2.10
pek.besi beton Dia.13mm kg 249.20
pek.besi beton dia.8 mm kg 25.60
pek.bekisting m2 21.00
sub jumlah
7 Pek. Kolom KP 15/15 +3.4 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 2.10
pek.besi beton Dia.12 mm kg 174.44
pek.besi beton dia.10 mm kg 31.36
pek.bekisting m2 2.10
sub jumlah
8 Pek. Anak Tangga
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.32
pek.besi beton Dia.12 mm kg 51.26
pek.besi beton dia.10 mm kg 11.39
pek.bekisting m2 0.02000
sub jumlah
9 Pek. Bordes Tangga T= 12 cm
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.13
pek.besi beton Dia.12 mm kg 11.39
pek.besi beton dia.10 mm kg 7.81
pek.bekisting m2 0.13
sub jumlah
10 Pek.Pelat Tangga T= 10 cm
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 4.65
pek.besi beton Dia.12 mm kg 40.58
pek.besi beton dia.10 mm kg 2.04
pek.bekisting m2 4.65
sub jumlah
11 Pek. Beton Plat DAK
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 1.45
pek.besi beton dia.8 mm kg 40.75
pek.bekisting m2 4.46
sub jumlah
sub jumlah pek.beton
IV PEKERJAAN DINDING
1 - Pekerjaan dinding 1 Pc : 5 Ps +3.40m m2 244.89
3 Pek. Acian / Plesteran m2 489.78
sub jumlah
V PEKERJAAN KUSEN,ALAT PENGGANTUNG
1 pek.kusen m3 0.68
2 pek.pintu pvc toilet bh 2
3 pek.daun pintu dan jendela m3 3.79
4 pek.kaca 5 mm ex ashasi m3 0.37
5 pek.engsel uk 3" dekson ps 16
6 pek.engsel uk 4" dekson bh 21
8 pek.kunci 2 slaagh ex dekson bh 6
9 pek.kunci km/wc (toilet) ex alfa bh 2
10 pek.slot pintu ex dekson set -
11 pek.tarikan jendela bh 16
sub jumlah
VI PEKERJAAN PLAFOND
1 pek.rangka plafond + penutup gypsum 9mm m2 126.18
2 pek.rangka plafond + penutup Grc 6mm km/wc m2 126.18
3 pek.list kayu 3/3 m1 101.50
4 pek.list gypsum 10 cm m1 101.50
sub jumlah
VII PEKERJAAN LANTAI
1 pek.pasangan keramik 20x20 km/wc+t.cuci/jemuran m2 6.00
2 pek.pasangan keramik lantai 30x30 ex roman putih m2 120.18
sub jumlah
VIII PEKERJAAN SANITAIRE DAN PLUMBING
1 pek.inst air bersih pipa pvc wavin aw.uk 1/2" m1 23.09
2 pek.inst setengah air kotor pipa pvc wavin aw.uk 2" m1 22.37
3 pek.inst air kotor pipa pvc wavin D uk 3" m1 19.32
4 pek.pas closed duduk toto bh 2
5 pek.floor drain uk.3" bh 2
6 pek.tangki air fiber uk 1100 liter+radar bh 1
7 pek.pompa air ex wester 250 watt unit 1
8 pek.pompa pendorong ex zimitsu 125 watt unit 1
9 pek.kran dinding bh 2
10 pek.bak kontrol uk.40x40 bh 1
11 pek.septictank unit 1
12 pek.sumur resapan unit 1
13 Pek .Kitchen sink unit 1
14 pek. Wastafel unit 2
sub jumlah
IX PEKERJAAN PENGECATAN
1 pek.pengecatan dinding m2 424.78
3 pek.pengecatan plafond m2 126.18
4 pek.pengecatan kayu m2 27.36
sub jumlah
X PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu m1 105.58
2 pek.titik stop kontak bh 11
3 pek.saklar tunggal bh 4
4 pek.saklar ganda bh 8
5 pek.lampu downlight bh 5
6 pek.lampu TL 20 watt bh 8
7 pek.lampu SL 15 watt bh 11
8 pek.pasang listrik baru daya 1300 watt unit 1
sub jumlah
SUB TOTAL

GEDUNG LANTAI 2
I PEKERJAAN BETON
1 Pek. Balok Induk B1 25/40
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 9.20
pek.besi beton dia.13 mm kg 916.70
pek.besi beton dia.8 mm kg 440.56
pek.bekisting m2 2.60
sub jumlah
2 pek.Balok anak 15/25
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 3.45
pek.besi beton dia.12 mm kg 128.16
pek.besi beton dia.8 mm kg 138.88
pek.bekisting m2 36.80
sub jumlah
3 Pek.Pelat lantai
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 15.84
pek.besi beton dia.12 mm kg 363.12
pek.besi beton dia.10 mm kg 536.80
pek.bekisting m2 269.52
sub jumlah
4 Pek. Kolom K1 30/30 +3.40 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 130.74
pek.besi beton dia.13 mm kg 365.57
pek.besi beton dia.8 mm kg 130.74
pek.bekisting m2 4.08
sub jumlah
4 Pek. Kolom K1 15/40 +3.40 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 1.84
pek.besi beton dia.13 mm kg 235.01
pek.besi beton dia.8 mm kg 75.07
pek.bekisting m2 33.66
sub jumlah
5 Pek. Kolom Kp 15/15 +3.40 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 1.02
pek.besi beton dia.12 mm kg 121.04
pek.besi beton dia.8 mm kg 21.76
pek.bekisting m2 2.04
sub jumlah
6 pek.Plat Topi
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.64
pek.besi beton dia.8 mm kg 17.07
pek.bekisting m2 2.40
sub jumlah
sub jumlah pek.beton
II PEKERJAAN DINDING
1 Pekerjaan dinding 1 Pc : 5 Ps +3.50m m2 270.00
3 Pek. Acian / Plesteran m2 540.00
sub jumlah
III PEKERJAAN KUSEN,ALAT PENGGANTUNG
1 pek.kusen m3 0.63
2 pek.daun jendela m2 0.03
3 pek.pintu pvc toilet Pt bh 2
4 pek. Pintu panil p1 m3 3.28
5 pek.kaca 5 mm ex ashasi m3 0.31
6 pek.engsel uk 3" dekson ps 62
7 pek.engsel uk 4" dekson ps 12
8 pek.kunci 2 slaagh ex dekson bh 4
9 pek.kunci km/wc (toilet) ex alfa bh 2
10 pek.slot pintu ex dekson set 4
11 pek.tarikan jendela bh 20
sub jumlah
IV PEKERJAAN PLAFOND
1 pek.rangka plafond + penutup gypsum 9mm m2 126.18
2 pek.rangka plafond + penutup Grc 6mm km/wc m2 126.18
3 pek.list kayu 3/3 m1 101.50
4 pek.list gypsum 10 cm m1 101.50
sub jumlah
V PEKERJAAN LANTAI
1 pek.pasangan keramik 20x20 km/wc+t.cuci/jemuran m2 7.50
2 pek.pasangan keramik lantai 30x30 ex roman putih m2 108.93
sub jumlah
VI PEKERJAAN SANITAIRE DAN PLUMBING
1 pek.inst air bersih pipa pvc wavin aw.uk 1/2" m1 19.56
2 pek.inst setengah air kotor pipa pvc wavin aw.uk 2" m1 3.69
3 pek.inst air kotor pipa pvc wavin D uk 3" m1 6.65
4 pek.pas closed duduk toto bh 2
5 pek.floor drain uk.3" bh 2
6 pek. Bathub bh 1
7 pek. Wastafel unit 2
8 pek.kitchen sink unit 1
9 pek.SHOWER bh 1
sub jumlah
VII PEKERJAAN PENGECATAN
1 pek.pengecatan dinding dalam ex jotun m2 489.77
2 pek.pengecatan plafond m2 126.18
3 pek.pengecatan kayu m2 25.07
sub jumlah
VIII PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu m1 44.53
2 pek.titik stop kontak bh 7
3 pek.saklar tunggal bh 6
4 pek.saklar ganda bh 6
5 pek.lampu downlight bh 10
6 pek.lampu TL 20 watt bh 2
7 pek.lampu SL 15 watt bh 12
sub jumlah
SUB TOTAL

