1 Pek. Beton Sloof Praktis 1.82 m3 Rp 2,750,000.00 Rp 5,002,800.00
2 Pek. Beton Kolom Praktis 0.51 m3
Rp 2,750,000.00 Rp 1,410,750.00
3 Pek. Beton Plat Topi dan atap 6.06 m3 Rp 2,750,000.00 Rp 16,670,500.00
4 Pek. Beton Kolom Struktur Lantai 2 1.37 m3 Rp 4,100,000.00 Rp 5,608,800.00
JUMLAH SUB ITEM Rp 28,692,850.00

IV. PEKERJAAN PASANGAN


1 Pek. Pas. Dinding Bata Merah 173.36 m2 Rp 131,000.00 Rp 22,709,636.00
2 Pek. Plesteran Dinding 346.71 m2
Rp 60,000.00 Rp 20,802,720.00
3 Pek. Acian Dinding 693.42 m2 Rp 30,000.00 Rp 20,802,720.00
4 Pek. Pas. Granit Lantai 60 x 60 Cm 26.74 m2
Rp 350,000.00 Rp 9,359,000.00
JUMLAH SUB ITEM Rp 73,674,076.00

Page 1 of 61
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SATUAN JUMLAH HARGA
PEKERJAAN

V. PEKERJAAN ATAP, PLAFON & KAYU


1 Pek. Waterproofing beton plat atap dengan semen sika 33.15 m2 Rp 85,000.00 Rp 2,817,750.00
2 Pek. Pas. Rangka Atap Baja Ringan 83.16 m2 Rp 165,000.00 Rp 13,721,400.00
3 Pek. Pas. List Plank Conwood 30.91 m' Rp 80,000.00 Rp 2,472,800.00
4 Pek. Pas. Metal roof 101.51 m2 Rp 264,000.00 Rp 26,798,640.00
5 Pek. Pas. Bubungan Genteng 27.61 m' Rp 160,000.00 Rp 4,417,600.00
6 Pek. Pas. Plafond Kalsiboard Rangka Holo 66.48 m2
Rp 120,000.00 Rp 7,977,960.00
7 Pek. Pas. List Plafond Shadow Line 70.97 m' Rp 25,000.00 Rp 1,774,250.00
8 Pek. Pas. Kusen Pintu & Jendela Kayu Jati 33.66 m' Rp 205,000.00 Rp 6,900,300.00
9 Pek. Pas. Daun Pintu Panel Kayu Jati 3.20 m2 Rp 1,300,000.00 Rp 4,160,000.00
10 Pek. Pas. Daun Pintu Alumunium Kaca Bening 3.20 m2 Rp 1,100,000.00 Rp 3,520,000.00
11 Pek. Pas. Daun Jendela Panel Kaca Bening 5.69 m2
Rp 800,000.00 Rp 4,550,400.00
12 Pek. Pas. Kusen Pintu Almunium 10.08 m' Rp 205,000.00 Rp 2,066,400.00
13 Pek. Pas. Kusen Pintu Almunium Sleding 1.00 buah Rp 1,550,000.00 Rp 1,550,000.00
14 Pek. Pas. Jendela Kaca Bening 11.54 m2 Rp 350,000.00 Rp 4,039,056.00
JUMLAH SUB ITEM Rp 86,766,556.00

VII. PEKERJAAN PENGECATAN & FINISHING


1 Pek. Pengecatan Tembok Interior & Exterior Dulux Catylac 173.36 m2 Rp 45,000.00 Rp 7,801,020.00
2 Pek. Pengecatan dinding Waterproofing ex nodrop 173.36 m2 Rp 45,000.00 Rp 7,801,020.00
3 Pek. Pengecatan Plafond ex vinilex 66.48 m2
Rp 40,000.00 Rp 2,659,320.00
4 Pek. Polituran Kusen ex propan water base 33.66 m Rp 100,000.00 Rp 3,366,000.00
5 Pek. Polituran Daun Pintu ex propan water base 6.40 m2 Rp 175,000.00 Rp 1,120,000.00
6 Pek. Polituran Daun Jendela ex propan water base 5.69 m2
Rp 90,000.00 Rp 511,920.00
7 Pek. Polituran List Plank ex propan water base 30.91 m Rp 50,000.00 Rp 1,545,500.00
JUMLAH SUB ITEM Rp 24,804,780.00
JUMLAH TOTAL PEKERJAAN BANGUNAN Rp 213,938,262.00

Page 2 of 61
DAFTAR ANALISA PEKERJAAN

HARGA HARGA HARGA HARGA


NO URAIAN SATUAN UPAH BAHAN JUMLAH
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)


2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK
119 0.0120 m3 Kayu meranti usuk/reng 1,700,000.00 20,400.00
261 0.0200 kg Paku Biasa 15,000.00 300.00
106 0.0070 m3 Kayu bekesting 1,669,333.00 11,685.33
5 0.1000 Hari Tukang kayu 120,000.00 12,000.00
13 0.1000 Hari Pekerja 95,000.00 9,500.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 23,150.00 32,385.33 55,535.33

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


5 0.1000 Hari Tukang kayu 120,000.00 12,000.00
13 0.0500 Hari Pekerja 95,000.00 4,750.00
Total : 16,750.00 16,750.00

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


97 1.0000 btg Bambu sedang 12,000.00 12,000.00
69 0.2500 kg Tali Ijuk 33,000.00 8,250.00
5 0.0170 Hari Tukang kayu 120,000.00 2,040.00
13 0.0020 Hari Pekerja 95,000.00 190.00
2 0.2500 Hari Kepala Tukang 110,000.00 27,500.00
1 0.0130 Hari Mandor 110,000.00 1,430.00
31,160.00 20,250.00 51,410.00

11 1 M3 BONGKARAN BETON BERTULANG


13 6.6670 Hari Pekerja 95,000.00 633,365.00
1 0.3330 Hari Mandor 110,000.00 36,630.00
Total : 669,995.00 669,995.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


13 6.6670 Hari Pekerja 95,000.00 633,365.00
1 0.0330 Hari Mandor 110,000.00 3,630.00
Total : 636,995.00 636,995.00

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 0 S/D 1 METER
13 0.7500 Hari Pekerja 95,000.00 71,250.00
1 0.0250 Hari Mandor 110,000.00 2,750.00
Total : 74,000.00 74,000.00
2 1 M3 GALIAN TANAH BIASA DALAM 1 S/D 2 METER
13 0.9000 Hari Pekerja 95,000.00 85,500.00
1 0.0450 Hari Mandor 110,000.00 4,950.00
Total : 90,450.00 90,450.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


13 1.0000 Hari Pekerja 95,000.00 95,000.00
1 0.0320 Hari Mandor 110,000.00 3,520.00
Total : 98,520.00 98,520.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


13 1.5000 Hari Pekerja 95,000.00 142,500.00
1 0.0600 Hari Mandor 110,000.00 6,600.00
Total : 149,100.00 149,100.00

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


13 1.2000 Hari Pekerja 95,000.00 114,000.00
1 0.0450 Hari Mandor 110,000.00 4,950.00
Total : 118,950.00 118,950.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


13 0.3300 Hari Pekerja 95,000.00 31,350.00
1 0.0100 Hari Mandor 110,000.00 1,100.00
Total : 32,450.00 32,450.00
9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 URUGAN TANAH PENINGGIAN


297 1.2000 m3 Tanah urug 43,750.00 52,500.00
13 0.5000 Hari Pekerja 95,000.00 47,500.00
1 0.0500 Hari Mandor 110,000.00 5,500.00
Total : 53,000.00 52,500.00 105,500.00

11 1 M3 PEMADATAN TANAH ( Per 20 Cm )


13 0.5000 Hari Pekerja 95,000.00 47,500.00
1 0.0500 Hari Mandor 110,000.00 5,500.00
Total : 53,000.00 53,000.00

12 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 100,000.00 120,000.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
1 0.0100 Hari Mandor 110,000.00 1,100.00
Total : 29,600.00 120,000.00 149,600.00

13 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk 24,750.00 148,500.00
13 0.1500 Hari Pekerja 95,000.00 14,250.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 15,900.00 148,500.00 164,400.00

14 1 M3 URUGAN SIRTU
296 1.2000 m3 Sirtu 110,000.00 132,000.00
13 0.2500 Hari Pekerja 95,000.00 23,750.00
1 0.0250 Hari Mandor 110,000.00 2,750.00
Total : 26,500.00 132,000.00 158,500.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


275 1.1000 m3 Batu kali 156,250.00 171,875.00
348 130.0000 kg Semen Conch 40 kg 1,325.00 172,250.00
294 0.5440 m3 Pasir pasang 187,500.00 102,000.00
13 1.5000 Hari Pekerja 95,000.00 142,500.00
4 0.7500 Hari Tukang Batu 120,000.00 90,000.00
2 0.0750 Hari Kepala Tukang 110,000.00 8,250.00
1 0.0750 Hari Mandor 110,000.00 8,250.00
Total : 249,000.00 446,125.00 695,125.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


275 1.1000 m3 Batu kali 156,250.00 171,875.00
346 91.0000 kg Semen Gresik 50 kg 1,300.00 118,300.00
294 0.5840 m3 Pasir pasang 187,500.00 109,500.00
13 1.5000 Hari Pekerja 95,000.00 142,500.00
4 0.7500 Hari Tukang Batu 120,000.00 90,000.00
2 0.0750 Hari Kepala Tukang 110,000.00 8,250.00
1 0.0750 Hari Mandor 110,000.00 8,250.00
Total : 249,000.00 399,675.00 648,675.00
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
275 0.4800 m3 Batu kali 156,250.00 75,000.00
346 194.0000 kg Semen Gresik 50 kg 1,300.00 252,200.00
293 0.3120 m3 Pasir beton 175,000.00 54,600.00
282 0.4680 m3 Koral Beton 312,500.00 146,250.00
350 126.0000 kg Besi beton 10,000.00 1,260,000.00
352 1.8000 kg Kawat beton RRT 12,333.00 22,199.40
13 3.4000 Hari Pekerja 95,000.00 323,000.00
4 0.8500 Hari Tukang Batu 120,000.00 102,000.00
2 0.0850 Hari Kepala Tukang 110,000.00 9,350.00
1 0.1700 Hari Mandor 110,000.00 18,700.00
453,050.00 1,810,249.40 2,263,299.40

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


275 0.4500 m3 Batu kali 156,250.00 70,312.50
346 194.0000 kg Semen Gresik 50 kg 1,300.00 252,200.00
304 0.3120 m1 Pipa Galvanis 2" 160,000.00 49,920.00
282 0.4680 m3 Koral Beton 312,500.00 146,250.00
13 2.4000 Hari Pekerja 95,000.00 228,000.00
4 0.8000 Hari Tukang Batu 120,000.00 96,000.00
2 0.0800 Hari Kepala Tukang 110,000.00 8,800.00
1 0.1190 Hari Mandor 110,000.00 13,090.00
Total : 345,890.00 518,682.50 864,572.50

8 1 M3 PASANGAN BATU KOSONG


275 1.2000 m3 Batu kali 156,250.00 187,500.00
295 0.4320 m3 Pasir urug 100,000.00 43,200.00
13 0.7800 Hari Pekerja 95,000.00 74,100.00
4 0.3900 Hari Tukang Batu 120,000.00 46,800.00
2 0.0390 Hari Kepala Tukang 110,000.00 4,290.00
1 0.0390 Hari Mandor 110,000.00 4,290.00
Total : 129,480.00 230,700.00 360,180.00

IV PEKERJAAN DINDING (SNI 6897 : 2008)


6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
273 70.0000 bj Bata pasang klas I 1,000.00 70,000.00
346 18.9500 kg Semen Gresik 50 kg 1,300.00 24,635.00
294 0.0380 m3 Pasir pasang 187,500.00 7,125.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
43,250.00 101,760.00 145,010.00

