OPNAME PEKERJAAN MANDOR SISWANTO

Opname :3 Siswanto
Periode : 28 Mei 2021 sd 10 Juni 2021
PT.CIAWENINDO MITRA PERKASA

Unit Price 单价 (Rp) LAST PERIOD TOTAL OF PERIOD


No Item of Works Volume Unit Total
Labor Price THIS PERIOD REMARK
ACCUMULATIVE ACCUMULATIVE
序号 说明 数量 单位 人工单价 单项总和

I PEKERJAAN LAIN LAIN (Opname Periode 1)


Pekerjaan Perapihan tanah setelah rata exa area
a 110.00 m2 5,000 550,000 100% Rp 550,000.00 Rp - 100% Rp 550,000
Form work
Pekerjaan Perapihan tanah setelah rata exa area
b 110.00 m2 5,000 550,000 100% Rp 550,000.00 Rp - 100% Rp 550,000
Ronbar fabrication
c Begisting tepi tinggi 10 cm area formwork 5.40 m2 40,000 216,000 100% Rp 216,000.00 Rp - 100% Rp 216,000
d Begisting tepi tinggi 10 cm area ronbar fabrication 5.40 m2 40,000 216,000 100% Rp 216,000.00 Rp - 100% Rp 216,000
e Cor lantai beton tebal 10 cm area formwork 110.00 m2 19,000 2,090,000 100% Rp 2,090,000.00 Rp - 100% Rp 2,090,000
f Cor lantai beton tebal 10 cm area ronbar fabricaton 110.00 m2 19,000 2,090,000 100% Rp 2,090,000.00 Rp - 100% Rp 2,090,000
Pasang anchour baja steel structur untuk formwork
g 24.00 pcs 35,000 840,000 100% Rp 840,000.00 Rp - 100% Rp 840,000
dan ronbar fabrication
h Bantu turun kontainer 20 ft 2.00 unit 150,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
i Atap site office 18.00 m2 100,000 1,800,000 100% Rp 1,800,000.00 Rp - 100% Rp 1,800,000
j Perapihan galian pile cap 198.00 m3 18,000 3,564,000 100% Rp 3,564,000.00 Rp - 100% Rp 3,564,000
k Turun besi, dua kali lansir krn trailer terperosok 5,000.00 kg 400 2,000,000 100% Rp 2,000,000.00 Rp - 100% Rp 2,000,000
akses dari ownerburuk @200/kg x 2
Begisting Pondasi Beton tanki solar uk. 0.4x0.4x2
l
sebanyak 2 unit
1. Begisting multiplek 3.84 m2 40,000 153,600 100% Rp 153,600.00 Rp - 100% Rp 153,600
2. Cor beton 0.64 m2 80,000 51,200 100% Rp 51,200.00 Rp - 100% Rp 51,200

II PEKERJAAN LAIN LAIN (Opname Periode 2)


Area 07
a Potong embeded plat spunpile karena diameter 342.00 ttk 5,000 1,710,000 30% Rp 513,000.00 30% Rp 513,000 60% Rp 1,026,000
dariowner kebesaran
b Las embeded besi stek spunpile 342.00 ttk 5,000 1,710,000 30% Rp 513,000.00 30% Rp 513,000 60% Rp 1,026,000

c Las stek D13 spunpile ke besi pilecap 6 pcs/spunpile 342.00 ttk 5,000 1,710,000 50% Rp 3,078,000.00 30% Rp 513,000 80% Rp 3,591,000

d Pasang plat grounding penangkal petir dalam tiebeam


dan dalam pilecap (termasuk las sambungan, las siku 200.00 m1 20,000 4,000,000 8% Rp 300,000.00 50% Rp 2,000,000 58% Rp 2,300,000
perempatan, las ke kolom, las ke besi spunpile)
e Turun Kaso 4/6 (Pengiriman pertama) 10.00 m3 20,000 200,000 100% Rp 200,000.00 Rp - 100% Rp 200,000
f Turun Kaso 4/6 (Pengiriman kedua) 10.00 m3 20,000 200,000 100% Rp 200,000.00 Rp - 100% Rp 200,000
g Turun multiplek 12mm 100.00 lbr 1,000 100,000 100% Rp 100,000.00 Rp - 100% Rp 100,000
h Turun multiplek 9mm 100.00 lbr 1,000 100,000 100% Rp 100,000.00 Rp - 100% Rp 100,000
i Turun besi tahap 2 5,000.00 kg 200 1,000,000 100% Rp 1,000,000.00 Rp - 100% Rp 1,000,000
j Pembuatan mockup - 0% Rp - Rp - 0% Rp -
- CTL-05 termasuk perubahan perubahannya bongkar
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
pasang
- CTL-06B termasuk perubahan perubahannya
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
bongkar pasang
- DTL-07 termasuk perubahan perubahannya bongkar
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
pasang
- DTL-08(1B) termasuk perubahan perubahannya
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
bongkar pasang
Unit Price 单价 (Rp) LAST PERIOD TOTAL OF PERIOD
No Item of Works Volume Unit Total
Labor Price THIS PERIOD REMARK
ACCUMULATIVE ACCUMULATIVE
序号 说明 数量 单位 人工单价 单项总和
- DTL-09(1B) termasuk perubahan perubahannya
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
bongkar pasang
- CT-2 termasuk perubahan perubahannya bongkar
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
pasang
- CT-2a termasuk perubahan perubahannya bongkar
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
pasang
- CT-2b termasuk perubahan perubahannya bongkar
1.00 Unit 300,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000
pasang