GEDUNG LANTAI 3
I PEKERJAAN BETON
1 Pek. Balok Induk B1 25/40
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 9.20
pek.besi beton dia.13 mm kg 916.70
pek.besi beton dia.8 mm kg 440.56
pek.bekisting m2 2.60
sub jumlah
2 pek.Ring Balok 15/25
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 2.55
pek.besi beton dia.12 mm kg 192.24
pek.besi beton dia.8 mm kg 124.00
pek.bekisting m2 27.20
sub jumlah
3 Pek. Beton Plat T= 12 cm
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 15.84
pek.besi beton dia.12 mm kg 363.12
pek.besi beton dia.10 mm kg 536.80
pek.bekisting m2 269.52
sub jumlah
4 Pek. Kolom K3 20/20 +2.60 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 3.28
pek.besi beton dia.13 mm kg 139.78
pek.besi beton dia.8 mm kg 99.98
pek.bekisting m2 2.08
sub jumlah
6 Pek.Pelat lantai
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 15.66
pek.besi beton dia.12 mm kg 626.31
pek.besi beton dia.10 mm kg 380.55
pek.bekisting m2 2.61
sub jumlah
7 Pek.Pelat Atap Dak
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 4.71
pek.besi beton dia.12 mm kg 180.67
pek.besi beton dia.10 mm kg 87.15
pek.bekisting m2 83.30
sub jumlah
sub jumlah pek.beton
II PEKERJAAN DINDING
1 Pekerjaan dinding 1 Pc : 5 Ps +3.50m m2 99.58
4 Pek. Acian / Plesteran m2 199.16
5 pek.pelapis dinding roaster m2 39
sub jumlah
III PEKERJAAN KUSEN,ALAT PENGGANTUNG
1 pek.kusen m3 0.05
2 pek.daun pintu dan jendela m2 0.50
3 pek.pintu pvc toilet Pt bh 1
4 pek. Pintu panil p1 m3 1.00
5 pek.kaca 5 mm ex ashasi m3 -
6 pek.engsel uk 3" dekson ps -
7 pek.engsel uk 5" dekson ps 2
8 pek.kunci 2 slaagh ex dekson bh -
9 pek.kunci km/wc (toilet) ex alfa bh -
10 pek.slot pintu ex dekson set -
11 pek.tarikan jendela bh -
sub jumlah
IV PEKERJAAN PLAFOND
1 pek.rangka plafond + penutup gypsum 9mm m2 39.25
2 pek.rangka plafond + penutup Grc 6mm km/wc m2 39.25
3 pek.list kayu 3/3 m1 101.50
4 pek.list gypsum 10 cm m1 101.50
sub jumlah
V PEKERJAAN LANTAI
1 pek.pasangan keramik 20x20 km/wc m2 4.25
sub jumlah
VI PEKERJAAN SANITAIRE DAN PLUMBING
1 pek.inst air bersih pipa pvc wavin aw.uk 1/2" m1 20.88
2 pek.inst setengah air kotor pipa pvc wavin aw.uk 2" m1 3.40
3 pek.inst air kotor pipa pvc wavin D uk 3" m1 3.4
4 pek.pas closed duduk toto bh 0
5 pek.floor drain uk.3" bh 2
6 pek. Wastafel bh 0
7 pek.kran dinding unit 2
8 pek.SHOWER unit 0
sub jumlah
VII PEKERJAAN PENGECATAN
1 pek.pengecatan dinding m2 199.21
3 pek.pengecatan plafond m2 39.25
4 pek.pengecatan kayu m2 1.54
sub jumlah
VIII PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu m1 16.05
2 pek.titik stop kontak bh 5
3 pek.saklar tunggal bh 1
4 pek.lampu TL 20 watt bh 2
5 pek.lampu SL 15 watt bh 5
sub jumlah
SUB TOTAL
PEKERJAAN TAMBAHAN
1 PEKERJAAN KOLAM RENANG
I PEKERJAAN BETON
Pek. Beton Plat T= 12 cm
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 8.82
pek.besi beton dia.12mm kg 136.17
pek.besi beton dia.8 mm kg 57.60
pek.bekisting m2 34.50
sub jumlah
II PEKERJAAN DINDING
1 Pekerjaan dinding 1 Pc : 5 Ps +2.00 m m2 13.80
2 Pek. Acian / Plesteran m2 13.8
sub jumlah
III PEKERJAAN LANTAI
1 pek.pasangan keramik lantai 30x30 ex roman putih m2 34.50
sub jumlah
IV PEKERJAAN PENGECATAN
1 pek.pengecatan dinding luar ex jotun m2 44.38
sub jumlah
SUB TOTAL
2 PEKERJAAN POS SATPAM
I PEKERJAAN BETON
1 Pek. Sloof 15/20
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.21
pek.besi beton dia.12mm kg 26.88
pek.besi beton dia.8 mm kg 7.28
pek.bekisting m2 0.12
sub jumlah
2 Pek. Kolom Kp 15/15 +3.50 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.32
pek.besi beton dia.12 mm kg 99.68
pek.besi beton dia.8 mm kg 17.92
pek.bekisting m2 2.10
sub jumlah
3 Pek. Ring Balok 15/20
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.24
pek.besi beton dia.13 mm kg 96.12
pek.besi beton dia.8 mm kg 44.37
pek.bekisting m2 -
sub jumlah
4 Pek.Pelat Atap Dak
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.36
pek.besi beton dia.12 mm kg 49.84
pek.besi beton dia.10 mm kg 16.36
pek.bekisting m2 6.96
sub jumlah
sub jumlah pek.beton
II PEKERJAAN DINDING
1 Pekerjaan dinding 1 Pc : 5 Ps +3.50m m2 24.50
2 Pek. Acian / Plesteran m2 49
sub jumlah
III PEKERJAAN PLAFOND
1 pek.rangka plafond + penutup gypsum 9mm m2 3.00
2 pek.list gypsum 10 cm m2 7.00
sub jumlah
IV PEKERJAAN LANTAI
1 pek.pasangan keramik lantai 30x30 ex roman putih m2 3.00
sub jumlah
V PEKERJAAN PENGECATAN
1 pek.pengecatan dinding dalam ex jotun m2 49.00
pek.pengecatan plafond m2 3.00
pek.pengecatan kayu m2 1.54
sub jumlah
VI PEKERJAAN INSTALASI LISTRIK
1 pek.titik kabel lampu m1 0.75
2 pek.titik stop kontak bh 1
3 pek.saklar tunggal bh 1
4 pek.lampu SL 15 watt bh 1
sub jumlah
SUB TOTAL
3 PEKERJAAN PERKERASAN JALAN
Pek.Galian perkerasan jalan m3 70.200
Pek.lapisan pondasi bawah m3 35.100
pek lapisan pondasi m3 23.400
pek.lapisan permukaan aspal m3 11.700
sub jumlah
4 PEKERJAAN PAGAR BANGUNAN
I PEKERJAAN BETON
1 Pek. Sloof 15/20
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.21
pek.besi beton dia.10 mm kg 26.88
pek.besi beton dia.8 mm kg 38.48
pek.bekisting m2 0.12
sub jumlah
2 Pek. Kolom Kp 15/15 +3.50 m
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 0.45
pek.besi beton dia.12 mm kg 7.12
pek.besi beton dia.8 mm kg 10.24
pek.bekisting m2 1.20
sub jumlah
3 Pek. Ring Balok 15/20
pek.cor beton setmix ad.1 pc : 2 ps :3 kr m3 2.22
pek.besi beton dia.12 mm kg 131.72
pek.besi beton dia.8 mm kg 51.31
pek.bekisting m2 0.95
sub jumlah
sub jumlah pek.beton
II PEKERJAAN DINDING
1 Pekerjaan dinding 1 Pc : 5 Ps +2.00 m m2 74.00
2 Pek. Acian / Plesteran m2 148
sub jumlah
III PEKERJAAN PENGECATAN
1 pek.pengecatan dinding dalam ex jotun m2 148.00
sub jumlah
SUB TOTAL
HARGA SATUAN RP BOBOT
JUMLAH HARGA RP
100%

2,800.00 812,000.00 0.09


1,000,000.00 1,000,000.00 0.10
300,000.00 300,000.00 0.03
300,000.00 300,000.00 0.03
380,920.00 9,523,000.00 1.00
250,000.00 250,000.00 0.03
150,000.00 150,000.00 0.02
250,000.00 250,000.00 0.03
1,000,000.00 1,000,000.00 0.10
3,000,000.00 3,000,000.00 0.31
3,000,000.00 3,000,000.00 0.31
250,000.00 250,000.00 0.03
20,500.00 1,414,500.00 0.15
21,249,500.00 2.23

38,900.00 3,452,170.78 0.36


387,230.00 1,541,272.21 0.16
775,190.00 6,779,521.04 0.71
206,500.00 971,727.05 0.10
22,820.00 1,314,975.12 0.14
113,600.00 4,941,600.00 0.52
206,500.00 5,988,500.00 0.63
769,370.00 2,764,923.44 0.29
27,754,689.63 2.91

1,072,750.00 2,900,447.81 0.30


21,720.00 46,089,575.88 4.84
21,720.00 2,348,679.17 0.25
21,720.00 537,252.02 0.06
112,660.00 349,246.00 0.037
52,225,200.88 5.48

1,072,750.00 2,900,447.81 0.30


21,720.00 4,320,897.74 0.45
21,720.00 14,092,075.01 1.48
21,720.00 675,008.95 0.07
112,660.00 394,310.00 0.04
22,382,739.51 2.35

267,850.00 1,086,299.16 39.02


172,050.00 51,340,501.11 5.39
172,050.00 167,440,711.68 17.57
172,050.00 5,346,928.61 0.56
78,850.00 2,199,915.00 0.23
227,414,355.55 62.77

1,072,750.00 113,788.13 0.01


21,720.00 1,000,857.60 0.11
21,720.00 448,472.90 0.05
112,660.00 1,991.67 0.00
1,565,110.29 0.16

1,072,750.00 9,869,300.00 1.04


21,720.00 21,476,736.00 2.25
21,720.00 9,568,963.20 1.00
112,660.00 26,948,272.00 2.83
67,863,271.20 7.12

1,072,750.00 4,730,827.50 0.50


21,720.00 8,173,670.40 0.86
21,720.00 2,923,222.40 0.31
112,660.00 473,172.00 0.05
16,300,892.30 1.71

1,072,750.00 2,252,775.00 11.31


21,720.00 5,412,624.00 27.18
21,720.00 556,032.00 2.79
112,660.00 2,365,860.00 11.88
10,587,291.00 53.17

1,072,750.00 2,252,775.00 0.24


21,720.00 3,788,836.80 0.40
21,720.00 681,139.20 0.07
112,660.00 236,586.00 0.02
6,959,337.00 0.73

1,072,750.00 343,280.00 0.036


21,720.00 1,113,454.08 0.12
21,720.00 247,434.24 0.03
112,660.00 2,253.20 0.00
1,706,421.52 0.18

1,072,750.00 144,091.78 0.02


21,720.00 247,434.24 0.03
21,720.00 169,589.76 0.02
112,660.00 15,132.49 0.00
576,248.27 0.06

1,072,750.00 4,984,425.60 0.52


21,720.00 881,484.48 0.09
21,720.00 44,308.80 0.00
112,660.00 523,463.42 0.05
6,433,682.30 0.68

1,072,750.00 1,553,342.00 0.16


21,720.00 885,017.60 0.09
112,660.00 502,463.60 0.05
2,940,823.20 0.31
178953726.48. 18.78

148,670.00 36,407,796.30 3.82


68,130.00 33,368,711.40 3.50
69,776,507.70 7.32

11,824,620.00 8,088,926.93 0.85


139,710.00 279,420.00 0.03
267,850.00 1,014,315.81 0.11
172,050.00 63,513.29 0.007
78,850.00 1,261,600.00 0.13
76,850.00 1,613,850.00 0.17
112,500.00 675,000.00 0.07
210,180.00 420,360.00 0.04
78,770.00 - 0.00
56,780.00 908,480.00 0.10
14,325,466 1.50

204,640.00 25,821,966.34 2.71


190,000.00 23,974,656.00 2.52
17,170.00 1,742,755.00 0.18
27,270.00 2,767,905.00 0.29
54,307,282.34 5.70

132,490.00 794,940.00 0.08


151,660.00 18,226,862.78 1.91
19,021,802.78 2.00

78,110.00 1,803,559.90 0.19


87,190.00 1,950,440.30 0.20
108,970.00 2,105,300.40 0.22
2,081,550.00 4,163,100.00 0.44
347,550.00 695,100.00 0.07
1,530,800.00 1,530,800.00 0.16
1,255,800.00 1,255,800.00 0.13
605,800.00 605,800.00 0.06
45,180.00 90,360.00 0.01
113,740.00 113,740.00 0.01
721,360.00 721,360.00 0.08
366,790.00 366,790.00 0.04
228,620.00 228,620.00 0.02
1,660,620.00 3,321,240.00 0.35
18,952,010.60 1.99