7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS


273 70.0000 bj Bata pasang klas I 1,000.00 70,000.00
346 14.3700 kg Semen Gresik 50 kg 1,300.00 18,681.00
294 0.0400 m3 Pasir pasang 187,500.00 7,500.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 43,250.00 96,181.00 139,431.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


273 70.0000 bj Bata pasang klas I 1,000.00 70,000.00
345 9.6800 kg Semen Gresik 40 kg 1,350.00 13,068.00
294 0.0450 m3 Pasir pasang 187,500.00 8,437.50
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 43,250.00 91,505.50 134,755.50

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


273 70.0000 bj Bata pasang klas I 1,000.00 70,000.00
345 6.5000 kg Semen Gresik 40 kg 1,350.00 8,775.00
294 0.0500 m3 Pasir pasang 187,500.00 9,375.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 43,250.00 88,150.00 131,400.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


274 12.5000 bj Batako kelas I 2,800.00 35,000.00
346 7.5000 kg Semen Gresik 50 kg 1,300.00 9,750.00
294 0.0270 m3 Pasir pasang 187,500.00 5,062.50
350 1.9500 kg Besi beton 10,000.00 19,500.00
13 0.3200 Hari Pekerja 95,000.00 30,400.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 45,150.00 69,312.50 114,462.50

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


274 15.0000 bj Batako kelas I 2,800.00 42,000.00
346 7.5000 kg Semen Gresik 50 kg 1,300.00 9,750.00
294 0.0270 m3 Pasir pasang 187,500.00 5,062.50
13 0.3200 Hari Pekerja 95,000.00 30,400.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 45,150.00 56,812.50 101,962.50
14 1 M2 PASANGAN DINDING GLASS BLOCK (10 x 20 x 20) CM
280 27.5000 bj Glass block 20,000.00 550,000.00
346 12.8000 kg Semen Gresik 50 kg 1,300.00 16,640.00
294 0.0350 m3 Pasir pasang 187,500.00 6,562.50
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 43,250.00 573,202.50 616,452.50

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM


345 10.2240 kg Semen Gresik 40 kg 1,350.00 13,802.40
294 0.0200 m3 Pasir pasang 187,500.00 3,750.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1500 Hari Tukang Batu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 49,800.00 17,552.40 67,352.40

2 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


345 7.7760 kg Semen Gresik 40 kg 1,350.00 10,497.60
294 0.0230 m3 Pasir pasang 187,500.00 4,312.50
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1500 Hari Tukang Batu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 49,800.00 14,810.10 64,610.10

3 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


345 5.1840 kg Semen Gresik 40 kg 1,350.00 6,998.40
294 0.0260 m3 Pasir pasang 187,500.00 4,875.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1500 Hari Tukang Batu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 49,800.00 11,873.40 61,673.40

4 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


345 3.4560 kg Semen Gresik 40 kg 1,350.00 4,665.60
294 0.0290 m3 Pasir pasang 187,500.00 5,437.50
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1500 Hari Tukang Batu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 49,800.00 10,103.10 59,903.10
5 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM
346 13.6320 kg Semen Gresik 50 kg 1,300.00 17,721.60
294 0.0270 m3 Pasir pasang 187,500.00 5,062.50
13 0.4000 Hari Pekerja 95,000.00 38,000.00
4 0.2000 Hari Tukang Batu 120,000.00 24,000.00
2 0.0200 Hari Kepala Tukang 110,000.00 2,200.00
1 0.0220 Hari Mandor 110,000.00 2,420.00
Total : 66,620.00 22,784.10 89,404.10

6 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


346 10.3680 kg Semen Gresik 50 kg 1,300.00 13,478.40
294 0.0310 m3 Pasir pasang 187,500.00 5,812.50
13 0.4000 Hari Pekerja 95,000.00 38,000.00
4 0.2000 Hari Tukang Batu 120,000.00 24,000.00
2 0.0200 Hari Kepala Tukang 110,000.00 2,200.00
1 0.0130 Hari Mandor 110,000.00 1,430.00
Total : 65,630.00 19,290.90 84,920.90

7 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM


346 6.9120 kg Semen Gresik 50 kg 1,300.00 8,985.60
294 0.0350 m3 Pasir pasang 187,500.00 6,562.50
13 0.4000 Hari Pekerja 95,000.00 38,000.00
4 0.2000 Hari Tukang Batu 120,000.00 24,000.00
2 0.0200 Hari Kepala Tukang 110,000.00 2,200.00
1 0.0220 Hari Mandor 110,000.00 2,420.00
Total : 66,620.00 15,548.10 82,168.10

8 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


346 0.5000 kg Semen Gresik 50 kg 1,300.00 650.00
294 0.0130 m3 Pasir pasang 187,500.00 2,437.50
13 0.0800 Hari Pekerja 95,000.00 7,600.00
4 0.4000 Hari Tukang Batu 120,000.00 48,000.00
2 0.0400 Hari Kepala Tukang 110,000.00 4,400.00
1 0.0040 Hari Mandor 110,000.00 440.00
Total : 60,440.00 3,087.50 63,527.50

9 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
346 4.3200 kg Semen Gresik 50 kg 1,300.00 5,616.00
294 0.0060 m3 Pasir pasang 187,500.00 1,125.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 43,250.00 6,741.00 49,991.00

10 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')


346 1.6000 kg Semen Gresik 50 kg 1,300.00 2,080.00
13 0.0700 Hari Pekerja 95,000.00 6,650.00
4 0.0350 Hari Tukang Batu 120,000.00 4,200.00
2 0.0040 Hari Kepala Tukang 110,000.00 440.00
1 0.0040 Hari Mandor 110,000.00 440.00
Total : 11,730.00 2,080.00 13,810.00

11 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS


345 6.3400 kg Semen Gresik 40 kg 1,350.00 8,559.00
294 0.0120 m3 Pasir pasang 187,500.00 2,250.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.1500 Hari Tukang Batu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0150 Hari Mandor 110,000.00 1,650.00
Total : 49,800.00 10,809.00 60,609.00
12 1 M2 PEKERJAAN ACIAN
345 3.2500 kg Semen Gresik 40 kg 1,350.00 4,387.50
13 0.3000 Hari Pekerja 95,000.00 28,500.00
4 0.2000 Hari Tukang Batu 120,000.00 24,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0100 Hari Mandor 110,000.00 1,100.00
Total : 26,200.00 4,387.50 30,587.50

13 1 M1 PEKERJAAN BENANGAN
346 0.7200 kg Semen Gresik 50 kg 1,300.00 936.00
4 0.1500 Hari Tukang Batu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0035 Hari Mandor 110,000.00 385.00
Total : 20,035.00 936.00 20,971.00

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M1 KUSEN PINTU DAN JENDELA KAYU KAMPER
112 0.0090 m3 Kayu kamper balok 7,500,000.00 67,500.00
261 0.1250 kg Paku Biasa 15,000.00 1,875.00
127 0.1000 ltr Lem Kayu 12,500.00 1,250.00
13 0.7000 Hari Pekerja 95,000.00 66,500.00
4 1.5000 Hari Tukang Batu 120,000.00 180,000.00
2 0.1500 Hari Kepala Tukang 110,000.00 16,500.00
1 0.0350 Hari Mandor 110,000.00 3,850.00
Total : 266,850.00 70,625.00 337,475.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU PANIL KAMPER


114 0.0400 m3 Kayu kamper papan 8,000,000.00 320,000.00
127 0.0500 ltr Lem Kayu 12,500.00 625.00
13 0.3500 Hari Pekerja 95,000.00 33,250.00
5 1.0500 Hari Tukang kayu 120,000.00 126,000.00
2 0.1050 Hari Kepala Tukang 110,000.00 11,550.00
1 0.0180 Hari Mandor 110,000.00 1,980.00
Total : 172,780.00 320,625.00 493,405.00

6 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II
114 0.0106 m3 Kayu kamper papan 8,000,000.00 85,155.84
127 0.3000 ltr Lem Kayu 12,500.00 3,750.00
77 0.7788 m2 Kaca 5 mm bening 65,000.00 50,622.00
13 0.8000 Hari Pekerja 95,000.00 76,000.00
5 2.4000 Hari Tukang kayu 120,000.00 288,000.00
2 0.2400 Hari Kepala Tukang 110,000.00 26,400.00
1 0.0400 Hari Mandor 110,000.00 4,400.00
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KAMPER
114 0.0150 m3 Kayu kamper papan 8,000,000.00 120,000.00
261 0.1000 kg Paku Biasa 15,000.00 1,500.00
13 0.1000 Hari Pekerja 95,000.00 9,500.00
5 0.2000 Hari Tukang kayu 120,000.00 24,000.00
2 0.0200 Hari Kepala Tukang 110,000.00 2,200.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 36,250.00 121,500.00 157,750.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II


114 0.0110 m3 Kayu kamper papan 8,000,000.00 88,000.00
261 0.0500 kg Paku Biasa 15,000.00 750.00
13 0.1000 Hari Pekerja 95,000.00 9,500.00
5 0.2000 Hari Tukang kayu 120,000.00 24,000.00
2 0.0200 Hari Kepala Tukang 110,000.00 2,200.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 36,250.00 88,750.00 125,000.00
VII PEKERJAAN BETON ( SNI 7394:2008)
1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
345 218.0000 kg Semen Gresik 40 kg 1,350.00 294,300.00
293 0.5200 m3 Pasir beton 175,000.00 91,000.00
282 0.8700 m3 Koral Beton 312,500.00 271,875.00
13 1.6500 Hari Pekerja 95,000.00 156,750.00
4 0.2500 Hari Tukang Batu 120,000.00 30,000.00
2 0.0250 Hari Kepala Tukang 110,000.00 2,750.00
1 0.0800 Hari Mandor 110,000.00 8,800.00
198,300.00 657,175.00 855,475.00

2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 4 KR
346 232.0000 kg Semen Gresik 50 kg 1,300.00 301,600.00
293 0.5200 m3 Pasir beton 175,000.00 91,000.00
282 0.7800 m3 Koral Beton 312,500.00 243,750.00
13 1.6500 Hari Pekerja 95,000.00 156,750.00
4 0.2500 Hari Tukang Batu 120,000.00 30,000.00
2 0.0250 Hari Kepala Tukang 110,000.00 2,750.00
1 0.0800 Hari Mandor 110,000.00 8,800.00
Total : 198,300.00 636,350.00 834,650.00

3 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
346 280.0000 kg Semen Gresik 50 kg 1,300.00 364,000.00
293 0.4500 m3 Pasir beton 175,000.00 78,750.00
282 0.9000 m3 Koral Beton 312,500.00 281,250.00
13 1.6500 Hari Pekerja 95,000.00 156,750.00
4 0.2500 Hari Tukang Batu 120,000.00 30,000.00
2 0.0250 Hari Kepala Tukang 110,000.00 2,750.00
1 0.0800 Hari Mandor 110,000.00 8,800.00
Total : 198,300.00 724,000.00 922,300.00

4 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


350 10.5000 kg Besi beton 10,000.00 105,000.00
352 0.1500 kg Kawat beton RRT 12,333.00 1,849.95
13 0.0700 Hari Pekerja 95,000.00 6,650.00
6 0.0700 Hari Tukang Besi 100,000.00 7,000.00
2 0.0070 Hari Kepala Tukang 110,000.00 770.00
1 0.0040 Hari Mandor 110,000.00 440.00
Total : 14,860.00 106,849.95 121,709.95