II PEKERJAAN LAIN LAIN (Opname Periode 3)

Pembuatan meja meeting uk 3 biru 2.00 Unit 100,000 200,000 100% Rp 200,000.00 Rp - 100% Rp 200,000
Pembuatan meja kompter uk 2 biru 1.00 Unit 75,000 75,000 100% Rp 75,000.00 Rp - 100% Rp 75,000
Pembuatan meja untuk tempat gambar owner 1.00 Unit 75,000 75,000 100% Rp 75,000.00 Rp - 100% Rp 75,000
Pembuatan kursi meeting panjang 3.00 Unit 75,000 225,000 100% Rp 225,000.00 Rp - 100% Rp 225,000
Pembuatan kursi meeting pendek 3.00 Unit 50,000 150,000 100% Rp 150,000.00 Rp - 100% Rp 150,000
Pembuatan bak sampah 1.00 Unit 75,000 75,000 100% Rp 75,000.00 Rp - 100% Rp 75,000
Turun balok 5/10 10.00 m3 20,000 200,000 100% Rp 200,000.00 Rp - 100% Rp 200,000
Turun kaso 4/6 tgl 10 juni 2021 10.00 m3 20,000 200,000 100% Rp 200,000.00 Rp - 100% Rp 200,000
Turun Multiplek Pynol 100.00 lbr 500 50,000 100% Rp 50,000.00 Rp - 100% Rp 50,000
Turun multiplek 12 mm tgl 100.00 lbr 500 50,000 100% Rp 50,000.00 Rp - 100% Rp 50,000
Turun mltiplek 12 mm tgl 100.00 lbr 500 50,000 100% Rp 50,000.00 Rp - 100% Rp 50,000
Turun multiplek 12 mm tgl 100.00 lbr 500 50,000 100% Rp 50,000.00 Rp - 100% Rp 50,000
Turun pipa support pcs - 0% Rp - Rp - 0% Rp -
Turun wing nut pcs - 0% Rp - Rp - 0% Rp -
Turun teerot pcs - 0% Rp - Rp - 0% Rp -

Area 07
Install penengkal petir 1,632.60 m1 5,000 8,163,000 25% Rp 2,040,750.00 60% Rp 4,897,800 85% Rp 6,938,550
Sedot lumpur&air dlm spunpile dg pompa& ember 342.00 ttk 10,000 3,420,000 50% Rp 1,710,000.00 30% Rp 1,026,000 80% Rp 2,736,000
Potong Pancang 18.00 ttk 50,000 900,000 100% Rp 900,000.00 Rp - 100% Rp 900,000

Area 09
Install penengkal petir 1,440.00 m1 5,000 7,200,000 25% Rp 1,800,000.00 40% Rp 2,880,000 65% Rp 4,680,000
Sedot lumpur dan air dalam spun pile 332.00 ttk 10,000 3,320,000 30% Rp 996,000.00 40% Rp 1,328,000 70% Rp 2,324,000
Potong Pancang 6.00 ttk 50,000 300,000 100% Rp 300,000.00 Rp - 100% Rp 300,000

Area 06
Install penengkal petir 616.00 m1 5,000 3,080,000 25% Rp 770,000.00 75% Rp 2,310,000 100% Rp 3,080,000
Sedot lumpur dan air dalam spun pile 114.00 ttk 10,000 1,140,000 100% Rp 1,140,000.00 Rp - 100% Rp 1,140,000
Potong Pancang 4.00 ttk 50,000 200,000 100% Rp 200,000.00 Rp - 100% Rp 200,000