348,170.00 147,894,259.92 15.52


343,710.00 43,370,152.70 4.55
68,710.00 1,880,111.73 0.20
193,144,524.35 20.27

3,013,800.00 318,197,004.00 33.39


3,013,070.00 33,143,770.00 3.48
43,600.00 174,400.00 0.02
53,600.00 428,800.00 0.04
118,600.00 593,000.00 0.06
78,600.00 628,800.00 0.07
108,600.00 1,194,600.00 0.13
1,128,600.00 1,128,600.00 0.12
355,488,974.00 37.30
952,974,483.91 105

AI 2
1,072,750.00 9,869,300.00 1.20
21,720.00 19,910,724.00 2.42
21,720.00 9,568,963.20 1.16
112,660.00 292,916.00 0.04
39,641,903.20 4.81

1,072,750.00 3,700,987.50 0.45


21,720.00 2,783,635.20 0.34
21,720.00 3,016,473.60 0.37
112,660.00 4,145,888.00 0.50
13,646,984.30 1.66

769,370.00 12,186,820.80 1.48


21,720.00 7,886,966.40 0.96
21,720.00 11,659,296.00 1.41
112,660.00 30,364,123.20 3.68
62,097,206.40 7.53

1,072,750.00 140,252,765.33 17.02


21,720.00 7,940,136.96 0.96
21,720.00 2,839,701.76 0.34
112,660.00 459,652.80 0.06
151,492,256.85 18.38

1,072,750.00 1,969,569.00 0.24


21,720.00 5,104,373.76 0.62
21,720.00 1,630,563.84 0.20
112,660.00 3,792,135.60 0.46
12,496,642.20 1.52

1,072,750.00 1,094,205.00 0.13


21,720.00 2,628,988.80 0.32
21,720.00 472,627.20 0.06
112,660.00 229,826.40 0.03
4,425,647.40 0.54

769,370.00 492,396.80 0.06


21,720.00 370,688.00 0.04
112,660.00 270,384.00 0.03
1,133,468.80 0.14
272,437,466.95 33.06

148,670.00 40,140,900.00 4.87


68,130.00 36,790,200.00 4.46
76,931,100.00 9.33

11,824,620.00 7,412,263.05 0.90


267,850.00 8,249.78 0.00
139,710.00 279,420.00 0.03
267,850.00 878,248.01 0.11
172,050.00 52,820.73 0.006
76,850.00 4,764,700.00 0.58
78,850.00 946,200.00 0.11
112,500.00 450,000.00 0.05
210,180.00 420,360.00 0.05
78,770.00 315,080.00 0.04
56,780.00 1,135,600.00 0.14
16,654,692 2.02

204,640.00 25,821,966.34 3.13


190,000.00 23,974,656.00 2.91
17,170.00 1,742,755.00 0.211
27,270.00 2,767,905.00 0.34
54,307,282.34 6.59

132,490.00 993,675.00 0.12


151,660.00 16,520,323.80 2.00
17,513,998.80 2.13

78,110.00 1,527,831.60 0.19


87,190.00 321,731.10 0.04
108,970.00 724,650.50 0.09
2,081,550.00 4,163,100.00 0.51
347,550.00 695,100.00 0.08
1,461,300.00 1,461,300.00 0.18
1,660,620.00 3,321,240.00 0.40
228,620.00 228,620.00 0.03
294,570.00 294,570.00 0.04
12,738,143.20 1.55

348,170.00 170,522,524.56 20.69


343,710.00 43,370,152.70 5.26
68,710.00 1,722,834.54 0.21
215,615,511.80 26.16

3,013,800.00 134,204,514.00 16.28


3,013,070.00 21,091,490.00 2.56
43,600.00 261,600.00 0.03
53,600.00 321,600.00 0.04
118,600.00 1,186,000.00 0.14
52,950.00 105,900.00 0.01
64,200.00 770,400.00 0.09
157,941,504.00 19.16
824,139,698.87 100

AI 3
1,072,750.00 9,869,300.00 2.55
21,720.00 19,910,724.00 5.15
21,720.00 9,568,963.20 2.47
112,660.00 292,916.00 0.08
39,641,903.20 10.25

1,072,750.00 2,735,512.50 0.71


21,720.00 4,175,452.80 1.08
21,720.00 2,693,280.00 0.70
112,660.00 3,064,352.00 0.79
12,668,597.30 3.28
769,370.00 12,186,820.80 3.15
21,720.00 7,886,966.40 2.04
21,720.00 11,659,296.00 3.02
112,660.00 30,364,123.20 7.85
62,097,206.40 16.06

1,072,750.00 3,514,329.00 0.91


21,720.00 3,035,934.72 0.79
21,720.00 2,171,536.64 0.56
112,660.00 234,332.80 0.06
8,956,133.16 2.32

769,370.00 12,049,442.09 3.12


21,720.00 13,603,470.58 3.52
21,720.00 8,265,513.42 2.14
112,660.00 294,069.64 0.08
34,212,495.73 8.85

769,370.00 3,623,732.70 0.94


21,720.00 3,924,152.40 1.01
21,720.00 1,892,869.04 0.49
112,660.00 9,384,578.00 2.43
18,825,332.14 4.87
176,401,667.93 #REF!

148,670.00 14,804,558.60 3.83


68,130 13,568,770.80 3.51
253,600 9,890,400.00 2.56
38,263,729.40 9.90

11,824,620.00 535,655.29 0.14


267,850.00 133,067.88 0.03
139,710.00 139,710.00 0.04
267,850.00 267,850.00 0.07
172,050.00 - 0.000
76,850.00 - 0.00
78,850.00 157,700.00 0.04
112,500.00 - 0.00
210,180.00 - 0.00
78,770.00 - 0.00
56,780.00 - 0.00
1,233,983 0.32

204,640.00 8,032,120.00 2.08


190,000.00 7,457,500.00 1.93
17,170.00 1,742,755.00 0.451
27,270.00 2,767,905.00 0.72
20,000,280.00 5.17

132,490.00 563,082.50 0.15


563,082.50 0.15

78,110.00 1,630,936.80 0.42


87,190.00 296,446.00 0.08
108,970.00 370,498.00 0.10
2,081,550.00 - 0.00
347,550.00 695,100.00 0.18
1,660,620.00 - 0.00
45,180.00 90,360.00 0.02
294,570.00 - 0.00
3,083,340.80 0.80

348,170.00 69,359,642.04 17.94


343,710.00 13,490,617.50 3.49
68,710.00 105,950.82 0.03
82,956,210.36 21.46

3,013,800.00 48,371,490.00 12.51


3,013,070.00 15,065,350.00 3.90
43,600.00 43,600.00 0.01
52,950.00 105,900.00 0.03
108,600.00 543,000.00 0.14
64,129,340.00 16.59
386,631,634.15 #REF!

769,370.00 6,785,843.40 8.30


21,720.00 2,957,612.40 3.62
21,720.00 1,251,072.00 1.53
112,660.00 3,886,770.00 4.76
14,881,297.80 18.21

148,670.00 2,051,646.00 2.51


68,130 940,194.00 1.15
2,991,840.00 3.66

151,660.00 5,232,270.00 6.40


5,232,270.00 6.40

343,710.00 15,253,849.80 18.66


15,253,849.80 18.66
38,359,257.60 41
1,072,750.00 225,277.50 0.28
21,720.00 583,833.60 0.71
21,720.00 158,121.60 0.19
112,660.00 13,519.20 0.02
980,751.90 1.20

1,072,750.00 337,916.25 0.41


21,720.00 2,165,049.60 2.65
21,720.00 389,222.40 0.48
112,660.00 236,586.00 0.29
3,128,774.25 3.83

1,072,750.00 257,460.00 0.32


21,720.00 2,087,726.40 2.55
21,720.00 963,788.80 1.18
112,660.00 - 0.00
3,308,975.20 4.05

769,370.00 276,973.20 0.34


21,720.00 1,082,524.80 1.32
21,720.00 355,299.38 0.43
112,660.00 784,113.60 0.96
2,498,910.98 3.06
9,917,412.33 12.13

148,670.00 3,642,415.00 4.46


68,130 3,338,370.00 4.08
6,980,785.00 8.54

204,640.00 613,920.00 0.75


27,270.00 190,890.00 0.23
804,810.00 0.98

151,660.00 454,980.00 0.56


454,980.00 0.56

348,170.00 17,060,330.00 20.87


343,710.00 1,031,130.00 1.26
68,710.00 105,950.82 0.13
18,197,410.82 22.26

3,013,800.00 2,260,350.00 2.77


3,013,070.00 3,013,070.00 3.69
43,600.00 43,600.00 0.05
108,600.00 108,600.00 0.13
5,425,620.00 6.64
41,781,018.15 15

38,900.00 2,730,780.00 3.34


387,230.00 13,591,773.00 16.63
387,230.00 9,061,182.00 11.09
769,370.00 9,001,629.00 11.01
34,385,364.00 42.07

1,072,750.00 225,277.50 0.28


21,720.00 583,833.60 0.71
21,720.00 835,785.60 1.02
112,660.00 13,519.20 0.02
1,658,415.90 2.03

1,072,750.00 482,737.50 0.59


21,720.00 154,646.40 0.19
21,720.00 222,412.80 0.27
112,660.00 135,192.00 0.17
994,988.70 1.22

1,072,750.00 2,381,505.00 2.91


21,720.00 2,860,958.40 3.50
21,720.00 1,114,380.80 1.36
112,660.00 107,027.00 0.13
6,463,871.20 7.91
9,117,275.80 11.16