5 1 M2 PASANG BEKISTING UNTUK PONDASI


106 0.0400 m3 Kayu bekesting 1,669,333.00 66,773.32
261 0.3000 kg Paku Biasa 15,000.00 4,500.00
129 0.1000 ltr Minyak bekisting 13,750.00 1,375.00
13 0.5200 Hari Pekerja 95,000.00 49,400.00
5 0.2600 Hari Tukang kayu 120,000.00 31,200.00
2 0.0260 Hari Kepala Tukang 110,000.00 2,860.00
1 0.0260 Hari Mandor 110,000.00 2,860.00
Total : 86,320.00 72,648.32 158,968.32
6 1 M2 PASANG BEKISTING UNTUK SLOOF
106 0.0400 m3 Kayu bekesting 1,669,333.00 66,773.32
261 0.3000 kg Paku Biasa 15,000.00 4,500.00
129 0.1000 ltr Minyak bekisting 13,750.00 1,375.00
13 0.5200 Hari Pekerja 95,000.00 49,400.00
5 0.2600 Hari Tukang kayu 120,000.00 31,200.00
2 0.0260 Hari Kepala Tukang 110,000.00 2,860.00
1 0.0260 Hari Mandor 110,000.00 2,860.00
Total : 86,320.00 72,648.32 158,968.32

7 1 M2 PASANG BEKISTING UNTUK KOLOM


106 0.0400 m3 Kayu bekesting 1,669,333.00 66,773.32
261 0.4000 kg Paku Biasa 15,000.00 6,000.00
129 0.2000 ltr Minyak bekisting 13,750.00 2,750.00
119 0.0150 m3 Kayu meranti usuk/reng 1,700,000.00 25,500.00
138 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50
109 2.0000 btg Kayu dolken (pekerjaan sementara) 120,000.00 240,000.00
13 0.6600 Hari Pekerja 95,000.00 62,700.00
5 0.3300 Hari Tukang kayu 120,000.00 39,600.00
2 0.0330 Hari Kepala Tukang 110,000.00 3,630.00
1 0.0330 Hari Mandor 110,000.00 3,630.00
Total : 109,560.00 377,860.82 487,420.82

8 1 M2 PASANG BEKISTING UNTUK BALOK


106 0.0400 m3 Kayu bekesting 1,669,333.00 66,773.32
261 0.4000 kg Paku Biasa 15,000.00 6,000.00
129 0.2000 ltr Minyak bekisting 13,750.00 2,750.00
119 0.0180 m3 Kayu meranti usuk/reng 1,700,000.00 30,600.00
138 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50
109 2.0000 btg Kayu dolken (pekerjaan sementara) 120,000.00 240,000.00
13 0.6600 Hari Pekerja 95,000.00 62,700.00
5 0.3300 Hari Tukang kayu 120,000.00 39,600.00
2 0.0330 Hari Kepala Tukang 110,000.00 3,630.00
1 0.0330 Hari Mandor 110,000.00 3,630.00
Total : 109,560.00 382,960.82 492,520.82

9 1 M2 PASANG BEKISTING UNTUK LANTAI


106 0.0400 m3 Kayu bekesting 1,669,333.00 66,773.32
261 0.4000 kg Paku Biasa 15,000.00 6,000.00
129 0.2000 ltr Minyak bekisting 13,750.00 2,750.00
119 0.0150 m3 Kayu meranti usuk/reng 1,700,000.00 25,500.00
138 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50
109 3.0000 btg Kayu dolken (pekerjaan sementara) 120,000.00 360,000.00
13 0.6600 Hari Pekerja 95,000.00 62,700.00
5 0.3300 Hari Tukang kayu 120,000.00 39,600.00
2 0.0330 Hari Kepala Tukang 110,000.00 3,630.00
1 0.0330 Hari Mandor 110,000.00 3,630.00
Total : 109,560.00 497,860.82 607,420.82

10 1 M2 PASANG BEKISTING UNTUK DINDING


106 0.0300 m3 Kayu bekesting 1,669,333.00 50,079.99
261 0.4000 kg Paku Biasa 15,000.00 6,000.00
129 0.2000 ltr Minyak bekisting 13,750.00 2,750.00
119 0.0200 m3 Kayu meranti usuk/reng 1,700,000.00 34,000.00
138 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50
109 3.0000 btg Kayu dolken (pekerjaan sementara) 120,000.00 360,000.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00 8,000.00
13 0.6600 Hari Pekerja 95,000.00 62,700.00
5 0.3300 Hari Tukang kayu 120,000.00 39,600.00
2 0.0330 Hari Kepala Tukang 110,000.00 3,630.00
1 0.0330 Hari Mandor 110,000.00 3,630.00
109,560.00 497,667.49 607,227.49

11 1 M2 PASANG BEKISTING UNTUK TANGGA


106 0.0300 m3 Kayu bekesting 1,669,333.00 50,079.99
261 0.4000 kg Paku Biasa 15,000.00 6,000.00
129 0.1500 ltr Minyak bekisting 13,750.00 2,062.50
119 0.0150 m3 Kayu meranti usuk/reng 1,700,000.00 25,500.00
138 0.3500 lbr Plywood 9 mm 105,250.00 36,837.50
109 2.0000 btg Kayu dolken (pekerjaan sementara) 120,000.00 240,000.00
13 0.6600 Hari Pekerja 95,000.00 62,700.00
5 0.3300 Hari Tukang kayu 120,000.00 39,600.00
2 0.0330 Hari Kepala Tukang 110,000.00 3,630.00
1 0.0330 Hari Mandor 110,000.00 3,630.00
Total : 109,560.00 360,479.99 470,039.99
VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)
1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
50 25.0000 bj Genteng Kodok Karang Pilang (Good Year) isi 20/m2 4,500.00 112,500.00
13 0.1500 Hari Pekerja 95,000.00 14,250.00
5 0.0600 Hari Tukang kayu 120,000.00 7,200.00
2 0.0060 Hari Kepala Tukang 110,000.00 660.00
1 0.0080 Hari Mandor 110,000.00 880.00
Total : 22,990.00 112,500.00 135,490.00
2 1 M2 PEKERJAAN ATAP GENTENG BETON CISANGKAN
57 11.0000 bj Genteng Beton Cisangkan isi 10/m2 8,750.00 96,250.00
13 0.1500 Hari Pekerja 95,000.00 14,250.00
5 0.0600 Hari Tukang kayu 120,000.00 7,200.00
2 0.0060 Hari Kepala Tukang 110,000.00 660.00
1 0.0080 Hari Mandor 110,000.00 880.00
Total : 22,990.00 96,250.00 119,240.00
3 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
55 25.0000 bj Genteng plentong dicat 2,200.00 55,000.00
13 0.1500 Hari Pekerja 95,000.00 14,250.00
5 0.0600 Hari Tukang kayu 120,000.00 7,200.00
2 0.0060 Hari Kepala Tukang 110,000.00 660.00
1 0.0080 Hari Mandor 110,000.00 880.00
Total : 22,990.00 55,000.00 77,990.00
4 1 M1 PASANG BUBUNGAN GENTENG PLENTONG
43 5.0000 bj Bubungan Karang Pilang isi 3,5/m 27,500.00 137,500.00
348 8.0000 kg Semen Conch 40 kg 1,325.00 10,600.00
294 0.0320 m3 Pasir pasang 187,500.00 6,000.00
13 0.4000 Hari Pekerja 95,000.00 38,000.00
5 0.2000 Hari Tukang kayu 120,000.00 24,000.00
2 0.0200 Hari Kepala Tukang 110,000.00 2,200.00
1 0.0020 Hari Mandor 110,000.00 220.00
Total : 64,420.00 154,100.00 218,520.00
IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)
1 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM
268 0.1100 kg Paku skrup 1/2" 16,500.00 1,815.00
103 0.3640 lbr Gypsum Board 60,000.00 21,840.00
13 0.1000 Hari Pekerja 95,000.00 9,500.00
5 0.0500 Hari Tukang kayu 120,000.00 6,000.00
2 0.0050 Hari Kepala Tukang 110,000.00 550.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 16,600.00 23,655.00 40,255.00

2 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


268 0.1100 kg Paku skrup 1/2" 16,500.00 1,815.00
105 0.3640 lbr Kalsiboard 4,5 mm 70,000.00 25,480.00
13 0.1000 Hari Pekerja 95,000.00 9,500.00
5 0.0500 Hari Tukang kayu 120,000.00 6,000.00
2 0.0050 Hari Kepala Tukang 110,000.00 550.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 16,600.00 27,295.00 43,895.00

3 1 M1 PASANG LIST GYPSUM


268 0.1000 kg Paku skrup 1/2" 16,500.00 1,650.00
128 1.1000 m' List Gypsum standar 16,500.00 18,150.00
13 0.1000 Hari Pekerja 95,000.00 9,500.00
5 0.0500 Hari Tukang kayu 120,000.00 6,000.00
2 0.0050 Hari Kepala Tukang 110,000.00 550.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 16,600.00 19,800.00 36,400.00

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
229 1.0000 bh Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT 1,950,000.00 1,950,000.00
6% x harga kloset Perlengkapan 117,000.00
13 3.3000 Hari Pekerja 95,000.00 313,500.00
4 1.1000 Hari Tukang Batu 120,000.00 132,000.00
2 0.0010 Hari Kepala Tukang 110,000.00 110.00
1 0.1600 Hari Mandor 110,000.00 17,600.00
Total : 463,210.00 2,067,000.00 2,530,210.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


238 1.0000 bh Kloset porselin jongkok Ina (standar) 130,000.00 130,000.00
346 6.0000 kg Semen Gresik 50 kg 1,300.00 7,800.00
294 0.0100 m3 Pasir pasang 187,500.00 1,875.00
13 1.0000 Hari Pekerja 95,000.00 95,000.00
4 1.5000 Hari Tukang Batu 120,000.00 180,000.00
2 1.5000 Hari Kepala Tukang 110,000.00 165,000.00
1 0.1600 Hari Mandor 110,000.00 17,600.00
Total : 457,600.00 139,675.00 597,275.00
3 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3
218 1.0000 bh Bak mandi fibre glass 70x70x66 cm 190,000.00 190,000.00
18% x harga wast Perlengkapan 34,200.00
13 1.8000 Hari Pekerja 95,000.00 171,000.00
4 2.7000 Hari Tukang Batu 120,000.00 324,000.00
2 0.5400 Hari Kepala Tukang 110,000.00 59,400.00
1 0.1100 Hari Mandor 110,000.00 12,100.00
Total : 566,500.00 224,200.00 790,700.00

4 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "


299 1.2000 m1 Pipa Galvanis 3/4" 55,000.00 66,000.00
35% x harga pipa Perlengkapan 19,250.00
13 0.0540 Hari Pekerja 95,000.00 5,130.00
4 0.0900 Hari Tukang Batu 120,000.00 10,800.00
2 0.0090 Hari Kepala Tukang 110,000.00 990.00
1 0.0270 Hari Mandor 110,000.00 2,970.00
Total : 19,890.00 85,250.00 105,140.00

5 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"


317 0.3000 ljr Pipa Maspion AW 3/4 25,700.00 7,710.00
35% x harga pipa Perlengkapan 8,995.00
13 0.0360 Hari Pekerja 95,000.00 3,420.00
4 0.0600 Hari Tukang Batu 120,000.00 7,200.00
2 0.0060 Hari Kepala Tukang 110,000.00 660.00
1 0.0018 Hari Mandor 110,000.00 198.00
Total : 11,478.00 16,705.00 28,183.00