Area 10
Install penengkal petir 377.25 m1 5,000 1,886,250 25% Rp 471,562.50 20% Rp 377,250 45% Rp 848,813
Sedot lumpur dan air dalam spun pile 108.00 ttk 10,000 1,080,000 34% Rp 367,200.00 20% Rp 216,000 54% Rp 583,200
Potong Pancang ttk 50,000 - 100% Rp - Rp - 100% Rp -
Unit Price 单价 (Rp) LAST PERIOD TOTAL OF PERIOD
No Item of Works Volume Unit Total
Labor Price THIS PERIOD REMARK
ACCUMULATIVE ACCUMULATIVE
序号 说明 数量 单位 人工单价 单项总和

Area 06
a Potong embeded plat spunpile karena diameter 114.00 ttk 5,000 570,000 Rp - 100% Rp 570,000 100% Rp 570,000
dariowner kebesaran
b Las embeded besi stek spunpile 114.00 ttk 5,000 570,000 Rp - 100% Rp 570,000 100% Rp 570,000

c Las stek D13 spunpile ke besi pilecap 6 pcs/spunpile 114.00 ttk 20,000 2,280,000 Rp - 100% Rp 2,280,000 100% Rp 2,280,000

d
Pasang plat grounding penangkal petir dalam tiebeam
dan dalam pilecap (termasuk las sambungan, las siku 300.00 m1 20,000 6,000,000 Rp - 100% Rp 6,000,000 100% Rp 6,000,000
perempatan, las ke kolom, las ke besi spunpile)

Area 10
a Potong embeded plat spunpile karena diameter 108.00 ttk 5,000 540,000 Rp - 50% Rp 270,000 50% Rp 270,000
dariowner kebesaran
b Las embeded besi stek spunpile 108.00 ttk 5,000 540,000 Rp - 50% Rp 270,000 50% Rp 270,000

c Las stek D13 spunpile ke besi pilecap 6 pcs/spunpile 108.00 ttk 20,000 2,160,000 Rp - 50% Rp 1,080,000 50% Rp 1,080,000

d Pasang plat grounding penangkal petir dalam tiebeam


dan dalam pilecap (termasuk las sambungan, las siku 50.00 m1 20,000 1,000,000 Rp - 50% Rp 500,000 50% Rp 500,000
perempatan, las ke kolom, las ke besi spunpile)

Area 9
a Potong embeded plat spunpile karena diameter
332.00 ttk 5,000 1,660,000 Rp - 50% Rp 830,000 50% Rp 830,000
dariowner kebesaran
b Las embeded besi stek spunpile 332.00 ttk 5,000 1,660,000 Rp - 50% Rp 830,000 50% Rp 830,000

c Las stek D13 spunpile ke besi pilecap 6 pcs/spunpile 332.00 ttk 2,000 664,000 Rp - 50% Rp 332,000 50% Rp 332,000

d
Pasang plat grounding penangkal petir dalam tiebeam
dan dalam pilecap (termasuk las sambungan, las siku 212.00 m1 20,000 4,240,000 Rp - 50% Rp 2,120,000 50% Rp 2,120,000
perempatan, las ke kolom, las ke besi spunpile)

- Bongkar besi dan geser geser area pabrikasi 100,000.00 kg 400 40,000,000 Rp - 50% Rp 20,000,000 50% Rp 20,000,000

- Bantu sedot air hujan masukkegalian 140.00 org 100,000 14,000,000 Rp - 100% Rp 14,000,000 100% Rp 14,000,000
Selama 2 minggu / 14 hari @ 10 org

Cor area pabrikasi besi baru


Pekerjaan Perapihan tanah setelah rata exa area
a 110.00 m2 5,000 550,000 Rp - 100% Rp 550,000 100% Rp 550,000
Form work
Pekerjaan Perapihan tanah setelah rata exa area
b 110.00 m2 5,000 550,000 Rp - 100% Rp 550,000 100% Rp 550,000
Ronbar fabrication
c Begisting tepi tinggi 10 cm area formwork 5.40 m2 40,000 216,000 Rp - 100% Rp 216,000 100% Rp 216,000
d Begisting tepi tinggi 10 cm area ronbar fabrication 5.40 m2 40,000 216,000 Rp - 100% Rp 216,000 100% Rp 216,000
e Cor lantai beton tebal 10 cm area formwork 110.00 m2 19,000 2,090,000 Rp - 100% Rp 2,090,000 100% Rp 2,090,000
f Cor lantai beton tebal 10 cm area ronbar fabricaton 110.00 m2 19,000 2,090,000 Rp - 100% Rp 2,090,000 100% Rp 2,090,000

TOTAL PEKERJAAN. 单项总和 - Rp 34,920,312.50 Rp 71,938,050.00 Rp 106,858,362.50