148,670.00 11,001,580.00 13.46 2,245,477,072.74


68,130 10,083,240.00 12.34
21,084,820.00 25.80

348,170.00 51,529,160.00 63.05


51,529,160.00 63.05
81,731,255.80 240
REKAPITULASI RAB

BOBOT
NO URAIAN PEKERJAAN JUMLAH
100%
GEDUNG LANTAI 1

I PEKERJAAN PERSIAPAN 21,249,500.00 1.94

II PEKERJAAN TANAH & PONDASI 27,754,689.63 3.73

III PEKERJAAN STRUKTUR BETON 178,953,726.48 4.44

IV PEKERJAAN DINDING 69,776,507.70 11.42

V PEKERJAAN KUSEN,ALAT PENGGANTUNG 14,325,466.02 2.32

VI PEKERJAAN PLAFOND 54,307,282.34 2.80

VII PEKERJAAN LANTAI 19,021,802.78 2.60

VIII PEKERJAAN SANITAIRE DAN PLUMBING 18,952,010.60 1.68

IX PEKERJAAN PENGECATAN 193,144,524.35 44.54

X PEKERJAAN INSTALASI LISTRIK 355,488,974.00 24.52

JUMLAH I 952,974,483.91 100


GEDUNG LANTAI 2

I PEKERJAAN BETON 272,437,466.95 13.66

II PEKERJAAN DINDING 76,931,100.00 11.81

III PEKERJAAN KUSEN,ALAT PENGGANTUNG 16,654,691.78 2.31

IV PEKERJAAN PLAFOND 54,307,282.34 2.89

V PEKERJAAN LANTAI 17,513,998.80 2.39

VI PEKERJAAN SANITAIRE DAN PLUMBING 12,738,143.20 2.04


VII PEKERJAAN PENGECATAN 215,615,511.80 51.05

VIII PEKERJAAN INSTALASI LISTRIK 157,941,504.00 13.86

JUMLAH II 824,139,698.87 100


GEDUNG LANTAI 3

I PEKERJAAN BETON 176,401,667.93 27.16

II PEKERJAAN DINDING 38,263,729.40 18.04

III PEKERJAAN KUSEN,ALAT PENGGANTUNG 1,233,983.17 2.87

IV PEKERJAAN PLAFOND 20,000,280.00 2.32

V PEKERJAAN LANTAI 563,082.50 2.95

VI PEKERJAAN SANITAIRE DAN PLUMBING 3,083,340.80 1.46

VII PEKERJAAN PENGECATAN 82,956,210.36 38.38

VIII PEKERJAAN INSTALASI LISTRIK 64,129,340.00 6.82

JUMLAH III 386,631,634.15 100


PEKERJAAN TAMBAHAN
1 PEKERJAAN KOLAM RENANG 38,359,257.60 14.74

2 PEKERJAAN POS SATPAM 41,781,018.15 31.38

3 PEKERJAAN PERKERASAN JALAN 34,385,364.00 11.99

4 PEKERJAAN PAGAR BANGUNAN 81,731,255.80 41.89

JUMLAH IV 196,256,895.55 100


JUMLAH 2,360,002,712.49
DIBULATKAN 2,360,000,000.00
HARGA BANGUNAN / M2 23,600,000.00
`
ANALISA HARGA SATUAN PEKERJAAN

KODE JENIS PEKERJAAN


KOEFISIEN
1 2 3
A001 1 M' PENGUKURAN KEMBALI SITE
tukang batu terampil 0.0100
pekerja terampil 0.0200
peralatan 1.0000
Jumlah
keuntungan max
jumlah
dibulatkan
A002 1 M2 PEK. DIREKSI KEET
Kayu Kelas III 0.1000
Paku 5 - 7 0.2500
Seng Glb BJLS 28 (80x180 cm) 1.1000
Triplek 3 mm 0.5000
PC 50 kg 0.1000
Pasir pasang 0.2500
Bata merah 70.0000
Peralatan 1.0000
Ongkos Pasang 1.0000
Jumlah
keuntungan max
jumlah
dibulatkan
A003 1M' PEK.PASANGAN BOUWPLANK
Kayu terentang 0.0100
paku 5 - 7 0.0380
ongkos pasang 1.0000
Jumlah
keuntungan max
jumlah
dibulatkan
A004 1 M3 PEK.GALIAN TANAH BIASA
Pekerja setengah terampil 0.4000
Mandor 0.0400
Alat bantu 1.0000
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A005 1 M3 PASANGAN AANSTAMPING BATU BELAH
Batu belah 1.2000
Pasir urug 0.4000
Pekerja 1.1250
Tk.batu setengah terampil 0.5625
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A006 1 M3 PASANGAN BATU BELAH 1:5
Batu belah 1.2000
PC (50Kg) 2.1600
Pasir pasang 0.4300
Pekerja 2.2500
Tk.batu setengah terampil 1.1250
Kep.tukang batu 0.1125
Mandor 0.1688
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A007 1 M3 URUGAN PASIR URUG
Pasir urug 1.2000
Pekerja 0.1500
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
dibulatkan
A008 1 M3 URUGAN TANAH KEMBALI
Pekerja 0.1920
Mandor 0.0190
Alat bantu 1.0000
Jumlah
Keuntungan max
Jumlah
dibulatkan
A009 1 M3 PEK.URUGAN TANAH PENINGGIAN LANTAI
Tukang gali 1.2000
Pekerja 0.1500
Mandor 0.0100
Alat bantu 1.0000
Jumlah
Keuntungan max
Jumlah
dibulatkan
A010 1 M3 LANTAI KERJA 1PC:3PS:5KRL
PC (50Kg) 3.9560
Pasir beton 0.5500
split pecah mesin 2/3 0.9300
Peralatan 1.0000
Pekerja 0.5000
Tk.batu setengah terampil 0.3750
kep.tukang batu 0.0375
Mandor 0.0075
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A011 1 M3 COR BETON K.175
PC (50Kg) 6.8000
Pasir beton 0.5400
split pecah mesin 2/3 0.8300
Pekerja 1.5000
Tk.batu setengah terampil 0.5000
kep.tukang batu 0.0500
Mandor 0.0100
Peralatan 1.0000
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A012 1 KG BESI BETON TERPASANG U - 24
Besi beton U -24 1.0500
Kawat beton 0.0100
Pekerja 0.0250
Tk.besi beton terampil 0.0150
Mandor 0.0050
Peralatan 1.0000
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A013 1 M2 BEKISTING DENGAN PAPAN
Kaso 5/7 ky.terentang 0.0170
papan terentang 0.0240
paku 5 - 7 0.4000
Pekerja 0.1200
Tk.kayu terampil 0.1500
Kep.tukang kayu 0.1500
Mandor 0.0500
Tk.kayu setengah terampil 0.1200
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A017 1 M2 PASANGAN BATA MERAH 1:2(1/2 BATA)
Bata merah 50.0000
PC (50Kg) 0.3790
Pasir pasang 0.0380
Pekerja setengah terampil 0.3218
Tk.batu setengah terampil 0.1605
Kep.tukang batu 0.0158
Mandor 0.0083
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A019 1 M2 PLESTERAN DINDING 1:2+ACIAN
PC (50Kg) 0.1800
Pasir pasang 0.0190
Alat bantu 1.0000
Pekerja setengah terampil 0.3000
Tk.batu setengah terampil 0.2140
kep.tukang batu 0.0210
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A019 1 M2 Pelapis dinding luar Wood plank papan fiber
wood plank papan fiber 0.1000
Alat bantu 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A019 1 M2 Pelapis dinding luar panel head board
panel headboard 0.1000
Alat bantu 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A019 1 M2 Pelapis dinding motif bata ex roman
bata tempel keramik ex roman 0.1000
Alat bantu 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A019 1 M2 Pelapis dinding roaster
Roster Beton 20 x 20 0.1000
Alat bantu 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A019 1 M2 Pelapis dinding wall panel wpc
wall panel wpc 0.1000
Alat bantu 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A021 1 M3 PEK.KUSEN PINTU DAN JENDELA
Kayu Kamper Singkil / Kapur (K. Samarinda Klas II) 1.2000
paku 8-10 cm 1.2500
Lem Putih (FOX) 1.0000
Pekerja 6.0000
Tk. Kayu terampil 18.0000
Kep. tukang kayu 1.8000
Mandor 0.3000
Jumlah
Keuntungan Max. 10 %
jumlah
Dibulatkan
A023 1 BH PASANG PINTU PVC TOILET
pintu pvc toilet 0.0170
Pekerja setengah terampil 0.3000
Tk. Kayu terampil 1.2000
Kep. tukang kayu 0.1200
Mandor 0.0200
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A024 1 M2 PEK.DAUN JENDELA (TANPA KACA)
Rangka kayu samarinda 0.0170
Lem Putih (FOX) 0.0300
Pekerja setengah terampil 0.3000
Tk. Kayu terampil 1.2000
Kep. tukang kayu 0.1200
Mandor 0.0200
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A026 1 M2 PEK.KACA 5 MM EX ASHASHI
kaca tebal 5mm 1.1000
Pekerja 0.0150
Tk. Kayu terampil 0.1500
Kep. tukang kayu 0.0150
Mandor 0.0008
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A027 1 PASANG PEMASANGAN ENGSEL PINTU 4"
engsel 4" ex.dekson 1.0000
Pekerja 0.0150
Tk. Kayu terampil 0.1500
Kep. tukang kayu 0.0150
Mandor 0.0008
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A028 1 PASANG PEMASANGAN ENGSEL JENDELA 3"
engsel 3" ex.dekson 1.0000
Pekerja 0.0150
Tk. Kayu terampil 0.1500
Kep. tukang kayu 0.0150
Mandor 0.0008
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A029 1 BUAH PEMASANGAN KUNCI 2 SLAAGH
kunci 2 slaagh ex.dekson 1.0000
Pekerja 0.0100
Tk. Kayu terampil 0.5000
Kep. tukang kayu 0.0500
Mandor 0.0050
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A030 1 BUAH PEMASANGAN KUNCI 2 KM/WC
Kunci KM Bulat ALFA 1.0000
Pekerja 0.0050
Tk. Kayu terampil 0.5000
Kep. tukang kayu 0.0500
Mandor 0.0030
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A031 1 BUAH PEMASANGAN SLOT PINTU
slot pintu merek dekson 1.0000
Pekerja 0.0050
Tk. Kayu terampil 0.5000
Kep. tukang kayu 0.0500
Mandor 0.0030
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A032 1 BUAH PEMASANGAN TARIKAN JENDELA
tarikan jendela merek dekson 1.0000
Pekerja 0.0050
Tk. Kayu terampil 0.5000
Kep. tukang kayu 0.0500
Mandor 0.0030
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A039 1 M2 PLAFOND GYPSUM 9 MM RANGKA HOLLOW
Plafond gypsum knauf 9mm 1.0100
besi hollow 40x40x0,4mm(galvanis) 1.1000
besi hollow 20x40x0,4mm(galvanis) 2.2000
Paku 2-3 cm 0.2000
Pekerja 0.3000
Tukang besi terampil 0.2000
kepala tukang besi 0.0200
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A040 1 M2 PLAFOND GRC 4mm RANGKA HOLLOW
Plafond grc 4mm 1.0100
besi hollow 40x40x0,4mm(galvanis) 1.1000
besi hollow 20x40x0,4mm(galvanis) 2.2000
Paku 2-3 cm 0.2000
Pekerja 0.3000
Tukang besi terampil 0.2000
kepala tukang besi 0.0200
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A041 1 M1 PEK.LIST GYPSUM 10 CM
List gypsum 10 cm 1.0100