6 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


239 1.0000 bh Kran biasa 18,150.00 18,150.00
250 0.0250 bh Seal tape 3,300.00 82.50
13 0.0100 Hari Pekerja 95,000.00 950.00
4 0.1000 Hari Tukang Batu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 14,600.00 18,232.50 32,832.50
XII PEKERJAAN KUNCI DAN KACA (SNI 2002)
1 1 BH PASANG KUNCI TANAM BIASA
95 1.0000 bh Kunci tanam 2 slag 104,500.00 104,500.00
13 0.0100 Hari Pekerja 95,000.00 950.00
5 0.5000 Hari Tukang kayu 120,000.00 60,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 62,600.00 104,500.00 167,100.00

2 1 PS PASANG ENGSEL PINTU


72 1.0000 ps Engsel nylon 12,700.00 12,700.00
13 0.0150 Hari Pekerja 95,000.00 1,425.00
5 0.1500 Hari Tukang kayu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0008 Hari Mandor 110,000.00 88.00
Total : 21,163.00 12,700.00 33,863.00

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


71 1.0000 ps Engsel kupu-kupu 9,000.00 9,000.00
13 0.0100 Hari Pekerja 95,000.00 950.00
5 0.1000 Hari Tukang kayu 120,000.00 12,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0005 Hari Mandor 110,000.00 55.00
Total : 14,105.00 9,000.00 23,105.00

4 1 BH PASANG KAIT ANGIN


88 1.0000 bh Kait angin biasa 10,300.00 10,300.00
13 0.0150 Hari Pekerja 95,000.00 1,425.00
5 0.1500 Hari Tukang kayu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0008 Hari Mandor 110,000.00 88.00
Total : 21,163.00 10,300.00 31,463.00

5 1 BH PASANG KUNCI SLOT


94 1.0000 bh Kunci slot 88,000.00 88,000.00
13 0.0200 Hari Pekerja 95,000.00 1,900.00
5 0.2000 Hari Tukang kayu 120,000.00 24,000.00
2 0.0200 Hari Kepala Tukang 110,000.00 2,200.00
1 0.0010 Hari Mandor 110,000.00 110.00
Total : 28,210.00 88,000.00 116,210.00
6 1 M2 PASANG KACA, TEBAL 5 MM
77 1.1000 m2 Kaca 5 mm bening 65,000.00 71,500.00
13 0.0150 Hari Pekerja 95,000.00 1,425.00
5 0.1500 Hari Tukang kayu 120,000.00 18,000.00
2 0.0150 Hari Kepala Tukang 110,000.00 1,650.00
1 0.0008 Hari Mandor 110,000.00 88.00
Total : 21,163.00 71,500.00 92,663.00

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)

1 1 M2 PASANG LANTAI GRANIT 60 X 60 CM POLISH


195 1.1000 m2 Granit Sincere 60 x 60 Cm Warna Cream Muda 100,000.00 110,000.00
345 10.0000 kg Semen Gresik 40 kg 1,350.00 13,500.00
294 0.0450 m3 Pasir pasang 187,500.00 8,437.50
349 1.5000 kg Semen warna/semen grouting 11,000.00 16,500.00
13 0.7000 Hari Pekerja 95,000.00 66,500.00
4 0.3500 Hari Tukang Batu 120,000.00 42,000.00
2 0.0350 Hari Kepala Tukang 110,000.00 3,850.00
1 0.0350 Hari Mandor 110,000.00 3,850.00
Total : 116,200.00 148,437.50 264,637.50

2 1 M2 PASANG LANTAI GRANIT 15 X 60 CM POLISH


197 1.1000 m2 Granit Niro granite 15 x 60 Cm Motif kayu 270,000.00 297,000.00
345 10.4000 kg Semen Gresik 40 kg 1,350.00 14,040.00
294 0.0450 m3 Pasir pasang 187,500.00 8,437.50
349 1.6200 kg Semen warna/semen grouting 11,000.00 17,820.00
13 0.7000 Hari Pekerja 95,000.00 66,500.00
4 0.4000 Hari Tukang Batu 120,000.00 48,000.00
2 0.0350 Hari Kepala Tukang 110,000.00 3,850.00
1 0.0350 Hari Mandor 110,000.00 3,850.00
Total : 122,200.00 337,297.50 459,497.50

3 1 M2 PASANG DINDING GRANIT 60 X 60 CM POLISH


196 1.1000 m2 Granit Sincere 60 x 60 Cm Warna Cream Tua 105,000.00 115,500.00
345 9.3000 kg Semen Gresik 40 kg 1,350.00 12,555.00
294 0.0180 m3 Pasir pasang 187,500.00 3,375.00
349 1.9400 kg Semen warna/semen grouting 11,000.00 21,340.00
13 0.9000 Hari Pekerja 95,000.00 85,500.00
4 0.4500 Hari Tukang Batu 120,000.00 54,000.00
2 0.0450 Hari Kepala Tukang 110,000.00 4,950.00
1 0.0450 Hari Mandor 110,000.00 4,950.00
Total : 149,400.00 152,770.00 302,170.00
4 1 M1 PASANG PLIN GRANIT 10 X 60 CM
195 0.1200 m2 Granit Sincere 60 x 60 Cm Warna Cream Muda 100,000.00 12,000.00
345 1.1400 kg Semen Gresik 40 kg 1,350.00 1,539.00
294 0.0030 m3 Pasir pasang 187,500.00 562.50
349 0.1000 kg Semen warna/semen grouting 11,000.00 1,100.00
13 0.0900 Hari Pekerja 95,000.00 8,550.00
4 0.0900 Hari Tukang Batu 120,000.00 10,800.00
2 0.0090 Hari Kepala Tukang 110,000.00 990.00
1 0.0050 Hari Mandor 110,000.00 550.00
Total : 20,890.00 15,201.50 36,091.50
5 1 M2 PASANG DINDING KERAMIK 20 X 40 CM POLISH
199 1.1000 m2 Keramik PlatinumTile 20 x 40 kelas I warna muda 85,000.00 93,500.00
345 9.3000 kg Semen Gresik 40 kg 1,350.00 12,555.00
294 0.0180 m3 Pasir pasang 187,500.00 3,375.00
349 1.9400 kg Semen warna/semen grouting 11,000.00 21,340.00
13 0.9000 Hari Pekerja 95,000.00 85,500.00
4 0.4500 Hari Tukang Batu 120,000.00 54,000.00
2 0.0450 Hari Kepala Tukang 110,000.00 4,950.00
1 0.0450 Hari Mandor 110,000.00 4,950.00
Total : 149,400.00 130,770.00 280,170.00
5 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM
198 1.1000 m2 Keramik Platinum 30 x 30 Cm Warna Cream Tua 80,000.00 88,000.00
345 10.0000 kg Semen Gresik 40 kg 1,350.00 13,500.00
294 0.0450 m3 Pasir pasang 187,500.00 8,437.50
349 0.5000 kg Semen warna/semen grouting 11,000.00 5,500.00
13 0.5000 Hari Pekerja 95,000.00 47,500.00
4 0.3000 Hari Tukang Batu 120,000.00 36,000.00
2 0.0350 Hari Kepala Tukang 110,000.00 3,850.00
1 0.0350 Hari Mandor 110,000.00 3,850.00
Total : 91,200.00 115,437.50 206,637.50

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
6 0.2000 kg Cat menie kayu 16,000.00 3,200.00
15 0.1500 ltr Dempul 26,235.00 3,935.25
3 0.1700 kg Cat dasar 19,000.00 3,230.00
4 0.2600 kg Cat emco 40,000.00 10,400.00
13 0.0700 Hari Pekerja 95,000.00 6,650.00
7 0.0090 Hari Tukang cat 100,000.00 900.00
2 0.0060 Hari Kepala Tukang 110,000.00 660.00
1 0.0025 Hari Mandor 110,000.00 275.00
Total : 8,485.00 20,765.25 29,250.25
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS
22 0.1500 ltr Politur vernis 35,000.00 5,250.00
15 0.0500 ltr Dempul 26,235.00 1,311.75
1 0.1000 lbr Amplas 2,500.00 250.00
16 0.0100 bh Kuas 5,000.00 50.00
13 0.1600 Hari Pekerja 95,000.00 15,200.00
7 0.1600 Hari Tukang cat 100,000.00 16,000.00
2 0.0160 Hari Kepala Tukang 110,000.00 1,760.00
1 0.0025 Hari Mandor 110,000.00 275.00
Total : 33,235.00 6,861.75 40,096.75
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
20 0.1000 kg Plamir tembok 15,000.00 1,500.00
3 0.1000 kg Cat dasar 19,000.00 1,900.00
13 0.2600 kg Cat tembok Vinilex 19,305.00 5,019.30
13 0.0200 Hari Pekerja 95,000.00 1,900.00
7 0.0630 Hari Tukang cat 100,000.00 6,300.00
2 0.0063 Hari Kepala Tukang 110,000.00 693.00
1 0.0025 Hari Mandor 110,000.00 275.00
Total : 9,168.00 8,419.30 17,587.30

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


3 0.1200 kg Cat dasar 19,000.00 2,280.00
13 0.1800 kg Cat tembok Vinilex 19,305.00 3,474.90
13 0.0280 Hari Pekerja 95,000.00 2,660.00
7 0.0420 Hari Tukang cat 100,000.00 4,200.00
2 0.0042 Hari Kepala Tukang 110,000.00 462.00
1 0.0025 Hari Mandor 110,000.00 275.00
Total : 7,597.00 5,754.90 13,351.90

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


21 0.5220 ltr Politur ultra 42,000.00 21,924.00
1 2.0000 lbr Amplas 2,500.00 5,000.00
13 0.2000 Hari Pekerja 95,000.00 19,000.00
7 0.2000 Hari Tukang cat 100,000.00 20,000.00
2 0.0160 Hari Kepala Tukang 110,000.00 1,760.00
1 0.0025 Hari Mandor 110,000.00 275.00

Total : 41,035.00 26,924.00 67,959.00

8 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) CAT DULUX
20 0.1000 kg Plamir tembok 15,000.00 1,500.00
3 0.1000 kg Cat dasar 19,000.00 1,900.00
8 0.3000 kg Cat tembok Dulux 23,000.00 6,900.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
7 0.1000 Hari Tukang cat 100,000.00 10,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0025 Hari Mandor 110,000.00 275.00
Total : 39,875.00 10,300.00 50,175.00

9 1 M2 PENGECATAN TEMBOK BARU EXTERIOR (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) CAT DULUX WHEATERSHIELD
20 0.1000 kg Plamir tembok 15,000.00 1,500.00
3 0.1000 kg Cat dasar 19,000.00 1,900.00
9 0.3000 kg Cat tembok Dulux Wheatershield 28,000.00 8,400.00
13 0.3000 Hari Pekerja 95,000.00 28,500.00
7 0.1000 Hari Tukang cat 100,000.00 10,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0025 Hari Mandor 110,000.00 275.00
Total : 39,875.00 11,800.00 51,675.00

10 1 M1 PENGECATAN LIST PLAFOND


20 0.0300 kg Plamir tembok 15,000.00 450.00
3 0.0300 kg Cat dasar 19,000.00 570.00
13 0.1500 kg Cat tembok Vinilex 19,305.00 2,895.75
13 0.1000 Hari Pekerja 95,000.00 9,500.00
7 0.0500 Hari Tukang cat 100,000.00 5,000.00
2 0.0100 Hari Kepala Tukang 110,000.00 1,100.00
1 0.0025 Hari Mandor 110,000.00 275.00
Total : 15,875.00 3,915.75 19,790.75

11 1 M2 PASANGAN WATERPROOFING
14 1.0000 kg Cat Waterproofing 50,000.00 50,000.00
13 0.4000 Hari Pekerja 95,000.00 38,000.00
1 0.0400 Hari Mandor 110,000.00 4,400.00
Total : 42,400.00 50,000.00 92,400.00

XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok 1,980.00 217,800.00
8.4000 kg Semen 50 Kg 1,350.00 11,340.00
Upah Kerja ( Lumpsum) 270,000.00 270,000.00
Total : 270,000.00 229,140.00 499,140.00
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA
13.7500 bh Paras Kerobokan 8,000.00 110,000.00
8.4000 kg Semen 50 Kg 1,350.00 11,340.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00 121,340.00 266,340.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan 1,980.00 108,900.00
4.2000 kg Semen 50 Kg 1,350.00 5,670.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00 114,570.00 259,570.00

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras 11,000.00 201,666.67
4.2000 kg Semen 50 Kg 1,350.00 5,670.00
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00 207,336.67 352,336.67

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok 1,980.00 108,900.00
4.4917 bh Batu paras 11,000.00 49,408.33
5.2500 kg Semen 50 Kg 1,350.00 7,087.50
Upah Kerja ( Lumpsum) 145,000.00 145,000.00
Total : 145,000.00 165,395.83 310,395.83

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00 108,900.00
4.2000 kg Semen 50 Kg 1,350.00 5,670.00
Upah Kerja ( Lumpsum) 288,500.00 288,500.00
Total : 288,500.00 114,570.00 403,070.00

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras 11,000.00 201,666.67
4.2000 kg Semen 50 Kg 1,350.00 5,670.00
Upah Kerja ( Lumpsum) 288,500.00 288,500.00
Total : 288,500.00 207,336.67 495,836.67

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00 108,900.00
4.4917 bh Batu paras 11,000.00 49,408.33
5.2500 kg Semen 50 Kg 1,350.00 7,087.50
Upah Kerja ( Lumpsum) 280,000.00 280,000.00
Total : 280,000.00 165,395.83 445,395.83

XVI PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225 80,000.00 80,000.00
0.0690 m3 Pasir Urug 100,000.00 6,900.00
0.5000 oh Tukang Batu 45,000.00 22,500.00
0.0500 oh Kepala Tukang 110,000.00 5,500.00
1.0000 oh Pekerja 35,000.00 35,000.00
0.0500 oh Mandor 110,000.00 5,500.00
Total : 68,500.00 86,900.00 155,400.00
2 Paving 10 x 20 cm tebal 6 cm K300 70,000.00 68,500.00 76,900.00 145,400.00
3 Paving 10 x 20 cm tebal 6 cm standard 60,000.00 68,500.00 66,900.00 135,400.00
4 Paving 10 x 20 cm tebal 8 cm K225 80,000.00 68,500.00 86,900.00 155,400.00
5 Paving 10 x 20 cm tebal 8 cm K300 90,000.00 68,500.00 96,900.00 165,400.00
6 Paving 10 x 20 cm tebal 8 cm standard 56,000.00 68,500.00 62,900.00 131,400.00
7 Paving Tiga Berlian tebal 6 cm K225 65,000.00 68,500.00 71,900.00 140,400.00
8 Paving Tiga Berlian tebal 8 cm K225 80,000.00 68,500.00 86,900.00 155,400.00
9 1 M2 PASANGAN GRASS BLOCK
1.0000 m2 Grass Block 35,000.00 35,000.00
0.0690 m3 Pasir Urug 100,000.00 6,900.00
0.5000 oh Tukang Batu 45,000.00 22,500.00
0.0500 oh Kepala Tukang 110,000.00 5,500.00
1.0000 oh Pekerja 35,000.00 35,000.00
0.0500 oh Mandor 110,000.00 5,500.00
Total : 68,500.00 41,900.00 110,400.00
10 1 M2 PASANGAN KORAL SIKAT
1.2000 zak Koral Sikat 65,000.00 78,000.00
9.2800 zak Semen 1,350.00 12,528.00
0.2000 m3 Pasir pasang 120,000.00 24,000.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.0100 oh Kepala Tukang 110,000.00 1,100.00
0.6250 oh Pekerja 35,000.00 21,875.00
0.0310 oh Mandor 110,000.00 3,410.00
Total : 37,635.00 114,528.00 152,163.00
11 1 M1 KANSTEIN BULAT 15X20X50 CM K225
1.0000 m1 Kanstein Bulat 15x20x50 cm K225 39,600.00 39,600.00
0.4500 zak Semen 50 Kg 1,350.00 607.50
0.0023 m3 Pasir Pasang 120,000.00 276.00
0.3500 oh Tukang Batu 45,000.00 15,750.00
0.0350 oh Kepala Tukang 110,000.00 3,850.00
0.9500 oh Pekerja 35,000.00 33,250.00
0.0950 oh Mandor 110,000.00 10,450.00
Total : 63,300.00 40,483.50 103,783.50
12 Kanstein Jumbo 15x30x50 cm K225 49,500.00 63,300.00 50,383.50 113,683.50
13 Kanstein Super 17x25x60 cm K225 52,800.00 63,300.00 53,683.50 116,983.50

14 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 36,000.00 10,224.00
0.0710 kg Thiner 15,000.00 1,065.00
0.0300 oh Tukang Cat 40,000.00 1,200.00
0.0030 oh Kep. Tukang 110,000.00 330.00
0.1500 oh Pekerja 35,000.00 5,250.00
0.0150 oh Mandor 110,000.00 1,650.00
Total : 8,430.00 11,289.00 19,719.00
15 1 M2 PASANGAN PAVING BETON 20/20 CM TEBAL 8 CM K 225
1.0000 m2 Paving 20 x 20 cm tebal 8 cm K225 95,000.00 95,000.00
0.0690 m3 Pasir Urug 100,000.00 6,900.00
0.2500 oh Tukang Batu 45,000.00 11,250.00
0.0500 oh Kepala Tukang Batu 110,000.00 5,500.00
0.5000 oh Pekerja 35,000.00 17,500.00
0.0250 oh Mandor 110,000.00 2,750.00
Total : 37,000.00 101,900.00 138,900.00

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 9,875.00 79,000.00
3.0000 bt Pipa Clipsal 20 mm hitam 7,500.00 22,500.00
2.0000 bh Tee dos clipsal 20 mm hitam 4,500.00 9,000.00
15.0000 bj Klem clipsal 20 mm hitam 650.00 9,750.00
3.0000 bj Sock clipsal 20 mm hitam 750.00 2,250.00
1.0000 bj Inbow dos plastik clipsal E 157 P 2,500.00 2,500.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 125,000.00 150,000.00

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 9,875.00 98,750.00
3.0000 bt Pipa Clipsal 20 mm hitam 7,500.00 22,500.00
1.0000 bh Tee dos clipsal 20 mm hitam 4,500.00 4,500.00
15.0000 bj Klem clipsal 20 mm hitam 650.00 9,750.00
4.0000 bj Sock clipsal 20 mm hitam 750.00 3,000.00
1.0000 bj Inbow dos plastik clipsal E 157 P 2,500.00 2,500.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 9,000.00 9,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00 25,000.00
Total : 25,000.00 175,000.00 200,000.00

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone 2,120.00 53,000.00
8.0000 bt Pipa Clipsal 20 mm putih 7,500.00 60,000.00
1.0000 bh Tee dos clipsal 20 mm putih 4,500.00 4,500.00
25.0000 bj Klem clipsal 20 mm putih 650.00 16,250.00
5.0000 bj Sock clipsal 20 mm putih 750.00 3,750.00
1.0000 bj Inbow dos plastik clipsal E 157 P 2,500.00 2,500.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 140,000.00 165,000.00

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof 3,800.00 76,000.00
6.0000 bt Pipa Clipsal 20 mm putih 7,500.00 45,000.00
2.0000 bh Tee dos clipsal 20 mm putih 4,500.00 9,000.00
20.0000 bj Klem clipsal 20 mm putih 650.00 13,000.00
6.0000 bj Sock clipsal 20 mm putih 750.00 4,500.00
1.0000 bj Inbow dos plastik clipsal E 157 P 2,500.00 2,500.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00 150,000.00 175,000.00
5

###
###
2.6
Pekerja
Tukang Batu
Kepala Tukang
Mandor
144

1.92307692307692
0.9700 M3 Krikil
0.5440 M3 Pasir
3.625600 Zak Semen 50 Kg
0.5000 Hr Tukang Batu
0.0550 Hr Kepala Tukang Batu
6.0000 Hr Pekerja
0.3000 Hr Mandor

###
###
###
###
###
###
###

12,171.00
1,093,439.32
###

###
1 M2 PASANG LANTAI KERAMIK 30 X 30 CM HOMOGENOUS type MCR
11.87 bh Keramik 30 x 30 cm 20454.5454545455 242795.454545455
10 kg Semen Portland 1050 10500
0.045 m3 Pasir Pasang 120000 5400
1.5 kg Semen warna/semen grouting 11000 16500
0.7 oh Pekerja 35000 24500
0.35 oh Tukang batu 45000 15750
0.035 oh Kepala Tukang 55000 1925
0.035 oh Mandor 60000 2100
Total : 44275 275195.454545455

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM HOMOGENOUS type MCR


26.5 bh Keramik 20 x 20 cm 9000 238500
10.4 kg Semen Portland 1050 10920
0.045 m3 Pasir Pasang 120000 5400
1.62 kg Semen warna/semen grouting 11000 17820
0.7 oh Pekerja 35000 24500
0.35 oh Tukang batu 45000 15750
0.035 oh Kepala Tukang 55000 1925
0.035 oh Mandor 60000 2100
Total : 44275 272640

1 M1 PASANG PLIN KERAMIK 10 X 30 CM HOMOGENOUS type MCR


3.33 bh Keramik 30 x 30 cm 20454.5454545455 68113.6363636364
1.14 kg Semen Portland 1050 1197
0.003 m3 Pasir Pasang 120000 360
0.1 kg Semen warna/semen grouting 11000 1100
0.09 oh Pekerja 35000 3150
0.09 oh Tukang batu 45000 4050
0.009 oh Kepala Tukang 55000 495
0.005 oh Mandor 60000 300
Total : 7995 70770.6363636364

1 M2 PASANG DINDING KERAMIK 25 X 25 CM HOMOGENOUS type MCR


26.5 bh Keramik 25 x 25 cm 9000 238500
2 9.3 kg Semen Portland 1050 9765
0.018 m3 Pasir Pasang 120000 2160
1.94 kg Semen warna/semen grouting 11000 21340
0.9 oh Pekerja 35000 31500
0.45 oh Tukang batu 45000 20250
0.045 oh Kepala Tukang 55000 2475
0.045 oh Mandor 60000 2700
Total : 56925 271765
3 1 M2 PASANGAN PAVING BETON 20/20 CM TEBAL 8 CM K 175
1 m2 Paving 20 x 20 cm tebal 8 cm 55000
0.069 m3 Pasir Urug 100,000.00
0.25 oh Tukang Batu 45,000.00 11,250.00
0.05 oh Kepala Tukang Batu 110,000.00 5,500.00
0.5 oh Pekerja 35,000.00 17,500.00
0.025 oh Mandor 110,000.00 2,750.00
Total : 37,000.00
181.280000
319470.45454546

316915

78765.636363636

328690
55000
6900

61900
DAFTAR HARGA SATUAN BAHAN DAN UPAH
BULAN OKTOBER TAHUN 2009
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN HARGA SATUAN


1 2 3 4

FINISHING
1 Amplas lbr 2,500.00
2 Cat besi kg 36,000.00
3 Cat dasar kg 19,000.00
4 Cat emco kg 40,000.00
5 Cat menie besi kg 16,000.00
6 Cat menie kayu kg 16,000.00
7 Cat tembok Decolith kg 25,000.00
8 Cat tembok Dulux kg 23,000.00
9 Cat tembok Dulux Wheatershield kg 23,000.00
10 Cat tembok Emco kg 36,680.00
11 Cat tembok Paragon kg 25,000.00
12 Cat tembok Toyopaint kg 16,500.00
13 Cat tembok Vinilex kg 19,305.00
14 Cat Waterproofing kg 50,000.00
15 Dempul ltr 26,235.00
16 Kuas bh 5,000.00
17 Mild zak 12,000.00
18 Minyak cat ltr 10,000.00
19 Plamir kayu kg 17,500.00
20 Plamir tembok kg 10,000.00
21 Politur ultra ltr 42,000.00
22 Politur vernis ltr 35,000.00
23 Thiner A Bonanza ltr 18,000.00
24 Thiner B Spesial ltr 15,000.00