Paku 2-3 cm 0.0200
Pekerja 0.0500
Tukang kayu terampil 0.0500
Kepala tukang kayu 0.0050
Mandor 0.0020
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A042 1 M' PEK.LIST KAYU 3 CM
List kayu 3 cm 1.0100
Paku 2-3 cm 0.0200
Pekerja 0.0500
Tukang kayu terampil 0.0500
Kepala tukang kayu 0.0050
Mandor 0.0020
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A016 1 M2 PASANG LANTAI TOILET UK.20x20
Keramik uk.20x20 roman putih 1.0100
PC (50Kg) 0.1600
pasir pasang 0.0300
pekerja terampil 0.2500
tk batu terampil 0.4000
kep.tukang batu 0.0500
Mandor 0.0250
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A014 1 M2 PASANG KERAMIK TILE UK.30x30 LANTAI UTAMA
Keramik uk.30x30 ex.roman putih 1.0100
PC (50Kg) 0.1600
Pasir pasang 0.0300
pekerja terampil 0.1875
tk.batu terampil 0.3000
kep.tukang batu 0.0375
Mandor 0.1880
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A015 1 M2 PASANG LANTAI KERAMIK TILE UK.30x30 ANTI SLIP(SELASAR)
Keramik uk 30x30 kasar ex.roman putih 1.0100
PC (50Kg) 0.1600
pasir pasang 0.0300
pekerja terampil 0.1875
tk batu terampil 0.3000
kep.tukang batu 0.0375
Mandor 0.1880
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A015 1 M2 PASANG lantai motif batu alam 50x50 ex uno
Keramik 40 x 40 KW I DN Warna/Corak ( Anti Slip ) 1.0100
PC (50Kg) 0.1600
pasir pasang 0.0300
pekerja terampil 0.1875
tk batu terampil 0.3000
kep.tukang batu 0.0375
Mandor 0.1880
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A015 1 M2 pasang Rumput sintetis ex sakura trass
rumput sintetis 1.0000
PC (50Kg) 0.1600
pasir pasang 0.0300
pekerja terampil 0.1875
Mandor 0.1880
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A044 1 M' PASANG PIPA TYPE AW,DIA 1/2"
Pipa PVC ex.wavin 1.2000
Perlengkapan 1.0000
Pekerja 0.0360
Tukang pipa 0.0600
Kep.tukang pipa 0.0050
Mandor 0.0018
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A043 1 M' PASANG PIPA TYPE AW,DIA 2"
Pipa PVC ex.wavin 1.2000
Perlengkapan 1.0000
Pekerja 0.0360
Tukang pipa 0.0600
Kep.tukang pipa 0.0050
Mandor 0.0018
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A043 1 M' PASANG PIPA TYPE AW,DIA 3"
Pipa PVC ex.wavin 1.2000
Perlengkapan 1.0000
Pekerja 0.0360
Tukang pipa 0.0600
Kep.tukang pipa 0.0050
Mandor 0.0018
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A047 1 BH PEMASANGAN KLOSET DUDUK
Kloset duduk ex.toto 1.0000
semen Pc (50kg) 0.6000
pasir pasang 0.0100
pekerja 1.0000
tukang batu terampil 1.0000
kep.tukang batu 0.1000
Mandor 0.0000
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A046 1 BH PEMASANGAN FLOOR DRAIN
floor drain ex.toto 1.0000
Pekerja 0.0100
Tukang pipa 0.1000
Kepala tukang pipa 0.0100
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A048 1 UNIT PEMASANGAN TANGKI AIR
tangki air fiber uk 1100 liter+radar 1.0000
pekerja 1.0000
Mandor 0.0050
peralatan 1.0000
Jumlah
keuntungan max
Jumlah
Dibulatkan
A049 1 UNIT PEMASANGAN POMPA AIR
pompa air kapasitas 250 watt merek wester 1.0000
pekerja 1.0000
Mandor 0.0050
peralatan 1.0000
Jumlah
keuntungan max
Jumlah
Dibulatkan
A050 1 UNIT PEMASANGAN POMPA PENDORONG
pompa pendorong ex zimitsu 125 watt 1.0000
pekerja 1.0000
Mandor 0.0050
peralatan 1.0000
Jumlah
keuntungan max
Jumlah
Dibulatkan
A051 1 BUAH PEK. BAK KONTROL 40 x 40
Bata merah 50.0000
semen Pc (50kg) 0.4154
pasir pasang 0.0641
pekerja 0.3000
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A052 1 UNIT PEK.SEPTICTANK 1,5x1,5x1,5
Bata merah 9.0000
beton 0.9000
tutup beton 0.2700
galian tanah 3.3800
pasir urug 0.2250
pekerja 0.3000
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A053 1 UNIT PEK.RESAPAN UK.1x1 t=15
split pecah 2/3 0.2000
pasir pasang 0.2000
beton 0.1000
galian tanah 1.5000
urugan tanah 0.3750
peralatan 1.0000
pekerja 0.3000
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A045 1 BH PEMASANGAN KRAN AIR DIA 1/2"
Kran air ex.onda 1.0000
seal tape 0.0250
Pekerja 0.0100
Tukang pipa 0.1000
Kep.tukang pipa 0.0100
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A045 1 BH PEMASANGAN KITCHEN SINK
Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) 1.0000
seal tape 0.0250
Pekerja 0.0100
Tukang pipa 0.1000
Kep.tukang pipa 0.0100
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A045 1 BH PEMASANGAN BATHUB
Bath Cape Washteren 1.0000
seal tape 0.0250
Pekerja 0.0100
Tukang pipa 0.1000
Kep.tukang pipa 0.0100
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A045 1 BH PEMASANGAN SHOWER
Shower Dengan Tiang 1.0000
seal tape 0.0250
Pekerja 0.0100
Tukang pipa 0.1000
Kep.tukang pipa 0.0100
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A045 1 BH PEMASANGAN WASTAFEL
Wastafel Lengkap INA 1.0000
seal tape 0.0250
Pekerja 0.0100
Tukang pipa 0.1000
Kep.tukang pipa 0.0100
Mandor 0.0050
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A054 1 M2 PENGECATAN DINDING EX.JOTUN
Cat tembok acrilic 0.1750
Plamir tembok 0.1600
Rol cat 0.0100
Steger Werk 1.0000
Hampelas 0.5000
Pekerja setengah terampil 0.1300
Tk. cat setengah terampil 0.1950
Kep. tukang cat 0.0195
Mandor 0.0065
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A055 1 M2 PENGECATAN PLAFOND DENGAN CAT TEMBOK EX.JOTUN
Cat tembok 0.2000
Plamir tembok 0.1600
rol cat 0.0100
hampelas 0.5000
steger wark 1.0000
Pekerja setengah terampil 0.1040
Tk.cat setengah terampil 0.1820
kep.tukang cat 0.0195
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A056 1 M2 PENGECATAN KAYU EX.F-TALITE
Menie kayu 0.1670
Plamir kayu 0.0830
Cat kayu 0.2000
hampelas 0.4000
Minyak cat terpentin 0.1500
kuas 3" 0.0500
Pekerja setengah terampil 0.2000
Tk.cat terampil 0.3000
Kep.tukang cat 0.0300
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A057 1 M1 PEMASANGAN TITIK KABEL LAMPU
Kabel NYM 3 X 2,5 mm2 ex suppreme 8.0000
Pipa Konduit 1/2 " 2.0000
Com listrik 2.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan max
Jumlah
Dibulatkan
A058 1 BUAH PEMASANGAN TITIK STOP KONTAK
Kabel NYM 3 X 2,5 mm2 ex suppreme 8.0000
Pipa Konduit 1/2 " 2.0000
Com listrik 2.0000
Stop Kontak Broko Standard ( 1 Phase ) 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan max
Jumlah
Dibulatkan
A059 1 BUAH PEMASANGAN TITIK SAKLAR TUNGGAL
Skalar tunggal (single) 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan max
Jumlah
Dibulatkan
A060 1 BUAH PEMASANGAN TITIK SAKLAR GANDA
saklar ganda (serie) 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan max
Jumlah
Dibulatkan
A061 1 BUAH PEMASANGAN ARMATURE LAMPU DOWNLIGHT LENGKAP LAMPU 8 WATT
armature lampu down light d.5" lengkap lampu SL 8w 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan maksimal
Jumlah
Dibulatkan
A062 1 BUAH PEMASANGAN LAMPU 8 WATT
Lampu Philips SL-8 watt 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan maksimal
Jumlah
Dibulatkan
A063 1 BUAH PEMASANGAN LAMPU 18 WATT
lampu SL 18 watt sek.philips 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan maksimal
Jumlah
Dibulatkan
A064 PENAMBAHAN DAYA LISTRIK + 1300 WATT
Tambah daya 1.0000
Jasa pasang 1.0000
pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan max
Jumlah
Dibulatkan
A063 1 BUAH PEMASANGAN LAMPU 20 WATT
Trapo TL 20 W ( Philip ) 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan maksimal
Jumlah
Dibulatkan
A063 1 BUAH PEMASANGAN LAMPU 25 WATT
Lampu SL Philip 25 W 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan maksimal
Jumlah
Dibulatkan
A063 1 BUAH PEMASANGAN LAMPU 15 WATT
Lampu SL Philip 18 W + Fitting Broco 1.0000
Pekerja 0.3000
Mandor 0.0100
Jumlah
keuntungan maksimal
Jumlah
Dibulatkan
A017 1 M2 PASANGAN BATA MERAH 1:2(1/2 BATA)
Bata merah 50.0000
PC (50Kg) 0.3790
Pasir pasang 0.0380
Pekerja setengah terampil 0.3218
Tk.batu setengah terampil 0.1605
Kep.tukang batu 0.0158
Mandor 0.0083
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A018 1 M2 PASANGAN BATA MERAH 1:5(1/2 BATA)
Bata merah 50.0000
PC (50Kg) 0.2592
Pasir pasang 0.0580
Pekerja setengah terampil 0.3218
Tk.batu setengah terampil 0.1605
Kep.tukang batu 0.0158
Mandor 0.0083
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A019 1 M2 PLESTERAN DINDING 1:2+ACIAN
PC (50Kg) 0.1800
Pasir pasang 0.0190
Alat bantu 1.0000
Pekerja setengah terampil 0.3000
Tk.batu setengah terampil 0.2140
kep.tukang batu 0.0210
Mandor 0.0100
Jumlah
Keuntungan max
Jumlah
Dibulatkan
A020 1 M2 PLESTERAN DINDING 1:5 + ACIAN
PC (50Kg) 0.1080
Pasir pasang 0.0190
Pekerja setengah terampil 0.2860
Tk.batu setengah terampil 0.2140
kep.tukang batu 0.0210
Mandor 0.0210
Jumlah
Keuntungan max
Jumlah
Dibulatkan

A022 1 M3 PEK.DAUN PINTU PANIL


Papan Kayu Kamper samarinda 0.0400
Lem Putih (FOX) 0.5000
Pekerja 1.0000
Tk. Kayu terampil 3.0000
Kep. tukang kayu 0.3000
Mandor 0.0500
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A023 1 BH PASANG PINTU PVC TOILET
pintu pvc toilet 0.0170
Pekerja setengah terampil 0.3000
Tk. Kayu terampil 1.2000
Kep. tukang kayu 0.1200
Mandor 0.0200
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A025 1 M2 PEK.KACA 3 MM EX ASHASHI
Kaca Es 3 mm 1.1000
Pekerja 0.0150
Tk. Kayu terampil 0.1500
Kep. tukang kayu 0.0150
Mandor 0.0008
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A033 1 M3 KUDA- KUDA KAYU RASAMALA
kayu rasamala 1.1000
Paku 5-7 cm 5.8000
Pekerja setengah terampil 3.0000
Tk. Kayu setengah terampil 5.0000
Kep. tukang kayu 2.0000
Mandor 0.5000
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A034 1 M3 GORDING
Kayu rasamala 6/12 1.1000
Paku 5-7 cm 3.6000
Pekerja setengah terampil 1.5000
Tk. Kayu setengah terampil 3.0000
Kep. tukang kayu 0.3000
Mandor 0.0300
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A035 1 M2 RANGKA ATAP
Kayu rasamala 5/7 0.0140
Kayu rasamala 3/4 4.0000
Paku 5-7 cm 0.2500
Pekerja setengah terampil 0.1500
Tk. Kayu terampil 0.1500
Kep. tukang kayu 0.0100
Mandor 0.0050
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A036 1 M2 PAS. GENTENG MULTI ROOF
Genteng multi roof 1.0000
Pekerja 0.1600
Tk. Kayu setengah terampil 0.0900
Kep. tukang kayu 0.0100
Mandor 0.0060
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A037 1 M1 PAS. BUBUNGAN GENTENG BULAT
Genteng bulat 4.0000
PC (50kg) 0.1304
Pasir pasang 0.2100
Peralatan 1.0000
Pekerja setengah terampil 0.1500
Tk. Batu terampil 0.2000
Kep. tukang batu 0.0100
Mandor 0.0100
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
A038 1 M1 PASANGAN LISTPLANK GRC
List plank GRC 0.0075
Paku 2-3 0.0100
Pekerja terampil 0.0700
Tk. Kayu setengah terampil 0.2000
Kep. tukang kayu 0.0200
Mandor 0.0040
Jumlah
Keuntungan Max. 10 %
Jumlah
Dibulatkan
HARGA SATUAN
SATUAN HARGA SATUAN PEKERJAAN (Rp)
4 5 6=(3x5)

org 91,800.00 918.00


org 81,600.00 1,632.00
ls 250.00 250.00
2,800.00

2,800.00

m³ 1,738,000.00 173,800.00
kg 16,500.00 4,125.00
lbr 50000.00 55,000.00
lbr 66,000.00 33,000.00
zak 85,000.00 8,500.00
m³ 205,000.00 51,250.00
bh 750.00 52,500.00
ls 250.00 250.00
ls 2,500.00 2,500.00
380,925.00

380,920.00

M3 1,738,000.00 17,380.00
Kg 16,500.00 627.00
Ls 2,500.00 2,500.00
20,507.00

20,500.00

OH 75,000.00 30,000.00
OH 160,000.00 6,400.00
Ls 2,500.00 2,500.00
38,900.00

38,900.00
M3 150,000.00 180,000.00
M3 159,500.00 63,800.00
OH 90,000.00 101,250.00
OH 75,000.00 42,187.50
387,237.50

387,230.00

M3 150,000.00 180,000.00
zak 85,000.00 183,600.00
M3 205,000.00 88,150.00
OH 90,000.00 202,500.00
OH 75,000.00 84,375.00
OH 85,000.00 9,562.50
OH 160,000.00 27,008.00
775,195.50

775,190.00

M3 159,500.00 191,400.00
OH 90,000.00 13,500.00
OH 160,000.00 1,600.00
206,500.00

206,500.00

OH 90,000.00 17,280.00
OH 160,000.00 3,040.00
Ls 2,500.00 2,500.00
22,820.00

22,820.00

M3 80,000.00 96,000.00
OH 90,000.00 13,500.00
OH 160,000.00 1,600.00
Ls 2,500.00 2,500.00
113,600.00

113,600.00
zak 85,000.00 336,260.00
M3 220,000.00 121,000.00
M3 220,000.00 204,600.00
Ls 30,000.00 30,000.00
OH 90,000.00 45,000.00
OH 75,000.00 28,125.00
OH 85,000.00 3,187.50
OH 160,000.00 1,200.00
769,372.50

769,370.00

Zak 85,000.00 578,000.00


M3 220,000.00 118,800.00
M3 220,000.00 182,600.00
OH 90,000.00 135,000.00
OH 75,000.00 37,500.00
OH 85,000.00 4,250.00
OH 160,000.00 1,600.00
Ls 15,000.00 15,000.00
1,072,750.00

1,072,750.00

Kg 16,170.00 16,978.50
Kg 20,000.00 200.00
OH 90,000.00 2,250.00
OH 80,000.00 1,200.00
OH 160,000.00 800.00
Ls 300.00 300.00
21,728.50

21,720.00

M3 1,595,000.00 27,115.00
M3 1,100,000.00 26,400.00
Kg 16,500.00 6,600.00
OH 90,000.00 10,800.00
OH 80,000.00 12,000.00
OH 85,000.00 12,750.00
OH 160,000.00 8,000.00
OH 75,000.00 9,000.00
112,665.00

112,660.00

Bh 1,300.00 65,000.00
zak 85,000.00 32,215.00
M3 205,000.00 7,790.00
OH 90,000.00 28,962.00
OH 75,000.00 12,037.50
OH 85,000.00 1,343.00
OH 160,000.00 1,328.00
148,675.50

148,670.00

Zak 85,000.00 15,300.00


M3 205,000.00 3,895.00
OH 2,500.00 2,500.00
OH 90,000.00 27,000.00
OH 75,000.00 16,050.00
OH 85,000.00 1,785.00
OH 160,000.00 1,600.00
68,130.00

68,130.00

M2 42,000.00 4,200.00
OH 2,500.00 2,500.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
35,300.00

35,300.00

M2 79,900.00 7,990.00
OH 2,500.00 2,500.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
39,090.00

39,090.00
M2 120,000.00 12,000.00
OH 2,500.00 2,500.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
43,100.00

43,100.00

bh 11,000.00 1,100.00
OH 2,500.00 2,500.00
OH 80,000.00 90,000.00
OH 65,000.00 160,000.00
253,600.00

253,600.00

bh 281,000.00 28,100.00
OH 2,500.00 2,500.00
OH 80,000.00 90,000.00
OH 80,000.00 160,000.00
280,600.00

280,600.00

M3 8,000,000.00 9,600,000.00
Kg 16,500.00 20,625.00
Kg 23,000.00 23,000.00
OH 90,000.00 540,000.00
OH 80,000.00 1,440,000.00
OH 85,000.00 153,000.00
OH 160,000.00 48,000.00
11,824,625.00

11,824,620.00

bh 195,000.00 3,315.00
org 90,000.00 27,000.00
org 80,000.00 96,000.00
org 85,000.00 10,200.00
org 160,000.00 3,200.00
139,715.00
139,710.00

m3 8,000,000.00 136,000.00
Kg 48,600.00 1,458.00
org 90,000.00 27,000.00
org 75,000.00 90,000.00
org 85,000.00 10,200.00
org 160,000.00 3,200.00
267,858.00

267,850.00

M2 143,000.00 157,300.00
OH 90,000.00 1,350.00
OH 80,000.00 12,000.00
OH 85,000.00 1,275.00
OH 160,000.00 128.00
172,053.00

172,050.00

Ps 62,400.00 62,400.00
OH 76,500.00 1,147.50
OH 91,800.00 13,770.00
OH 96,900.00 1,453.50
OH 107,100.00 85.68
78,856.68

78,850.00

Ps 60,400.00 60,400.00
OH 76,500.00 1,147.50
OH 91,800.00 13,770.00
OH 96,900.00 1,453.50
OH 107,100.00 85.68
76,856.68

76,850.00

Bh 66,550.00 66,550.00
OH 90,000.00 900.00
OH 80,000.00 40,000.00
OH 85,000.00 4,250.00
OH 160,000.00 800.00
112,500.00

112,500.00

Bh 165,000.00 165,000.00
OH 90,000.00 450.00
OH 80,000.00 40,000.00
OH 85,000.00 4,250.00
OH 160,000.00 480.00
210,180.00

210,180.00

bh 30,000.00 30,000.00
OH 90,000.00 450.00
OH 80,000.00 40,000.00
OH 160,000.00 8,000.00
OH 107,100.00 321.30
78,771.30

78,770.00

Bh 11,600.00 11,600.00
OH 90,000.00 450.00
OH 80,000.00 40,000.00
OH 85,000.00 4,250.00
OH 160,000.00 480.00
56,780.00

56,780.00

Lbr 82,500.00 83,325.00


Btg 25,000.00 27,500.00
Btg 20,000.00 44,000.00
Kg 17,600.00 3,520.00
OH 90,000.00 27,000.00
OH 80,000.00 16,000.00
OH 85,000.00 1,700.00
OH 160,000.00 1,600.00
204,645.00

204,640.00

Lbr 68,000.00 68,680.00


M1 25,000.00 27,500.00
M1 20,000.00 44,000.00
Kg 17,600.00 3,520.00
OH 90,000.00 27,000.00
OH 80,000.00 16,000.00
OH 85,000.00 1,700.00
OH 160,000.00 1,600.00
190,000.00

190,000.00

M1 17,500.00 17,675.00
Kg 17,600.00 352.00
OH 90,000.00 4,500.00
OH 80,000.00 4,000.00
OH 85,000.00 425.00
OH 160,000.00 320.00
27,272.00

27,270.00

M1 7,500.00 7,575.00
Kg 17,600.00 352.00
OH 90,000.00 4,500.00
OH 80,000.00 4,000.00
OH 85,000.00 425.00
OH 160,000.00 320.00
17,172.00

17,170.00

M2 49,500.00 49,995.00
Zak 85,000.00 13,600.00
M3 205,000.00 6,150.00
OH 90,000.00 22,500.00
OH 80,000.00 32,000.00
OH 85,000.00 4,250.00
OH 160,000.00 4,000.00
132,495.00

132,490.00

M2 57,200.00 57,772.00
Zak 85,000.00 13,600.00
M3 205,000.00 6,150.00
OH 90,000.00 16,875.00
OH 80,000.00 24,000.00
OH 85,000.00 3,187.50
OH 160,000.00 30,080.00
151,664.50

151,660.00

M2 66,000.00 66,660.00
Zak 85,000.00 13,600.00
M3 205,000.00 6,150.00
OH 90,000.00 16,875.00
OH 80,000.00 24,000.00
OH 85,000.00 3,187.50
OH 160,000.00 30,080.00
160,552.50