PENUTUP ATAP
25 Alang-alang lbr 16,250.00
26 Alluminium foil m2 27,500.00
27 Asbes Bubungan lbr 23,667.00
28 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr 25,500.00
29 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr 35,000.00
30 Asbes Rata 2 m x 1 m x 4 mm lbr 14,300.00
29 Atap metal Toratora 1 x 4 Extra m2 82,368.00
30 Atap metal Toratora 1 x 4 Premium m2 120,120.00
31 Atap metal Toratora 2 x 4 Extra m2 72,930.00
32 Atap metal Toratora 2 x 4 Premium m2 107,250.00
33 Atap metal Toratora 3 x 4 Extra m2 69,784.00
34 Atap metal Toratora 3 x 4 Premium m2 102,960.00
35 Atap metal Toratora 4 x 4 Extra m2 68,640.00
36 Atap metal Toratora 4 x 4 Premium m2 100,386.00
37 Bentala paras bh 66,000.00
38 Bentala tanah liat bh 49,500.00
39 Besi profil WF kg 13,750.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
40 Besi strip kg 6,050.00
41 Bubungan Biasa bj 3,500.00
42 Bubungan Karang Pilang (glazur) isi 3,5/m bj 22,000.00
43 Bubungan Karang Pilang isi 3,5/m bj 27,500.00
44 Bubungan Ngalayur isi 3,5/m bj 7,150.00
45 Bubungan Plentong bj 3,500.00
46 Bubungan Utama isi 3,5/m bj 8,250.00
47 Bubungan Beton Cisangkan isi 7,5/m bj 17,000.00
47 Genteng Kanmuri (glazur) isi 14/m2 bj 2,500.00
48 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj 3,025.00
49 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj 3,025.00
50 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj 4,500.00
51 Genteng Morando Abadi isi 18/m2 bj 3,850.00
52 Genteng Morando Jatiwangi isi 18/m2 bj 2,200.00
53 Genteng Morando Ngalayur isi 20/m2 bj 1,870.00
54 Genteng Plentong bj 2,000.00
55 Genteng plentong dicat bj 2,200.00
56 Genteng Plentong Jatiwangi isi 24/m2 bj 1,650.00
57 Genteng Beton Cisangkan isi 10/m2 bj 8,750.00
58 Ijuk kg 24,750.00
59 Ikut celedu paras bh 49,500.00
60 Ikut celedu tanah liat bh 38,500.00
61 Murda paras bh 71,500.00
62 Murda tanah liat bh 35,000.00
63 Seng BJLS 0,20 gelombang lbr 45,000.00
64 Seng BJLS 0,25 gelombang lbr 40,000.00
65 Seng BJLS 0,28 gelombang lbr 40,000.00
66 Seng BJLS 0,32 gelombang lbr 65,000.00
67 Seng Plat 3" x 6" BJLS 28 lbr 44,000.00
68 Sirap Jati bh 7,900.00
69 Tali Ijuk kg 33,000.00
70 Tali pengikat alang-alang ikat 7,700.00

PENGGANTUNG
71 Engsel kupu-kupu ps 9,000.00
72 Engsel nylon ps 12,700.00
73 Espagnoleth set 31,900.00
74 Grendel biasa bh 9,350.00
75 Grendel hararo bh 18,425.00
76 Kaca 3 mm bening m2 50,000.00
77 Kaca 5 mm bening m2 65,000.00
78 Kaca 6 mm bening m2 90,000.00
79 Kaca 8 mm bening m2 130,000.00
80 Kaca 10 mm bening m2 185,000.00
81 Kaca 12 mm bening m2 215,000.00
82 Kaca Es/Kapur 3 mm m2 75,000.00
83 Kaca Es/Kapur 5 mm m2 105,000.00
84 Kaca nako daun 93,500.00
85 Kaca nako teralis bening m2 113,300.00
86 Kaca ryben 3 mm m2 60,000.00
87 Kaca ryben 5 mm m2 75,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
88 Kait angin biasa bh 10,300.00
89 Kunci pintu TOP bh 40,000.00
90 Kunci pintu Union bh 65,000.00
91 Kunci pintu Vanesa bh 107,000.00
92 Kunci pintu Yale bh 112,500.00
93 Kunci pintu YURI bh 110,000.00
94 Kunci slot bh 88,000.00
95 Kunci tanam 2 slag bh 104,500.00

KAYU DAN PLAFOND


96 Bambu besar btg 14,300.00
97 Bambu sedang btg 12,000.00
98 Bambu kecil btg 9,500.00
99 Celling teak (0,62 x 2,40) m2 lbr 69,300.00
100 Eternit lbr 14,500.00
101 Formika lbr 77,000.00
102 Gedeg kulit kelas I m2 18,700.00
103 Gypsum Board lbr 60,000.00
104 Hard board MDF lbr 104,500.00
105 Kalsiboard 4,5 mm lbr 70,000.00
106 Kayu bekesting m3 1,669,333.00
107 Kayu bingkirai m3 8,500,000.00
108 Kayu bingkirai papan m3 9,500,000.00
109 Kayu dolken (pekerjaan sementara) btg 120,000.00
110 Kayu jati m3 25,000,000.00
111 Kayu jati papan m3 27,000,000.00
112 Kayu kamper balok m3 7,500,000.00
113 Kayu kamper usuk/reng m3 6,500,000.00
114 Kayu kamper papan m3 8,000,000.00
115 Kayu kruing balok m3 5,000,000.00
116 Kayu kruing usuk/reng m3 4,800,000.00
117 Kayu kruing papan m3 6,000,000.00
118 Kayu meranti balok m3 2,000,000.00
119 Kayu meranti usuk/reng m3 1,700,000.00
120 Kayu meranti papan m3 4,000,000.00
121 Kayu merbau m3 9,500,000.00
122 Kayu merbau papan m3 10,000,000.00
123 Kayu profil m1 12,250.00
124 Kayu seseh balok m3 2,264,750.00
125 Kayu seseh dolken m3 2,750,000.00
126 Lem Aibond kg 33,000.00
127 Lem Kayu ltr 12,500.00
128 List Gypsum standar m' 16,500.00
129 Minyak bekisting ltr 13,750.00
130 Multiplek 12 mm lbr 126,000.00
131 Multiplek 18 mm lbr 186,000.00
132 Multiplek 6 mm lbr 58,500.00
133 Multiplek 9 mm lbr 96,500.00
134 Plywood 12 mm lbr 165,000.00
135 Plywood 3 mm lbr 46,333.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
136 Plywood 4 mm lbr 53,200.00
137 Plywood 6 mm lbr 66,550.00
138 Plywood 9 mm lbr 105,250.00
139 Plywood aluminium lbr 82,500.00
140 Teak wood (0,9x2,00) m2 lbr 65,000.00
141 Teak wood (1,20x2,40) m2 lbr 77,500.00

KERAMIK
IKAD
142 Ikad (Keramik) Kw. I 10 x 20 cm m2 51,480.00
143 Ikad (Keramik) Kw. I 20 x 20 cm m2 50,490.00
144 Ikad (Keramik) Kw. I 20 x 30 cm m2 49,940.00
145 Ikad (Keramik) Kw. I 30 x 30 cm m2 57,750.00
146 Ikad (Keramik) Kw. I 40 x 40 cm m2 57,970.00
147 Ikad (Keramik) Kw. II 10 x 20 cm m2 35,000.00
148 Ikad (Keramik) Kw. II 20 x 20 cm m2 40,000.00
149 Ikad (Keramik) Kw. II 20 x 30 cm m2 53,460.00
150 Ikad (Keramik) Kw. II 30 x 30 cm m2 51,480.00
151 Ikad (Keramik) Kw. II 40 x 40 cm m2 47,465.00

INESA
152 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2 190,696.00
153 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 153,367.50
154 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2 179,080.00
155 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2 142,175.00
156 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2 164,560.00
157 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2 208,846.00
158 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2 208,846.00
159 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2 159,720.00
160 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2 196,504.00
161 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2 148,467.00
162 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2 248,171.00

ESSENZA
163 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2 244,662.00
164 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2 181,984.00
165 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 208,120.00
166 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 158,994.00
167 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 208,120.00
168 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP) m2 158,950.00
169 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2 232,320.00
170 Keramik Kelas I Domus m2 211,750.00
171 Keramik Kelas I Granity Imperiali m2 211,750.00
172 Keramik Kelas I Lavagna m2 233,530.00
173 Keramik Kelas I Mountain Peak m2 194,810.00

GARUDA
174 Keramik 20 x 20 kelas I Emboss Dasar Muda m2 43,000.00
175 Keramik 20 x 20 kelas I Emboss Dasar Tua m2 45,000.00
176 Keramik 20 x 20 kelas I Tesia m2 45,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
177 Keramik 20 x 20 kelas II Emboss Dasar Muda m2 43,000.00
178 Keramik 20 x 20 kelas II Emboss Dasar Tua m2 44,000.00
179 Keramik 20 x 20 kelas II Tesia m2 43,000.00
180 Keramik 20 x 25 kelas I Motif Dasar Medium m2 46,000.00
181 Keramik 20 x 25 kelas I Motif Dasar Muda m2 46,000.00
182 Keramik 20 x 25 kelas I Nuri Dark m2 48,000.00
183 Keramik 20 x 25 kelas I Polos m2 40,000.00
184 Keramik 30 x 30 kelas I Granity m2 45,000.00
185 Keramik 30 x 30 kelas I Motif Embose m2 45,000.00
186 Keramik 30 x 30 kelas II Granity m2 43,000.00
187 Keramik 30 x 30 kelas II Motif Embose m2 43,000.00
188 Keramik 40 x 40 kelas I Motif Dasar Muda m2 48,000.00
189 Keramik 40 x 40 kelas I Motif Dasar Muda m2 48,000.00
190 Keramik 40 x 40 kelas I Motif Embose m2 50,050.00
191 Keramik 40 x 40 kelas I Motif Granity Tua m2 55,000.00
192 Keramik 40 x 40 kelas I Motif Medium Color m2 45,000.00
193 Keramik 40 x 40 kelas I Motif Spesial Color m2 44,550.00
194 Keramik 50 x 50 kelas I m2 70,000.00

ASIA
195 Granit Sincere 60 x 60 Cm Warna Cream Muda m2 100,000.00
196 Granit Sincere 60 x 60 Cm Warna Cream Tua m2 105,000.00
197 Granit Niro granite 15 x 60 Cm Motif kayu m2 270,000.00
198 Keramik Platinum 30 x 30 Cm Warna Cream Tua m2 80,000.00
199 Keramik PlatinumTile 20 x 40 kelas I warna muda m2 85,000.00
200 Keramik Asia Tile 30 x 30 kelas I warna muda m2 35,200.00
201 Keramik Asia Tile 30 x 30 kelas I warna tua m2 46,200.00
202 Keramik Asia Tile 40 x 40 kelas I polish m2 70,000.00
203 Keramik Asia Tile 40 x 40 kelas I unpolish m2 48,000.00
204 Keramik Asia Tile 20 x 20 kelas II m2 37,000.00
205 Keramik Asia Tile 20 x 30 kelas II m2 52,000.00
206 Keramik Asia Tile 30 x 30 kelas II m2 32,450.00
207 Keramik Asia Tile 40 x 40 kelas II m2 61,600.00

MULIA
208 Keramik 10 x 20 cm kelas I m2 40,000.00
209 Keramik 20 x 20 cm kelas I m2 44,250.00
210 Keramik 20 x 30 cm kelas I m2 55,000.00
211 Keramik 30 x 30 cm kelas I m2 41,470.00
212 Keramik 40 x 40 cm kelas I m2 48,400.00
213 Keramik 10 x 20 cm kelas II m2 38,000.00
214 Keramik 20 x 20 cm kelas II m2 42,000.00
215 Keramik 20 x 30 cm kelas II m2 52,000.00
216 Keramik 30 x 30 cm kelas II m2 33,000.00
217 Keramik 40 x 40 cm kelas II m2 43,450.00

SANITAIR
218 Bak mandi fibre glass 70x70x66 cm bh 190,000.00
219 Bak mandi keramik bh 160,000.00
220 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh 1,837,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
221 Floor drain plastik bh 11,000.00
222 Floor drain stainless bh 106,333.00
223 Kloset duduk KIA bh 1,581,800.00
224 Kloset duduk Amerika Standar bh 1,454,200.00
225 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT bh 4,136,000.00
226 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT bh 5,610,000.00
227 Kloset duduk " TOTO Type AVANTE CW 823 J bh 1,800,000.00
228 Kloset duduk " TOTO Type CW 660J bh 602,800.00
229 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh 1,950,000.00
230 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNA bh 2,130,000.00
231 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh 653,000.00
232 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh 2,796,200.00
233 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh 2,961,200.00
234 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh 1,734,700.00
235 Kloset jongkok " TOTO Type CE 6 COMPLIT bh 1,591,700.00
236 Kloset jongkok " TOTO Type CE 7 COMPLIT bh 1,756,700.00
237 Kloset porselin jongkok Kia (standar) bh 135,300.00
238 Kloset porselin jongkok Ina (standar) bh 130,000.00
239 Kran biasa bh 18,150.00
240 Kran SunEi bh 99,000.00
241 Kran TOTO T 205 LCSC bh 655,600.00
242 Kran TOTO T 205 MC bh 293,700.00
243 Kran TOTO T 23 B13 bh 247,500.00
244 Kran TOTO T 23 B13V7N bh 51,700.00
245 Kran TOTO T 26 - 13 bh 267,300.00
246 Kran TOTO TX 109 LH bh 169,400.00
247 Penyekat Urinoir " TOTO " Type A 100 " bh 1,900,000.00
248 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh 196,900.00
249 Soap holder " TOTO " Type S 6 N " bh 512,600.00
250 Seal tape bh 3,300.00
251 Urinoir " TOTO U 57 M bh 223,300.00
252 Urinoir " TOTO U 57 M BODI bh 331,667.00
253 Urinoir " TOTO UW 447 JT 1 " bh -
254 Urinoir " TOTO UW 447 JT 1 BODI bh -
255 Urinoir " TOTO UW 447 JT 1,M " bh -
256 Urinoir " TOTO UW 447 JT 1,M "BODI bh -
257 Wastagel KIA Standard bh 236,500.00
258 Wastagel KIA Warna bh 316,800.00
259 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh 1,800,000.00
260 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh 2,300,000.00

PAKU
261 Paku Biasa kg 15,000.00
262 Paku kalsiboard kg 16,000.00
263 Paku list SQ kg 15,840.00
264 Paku pancing 60 x 230 kg 18,750.00
265 Paku reng/usuk SQ kg 15,000.00
266 Paku seng kg 20,000.00
267 Paku seng import bj 45,000.00
268 Paku skrup 1/2" kg 16,500.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
269 Paku skrup 2" kg 16,500.00
270 Paku skrup 3.5" kg 24,167.00
271 Paku sumbat 1/2" kg 13,750.00

PASIR, BATU, KERIKIL, BATA DAN PARAS


272 Bata gosok ex Tulikup bj 1,980.00
273 Bata pasang klas I bj 1,000.00
274 Batako kelas I bj 2,800.00
275 Batu kali m3 156,250.00
276 Batu karang m3 120,000.00
277 Batu lahar Singaraja m3 150,000.00
278 Batu pecah 5-7 cm (manual) m3 120,000.00
279 Batu pipih Singaraja m3 150,000.00
280 Glass block bj 20,000.00
281 Kerawang bh 82,500.00
282 Koral Beton m3 312,500.00
283 Limestone m3 100,000.00
284 Paras Batik bh 15,000.00
285 Paras Buahan bh 6,600.00
286 Paras Karang Bukit bh 7,700.00
287 Paras Kerobokan bh 8,000.00
288 Paras Malem bh 12,870.00
289 Paras Putih Bukit bh 3,300.00
290 Paras Silakarang tebal bh 13,860.00
291 Paras Silakarang tipis bh 11,000.00
292 Paras untuk pondasi bh 12,000.00
293 Pasir beton m3 175,000.00
294 Pasir pasang m3 187,500.00
295 Pasir urug m3 100,000.00
296 Sirtu m3 110,000.00
297 Tanah urug m3 43,750.00

PIPA
298 Pipa Galvanis 1/2" m1 52,000.00
299 Pipa Galvanis 3/4" m1 55,000.00
300 Pipa Galvanis 1 1/4" m1 100,000.00
301 Pipa Galvanis 1 1/2" m1 117,000.00
302 Pipa Galvanis 1" m1 80,000.00
303 Pipa Galvanis 1,5 BSA m1 62,500.00
304 Pipa Galvanis 2" m1 160,000.00
305 Pipa Galvanis 3" m1 175,000.00
306 Pipa Maspion AW 1 ljr 32,500.00
307 Pipa Maspion AW 1/2 ljr 21,000.00
308 Pipa Maspion AW 10 ljr 109,200.00
309 Pipa Maspion AW 1-1/2 ljr 59,800.00
310 Pipa Maspion AW 1-1/4 ljr 45,800.00
311 Pipa Maspion AW 12 ljr 1,550,000.00
312 Pipa Maspion AW 14 ljr 1,900,000.00
313 Pipa Maspion AW 16 ljr 2,400,000.00
314 Pipa Maspion AW 2 ljr 89,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
315 Pipa Maspion AW 2-1/2 ljr 114,000.00
316 Pipa Maspion AW 3 ljr 162,000.00
317 Pipa Maspion AW 3/4 ljr 25,700.00
318 Pipa Maspion AW 4 ljr 257,000.00
319 Pipa Maspion AW 5 ljr 373,000.00
320 Pipa Maspion AW 6 ljr 494,000.00
321 Pipa Maspion AW 8 ljr 768,000.00
322 Pipa Maspion C 1 ljr 14,700.00
323 Pipa Maspion C 1-1/2 ljr 22,000.00
324 Pipa Maspion C 1-1/4 ljr 18,700.00
325 Pipa Maspion C 2 ljr 35,000.00
326 Pipa Maspion C 2-1/2 ljr 45,000.00
327 Pipa Maspion C 3 ljr 52,000.00
328 Pipa Maspion C 3/4 ljr 10,000.00
329 Pipa Maspion C 4 ljr 67,000.00
330 Pipa Maspion C 5/8 ljr 5,500.00
331 Pipa Maspion D 10 ljr 784,000.00
332 Pipa Maspion D 1-1/2 ljr 32,000.00
333 Pipa Maspion D 1-1/4 ljr 28,000.00
334 Pipa Maspion D 12 ljr 1,877,568.00
335 Pipa Maspion D 14 ljr 1,270,000.00
336 Pipa Maspion D 16 ljr 1,650,000.00
337 Pipa Maspion D 2 ljr 42,000.00
338 Pipa Maspion D 2-1/2 ljr 62,000.00
339 Pipa Maspion D 3 ljr 91,000.00
340 Pipa Maspion D 4 ljr 128,000.00
341 Pipa Maspion D 5 ljr 209,000.00
342 Pipa Maspion D 6 ljr 254,000.00
343 Pipa Maspion D 8 ljr 449,000.00

SEMEN
344 Semen Bosowa 50 kg kg 1,100.00
345 Semen Gresik 40 kg kg 1,350.00
346 Semen Gresik 50 kg kg 1,300.00
347 Semen Tiga Roga 50 kg kg 1,020.00
348 Semen Conch 40 kg kg 1,325.00
349 Semen warna/semen grouting kg 11,000.00

BESI BETON DAN PAGAR


350 Besi beton kg 10,000.00
351 Kawat berduri roll 66,000.00
352 Kawat beton RRT kg 12,333.00
353 Pagar BRC asli T.120 diameter 6mm m' 161,700.00
354 Pagar BRC asli T.150 diameter 6mm m' 172,000.00
355 Pagar BRC asli T.175 diameter 7mm m' 249,000.00
356 Pagar BRC asli T.190 diameter 7mm m' 267,000.00
357 Pagar BRC asli T.90 diameter 6mm m' 134,000.00
358 Pagar HotDip Galvanized T.120 diameter 6mm m' 136,000.00
359 Pagar HotDip Galvanized T.150 diameter 7mm m' 187,000.00
360 Pagar HotDip Galvanized T.175 diameter 7mm m' 203,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
361 Pagar HotDip Galvanized T.190 diameter 7mm m' 218,000.00
362 Pagar HotDip Galvanized T.90 diameter 6mm m' 118,000.00
363 Tiang BRC asli T. 120 diameter 1 1/2" bh 160,000.00
364 Tiang BRC asli T. 150 diameter 2" bh 209,000.00
365 Tiang BRC asli T. 175 diameter 2" bh 240,000.00
366 Tiang BRC asli T. 190 diameter 2" bh 246,000.00
367 Tiang BRC asli T. 90 diameter 1 1/2" bh 136,000.00
368 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh 142,000.00
369 Tiang HotDip Galvanized T. 150 diameter 2" bh 169,000.00
370 Tiang HotDip Galvanized T. 175 diameter 2" bh 185,000.00
371 Tiang HotDip Galvanized T. 190 diameter 2" bh 197,000.00
372 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh 123,000.00

BAHAN LISTRIK
373 Saklar (Broco) bh 14,850.00
374 Stop Kontak bh 13,420.00
375 Fitting bh 7,300.00
376 Steker bh 6,875.00
377 Kabel NYM 2 mm m1 6,500.00
378 Kabel NYM 4 mm m1 5,500.00
379 Lampu pijar 10 Watt (Philip) bh 4,950.00
380 Lampu pijar 15 Watt (Philip) bh 4,750.00
381 Lampu pijar 25 Watt (Philip) bh 6,900.00
382 Lampu TL 10 Watt (10 Watt) bh 27,500.00
383 Lampu TL 20 Watt (10 Watt) bh 34,000.00
384 Lampu TL 25 Watt (10 Watt) bh 31,900.00

BUIS BETON
385 Buis beton 10 x 75 bh 49,000.00
386 Buis beton 15 x 75 bh 19,800.00
387 Buis beton 20 x 75 bh 27,667.00
388 Buis beton 25 x 75 bh 33,333.00
389 Buis beton 30 x 75 bh 36,600.00
390 Buis beton 50 x 75 bh 45,000.00

LAMPU
391 Lampu pijar 10 Watt bh 4,950.00
392 Lampu pijar 15 Watt bh 6,500.00
393 Lampu pijar 25 Watt bh 7,000.00
394 Lampu pijar 40 Watt bh 6,500.00
395 Lampu TL 10 Watt bh 27,000.00
396 Lampu TL 20 Watt bh 34,000.00
397 Lampu TL 40 Watt bh 32,000.00