160,550.00

M2 66,000.00 66,660.00
Zak 85,000.00 13,600.00
M3 205,000.00 6,150.00
OH 90,000.00 16,875.00
OH 80,000.00 24,000.00
OH 85,000.00 3,187.50
OH 160,000.00 30,080.00
160,552.50

160,550.00

M2 170,000.00 170,000.00
Zak 62,700.00 10,032.00
M3 15,000.00 450.00
OH 80,000.00 15,000.00
OH 50,000.00 9,400.00
204,882.00

204,880.00

Btg 32,800.00 39,360.00


Ls 30,000.00 30,000.00
OH 90,000.00 3,240.00
OH 80,000.00 4,800.00
OH 85,000.00 425.00
OH 160,000.00 288.00
78,113.00

78,110.00

M1 40,370.00 48,444.00
Ls 30,000.00 30,000.00
OH 90,000.00 3,240.00
OH 80,000.00 4,800.00
OH 85,000.00 425.00
OH 160,000.00 288.00
87,197.00

87,190.00

M1 58,520.00 70,224.00
Ls 30,000.00 30,000.00
OH 90,000.00 3,240.00
OH 80,000.00 4,800.00
OH 85,000.00 425.00
OH 160,000.00 288.00
108,977.00

108,970.00

Bh 1,850,000.00 1,850,000.00
Zak 85,000.00 51,000.00
M3 205,000.00 2,050.00
OH 90,000.00 90,000.00
OH 80,000.00 80,000.00
OH 85,000.00 8,500.00
OH 160,000.00 -
2,081,550.00

2,081,550.00

BH 337,000.00 337,000.00
OH 90,000.00 900.00
OH 80,000.00 8,000.00
OH 85,000.00 850.00
OH 160,000.00 800.00
347,550.00

347,550.00

Unit 1,425,000.00 1,425,000.00


OH 90,000.00 90,000.00
OH 160,000.00 800.00
Ls 15,000.000 15,000.00
1,530,800.00

1,530,800.00

Unit 1,150,000.00 1,150,000.00


OH 90,000.00 90,000.00
OH 160,000.00 800.00
Ls 15,000.000 15,000.00
1,255,800.00

1,255,800.00

Unit 500,000.00 500,000.00


OH 90,000.00 90,000.00
OH 160,000.00 800.00
Ls 15,000.000 15,000.00
605,800.00

605,800.00

Bh 750.00 37,500.00
Zak 85,000.00 35,309.00
M3 205,000.00 13,140.50
OH 90,000.00 27,000.00
OH 160,000.00 800.00
113,749.50

113,740.00

M2 1,020.00 9,180.00
M3 106,800.00 96,120.00
M3 931,700.00 251,559.00
M3 89,000.00 300,820.00
M3 159,500.00 35,887.50
OH 90,000.00 27,000.00
OH 160,000.00 800.00
721,366.50

721,360.00

M3 220,000.00 44,000.00
M3 205,000.00 41,000.00
M3 106,800.00 10,680.00
M3 89,000.00 133,500.00
M3 159,500.00 59,812.50
Ls 50,000.00 50,000.00
OH 90,000.00 27,000.00
OH 160,000.00 800.00
366,792.50

366,790.00

Bh 34,560.00 34,560.00
Bh 3,000.00 75.00
OH 90,000.00 900.00
OH 80,000.00 8,000.00
OH 85,000.00 850.00
OH 160,000.00 800.00
45,185.00

45,180.00

Bh 218,000.00 218,000.00
Bh 3,000.00 75.00
OH 90,000.00 900.00
OH 80,000.00 8,000.00
OH 85,000.00 850.00
OH 160,000.00 800.00
228,625.00

228,620.00

Unit 1,450,680.00 1,450,680.00


Bh 3,000.00 75.00
OH 90,000.00 900.00
OH 80,000.00 8,000.00
OH 85,000.00 850.00
OH 160,000.00 800.00
1,461,305.00

1,461,300.00

Bh 284,000.00 284,000.00
Bh 3,000.00 75.00
OH 90,000.00 900.00
OH 80,000.00 8,000.00
OH 80,000.00 800.00
OH 160,000.00 800.00
294,575.00

294,570.00

Bh 1,650,000.00 1,650,000.00
Bh 3,000.00 75.00
OH 90,000.00 900.00
OH 80,000.00 8,000.00
OH 85,000.00 850.00
OH 160,000.00 800.00
1,660,625.00

1,660,620.00

Kg 82,500.00 14,437.50
Kg 13,320.00 2,131.20
Bh 30,250.00 302.50
Bh 300,000.00 300,000.00
Lbr 11,000.00 5,500.00
OH 90,000.00 11,700.00
OH 60,000.00 11,700.00
OH 70,000.00 1,365.00
OH 160,000.00 1,040.00
348,176.20

348,170.00

Kg 62,700.00 12,540.00
Kg 13,320.00 2,131.20
Bh 30,250.00 302.50
Lbr 11,000.00 5,500.00
Bh 300,000.00 300,000.00
OH 90,000.00 9,360.00
OH 60,000.00 10,920.00
OH 70,000.00 1,365.00
OH 160,000.00 1,600.00
343,718.70

343,710.00

Kg 44,000.00 7,348.00
Kg 13,320.00 1,105.56
Kg 65,000.00 13,000.00
Lbr 11,000.00 4,400.00
Ltr 11,000.00 1,650.00
Bh 30,250.00 1,512.50
OH 90,000.00 18,000.00
OH 60,000.00 18,000.00
OH 70,000.00 2,100.00
OH 160,000.00 1,600.00
68,716.06

68,710.00

M 362,450.00 2,899,600.00
Btg 32,800.00 65,600.00
Bh 10,000.00 20,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
3,013,800.00
3,013,800.00

M 362,450.00 2,899,600.00
Btg 32,800.00 65,600.00
Bh 10.00 20.00
Bh 19,250.00 19,250.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
3,013,070.00

3,013,070.00

Bh 15,000.00 15,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
43,600.00

43,600.00

Bh 25,000.00 25,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
53,600.00

53,600.00

Bh 90,000.00 90,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
118,600.00

118,600.00

Bh 50,000.00 50,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
78,600.00

78,600.00

Bh 80,000.00 80,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
108,600.00

108,600.00

Ls 900,000 900,000.00
Ls 200,000 200,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
1,128,600.00

1,128,600.00

Bh 29,700.00 29,700.00
OH 75,000.00 22,500.00
OH 75,000.00 750.00
52,950.00

52,950.00

Bh 33,000.00 33,000.00
OH 100,000.00 30,000.00
OH 120,000.00 1,200.00
64,200.00

64,200.00

Bh 80,000.00 80,000.00
OH 90,000.00 27,000.00
OH 160,000.00 1,600.00
108,600.00

108,600.00
Bh 1,020.00 51,000.00
zak 71,400.00 27,060.60
M3 153,000.00 5,814.00
OH 79,050.00 25,438.29
OH 86,700.00 13,915.35
OH 96,900.00 1,531.02
OH 107,100.00 888.93
125,648.19

125,640.00

Bh 1,020.00 51,000.00
zak 71,400.00 18,506.88
M3 153,000.00 8,874.00
OH 79,050.00 25,438.29
OH 86,700.00 13,915.35
OH 96,900.00 1,531.02
OH 107,100.00 888.93
120,154.47

120,150.00

Zak 71,400.00 12,852.00


M3 153,000.00 2,907.00
OH 2,500.00 2,500.00
OH 79,050.00 23,715.00
OH 86,700.00 18,553.80
OH 96,900.00 2,034.90
OH 107,100.00 1,071.00
63,633.70

63,630.00

zak 71,400.00 7,711.20


M3 153,000.00 2,907.00
OH 79,050.00 22,608.30
OH 86,700.00 18,553.80
OH 96,900.00 2,034.90
OH 107,100.00 2,249.10
56,064.30

56,060.00

M3 107,100.00 4,284.00
Kg 23,460.00 11,730.00
OH 76,500.00 76,500.00
OH 91,800.00 275,400.00
OH 96,900.00 29,070.00
OH 107,100.00 5,355.00
402,339.00

402,330.00

m3 198,900.00 3,381.30
org 79,050.00 23,715.00
org 91,800.00 110,160.00
org 96,900.00 11,628.00
org 107,100.00 2,142.00
151,026.30

151,020.00
M2 117,300.00 129,030.00
OH 76,500.00 1,147.50
OH 91,800.00 13,770.00
OH 96,900.00 1,453.50
OH 107,100.00 85.68
145,486.68

145,480.00
M3 7,140,000.00 7,854,000.00
Kg 15,300.00 88,740.00
OH 79,050.00 237,150.00
OH 86,700.00 433,500.00
OH 96,900.00 193,800.00
OH 107,100.00 53,550.00
8,860,740.00

8,860,740.00

M3 7,140,000.00 7,854,000.00
Kg 15,300.00 55,080.00
OH 79,050.00 118,575.00
OH 86,700.00 260,100.00
OH 96,900.00 29,070.00
OH 107,100.00 3,213.00
8,320,038.00

8,320,030.00

btg 46,920.00 656.88


Btg 16,320.00 65,280.00
Kg 15,300.00 3,825.00
OH 79,050.00 11,857.50
OH 91,800.00 13,770.00
OH 96,900.00 969.00
OH 107,100.00 535.50
96,893.88
96,890.00

Bh 55,590.00 55,590.00
OH 76,500.00 12,240.00
OH 86,700.00 7,803.00
OH 96,900.00 969.00
OH 107,100.00 642.60
77,244.60

77,240.00

Bh 4,590.00 18,360.00
Zak 71,400.00 9,310.56
M3 153,000.00 32,130.00
Ls 2,500.00 2,500.00
OH 79,050.00 11,857.50
OH 91,800.00 18,360.00
OH 96,900.00 969.00
OH 107,100.00 1,071.00
94,558.06