PAVING
398 Paving 10 x 20 cm tebal 6 cm K225 m2 51,000.00
399 Paving 10 x 20 cm tebal 6 cm K300 m2 70,000.00
400 Paving 10 x 20 cm tebal 6 cm standard m2 60,000.00
401 Paving 10 x 20 cm tebal 8 cm K225 m2 80,000.00
NO NAMA BARANG SATUAN HARGA SATUAN
1 2 3 4
402 Paving 10 x 20 cm tebal 8 cm K300 m2 90,000.00
403 Paving 10 x 20 cm tebal 8 cm standard m2 56,000.00
404 Paving Tiga Berlian tebal 6 cm K225 m2 65,000.00
405 Paving Tiga Berlian tebal 8 cm K225 m2 80,000.00

LAIN-LAIN
406 Dugul batu hitam 50 x 50 x 200 unit 2,656,500.00
407 Dugul batu hitam 60 x 70 x 250 unit 3,415,500.00
408 Dugul batu hitam 70 x 70 x 250 unit 3,415,500.00
409 Kanstein Bulat 15x20x50 cm K225 m1 39,600.00
410 Kanstein Jumbo 15x30x50 cm K225 m1 49,500.00
411 Kanstein Super 17x25x60 cm K225 m1 52,800.00
412 Padmasari batu hitam 50 x 50 x 200 unit 2,530,000.00
413 Padmasari batu hitam 70 x 70 x 250 unit 3,289,000.00
414 Padmasari batu hitam 65 x 75 x 225 unit 2,574,000.00
ARGA SATUAN BAHAN DAN UPAH
AN OKTOBER TAHUN 2009

HARGA SATUAN
4

2,500.00
36,000.00
19,000.00
40,000.00
16,000.00
16,000.00
25,000.00
23,000.00
28,000.00
36,680.00
25,000.00
16,500.00
19,305.00
50,000.00
26,235.00
5,000.00
12,000.00
10,000.00
17,500.00
15,000.00
42,000.00
35,000.00
18,000.00
15,000.00
-
-
16,250.00
27,500.00
23,667.00
25,500.00
35,000.00
14,300.00
82,368.00
120,120.00
72,930.00
107,250.00
69,784.00
102,960.00
68,640.00
100,386.00
66,000.00
49,500.00
13,750.00
HARGA SATUAN
4
6,050.00
3,500.00
22,000.00
27,500.00
7,150.00
3,500.00
8,250.00
17,000.00
2,500.00
3,025.00
3,025.00
4,500.00
3,850.00
2,200.00
1,870.00
2,000.00
2,200.00
1,650.00
8,750.00
24,750.00
49,500.00
38,500.00
71,500.00
35,000.00
45,000.00
40,000.00
40,000.00
65,000.00
44,000.00
7,900.00
33,000.00
7,700.00
-
-
9,000.00
12,700.00
31,900.00
9,350.00
18,425.00
50,000.00
65,000.00
90,000.00
130,000.00
185,000.00
215,000.00
75,000.00
105,000.00
93,500.00
113,300.00
60,000.00
75,000.00
HARGA SATUAN
4
10,300.00
40,000.00
65,000.00
107,000.00
112,500.00
110,000.00
88,000.00
104,500.00
-
-
14,300.00
12,000.00
9,500.00
69,300.00
14,500.00
77,000.00
18,700.00
60,000.00
104,500.00
70,000.00
1,669,333.00
8,500,000.00
9,500,000.00
120,000.00
25,000,000.00
27,000,000.00
7,500,000.00
6,500,000.00
8,000,000.00
5,000,000.00
4,800,000.00
6,000,000.00
2,000,000.00
1,700,000.00
4,000,000.00
9,500,000.00
10,000,000.00
12,250.00
2,264,750.00
2,750,000.00
33,000.00
12,500.00
16,500.00
13,750.00
126,000.00
186,000.00
58,500.00
96,500.00
165,000.00
46,333.00
HARGA SATUAN
4
53,200.00
66,550.00
105,250.00
82,500.00
65,000.00
77,500.00
-
-
-
51,480.00
50,490.00
49,940.00
57,750.00
57,970.00
35,000.00
40,000.00
53,460.00
51,480.00
47,465.00
-
-
190,696.00
153,367.50
179,080.00
142,175.00
164,560.00
208,846.00
208,846.00
159,720.00
196,504.00
148,467.00
248,171.00
-
-
244,662.00
181,984.00
208,120.00
158,994.00
208,120.00
158,950.00
232,320.00
211,750.00
211,750.00
233,530.00
194,810.00
-
-
43,000.00
45,000.00
45,000.00
HARGA SATUAN
4
43,000.00
44,000.00
43,000.00
46,000.00
46,000.00
48,000.00
40,000.00
45,000.00
45,000.00
43,000.00
43,000.00
48,000.00
48,000.00
50,050.00
55,000.00
45,000.00
44,550.00
70,000.00
-
-
100,000.00
105,000.00
270,000.00
80,000.00
85,000.00
35,200.00
46,200.00
70,000.00
48,000.00
37,000.00
52,000.00
32,450.00
61,600.00
-
-
40,000.00
44,250.00
55,000.00
41,470.00
48,400.00
38,000.00
42,000.00
52,000.00
33,000.00
43,450.00
-
-
190,000.00
160,000.00
1,837,000.00
HARGA SATUAN
4
11,000.00
106,333.00
1,581,800.00
1,454,200.00
4,136,000.00
5,610,000.00
1,800,000.00
602,800.00
1,950,000.00
2,130,000.00
653,000.00
2,796,200.00
2,961,200.00
1,734,700.00
1,591,700.00
1,756,700.00
135,300.00
130,000.00
18,150.00
99,000.00
655,600.00
293,700.00
247,500.00
51,700.00
267,300.00
169,400.00
1,900,000.00
196,900.00
512,600.00
3,300.00
223,300.00
331,667.00
-
-
-
-
236,500.00
316,800.00
1,800,000.00
2,300,000.00
-
-
15,000.00
16,000.00
15,840.00
18,750.00
15,000.00
20,000.00
45,000.00
16,500.00
HARGA SATUAN
4
16,500.00
24,167.00
13,750.00
-
-
1,980.00
1,000.00
2,800.00
156,250.00
120,000.00
150,000.00
120,000.00
150,000.00
20,000.00
82,500.00
312,500.00
100,000.00
15,000.00
6,600.00
7,700.00
8,000.00
12,870.00
3,300.00
13,860.00
11,000.00
12,000.00
175,000.00
187,500.00
100,000.00
110,000.00
43,750.00
-
-
52,000.00
55,000.00
100,000.00
117,000.00
80,000.00
62,500.00
160,000.00
175,000.00
32,500.00
21,000.00
109,200.00
59,800.00
45,800.00
1,550,000.00
1,900,000.00
2,400,000.00
89,000.00
HARGA SATUAN
4
114,000.00
162,000.00
25,700.00
257,000.00
373,000.00
494,000.00
768,000.00
14,700.00
22,000.00
18,700.00
35,000.00
45,000.00
52,000.00
10,000.00
67,000.00
5,500.00
784,000.00
32,000.00
28,000.00
1,877,568.00
1,270,000.00
1,650,000.00
42,000.00
62,000.00
91,000.00
128,000.00
209,000.00
254,000.00
449,000.00
-
-
1,100.00
1,350.00
1,300.00
1,020.00
1,325.00
11,000.00
-
-
10,000.00
66,000.00
12,333.00
161,700.00
172,000.00
249,000.00
267,000.00
134,000.00
136,000.00
187,000.00
203,000.00
HARGA SATUAN
4
218,000.00
118,000.00
160,000.00
209,000.00
240,000.00
246,000.00
136,000.00
142,000.00
169,000.00
185,000.00
197,000.00
123,000.00
-
-
14,850.00
13,420.00
7,300.00
6,875.00
6,500.00
5,500.00
4,950.00
4,750.00
6,900.00
27,500.00
34,000.00
31,900.00
-
-
49,000.00
19,800.00
27,667.00
33,333.00
36,600.00
45,000.00
-
-
4,950.00
6,500.00
7,000.00
6,500.00
27,000.00
34,000.00
32,000.00
-
-
-
51,000.00
70,000.00
60,000.00
80,000.00
HARGA SATUAN
4
90,000.00
56,000.00
65,000.00
80,000.00
-
-
2,656,500.00
3,415,500.00
3,415,500.00
39,600.00
49,500.00
52,800.00
2,530,000.00
3,289,000.00
2,574,000.00
DAFTAR HARGA SATUAN UPAH

HARGA
NO NAMA BARANG SPESIFIKASI SATUAN (Rp.)
1 2 3 4 5

1 Mandor Hari 110,000.00


2 Kepala Tukang Hari 110,000.00
3 Tukang Politur Hari 100,000.00
4 Tukang Batu Hari 120,000.00
5 Tukang kayu Hari 120,000.00
6 Tukang Besi Hari 100,000.00
7 Tukang cat Hari 100,000.00
8 Tukang gali Hari 95,000.00
9 Tukang Listrik Hari 80,000.00
10 Tukang Pipa/ Tukang Ledeng Hari 95,000.00
11 Tukang Aspal Hari 80,000.00
12 Tukang masak Aspal Hari 70,000.00
13 Pekerja Hari 95,000.00
14 Tukang Ukir Hari 100,000.00
15 Operator Hari 100,000.00
16 Pembantu Operator Hari 100,000.00
17 Mekanik Hari 100,000.00
18 Pembantu Mekanik Hari 100,000.00
19 Pasang Atap Alang-Alang Hari 100,000.00
20 Pasang Bata Gosok Dua Muka m2 270,000.00
21 Pasang Bata Gosok Satu Muka m2 145,000.00
22 Pasang Batu Paras Diukir m2 288,500.00
23 Pasang Patu Paras Siap Diukir m2 250,000.00
24 Tukang Bongkar Begesting Hari 35,000.00
plint lantai 1 plint lantai 2 Plafond 1 Plafond 2
0.73 16.60 15 153.123 138.23
0.73 33.15
7.13 13.90
3.23 14.10
0.15 14.10 List 1 List 2
4.98 14.40 35.6 8.9
3.63 4.15 12.4 24.4
5.60 13.9 12.4
1.20 6.4 14.4
1.55 5.4
15.40 6.4
15.90
2.25
1.78
2.28
7.90
1.70
1.75 68.3 71.9

77.85 110.40 203.25

PINTU JUMLAH PANJANG KUSEN LUAS PINTU TOTAL PANJANG TOTAL LUAS
P1J1 1.00 7.40 5.40 7.40 5.40
P2 KAMAR 4.00 5.00 1.64 20.00 6.56
P3 WC 2.00 4.95 1.46 9.90 2.91
P4 (Sleding Single) 2.00 7.90 1.64 15.80 3.28
P5 (Sleding doble) 1.00 12.24 2.87 12.24 2.87

65.34 14.87

JENDELA JUMLAH PANJANG KUSEN LUAS Jendela TOTAL PANJANG TOTAL LUAS
JI PJ1 1.00 - 0.66 - 0.66
J2 SLIDING SINGEL 2.00 - 0.84 - 1.68
J3 SLIDING DOBEL 2.00 - 1.25 - 2.50
J4 3.00 5.96 0.63 17.88 1.90
J5 2.00 7.16 1.67 14.32 3.35
J6 1.00 9.88 2.53 9.88 2.53
J7 1.00 3.71 0.20 3.71 0.20

45.79 12.82

111.13
Plafond atap Plafond 1 Plafond 2 Plafond atap
50.4 9.115 6

341.753 15.115

List atap
31.6

31.6 171.8

30.00

6.15

KACA MATI VENTILASI


0.59 -
1.51 -
2.25 2.00 1,050.00
1.71 4.00
3.01 -
2.27 -
0.18 1.00
-
11.54 -
Pek Kolom

8.9
7.4
65.86