94,550.00

Btg 63,750.00 478.13


Kg 17,340.00 173.40
OH 81,600.00 5,712.00
OH 86,700.00 17,340.00
OH 96,900.00 1,938.00
OH 107,100.00 428.40
26,069.93

26,060.00
``
HARGA SATUAN PEKERJAAN

NO URAIAN PEKERJAAN

1 2
1 1 M' PENGUKURAN KEMBALI SITE
2 1 M2 PEK. DIREKSI KEET
3 1M' PEK.PASANGAN BOUWPLANK
4 1 M3 PEK.GALIAN TANAH BIASA
5 1 M3 PASANGAN AANSTAMPING BATU BELAH
6 1 M3 PASANGAN BATU BELAH 1:5
7 1 M3 URUGAN PASIR URUG
8 1 M3 URUGAN TANAH KEMBALI
9 1 M3 PEK.URUGAN TANAH PENINGGIAN LANTAI
10 1 M3 LANTAI KERJA 1PC:3PS:5KRL
11 1 M3 COR BETON K.175
12 1 KG BESI BETON TERPASANG U - 24
13 1 M2 BEKISTING DENGAN PAPAN
14 1 M2 PASANGAN BATA MERAH 1:2(1/2 BATA)
15 1 M2 PLESTERAN DINDING 1:2+ACIAN
1 M2 Pelapis dinding luar Wood plank papan fiber
1 M2 Pelapis dinding luar panel head board
1 M2 Pelapis dinding motif bata ex roman
1 M2 Pelapis dinding roaster
1 M2 Pelapis dinding wall panel wpc
16 1 M3 PEK.KUSEN PINTU DAN JENDELA
17 1 BH PASANG PINTU PVC TOILET
18 1 M2 PEK.DAUN JENDELA (TANPA KACA)
19 1 M2 PEK.KACA 5 MM EX ASHASHI
20 1 PASANG PEMASANGAN ENGSEL PINTU 4"
21 1 PASANG PEMASANGAN ENGSEL JENDELA 3"
22 1 BUAH PEMASANGAN KUNCI 2 SLAAGH
23 1 BUAH PEMASANGAN KUNCI 2 KM/WC
24 1 BUAH PEMASANGAN SLOT PINTU
25 1 BUAH PEMASANGAN TARIKAN JENDELA
26 1 M2 PLAFOND GYPSUM 9 MM RANGKA HOLLOW
27 1 M2 PLAFOND GRC 4mm RANGKA HOLLOW
28 1 M1 PEK.LIST GYPSUM 10 CM
29 1 M' PEK.LIST KAYU 3 CM
30 1 M2 PASANG LANTAI TOILET UK.20x20
31 1 M2 PASANG KERAMIK TILE UK.30x30 LANTAI UTAMA
32 1 M2 PASANG LANTAI KERAMIK TILE UK.30x30 ANTI SLIP(SELASAR)
1 M2 PASANG lantai motif batu alam 50x50 ex uno
1 M2 pasang Rumput sintetis ex sakura trass
33 1 M' PASANG PIPA TYPE AW,DIA 1/2"
34 1 M' PASANG PIPA TYPE AW,DIA 2"
35 1 M' PASANG PIPA TYPE AW,DIA 3"
36 1 BH PEMASANGAN KLOSET DUDUK
37 1 BH PEMASANGAN FLOOR DRAIN
38 1 UNIT PEMASANGAN TANGKI AIR
39 1 UNIT PEMASANGAN POMPA AIR
40 1 UNIT PEMASANGAN POMPA PENDORONG
41 1 BUAH PEK. BAK KONTROL 40 x 40
42 1 UNIT PEK.SEPTICTANK 1,5x1,5x1,5
43 1 UNIT PEK.RESAPAN UK.1x1 t=15
44 1 BH PEMASANGAN KRAN AIR DIA 1/2"
45 1 BH PEMASANGAN KITCHEN SINK
1 BH PEMASANGAN BATHUB
1 BH PEMASANGAN SHOWER
46 1 BH PEMASANGAN WASTAFEL
47 1 M2 PENGECATAN DINDING EX.JOTUN
48 1 M2 PENGECATAN PLAFOND DENGAN CAT TEMBOK EX.JOTUN
49 1 M2 PENGECATAN KAYU EX.F-TALITE
1 M1 PEMASANGAN TITIK KABEL LAMPU
1 BUAH PEMASANGAN TITIK STOP KONTAK
1 BUAH PEMASANGAN TITIK SAKLAR TUNGGAL
1 BUAH PEMASANGAN TITIK SAKLAR GANDA
1 BUAH PEMASANGAN ARMATURE LAMPU DOWNLIGHT LENGKAP LAMPU 8 WATT
1 BUAH PEMASANGAN LAMPU 8 WATT
1 BUAH PEMASANGAN LAMPU 18 WATT
PENAMBAHAN DAYA LISTRIK + 1300 WATT
1 BUAH PEMASANGAN LAMPU 20 WATT
1 BUAH PEMASANGAN LAMPU 25 WATT
1 BUAH PEMASANGAN LAMPU 15 WATT

1 1M' PEK.PASANGAN BOUWPLANK


2 1 M3 PEK.GALIAN TANAH BIASA
3 1 M3 URUGAN TANAH KEMBALI
4 1 M3 URUGAN PASIR URUG
5 1 M3 PEK.URUGAN TANAH PENINGGIAN LANTAI
6 1 M3 LANTAI KERJA 1PC:3PS:5KRL
7 1 M3 COR BETON K.175
8 1 KG BESI BETON TERPASANG U - 24
9 1 M2 BEKISTING DENGAN PAPAN
10 #NAME?
11 1 M3 PASANGAN AANSTAMPING BATU BELAH
12 1 M3 PASANGAN BATU BELAH 1:5
13 #NAME?
14 1 M2 PASANG KERAMIK TILE UK.30x30 LANTAI UTAMA
15 1 M2 PASANG LANTAI KERAMIK TILE UK.30x30 ANTI SLIP(SELASAR)
16 1 M2 PASANG LANTAI TOILET UK.20x20
17 1 M2 PASANGAN BATA MERAH 1:2(1/2 BATA)
18 1 M2 PASANGAN BATA MERAH 1:5(1/2 BATA)
19 1 M2 PLESTERAN DINDING 1:2+ACIAN
20 1 M2 PLESTERAN DINDING 1:5 + ACIAN
21 1 M3 PEK.KUSEN PINTU DAN JENDELA
22 1 M3 PEK.DAUN PINTU PANIL
23 1 BH PASANG PINTU PVC TOILET
24 1 M2 PEK.DAUN JENDELA (TANPA KACA)
25 1 M2 PEK.KACA 3 MM EX ASHASHI
26 1 M2 PEK.KACA 5 MM EX ASHASHI
27 1 PASANG PEMASANGAN ENGSEL PINTU 4"
28 1 PASANG PEMASANGAN ENGSEL JENDELA 3"
29 1 BUAH PEMASANGAN KUNCI 2 SLAAGH
30 1 BUAH PEMASANGAN KUNCI 2 KM/WC
31 1 BUAH PEMASANGAN SLOT PINTU
32 1 BUAH PEMASANGAN TARIKAN JENDELA
33 1 M3 KUDA- KUDA KAYU RASAMALA
34 1 M3 GORDING
35 1 M2 RANGKA ATAP
36 1 M2 PAS. GENTENG MULTI ROOF
37 1 M1 PAS. BUBUNGAN GENTENG BULAT
38 1 M1 PASANGAN LISTPLANK GRC
39 1 M2 PLAFOND GYPSUM 9 MM RANGKA HOLLOW
40 1 M2 PLAFOND GRC 4mm RANGKA HOLLOW
41 1 M1 PEK.LIST GYPSUM 10 CM
42 1 M' PEK.LIST KAYU 3 CM
43 1 M' PASANG PIPA TYPE AW,DIA 2"
44 1 M' PASANG PIPA TYPE AW,DIA 1/2"
45 1 BH PEMASANGAN KRAN AIR DIA 1/2"
46 1 BH PEMASANGAN FLOOR DRAIN
47 1 BH PEMASANGAN KLOSET DUDUK
48 1 UNIT PEMASANGAN TANGKI AIR
49 1 UNIT PEMASANGAN POMPA AIR
50 1 UNIT PEMASANGAN POMPA PENDORONG
51 1 BUAH PEK. BAK KONTROL 40 x 40
52 1 UNIT PEK.SEPTICTANK 1,5x1,5x1,5
53 1 UNIT PEK.RESAPAN UK.1x1 t=15
54 1 M2 PENGECATAN DINDING EX.JOTUN
55 1 M2 PENGECATAN PLAFOND DENGAN CAT TEMBOK EX.JOTUN
56 1 M2 PENGECATAN KAYU EX.F-TALITE
57 1 M1 PEMASANGAN TITIK KABEL LAMPU
58 1 BUAH PEMASANGAN TITIK STOP KONTAK
59 1 BUAH PEMASANGAN TITIK SAKLAR TUNGGAL
60 1 BUAH PEMASANGAN TITIK SAKLAR GANDA

61
1 BUAH PEMASANGAN ARMATURE LAMPU DOWNLIGHT LENGKAP LAMPU 8 WATT
62 1 BUAH PEMASANGAN LAMPU 8 WATT
63 1 BUAH PEMASANGAN LAMPU 18 WATT
64 PENAMBAHAN DAYA LISTRIK + 1300 WATT
JUMLAH

3
2,800.00
380,920.00
20,500.00
38,900.00
387,230.00
775,190.00
206,500.00
22,820.00
113,600.00
769,370.00
1,072,750.00
21,720.00
112,660.00
148,670.00
68,130.00
35,300.00
39,090.00
43,100.00
253,600.00
280,600.00
11,824,620.00
139,710.00
267,850.00
172,050.00
78,850.00
76,850.00
112,500.00
210,180.00
78,770.00
56,780.00
204,640.00
190,000.00
27,270.00
17,170.00
132,490.00
151,660.00
160,550.00
160,550.00
204,880.00
78,110.00
87,190.00
108,970.00
2,081,550.00
347,550.00
1,530,800.00
1,255,800.00
605,800.00
113,740.00
721,360.00
366,790.00
45,180.00
228,620.00
1,461,300.00
294,570.00
1,660,620.00
348,170.00
343,710.00
68,710.00
3,013,800.00
3,013,070.00
43,600.00
53,600.00
118,600.00
78,600.00
108,600.00
1,128,600.00
52,950.00
64,200.00
108,600.00

20,500.00
38,900.00
22,820.00
206,500.00
113,600.00
769,370.00
1,072,750.00
21,720.00
112,660.00
#NAME?
387,230.00
775,190.00
-
151,660.00
160,550.00
132,490.00
125,640.00
120,150.00
63,630.00
56,060.00
11,824,620.00
402,330.00
151,020.00
267,850.00
145,480.00
172,050.00
78,850.00
76,850.00
112,500.00
210,180.00
78,770.00
56,780.00
8,860,740.00
8,320,030.00
96,890.00
77,240.00
94,550.00
26,060.00
204,640.00
190,000.00
27,270.00
17,170.00
87,190.00
78,110.00
45,180.00
347,550.00
2,081,550.00
1,530,800.00
1,255,800.00
605,800.00
113,740.00
721,360.00
366,790.00
348,170.00
343,710.00
68,710.00
3,013,800.00
3,013,070.00
43,600.00
53,600.00
118,600.00

78,600.00
108,600.00
1,128,600.00

Anda mungkin juga menyukai